{"canonical":"https://sealedbidder.com/opportunities/36c25026b0027","key":"36C25026B0027","url":"https://sealedbidder.com/opportunities/36c25026b0027","title":"P400--Building 149 and 150 Demolition 552-26-201","solicitation_number":"36C25026B0027","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-03-19T14:00:00Z","first_posted":"2026-02-02","last_posted":"2026-05-05","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"238910","psc":"P400","set_aside":"SDVOSBC","place_state":"OH","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"39113","place_county_name":"Montgomery County","place_city":"3921000","place_city_name":"Dayton","winner":"KOALA ROOFING LLC","award_amount":"186238.00","publications":[{"notice_id":"45c2140ebc404f27a4d649bc67e1d082","title":"P400--Building 149 and 150 Demolition 552-26-201","solicitation_number":"36C25026B0027","notice_type":"p","base_type":"p","posted":"2026-02-02","posted_at":"2026-02-02T14:53:24.738Z","due_at":"2026-03-19T14:00:00Z","due_date":"2026-03-19","cancelled":false,"archived":true,"archive_date":"2026-04-18","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/45c2140ebc404f27a4d649bc67e1d082/view","enriched":true,"history":[{"index":4,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-02T14:53:24.738Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"45c2140ebc404f27a4d649bc67e1d082","solicitation_number":"36C25026B0027"},{"index":2,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-11T14:45:17.655Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9183b45576b0437eb7067822a4f8da6c","solicitation_number":"36C25026B0027","related_opportunity_id":"45c2140ebc404f27a4d649bc67e1d082"}]},{"notice_id":"9183b45576b0437eb7067822a4f8da6c","title":"P400--Building 149 and 150 Demolition 552-26-201","solicitation_number":"36C25026B0027","notice_type":"o","base_type":"p","posted":"2026-02-11","posted_at":"2026-02-11T14:45:17.655Z","due_at":"2026-03-13T14:00:00Z","due_date":"2026-03-13","cancelled":false,"archived":true,"archive_date":"2026-04-12","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9183b45576b0437eb7067822a4f8da6c/view","enriched":true,"history":[{"index":8,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-10T12:24:41.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"103ef9e64f28491ca91d771b6a5399f4","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":6,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-02T14:53:24.738Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"45c2140ebc404f27a4d649bc67e1d082","solicitation_number":"36C25026B0027"},{"index":4,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T18:04:40.753Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c785320269c145fc8039b086dfe6a454","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":3,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T14:20:31.819Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"56f4346ff5d44d26b352711cd29b8af1","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":2,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-11T14:45:17.655Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9183b45576b0437eb7067822a4f8da6c","solicitation_number":"36C25026B0027","related_opportunity_id":"45c2140ebc404f27a4d649bc67e1d082"}]},{"notice_id":"56f4346ff5d44d26b352711cd29b8af1","title":"P400--Building 149 and 150 Demolition 552-26-201","solicitation_number":"36C25026B0027","notice_type":"o","base_type":"o","posted":"2026-02-13","posted_at":"2026-02-13T14:20:31.819Z","due_at":"2026-03-19T14:00:00Z","due_date":"2026-03-19","cancelled":false,"archived":true,"archive_date":"2026-04-18","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/56f4346ff5d44d26b352711cd29b8af1/view","enriched":true,"history":[{"index":5,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-10T12:24:41.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"103ef9e64f28491ca91d771b6a5399f4","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":3,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T18:04:40.753Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c785320269c145fc8039b086dfe6a454","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":2,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T14:20:31.819Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"56f4346ff5d44d26b352711cd29b8af1","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":1,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-11T14:45:17.655Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9183b45576b0437eb7067822a4f8da6c","solicitation_number":"36C25026B0027","related_opportunity_id":"45c2140ebc404f27a4d649bc67e1d082"}]},{"notice_id":"c785320269c145fc8039b086dfe6a454","title":"P400--Building 149 and 150 Demolition 552-26-201","solicitation_number":"36C25026B0027","notice_type":"o","base_type":"o","posted":"2026-02-23","posted_at":"2026-02-23T18:04:40.753Z","due_at":"2026-03-19T14:00:00Z","due_date":"2026-03-19","cancelled":false,"archived":true,"archive_date":"2026-04-18","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c785320269c145fc8039b086dfe6a454/view","enriched":true,"history":[{"index":5,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-10T12:24:41.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"103ef9e64f28491ca91d771b6a5399f4","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":3,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T18:04:40.753Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c785320269c145fc8039b086dfe6a454","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":2,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T14:20:31.819Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"56f4346ff5d44d26b352711cd29b8af1","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":1,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-11T14:45:17.655Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9183b45576b0437eb7067822a4f8da6c","solicitation_number":"36C25026B0027","related_opportunity_id":"45c2140ebc404f27a4d649bc67e1d082"}]},{"notice_id":"103ef9e64f28491ca91d771b6a5399f4","title":"P400--Building 149 and 150 Demolition 552-26-201","solicitation_number":"36C25026B0027","notice_type":"o","base_type":"o","posted":"2026-03-10","posted_at":"2026-03-10T12:24:41.720Z","due_at":"2026-03-19T14:00:00Z","due_date":"2026-03-19","cancelled":false,"archived":true,"archive_date":"2026-04-18","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/103ef9e64f28491ca91d771b6a5399f4/view","enriched":true,"history":[{"index":5,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-10T12:24:41.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"103ef9e64f28491ca91d771b6a5399f4","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":3,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T18:04:40.753Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c785320269c145fc8039b086dfe6a454","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":2,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T14:20:31.819Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"56f4346ff5d44d26b352711cd29b8af1","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":1,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-11T14:45:17.655Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9183b45576b0437eb7067822a4f8da6c","solicitation_number":"36C25026B0027","related_opportunity_id":"45c2140ebc404f27a4d649bc67e1d082"}]},{"notice_id":"619749e0591b4b0f8ecd21e052744d01","title":"P400--Building 149 and 150 Demolition 552-26-201","solicitation_number":"36C25026B0027","notice_type":"a","base_type":"a","posted":"2026-05-05","posted_at":"2026-05-05T10:42:00.264Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2026-06-04","removed_at":null,"award_number":"36C25026C0099","awardee_name":"KOALA ROOFING LLC","amount":"186238.00","link_sam":"https://sam.gov/workspace/contract/opp/619749e0591b4b0f8ecd21e052744d01/view","enriched":true,"history":[{"index":3,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-05T10:42:00.264Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"619749e0591b4b0f8ecd21e052744d01","solicitation_number":"36C25026B0027"}]}],"latest_notice_id":"619749e0591b4b0f8ecd21e052744d01","first_type":"p","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-02-02","posted_at":"2026-02-02T14:53:24.738Z","created_at":"2026-02-02T14:53:22.499Z","modified_at":"2026-04-19T04:00:06.704Z","response_deadline":{"raw":"2026-03-19T10:00:00-04:00","utc":"2026-03-19T14:00:00Z","date":"2026-03-19","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/45c2140ebc404f27a4d649bc67e1d082/view"},"naics":{"codes":["238910"],"primary":"238910"},"title":"P400--Building 149 and 150 Demolition 552-26-201","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-18","archive_type":"auto_custom"},"history":[{"index":4,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-02T14:53:24.738Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"45c2140ebc404f27a4d649bc67e1d082","solicitation_number":"36C25026B0027"},{"index":2,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-11T14:45:17.655Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9183b45576b0437eb7067822a4f8da6c","solicitation_number":"36C25026B0027","related_opportunity_id":"45c2140ebc404f27a4d649bc67e1d082"}],"contacts":[{"name":"Julie Stout","role":"primary","email":"julie.stout@va.gov","phone":"317-988-1519","title":"Contracting Officer"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"45c2140ebc404f27a4d649bc67e1d082","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"9183b45576b0437eb7067822a4f8da6c","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T07:37:38.022288991Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"d8999d216d7bc4e3b959194f4b386ea385a354b611a43eaf39dec877eafd6f67","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-14T07:37:38.022288991Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Description proposed work.\nThis project is to demolish 2 brick buildings, designated as B149 and B150. Both buildings have experienced a complete roof collapse causing substantial damage to the supporting walls. The extent of the damage renders the buildings irreparable, necessitating complete demolition of roof structure, and exterior supporting walls.  