{"canonical":"https://sealedbidder.com/opportunities/36c25026q0261","key":"36C25026Q0261","url":"https://sealedbidder.com/opportunities/36c25026q0261","title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers FINAL","solicitation_number":"36C25026Q0261","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-04-15T16:00:00Z","first_posted":"2026-03-18","last_posted":"2026-04-15","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"811210","psc":"H359","set_aside":"VSA","place_state":"OH","place_scope":"site","site":null,"place_state_source":"sam_zip","place_evidence":null,"place_county":"39035","place_county_name":"Cuyahoga County","place_city":"3916000","place_city_name":"Cleveland","winner":"TEKTON CC, LLC","award_amount":null,"publications":[{"notice_id":"178ea3261ce9441291195baa30008bf2","title":"H359--CS | Automatic Transfer Switch Maintenance and Repair","solicitation_number":"36C25026Q0261","notice_type":"k","base_type":"k","posted":"2026-03-18","posted_at":"2026-03-18T17:32:31.593Z","due_at":"2026-04-15T16:00:00Z","due_date":"2026-04-15","cancelled":false,"archived":true,"archive_date":"2026-06-14","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/178ea3261ce9441291195baa30008bf2/view","enriched":true,"history":[{"index":5,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers FINAL","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-15T15:55:51.515Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"5fb838c6729b4630bc217bc40cbecf26","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":3,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers UDPATED","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-27T16:27:45.146Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"83d1867fc8d449ebb6474ab98ecda3a0","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":2,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-23T15:24:23.003Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"9b537cf6c6884446a97055c661cd7ea4","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":1,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-18T17:32:31.593Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"178ea3261ce9441291195baa30008bf2","solicitation_number":"36C25026Q0261"}]},{"notice_id":"9b537cf6c6884446a97055c661cd7ea4","title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers","solicitation_number":"36C25026Q0261","notice_type":"k","base_type":"k","posted":"2026-03-23","posted_at":"2026-03-23T15:24:23.003Z","due_at":"2026-04-15T16:00:00Z","due_date":"2026-04-15","cancelled":false,"archived":true,"archive_date":"2026-06-14","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9b537cf6c6884446a97055c661cd7ea4/view","enriched":true,"history":[{"index":5,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers FINAL","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-15T15:55:51.515Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"5fb838c6729b4630bc217bc40cbecf26","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":3,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers UDPATED","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-27T16:27:45.146Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"83d1867fc8d449ebb6474ab98ecda3a0","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":2,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-23T15:24:23.003Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"9b537cf6c6884446a97055c661cd7ea4","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":1,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-18T17:32:31.593Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"178ea3261ce9441291195baa30008bf2","solicitation_number":"36C25026Q0261"}]},{"notice_id":"83d1867fc8d449ebb6474ab98ecda3a0","title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers UDPATED","solicitation_number":"36C25026Q0261","notice_type":"k","base_type":"k","posted":"2026-03-27","posted_at":"2026-03-27T16:27:45.146Z","due_at":"2026-04-15T16:00:00Z","due_date":"2026-04-15","cancelled":false,"archived":true,"archive_date":"2026-06-14","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/83d1867fc8d449ebb6474ab98ecda3a0/view","enriched":true,"history":[{"index":5,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers FINAL","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-15T15:55:51.515Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"5fb838c6729b4630bc217bc40cbecf26","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":3,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers UDPATED","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-27T16:27:45.146Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"83d1867fc8d449ebb6474ab98ecda3a0","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":2,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-23T15:24:23.003Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"9b537cf6c6884446a97055c661cd7ea4","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":1,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-18T17:32:31.593Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"178ea3261ce9441291195baa30008bf2","solicitation_number":"36C25026Q0261"}]},{"notice_id":"5fb838c6729b4630bc217bc40cbecf26","title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers FINAL","solicitation_number":"36C25026Q0261","notice_type":"k","base_type":"k","posted":"2026-04-15","posted_at":"2026-04-15T15:55:51.515Z","due_at":"2026-04-15T16:00:00Z","due_date":"2026-04-15","cancelled":false,"archived":true,"archive_date":"2026-06-14","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5fb838c6729b4630bc217bc40cbecf26/view","enriched":true,"history":[{"index":5,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers FINAL","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-15T15:55:51.515Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"5fb838c6729b4630bc217bc40cbecf26","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":3,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers UDPATED","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-27T16:27:45.146Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"83d1867fc8d449ebb6474ab98ecda3a0","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":2,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-23T15:24:23.003Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"9b537cf6c6884446a97055c661cd7ea4","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":1,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-18T17:32:31.593Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"178ea3261ce9441291195baa30008bf2","solicitation_number":"36C25026Q0261"}]}],"latest_notice_id":"5fb838c6729b4630bc217bc40cbecf26","first_type":"k","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-03-18","posted_at":"2026-03-18T17:32:31.593Z","created_at":"2026-03-18T17:32:29.359Z","modified_at":"2026-06-15T04:00:05.990Z","response_deadline":{"raw":"2026-04-15T12:00:00-04:00","utc":"2026-04-15T16:00:00Z","date":"2026-04-15","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/178ea3261ce9441291195baa30008bf2/view"},"naics":{"codes":["811210"],"primary":"811210"},"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-14","archive_type":"auto_custom"},"history":[{"index":5,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers FINAL","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-15T15:55:51.515Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"5fb838c6729b4630bc217bc40cbecf26","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":3,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers UDPATED","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-27T16:27:45.146Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"83d1867fc8d449ebb6474ab98ecda3a0","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":2,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-23T15:24:23.003Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"9b537cf6c6884446a97055c661cd7ea4","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":1,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-18T17:32:31.593Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"178ea3261ce9441291195baa30008bf2","solicitation_number":"36C25026Q0261"}],"contacts":[{"name":"April Fawley","role":"primary","email":"april.fawley@va.gov","phone":"734-222-4360","title":"Contract Specialist"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"178ea3261ce9441291195baa30008bf2","set_aside":{"code":"VSA","label":"Veteran-Owned Small Business Set-Aside (Department of Veterans Affairs)"},"lineage_id":"178ea3261ce9441291195baa30008bf2","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-11T01:09:42.319076640Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"edd7410988b21650395fe661613dc3e068343c8f33cf40e647b332a7ccecd595","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-11T01:09:42.319076640Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"DESCRIPTION:  This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format Revolutionary FAR Overhaul (RFO) in Federal Acquisition Regulation (FAR) subpart 12.202,  Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services,  as supplemented with additional information included in this notice. This announcement constitutes only solicitation; quotes are being requested, and a written solicitation document will not be issued.\n\nSolicitation Number 36C25026Q0261 is being issued as a Request for Quote (RFQ) and the intent is to award a firm fixed price for Automatic Transfer Switch, Maintenance and Repair services. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-06.Â  \n\nThe requirement is set-aside for a Veterans Owned Small Business for commercial items under the North Atlantic Industrial Classification System (NAICS) 811210   Electronic and Precision Equipment Repair and Maintenance.  The FSC/PSC is H359   Inspection   Electrical and Electronic Equipment Components.\n \nREQUIREMENTS: The Louis Stokes Cleveland VA Medical Center is seeking contractors that can provide maintenance and repair for Automatic Transfer Switches located at the Wade Park facility (10701 East Blvd Cleveland, OH 44106). \n\nPROVISIONS AND CLAUSES: This combined synopsis lists one or more clauses by reference with the same force and effect as if they were given in full text (RFO 52.252-2). The provisions at RFO 52.212-1, Instructions to Offerors-Commercial Items, apply to this acquisition with the following addendum to the provisions of the standard provisions.  In accordance with RFO 52.212-2 Evaluation-Commercial Items all offers will be considered under Comparative Analysis. The Government will award a contract resulting from this solicitation to the offer responsible, whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.  The following factors shall be used to evaluate offers. \n\nBest Value\nTechnical and past performance, when combined, is more important than price.  \n\nNOTE: The Government reserves the right to award without discussions, vendors shall submit the most favorable terms. Small Businesses are encouraged to contract their nearest Procurement Technical Assistance Center (PTAC) if assistance is needed in preparing their quote. \n\nELECTRONIC INVOICE SUBMISSION: The Department of Veterans Affairs (VA Financial Service Center (FSC) is the designated agency office for invoice receipt in accordance with the Prompt Payment Act (5 CFR part 1315).  FSC or its designated representative may contact the vendor to provide specific instructions for electronic submission of invoices.  The vendor will be responsible for any associated expenses.  FSC may utilize third-party contractors to facilitate invoice processing.  Prior to contact by FSC or its designated representative for electronic invoicing submissions, the vendor shall continue to submit all invoices to FSC at the following mailing address: Department of Veterans Affairs, Financial Services Center, and PO Box 149971, Austin, TX 78714-8971. \n\nOfferors shall complete FAR 52.212-3 Offerors Representations and Certifications-Commercial Items available for online registration at https://sam.gov/entity-registration or include a written copy with the quote submitted. The clauses that applies to this solicitation are:\n\n52.203-16 PREVENTING PERSONAL CONFLICTS OF INTEREST \n52.204-7 (SAM registration) the successful offeror must be registered with the System Award Management (SAM) to be awarded a contract, you may register easily and quickly on-line at http://www.sam.gov\n52.212-4 Contract Terms and Conditions-Commercial Items, applies to this acquisition, to include the following addendum to the clause: \nADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS COMMERCIAL ITEMS: Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The following clauses are incorporated into 52.212-4 as an addendum to this contract:\n52.217-8 OPTION TO EXTEND SERVICES \n52.217-9-OPTION TO EXTEND THE TERM OF THE CONTRACT\n52.232-18 AVAILABILITY OF FUNDS \n52.237-3 CONTINUITY OF SERVICES\n52.252-2 CLAUSES INCORPORATED BY REFERENCE \nFAR Number\nTitle\nDate\n52.204-13\nSYSTEM FOR AWARD MANAGEMENT MAINTENANCE\nOCT 2018\n52.204-18\nCOMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE\nAUG 2020\n852.242-71\nADMINISTRATIVE CONTRACTING OFFICER\nOCT 2020\nVAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS \nVAAR 852.237-70 (Contractor Responsibility) \n852.2370-4 (Commercial Advertising).  \n\n(End of Addendum to 52.212-4)\n\n52.212-5, Contract Terms and Conditions Required to Implement Statues or Executive Orders-Commercial Items, applies to this acquisition which shall include the following clauses by reference.  Clauses: 52.203-6, 52.217-8, 52.217-9, 52.219-4, 52.219-8, 52.219-23 alt1, 52.222-21, 52.222-26, 52.222-35, 52.222 36, 52.222-37, 52.222-42 Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67): This Statement is for Information Only: It is not a Wage Determination. This is for Instruction Only. The Contractor is responsible for the correct title classification of workers and compliance with all DOL applicable wage and hour laws and assume all related risks. The VA is not responsible for wage determinations and classifications.\n\nWAGE DETERMINATION LIST: 2015-4727 REVISION NUMBER 28\n52.225-3 Alternate I. The preceding Federal Acquisition Regulations (FAR) clauses and provisions may be accessed on the Internet at http://www.arnet.gov/far. The preceding Veterans Administration (VAAR) clauses and provisions may be accessed on the Internet at http://www.va.gov/oa&mmlvarr/. To receive credit as a Service Disabled Veteran Owned Small Business, an offeror must be registered and verified in Vendor Information Pages (VIP) database. (http://www.VetBiz.gov) prior to submitting a quote.\n\n \nEVALUATION CRITERIA\nThe Government will award a contract resulting from this solicitation to the offer responsible, whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.  The following factors should be used to evaluate offers:  \n\nBest Value:   \nTechnical and past performance, when combined, is more important than price.  \n\nWORK REQUIRED BY OTHERS\nAll work required by others shall be identified under this section by the Bidder.\n\n52.212-2 EVALUATION COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)\n\nThe Government intends to award a contract resulting from this solicitation to the responsible quoter whose quote, conforming to the solicitation, offers the lowest price and whose quote is evaluated to be acceptable under the technical acceptability standard described below. Quotes will be evaluated and ranked by total price, ranging from lowest to highest. The lowest-priced quote will be evaluated as acceptable or unacceptable based on the technical acceptability standard established in the solicitation.  In the event the Government determines the lowest price quote to be technically unacceptable, the next lowest-price quote will be evaluated. This process will continue until an award ceremony can be held. \n\nTo be determined technically acceptable: The quote provided for an evaluation is based on the contractor s ability to meet all requirements of the solicitation and will be considered technically acceptable if they are able to meet all requirements of the solicitation. \n\n\n \nSTATEMENT OF WORK\nContract Title\n\nAutomatic Transfer Switch, Maintenance and Repair\nBackground  \nThe Louis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106, is seeking a qualified contractor to provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site full maintenance and repair of government owned Automatic Transfer Switches.  Full maintenance includes on-site maintenance and annual preventative maintenance inspections (PMI s) intended to keep equipment maintained in first class operating condition and must comply with all requirements of the latest revised edition (as of the date bids are taken) of the National Electric Code NFPA70 and Electrical Safety in the Work place NFPA70E, Life Safety Code NFPA 101 and all other applicable laws, regulations, ordinances, codes, etc.\n\nScope \n\nVendor shall provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site full preventative maintenance inspections (PMI s) and intervening service calls for 47 government owned Automatic Transfer Switches located at the Wade Park facility of the Cleveland VA Medical Center, located at 10701 East Blvd., Cleveland, Ohio 44106.  \n\nContractor will provide full on-site maintenance and preventative maintenance inspections (PMI s), as specified, on the equipment that follows:  \n\nThis shall include full 24/7 on-call maintenance and minor repair of all Transfer Switches covered under contract.  Price is to be quoted at a fixed hourly rate and is to include parts associated with the repair.  \n\nAutomatic Transfer Switch manufacturers include but are not limited to: ASCO, GE, Zenith. \n\nÂ \nATS DESIGNATION\nSERIAL\nLOCATION\nTYPE\nTransition\n1\nATS-1\n141861-1\nBA-151\nBYPASS \nOpen Transition\n2\nATS-2 CRSBAC1\n1975553 WE\nBA-151\nBYPASS \nClosed Transition\n3\nATS-3 EQSBAC1\n141862\nBA-151\nBYPASS \nDelay Transition\n4\nATS-4 EQSBAC2\n1597882\nBA-151\nBYPASS \nDelay Transition\n5\nATS-5\n2394370-001WE\nBD-412A\nBYPASS \nClosed Transition\n6\nATS-6 DPHKB1 EQ\n546210 WE\nBF-458\nBYPASS \nOpen Transition\n7\nATS-7 DPHKB1 LS\n530199 RE\nBF-458\nNON BYPASS\nOpen Transition\n8\nATS-8\n2394371-001WE\nBD-412A\nBYPASS \nClosed Transition\n9\nATS-11\n668361001\n105\nBYPASS \nOpen Transition\n10\nATS-12\n713077001\n105\nBYPASS \nOpen Transition\n11\nATS-13\n668361-002FP\n105\nBYPASS \nOpen Transition\n12\nATS-14 ELE72\n197818\n7000 PH\nNON BYPASS\nOpen Transition\n13\nATS-15\n1656995 WE\nBE-601\nBYPASS \nClosed Transition\n14\nATS-16 DPNB1 CR\n271685 FP\nBE-261\nBYPASS \nOpen Transition\n15\nATS-17 DPNB1 EQ\n268904 FP\nBE-261\nBYPASS \nDelay Transition\n16\nATS-18 DPNB1 LS\n268903 FP\nBE-261\nNON BYPASS\nOpen Transition\n17\nATS-19 DPNB1 CATH\n282767 FP\nBE-261\nBYPASS \nOpen Transition\n18\nATS-20\n422369 WE\n2B-900\nBYPASS \nOpen Transition\n19\nATS-21 SBMW1 EQ\n422514WE\n2D-900\nBYPASS \nOpen Transition\n20\nATS-22\n2394372-001 WE\nBD-412A\nBYPASS \nClosed Transition\n21\nATS-23 HBCR1\n506511-002WE\nBD-422\nBYPASS \nOpen Transition\n22\nATS-24 HBLS1\n506512 WE\nBD-422\nBYPASS \nOpen Transition\n23\nATS-25 HBEQ1\n506511-001WE\nBD-422\nBYPASS \nOpen Transition\n24\nATS-26 DPHL72-EQ\n1259263 WE\nBD-424\nBYPASS \nClosed Transition\n25\nATS-30\n1573577\nBD-424\nBYPASS \nClosed Transition\n26\nATS-33 CATS1\n504834-001 WE\n1F-192B\nBYPASS \nClosed Transition\n27\nATS-34 CATS2\n504834-002 WE\n1F-192B\nBYPASS \nClosed Transition\n28\nATS-35 LATS\n504835-001 WE\n1F-192B\nBYPASS \nClosed Transition\n29\nATS-36 EATS1\n504835-002 WE\n1F-192A\nBYPASS \nClosed Transition\n30\nATS-37 EATS2\n492315 WE\nPF-105\nBYPASS \nClosed Transition\n31\nATS-38 EATS3\n492314 WE\nPF-105\nBYPASS \nClosed Transition\n32\nATS-39 LS1\n600186-002 WE\nLAB WH PENTHOUSE\nBYPASS \nOpen Transition\n33\nATS-40 C2\n600186-001 WE\nLAB WH PENTHOUSE\nBYPASS \nOpen Transition\n34\nATS-41 TELEDATA-ATS\n1005140 WE\n2B-502\nBYPASS \nOpen Transition\n35\nATS-42 RAD2ATSG1\n503355 WE\n2B-502\nBYPASS \nOpen Transition\n36\nATS-43\n606154 WE\n7TH FLOOR PH\nBYPASS \nOpen Transition\n37\nATS-44\n606153 WE\n7TH FLOOR PH\nBYPASS \nOpen Transition\n38\nATS-45\n606152-001 WE\n7TH FLOOR PH\nBYPASS \nOpen Transition\n39\nATS-46\n606152-002 WE\n7TH FLOOR PH\nBYPASS \nOpen Transition\n40\nATS-47 C3\n53381\nLAB WH PENTHOUSE\nNON ASCO - EATON \nUnknown\n41\nATS-48 CR1\n1648909-1\n2F-501D PENTHOUSE\nNON ASCO - ABB/ZENEITH\nUnknown\n42\nATS-49 RADBATSC1\n1023891 WE\nBA-551\nBYPASS \nOpen Transition\n43\nATS-50 RADBATSG1\n1058375 WE\nBA-551\nBYPASS \nOpen Transition\n44\nATS-51\n1259264 RE\nBE-601\nNON BYPASS\nOpen Transition\n45\nATS-52\n1259265 RE\nBE-601\nNON BYPASS\nOpen Transition\n46\nATS-65\n1265363 WE\nBE-603\nBYPASS \nClosed Transition\n47\nMTS-1 / EC3B\n1684822 WE\nBE-603\nNON BYPASS - MANUAL TRANSFER SWITCH\nOpen Transition\n\n\nINSPECTION OF EQUIPMENT AND CONDITIONS AT JOB SITE\n\nÂ Â Â Â Â Â Â Â Â Â Â  Prior to bidding, it shall be the responsibility of the bidder to visit the job site and inspect each ATS to establish to his satisfaction the condition of the ATS equipment to be maintained and any other conditions affecting the work to be performed, this includes ATSs that are of different manufactures. This equipment is offered in an \"as is\" condition.Â  No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract.\nÂ Â Â Â Â Â Â Â Â Â Â  \nWIRING DIAGRAMS\n\nÂ Â Â Â Â Â Â Â Â Â Â  Contractor shall provide the Department of Veterans Affairs with a set of reproducible wiring diagrams covering all changes, modifications, etc., which take place during the contract term.Â  These reproducible wiring diagrams are to be furnished to the Department of Veterans Affairs immediately following modifications.\n\nPERFORMANCE REPORTS\nÂ Â Â Â Â Â Â Â Â Â Â  \nÂ Â Â Â Â Â Â Â Â Â Â  At the end of each three hundred and sixty (360) day period the Contractor shall provide the VA Point of Contact (POC) a report of performance to review performance and scheduled major repairs contemplated during the next three hundred sixty (360) day period.Â  The Contractor shall submit written work orders and performance reports, and invoices no later than seven days at the end of each equipment service date during the twelve (12) month period.\n\nSCHEDULED MAINTENANCE\n\nÂ Â Â Â Â Â Â Â Â Â Â  All preventive maintenance performed by the Contractor shall be scheduled on each Automatic transfer switch by a certified and licensed ATS contractor prior to commencement of the contract and subject to final approval of the Department of Veterans Affairs POC. All service inspections and maintenance shall take place at the beginning of the month to allow the proper documentation to be included in that month s PMs. If any ATS maintenance and/or repair work is performed outside of normal working hours, only the bonus portion of the overtime hours work will be billed.\n\nÂ Â Â Â Â Â Â Â Â Â Â  The preventive maintenance schedule, as prepared by the Contractor, shall show Department of Veterans Affairs name, ATS serial numbers, examination frequency, examination hours and be keyed to a preventive maintenance schedule prepared for the specific equipment covered by this specification. Number of ATSs, serial numbers, line and load locations is outlined in the  Automatic Transfer Switches  section.\n\nExamine: The Contractor shall examine the equipment on a regular interval as set forth above.\nWhen, as a result of an examination, corrective action is found to be the responsibility of the Contractor, the Contractor shall proceed immediately to make (or cause to be made) replacements, repairs and corrections.Â  When such work is determined not to be the Contractor's responsibility, a written report, signed by the Contractor, shall be delivered to the Department of Veterans Affairs for further action.\n\nItems of an emergency nature shall be communicated to the Department of Veterans Affairs immediately and followed up in written form.\n\nExaminations of the equipment shall follow the basic procedures recognized by the transfer switch service industry.\n\nClean: The Contractor shall clean all equipment and its surroundings before exiting the area. Cleaning of the equipment shall occur annually to maintain a professional appearance and preserve the life of the equipment.Â  \n\nPaint: The Contractor shall maintain a professional appearance, prevent rusting, and preserve the equipment. All paint should be suitable for the purpose intended and be of a high quality.Â  Application of the paint shall, in all circumstances, comply with applicable local codes and/or current ANSI codes.\n\nLubricate: The Contractor shall lubricate all moving parts of the equipment.Â  Lubricants shall be applied at intervals recommended by the equipment manufacturer or as dictated through use of the equipment.Â  All lubricants shall be suitable for the purpose intended and shall meet or exceed the minimum requirements specified by the manufacturer of the equipment to which the lubricant is applied.\n\nAdjust: The Contractor shall adjust the equipment.Â  Adjustments shall be made as necessary and when the operation of the equipment varies from its normal or originally designed performance standards, because of normal wear and use.Â  \n\nQualified individuals properly trained and equipped with tools and instruments, and employees of the awarded Contractor shall make adjustments.Â  Adjustments shall be made at regular intervals frequent enough to maintain the Automatic Transfer Switch in optimum operating condition.\n\nParts or assemblies which have worn (or otherwise deteriorated) beyond \"normal\" adjustment limits shall be replaced as provided for under the \"Replace\" and/or \"Repair\" section of this specification.\n\nReplace: The Contractor shall, when required, \"replace\" items covered under the contract during the course of scheduled preventive maintenance when in the reasonable opinion of Department of Veterans Affairs such replacement will prevent an unscheduled shutdown and/or ensure the continued normal operation of the automatic transfer switch or which otherwise will extend the useful life of the ATS.Â  All replacements shall be made using original manufacturers  parts or Department of Veterans Affairs approved equal.\n\nRepairs:\n\nRepairs which are the responsibility of the Contractor:\nRepairs shall be made by the Contractor to ATS components covered by the agreement.Â  The Contractor shall make (or cause to be made) all repairs made necessary due to normal wear and use of the ATS system.Â  All repairs performed by the Contractor shall be completed in a timely manner and considered as repaired/rebuilt to like new condition.