{"canonical":"https://sealedbidder.com/opportunities/36c25026b0046","key":"36C25026B0046","url":"https://sealedbidder.com/opportunities/36c25026b0046","title":"J047--FY26 NRM -Medical Gas Deficiency 610A4-26-507 (VA-26-00058207)","solicitation_number":"36C25026B0046","notice_type":"p","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-08-14T14:00:00Z","first_posted":"2026-06-11","last_posted":"2026-06-11","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"238220","psc":"J047","set_aside":"SDVOSBC","place_state":"IN","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"18003","place_county_name":"Allen County","place_city":"1825000","place_city_name":"Fort Wayne","winner":null,"award_amount":null,"publications":[{"notice_id":"1f22c116b087410e9f1efc6e6eb8c2e3","title":"J047--FY26 NRM -Medical Gas Deficiency 610A4-26-507 (VA-26-00058207)","solicitation_number":"36C25026B0046","notice_type":"p","base_type":"p","posted":"2026-06-11","posted_at":"2026-06-11T19:48:53.660Z","due_at":"2026-08-14T14:00:00Z","due_date":"2026-08-14","cancelled":false,"archived":true,"archive_date":"2026-10-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1f22c116b087410e9f1efc6e6eb8c2e3/view","enriched":true,"history":[{"index":1,"title":"J047--FY26 NRM -Medical Gas Deficiency 610A4-26-507 (VA-26-00058207)","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-06-11T19:48:53.660Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1f22c116b087410e9f1efc6e6eb8c2e3","solicitation_number":"36C25026B0046"}]}],"latest_notice_id":"1f22c116b087410e9f1efc6e6eb8c2e3","first_type":"p","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-06-11","posted_at":"2026-06-11T19:48:53.660Z","created_at":"2026-06-11T19:48:50.387Z","modified_at":"2026-06-11T19:48:53.660Z","response_deadline":{"raw":"2026-08-14T10:00:00-04:00","utc":"2026-08-14T14:00:00Z","date":"2026-08-14","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1f22c116b087410e9f1efc6e6eb8c2e3/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"J047--FY26 NRM -Medical Gas Deficiency 610A4-26-507 (VA-26-00058207)","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-10-13","archive_type":"auto_custom"},"history":[{"index":1,"title":"J047--FY26 NRM -Medical Gas Deficiency 610A4-26-507 (VA-26-00058207)","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-06-11T19:48:53.660Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1f22c116b087410e9f1efc6e6eb8c2e3","solicitation_number":"36C25026B0046"}],"contacts":[{"name":"Tiffany Rausch","role":"primary","email":"tiffany.rausch@va.gov","phone":"317-988-1521","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"1f22c116b087410e9f1efc6e6eb8c2e3","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"1f22c116b087410e9f1efc6e6eb8c2e3","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-21T00:47:00.290593236Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T16:22:40.277975Z","row_sha256":"44dba37bab5c946e6af6cf423165ea6d3d27fabac79c97caa6818e6c9e51f5fe","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-21T00:47:00.290593236Z","first_seen_at":"2026-09-16T16:22:40.277975Z"},"description":{"html":"SCOPE\n\nA recent medical gas evaluation identified deficiencies on the 3rd Floor. The Contractor shall correct all cited items and ensure all O  (OXYGEN), MA (COMPRESS MEDICAL AIR), VAC (MEDICAL VACUUM), WAGD (Waste Anesthetic Gas Disposal), N  (Nitrogen), N O (Nitrous Oxide), valves, alarms, and infrastructure are fully code compliant and fully operational.\n\nCode Compliance Requirements\nAll work shall be performed in accordance with NFPA 99, 2018 Edition.\nAny location where N O or halogenated anesthetic agents may be administered - including CT, X-ray, and imaging rooms using roll in anesthesia machines - shall be equipped with dedicated WAGD inlets.\nRooms receiving WAGD shall be treated as anesthetizing locations. Contractor shall provide:\nA dedicated zone valve assembly per NFPA 99 Section 5.1.4.6.2.\nArea alarm coverage meeting NFPA 99 requirements.\n\nINFECTION CONTROL RISK ASSESSMENT (ICRA)\nContractor shall coordinate with Infection Prevention and Control and complete an ICRA before work begins.\nICRA measures may include barriers, negative air, HEPA filtration, dust containment, restricted work hours, cleaning protocols, and traffic controls.\nContractor must implement and maintain all ICRA requirements for the project duration and promptly correct any deficiencies identified by Infection Control, Safety, or the COR.\n\nPhasing and Shutdown Requirements\nSubmit a phasing and shutdown plan at least 14 working days prior to any interruption.\nNo room may begin until the previous room is fully commissioned.\nEach Room Must Follow These Phases:\nPre Construction Coordination\nICRA Containment Setup\nSelective Ceiling Demolition & Rough In\nGas Shutdowns & Tie Ins. Follow NFPA 99 procedures for tie ins, including depressurization, blow down, leak testing, and post connection re verification. Installation personnel must be credentialed:\nASSE 6010 medical gas installers.\nBrazers qualified per ASME BPVC Section IX / AWS B2.2.\nDevice Installation\nCeiling Restoration (hard ceiling rooms only, as applicable in others)\nNFPA 99 Room Level Testing & Commissioning (CxA witnessed). Room level commissioning includes flow, pressure, cross connection testing, ZVB verification, alarm testing, labeling, and source system checks.\nRoom Closeout & Transition to Next Room\nMaintain continuous facility operations. Comply with infection control, egress, and safety standards in active care areas.