{"canonical":"https://sealedbidder.com/opportunities/36c24925b0007","key":"36C24925B0007","url":"https://sealedbidder.com/opportunities/36c24925b0007","title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","solicitation_number":"36C24925B0007","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-08-08T18:00:00Z","first_posted":"2025-06-03","last_posted":"2025-07-31","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","place_state":"TN","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"47149","place_county_name":"Rutherford County","place_city":"4751560","place_city_name":"Murfreesboro","winner":"PARAMOUNT CONSTRUCTION GROUP, LLC","award_amount":null,"publications":[{"notice_id":"b683b0bbaedb42f4a0e9955143de6fb8","title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","solicitation_number":"36C24925B0007","notice_type":"p","base_type":"p","posted":"2025-06-03","posted_at":"2025-06-03T15:16:46.400Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-09-10","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b683b0bbaedb42f4a0e9955143de6fb8/view","enriched":true,"history":[{"index":4,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T15:16:46.400Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"b683b0bbaedb42f4a0e9955143de6fb8","solicitation_number":"36C24925B0007"},{"index":2,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T12:38:41.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5dcd9991ec4a4e92833268f6e57eb722","solicitation_number":"36C24925B0007","related_opportunity_id":"b683b0bbaedb42f4a0e9955143de6fb8"}]},{"notice_id":"5dcd9991ec4a4e92833268f6e57eb722","title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","solicitation_number":"36C24925B0007","notice_type":"o","base_type":"p","posted":"2025-07-02","posted_at":"2025-07-02T12:38:41.767Z","due_at":"2025-08-01T18:00:00Z","due_date":"2025-08-01","cancelled":false,"archived":true,"archive_date":"2025-11-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5dcd9991ec4a4e92833268f6e57eb722/view","enriched":true,"history":[{"index":6,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T15:16:46.400Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"b683b0bbaedb42f4a0e9955143de6fb8","solicitation_number":"36C24925B0007"},{"index":4,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:43:55.969Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8de60b7c04d343129b0e6fc9e97379df","solicitation_number":"36C24925B0007","parent_opportunity_id":"5dcd9991ec4a4e92833268f6e57eb722"},{"index":2,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T12:38:41.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5dcd9991ec4a4e92833268f6e57eb722","solicitation_number":"36C24925B0007","related_opportunity_id":"b683b0bbaedb42f4a0e9955143de6fb8"}]},{"notice_id":"8de60b7c04d343129b0e6fc9e97379df","title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","solicitation_number":"36C24925B0007","notice_type":"o","base_type":"o","posted":"2025-07-31","posted_at":"2025-07-31T21:43:55.969Z","due_at":"2025-08-08T18:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-09-07","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8de60b7c04d343129b0e6fc9e97379df/view","enriched":true,"history":[{"index":3,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:43:55.969Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8de60b7c04d343129b0e6fc9e97379df","solicitation_number":"36C24925B0007","parent_opportunity_id":"5dcd9991ec4a4e92833268f6e57eb722"},{"index":1,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T12:38:41.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5dcd9991ec4a4e92833268f6e57eb722","solicitation_number":"36C24925B0007","related_opportunity_id":"b683b0bbaedb42f4a0e9955143de6fb8"}]}],"latest_notice_id":"8de60b7c04d343129b0e6fc9e97379df","first_type":"p","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-06-03","posted_at":"2025-06-03T15:16:46.400Z","created_at":"2025-06-03T15:16:45.202Z","modified_at":"2025-09-11T03:55:55.293Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/b683b0bbaedb42f4a0e9955143de6fb8/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","agency":{"office":{"code":"36C249","name":"249-NETWORK CONTRACT OFFICE 9 (36C249)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"organization_id":"100163849","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-10","archive_type":"auto_custom"},"history":[{"index":4,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T15:16:46.400Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"b683b0bbaedb42f4a0e9955143de6fb8","solicitation_number":"36C24925B0007"},{"index":2,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T12:38:41.