Â  No parts or equipment covered under this agreement may be permanently removed from the job site without written approval by the Department of Veterans Affairs. \n\nRepairs which are the responsibility of the Department of Veterans Affairs:\nRepairs shall be made by the Contractor, when authorized by the Department of Veterans Affairs where such repairs are not included in the contract.Â  The Contractor shall make (or cause to be made) all repairs made necessary for any reason during the term of the contract.Â  The Contractor shall supply all labor, materials, and supplies at the Contractor's usual billing rates.Â  Upon completion of all repair work, the Contractor shall submit to the Department of Veterans Affairs for payment an invoice detailing the nature of the work performed and related charges.Â  The repair billing rate shall be set forth in the bid document.\n\nPrior to any repairs being made by the Contractor, the Contractor shall submit a written proposal to the Department of Veterans Affairs to obtain formal approval to proceed.\n\nCallback Service: The ATS Contractor shall provide a 24/7  Answering/Call Center  for emergency response at no additional charge to the government. Additionally, Emergency callback service shall be provided between the hours of 6:00 AM and 6:00 PM at no additional charge to the government. For the purpose of this specification, a \"callback\" is a request from the Department of Veterans Affairs to the Contractor, requesting the Contractor to report to a specific ATS to correct any ATS problem and/or condition, which in the Owner/Manager's opinion needs attention before the Contractor's next scheduled preventive maintenance visit. Lamp and Signal Replacements shall be performed during on-the-spot maintenance visits.\nEmergency service during overtime working hours.\n\nThe Contractor shall provide 24-hour callback service. Should an  Authorized Representative  of the Department of Veterans Affairs request Emergency callback service outside of the normal working hours, the Contractor shall respond to an overtime callback within four (4) hours of the time reported to the Contractor.\n\n \nSPECIFIC TASKS\n\nTask 1 - Onsite Service and Repair  \n\nRequirement is for full service, twenty-four (24) hours per day, seven (7) days per week, including federal holidays.\n\nPerformance of Service: \nAll work shall be performed by competent personnel, experienced and qualified to work on specific equipment.  \nContractor shall arrive on-site in response to intervening emergency service calls within four (4) hours after a telephone call is placed by the COR, or designated Engineering Representative.  All work performed shall be accomplished in accordance with manufacturer s instructions, including, but not limited to, adjustments, calibrations, cleaning, lubrication, testing, disassembly, replacement of worn or defective parts, firmware and programming updates etc., necessary to keep the equipment in first-class operating condition.  \nAutomatic Transfer Switches shall include various manufactured brands.  A list of transfer switches and locations shall be provided upon the award of contract.  The list of transfer switches to be covered under this contract may change throughout the course of the multi-year agreement.  Any change to the inventory list will be amended in the contract by a modification signed by both the contracting officer and contractor.\nFor repairs or services performed during normal work hours, 7:00am to 3:30pm at the Wade Park facility, the contractor shall report to the Electric Shop, Room BE-440 (basement).  The contractor shall sign in and obtain a badge and return the badge at the end of the day.  After all the work is completed, the contractor shall again report in person to the rooms listed above and submit a written service report outlining the services performed and completed to include door locations and parts used.\nFor services performed after normal work hours, the contractor shall report to the Boiler Plant 1D-480 (first floor).  After all work is completed, the contractor shall again report in person to the Boiler Plant and submit the same report required above.\nSafety:\nContractor s maintenance of equipment shall satisfy all requirements as set forth by the Department of Health Education and Welfare, National Fire and Protection Agency (NFPA), Joint Commission on Accreditation of Hospital Organizations (JCAHO) and the state of Ohio.\nParts: \nAll necessary parts shall be included under this contract up to $2,000.00 per emergency service repair or annual inspection.  New or rebuilt parts shall be furnished by the contractor.  All parts shall be of current manufacture and have versatility with presently installed equipment.  All newly installed replacement parts become the property of the Government.  Replaced parts are to be disposed of by the contractor after obtaining approval from the COR.  Operating and consumable supplies are not a part of this contract.\nTest Equipment:  \nThe Wade Park VA Medical Center will not furnish and/or test equipment for the performance of this contract.  It is the responsibility of the contractor to bring the appropriate equipment and/or supplies necessary to complete the work required herein.\n \nTask 2 - Annual Preventative Maintenance  \n\nContractors should provide annual preventative maintenance inspections (PMI s) on each automatic transfer switch included in the maintenance agreement.   Contractors shall be required to coordinate annual preventative maintenance with the Contracting Officer s Representative (COR) no later than September of each year.  \nAnnual PM shall be completed during normal working hours in November of each year. \nUpon PM completion, functional transfer switch test with generator operation will be conducted to fully demonstrate all transfer switches function properly\nFunctional test will take place before normal working hours at 5am, or after normal working hours after 7pm.\nAnnual PM inspection reports shall be submitted to COR No Later Than 14 days after PM inspection completion.  \nTransfer Switch report shall indicate individual units pass or fail along with any recommended corrective action follow-up.\nPMIs shall be performed in accordance with the manufacturer s instructions and should include:\nMinimum Scope of maintenance and required PM Checklist:\n\n\nScope of Task for Maintenance Work\nTransfer Switch Status\n\n\nDe-energized\nEnergized\n1\nDe-energize the switchgear and engine start signals. \nYes\nNo\n2\nSecure and lockout normal and emergency disconnects. \nYes\nNo\n3\nRemove the arc chutes and pole covers. \nYes\nNo\n4\nVerify and record all sensing and time delay functions in the switchgear. \nYes\nYes\n5\nVacuums clean the accumulated dust from the switchgear and accessory panels.\nYes\nYes\n6\nInspect for moisture or signs of previous wetness or dripping. \nYes\nYes\n7\nRemove dirt and grime with an approved solvent. \nYes\nYes\n8\nClean and lubricate TS coil and operator linkage. \nYes\nYes\n9\nInspect all insulating parts for cracks or discoloration due to excessive heat. \nYes\nAs Allowed\n10\nInspect all main arcing contacts for excessive erosion. \nYes\nMeter\n11\nInspect all main current carrying contacts for pitting and discoloration due to excessive heat. \nYes\nYes\n12\nPerform contact resistance test on normal and emergency main contacts.\nYes\nMeter\n13\nInspect and clean all add-on panels and accessories. \nYes\nYes\n14\nInspect and clean all add-on panels and accessories. \nYes\nYes\n15\nRe-install arc chutes and pole covers. \nYes\nN/A\n16\nManually operate the main transfer movement to check proper contact alignment, deflection gap and wiping action and control contact operation.\nYes\nNo\n17\nCheck all cable and control wire connections to the transfer switch control and sensing panel \nYes\nControls Only\n18\nReconnect Engine Start. \nYes\nN/A\n19\nRe-energize the switchgear and conduct a test by simulating a normal source failure. \nYes\nAs Allowed\n20\nPerform millivolt drop readings across normal and emergency main contacts during transfer\nYes\nYes\n21\nPrepare Computer Generated Report of inspection for each piece of equipment and submit\nYes\nYes\n\nTask 3 - Additional requirements as follows, but not limited to:\n\nAll work to be performed by an ASCO factory authorized field service engineer.\nVendor to be an ASCO factory authorized dealer.\nPriority emergency service response.\nEmergency Service Calls at no additional charge\nDiscounts on replacement parts.\nDirect access to OEM repair parts.\nPrompt notification of factory upgrades and new product releases.\nAccess to the ASCO Services  Emergency Stock  of replacement transfer switches located strategically throughout the U.S.\nComputer generated service reports for all covered equipment.\n\nWithin fourteen (14) calendar days after the award, and prior to performing any services on the equipment, the contractor shall furnish two (2) copies of its preventative maintenance procedures/checklist which will be used during the preventative maintenance services of this contract.  The contractor will have fourteen (14) days to make necessary corrections or adjustments identified during preventative maintenance check.  The contractor shall provide written documentation of corrective action taken to repair items identified during preventative maintenance checks.\n\nThe contractor shall provide full maintenance and repair services to keep all transfer switches in premier operational condition.  Service calls shall be placed to the contractor who is to arrive on site to begin maintenance or repair work within four (4) hours of receiving the call.  \n\nDELIVERABLES\n\nUpon completion of annual PM, the contractor will provide a completed PM checklist to the COR indicating pass or failure for each transfer switch covered by this scope of work by the dates listed above. \n \nSOW Task#\nDeliverable Title\nFormat\nNumber\nCalendar Days After CO Start\n1\nService and Repair\nRequests submitted by COR\nN/A\nWithin 4 hours of call.\n2\nAnnual Inspection Report\nCOR provided checklist\nEmailed copy to COR\nNLT 14 days after inspection\n\nPERFORMANCE MONITORING\n\nCOR will ensure inspection reports are completed timely and uploaded into the VA maintenance records.  Performance monitoring will be conducted through QASP.\n\n \nCHECK-IN REQUIREMENTS\n\nThe Contractor Service Personnel and/or representative must report to the appropriate department Supervisor or designated point of contact (POC) to sign in with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out. \n\nSECURITY REQUIREMENTS\n\nThe C&A requirements do not apply, and a Security Accreditation Package is not required.\n\nDedicated personnel will be assigned solely to observe, interact, assist, and ensure protection of VA sensitive information. \nContractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation.Â \nGeneral Security\n\nContractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.\n\nVA Information Custodial Language \n\n11.1. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1). \n\n11.2. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.\n\nGovernment-Furnished Equipment (GFE)/Government-Furnished Information (GFI)  \n\nNo government furnished equipment will be issued to complete the requirements of this contract.\n\nOther Pertinent Information or Special Considerations \n\nThe awarded contractor must be able to access and source the necessary repair parts, hardware, software, firmware and programming for all automatic transfer switches installed within Louis Stokes VAMC.\n\n a.  Identification of Possible Follow-on Work.  \n\nAny additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work. \n\n b.  Identification of Potential Conflicts of Interest (COI). \n  None\n\n c.  Identification of Non-Disclosure Requirements. \n  Not Applicable\n\n d.  Packaging, Packing and Shipping Instructions.  \n  None\n\n e.  Inspection and Acceptance Criteria.  \n  Contractor will be responsible for meeting timelines listed in this SOW to include \n           annual inspection, inspection reports, and response to service calls. \n\nRISK CONTROL\n\nWork performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility.  \n\nPLACE OF PERFORMANCE\n\nLouis Stokes VA Medical Center \n10701 East Blvd\nCleveland, Ohio 44106\n\n\n \nQUALITY ASSURANCE SURVEILLANCE PLAN (QASP)\n1. PURPOSE\n\nThis Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract.  This QASP explains the following:\nWhat will be monitored.\nAutomatic Transfer Switch Annual Inspection\nAutomatic Transfer Switch Maintenance and Repair\nService call response.\n\nHow monitoring will take place.\nFacility Automatic Transfer Switch equipment list will be provided to contractor for equipment information and location.  \nCOR will provide COR with inspection checklists at beginning of each inspection.\nContractor will complete inspection and checklist.\nContractor will return checklist to COR no later than 14 days after the inspection. \nContractor will respond to the facility for service calls placed by COR or designated official within 4 hours.\n\nInventory Parts O- Hand Inspection\n\nThe vendor is to maintain and inventory all replacement on hand parts that are specified in the contract. \n\nPreventative Maintenance\n\nContractor will complete annual maintenance inspections. \n\nThis QASP does not detail how the contractor accomplishes the work.  Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract.  