\n\nArea Alarm\nDeficiency: Surgery Ward (Surgery Rooms and Recovery Room) lack any aliquant area alarm.\nCorrection: Provide and install new panels and update existing area alarm to support at the minimum: O , MA, VAC, WAGD, N , and N O. Include all transducers, wiring, labeling, and verification.\nProvide and install one (1) new Master Area Alarm Panel in Room #3204. New area alarm panel shall support: O , MA, VAC, WAGD, N , and N O.\nRetrofit the existing hallway area alarm panel and sensors for monitoring rooms #3210 and #3218. Area alarm panel for shall support: O , MA, VAC, and WAGD.\nProvide one (1) new area alarm panel in the hallway for monitoring rooms #3235 and #3225. New area alarm panel shall support: O , MA, VAC, WAGD, N , and N O.\nAdditional Requirements:\nAll panels shall be fully integrated, tested, and commissioned in accordance with NFPA 99 5.1.11.  \nDedicated conduit for low-voltage cabling.\nSupervised loops with proper EOL termination.\nPanel mounting, programming, and labeling.\nRelay outputs for BMS / nurse-call integration if required.\nSensor commissioning on every monitored line.\nFull simulated alarm test at each source and each panel.\nPerform full functional testing, including setpoints, audible/visual alarms, test mode, and signal accuracy checks.\nFinal verification shall be completed by a qualified ASSE 6030 Medical Gas Verifier.\nProvide a one year warranty on parts, labor, and workmanship.\n\nZone Valve Box (ZVB)\nDeficiency: Operation Room (PRE OP) and Endoscope lack required intervening walls between ZVBs and the outlets/inlets they serve. Surgery Ward lacks ZVBs. \nCorrection: Revise architectural layout to include intervening walls. Provide all necessary piping, enclosures, labeling, and materials.\nRoom #3304 (PRE OP) - Relocate existing ZVB (O , MA, VAC) to NFPA compliant hallway locations.\nRooms #3315 (Endo) - Relocate existing ZVB (O , MA, VAC) to NFPA compliant hallway locations.\nRoom 3210   Provide one (1) new ZVB (WAGD, O , VAC, MA).\nRoom 3218   Provide one (1) new ZVB (WAGD, O , VAC, MA).\nRoom 3235   Provide one (1) new ZVB (WAGD, N O, N ) and one (1) ZVB (O , MA, VAC).\nRoom 3225   Provide one (1) new ZVB (WAGD, N O, N ) and one (1) ZVB (O , MA, VAC).\nRequirements per NFPA 99:\n All installations shall meet NFPA 99 requirements for isolation capability, accessibility, and labeling.\nZone valves must be located such that a wall intervenes between valves and outlets they control.\nZone valves shall serve only outlets on the same story and not be located inside rooms they control.\n\nNitrogen (N ) Zone Valves\nDeficiency: No N  zone valves currently serve Operating Rooms #3232 and #3235.\nCorrection: Verify whether any N  outlets were previously removed or isolated. \nInstall new N  zone valves, DISS standard outlets, and associated labeling/enclosures as required.\nPerform functional isolation tests, leak checks, and pressure indication verification.\n\nWaste Anesthetic Gas Disposal (WAGD) Systems\nDeficiency: No WAGD inlets exist in Surgery Ward.\nCorrection: Provide and install WAGD-VAC and WAGD inlet assemblies (headwall or boom). Route piping, label, and test each installation. One WAGD valve per room is required. \nProvide a complete WAGD system serving rooms #3235, #3225, #3218, and #3210 including:\nWAGD-VAC: Determine vacuum levels based on anesthetic agents used. Designed for safe operation in environments with elevated oxygen concentrations. \nUses a non contact, oil free pumping mechanism that prevents lubrication from entering the airflow stream. All internal components - including those exposed to the airflow path - shall be cleaned and prepared using oxygen compatible processes and materials. Pumps and system modules shall be factory assembled, piped, wired, and tested prior to delivery. \nVariable speed technology shall modulate pump speed to match real time vacuum demand to improve efficiency, reduce wear, and minimize heat and noise generation. System shall allow single point connection for electrical power, vacuum intake, and exhaust discharge. Exhaust manifold shall include a dedicated drip leg with shutoff valve. \nFour passive EVAC type WAGD console inlets. Maintain minimum 5 ft separation between medical vacuum and WAGD per NFPA 99 (2005 Edition.) \nWAGD sensors, service valves, riser valves, and source valves. Size piping, valves, regulators, and branch lines per NFPA 99 pressure loss and performance criteria. Piping, penetrations, supports, and identification\nFinal equipment location shall be coordinated and approved by Owner and Engineer of Record: \nValidate static and dynamic vacuum levels.\nVerify WAGD inlet flow capacity.\nTest alarm conditions and valve isolation.\nConfirm complete separation between WAGD and medical vacuum systems.\n\nHard Ceiling\nThe Contractor shall fully account for work above hard lid, non accessible ceilings in the following surgery ward rooms:\nHard ceiling work shall be included in the bid and include:\nSelective demolition only where access is required.\nTemporary fire rated closures and daily sealing.\nICRA compliant barriers, negative air, and HEPA filtration.\nFull ceiling restoration matching existing finish.\nRestoration of all fire rated assemblies.\nCoordination with COR, Infection Control, and Surgery.\n\nCommissioning Requirements\nCommissioning shall comply with Specification 22 08 00 and 01 91 00. Work includes:\nPre functional checklists.