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5dcd9991ec4a4e92833268f6e57eb722","solicitation_number":"36C24925B0007","related_opportunity_id":"b683b0bbaedb42f4a0e9955143de6fb8"}],"contacts":[{"name":"Brian Bentley","role":"primary","email":"Brian.Bentley@va.gov","phone":"(615) 225-6896","title":"Contracting Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"b683b0bbaedb42f4a0e9955143de6fb8","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"5dcd9991ec4a4e92833268f6e57eb722","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T07:56:03.341656677Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c14d2c66390e94d285d5ee748e85638784d91b365dd5fd3e653df368fc89775c","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T07:56:03.341656677Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"STATEMENT OF WORK\n\nGENERAL INFORMATION \n\nTitle of Project: Project# 626A4-20-103 Improve Security York Campus\n\nScope of Work:  The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project# 626A4-20-103 \"Improve Security York campus  at the Tennessee Valley Healthcare System, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 in accordance with the specifications and drawings. Work includes demolition and new construction, including, but not limited to, general construction, civil, architectural, electrical, low voltage, industrial hygiene, and certain other items.\nStatement Of Bid Item(S)\n\nBID ITEM I: Includes all work per drawings and specifications. Period of Performance: 180 calendar days\n\nBID ITEM II: All items in BID ITEM I except for the bollards around the fuel point.\n\n\nGENERAL REQUIREMENTS\n\nAll work including materials will be warranted for a period of one year unless otherwise indicated in the specifications.\n\nContractor will be required to work nights (6:00pm   6:00am) and/or weekends to perform this work and maintain functionality of affected areas, and to minimize disruptions to the Medical Centers operations. Weekend shall be identified on the project schedule submitted by the contractor and approved by the VA before work begins.\n\nSee specifications for additional requirements.","text":"STATEMENT OF WORK\n\nGENERAL INFORMATION\n\nTitle of Project: Project# 626A4-20-103 Improve Security York Campus\n\nScope of Work: The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project# 626A4-20-103 \"Improve Security York campus at the Tennessee Valley Healthcare System, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 in accordance with the specifications and drawings. Work includes demolition and new construction, including, but not limited to, general construction, civil, architectural, electrical, low voltage, industrial hygiene, and certain other items.\nStatement Of Bid Item(S)\n\nBID ITEM I: Includes all work per drawings and specifications. Period of Performance: 180 calendar days\n\nBID ITEM II: All items in BID ITEM I except for the bollards around the fuel point.\n\nGENERAL REQUIREMENTS\n\nAll work including materials will be warranted for a period of one year unless otherwise indicated in the specifications.\n\nContractor will be required to work nights (6:00pm 6:00am) and/or weekends to perform this work and maintain functionality of affected areas, and to minimize disruptions to the Medical Centers operations. Weekend shall be identified on the project schedule submitted by the contractor and approved by the VA before work begins.\n\nSee specifications for additional requirements.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C24925B0007","place_of_performance":{"zip":"37129","city":{"code":"51560","name":"Murfreesboro"},"state":{"code":"TN","name":"Tennessee"},"street":"Alvin C. York VAMC 3400 Lebanon Rd","country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1DA"},{"award":{"awardee":{}},"dates":{"posted":"2025-07-02","posted_at":"2025-07-02T12:38:41.767Z","created_at":"2025-07-02T12:38:12.752Z","modified_at":"2025-09-08T04:00:15.246Z","response_deadline":{"raw":"2025-08-01T13:00:00-05:00","utc":"2025-08-01T18:00:00Z","date":"2025-08-01","time":"13:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5dcd9991ec4a4e92833268f6e57eb722/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","agency":{"office":{"code":"36C249","name":"249-NETWORK CONTRACT OFFICE 9 (36C249)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"organization_id":"100163849","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-11-08","archive_type":"auto_custom"},"history":[{"index":6,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-03T15:16:46.400Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"b683b0bbaedb42f4a0e9955143de6fb8","solicitation_number":"36C24925B0007"},{"index":4,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:43:55.969Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8de60b7c04d343129b0e6fc9e97379df","solicitation_number":"36C24925B0007","parent_opportunity_id":"5dcd9991ec4a4e92833268f6e57eb722"},{"index":2,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T12:38:41.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5dcd9991ec4a4e92833268f6e57eb722","solicitation_number":"36C24925B0007","related_opportunity_id":"b683b0bbaedb42f4a0e9955143de6fb8"}],"contacts":[{"name":"Brian Bentley","role":"primary","email":"Brian.Bentley@va.gov","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"5dcd9991ec4a4e92833268f6e57eb722","lineage_id":"5dcd9991ec4a4e92833268f6e57eb722","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T04:23:30.009064545Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"0c9ff43176fdf0c25af42a54092624488a12f683c4d06d5924a31d979bb8f8d6","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-11T04:23:30.009064545Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"STATEMENT OF WORK\n\nGENERAL INFORMATION \n\nTitle of Project: Project# 626A4-20-103 Improve Security York Campus\n\nScope of Work:  The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project# 626A4-20-103 \"Improve Security York campus  at the Tennessee Valley Healthcare System, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 in accordance with the specifications and drawings. Work includes demolition and new construction, including, but not limited to, general construction, civil, architectural, electrical, low voltage, industrial hygiene, and certain other items.