It is the Government s responsibility to be objective, fair, and consistent in evaluating performance. \n\nThis QASP is a  living document  and the Government may review and revise it on a regular basis.  However, the Government shall coordinate changes with the contractor.  Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.\n\n\n2. GOVERNMENT ROLES AND RESPONSIBILITIES\n \nThe following personnel shall oversee and coordinate surveillance activities.  \n\na. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.  The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor s performance.\n\nb. Contracting Officer s Technical Representative (COR) - The COR is responsible for technical administration of the contract and shall ensure proper Government surveillance of the contractor s performance. The COR shall keep a quality assurance file.  The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government s behalf.  \n\n3. CONTRACTOR REPRESENTATIVES\n\nThe following employees of the contractor serve as the contractor s program manager for this contract.  \n\nName/Title:______________________\n\n4. PERFORMANCE STANDARDS\n\nPerformance standards define desired services.  The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.  \n\nTask\nID\nIndicator\nStandard\nAcceptable Quality Level\nMethod of Surveillance\nIncentive\nVAMC needs Maintenance of Transfer Switches\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nCosts\n\n\n1\nAccessibility\nPeriodic Inspection- (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)\n100%\nCan be performed periodically or through 100% surveillance\nExercise of Option Period \n2\nProfessional Oversight\nContracted vendor will adhere to all State and Federal regulations for safety and patient privacy\n100%\nReview of State and corporate privacy policies\nExercise of Option Period \n3\nImplement VA policies on Medical Waste Removal Services\nContractor will implement and manage policies established by the VA, \n100%\nReview of reports and destruction\nrecords\nExercise of Option Period \n4\nCosts\nThe contractor will bill the VA correctly based on the terms of the contact\n100%\nReview of billing statements\nExercise of Option Period \n\nHIPPA Compliance\n5\nAdherence to HIPPA\nThe contractor must adhere to the provisions of HIPPA and the National Standards to Protect the Privacy and Security of Protected Health Information (PHI)\n100%\nDirect Observation and Validated User/Customer Complaints\nExercise of Option Period \n\n\nComments: ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________\n\n5. INCENTIVES\n\nThe Government shall use Exercise of Options (if any) and Past Performance as incentives.  Incentives shall be based on exceeding, meeting, or not meeting performance standards.  \n\n6. METHODS OF QA SURVEILLANCE \n\nVarious methods exist to monitor performance.  The COR shall use the surveillance methods listed below in the administration of this QASP. \n\na. DIRECT OBSERVATION.  The end user will sign into the web and perform a daily check on the temperature monitoring system.\n\nb. PERIODIC MONTHLY INSPECTION. Monthly flash reports will be produced and a meeting will be conducted to discuss ongoing issues.\n\nc. VALIDATED USER/CUSTOMER COMPLAINTS.  The Maximo work order system will be improvised. Written complaints from Staff and Patients will be documented and passed on to the Contracting Officer.\n\nd. PERIODIC SAMPLING. To be used if there is a problem/deficiency that is suspected.\n\ne. 100% INSPECTION.  Monitoring software provides 24/7 365 days a year system status and alerts.\n\nf. PROGRESS STANDARD MEETINGS. To be used based on the Contracting Officers Discretion.\n \n7. RATINGS\n\nMetrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level.  A rating scale shall be used to determine a positive, neutral, or negative outcome.  The following ratings shall be used:\n\nExcellent = Exceeds Standards\nSatisfactory = Meets Standards\nUnsatisfactory = Fails to Meet Standards\n\n8. DOCUMENTING PERFORMANCE\n\na.  ACCEPTABLE PERFORMANCE\n\nThe Government shall document positive performance.  Any report may become a part of the supporting documentation for any contractual action. \n\nb.  UNACCEPTABLE PERFORMANCE\n\nWhen unacceptable performance occurs, the COR shall inform the contractor.  This will normally be in writing unless circumstances necessitate verbal communication.  In any case the COR shall document the discussion and place it in the COR file.  \n\nWhen the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager.  \n\nThe contractor shall acknowledge receipt of the CDR in writing.  The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence.  The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COTR.  The Government shall review the contractor's corrective action plan to determine acceptability. \n\nAny CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. \n\n9. FREQUENCY OF MEASUREMENT\n\na. Frequency of Measurement.\n\nDuring contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.  \n\nb. Frequency of Performance Assessment Meetings.\n\nThe COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.  \n \nPERIOD OF PERFORMANCE\n\nBase Year: July 1, 2026, through June 30, 2027\nOption Year One: July 1, 2027, through June 30, 2028\nOne Year Two: July 1, 2028, through June 30, 2029\nOption Year Three: July 1, 2029, through June 30, 2030\nOption Year Four: July 1, 2030, through June 30, 2031\n\n\n\nPRICE/COST SCHEDULE\n\nITEM NUMBER\nDESCRIPTION OF SUPPLIES/SERVICES\nQUANTITY\nUNIT\nUNIT PRICE\nAMOUNT\n0001\n\n1.00\nYR\n_______\n_______________\n\n\nPerform Annual Maintenance of Transfer Switches.   \n\nContract Period: BASE YEAR\n\n\n\n1001\n\n\n1.00\n\nYR\n\n_______\n\n_______________\n\n\nPerform Annual Maintenance of Transfer Switches.   \n\nContract Period: OPTION YEAR 1 \n\n\n\n2001\n\n\n1.00\n\nYR\n\n_______\n\n_______________\n\nPerform Annual Maintenance of Transfer Switches.   \n\nContract Period: OPTION YEAR 2 \n\n\n\n3001\n\n\n1.00\n\nYR\n\n_______\n\n_______________\n\n\nPerform Annual Maintenance of Transfer Switches.   \n\nContract Period: OPTION YEAR 3\n\n\n\n4001\n\n                                                        1.00       YR     _______\n\nPerform Annual Maintenance of Transfer Switches.   \n\nContract Period: OPTION YEAR 4\n\n\n_______________\n\n\n\n\n\nGRAND TOTAL\n\n_______________\n\n\n \nTECHNICAL CAPABILITY EVALUATION APPROACH (no more than 10 pages). The contractors shall meet the following requirements:\n\nTechnical evaluation factors for an Automatic Transfer Switch (ATS) annual maintenance government contract must ensure that the contractor can safely and effectively maintain critical emergency power infrastructure in compliance with manufacturer specs and standards like NFPA 110. Key areas include technician qualifications, testing procedures, safety protocols, and documentation.Â \n\nContractor s field engineers must be OEM factory-trained and certified for the specific brands of ATS installed at this facility (e.g., ASCO, Zenith, GE) with ready access to repair parts and engineering service support, including aged or obsolete switches. \nContractors must be engaged in maintenance, repair, inspection, and testing of electrical power distribution equipment. Contractors must have a minimum of five (5) years, within the last five (5) years of successful experience maintaining power distribution equipment identical or like the equipment listed in this Statement of Work.\nElectrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) must be the primary interest/specialty of the Contractor s business.\nMust be NETA (InterNational Electrical Testing Association) certified technicians, with updated NETA certifications.\nMust be able to respond to emergencies 24/7.  \nContractor annual maintenance must include, at minimum, thermal scanning, cleaning, lubrication, torque check of all power connections, and calibration of voltage/frequency sensing relays.\nContractors must have the ability to inspect contact wear, pitting, and arc chutes.\nContractors must have the ability to verify the accuracy of the time-delay settings (e.g., engine start delay, emergency transfer delay, retransfer delay).\nPAST PERFORMANCE\nThe Past Performance Approach will be evaluated based on the offeror providing information regarding a minimum of two past performance references, previous experience providing Automatic Transfer Switch Maintenance.  The past performance must be within the last three (3) years. Offeror s examples of previous efforts should be of similar size and scope as described in the SOW.  Information should include agency name, location, description, and point of contact with phone number, contract or delivery order number, a brief scope of contract, and contract value, so that the government can evaluate past performance. \n\nThe Government will make determination of relevance.  If no past performance information is readily available. the Offeror s past performance will not be evaluated favorably or unfavorably. \n\nThe government will evaluate information in CPARS, FAPIIS, and personal knowledge of offerors.\n\nInclude the Point of Contact name, phone number, and email for this contract or project. The VA will call this Point of Contact to ask about the performance. \n\nPRICE EVALUATION APPROACH\nThe Government will evaluate quotes by adding the total of all line-item prices, including all years. The Government will evaluate price reasonableness and in an overall best value determination.\n   \n Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not oblige the Government to exercise the option(s).\n\nA written notice of the award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether there are negotiations after its receipt, unless a written notice of withdrawal is received before award.\n\nAll questions must be submitted to April Fawley, Contracting Specialist via e-mail only by March 20, 2026, by 12:00 p.m., Eastern Standard Time ( EST ).  All responses to questions that may affect offers will be incorporated into a written amendment to the solicitation.   Quotes and accompanying information are due via email, no later than April 15, 2026, by 12:00 p.m., EST.\n\nTechnical questions and Quotes must be sent by email to april.fawley@va.gov.","text":"DESCRIPTION: This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format Revolutionary FAR Overhaul (RFO) in Federal Acquisition Regulation (FAR) subpart 12.202, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes only solicitation; quotes are being requested, and a written solicitation document will not be issued.\n\nSolicitation Number 36C25026Q0261 is being issued as a Request for Quote (RFQ) and the intent is to award a firm fixed price for Automatic Transfer Switch, Maintenance and Repair services. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-06.Â\n\nThe requirement is set-aside for a Veterans Owned Small Business for commercial items under the North Atlantic Industrial Classification System (NAICS) 811210 Electronic and Precision Equipment Repair and Maintenance. The FSC/PSC is H359 Inspection Electrical and Electronic Equipment Components.\n\nREQUIREMENTS: The Louis Stokes Cleveland VA Medical Center is seeking contractors that can provide maintenance and repair for Automatic Transfer Switches located at the Wade Park facility (10701 East Blvd Cleveland, OH 44106).\n\nPROVISIONS AND CLAUSES: This combined synopsis lists one or more clauses by reference with the same force and effect as if they were given in full text (RFO 52.252-2). The provisions at RFO 52.212-1, Instructions to Offerors-Commercial Items, apply to this acquisition with the following addendum to the provisions of the standard provisions. In accordance with RFO 52.212-2 Evaluation-Commercial Items all offers will be considered under Comparative Analysis. The Government will award a contract resulting from this solicitation to the offer responsible, whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers.\n\nBest Value\nTechnical and past performance, when combined, is more important than price.\n\nNOTE: The Government reserves the right to award without discussions, vendors shall submit the most favorable terms. Small Businesses are encouraged to contract their nearest Procurement Technical Assistance Center (PTAC) if assistance is needed in preparing their quote.\n\nELECTRONIC INVOICE SUBMISSION: The Department of Veterans Affairs (VA Financial Service Center (FSC) is the designated agency office for invoice receipt in accordance with the Prompt Payment Act (5 CFR part 1315). FSC or its designated representative may contact the vendor to provide specific instructions for electronic submission of invoices. The vendor will be responsible for any associated expenses. FSC may utilize third-party contractors to facilitate invoice processing. Prior to contact by FSC or its designated representative for electronic invoicing submissions, the vendor shall continue to submit all invoices to FSC at the following mailing address: Department of Veterans Affairs, Financial Services Center, and PO Box 149971, Austin, TX 78714-8971.