Building 149 is located in a large courtyard surrounded by other structures and connecting corridors, which necessitates additional access and demolition considerations.\nThe contractor shall complete the requirements described in this scope of work, drawings and specifications within 120 calendar days after the notice to proceed. Maintaining the operational capability of the medical center is paramount and the contractor shall coordinate all activity schedules with the COR prior to execution and two (2) weeks in advance. Work during this project shall be conducted during normal business hours and/or after hours/weekends according to the nature of the work. Normal business hours are defined as 7:00AM to 4:30PM Monday through Friday.\nTentative dates for issuing invitation.\nThe VA plans to issue the solicitation on or about 6 February 2026.\nWill plans be available forÂ inspectionÂ without charge?\nThe solicitation and all appliable information, drawings and specifications will be published electronically at no cost. \nDate by which requests for the invitation for bidsÂ shouldÂ be submitted.\nWill be determined based on actual solicitation posting. \nRestricted to small businesses?\nThis procurement is 100% set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) socio-economic concerns. \nAmount to be charged forÂ solicitationÂ documents.\n$0.00\nPublicized through theÂ Governmentwide point of entry?\nYes. \n***END OF SYNOPSIS***","text":"Description proposed work.\nThis project is to demolish 2 brick buildings, designated as B149 and B150. Both buildings have experienced a complete roof collapse causing substantial damage to the supporting walls. The extent of the damage renders the buildings irreparable, necessitating complete demolition of roof structure, and exterior supporting walls. Building 149 is located in a large courtyard surrounded by other structures and connecting corridors, which necessitates additional access and demolition considerations.\nThe contractor shall complete the requirements described in this scope of work, drawings and specifications within 120 calendar days after the notice to proceed. Maintaining the operational capability of the medical center is paramount and the contractor shall coordinate all activity schedules with the COR prior to execution and two (2) weeks in advance. Work during this project shall be conducted during normal business hours and/or after hours/weekends according to the nature of the work. Normal business hours are defined as 7:00AM to 4:30PM Monday through Friday.\nTentative dates for issuing invitation.\nThe VA plans to issue the solicitation on or about 6 February 2026.\nWill plans be available forÂ inspectionÂ without charge?\nThe solicitation and all appliable information, drawings and specifications will be published electronically at no cost.\nDate by which requests for the invitation for bidsÂ shouldÂ be submitted.\nWill be determined based on actual solicitation posting.\nRestricted to small businesses?\nThis procurement is 100% set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) socio-economic concerns.\nAmount to be charged forÂ solicitationÂ documents.\n$0.00\nPublicized through theÂ Governmentwide point of entry?\nYes.\n***END OF SYNOPSIS***","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C25026B0027","place_of_performance":{"zip":"45428","city":{"code":"21000","name":"Dayton"},"state":{"code":"OH","name":"Ohio"},"street":"Dayton VA Medical Center 4100 W. 3rd Street","country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"P400"},{"award":{"awardee":{}},"dates":{"posted":"2026-02-11","posted_at":"2026-02-11T14:45:17.655Z","created_at":"2026-02-11T14:44:36.003Z","modified_at":"2026-04-19T04:00:06.704Z","response_deadline":{"raw":"2026-03-13T10:00:00-04:00","utc":"2026-03-13T14:00:00Z","date":"2026-03-13","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9183b45576b0437eb7067822a4f8da6c/view"},"naics":{"codes":["238910"],"primary":"238910"},"title":"P400--Building 149 and 150 Demolition 552-26-201","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-12","archive_type":"auto_custom"},"history":[{"index":8,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-10T12:24:41.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"103ef9e64f28491ca91d771b6a5399f4","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":6,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-02T14:53:24.738Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"45c2140ebc404f27a4d649bc67e1d082","solicitation_number":"36C25026B0027"},{"index":4,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T18:04:40.753Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c785320269c145fc8039b086dfe6a454","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":3,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T14:20:31.819Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"56f4346ff5d44d26b352711cd29b8af1","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":2,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-11T14:45:17.655Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9183b45576b0437eb7067822a4f8da6c","solicitation_number":"36C25026B0027","related_opportunity_id":"45c2140ebc404f27a4d649bc67e1d082"}],"contacts":[{"name":"Julie A Stout","role":"primary","email":"Julie.Stout@va.gov","title":"Division Chief"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"9183b45576b0437eb7067822a4f8da6c","lineage_id":"9183b45576b0437eb7067822a4f8da6c","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-13T03:28:36.413398847Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"83a3e4d270f6096b3722df4d4c473bf37e01c5b9fccd453097a9924afd7ff861","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-13T03:28:36.413398847Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"STATEMENT OF WORK (SOW)\n\nContract Title.  552-26-203 Demolition of Buildings 149 and 150\nBackground.  \nThis Statement of Work (SOW) outlines the requirements for demolishing two brick buildings, designated as Building 149 and Building 150. Both buildings have experienced a complete roof collapse causing substantial damage to the supporting walls. The extent of the damage renders the buildings irreparable, necessitating complete demolition of roof structure, and exterior supporting walls.  Building 149 is located in a large courtyard surrounded by other structures and connecting corridors, which necessitates additional access and demolition considerations.\nScope. The contractor shall supply all necessary labor, materials, equipment, and services to execute the following tasks: \n\nDemolition. Demolition of Building walls and roof system in their entirety.\n\nUtility Removal and Termination.\nRemoval and safe termination of steam and condensate return lines in each building at their source.\nRemoval and safe termination of electrical systems in each building at their source.\nRemoval and safe termination of water supply in each building at their source.\nThe contractor shall provide a detailed Utility Shutdown Plan outlining the steps and precautions for safely shutting down, de-energizing, and terminating all utilities for these two buildings.\n\nRetention of Structural Elements.\nThe concrete floor of each building is to be protected and preserved.\nSidewalks adjacent to both buildings are to be protected and preserved.\nTunnels with concrete lids are to be protected and preserved.\n\n Temporary Fencing.\nInstallation and maintenance of temporary fencing around the entire perimeter of the demolition sites for both Building 149 and Building 150 for the duration of the project .\nFencing must be a minimum of six (6) feet high and secured to prevent unauthorized access.\nClearly marked construction site signs to be placed on the fencing to indicate restricted access and necessary safety precautions.\n\n Construction Waste Documentation.\nThe contractor shall document all construction waste generated during the demolition process.\nProvide documentation to the COR detailing the types and quantities of construction waste, including disposal methods and locations.\n\n Daily Logs.\nThe contractor shall maintain and submit daily logs of all activities on the site.\nDaily Logs should include details of work performed, personnel on-site, equipment used, any safety incidents or near misses, and any other relevant information.\nDaily logs should be submitted to the Contracting Officer's Representative by the end of each work week.\n\nPerformance Monitoring. The Contracting Officer or their Representative will perform inspections to verify compliance with the SOW.\nSecurity Requirements. The C&A requirements do not apply, and a Security Accreditation Package is not required.\nSecurity Badges. \nAll contractor personnel must be issued and visibly wear security badges at all times while on-site.\nSecurity badges must include the contractor's name and photo identification.\nProcedures for obtaining and returning security badges must be coordinated with the Contracting Officer's Representative.\n\nSafety and Compliance.\nDemolition activities must strictly comply with all applicable federal, state, and local regulations, ensuring adherence to the highest safety and environmental standards. This includes, but is not limited to:\n\nOccupational Safety and Health Administration (OSHA) Standards.\nOSHA 29 CFR 1926 Subpart T - Demolition, which outlines general safety and health provisions specific to demolition activities.\nOSHA 29 CFR 1910.147 - The control of hazardous energy (lockout/tagout) to prevent accidental startup of machinery and the release of hazardous energy.\nOSHA 29 CFR 1926 Subpart E - Personal Protective and Life Saving Equipment, ensuring all workers are equipped with the necessary safety gear.\n\nEnvironmental Protection Agency (EPA) Regulations.\nCompliance with the Clean Water Act (CWA) for managing water runoff and discharges.