\nStatement Of Bid Item(S)\n\nBID ITEM I: Includes all work per drawings and specifications. Period of Performance: 180 calendar days\n\nBID ITEM II: All items in BID ITEM I except for the bollards around the fuel point.\n\n\nGENERAL REQUIREMENTS\n\nAll work including materials will be warranted for a period of one year unless otherwise indicated in the specifications.\n\nContractor will be required to work nights (6:00pm   6:00am) and/or weekends to perform this work and maintain functionality of affected areas, and to minimize disruptions to the Medical Centers operations. Weekend shall be identified on the project schedule submitted by the contractor and approved by the VA before work begins.\n\nSee specifications for additional requirements.","text":"STATEMENT OF WORK\n\nGENERAL INFORMATION\n\nTitle of Project: Project# 626A4-20-103 Improve Security York Campus\n\nScope of Work: The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project# 626A4-20-103 \"Improve Security York campus at the Tennessee Valley Healthcare System, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 in accordance with the specifications and drawings. Work includes demolition and new construction, including, but not limited to, general construction, civil, architectural, electrical, low voltage, industrial hygiene, and certain other items.\nStatement Of Bid Item(S)\n\nBID ITEM I: Includes all work per drawings and specifications. Period of Performance: 180 calendar days\n\nBID ITEM II: All items in BID ITEM I except for the bollards around the fuel point.\n\nGENERAL REQUIREMENTS\n\nAll work including materials will be warranted for a period of one year unless otherwise indicated in the specifications.\n\nContractor will be required to work nights (6:00pm 6:00am) and/or weekends to perform this work and maintain functionality of affected areas, and to minimize disruptions to the Medical Centers operations. Weekend shall be identified on the project schedule submitted by the contractor and approved by the VA before work begins.\n\nSee specifications for additional requirements.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24925B0007","product_service_code":"Z1DA"},{"award":{"awardee":{}},"dates":{"posted":"2025-07-31","posted_at":"2025-07-31T21:43:55.969Z","created_at":"2025-07-31T21:43:27.481Z","modified_at":"2025-09-08T04:00:15.246Z","response_deadline":{"raw":"2025-08-08T13:00:00-05:00","utc":"2025-08-08T18:00:00Z","date":"2025-08-08","time":"13:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8de60b7c04d343129b0e6fc9e97379df/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","agency":{"office":{"code":"36C249","name":"249-NETWORK CONTRACT OFFICE 9 (36C249)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"organization_id":"100163849","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-07","archive_type":"auto_custom"},"history":[{"index":3,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T21:43:55.969Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8de60b7c04d343129b0e6fc9e97379df","solicitation_number":"36C24925B0007","parent_opportunity_id":"5dcd9991ec4a4e92833268f6e57eb722"},{"index":1,"title":"Z1DA--Project# 626A4-20-103- Improve Security York Campus","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T12:38:41.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"5dcd9991ec4a4e92833268f6e57eb722","solicitation_number":"36C24925B0007","related_opportunity_id":"b683b0bbaedb42f4a0e9955143de6fb8"}],"contacts":[{"name":"Jen Jamieson","role":"primary","email":"jen.jamieson@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8de60b7c04d343129b0e6fc9e97379df","lineage_id":"5dcd9991ec4a4e92833268f6e57eb722","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-06T04:15:04.469687914Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"cb4377b304b7e675f5372c1c550aaa34d616650bebde8d3a905b53e4f5124f95","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-06T04:15:04.469687914Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"RFIs:\nWhat is the thickness of the existing wall to be modified in G12B?\nACG Response: Wall is believed to be 6  or 3 5/8  stud wall. Invasive survey was not permissible.  The 3 5/8  16 ga studs to be added for welding the diamond mesh to will fit either scenario. 2 Â½\" 16 ga studs permissible if wall is 3 5/8 .\nCan new bollards be sleeved in lieu of paint?\nACG Response: Yes\nWhat is the thickness of the concrete on sheet CS100?\nACG Response: Borings of the concrete were not taken. Assume 6  thick.\nIt is unclear from detail 11/A-601 how to attach the new studs onto existing wall. Please provide additional front elevation showing height and attachment method for new studs.\nACG Response: The height of additional studs is from floor to underside of deck. Welding is called out 16  o.c. both ways, add 16 ga horizontal blocking where needed.  