\nFunctional performance testing witnessed by the COMMISSIONING AGENT (CXA).\nSystems manuals, test results, and training deliverables. Refer to Whole Building Commissioning Process Manual (May 1, 2013; minor revisions 11/01/2013).\n\nPost Construction Testing & Verification\nContractor shall perform complete NFPA 99 testing including:\nAlarm system testing   audio/visual, setpoints, transducer accuracy.\nZone valve testing   leak checks, pressure indication, labeling.\nOutlet/inlet testing   static and dynamic pressure, flow drop, cross connection checks.\nSource system verification   dew point, CO monitoring, manifold changeover, relief valve venting, pigtail documentation.\n\nDocumentation Deliverables\nContractor shall provide:\nFinal test reports and checklists.\nAs built AutoCAD drawings.\nUpdated utility and piping maps.\nValve tag lists and labeling photos.\nLockout/tagout point identification (Specification 22 05 11).","text":"SCOPE\n\nA recent medical gas evaluation identified deficiencies on the 3rd Floor. The Contractor shall correct all cited items and ensure all O (OXYGEN), MA (COMPRESS MEDICAL AIR), VAC (MEDICAL VACUUM), WAGD (Waste Anesthetic Gas Disposal), N (Nitrogen), N O (Nitrous Oxide), valves, alarms, and infrastructure are fully code compliant and fully operational.\n\nCode Compliance Requirements\nAll work shall be performed in accordance with NFPA 99, 2018 Edition.\nAny location where N O or halogenated anesthetic agents may be administered - including CT, X-ray, and imaging rooms using roll in anesthesia machines - shall be equipped with dedicated WAGD inlets.\nRooms receiving WAGD shall be treated as anesthetizing locations. Contractor shall provide:\nA dedicated zone valve assembly per NFPA 99 Section 5.1.4.6.2.\nArea alarm coverage meeting NFPA 99 requirements.\n\nINFECTION CONTROL RISK ASSESSMENT (ICRA)\nContractor shall coordinate with Infection Prevention and Control and complete an ICRA before work begins.\nICRA measures may include barriers, negative air, HEPA filtration, dust containment, restricted work hours, cleaning protocols, and traffic controls.\nContractor must implement and maintain all ICRA requirements for the project duration and promptly correct any deficiencies identified by Infection Control, Safety, or the COR.\n\nPhasing and Shutdown Requirements\nSubmit a phasing and shutdown plan at least 14 working days prior to any interruption.\nNo room may begin until the previous room is fully commissioned.\nEach Room Must Follow These Phases:\nPre Construction Coordination\nICRA Containment Setup\nSelective Ceiling Demolition & Rough In\nGas Shutdowns & Tie Ins. Follow NFPA 99 procedures for tie ins, including depressurization, blow down, leak testing, and post connection re verification. Installation personnel must be credentialed:\nASSE 6010 medical gas installers.\nBrazers qualified per ASME BPVC Section IX / AWS B2.2.\nDevice Installation\nCeiling Restoration (hard ceiling rooms only, as applicable in others)\nNFPA 99 Room Level Testing & Commissioning (CxA witnessed). Room level commissioning includes flow, pressure, cross connection testing, ZVB verification, alarm testing, labeling, and source system checks.\nRoom Closeout & Transition to Next Room\nMaintain continuous facility operations. Comply with infection control, egress, and safety standards in active care areas.\n\nArea Alarm\nDeficiency: Surgery Ward (Surgery Rooms and Recovery Room) lack any aliquant area alarm.\nCorrection: Provide and install new panels and update existing area alarm to support at the minimum: O , MA, VAC, WAGD, N , and N O. Include all transducers, wiring, labeling, and verification.\nProvide and install one (1) new Master Area Alarm Panel in Room #3204. New area alarm panel shall support: O , MA, VAC, WAGD, N , and N O.\nRetrofit the existing hallway area alarm panel and sensors for monitoring rooms #3210 and #3218. Area alarm panel for shall support: O , MA, VAC, and WAGD.\nProvide one (1) new area alarm panel in the hallway for monitoring rooms #3235 and #3225. New area alarm panel shall support: O , MA, VAC, WAGD, N , and N O.\nAdditional Requirements:\nAll panels shall be fully integrated, tested, and commissioned in accordance with NFPA 99 5.1.11.\nDedicated conduit for low-voltage cabling.\nSupervised loops with proper EOL termination.\nPanel mounting, programming, and labeling.\nRelay outputs for BMS / nurse-call integration if required.\nSensor commissioning on every monitored line.\nFull simulated alarm test at each source and each panel.\nPerform full functional testing, including setpoints, audible/visual alarms, test mode, and signal accuracy checks.\nFinal verification shall be completed by a qualified ASSE 6030 Medical Gas Verifier.\nProvide a one year warranty on parts, labor, and workmanship.\n\nZone Valve Box (ZVB)\nDeficiency: Operation Room (PRE OP) and Endoscope lack required intervening walls between ZVBs and the outlets/inlets they serve. Surgery Ward lacks ZVBs.\nCorrection: Revise architectural layout to include intervening walls. Provide all necessary piping, enclosures, labeling, and materials.\nRoom #3304 (PRE OP) - Relocate existing ZVB (O , MA, VAC) to NFPA compliant hallway locations.\nRooms #3315 (Endo) - Relocate existing ZVB (O , MA, VAC) to NFPA compliant hallway locations.\nRoom 3210 Provide one (1) new ZVB (WAGD, O , VAC, MA).\nRoom 3218 Provide one (1) new ZVB (WAGD, O , VAC, MA).