\nAdherence to the Clean Air Act (CAA) for controlling dust and emissions, particularly the National Emission Standards for Hazardous Air Pollutants (NESHAP) regarding asbestos.\n\nMaster Specification.\nSpecification 02 41 00   Demolition\nSpecification 01 35 26   Safety Requirements for Major Projects\n\nState and Local Regulations.\nObtain all necessary permits from state and local authorities, including demolition permits and waste disposal permits.\nAdherence to state-specific occupational safety regulations and environmental protection guidelines.\n\nNational Fire Protection Association (NFPA) Standards.\nNFPA 70 (National Electrical Code) for ensuring all electrical disconnections are performed safely.\nNFPA 241 for safeguarding construction, alteration, and demolition operations.\n\nHazardous Material Handling.\nCompliance with the Resource Conservation and Recovery Act (RCRA) for the management and disposal of hazardous waste.\nAdherence to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for any potential hazardous substance releases and required reporting.\nAll activities must be conducted under the supervision of qualified and certified personnel, ensuring complete adherence to these standards and regulations. Detailed records of compliance shall be maintained and available for review upon request.\nThe contractor shall implement a site-specific safety plan addressing all potential hazards, including the safe removal of materials of unknown type and quantity buried under the roof debris. \n\nUtility Termination.\nThe contractor shall verify, ensure, and coordinate the proper disconnection and termination of all utility lines, including steam, water, and electricity associated with these two buildings. This involves collaborating with relevant utility providers, conducting thorough inspections to confirm disconnections, and implementing safety protocols to prevent any accidental utility service disruptions or hazards during the demolition process.\nThe contractor shall obtain all necessary permits and approvals required for the termination of utility services. This includes coordinating activities with Engineering and effected services, submitting detailed shop drawings and documentation, and ensuring compliance with all relevant regulations and codes for the safe disconnection of utilities such as water, electricity, and steam lines.\nThe contractor is strictly prohibited from performing any electrical hot work under any circumstances. Prior to commencing any demolition or construction activities, all electrical systems must be completely de-energized. This process includes isolating and shutting down power sources, locking out and tagging out all electrical circuits in accordance with OSHA Standard 29 CFR 1910.147 for the control of hazardous energy, and thoroughly verifying that the area is safe to work in through proper testing and inspection procedures as outlined in NFPA 70E. Additionally, the contractor must maintain documentation confirming that these safety measures have been implemented and adhered to, including compliance with the National Electrical Code (NEC) and other relevant federal, state, and local regulations.\nThe contractor is required to provide a comprehensive Utility Shutdown Plan that outlines the specific steps and precautions for safely shutting down, de-energizing, and terminating all utility services. This plan must adhere to all relevant regulations and standards, including but not limited to OSHA Standard 29 CFR 1910.147, which covers the control of hazardous energy (lockout/tagout) procedures, and NFPA 70E for electrical safety in the workplace.\n \nThe plan should include:\nIdentification and assessment of all utility lines, including electricity, water, steam, gas, and any other services.\nDetailed procedures for isolating and shutting down power sources in compliance with OSHA lockout/tagout requirements.\nVerification processes to ensure complete de-energization and safety, involving appropriate testing and inspection protocols as per NFPA 70E.\nCoordination with utility providers and relevant regulatory agencies to secure all necessary permits and approvals for utility termination, ensuring compliance with federal, state, and local codes, including the National Electrical Code (NEC).\nSafety precautions to protect workers and the environment from potential hazards associated with the utility shutdown.\nDocumentation and records of all steps taken in the shutdown process, including signed verification of de-energization and termination by qualified personnel.\nThis Utility Shutdown Plan must be submitted for approval prior to the commencement of any demolition or construction activities.\n\nSite Protection.\nEnsure protection of the concrete floor, sidewalks, and tunnels throughout the demolition process.\nAny damage to the retained structures must be repaired at the contractor's expense.\nAdditional Considerations for Building 149.\nGiven the building's location in a large courtyard surrounded by other structures and enclosed connecting corridors, it is essential to undertake additional planning and precautions to ensure the safety and integrity of the adjacent buildings and structures.\nThe contractor must develop and submit a comprehensive access plan to ensure safe entry and exit from the courtyard, while minimizing disruption to the adjacent buildings.\nCoordinate with the Contracting Officer s Representative (COR) for stakeholders or departments occupying the surrounding buildings to address any potential concerns and establish a schedule that minimizes disruption to ongoing operations.\nPerform structural assessments and institute monitoring of adjacent buildings and connecting corridors to prevent any damage during demolition activities.\nImplement dust control and noise mitigation measures to minimize disturbances to the occupants of the surrounding buildings.\nMaterials of unknown type and quantity have been identified to be in and beneath the collapsed roof structure and will need to be safely removed, preventing spills or runoff, and disposed of accordingly.  Please refer to the attached photographs of Building 149. \nProvide a detailed description of all hazardous materials located in the structure and provide it to the Contracting Officer Representative (COR).\n\nAdditional Considerations for Building 150.\nThe contractor must develop and submit a comprehensive access plan to ensure safe entry and exit from the courtyard, while minimizing disruption to the adjacent buildings.\nCoordinate with the Contracting Officer s Representative (COR) for stakeholders or departments occupying the surrounding buildings to address any potential concerns and establish a schedule that minimizes disruption to ongoing operations.\nPerform structural assessments and institute monitoring of adjacent buildings.\nImplement dust control and noise mitigation measures to minimize disturbances to the occupants of the surrounding buildings.\nMaterials of unknown type and quantity have been identified to be in and beneath the collapsed roof structure and will need to be safely removed, preventing spills or runoff, and disposed of accordingly.  Please refer to the attached photographs of Building150.\nProvide a detailed description of all hazardous materials located in the structure and provide it to the Contracting Officer Representative (COR).\n\nDeliverables.\nA detailed project schedule, including milestones, to be submitted within 10 days of NTP.\nWeekly progress reports detailing complete work, safety compliance, and any issues encountered.\nFinal report upon completion, including photographs of the retained structural elements.\nUtility Shutdown Plan for the safe shutdown, de-energizing, and termination of all utilities.\nConstruction waste documentation detailing the types and quantities of construction waste, including disposal methods and locations.\nDaily logs of all on-site activities, submitted to the Contracting Officer's Representative by the end of each working week.\nSecurity Badging documentation. \n\nSubmittal Requirements.\nRisk Assessment Safety Plan.\nEnvironmental Protection Plan.\nDetailed Abatement Plan.\nPermits and Approvals for Utility Termination.\nDetailed Demolition Plan, Including Methods for Protecting Retained Structures.\nHazardous Materials Survey and Inventory.\nAccess Plan for Building 149.\nCoordination Plan for Surrounding Buildings.\nUtility Shutdown Plan.\nConstruction waste documentation.\nDaily logs of on-site activities.\n \nQuality Control.\nThe contractor shall implement a Quality Control Plan to ensure compliance with the Statement of Work (SOW) requirements and verify that all work is performed to the specified standards and specifications.\n\nInspection and Acceptance Criteria. Final acceptance will be based on:\nSuccessful demolition and removal of specified elements.\nSafe disconnection and termination of utilities.\nPreservation of specified structural elements without damage.\nSuccessful implementation of access and coordination plans for Building 149.\nProper installation and maintenance of temporary fencing throughout the project duration.\nSuccessful execution of the Utility Shutdown Plan.\nSubmission of complete and accurate construction waste documentation.\nConsistent and timely submission of daily logs.\n\nPlace of Performance. 4100 West Third St., B149 and B150, Dayton, Ohio 45428\n\nPeriod of Performance. The contractor shall complete all tasks within 120 days from the issuance date of the Notice to Proceed (NTP)\n\nSpecifications.\n01 00 00 - General Requirements\n01 32 16.15 - Project Schedules (Small Projects)\n01 33 23 - Shop Drawings, Product Data, and Samples\n01 35 26 - Safety Requirements\n01 45 00 - Quality Control\n01 45 29 - Testing Laboratory Services\n01 57 19 - Temporary Environmental Controls\n01 74 19 - Construction Waste Management\n02 41 00   Demolition\n02 82 11 - Traditional Asbestos Abatement\n02 82 13.41 - Asbestos Abatement for Total Demolition Project\n02 83 33.13 - Lead-Based Paint Removal and Disposal\n26 24 16 - Panelboards\n26 29 21 - Enclosed Switches and Circuit Breakers\n33 63 00 - Steam Energy Distribution","text":"STATEMENT OF WORK (SOW)\n\nContract Title. 