\n\nOfferors shall complete FAR 52.212-3 Offerors Representations and Certifications-Commercial Items available for online registration at https://sam.gov/entity-registration or include a written copy with the quote submitted. The clauses that applies to this solicitation are:\n\n52.203-16 PREVENTING PERSONAL CONFLICTS OF INTEREST\n52.204-7 (SAM registration) the successful offeror must be registered with the System Award Management (SAM) to be awarded a contract, you may register easily and quickly on-line at http://www.sam.gov\n52.212-4 Contract Terms and Conditions-Commercial Items, applies to this acquisition, to include the following addendum to the clause:\nADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS COMMERCIAL ITEMS: Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The following clauses are incorporated into 52.212-4 as an addendum to this contract:\n52.217-8 OPTION TO EXTEND SERVICES\n52.217-9-OPTION TO EXTEND THE TERM OF THE CONTRACT\n52.232-18 AVAILABILITY OF FUNDS\n52.237-3 CONTINUITY OF SERVICES\n52.252-2 CLAUSES INCORPORATED BY REFERENCE\nFAR Number\nTitle\nDate\n52.204-13\nSYSTEM FOR AWARD MANAGEMENT MAINTENANCE\nOCT 2018\n52.204-18\nCOMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE\nAUG 2020\n852.242-71\nADMINISTRATIVE CONTRACTING OFFICER\nOCT 2020\nVAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS\nVAAR 852.237-70 (Contractor Responsibility)\n852.2370-4 (Commercial Advertising).\n\n(End of Addendum to 52.212-4)\n\n52.212-5, Contract Terms and Conditions Required to Implement Statues or Executive Orders-Commercial Items, applies to this acquisition which shall include the following clauses by reference. Clauses: 52.203-6, 52.217-8, 52.217-9, 52.219-4, 52.219-8, 52.219-23 alt1, 52.222-21, 52.222-26, 52.222-35, 52.222 36, 52.222-37, 52.222-42 Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67): This Statement is for Information Only: It is not a Wage Determination. This is for Instruction Only. The Contractor is responsible for the correct title classification of workers and compliance with all DOL applicable wage and hour laws and assume all related risks. The VA is not responsible for wage determinations and classifications.\n\nWAGE DETERMINATION LIST: 2015-4727 REVISION NUMBER 28\n52.225-3 Alternate I. The preceding Federal Acquisition Regulations (FAR) clauses and provisions may be accessed on the Internet at http://www.arnet.gov/far. The preceding Veterans Administration (VAAR) clauses and provisions may be accessed on the Internet at http://www.va.gov/oa&mmlvarr/. To receive credit as a Service Disabled Veteran Owned Small Business, an offeror must be registered and verified in Vendor Information Pages (VIP) database. (http://www.VetBiz.gov) prior to submitting a quote.\n\nEVALUATION CRITERIA\nThe Government will award a contract resulting from this solicitation to the offer responsible, whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors should be used to evaluate offers:\n\nBest Value:\nTechnical and past performance, when combined, is more important than price.\n\nWORK REQUIRED BY OTHERS\nAll work required by others shall be identified under this section by the Bidder.\n\n52.212-2 EVALUATION COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)\n\nThe Government intends to award a contract resulting from this solicitation to the responsible quoter whose quote, conforming to the solicitation, offers the lowest price and whose quote is evaluated to be acceptable under the technical acceptability standard described below. Quotes will be evaluated and ranked by total price, ranging from lowest to highest. The lowest-priced quote will be evaluated as acceptable or unacceptable based on the technical acceptability standard established in the solicitation. In the event the Government determines the lowest price quote to be technically unacceptable, the next lowest-price quote will be evaluated. This process will continue until an award ceremony can be held.\n\nTo be determined technically acceptable: The quote provided for an evaluation is based on the contractor s ability to meet all requirements of the solicitation and will be considered technically acceptable if they are able to meet all requirements of the solicitation.\n\nSTATEMENT OF WORK\nContract Title\n\nAutomatic Transfer Switch, Maintenance and Repair\nBackground\nThe Louis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106, is seeking a qualified contractor to provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site full maintenance and repair of government owned Automatic Transfer Switches. Full maintenance includes on-site maintenance and annual preventative maintenance inspections (PMI s) intended to keep equipment maintained in first class operating condition and must comply with all requirements of the latest revised edition (as of the date bids are taken) of the National Electric Code NFPA70 and Electrical Safety in the Work place NFPA70E, Life Safety Code NFPA 101 and all other applicable laws, regulations, ordinances, codes, etc.\n\nScope\n\nVendor shall provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site full preventative maintenance inspections (PMI s) and intervening service calls for 47 government owned Automatic Transfer Switches located at the Wade Park facility of the Cleveland VA Medical Center, located at 10701 East Blvd., Cleveland, Ohio 44106.\n\nContractor will provide full on-site maintenance and preventative maintenance inspections (PMI s), as specified, on the equipment that follows:\n\nThis shall include full 24/7 on-call maintenance and minor repair of all Transfer Switches covered under contract. Price is to be quoted at a fixed hourly rate and is to include parts associated with the repair.\n\nAutomatic Transfer Switch manufacturers include but are not limited to: ASCO, GE, Zenith.\n\nÂ\nATS DESIGNATION\nSERIAL\nLOCATION\nTYPE\nTransition\n1\nATS-1\n141861-1\nBA-151\nBYPASS\nOpen Transition\n2\nATS-2 CRSBAC1\n1975553 WE\nBA-151\nBYPASS\nClosed Transition\n3\nATS-3 EQSBAC1\n141862\nBA-151\nBYPASS\nDelay Transition\n4\nATS-4 EQSBAC2\n1597882\nBA-151\nBYPASS\nDelay Transition\n5\nATS-5\n2394370-001WE\nBD-412A\nBYPASS\nClosed Transition\n6\nATS-6 DPHKB1 EQ\n546210 WE\nBF-458\nBYPASS\nOpen Transition\n7\nATS-7 DPHKB1 LS\n530199 RE\nBF-458\nNON BYPASS\nOpen Transition\n8\nATS-8\n2394371-001WE\nBD-412A\nBYPASS\nClosed Transition\n9\nATS-11\n668361001\n105\nBYPASS\nOpen Transition\n10\nATS-12\n713077001\n105\nBYPASS\nOpen Transition\n11\nATS-13\n668361-002FP\n105\nBYPASS\nOpen Transition\n12\nATS-14 ELE72\n197818\n7000 PH\nNON BYPASS\nOpen Transition\n13\nATS-15\n1656995 WE\nBE-601\nBYPASS\nClosed Transition\n14\nATS-16 DPNB1 CR\n271685 FP\nBE-261\nBYPASS\nOpen Transition\n15\nATS-17 DPNB1 EQ\n268904 FP\nBE-261\nBYPASS\nDelay Transition\n16\nATS-18 DPNB1 LS\n268903 FP\nBE-261\nNON BYPASS\nOpen Transition\n17\nATS-19 DPNB1 CATH\n282767 FP\nBE-261\nBYPASS\nOpen Transition\n18\nATS-20\n422369 WE\n2B-900\nBYPASS\nOpen Transition\n19\nATS-21 SBMW1 EQ\n422514WE\n2D-900\nBYPASS\nOpen Transition\n20\nATS-22\n2394372-001 WE\nBD-412A\nBYPASS\nClosed Transition\n21\nATS-23 HBCR1\n506511-002WE\nBD-422\nBYPASS\nOpen Transition\n22\nATS-24 HBLS1\n506512 WE\nBD-422\nBYPASS\nOpen Transition\n23\nATS-25 HBEQ1\n506511-001WE\nBD-422\nBYPASS\nOpen Transition\n24\nATS-26 DPHL72-EQ\n1259263 WE\nBD-424\nBYPASS\nClosed Transition\n25\nATS-30\n1573577\nBD-424\nBYPASS\nClosed Transition\n26\nATS-33 CATS1\n504834-001 WE\n1F-192B\nBYPASS\nClosed Transition\n27\nATS-34 CATS2\n504834-002 WE\n1F-192B\nBYPASS\nClosed Transition\n28\nATS-35 LATS\n504835-001 WE\n1F-192B\nBYPASS\nClosed Transition\n29\nATS-36 EATS1\n504835-002 WE\n1F-192A\nBYPASS\nClosed Transition\n30\nATS-37 EATS2\n492315 WE\nPF-105\nBYPASS\nClosed Transition\n31\nATS-38 EATS3\n492314 WE\nPF-105\nBYPASS\nClosed Transition\n32\nATS-39 LS1\n600186-002 WE\nLAB WH PENTHOUSE\nBYPASS\nOpen Transition\n33\nATS-40 C2\n600186-001 WE\nLAB WH PENTHOUSE\nBYPASS\nOpen Transition\n34\nATS-41 TELEDATA-ATS\n1005140 WE\n2B-502\nBYPASS\nOpen Transition\n35\nATS-42 RAD2ATSG1\n503355 WE\n2B-502\nBYPASS\nOpen Transition\n36\nATS-43\n606154 WE\n7TH FLOOR PH\nBYPASS\nOpen Transition\n37\nATS-44\n606153 WE\n7TH FLOOR PH\nBYPASS\nOpen Transition\n38\nATS-45\n606152-001 WE\n7TH FLOOR PH\nBYPASS\nOpen Transition\n39\nATS-46\n606152-002 WE\n7TH FLOOR PH\nBYPASS\nOpen Transition\n40\nATS-47 C3\n53381\nLAB WH PENTHOUSE\nNON ASCO - EATON\nUnknown\n41\nATS-48 CR1\n1648909-1\n2F-501D PENTHOUSE\nNON ASCO - ABB/ZENEITH\nUnknown\n42\nATS-49 RADBATSC1\n1023891 WE\nBA-551\nBYPASS\nOpen Transition\n43\nATS-50 RADBATSG1\n1058375 WE\nBA-551\nBYPASS\nOpen Transition\n44\nATS-51\n1259264 RE\nBE-601\nNON BYPASS\nOpen Transition\n45\nATS-52\n1259265 RE\nBE-601\nNON BYPASS\nOpen Transition\n46\nATS-65\n1265363 WE\nBE-603\nBYPASS\nClosed Transition\n47\nMTS-1 / EC3B\n1684822 WE\nBE-603\nNON BYPASS - MANUAL TRANSFER SWITCH\nOpen Transition\n\nINSPECTION OF EQUIPMENT AND CONDITIONS AT JOB SITE\n\nÂ Â Â Â Â Â Â Â Â Â Â Prior to bidding, it shall be the responsibility of the bidder to visit the job site and inspect each ATS to establish to his satisfaction the condition of the ATS equipment to be maintained and any other conditions affecting the work to be performed, this includes ATSs that are of different manufactures. This equipment is offered in an \"as is\" condition.Â No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract.\nÂ Â Â Â Â Â Â Â Â Â Â\nWIRING DIAGRAMS\n\nÂ Â Â Â Â Â Â Â Â Â Â Contractor shall provide the Department of Veterans Affairs with a set of reproducible wiring diagrams covering all changes, modifications, etc., which take place during the contract term.Â These reproducible wiring diagrams are to be furnished to the Department of Veterans Affairs immediately following modifications.\n\nPERFORMANCE REPORTS\nÂ Â Â Â Â Â Â Â Â Â Â\nÂ Â Â Â Â Â Â Â Â Â Â At the end of each three hundred and sixty (360) day period the Contractor shall provide the VA Point of Contact (POC) a report of performance to review performance and scheduled major repairs contemplated during the next three hundred sixty (360) day period.Â The Contractor shall submit written work orders and performance reports, and invoices no later than seven days at the end of each equipment service date during the twelve (12) month period.\n\nSCHEDULED MAINTENANCE\n\nÂ Â Â Â Â Â Â Â Â Â Â All preventive maintenance performed by the Contractor shall be scheduled on each Automatic transfer switch by a certified and licensed ATS contractor prior to commencement of the contract and subject to final approval of the Department of Veterans Affairs POC. All service inspections and maintenance shall take place at the beginning of the month to allow the proper documentation to be included in that month s PMs. If any ATS maintenance and/or repair work is performed outside of normal working hours, only the bonus portion of the overtime hours work will be billed.\n\nÂ Â Â Â Â Â Â Â Â Â Â The preventive maintenance schedule, as prepared by the Contractor, shall show Department of Veterans Affairs name, ATS serial numbers, examination frequency, examination hours and be keyed to a preventive maintenance schedule prepared for the specific equipment covered by this specification. Number of ATSs, serial numbers, line and load locations is outlined in the Automatic Transfer Switches section.\n\nExamine: The Contractor shall examine the equipment on a regular interval as set forth above.\nWhen, as a result of an examination, corrective action is found to be the responsibility of the Contractor, the Contractor shall proceed immediately to make (or cause to be made) replacements, repairs and corrections.Â When such work is determined not to be the Contractor's responsibility, a written report, signed by the Contractor, shall be delivered to the Department of Veterans Affairs for further action.\n\nItems of an emergency nature shall be communicated to the Department of Veterans Affairs immediately and followed up in written form.\n\nExaminations of the equipment shall follow the basic procedures recognized by the transfer switch service industry.\n\nClean: The Contractor shall clean all equipment and its surroundings before exiting the area. Cleaning of the equipment shall occur annually to maintain a professional appearance and preserve the life of the equipment.Â\n\nPaint: The Contractor shall maintain a professional appearance, prevent rusting, and preserve the equipment. All paint should be suitable for the purpose intended and be of a high quality.Â Application of the paint shall, in all circumstances, comply with applicable local codes and/or current ANSI codes.\n\nLubricate: The Contractor shall lubricate all moving parts of the equipment.Â Lubricants shall be applied at intervals recommended by the equipment manufacturer or as dictated through use of the equipment.Â All lubricants shall be suitable for the purpose intended and shall meet or exceed the minimum requirements specified by the manufacturer of the equipment to which the lubricant is applied.\n\nAdjust: The Contractor shall adjust the equipment.Â Adjustments shall be made as necessary and when the operation of the equipment varies from its normal or originally designed performance standards, because of normal wear and use.Â\n\nQualified individuals properly trained and equipped with tools and instruments, and employees of the awarded Contractor shall make adjustments.Â Adjustments shall be made at regular intervals frequent enough to maintain the Automatic Transfer Switch in optimum operating condition.\n\nParts or assemblies which have worn (or otherwise deteriorated) beyond \"normal\" adjustment limits shall be replaced as provided for under the \"Replace\" and/or \"Repair\" section of this specification.