\nRoom 3235 Provide one (1) new ZVB (WAGD, N O, N ) and one (1) ZVB (O , MA, VAC).\nRoom 3225 Provide one (1) new ZVB (WAGD, N O, N ) and one (1) ZVB (O , MA, VAC).\nRequirements per NFPA 99:\nAll installations shall meet NFPA 99 requirements for isolation capability, accessibility, and labeling.\nZone valves must be located such that a wall intervenes between valves and outlets they control.\nZone valves shall serve only outlets on the same story and not be located inside rooms they control.\n\nNitrogen (N ) Zone Valves\nDeficiency: No N zone valves currently serve Operating Rooms #3232 and #3235.\nCorrection: Verify whether any N outlets were previously removed or isolated.\nInstall new N zone valves, DISS standard outlets, and associated labeling/enclosures as required.\nPerform functional isolation tests, leak checks, and pressure indication verification.\n\nWaste Anesthetic Gas Disposal (WAGD) Systems\nDeficiency: No WAGD inlets exist in Surgery Ward.\nCorrection: Provide and install WAGD-VAC and WAGD inlet assemblies (headwall or boom). Route piping, label, and test each installation. One WAGD valve per room is required.\nProvide a complete WAGD system serving rooms #3235, #3225, #3218, and #3210 including:\nWAGD-VAC: Determine vacuum levels based on anesthetic agents used. Designed for safe operation in environments with elevated oxygen concentrations.\nUses a non contact, oil free pumping mechanism that prevents lubrication from entering the airflow stream. All internal components - including those exposed to the airflow path - shall be cleaned and prepared using oxygen compatible processes and materials. Pumps and system modules shall be factory assembled, piped, wired, and tested prior to delivery.\nVariable speed technology shall modulate pump speed to match real time vacuum demand to improve efficiency, reduce wear, and minimize heat and noise generation. System shall allow single point connection for electrical power, vacuum intake, and exhaust discharge. Exhaust manifold shall include a dedicated drip leg with shutoff valve.\nFour passive EVAC type WAGD console inlets. Maintain minimum 5 ft separation between medical vacuum and WAGD per NFPA 99 (2005 Edition.)\nWAGD sensors, service valves, riser valves, and source valves. Size piping, valves, regulators, and branch lines per NFPA 99 pressure loss and performance criteria. Piping, penetrations, supports, and identification\nFinal equipment location shall be coordinated and approved by Owner and Engineer of Record:\nValidate static and dynamic vacuum levels.\nVerify WAGD inlet flow capacity.\nTest alarm conditions and valve isolation.\nConfirm complete separation between WAGD and medical vacuum systems.\n\nHard Ceiling\nThe Contractor shall fully account for work above hard lid, non accessible ceilings in the following surgery ward rooms:\nHard ceiling work shall be included in the bid and include:\nSelective demolition only where access is required.\nTemporary fire rated closures and daily sealing.\nICRA compliant barriers, negative air, and HEPA filtration.\nFull ceiling restoration matching existing finish.\nRestoration of all fire rated assemblies.\nCoordination with COR, Infection Control, and Surgery.\n\nCommissioning Requirements\nCommissioning shall comply with Specification 22 08 00 and 01 91 00. Work includes:\nPre functional checklists.\nFunctional performance testing witnessed by the COMMISSIONING AGENT (CXA).\nSystems manuals, test results, and training deliverables. Refer to Whole Building Commissioning Process Manual (May 1, 2013; minor revisions 11/01/2013).\n\nPost Construction Testing & Verification\nContractor shall perform complete NFPA 99 testing including:\nAlarm system testing audio/visual, setpoints, transducer accuracy.\nZone valve testing leak checks, pressure indication, labeling.\nOutlet/inlet testing static and dynamic pressure, flow drop, cross connection checks.\nSource system verification dew point, CO monitoring, manifold changeover, relief valve venting, pigtail documentation.\n\nDocumentation Deliverables\nContractor shall provide:\nFinal test reports and checklists.\nAs built AutoCAD drawings.\nUpdated utility and piping maps.\nValve tag lists and labeling photos.\nLockout/tagout point identification (Specification 22 05 11).","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C25026B0046","place_of_performance":{"zip":"46805","city":{"code":"25000","name":"Fort Wayne"},"state":{"code":"IN","name":"Indiana"},"street":"VA Northern Indiana Health Care System (VANIHCS) Fort Wayne Campus","country":{"code":"USA","name":"UNITED STATES"},"street2":"2121 Lake Avenue"},"product_service_code":"J047"}],"due_at":"2026-08-14T14:00:00Z","due_date":"2026-08-14","closes_at":"2026-08-14T14:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","state":"IN","county":"18003","county_name":"Allen County","city":"1825000","city_name":"Fort Wayne","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-14T04:54:08.570351Z","principal_notice_id":"1f22c116b087410e9f1efc6e6eb8c2e3","description":{"text":"SCOPE\n\nA recent medical gas evaluation identified deficiencies on the 3rd Floor. The Contractor shall correct all cited items and ensure all O (OXYGEN), MA (COMPRESS MEDICAL AIR), VAC (MEDICAL VACUUM), WAGD (Waste Anesthetic Gas Disposal), N (Nitrogen), N O (Nitrous Oxide), valves, alarms, and infrastructure are fully code compliant and fully operational.\n\nCode Compliance Requirements\nAll work shall be performed in accordance with NFPA 99, 2018 Edition.