552-26-203 Demolition of Buildings 149 and 150\nBackground.\nThis Statement of Work (SOW) outlines the requirements for demolishing two brick buildings, designated as Building 149 and Building 150. Both buildings have experienced a complete roof collapse causing substantial damage to the supporting walls. The extent of the damage renders the buildings irreparable, necessitating complete demolition of roof structure, and exterior supporting walls. Building 149 is located in a large courtyard surrounded by other structures and connecting corridors, which necessitates additional access and demolition considerations.\nScope. The contractor shall supply all necessary labor, materials, equipment, and services to execute the following tasks:\n\nDemolition. Demolition of Building walls and roof system in their entirety.\n\nUtility Removal and Termination.\nRemoval and safe termination of steam and condensate return lines in each building at their source.\nRemoval and safe termination of electrical systems in each building at their source.\nRemoval and safe termination of water supply in each building at their source.\nThe contractor shall provide a detailed Utility Shutdown Plan outlining the steps and precautions for safely shutting down, de-energizing, and terminating all utilities for these two buildings.\n\nRetention of Structural Elements.\nThe concrete floor of each building is to be protected and preserved.\nSidewalks adjacent to both buildings are to be protected and preserved.\nTunnels with concrete lids are to be protected and preserved.\n\nTemporary Fencing.\nInstallation and maintenance of temporary fencing around the entire perimeter of the demolition sites for both Building 149 and Building 150 for the duration of the project .\nFencing must be a minimum of six (6) feet high and secured to prevent unauthorized access.\nClearly marked construction site signs to be placed on the fencing to indicate restricted access and necessary safety precautions.\n\nConstruction Waste Documentation.\nThe contractor shall document all construction waste generated during the demolition process.\nProvide documentation to the COR detailing the types and quantities of construction waste, including disposal methods and locations.\n\nDaily Logs.\nThe contractor shall maintain and submit daily logs of all activities on the site.\nDaily Logs should include details of work performed, personnel on-site, equipment used, any safety incidents or near misses, and any other relevant information.\nDaily logs should be submitted to the Contracting Officer's Representative by the end of each work week.\n\nPerformance Monitoring. The Contracting Officer or their Representative will perform inspections to verify compliance with the SOW.\nSecurity Requirements. The C&A requirements do not apply, and a Security Accreditation Package is not required.\nSecurity Badges.\nAll contractor personnel must be issued and visibly wear security badges at all times while on-site.\nSecurity badges must include the contractor's name and photo identification.\nProcedures for obtaining and returning security badges must be coordinated with the Contracting Officer's Representative.\n\nSafety and Compliance.\nDemolition activities must strictly comply with all applicable federal, state, and local regulations, ensuring adherence to the highest safety and environmental standards. This includes, but is not limited to:\n\nOccupational Safety and Health Administration (OSHA) Standards.\nOSHA 29 CFR 1926 Subpart T - Demolition, which outlines general safety and health provisions specific to demolition activities.\nOSHA 29 CFR 1910.147 - The control of hazardous energy (lockout/tagout) to prevent accidental startup of machinery and the release of hazardous energy.\nOSHA 29 CFR 1926 Subpart E - Personal Protective and Life Saving Equipment, ensuring all workers are equipped with the necessary safety gear.\n\nEnvironmental Protection Agency (EPA) Regulations.\nCompliance with the Clean Water Act (CWA) for managing water runoff and discharges.\nAdherence to the Clean Air Act (CAA) for controlling dust and emissions, particularly the National Emission Standards for Hazardous Air Pollutants (NESHAP) regarding asbestos.\n\nMaster Specification.\nSpecification 02 41 00 Demolition\nSpecification 01 35 26 Safety Requirements for Major Projects\n\nState and Local Regulations.\nObtain all necessary permits from state and local authorities, including demolition permits and waste disposal permits.\nAdherence to state-specific occupational safety regulations and environmental protection guidelines.\n\nNational Fire Protection Association (NFPA) Standards.\nNFPA 70 (National Electrical Code) for ensuring all electrical disconnections are performed safely.\nNFPA 241 for safeguarding construction, alteration, and demolition operations.\n\nHazardous Material Handling.\nCompliance with the Resource Conservation and Recovery Act (RCRA) for the management and disposal of hazardous waste.\nAdherence to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for any potential hazardous substance releases and required reporting.\nAll activities must be conducted under the supervision of qualified and certified personnel, ensuring complete adherence to these standards and regulations. Detailed records of compliance shall be maintained and available for review upon request.\nThe contractor shall implement a site-specific safety plan addressing all potential hazards, including the safe removal of materials of unknown type and quantity buried under the roof debris.\n\nUtility Termination.\nThe contractor shall verify, ensure, and coordinate the proper disconnection and termination of all utility lines, including steam, water, and electricity associated with these two buildings. This involves collaborating with relevant utility providers, conducting thorough inspections to confirm disconnections, and implementing safety protocols to prevent any accidental utility service disruptions or hazards during the demolition process.\nThe contractor shall obtain all necessary permits and approvals required for the termination of utility services. This includes coordinating activities with Engineering and effected services, submitting detailed shop drawings and documentation, and ensuring compliance with all relevant regulations and codes for the safe disconnection of utilities such as water, electricity, and steam lines.\nThe contractor is strictly prohibited from performing any electrical hot work under any circumstances. Prior to commencing any demolition or construction activities, all electrical systems must be completely de-energized. This process includes isolating and shutting down power sources, locking out and tagging out all electrical circuits in accordance with OSHA Standard 29 CFR 1910.147 for the control of hazardous energy, and thoroughly verifying that the area is safe to work in through proper testing and inspection procedures as outlined in NFPA 70E. Additionally, the contractor must maintain documentation confirming that these safety measures have been implemented and adhered to, including compliance with the National Electrical Code (NEC) and other relevant federal, state, and local regulations.\nThe contractor is required to provide a comprehensive Utility Shutdown Plan that outlines the specific steps and precautions for safely shutting down, de-energizing, and terminating all utility services. This plan must adhere to all relevant regulations and standards, including but not limited to OSHA Standard 29 CFR 1910.147, which covers the control of hazardous energy (lockout/tagout) procedures, and NFPA 70E for electrical safety in the workplace.\n\nThe plan should include:\nIdentification and assessment of all utility lines, including electricity, water, steam, gas, and any other services.\nDetailed procedures for isolating and shutting down power sources in compliance with OSHA lockout/tagout requirements.\nVerification processes to ensure complete de-energization and safety, involving appropriate testing and inspection protocols as per NFPA 70E.\nCoordination with utility providers and relevant regulatory agencies to secure all necessary permits and approvals for utility termination, ensuring compliance with federal, state, and local codes, including the National Electrical Code (NEC).\nSafety precautions to protect workers and the environment from potential hazards associated with the utility shutdown.\nDocumentation and records of all steps taken in the shutdown process, including signed verification of de-energization and termination by qualified personnel.\nThis Utility Shutdown Plan must be submitted for approval prior to the commencement of any demolition or construction activities.\n\nSite Protection.\nEnsure protection of the concrete floor, sidewalks, and tunnels throughout the demolition process.\nAny damage to the retained structures must be repaired at the contractor's expense.\nAdditional Considerations for Building 149.\nGiven the building's location in a large courtyard surrounded by other structures and enclosed connecting corridors, it is essential to undertake additional planning and precautions to ensure the safety and integrity of the adjacent buildings and structures.\nThe contractor must develop and submit a comprehensive access plan to ensure safe entry and exit from the courtyard, while minimizing disruption to the adjacent buildings.\nCoordinate with the Contracting Officer s Representative (COR) for stakeholders or departments occupying the surrounding buildings to address any potential concerns and establish a schedule that minimizes disruption to ongoing operations.\nPerform structural assessments and institute monitoring of adjacent buildings and connecting corridors to prevent any damage during demolition activities.\nImplement dust control and noise mitigation measures to minimize disturbances to the occupants of the surrounding buildings.