\n\nReplace: The Contractor shall, when required, \"replace\" items covered under the contract during the course of scheduled preventive maintenance when in the reasonable opinion of Department of Veterans Affairs such replacement will prevent an unscheduled shutdown and/or ensure the continued normal operation of the automatic transfer switch or which otherwise will extend the useful life of the ATS.Â All replacements shall be made using original manufacturers parts or Department of Veterans Affairs approved equal.\n\nRepairs:\n\nRepairs which are the responsibility of the Contractor:\nRepairs shall be made by the Contractor to ATS components covered by the agreement.Â The Contractor shall make (or cause to be made) all repairs made necessary due to normal wear and use of the ATS system.Â All repairs performed by the Contractor shall be completed in a timely manner and considered as repaired/rebuilt to like new condition.Â No parts or equipment covered under this agreement may be permanently removed from the job site without written approval by the Department of Veterans Affairs.\n\nRepairs which are the responsibility of the Department of Veterans Affairs:\nRepairs shall be made by the Contractor, when authorized by the Department of Veterans Affairs where such repairs are not included in the contract.Â The Contractor shall make (or cause to be made) all repairs made necessary for any reason during the term of the contract.Â The Contractor shall supply all labor, materials, and supplies at the Contractor's usual billing rates.Â Upon completion of all repair work, the Contractor shall submit to the Department of Veterans Affairs for payment an invoice detailing the nature of the work performed and related charges.Â The repair billing rate shall be set forth in the bid document.\n\nPrior to any repairs being made by the Contractor, the Contractor shall submit a written proposal to the Department of Veterans Affairs to obtain formal approval to proceed.\n\nCallback Service: The ATS Contractor shall provide a 24/7 Answering/Call Center for emergency response at no additional charge to the government. Additionally, Emergency callback service shall be provided between the hours of 6:00 AM and 6:00 PM at no additional charge to the government. For the purpose of this specification, a \"callback\" is a request from the Department of Veterans Affairs to the Contractor, requesting the Contractor to report to a specific ATS to correct any ATS problem and/or condition, which in the Owner/Manager's opinion needs attention before the Contractor's next scheduled preventive maintenance visit. Lamp and Signal Replacements shall be performed during on-the-spot maintenance visits.\nEmergency service during overtime working hours.\n\nThe Contractor shall provide 24-hour callback service. Should an Authorized Representative of the Department of Veterans Affairs request Emergency callback service outside of the normal working hours, the Contractor shall respond to an overtime callback within four (4) hours of the time reported to the Contractor.\n\nSPECIFIC TASKS\n\nTask 1 - Onsite Service and Repair\n\nRequirement is for full service, twenty-four (24) hours per day, seven (7) days per week, including federal holidays.\n\nPerformance of Service:\nAll work shall be performed by competent personnel, experienced and qualified to work on specific equipment.\nContractor shall arrive on-site in response to intervening emergency service calls within four (4) hours after a telephone call is placed by the COR, or designated Engineering Representative. All work performed shall be accomplished in accordance with manufacturer s instructions, including, but not limited to, adjustments, calibrations, cleaning, lubrication, testing, disassembly, replacement of worn or defective parts, firmware and programming updates etc., necessary to keep the equipment in first-class operating condition.\nAutomatic Transfer Switches shall include various manufactured brands. A list of transfer switches and locations shall be provided upon the award of contract. The list of transfer switches to be covered under this contract may change throughout the course of the multi-year agreement. Any change to the inventory list will be amended in the contract by a modification signed by both the contracting officer and contractor.\nFor repairs or services performed during normal work hours, 7:00am to 3:30pm at the Wade Park facility, the contractor shall report to the Electric Shop, Room BE-440 (basement). The contractor shall sign in and obtain a badge and return the badge at the end of the day. After all the work is completed, the contractor shall again report in person to the rooms listed above and submit a written service report outlining the services performed and completed to include door locations and parts used.\nFor services performed after normal work hours, the contractor shall report to the Boiler Plant 1D-480 (first floor). After all work is completed, the contractor shall again report in person to the Boiler Plant and submit the same report required above.\nSafety:\nContractor s maintenance of equipment shall satisfy all requirements as set forth by the Department of Health Education and Welfare, National Fire and Protection Agency (NFPA), Joint Commission on Accreditation of Hospital Organizations (JCAHO) and the state of Ohio.\nParts:\nAll necessary parts shall be included under this contract up to $2,000.00 per emergency service repair or annual inspection. New or rebuilt parts shall be furnished by the contractor. All parts shall be of current manufacture and have versatility with presently installed equipment. All newly installed replacement parts become the property of the Government. Replaced parts are to be disposed of by the contractor after obtaining approval from the COR. Operating and consumable supplies are not a part of this contract.\nTest Equipment:\nThe Wade Park VA Medical Center will not furnish and/or test equipment for the performance of this contract. It is the responsibility of the contractor to bring the appropriate equipment and/or supplies necessary to complete the work required herein.\n\nTask 2 - Annual Preventative Maintenance\n\nContractors should provide annual preventative maintenance inspections (PMI s) on each automatic transfer switch included in the maintenance agreement. Contractors shall be required to coordinate annual preventative maintenance with the Contracting Officer s Representative (COR) no later than September of each year.\nAnnual PM shall be completed during normal working hours in November of each year.\nUpon PM completion, functional transfer switch test with generator operation will be conducted to fully demonstrate all transfer switches function properly\nFunctional test will take place before normal working hours at 5am, or after normal working hours after 7pm.\nAnnual PM inspection reports shall be submitted to COR No Later Than 14 days after PM inspection completion.\nTransfer Switch report shall indicate individual units pass or fail along with any recommended corrective action follow-up.\nPMIs shall be performed in accordance with the manufacturer s instructions and should include:\nMinimum Scope of maintenance and required PM Checklist:\n\nScope of Task for Maintenance Work\nTransfer Switch Status\n\nDe-energized\nEnergized\n1\nDe-energize the switchgear and engine start signals.\nYes\nNo\n2\nSecure and lockout normal and emergency disconnects.\nYes\nNo\n3\nRemove the arc chutes and pole covers.\nYes\nNo\n4\nVerify and record all sensing and time delay functions in the switchgear.\nYes\nYes\n5\nVacuums clean the accumulated dust from the switchgear and accessory panels.\nYes\nYes\n6\nInspect for moisture or signs of previous wetness or dripping.\nYes\nYes\n7\nRemove dirt and grime with an approved solvent.\nYes\nYes\n8\nClean and lubricate TS coil and operator linkage.\nYes\nYes\n9\nInspect all insulating parts for cracks or discoloration due to excessive heat.\nYes\nAs Allowed\n10\nInspect all main arcing contacts for excessive erosion.\nYes\nMeter\n11\nInspect all main current carrying contacts for pitting and discoloration due to excessive heat.\nYes\nYes\n12\nPerform contact resistance test on normal and emergency main contacts.\nYes\nMeter\n13\nInspect and clean all add-on panels and accessories.\nYes\nYes\n14\nInspect and clean all add-on panels and accessories.\nYes\nYes\n15\nRe-install arc chutes and pole covers.\nYes\nN/A\n16\nManually operate the main transfer movement to check proper contact alignment, deflection gap and wiping action and control contact operation.\nYes\nNo\n17\nCheck all cable and control wire connections to the transfer switch control and sensing panel\nYes\nControls Only\n18\nReconnect Engine Start.\nYes\nN/A\n19\nRe-energize the switchgear and conduct a test by simulating a normal source failure.\nYes\nAs Allowed\n20\nPerform millivolt drop readings across normal and emergency main contacts during transfer\nYes\nYes\n21\nPrepare Computer Generated Report of inspection for each piece of equipment and submit\nYes\nYes\n\nTask 3 - Additional requirements as follows, but not limited to:\n\nAll work to be performed by an ASCO factory authorized field service engineer.\nVendor to be an ASCO factory authorized dealer.\nPriority emergency service response.\nEmergency Service Calls at no additional charge\nDiscounts on replacement parts.\nDirect access to OEM repair parts.\nPrompt notification of factory upgrades and new product releases.\nAccess to the ASCO Services Emergency Stock of replacement transfer switches located strategically throughout the U.S.\nComputer generated service reports for all covered equipment.\n\nWithin fourteen (14) calendar days after the award, and prior to performing any services on the equipment, the contractor shall furnish two (2) copies of its preventative maintenance procedures/checklist which will be used during the preventative maintenance services of this contract. The contractor will have fourteen (14) days to make necessary corrections or adjustments identified during preventative maintenance check. The contractor shall provide written documentation of corrective action taken to repair items identified during preventative maintenance checks.\n\nThe contractor shall provide full maintenance and repair services to keep all transfer switches in premier operational condition. Service calls shall be placed to the contractor who is to arrive on site to begin maintenance or repair work within four (4) hours of receiving the call.\n\nDELIVERABLES\n\nUpon completion of annual PM, the contractor will provide a completed PM checklist to the COR indicating pass or failure for each transfer switch covered by this scope of work by the dates listed above.\n\nSOW Task#\nDeliverable Title\nFormat\nNumber\nCalendar Days After CO Start\n1\nService and Repair\nRequests submitted by COR\nN/A\nWithin 4 hours of call.\n2\nAnnual Inspection Report\nCOR provided checklist\nEmailed copy to COR\nNLT 14 days after inspection\n\nPERFORMANCE MONITORING\n\nCOR will ensure inspection reports are completed timely and uploaded into the VA maintenance records. Performance monitoring will be conducted through QASP.\n\nCHECK-IN REQUIREMENTS\n\nThe Contractor Service Personnel and/or representative must report to the appropriate department Supervisor or designated point of contact (POC) to sign in with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out.\n\nSECURITY REQUIREMENTS\n\nThe C&A requirements do not apply, and a Security Accreditation Package is not required.\n\nDedicated personnel will be assigned solely to observe, interact, assist, and ensure protection of VA sensitive information.\nContractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation.Â\nGeneral Security\n\nContractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.\n\nVA Information Custodial Language\n\n11.1. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).\n\n11.2. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.\n\nGovernment-Furnished Equipment (GFE)/Government-Furnished Information (GFI)\n\nNo government furnished equipment will be issued to complete the requirements of this contract.\n\nOther Pertinent Information or Special Considerations\n\nThe awarded contractor must be able to access and source the necessary repair parts, hardware, software, firmware and programming for all automatic transfer switches installed within Louis Stokes VAMC.\n\na. Identification of Possible Follow-on Work.\n\nAny additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work.\n\nb. Identification of Potential Conflicts of Interest (COI).\nNone\n\nc. Identification of Non-Disclosure Requirements.\nNot Applicable\n\nd. Packaging, Packing and Shipping Instructions.\nNone\n\ne. Inspection and Acceptance Criteria.\nContractor will be responsible for meeting timelines listed in this SOW to include\nannual inspection, inspection reports, and response to service calls.\n\nRISK CONTROL\n\nWork performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility.\n\nPLACE OF PERFORMANCE\n\nLouis Stokes VA Medical Center\n10701 East Blvd\nCleveland, Ohio 44106\n\nQUALITY ASSURANCE SURVEILLANCE PLAN (QASP)\n1. PURPOSE\n\nThis Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:\nWhat will be monitored.\nAutomatic Transfer Switch Annual Inspection\nAutomatic Transfer Switch Maintenance and Repair\nService call response.