\nAny location where N O or halogenated anesthetic agents may be administered - including CT, X-ray, and imaging rooms using roll in anesthesia machines - shall be equipped with dedicated WAGD inlets.\nRooms receiving WAGD shall be treated as anesthetizing locations. Contractor shall provide:\nA dedicated zone valve assembly per NFPA 99 Section 5.1.4.6.2.\nArea alarm coverage meeting NFPA 99 requirements.\n\nINFECTION CONTROL RISK ASSESSMENT (ICRA)\nContractor shall coordinate with Infection Prevention and Control and complete an ICRA before work begins.\nICRA measures may include barriers, negative air, HEPA filtration, dust containment, restricted work hours, cleaning protocols, and traffic controls.\nContractor must implement and maintain all ICRA requirements for the project duration and promptly correct any deficiencies identified by Infection Control, Safety, or the COR.\n\nPhasing and Shutdown Requirements\nSubmit a phasing and shutdown plan at least 14 working days prior to any interruption.\nNo room may begin until the previous room is fully commissioned.\nEach Room Must Follow These Phases:\nPre Construction Coordination\nICRA Containment Setup\nSelective Ceiling Demolition & Rough In\nGas Shutdowns & Tie Ins. Follow NFPA 99 procedures for tie ins, including depressurization, blow down, leak testing, and post connection re verification. Installation personnel must be credentialed:\nASSE 6010 medical gas installers.\nBrazers qualified per ASME BPVC Section IX / AWS B2.2.\nDevice Installation\nCeiling Restoration (hard ceiling rooms only, as applicable in others)\nNFPA 99 Room Level Testing & Commissioning (CxA witnessed). Room level commissioning includes flow, pressure, cross connection testing, ZVB verification, alarm testing, labeling, and source system checks.\nRoom Closeout & Transition to Next Room\nMaintain continuous facility operations. Comply with infection control, egress, and safety standards in active care areas.\n\nArea Alarm\nDeficiency: Surgery Ward (Surgery Rooms and Recovery Room) lack any aliquant area alarm.\nCorrection: Provide and install new panels and update existing area alarm to support at the minimum: O , MA, VAC, WAGD, N , and N O. Include all transducers, wiring, labeling, and verification.\nProvide and install one (1) new Master Area Alarm Panel in Room #3204. New area alarm panel shall support: O , MA, VAC, WAGD, N , and N O.\nRetrofit the existing hallway area alarm panel and sensors for monitoring rooms #3210 and #3218. Area alarm panel for shall support: O , MA, VAC, and WAGD.\nProvide one (1) new area alarm panel in the hallway for monitoring rooms #3235 and #3225. New area alarm panel shall support: O , MA, VAC, WAGD, N , and N O.\nAdditional Requirements:\nAll panels shall be fully integrated, tested, and commissioned in accordance with NFPA 99 5.1.11.\nDedicated conduit for low-voltage cabling.\nSupervised loops with proper EOL termination.\nPanel mounting, programming, and labeling.\nRelay outputs for BMS / nurse-call integration if required.\nSensor commissioning on every monitored line.\nFull simulated alarm test at each source and each panel.\nPerform full functional testing, including setpoints, audible/visual alarms, test mode, and signal accuracy checks.\nFinal verification shall be completed by a qualified ASSE 6030 Medical Gas Verifier.\nProvide a one year warranty on parts, labor, and workmanship.\n\nZone Valve Box (ZVB)\nDeficiency: Operation Room (PRE OP) and Endoscope lack required intervening walls between ZVBs and the outlets/inlets they serve. Surgery Ward lacks ZVBs.\nCorrection: Revise architectural layout to include intervening walls. Provide all necessary piping, enclosures, labeling, and materials.\nRoom #3304 (PRE OP) - Relocate existing ZVB (O , MA, VAC) to NFPA compliant hallway locations.\nRooms #3315 (Endo) - Relocate existing ZVB (O , MA, VAC) to NFPA compliant hallway locations.\nRoom 3210 Provide one (1) new ZVB (WAGD, O , VAC, MA).\nRoom 3218 Provide one (1) new ZVB (WAGD, O , VAC, MA).\nRoom 3235 Provide one (1) new ZVB (WAGD, N O, N ) and one (1) ZVB (O , MA, VAC).\nRoom 3225 Provide one (1) new ZVB (WAGD, N O, N ) and one (1) ZVB (O , MA, VAC).\nRequirements per NFPA 99:\nAll installations shall meet NFPA 99 requirements for isolation capability, accessibility, and labeling.\nZone valves must be located such that a wall intervenes between valves and outlets they control.\nZone valves shall serve only outlets on the same story and not be located inside rooms they control.\n\nNitrogen (N ) Zone Valves\nDeficiency: No N zone valves currently serve Operating Rooms #3232 and #3235.\nCorrection: Verify whether any N outlets were previously removed or isolated.\nInstall new N zone valves, DISS standard outlets, and associated labeling/enclosures as required.\nPerform functional isolation tests, leak checks, and pressure indication verification.\n\nWaste Anesthetic Gas Disposal (WAGD) Systems\nDeficiency: No WAGD inlets exist in Surgery Ward.\nCorrection: Provide and install WAGD-VAC and WAGD inlet assemblies (headwall or boom). Route piping, label, and test each installation. One WAGD valve per room is required.\nProvide a complete WAGD system serving rooms #3235, #3225, #3218, and #3210 including:\nWAGD-VAC: Determine vacuum levels based on anesthetic agents used. Designed for safe operation in environments with elevated oxygen concentrations.