\nMaterials of unknown type and quantity have been identified to be in and beneath the collapsed roof structure and will need to be safely removed, preventing spills or runoff, and disposed of accordingly. Please refer to the attached photographs of Building 149.\nProvide a detailed description of all hazardous materials located in the structure and provide it to the Contracting Officer Representative (COR).\n\nAdditional Considerations for Building 150.\nThe contractor must develop and submit a comprehensive access plan to ensure safe entry and exit from the courtyard, while minimizing disruption to the adjacent buildings.\nCoordinate with the Contracting Officer s Representative (COR) for stakeholders or departments occupying the surrounding buildings to address any potential concerns and establish a schedule that minimizes disruption to ongoing operations.\nPerform structural assessments and institute monitoring of adjacent buildings.\nImplement dust control and noise mitigation measures to minimize disturbances to the occupants of the surrounding buildings.\nMaterials of unknown type and quantity have been identified to be in and beneath the collapsed roof structure and will need to be safely removed, preventing spills or runoff, and disposed of accordingly. Please refer to the attached photographs of Building150.\nProvide a detailed description of all hazardous materials located in the structure and provide it to the Contracting Officer Representative (COR).\n\nDeliverables.\nA detailed project schedule, including milestones, to be submitted within 10 days of NTP.\nWeekly progress reports detailing complete work, safety compliance, and any issues encountered.\nFinal report upon completion, including photographs of the retained structural elements.\nUtility Shutdown Plan for the safe shutdown, de-energizing, and termination of all utilities.\nConstruction waste documentation detailing the types and quantities of construction waste, including disposal methods and locations.\nDaily logs of all on-site activities, submitted to the Contracting Officer's Representative by the end of each working week.\nSecurity Badging documentation.\n\nSubmittal Requirements.\nRisk Assessment Safety Plan.\nEnvironmental Protection Plan.\nDetailed Abatement Plan.\nPermits and Approvals for Utility Termination.\nDetailed Demolition Plan, Including Methods for Protecting Retained Structures.\nHazardous Materials Survey and Inventory.\nAccess Plan for Building 149.\nCoordination Plan for Surrounding Buildings.\nUtility Shutdown Plan.\nConstruction waste documentation.\nDaily logs of on-site activities.\n\nQuality Control.\nThe contractor shall implement a Quality Control Plan to ensure compliance with the Statement of Work (SOW) requirements and verify that all work is performed to the specified standards and specifications.\n\nInspection and Acceptance Criteria. Final acceptance will be based on:\nSuccessful demolition and removal of specified elements.\nSafe disconnection and termination of utilities.\nPreservation of specified structural elements without damage.\nSuccessful implementation of access and coordination plans for Building 149.\nProper installation and maintenance of temporary fencing throughout the project duration.\nSuccessful execution of the Utility Shutdown Plan.\nSubmission of complete and accurate construction waste documentation.\nConsistent and timely submission of daily logs.\n\nPlace of Performance. 4100 West Third St., B149 and B150, Dayton, Ohio 45428\n\nPeriod of Performance. The contractor shall complete all tasks within 120 days from the issuance date of the Notice to Proceed (NTP)\n\nSpecifications.\n01 00 00 - General Requirements\n01 32 16.15 - Project Schedules (Small Projects)\n01 33 23 - Shop Drawings, Product Data, and Samples\n01 35 26 - Safety Requirements\n01 45 00 - Quality Control\n01 45 29 - Testing Laboratory Services\n01 57 19 - Temporary Environmental Controls\n01 74 19 - Construction Waste Management\n02 41 00 Demolition\n02 82 11 - Traditional Asbestos Abatement\n02 82 13.41 - Asbestos Abatement for Total Demolition Project\n02 83 33.13 - Lead-Based Paint Removal and Disposal\n26 24 16 - Panelboards\n26 29 21 - Enclosed Switches and Circuit Breakers\n33 63 00 - Steam Energy Distribution","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C25026B0027","product_service_code":"P400"},{"award":{"awardee":{}},"dates":{"posted":"2026-02-13","posted_at":"2026-02-13T14:20:31.819Z","created_at":"2026-02-13T14:20:30.353Z","modified_at":"2026-04-19T04:00:06.704Z","response_deadline":{"raw":"2026-03-19T10:00:00-04:00","utc":"2026-03-19T14:00:00Z","date":"2026-03-19","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/56f4346ff5d44d26b352711cd29b8af1/view"},"naics":{"codes":["238910"],"primary":"238910"},"title":"P400--Building 149 and 150 Demolition 552-26-201","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-18","archive_type":"auto_custom"},"history":[{"index":5,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-10T12:24:41.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"103ef9e64f28491ca91d771b6a5399f4","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":3,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T18:04:40.753Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c785320269c145fc8039b086dfe6a454","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":2,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T14:20:31.819Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"56f4346ff5d44d26b352711cd29b8af1","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":1,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-11T14:45:17.655Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9183b45576b0437eb7067822a4f8da6c","solicitation_number":"36C25026B0027","related_opportunity_id":"45c2140ebc404f27a4d649bc67e1d082"}],"contacts":[{"name":"Julie A Stout","role":"primary","email":"Julie.Stout@va.gov","title":"Division Chief"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"56f4346ff5d44d26b352711cd29b8af1","lineage_id":"9183b45576b0437eb7067822a4f8da6c","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-13T02:00:44.146699787Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"2db1a094b93765031d5c6746c10b2c6fd448cd1bde685bd6561dcf8803746914","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-13T02:00:44.146699787Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"This page intentionally left blank.","text":"This page intentionally left blank.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C25026B0027","product_service_code":"P400"},{"award":{"awardee":{}},"dates":{"posted":"2026-02-23","posted_at":"2026-02-23T18:04:40.753Z","created_at":"2026-02-23T18:04:37.991Z","modified_at":"2026-04-19T04:00:06.704Z","response_deadline":{"raw":"2026-03-19T10:00:00-04:00","utc":"2026-03-19T14:00:00Z","date":"2026-03-19","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c785320269c145fc8039b086dfe6a454/view"},"naics":{"codes":["238910"],"primary":"238910"},"title":"P400--Building 149 and 150 Demolition 552-26-201","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-18","archive_type":"auto_custom"},"history":[{"index":5,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-10T12:24:41.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"103ef9e64f28491ca91d771b6a5399f4","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":3,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T18:04:40.753Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c785320269c145fc8039b086dfe6a454","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":2,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T14:20:31.819Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"56f4346ff5d44d26b352711cd29b8af1","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":1,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-11T14:45:17.655Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9183b45576b0437eb7067822a4f8da6c","solicitation_number":"36C25026B0027","related_opportunity_id":"45c2140ebc404f27a4d649bc67e1d082"}],"contacts":[{"name":"Julie A Stout","role":"primary","email":"Julie.Stout@va.gov","title":"Division Chief"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c785320269c145fc8039b086dfe6a454","lineage_id":"9183b45576b0437eb7067822a4f8da6c","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-12T09:12:58.366851644Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"7ae4dea3add995c3b441a2e8bec23f997e155f6886798880e5a448508b2e4aa4","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-12T09:12:58.366851644Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"W efgwef 2we fw2ef","text":"W efgwef 2we fw2ef","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C25026B0027","product_service_code":"P400"},{"award":{"awardee":{}},"dates":{"posted":"2026-03-10","posted_at":"2026-03-10T12:24:41.720Z","created_at":"2026-03-10T12:24:39.112Z","modified_at":"2026-04-19T04:00:06.704Z","response_deadline":{"raw":"2026-03-19T10:00:00-04:00","utc":"2026-03-19T14:00:00Z","date":"2026-03-19","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/103ef9e64f28491ca91d771b6a5399f4/view"},"naics":{"codes":["238910"],"primary":"238910"},"title":"P400--Building 149 and 150 Demolition 552-26-201","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-18","archive_type":"auto_custom"},"history":[{"index":5,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-10T12:24:41.720Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"103ef9e64f28491ca91d771b6a5399f4","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":3,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T18:04:40.753Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c785320269c145fc8039b086dfe6a454","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":2,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T14:20:31.819Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"56f4346ff5d44d26b352711cd29b8af1","solicitation_number":"36C25026B0027","parent_opportunity_id":"9183b45576b0437eb7067822a4f8da6c"},{"index":1,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-11T14:45:17.655Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9183b45576b0437eb7067822a4f8da6c","solicitation_number":"36C25026B0027","related_opportunity_id":"45c2140ebc404f27a4d649bc67e1d082"}],"contacts":[{"name":"Julie A Stout","role":"primary","email":"Julie.Stout@va.gov","title":"Division Chief"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"103ef9e64f28491ca91d771b6a5399f4","lineage_id":"9183b45576b0437eb7067822a4f8da6c","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-11T08:58:30.980807524Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"5348ec63de0d0e55654781c87e379f8cc26ffeb1ba054c00e8142afff82064ad","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-11T08:58:30.980807524Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Question: Page 9 of 74   solicitation reference Additional Considerations for Building 150 Par F..  