\n\nHow monitoring will take place.\nFacility Automatic Transfer Switch equipment list will be provided to contractor for equipment information and location.\nCOR will provide COR with inspection checklists at beginning of each inspection.\nContractor will complete inspection and checklist.\nContractor will return checklist to COR no later than 14 days after the inspection.\nContractor will respond to the facility for service calls placed by COR or designated official within 4 hours.\n\nInventory Parts O- Hand Inspection\n\nThe vendor is to maintain and inventory all replacement on hand parts that are specified in the contract.\n\nPreventative Maintenance\n\nContractor will complete annual maintenance inspections.\n\nThis QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government s responsibility to be objective, fair, and consistent in evaluating performance.\n\nThis QASP is a living document and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.\n\n2. GOVERNMENT ROLES AND RESPONSIBILITIES\n\nThe following personnel shall oversee and coordinate surveillance activities.\n\na. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor s performance.\n\nb. Contracting Officer s Technical Representative (COR) - The COR is responsible for technical administration of the contract and shall ensure proper Government surveillance of the contractor s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government s behalf.\n\n3. CONTRACTOR REPRESENTATIVES\n\nThe following employees of the contractor serve as the contractor s program manager for this contract.\n\nName/Title:______________________\n\n4. PERFORMANCE STANDARDS\n\nPerformance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.\n\nTask\nID\nIndicator\nStandard\nAcceptable Quality Level\nMethod of Surveillance\nIncentive\nVAMC needs Maintenance of Transfer Switches\n\nCosts\n\n1\nAccessibility\nPeriodic Inspection- (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)\n100%\nCan be performed periodically or through 100% surveillance\nExercise of Option Period\n2\nProfessional Oversight\nContracted vendor will adhere to all State and Federal regulations for safety and patient privacy\n100%\nReview of State and corporate privacy policies\nExercise of Option Period\n3\nImplement VA policies on Medical Waste Removal Services\nContractor will implement and manage policies established by the VA,\n100%\nReview of reports and destruction\nrecords\nExercise of Option Period\n4\nCosts\nThe contractor will bill the VA correctly based on the terms of the contact\n100%\nReview of billing statements\nExercise of Option Period\n\nHIPPA Compliance\n5\nAdherence to HIPPA\nThe contractor must adhere to the provisions of HIPPA and the National Standards to Protect the Privacy and Security of Protected Health Information (PHI)\n100%\nDirect Observation and Validated User/Customer Complaints\nExercise of Option Period\n\nComments: ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________\n\n5. INCENTIVES\n\nThe Government shall use Exercise of Options (if any) and Past Performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.\n\n6. METHODS OF QA SURVEILLANCE\n\nVarious methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.\n\na. DIRECT OBSERVATION. The end user will sign into the web and perform a daily check on the temperature monitoring system.\n\nb. PERIODIC MONTHLY INSPECTION. Monthly flash reports will be produced and a meeting will be conducted to discuss ongoing issues.\n\nc. VALIDATED USER/CUSTOMER COMPLAINTS. The Maximo work order system will be improvised. Written complaints from Staff and Patients will be documented and passed on to the Contracting Officer.\n\nd. PERIODIC SAMPLING. To be used if there is a problem/deficiency that is suspected.\n\ne. 100% INSPECTION. Monitoring software provides 24/7 365 days a year system status and alerts.\n\nf. PROGRESS STANDARD MEETINGS. To be used based on the Contracting Officers Discretion.\n\n7. RATINGS\n\nMetrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:\n\nExcellent = Exceeds Standards\nSatisfactory = Meets Standards\nUnsatisfactory = Fails to Meet Standards\n\n8. DOCUMENTING PERFORMANCE\n\na. ACCEPTABLE PERFORMANCE\n\nThe Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.\n\nb. UNACCEPTABLE PERFORMANCE\n\nWhen unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.\n\nWhen the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager.\n\nThe contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COTR. The Government shall review the contractor's corrective action plan to determine acceptability.\n\nAny CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.\n\n9. FREQUENCY OF MEASUREMENT\n\na. Frequency of Measurement.\n\nDuring contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.\n\nb. Frequency of Performance Assessment Meetings.\n\nThe COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.\n\nPERIOD OF PERFORMANCE\n\nBase Year: July 1, 2026, through June 30, 2027\nOption Year One: July 1, 2027, through June 30, 2028\nOne Year Two: July 1, 2028, through June 30, 2029\nOption Year Three: July 1, 2029, through June 30, 2030\nOption Year Four: July 1, 2030, through June 30, 2031\n\nPRICE/COST SCHEDULE\n\nITEM NUMBER\nDESCRIPTION OF SUPPLIES/SERVICES\nQUANTITY\nUNIT\nUNIT PRICE\nAMOUNT\n0001\n\n1.00\nYR\n_______\n_______________\n\nPerform Annual Maintenance of Transfer Switches.\n\nContract Period: BASE YEAR\n\n1001\n\n1.00\n\nYR\n\n_______\n\n_______________\n\nPerform Annual Maintenance of Transfer Switches.\n\nContract Period: OPTION YEAR 1\n\n2001\n\n1.00\n\nYR\n\n_______\n\n_______________\n\nPerform Annual Maintenance of Transfer Switches.\n\nContract Period: OPTION YEAR 2\n\n3001\n\n1.00\n\nYR\n\n_______\n\n_______________\n\nPerform Annual Maintenance of Transfer Switches.\n\nContract Period: OPTION YEAR 3\n\n4001\n\n1.00 YR _______\n\nPerform Annual Maintenance of Transfer Switches.\n\nContract Period: OPTION YEAR 4\n\n_______________\n\nGRAND TOTAL\n\n_______________\n\nTECHNICAL CAPABILITY EVALUATION APPROACH (no more than 10 pages). The contractors shall meet the following requirements:\n\nTechnical evaluation factors for an Automatic Transfer Switch (ATS) annual maintenance government contract must ensure that the contractor can safely and effectively maintain critical emergency power infrastructure in compliance with manufacturer specs and standards like NFPA 110. Key areas include technician qualifications, testing procedures, safety protocols, and documentation.Â\n\nContractor s field engineers must be OEM factory-trained and certified for the specific brands of ATS installed at this facility (e.g., ASCO, Zenith, GE) with ready access to repair parts and engineering service support, including aged or obsolete switches.\nContractors must be engaged in maintenance, repair, inspection, and testing of electrical power distribution equipment. Contractors must have a minimum of five (5) years, within the last five (5) years of successful experience maintaining power distribution equipment identical or like the equipment listed in this Statement of Work.\nElectrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) must be the primary interest/specialty of the Contractor s business.\nMust be NETA (InterNational Electrical Testing Association) certified technicians, with updated NETA certifications.\nMust be able to respond to emergencies 24/7.\nContractor annual maintenance must include, at minimum, thermal scanning, cleaning, lubrication, torque check of all power connections, and calibration of voltage/frequency sensing relays.\nContractors must have the ability to inspect contact wear, pitting, and arc chutes.\nContractors must have the ability to verify the accuracy of the time-delay settings (e.g., engine start delay, emergency transfer delay, retransfer delay).\nPAST PERFORMANCE\nThe Past Performance Approach will be evaluated based on the offeror providing information regarding a minimum of two past performance references, previous experience providing Automatic Transfer Switch Maintenance. The past performance must be within the last three (3) years. Offeror s examples of previous efforts should be of similar size and scope as described in the SOW. Information should include agency name, location, description, and point of contact with phone number, contract or delivery order number, a brief scope of contract, and contract value, so that the government can evaluate past performance.\n\nThe Government will make determination of relevance. If no past performance information is readily available. the Offeror s past performance will not be evaluated favorably or unfavorably.\n\nThe government will evaluate information in CPARS, FAPIIS, and personal knowledge of offerors.\n\nInclude the Point of Contact name, phone number, and email for this contract or project. The VA will call this Point of Contact to ask about the performance.\n\nPRICE EVALUATION APPROACH\nThe Government will evaluate quotes by adding the total of all line-item prices, including all years. The Government will evaluate price reasonableness and in an overall best value determination.\n\nOptions. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not oblige the Government to exercise the option(s).\n\nA written notice of the award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether there are negotiations after its receipt, unless a written notice of withdrawal is received before award.\n\nAll questions must be submitted to April Fawley, Contracting Specialist via e-mail only by March 20, 2026, by 12:00 p.m., Eastern Standard Time ( EST ). All responses to questions that may affect offers will be incorporated into a written amendment to the solicitation. Quotes and accompanying information are due via email, no later than April 15, 2026, by 12:00 p.m., EST.\n\nTechnical questions and Quotes must be sent by email to april.fawley@va.gov.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C25026Q0261","place_of_performance":{"zip":"44106","city":{"name":"Cleveland"},"state":{"code":"OH","name":"Ohio"},"street":"Louis Stokes Cleveland VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"10701 East Blvd"},"product_service_code":"H359"},{"award":{"awardee":{}},"dates":{"posted":"2026-03-23","posted_at":"2026-03-23T15:24:23.003Z","created_at":"2026-03-23T15:24:20.717Z","modified_at":"2026-06-15T04:00:05.990Z","response_deadline":{"raw":"2026-04-15T12:00:00-04:00","utc":"2026-04-15T16:00:00Z","date":"2026-04-15","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9b537cf6c6884446a97055c661cd7ea4/view"},"naics":{"codes":["811210"],"primary":"811210"},"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-14","archive_type":"auto_custom"},"history":[{"index":5,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers FINAL","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-15T15:55:51.515Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"5fb838c6729b4630bc217bc40cbecf26","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":3,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers UDPATED","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-27T16:27:45.146Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"83d1867fc8d449ebb6474ab98ecda3a0","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":2,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-23T15:24:23.003Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"9b537cf6c6884446a97055c661cd7ea4","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":1,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-18T17:32:31.593Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"178ea3261ce9441291195baa30008bf2","solicitation_number":"36C25026Q0261"}],"contacts":[{"name":"April Fawley","role":"primary","email":"April.Fawley@va.gov","phone":"734-222-4360","title":"Contract Specialist"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"9b537cf6c6884446a97055c661cd7ea4","set_aside":{"code":"VSA","label":"Veteran-Owned Small Business Set-Aside (Department of Veterans Affairs)"},"lineage_id":"178ea3261ce9441291195baa30008bf2","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-10T03:22:22.793606771Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"68feb540b9d6d9993f39f50311966446253c959ee9c75b71024175abb7683e91","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-10T03:22:22.793606771Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Questions and Answers - 36C25026Q0261\n\nQ1:  Is there an incumbent contract, and if so what is the contract number?\nA: 36C25021P1528\n\nQ2: Specific question which bidder outlines their plan and asks if acceptable.\nA: Contracting does not provide that type of information. It is the contractor s responsibility to determine which program (if any) meets the requirements of the solicitation.","text":"Questions and Answers - 36C25026Q0261\n\nQ1: Is there an incumbent contract, and if so what is the contract number?\nA: 36C25021P1528\n\nQ2: Specific question which bidder outlines their plan and asks if acceptable.\nA: Contracting does not provide that type of information. It is the contractor s responsibility to determine which program (if any) meets the requirements of the solicitation.