\nUses a non contact, oil free pumping mechanism that prevents lubrication from entering the airflow stream. All internal components - including those exposed to the airflow path - shall be cleaned and prepared using oxygen compatible processes and materials. Pumps and system modules shall be factory assembled, piped, wired, and tested prior to delivery.\nVariable speed technology shall modulate pump speed to match real time vacuum demand to improve efficiency, reduce wear, and minimize heat and noise generation. System shall allow single point connection for electrical power, vacuum intake, and exhaust discharge. Exhaust manifold shall include a dedicated drip leg with shutoff valve.\nFour passive EVAC type WAGD console inlets. Maintain minimum 5 ft separation between medical vacuum and WAGD per NFPA 99 (2005 Edition.)\nWAGD sensors, service valves, riser valves, and source valves. Size piping, valves, regulators, and branch lines per NFPA 99 pressure loss and performance criteria. Piping, penetrations, supports, and identification\nFinal equipment location shall be coordinated and approved by Owner and Engineer of Record:\nValidate static and dynamic vacuum levels.\nVerify WAGD inlet flow capacity.\nTest alarm conditions and valve isolation.\nConfirm complete separation between WAGD and medical vacuum systems.\n\nHard Ceiling\nThe Contractor shall fully account for work above hard lid, non accessible ceilings in the following surgery ward rooms:\nHard ceiling work shall be included in the bid and include:\nSelective demolition only where access is required.\nTemporary fire rated closures and daily sealing.\nICRA compliant barriers, negative air, and HEPA filtration.\nFull ceiling restoration matching existing finish.\nRestoration of all fire rated assemblies.\nCoordination with COR, Infection Control, and Surgery.\n\nCommissioning Requirements\nCommissioning shall comply with Specification 22 08 00 and 01 91 00. Work includes:\nPre functional checklists.\nFunctional performance testing witnessed by the COMMISSIONING AGENT (CXA).\nSystems manuals, test results, and training deliverables. Refer to Whole Building Commissioning Process Manual (May 1, 2013; minor revisions 11/01/2013).\n\nPost Construction Testing & Verification\nContractor shall perform complete NFPA 99 testing including:\nAlarm system testing audio/visual, setpoints, transducer accuracy.\nZone valve testing leak checks, pressure indication, labeling.\nOutlet/inlet testing static and dynamic pressure, flow drop, cross connection checks.\nSource system verification dew point, CO monitoring, manifold changeover, relief valve venting, pigtail documentation.\n\nDocumentation Deliverables\nContractor shall provide:\nFinal test reports and checklists.\nAs built AutoCAD drawings.\nUpdated utility and piping maps.\nValve tag lists and labeling photos.\nLockout/tagout point identification (Specification 22 05 11).","html":"SCOPE\n\nA recent medical gas evaluation identified deficiencies on the 3rd Floor. The Contractor shall correct all cited items and ensure all O  (OXYGEN), MA (COMPRESS MEDICAL AIR), VAC (MEDICAL VACUUM), WAGD (Waste Anesthetic Gas Disposal), N  (Nitrogen), N O (Nitrous Oxide), valves, alarms, and infrastructure are fully code compliant and fully operational.\n\nCode Compliance Requirements\nAll work shall be performed in accordance with NFPA 99, 2018 Edition.\nAny location where N O or halogenated anesthetic agents may be administered - including CT, X-ray, and imaging rooms using roll in anesthesia machines - shall be equipped with dedicated WAGD inlets.\nRooms receiving WAGD shall be treated as anesthetizing locations. Contractor shall provide:\nA dedicated zone valve assembly per NFPA 99 Section 5.1.4.6.2.\nArea alarm coverage meeting NFPA 99 requirements.\n\nINFECTION CONTROL RISK ASSESSMENT (ICRA)\nContractor shall coordinate with Infection Prevention and Control and complete an ICRA before work begins.\nICRA measures may include barriers, negative air, HEPA filtration, dust containment, restricted work hours, cleaning protocols, and traffic controls.\nContractor must implement and maintain all ICRA requirements for the project duration and promptly correct any deficiencies identified by Infection Control, Safety, or the COR.\n\nPhasing and Shutdown Requirements\nSubmit a phasing and shutdown plan at least 14 working days prior to any interruption.\nNo room may begin until the previous room is fully commissioned.\nEach Room Must Follow These Phases:\nPre Construction Coordination\nICRA Containment Setup\nSelective Ceiling Demolition & Rough In\nGas Shutdowns & Tie Ins. Follow NFPA 99 procedures for tie ins, including depressurization, blow down, leak testing, and post connection re verification. Installation personnel must be credentialed:\nASSE 6010 medical gas installers.\nBrazers qualified per ASME BPVC Section IX / AWS B2.2.\nDevice Installation\nCeiling Restoration (hard ceiling rooms only, as applicable in others)\nNFPA 99 Room Level Testing & Commissioning (CxA witnessed). Room level commissioning includes flow, pressure, cross connection testing, ZVB verification, alarm testing, labeling, and source system checks.\nRoom Closeout & Transition to Next Room\nMaintain continuous facility operations. Comply with infection control, egress, and safety standards in active care areas.\n\nArea Alarm\nDeficiency: Surgery Ward (Surgery Rooms and Recovery Room) lack any aliquant area alarm.\nCorrection: Provide and install new panels and update existing area alarm to support at the minimum: O , MA, VAC, WAGD, N , and N O. Include all transducers, wiring, labeling, and verification.