# 626A4-25-201 - AE Upgrade Primary Power Distribution

Canonical: https://sealedbidder.com/opportunities/36c24925r0037

- Solicitation number: 36C24925R0037
- Notice type: Solicitation (first published as presolicitation)
- Status: Awarded to Health Facility Solutions Company
- Department: Department of Veterans Affairs
- Contracting office: 249-Network Contract Office 9 (36C249)
- NAICS: 541330 Engineering Services
- Product or service code: C1DA Architect And Engineering- Construction: Hospitals And Infirmaries
- Set-aside: Service-disabled veteran-owned small business set-aside
- Small business size standard: $25.5 million in average annual receipts (13 CFR 121.201, NAICS 541330)
- Location read from: the notice's place of performance
- County: Rutherford County (FIPS 47149). https://sealedbidder.com/counties/rutherford-county-tn-47149
- City: Murfreesboro. https://sealedbidder.com/cities/murfreesboro-tn-4751560
- First posted: June 9, 2025
- Last posted: July 21, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/59185b6776844498a2cc675e00742707/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: Service-disabled veteran-owned small business set-aside. Reserved for service-disabled veteran-owned small businesses. Small, under NAICS 541330 (engineering services), means no more than $25.5 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 30 days from the day the solicitation was posted, June 25, 2025, to the deadline.
- Before the solicitation: The agency published a presolicitation on June 9, 2025, 16 days before the solicitation.
- How it ended: Awarded to Health Facility Solutions Company on September 11, 2025, 48 days after offers were due. The contracting office reported 24 offers (full and open competition after exclusion of sources).

## Description

626A4-25-201 - 36C24925R0037 - AE Upgrade Primary Power Distribution
Responses to RFIs:

The Statement of Work is good but since this is an upgrade to the existing facilities, do you have 1-line/as-built drawings that we can use in our bid preparation?
A: Please see attached one-line drawings for existing conditions. The DWG file is the overall campus one line. The PDF shows a co-generator that was added to the campus power. There seems to be some discrepancies in the one-lines, so the AE s need to keep that in mind.

A site walk would also go a long way in assisting us with pricing.
A: No, site visit will not be provided since this is an AE Design. No fee proposal shall be needed until after evaluation has been made on the provided SF330.

Page 3 says PPQs will count towards the page limitations but there is no mention of the page limit anywhere else. Is there a page limit for the SF330 submission?
A: Size:Â  Maximum size of the e-mail message shall not exceed five (5) megabytes. Only one email is permitted unless otherwise stated in this paragraph or in writing by a Contracting Officer. Submitted SF330 s are not to exceed a total of fifty (50) pages INCLUDING cover page and any other submitted documents.

Does the VA have a list of which disciplines firms should provide resumes for in Section E?
A: Yes, see page 5 of SF 330

Does the VA have a minimum or maximum number of projects they want firms to submit in Section F?
A: Yes, the AE should provide 3-5 relevant projects for this section.

Can you please confirm that we only need to provide VA projects awarded in the previous 12 months and the full potential value of any current indefinite delivery contracts for the prime A-E and not for our proposed subcontractors?
A: Provide the available capacity of key disciplines by providing current project workload, inclusive of all projects awarded by the VA during the previous 12 months and the full potential value of any current indefinite delivery contracts.

Can you please confirm we are not required to submit CPARS with our submission, only PPQs if CPARS are not available for the project?
A: CPARS to be submitted, if there is no CPARS data available, Past Performance Questionnaires (PPQs) will be accepted.

Can you please confirm that the geographical location of the firm is not an evaluation consideration of Factor 5 (Location)? Page 4 states  location in the general geographical area of the project  but then states that the intent is  not where the firm is located.  This paragraph also refers to Secondary Selection Criteria Factor 1, where information related to the firm s location is to be addressed, but there is no paragraph or subcategory for Secondary Selection Criteria in the RFQ.
A: Geographical location of the firm is not an evaluation consideration, however, intent of this factor is to showcase a firm s understanding of the site and locality, and not where the firm is located. Firm s location to be addressed is to determine what Wage Determination to extract from SAM.gov.