Provide a detailed description of all hazardous materials located in the structure and provide it to the COR   Is testing required to identify all hazardous materials, and who is responsible for identifying any/all of the materials that will require testing to be designated (or not) as hazardous?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal.\n\nQuestion: Page 5 of 74   solicitation reference Utility Removal and Termination Par(s) A, B, C, D  Removal and safe termination of  (steam, condensate, electrical systems, water supply) in each building at their source   Will the various utilities be terminated in the respective buildings 149 and/or 150 or another building, and can the VA provide as-built drawings for the buildings that the utilities will be terminated in?\nAnswer: For building 149, contractor is to remove existing steam and condensate pipe back to the valve. Existing valve is to remain and will be capped/plugged off. For building 150, remove existing piping. B150 s valve has already been copped by maintenance shops. Refer to 006 Steam Distribution Plan in this solicitation.\n\nQuestion: Page 7 of 74   solicitation, reference Hazardous Material Handling Par D.,  The contractor shall implement a site-specific safety plan addressing all potential hazards, including the safe removal of unknown type and quantity buried under the roof debris.   Shall the contractor assume potential hazards to be asbestos, lead paint/pipes, mercury, PCBs, mold, silica dust, creosote, refrigerants, etc.?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous.\n\nQuestion:  Page 9 of 74   solicitation, reference Additional Considerations for Building 149 Par G.,  Provide a detailed description of all hazardous materials located in the structure    Shall the contractor provide the  detailed description  following testing? and will a contract modification be issued if unforeseen and unreported hazardous materials are found that require special handling and disposal?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal.\nQuestion: Solicitation and Specifications, many references are made to asbestos, has there been a hazardous survey completed for the buildings scheduled for demolition and can the VA post the hazardous survey via amendment?\nAnswer: Due to safety concerns, no survey was completed. Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal \n\nQuestion: Solicitation and Specifications, many references are made to asbestos, has any testing been performed to determine if asbestos actually exists in the buildings scheduled for demolition or is the contractor to assume the building does contain asbestos? Is the contractor to assume the asbestos is friable or non-friable?\nAnswer: Due to safety concerns, no testing was completed. Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal\n\nQuestion: During demolition of building 149, can the contractor assume the corridor connecting buildings 305 and 409 will be closed to normal hospital foot traffic, a containment with ramps and floor protection would be constructed isolating the corridor door(s) leading to the parking lot between buildings 305 and 409, and finally, can the contractor stage dumpsters in that parking area?\nAnswer: The corridor connecting buildings 305 and 409 shall be closed to normal hospital foot traffic. Coordination for setting dumpsters shall be coordinated with the COR. \n\nQuestion: Can you tell us How tall are walkways are, so we know which crane to use? Will the contractor need to relandscape the area after the demo is complete on build 149?\nAnswer: The roof ridge line is estimated to be around 20' above grade. This is not an exact measurement. Yes. The contractor shall be responsible for areas that are effected by the construction.\n\nQuestion: In reference to Section 01 00 00, can connecting corridors between buildings 409 and 305 be closed off for demolition and removal of Building 149? Can the parking lots, located outside the corridors, be closed off for Crane and dumpster staging for demolition of Building 149?\nAnswer: Connecting corridor between will require closer in order to remove debris. Sections of the parking lot can be closed off for the use of equipment and dumpster. However, the loading dock will need to remain accessible to maintain shipping and receiving operations.\n\nQuestion: In reference to Section 01 57 19, can hoses be run thru building or hallway for dust suppression for demolition of Building 149?\nAnswer: No hoses will be permitted to run through buildings. A hose running across the corridor at the access doors will be acceptable. No hose connection will be permittable within the corridor to prevent damages caused by possible leakages. Hoses running through the corridor shall be removed as required to secure corridor doors.\n\nQuestion: In reference to Section 33 63 00, what are the requirements for Steam line abandonment?\nAnswer: For building 149, contractor is to remove existing steam and condensate pipe back to the valve. Existing valve is to remain and will be capped/plugged off. For building 150, remove existing piping. B150 s valve has already been capped by the maintenance shops.","text":"Question: Page 9 of 74 solicitation reference Additional Considerations for Building 150 Par F.. Provide a detailed description of all hazardous materials located in the structure and provide it to the COR Is testing required to identify all hazardous materials, and who is responsible for identifying any/all of the materials that will require testing to be designated (or not) as hazardous?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal.\n\nQuestion: Page 5 of 74 solicitation reference Utility Removal and Termination Par(s) A, B, C, D Removal and safe termination of (steam, condensate, electrical systems, water supply) in each building at their source Will the various utilities be terminated in the respective buildings 149 and/or 150 or another building, and can the VA provide as-built drawings for the buildings that the utilities will be terminated in?\nAnswer: For building 149, contractor is to remove existing steam and condensate pipe back to the valve. Existing valve is to remain and will be capped/plugged off. For building 150, remove existing piping. B150 s valve has already been copped by maintenance shops. Refer to 006 Steam Distribution Plan in this solicitation.\n\nQuestion: Page 7 of 74 solicitation, reference Hazardous Material Handling Par D., The contractor shall implement a site-specific safety plan addressing all potential hazards, including the safe removal of unknown type and quantity buried under the roof debris. Shall the contractor assume potential hazards to be asbestos, lead paint/pipes, mercury, PCBs, mold, silica dust, creosote, refrigerants, etc.?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous.\n\nQuestion: Page 9 of 74 solicitation, reference Additional Considerations for Building 149 Par G., Provide a detailed description of all hazardous materials located in the structure Shall the contractor provide the detailed description following testing? and will a contract modification be issued if unforeseen and unreported hazardous materials are found that require special handling and disposal?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal.\nQuestion: Solicitation and Specifications, many references are made to asbestos, has there been a hazardous survey completed for the buildings scheduled for demolition and can the VA post the hazardous survey via amendment?\nAnswer: Due to safety concerns, no survey was completed. Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal\n\nQuestion: Solicitation and Specifications, many references are made to asbestos, has any testing been performed to determine if asbestos actually exists in the buildings scheduled for demolition or is the contractor to assume the building does contain asbestos? Is the contractor to assume the asbestos is friable or non-friable?\nAnswer: Due to safety concerns, no testing was completed. Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal\n\nQuestion: During demolition of building 149, can the contractor assume the corridor connecting buildings 305 and 409 will be closed to normal hospital foot traffic, a containment with ramps and floor protection would be constructed isolating the corridor door(s) leading to the parking lot between buildings 305 and 409, and finally, can the contractor stage dumpsters in that parking area?\nAnswer: The corridor connecting buildings 305 and 409 shall be closed to normal hospital foot traffic. Coordination for setting dumpsters shall be coordinated with the COR.\n\nQuestion: Can you tell us How tall are walkways are, so we know which crane to use? Will the contractor need to relandscape the area after the demo is complete on build 149?\nAnswer: The roof ridge line is estimated to be around 20' above grade. This is not an exact measurement. Yes. The contractor shall be responsible for areas that are effected by the construction.\n\nQuestion: In reference to Section 01 00 00, can connecting corridors between buildings 409 and 305 be closed off for demolition and removal of Building 149? Can the parking lots, located outside the corridors, be closed off for Crane and dumpster staging for demolition of Building 149?