\nProvide and install one (1) new Master Area Alarm Panel in Room #3204. New area alarm panel shall support: O , MA, VAC, WAGD, N , and N O.\nRetrofit the existing hallway area alarm panel and sensors for monitoring rooms #3210 and #3218. Area alarm panel for shall support: O , MA, VAC, and WAGD.\nProvide one (1) new area alarm panel in the hallway for monitoring rooms #3235 and #3225. New area alarm panel shall support: O , MA, VAC, WAGD, N , and N O.\nAdditional Requirements:\nAll panels shall be fully integrated, tested, and commissioned in accordance with NFPA 99 5.1.11.  \nDedicated conduit for low-voltage cabling.\nSupervised loops with proper EOL termination.\nPanel mounting, programming, and labeling.\nRelay outputs for BMS / nurse-call integration if required.\nSensor commissioning on every monitored line.\nFull simulated alarm test at each source and each panel.\nPerform full functional testing, including setpoints, audible/visual alarms, test mode, and signal accuracy checks.\nFinal verification shall be completed by a qualified ASSE 6030 Medical Gas Verifier.\nProvide a one year warranty on parts, labor, and workmanship.\n\nZone Valve Box (ZVB)\nDeficiency: Operation Room (PRE OP) and Endoscope lack required intervening walls between ZVBs and the outlets/inlets they serve. Surgery Ward lacks ZVBs. \nCorrection: Revise architectural layout to include intervening walls. Provide all necessary piping, enclosures, labeling, and materials.\nRoom #3304 (PRE OP) - Relocate existing ZVB (O , MA, VAC) to NFPA compliant hallway locations.\nRooms #3315 (Endo) - Relocate existing ZVB (O , MA, VAC) to NFPA compliant hallway locations.\nRoom 3210   Provide one (1) new ZVB (WAGD, O , VAC, MA).\nRoom 3218   Provide one (1) new ZVB (WAGD, O , VAC, MA).\nRoom 3235   Provide one (1) new ZVB (WAGD, N O, N ) and one (1) ZVB (O , MA, VAC).\nRoom 3225   Provide one (1) new ZVB (WAGD, N O, N ) and one (1) ZVB (O , MA, VAC).\nRequirements per NFPA 99:\n All installations shall meet NFPA 99 requirements for isolation capability, accessibility, and labeling.\nZone valves must be located such that a wall intervenes between valves and outlets they control.\nZone valves shall serve only outlets on the same story and not be located inside rooms they control.\n\nNitrogen (N ) Zone Valves\nDeficiency: No N  zone valves currently serve Operating Rooms #3232 and #3235.\nCorrection: Verify whether any N  outlets were previously removed or isolated. \nInstall new N  zone valves, DISS standard outlets, and associated labeling/enclosures as required.\nPerform functional isolation tests, leak checks, and pressure indication verification.\n\nWaste Anesthetic Gas Disposal (WAGD) Systems\nDeficiency: No WAGD inlets exist in Surgery Ward.\nCorrection: Provide and install WAGD-VAC and WAGD inlet assemblies (headwall or boom). Route piping, label, and test each installation. One WAGD valve per room is required. \nProvide a complete WAGD system serving rooms #3235, #3225, #3218, and #3210 including:\nWAGD-VAC: Determine vacuum levels based on anesthetic agents used. Designed for safe operation in environments with elevated oxygen concentrations. \nUses a non contact, oil free pumping mechanism that prevents lubrication from entering the airflow stream. All internal components - including those exposed to the airflow path - shall be cleaned and prepared using oxygen compatible processes and materials. Pumps and system modules shall be factory assembled, piped, wired, and tested prior to delivery. \nVariable speed technology shall modulate pump speed to match real time vacuum demand to improve efficiency, reduce wear, and minimize heat and noise generation. System shall allow single point connection for electrical power, vacuum intake, and exhaust discharge. Exhaust manifold shall include a dedicated drip leg with shutoff valve. \nFour passive EVAC type WAGD console inlets. Maintain minimum 5 ft separation between medical vacuum and WAGD per NFPA 99 (2005 Edition.) \nWAGD sensors, service valves, riser valves, and source valves. Size piping, valves, regulators, and branch lines per NFPA 99 pressure loss and performance criteria. Piping, penetrations, supports, and identification\nFinal equipment location shall be coordinated and approved by Owner and Engineer of Record: \nValidate static and dynamic vacuum levels.\nVerify WAGD inlet flow capacity.\nTest alarm conditions and valve isolation.\nConfirm complete separation between WAGD and medical vacuum systems.\n\nHard Ceiling\nThe Contractor shall fully account for work above hard lid, non accessible ceilings in the following surgery ward rooms:\nHard ceiling work shall be included in the bid and include:\nSelective demolition only where access is required.\nTemporary fire rated closures and daily sealing.\nICRA compliant barriers, negative air, and HEPA filtration.\nFull ceiling restoration matching existing finish.\nRestoration of all fire rated assemblies.\nCoordination with COR, Infection Control, and Surgery.\n\nCommissioning Requirements\nCommissioning shall comply with Specification 22 08 00 and 01 91 00. Work includes:\nPre functional checklists.\nFunctional performance testing witnessed by the COMMISSIONING AGENT (CXA).\nSystems manuals, test results, and training deliverables. Refer to Whole Building Commissioning Process Manual (May 1, 2013; minor revisions 11/01/2013).