Would you consider cancelling this solicitation and re-issuing it through the IDIQ AE MATOC TVHS-Nashville and Murfreesboro that was awarded in September 2024? This vehicle has not yet been used to solicit responses to RFQs and seems to be a perfect fit for this project.
A: No

Thanks for any insight you can give as to why this vehicle is not being used.
A: CONSTRUCTION BUDGET DESIGN LIMITATIONS/PROJECT MAGNITUDE: Estimated Budget Between $5,000,000.00 and $10,000,000.00.

Can you please clarify if PDFs are an acceptable format for the 626A4-25-201 - 36C24925R0037 - AE Upgrade Primary Power Distribution SF330s to be submitted?Â 
A: Yes, PDFs are acceptable.

Can you please also confirm the page limitations?
A: Size:Â  Maximum size of the e-mail message shall not exceed five (5) megabytes. Only one email is permitted unless otherwise stated in this paragraph or in writing by a Contracting Officer. Submitted SF330 s are not to exceed a total of fifty (50) pages INCLUDING cover page and any other submitted documents.

## Attachments

- [36C24925R0037.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/55f70738ce6b4062a41a8269a09a9eec/download)
- [36C24925R0037_1.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d062a189b53e454c97736d0311cd7788/download)
- [VA Website](https://www.va.gov) (link)
- [Atch 1 VA Form 6298 Architect-Engineer Fee Proposal.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/acd20142df864bf587f3912539fbd44e/download)
- [Atch 2 AE Supplemental Design Submission Instructions.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/213c2d2e24f74d8d9618180a765ab3ce/download)
- [Atch 3 Certificate of Independent Price Determination.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/feed73dd4c5c400887e92f772942d529/download)
- [Atch 4 Certificate of Acknowledge No Construction Contract.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b8b7ec3aab534812a7c66d9862e42151/download)
- [Atch 5 VA Information Custodial Language.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b7580379d4b644a09d48cbb6754e931b/download)
- [Atch 6 Access to VA Information and VA Information Systems.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/06d0488e679d4b4da1d19072c98bdb57/download)
- [36C24925R0037 0001.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d274036ce4764a9380b7c6917c28ba41/download)

## Award on USAspending

- Recipient: Health Facility Solutions Company (UEI HGD8C58ELNL3)
- Contract: 36C24925C0063, definitive contract
- Obligated: $1,652,446.00
- Competition: Full and Open Competition After Exclusion of Sources, 24 offers received
- Link: solicitation number 36C24925R0037 equals the FPDS solicitation identifier; same awarding office 36C249 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_36C24925C0063_3600_-NONE-_-NONE-/


## Open now in the same industry

98 open in NAICS 541330.

- IDIQ Contract for Architect-Engineer (A-E) Services for Ship Homeporting and Related Operational Issues for Various Locations Throughout the Naval Facilities Engineering Systems Command Atlantic Area of Responsibility and Worldwide (N62470-27-R-0009), due November 27, 2026 at 11:00 AM EST. https://sealedbidder.com/opportunities/n6247027r0009
- SEAPORT_NMRIL_FMS_LAB_SPPT_1 (SEAPORT_NMRIL_FMS_LAB_SPPT_REV1), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/seaportnmrilfmslabspptrev1
- FY 27 Service (Base+4) | NYH Energy Control Procedures/LOTO Services | 630 (36C24227Q0091), due November 27, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/36c24227q0091

## Publications

- June 9, 2025: Presolicitation. Notice 1d529fede37d499aa611242a957f61d5. https://sam.gov/workspace/contract/opp/1d529fede37d499aa611242a957f61d5/view
- June 25, 2025: Solicitation, due July 25, 2025 at 2:00 PM EDT. Notice bbaf29c7634b42e9b56e025fc807b6be. https://sam.gov/workspace/contract/opp/bbaf29c7634b42e9b56e025fc807b6be/view
- June 26, 2025: Solicitation, due July 25, 2025 at 2:00 PM EDT. Notice 55c71d5057a74915926989d84b0b219f. https://sam.gov/workspace/contract/opp/55c71d5057a74915926989d84b0b219f/view
- July 21, 2025: Solicitation, due July 25, 2025 at 2:00 PM EDT. Notice 59185b6776844498a2cc675e00742707. https://sam.gov/workspace/contract/opp/59185b6776844498a2cc675e00742707/view

## Points of contact

- Jen Jamieson, Contract Specialist, jen.jamieson@va.gov

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/36c24925r0037.