\nAnswer: Connecting corridor between will require closer in order to remove debris. Sections of the parking lot can be closed off for the use of equipment and dumpster. However, the loading dock will need to remain accessible to maintain shipping and receiving operations.\n\nQuestion: In reference to Section 01 57 19, can hoses be run thru building or hallway for dust suppression for demolition of Building 149?\nAnswer: No hoses will be permitted to run through buildings. A hose running across the corridor at the access doors will be acceptable. No hose connection will be permittable within the corridor to prevent damages caused by possible leakages. Hoses running through the corridor shall be removed as required to secure corridor doors.\n\nQuestion: In reference to Section 33 63 00, what are the requirements for Steam line abandonment?\nAnswer: For building 149, contractor is to remove existing steam and condensate pipe back to the valve. Existing valve is to remain and will be capped/plugged off. For building 150, remove existing piping. B150 s valve has already been capped by the maintenance shops.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C25026B0027","product_service_code":"P400"},{"award":{"date":"2026-05-04","amount":"186238.00","number":"36C25026C0099","awardee":{"raw":"KOALA ROOFING LLC EDENTON 27932 NCL","uei":"Z16BG9LAXMN9","cage":"9YEK0","name":"KOALA ROOFING LLC","location":{"zip":"27932","city":{"name":"EDENTON"},"state":{"name":"NC"},"country":{"code":"NCL","name":"NEW CALEDONIA"}}}},"dates":{"posted":"2026-05-05","posted_at":"2026-05-05T10:42:00.264Z","award_date":"2026-05-04","created_at":"2026-05-05T10:41:58.044Z","modified_at":"2026-06-05T04:04:31.392Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/619749e0591b4b0f8ecd21e052744d01/view"},"naics":{"codes":["238910"],"primary":"238910"},"title":"P400--Building 149 and 150 Demolition 552-26-201","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-04","archive_type":"auto_custom"},"history":[{"index":3,"title":"P400--Building 149 and 150 Demolition 552-26-201","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-05T10:42:00.264Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"619749e0591b4b0f8ecd21e052744d01","solicitation_number":"36C25026B0027"}],"contacts":[{"name":"Julie Stout","role":"primary","email":"julie.stout@va.gov","phone":"317-988-1519","title":"Contracting Officer"}],"base_type":{"code":"a","label":"Award Notice"},"notice_id":"619749e0591b4b0f8ecd21e052744d01","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"619749e0591b4b0f8ecd21e052744d01","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-05T04:46:03.934143803Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"b995d8618f12626b3181e8dad7957518102042929a3a7c44be13377b4bc1a180","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-05T04:46:03.934143803Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"36C25026B0027","product_service_code":"P400"}],"due_at":"2026-03-19T14:00:00Z","due_date":"2026-03-19","closes_at":"2026-03-19T14:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","state":"OH","county":"39113","county_name":"Montgomery County","city":"3921000","city_name":"Dayton","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"Z16BG9LAXMN9","amount":"186238.00","linked_awards":6,"cancelled":false,"archived":true,"updated_at":"2026-10-05T04:46:55.746237Z","principal_notice_id":"103ef9e64f28491ca91d771b6a5399f4","description":{"text":"Question: Page 9 of 74 solicitation reference Additional Considerations for Building 150 Par F.. Provide a detailed description of all hazardous materials located in the structure and provide it to the COR Is testing required to identify all hazardous materials, and who is responsible for identifying any/all of the materials that will require testing to be designated (or not) as hazardous?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal.\n\nQuestion: Page 5 of 74 solicitation reference Utility Removal and Termination Par(s) A, B, C, D Removal and safe termination of (steam, condensate, electrical systems, water supply) in each building at their source Will the various utilities be terminated in the respective buildings 149 and/or 150 or another building, and can the VA provide as-built drawings for the buildings that the utilities will be terminated in?\nAnswer: For building 149, contractor is to remove existing steam and condensate pipe back to the valve. Existing valve is to remain and will be capped/plugged off. For building 150, remove existing piping. B150 s valve has already been copped by maintenance shops. Refer to 006 Steam Distribution Plan in this solicitation.\n\nQuestion: Page 7 of 74 solicitation, reference Hazardous Material Handling Par D., The contractor shall implement a site-specific safety plan addressing all potential hazards, including the safe removal of unknown type and quantity buried under the roof debris. Shall the contractor assume potential hazards to be asbestos, lead paint/pipes, mercury, PCBs, mold, silica dust, creosote, refrigerants, etc.?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous.\n\nQuestion: Page 9 of 74 solicitation, reference Additional Considerations for Building 149 Par G., Provide a detailed description of all hazardous materials located in the structure Shall the contractor provide the detailed description following testing? and will a contract modification be issued if unforeseen and unreported hazardous materials are found that require special handling and disposal?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal.\nQuestion: Solicitation and Specifications, many references are made to asbestos, has there been a hazardous survey completed for the buildings scheduled for demolition and can the VA post the hazardous survey via amendment?\nAnswer: Due to safety concerns, no survey was completed. Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal\n\nQuestion: Solicitation and Specifications, many references are made to asbestos, has any testing been performed to determine if asbestos actually exists in the buildings scheduled for demolition or is the contractor to assume the building does contain asbestos? Is the contractor to assume the asbestos is friable or non-friable?\nAnswer: Due to safety concerns, no testing was completed. Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal\n\nQuestion: During demolition of building 149, can the contractor assume the corridor connecting buildings 305 and 409 will be closed to normal hospital foot traffic, a containment with ramps and floor protection would be constructed isolating the corridor door(s) leading to the parking lot between buildings 305 and 409, and finally, can the contractor stage dumpsters in that parking area?\nAnswer: The corridor connecting buildings 305 and 409 shall be closed to normal hospital foot traffic. Coordination for setting dumpsters shall be coordinated with the COR.\n\nQuestion: Can you tell us How tall are walkways are, so we know which crane to use? Will the contractor need to relandscape the area after the demo is complete on build 149?\nAnswer: The roof ridge line is estimated to be around 20' above grade. This is not an exact measurement. Yes. The contractor shall be responsible for areas that are effected by the construction.\n\nQuestion: In reference to Section 01 00 00, can connecting corridors between buildings 409 and 305 be closed off for demolition and removal of Building 149? Can the parking lots, located outside the corridors, be closed off for Crane and dumpster staging for demolition of Building 149?\nAnswer: Connecting corridor between will require closer in order to remove debris. Sections of the parking lot can be closed off for the use of equipment and dumpster. However, the loading dock will need to remain accessible to maintain shipping and receiving operations.\n\nQuestion: In reference to Section 01 57 19, can hoses be run thru building or hallway for dust suppression for demolition of Building 149?\nAnswer: No hoses will be permitted to run through buildings. A hose running across the corridor at the access doors will be acceptable. No hose connection will be permittable within the corridor to prevent damages caused by possible leakages. Hoses running through the corridor shall be removed as required to secure corridor doors.\n\nQuestion: In reference to Section 33 63 00, what are the requirements for Steam line abandonment?\nAnswer: For building 149, contractor is to remove existing steam and condensate pipe back to the valve. Existing valve is to remain and will be capped/plugged off. For building 150, remove existing piping. B150 s valve has already been capped by the maintenance shops.","html":"Question: Page 9 of 74   solicitation reference Additional Considerations for Building 150 Par F..  Provide a detailed description of all hazardous materials located in the structure and provide it to the COR   Is testing required to identify all hazardous materials, and who is responsible for identifying any/all of the materials that will require testing to be designated (or not) as hazardous?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal.\n\nQuestion: Page 5 of 74   solicitation reference Utility Removal and Termination Par(s) A, B, C, D  Removal and safe termination of  (steam, condensate, electrical systems, water supply) in each building at their source   Will the various utilities be terminated in the respective buildings 149 and/or 150 or another building, and can the VA provide as-built drawings for the buildings that the utilities will be terminated in?\nAnswer: For building 149, contractor is to remove existing steam and condensate pipe back to the valve. Existing valve is to remain and will be capped/plugged off. For building 150, remove existing piping. B150 s valve has already been copped by maintenance shops. Refer to 006 Steam Distribution Plan in this solicitation.\n\nQuestion: Page 7 of 74   solicitation, reference Hazardous Material Handling Par D.,  The contractor shall implement a site-specific safety plan addressing all potential hazards, including the safe removal of unknown type and quantity buried under the roof debris.   