\n\nPost Construction Testing & Verification\nContractor shall perform complete NFPA 99 testing including:\nAlarm system testing   audio/visual, setpoints, transducer accuracy.\nZone valve testing   leak checks, pressure indication, labeling.\nOutlet/inlet testing   static and dynamic pressure, flow drop, cross connection checks.\nSource system verification   dew point, CO monitoring, manifold changeover, relief valve venting, pigtail documentation.\n\nDocumentation Deliverables\nContractor shall provide:\nFinal test reports and checklists.\nAs built AutoCAD drawings.\nUpdated utility and piping maps.\nValve tag lists and labeling photos.\nLockout/tagout point identification (Specification 22 05 11).","origin":"detail"},"contacts":[{"name":"Tiffany Rausch","role":"primary","email":"tiffany.rausch@va.gov","phone":"317-988-1521","title":"Contract Specialist"}],"place_of_performance":{"zip":"46805","city":{"code":"25000","name":"Fort Wayne"},"state":{"code":"IN","name":"Indiana"},"street":"VA Northern Indiana Health Care System (VANIHCS) Fort Wayne Campus","country":{"code":"USA","name":"UNITED STATES"},"street2":"2121 Lake Avenue"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"naics_codes":["238220"],"award":{"awardee":{}},"attachments":[{"resource_id":"cc88aa4a61334a11b02d29137308b574","name":"36C25026B0046.docx","kind":"file","mime_type":".docx","size_bytes":31992,"posted_at":"2026-06-11T19:48:53.660Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cc88aa4a61334a11b02d29137308b574/download","mirrored":false}],"awards":[],"related":[{"key":"36C25027Q0113","latest_notice_id":"30f6d444e0f641e5b23d5b4c1ec5a384","title":"Q301--Prostate Reference Lab Testing Services","solicitation_number":"36C25027Q0113","notice_type":"r","first_type":"r","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-25T21:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"621511","psc":"Q301","set_aside":null,"state":"OH","county":"39049","county_name":"Franklin County","city":"3918000","city_name":"Columbus","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C25027Q0014","latest_notice_id":"b13cc87179e947e7b42da2de44a6bde1","title":"J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland","solicitation_number":"36C25027Q0014","notice_type":"k","first_type":"k","first_posted":"2026-10-09","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"238210","psc":"J061","set_aside":"SBA","state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C25027Q0123","latest_notice_id":"fb53a332644a4c8fa983bf28c8643d2d","title":"S222--Sources Sought - Hazardous Waste Removal/Disposal Northeast Ohio VA Healthcare System - Cleveland, OH","solicitation_number":"36C25027Q0123","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T18:30:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T18:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"562112","psc":"S222","set_aside":null,"state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C25027B0009","latest_notice_id":"85b83d408f1f422885991142c2734b45","title":"Z1DA--FY27 NRM - VISN Base Modernize Nurse Call - 539-23-101","solicitation_number":"36C25027B0009","notice_type":"p","first_type":"p","first_posted":"2026-11-08","last_posted":"2026-11-08","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-09T05:16:39.607305Z"},{"key":"36C25027B0008","latest_notice_id":"5afe716a38494a6f84b1e84205805f86","title":"Z1DA--FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206","solicitation_number":"36C25027B0008","notice_type":"p","first_type":"p","first_posted":"2026-11-08","last_posted":"2026-11-08","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-09T05:16:39.607305Z"}],"similar_open":[{"key":"W911PT27QA020","latest_notice_id":"084d5efc5ec44a9885a37b90e6705ffa","title":"REMOVE AND REPAIR TWO HIGH VELOCITY AIR HANDLING UNITS","solicitation_number":"W911PT27QA020","notice_type":"k","first_type":"k","first_posted":"2026-11-05","last_posted":"2026-11-05","notices":1,"due_at":"2026-11-25T18:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911PT","office_name":"W6QK ACC WVA","naics":"238220","psc":"Z2NB","set_aside":"SBA","state":"NY","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"description","state_evidence":"IGH VELOCITY AIR HANDLING UNITSPROJECT LOCATION: WATERVLIET ARSENAL","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"},{"key":"2031ZA27B00001","latest_notice_id":"622efd27a6cf48589063c08d3700b96b","title":"Modernize Regenerative Thermal Oxidizer (RTO)","solicitation_number":"2031ZA27B00001","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-25T21:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-020","dept_name":"TREASURY, DEPARTMENT OF THE","sub_key":"s-2041","sub_name":"BUREAU OF ENGRAVING AND PRINTING","office_key":"o-2031ZA","office_name":"OFFICE OF THE CHIEF PROCUREMENT OFFICER","naics":"238220","psc":"Z2AZ","set_aside":null,"state":"TX","county":"48439","county_name":"Tarrant County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"140PP027B0004","latest_notice_id":"53398cb59b8f4b0687efd4e3fa6241dc","title":"Z--13976 PUHO FIRE PROTECTION AT DORM","solicitation_number":"140PP027B0004","notice_type":"r","first_type":"s","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":2,"due_at":"2026-11-26T03:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T03:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140PP0","office_name":"NATIONAL PARK SERVICE CONTRACTING ACTIVITY","naics":"238220","psc":"Z2AA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open_total":59,"indexable":false}