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C25026Q0261","place_of_performance":{"zip":"44106-1702","street":"Louis Stokes Cleveland VA Medical Center 10701 East Blvd.","country":{"code":"USA","name":"UNITED STATES"},"street2":"Cleveland, OH"},"product_service_code":"H359"},{"award":{"awardee":{}},"dates":{"posted":"2026-03-27","posted_at":"2026-03-27T16:27:45.146Z","created_at":"2026-03-27T16:27:42.852Z","modified_at":"2026-06-15T04:00:05.990Z","response_deadline":{"raw":"2026-04-15T12:00:00-04:00","utc":"2026-04-15T16:00:00Z","date":"2026-04-15","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/83d1867fc8d449ebb6474ab98ecda3a0/view"},"naics":{"codes":["811210"],"primary":"811210"},"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers UDPATED","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-14","archive_type":"auto_custom"},"history":[{"index":5,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers FINAL","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-15T15:55:51.515Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"5fb838c6729b4630bc217bc40cbecf26","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":3,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers UDPATED","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-27T16:27:45.146Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"83d1867fc8d449ebb6474ab98ecda3a0","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":2,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-23T15:24:23.003Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"9b537cf6c6884446a97055c661cd7ea4","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":1,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-18T17:32:31.593Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"178ea3261ce9441291195baa30008bf2","solicitation_number":"36C25026Q0261"}],"contacts":[{"name":"April Fawley","role":"primary","email":"april.fawley@va.gov","phone":"734-222-4360","title":"Contract Specialist"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"83d1867fc8d449ebb6474ab98ecda3a0","set_aside":{"code":"VSA","label":"Veteran-Owned Small Business Set-Aside (Department of Veterans Affairs)"},"lineage_id":"178ea3261ce9441291195baa30008bf2","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-09T02:33:20.951249688Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"0348072657b6011e94a1520352b9668ec23cb02dab6f3ba90b4e88bc1615fd1c","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-09T02:33:20.951249688Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Questions and Answers UPDATE - 36C25026Q0261 \n\nQ1:  Is there an incumbent contract, and if so what is the contract number?\nA: 36C25021P1528\n\nQ2: Specific question which bidder outlines their plan and asks if acceptable.\nA: Contracting does not provide that type of information. It is the contractor s responsibility to determine which program (if any) meets the requirements of the solicitation. \n\nQ3:   SOW specifies ASCO authorization. Â Is this a must?\nA: The transfer switches within our facility are all ASCO switches and the awarded vendor must have factory training, ready access to necessary repair parts, repair manuals and engineering support in order to maintain and repair these systems.","text":"Questions and Answers UPDATE - 36C25026Q0261\n\nQ1: Is there an incumbent contract, and if so what is the contract number?\nA: 36C25021P1528\n\nQ2: Specific question which bidder outlines their plan and asks if acceptable.\nA: Contracting does not provide that type of information. It is the contractor s responsibility to determine which program (if any) meets the requirements of the solicitation.\n\nQ3: SOW specifies ASCO authorization. Â Is this a must?\nA: The transfer switches within our facility are all ASCO switches and the awarded vendor must have factory training, ready access to necessary repair parts, repair manuals and engineering support in order to maintain and repair these systems.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C25026Q0261","place_of_performance":{"zip":"44106-1702","street":"Louis Stokes Cleveland VA Medical Center 10701 East Blvd.","country":{"name":"United States"},"street2":"Cleveland, OH"},"product_service_code":"H359"},{"award":{"awardee":{}},"dates":{"posted":"2026-04-15","posted_at":"2026-04-15T15:55:51.515Z","created_at":"2026-04-15T15:55:49.230Z","modified_at":"2026-06-15T04:00:05.990Z","response_deadline":{"raw":"2026-04-15T12:00:00-04:00","utc":"2026-04-15T16:00:00Z","date":"2026-04-15","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5fb838c6729b4630bc217bc40cbecf26/view"},"naics":{"codes":["811210"],"primary":"811210"},"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers FINAL","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-14","archive_type":"auto_custom"},"history":[{"index":5,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers FINAL","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-15T15:55:51.515Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"5fb838c6729b4630bc217bc40cbecf26","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":3,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers UDPATED","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-27T16:27:45.146Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"83d1867fc8d449ebb6474ab98ecda3a0","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":2,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair Questions and Answers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-23T15:24:23.003Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"9b537cf6c6884446a97055c661cd7ea4","solicitation_number":"36C25026Q0261","parent_opportunity_id":"178ea3261ce9441291195baa30008bf2"},{"index":1,"title":"H359--CS | Automatic Transfer Switch Maintenance and Repair","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-18T17:32:31.593Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"178ea3261ce9441291195baa30008bf2","solicitation_number":"36C25026Q0261"}],"contacts":[{"name":"April Fawley","role":"primary","email":"april.fawley@va.gov","phone":"734-222-4360","title":"Contract Specialist"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"5fb838c6729b4630bc217bc40cbecf26","set_aside":{"code":"VSA","label":"Veteran-Owned Small Business Set-Aside (Department of Veterans Affairs)"},"lineage_id":"178ea3261ce9441291195baa30008bf2","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-06T12:38:39.713074073Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"8dfea101407056374cfef0e56adb4d7ca769a2dda7c61c1b279842db55d238df","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-06T12:38:39.713074073Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"CS | Automatic Transfer Switch\nMaintenance and Repair Questions and Answers FINAL\n\nRequirement is not subject to Service or Special Trade Limitations.","text":"CS | Automatic Transfer Switch\nMaintenance and Repair Questions and Answers FINAL\n\nRequirement is not subject to Service or Special Trade Limitations.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C25026Q0261","place_of_performance":{"zip":"44106-1702","street":"10701 East Blvd. Cleveland, OH","country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"H359"}],"due_at":"2026-04-15T16:00:00Z","due_date":"2026-04-15","closes_at":"2026-04-15T16:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","state_source":"sam_zip","state_evidence":null,"site_key":null,"winner_key":"DKJJJVFBNQB9","amount":null,"linked_awards":4,"cancelled":false,"archived":true,"updated_at":"2026-10-06T13:32:53.433216Z","principal_notice_id":"5fb838c6729b4630bc217bc40cbecf26","description":{"text":"CS | Automatic Transfer Switch\nMaintenance and Repair Questions and Answers FINAL\n\nRequirement is not subject to Service or Special Trade Limitations.","html":"CS | Automatic Transfer Switch\nMaintenance and Repair Questions and Answers FINAL\n\nRequirement is not subject to Service or Special Trade Limitations.","origin":"detail"},"contacts":[{"name":"April Fawley","role":"primary","email":"april.fawley@va.gov","phone":"734-222-4360","title":"Contract Specialist"}],"place_of_performance":{"zip":"44106-1702","street":"10701 East Blvd. Cleveland, OH","country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"naics_codes":["811210"],"award":{"awardee":{}},"attachments":[{"resource_id":"c19d762dac094458a33e314bc8332fba","name":"36C25026Q0261.docx","kind":"file","mime_type":".docx","size_bytes":66548,"posted_at":"2026-03-18T17:32:31.593Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c19d762dac094458a33e314bc8332fba/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C25026P0797_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C25026P0797_3600_-NONE-_-NONE-/","piid":"36C25026P0797","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"DKJJJVFBNQB9","recipient_name":"TEKTON CC, LLC","recipient_uei":"DKJJJVFBNQB9","recipient_cage":"69SN9","recipient_city":"PAHRUMP","recipient_state":"NV","sub_name":"Department of Veterans Affairs","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","office_key":"o-36C250","first_action_date":"2026-06-24","last_action_date":"2026-06-24","actions":1,"obligated":"32750.39","current_total_value":"32750.39","potential_total_value":"182479.37","naics":"811210","psc":"H359","extent_competed":"COMPETED UNDER SAP","set_aside":"VETERAN SET ASIDE","offers_received":5,"description":"ANNUAL AUTOMATIC TRANSFER SWITCH REPAIRS AND MAINTENANCE BASE YEAR","method":"solicitation","confidence":"high","evidence":["solicitation number 36C25026Q0261 equals the FPDS solicitation identifier","same awarding office 36C250"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C25027Q0014","latest_notice_id":"b13cc87179e947e7b42da2de44a6bde1","title":"J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland","solicitation_number":"36C25027Q0014","notice_type":"k","first_type":"k","first_posted":"2026-10-09","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"238210","psc":"J061","set_aside":"SBA","state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C25027Q0123","latest_notice_id":"fb53a332644a4c8fa983bf28c8643d2d","title":"S222--Sources Sought - Hazardous Waste Removal/Disposal Northeast Ohio VA Healthcare System - Cleveland, OH","solicitation_number":"36C25027Q0123","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T18:30:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T18:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"562112","psc":"S222","set_aside":null,"state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C25027B0009","latest_notice_id":"85b83d408f1f422885991142c2734b45","title":"Z1DA--FY27 NRM - VISN Base Modernize Nurse Call - 539-23-101","solicitation_number":"36C25027B0009","notice_type":"p","first_type":"p","first_posted":"2026-11-08","last_posted":"2026-11-08","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-09T05:16:39.607305Z"},{"key":"36C25027B0008","latest_notice_id":"5afe716a38494a6f84b1e84205805f86","title":"Z1DA--FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206","solicitation_number":"36C25027B0008","notice_type":"p","first_type":"p","first_posted":"2026-11-08","last_posted":"2026-11-08","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-09T05:16:39.607305Z"},{"key":"36C25027B0005","latest_notice_id":"2cb4a6354be04cc89c5d6125945b1892","title":"Z1DA--***FY27 Requirement*** First Floor X Ray - Room CC157 553-CSI-022","solicitation_number":"36C25027B0005","notice_type":"p","first_type":"p","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":"MI","county":"26163","county_name":"Wayne County","city":"2622000","city_name":"Detroit","country":null,"place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T00:57:17.217280Z"}],"similar_open":[{"key":"FA860127R0009","latest_notice_id":"67fa006bcdab4fb290871d3e64c7b155","title":"FA8601 Auto Sampler Maintenance and Repair","solicitation_number":"FA860127R0009","notice_type":"k","first_type":"k","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2027-01-07T18:00:00Z","due_date":"2027-01-07","closes_at":"2027-01-07T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA8601","office_name":"FA8601 AFLCMC PZIO","naics":"811210","psc":"J066","set_aside":null,"state":"OH","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"ED. NOTE THAT E-MAIL FILTERS AT WRIGHT-PATTERSON AIR FORCE BASE","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"75N98027Q00080","latest_notice_id":"046af05910ad4f4092a269aefe7c0850","title":"Preventive Maintenance Service - GE TracerLab","solicitation_number":"75N98027Q00080","notice_type":"k","first_type":"k","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-27T14:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T14:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-075","dept_name":"HEALTH AND HUMAN SERVICES, DEPARTMENT OF","sub_key":"s-7529","sub_name":"NATIONAL INSTITUTES OF HEALTH","office_key":"o-75N980","office_name":"NATIONAL INSTITUTES OF HEALTH OLAO","naics":"811210","psc":"J066","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"36C26227Q0063","latest_notice_id":"57c32e663caa45e58aecf5d9fcc6fe70","title":"J065--ALCON CONSTELLATION LXT AND EMBEDDED LASERS & ALCON CENTURION VISION PHACOEMULSIFICATION PMI SVCS","solicitation_number":"36C26227Q0063","notice_type":"k","first_type":"r","first_posted":"2026-10-21","last_posted":"2026-11-20","notices":3,"due_at":"2026-11-27T19:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"811210","psc":"J065","set_aside":"SDVOSBC","state":"CA","county":"06037","county_name":"Los Angeles County","city":"0643000","city_name":"Long Beach","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":58,"indexable":false}