Shall the contractor assume potential hazards to be asbestos, lead paint/pipes, mercury, PCBs, mold, silica dust, creosote, refrigerants, etc.?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous.\n\nQuestion:  Page 9 of 74   solicitation, reference Additional Considerations for Building 149 Par G.,  Provide a detailed description of all hazardous materials located in the structure    Shall the contractor provide the  detailed description  following testing? and will a contract modification be issued if unforeseen and unreported hazardous materials are found that require special handling and disposal?\nAnswer: Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal.\nQuestion: Solicitation and Specifications, many references are made to asbestos, has there been a hazardous survey completed for the buildings scheduled for demolition and can the VA post the hazardous survey via amendment?\nAnswer: Due to safety concerns, no survey was completed. Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal \n\nQuestion: Solicitation and Specifications, many references are made to asbestos, has any testing been performed to determine if asbestos actually exists in the buildings scheduled for demolition or is the contractor to assume the building does contain asbestos? Is the contractor to assume the asbestos is friable or non-friable?\nAnswer: Due to safety concerns, no testing was completed. Due to the extent of the structural failure, all materials shall be considered to be hazardous. The identification of the materials shall account for the type. The VA needs to account for what hazardous materials are located in the demo site for disposal\n\nQuestion: During demolition of building 149, can the contractor assume the corridor connecting buildings 305 and 409 will be closed to normal hospital foot traffic, a containment with ramps and floor protection would be constructed isolating the corridor door(s) leading to the parking lot between buildings 305 and 409, and finally, can the contractor stage dumpsters in that parking area?\nAnswer: The corridor connecting buildings 305 and 409 shall be closed to normal hospital foot traffic. Coordination for setting dumpsters shall be coordinated with the COR. \n\nQuestion: Can you tell us How tall are walkways are, so we know which crane to use? Will the contractor need to relandscape the area after the demo is complete on build 149?\nAnswer: The roof ridge line is estimated to be around 20' above grade. This is not an exact measurement. Yes. The contractor shall be responsible for areas that are effected by the construction.\n\nQuestion: In reference to Section 01 00 00, can connecting corridors between buildings 409 and 305 be closed off for demolition and removal of Building 149? Can the parking lots, located outside the corridors, be closed off for Crane and dumpster staging for demolition of Building 149?\nAnswer: Connecting corridor between will require closer in order to remove debris. Sections of the parking lot can be closed off for the use of equipment and dumpster. However, the loading dock will need to remain accessible to maintain shipping and receiving operations.\n\nQuestion: In reference to Section 01 57 19, can hoses be run thru building or hallway for dust suppression for demolition of Building 149?\nAnswer: No hoses will be permitted to run through buildings. A hose running across the corridor at the access doors will be acceptable. No hose connection will be permittable within the corridor to prevent damages caused by possible leakages. Hoses running through the corridor shall be removed as required to secure corridor doors.\n\nQuestion: In reference to Section 33 63 00, what are the requirements for Steam line abandonment?\nAnswer: For building 149, contractor is to remove existing steam and condensate pipe back to the valve. Existing valve is to remain and will be capped/plugged off. For building 150, remove existing piping. B150 s valve has already been capped by the maintenance shops.","origin":"detail"},"contacts":[{"name":"Julie Stout","role":"primary","email":"julie.stout@va.gov","phone":"317-988-1519","title":"Contracting Officer"}],"place_of_performance":null,"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"naics_codes":["238910"],"award":{"awardee":{}},"attachments":[{"resource_id":"ed927af4bdd94bc2a688cc25f7c35bc7","name":"36C25026B0027.docx","kind":"file","mime_type":".docx","size_bytes":133114,"posted_at":"2026-02-11T14:45:17.655Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ed927af4bdd94bc2a688cc25f7c35bc7/download","mirrored":false},{"resource_id":"66cd4e8f72004cae972d393f57f00231","name":"36C25026B0027_1.docx","kind":"file","mime_type":".docx","size_bytes":24956,"posted_at":"2026-02-02T14:53:24.738Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/66cd4e8f72004cae972d393f57f00231/download","mirrored":false},{"resource_id":"a41ce3255880490eb1c96e441ad80019","name":"36C25026C0099_1.docx","kind":"file","mime_type":".docx","size_bytes":13640,"posted_at":"2026-05-05T10:42:00.264Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a41ce3255880490eb1c96e441ad80019/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C25026C0099_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C25026C0099_3600_-NONE-_-NONE-/","piid":"36C25026C0099","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"Z16BG9LAXMN9","recipient_name":"KOALA ROOFING LLC","recipient_uei":"Z16BG9LAXMN9","recipient_cage":"9YEK0","recipient_city":"EDENTON","recipient_state":"NC","sub_name":"Department of Veterans Affairs","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","office_key":"o-36C250","first_action_date":"2026-05-04","last_action_date":"2026-05-04","actions":1,"obligated":"186238.00","current_total_value":"186238.00","potential_total_value":"186238.00","naics":"238910","psc":"P400","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":12,"description":"BUILDING 149 AND 150 DEMOLITION - 552-26-201","method":"piid","confidence":"high","evidence":["award number 36C25026C0099 equals the contract number","same awarding office 36C250"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C25027Q0113","latest_notice_id":"30f6d444e0f641e5b23d5b4c1ec5a384","title":"Q301--Prostate Reference Lab Testing Services","solicitation_number":"36C25027Q0113","notice_type":"r","first_type":"r","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-25T21:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"621511","psc":"Q301","set_aside":null,"state":"OH","county":"39049","county_name":"Franklin County","city":"3918000","city_name":"Columbus","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C25027Q0014","latest_notice_id":"b13cc87179e947e7b42da2de44a6bde1","title":"J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland","solicitation_number":"36C25027Q0014","notice_type":"k","first_type":"k","first_posted":"2026-10-09","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"238210","psc":"J061","set_aside":"SBA","state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C25027Q0123","latest_notice_id":"fb53a332644a4c8fa983bf28c8643d2d","title":"S222--Sources Sought - Hazardous Waste Removal/Disposal Northeast Ohio VA Healthcare System - Cleveland, OH","solicitation_number":"36C25027Q0123","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T18:30:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T18:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"562112","psc":"S222","set_aside":null,"state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C25027B0009","latest_notice_id":"85b83d408f1f422885991142c2734b45","title":"Z1DA--FY27 NRM - VISN Base Modernize Nurse Call - 539-23-101","solicitation_number":"36C25027B0009","notice_type":"p","first_type":"p","first_posted":"2026-11-08","last_posted":"2026-11-08","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-09T05:16:39.607305Z"},{"key":"36C25027B0008","latest_notice_id":"5afe716a38494a6f84b1e84205805f86","title":"Z1DA--FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206","solicitation_number":"36C25027B0008","notice_type":"p","first_type":"p","first_posted":"2026-11-08","last_posted":"2026-11-08","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-09T05:16:39.607305Z"}],"similar_open":[{"key":"19JM3727Q0002","latest_notice_id":"79b69696ceed4090b5e4db5a94cb31be","title":"Trenching, Conduit and Ground-well Installation","solicitation_number":"19JM3727Q0002","notice_type":"o","first_type":"o","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-019","dept_name":"STATE, DEPARTMENT OF","sub_key":"s-1900","sub_name":"STATE, DEPARTMENT OF","office_key":"o-19JM37","office_name":"U.S. EMBASSY KINGSTON","naics":"238910","psc":"N038","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"JAM","place_scope":"overseas","state_source":null,"state_evidence":"JAMAICA","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"FA480027S0010","latest_notice_id":"ae1b453507cb4f65a4607e0c8463052a","title":"Facility 1345 Demo","solicitation_number":"FA480027S0010","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-25T20:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4800","office_name":"FA4800 633 CONS PKP","naics":"238910","psc":"P400","set_aside":"SBA","state":"VA","county":"51650","county_name":"City of Hampton","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"127EAX26Q0076","latest_notice_id":"02adbaca8b5c4c3d8994f219a97973da","title":"Camptonville Housing Decommissioning","solicitation_number":"127EAX26Q0076","notice_type":"k","first_type":"k","first_posted":"2026-10-28","last_posted":"2026-11-20","notices":7,"due_at":"2026-12-05T01:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-05T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-120385","office_name":"USDA FOREST SERIVCE","naics":"238910","psc":"Y1AZ","set_aside":"SBA","state":"CA","county":"06057","county_name":"Nevada County","city":"0650874","city_name":"Nevada City","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":8,"indexable":false}