There are  mulitple acceptable ways of attachment for new studs to existing. This can be determined by cold form vendor. \nSheet A-100 Key Note 6 does not appear to be used in the drawing. Please indicate which windows are to receive this film and what size is needed.\nACG Response: Keynote 6 shows in 3 locations just below column line A. Size of film is listed in keynote.\nCan superintendent dual-hat as SSHO?\nYes\nDetail 11/A-601 shows 2 runs of stud horizontal in wall. Is this correct or are new studs attached vertically to existing studs?\nACG Response: Our partition details show partitions in section at floor and ceiling with break lines, then plans in the middle. Details are labeled. New 16 ga studs to be attached to existing vertical studs.\n01 45 00 3.4.B states the CQC System Manager must be a graduate engineer, architect, or construction manager. Can this be substituted with 5 years of quality control experience?\nYes\n01 00 00 1.23 states a project sign is required. Is a project sign needed?\nNo\n01 00 00 1.24 states a safety sign is required. Is a safety sign needed, or can safety information be displayed in the prime contractor s job trailer?\nYes\n01 00 00 1.25 and 1.26 requires the contractor to provide professional photo documentation and indexing. Is it acceptable for the prime contractor to provide this through ProCore?\nYes\nIs there a basis of design for the new pass window?\nACG Response: Basis of design is listed in keynote 3, A-100\nSome of the steel subcontactors have expressed concern about spot welding the security mesh onto metal studs, due to the possibility the welding process may melt through the studs and not provide a secure connection. Is it acceptable to use metal screws to fasten the security mesh onto the metal studs?\nACG Response: No\nDetail 3/E-501 shows a PACS panel but does not indicate if it is new or existing. Is the contractor to replace the physical access control panel or tie into existing?\nACG Response: Elect   Tie into existing.\nDetail 1/E-501 shows locations for all access control devices around the doors (ie. Controller Box, RX, ES, DC, etc.). Is the contractor to replace all access control devices or only replace card readers?\nACG Response:Elect   Install all new.\nDetail 1/E-501 notes seem to indicate new conduit, boxes, supports and cabling for the PACS devices at each door. Is this correct?\nACG Response:Elect   Contractor may reuse conduit from PACS panel to door location. Contractor to install new cabling from PACS panel to door location. Provide new cabling and conduit at doors.\nIf cabling is to be replaced, is it to be replaced back to the panel, or just to the 8 x8 x4  Controller Box above the door?\nACG Response: LV - Contractor may reuse conduit from PACS panel to door location. Contractor to install new cabling from PACS panel to door location.\nIs any commissioning required on this project? \nACG Response: No\nIs a full-time on-site quality control manager required for this project? \nYes\nCan the Superintendent also be the quality control manager? \nYes\nIs a full-time on-site Safety and Health Officer required for this project? \nYes\nCan the Superintendent also be the site safety and Health Officer? \nYes\nCan the Superintendent be Triple hatted as the SSHO and QC Manager? \nYes\nAs is typical for most VA projects can the QC plan be implemented by the onsite superintendent and administrated by the PM without additional staff (other than what is required for commissioning) as called for in 01 45 00.? \nYes\nWhat is the total dollar amount that the VA has requested for this project? \nConstruction magnitude is between $500,000 and $1,000,000.\nHas the funding request been approved and full funding for this project available to the NCO station?  \nFunds are subject to availability at the time of award.\n Which scopes of work will be allowed to be performed during normal hours (6AM   5PM)? \nACG Response: All work to take place off Pharmacy business hours\n Will this project be done in phases? \nACG Response: See Sheet notes A-100\n Will each phase have to be fully completed before moving to the next or can some phases be completed simultaneously? \nACG Response: The only phasing is to keep one window operational,\n How many areas will we be given at a time? \nACG Response: Off hours, contractors will have access to all work areas\n The area of work is an interior room without an exterior window nearby to vent the negative air outside, is there another means of venting air from the space to achieve the negative pressure required by ICRA? \nACG Response: There are windows located in exterior wall adjacent to column line A.\n Is there any other openings we can use to vent our negative air to meet the ICRA requirements? \nACG Response: There are windows located in exterior wall adjacent to column line A.\n In ICRA areas that require Category B Level 1 or 2, can we use zip-walls or plastic sheeting as containment? \nNo because this area is in the pharmacy. Walls are for security reasons\n In any ICRA areas that require above Category B containment, can plastic wall panels be used for the ICRA walls, such as STARC Panels or Temporary Wall System s panels? \nACG Response: Starc walls or Edgeguard walls are permitted as long as barrier is not called out to be rated\n Will a temporary wall need to be placed inside the room dividing Phase 1 from Phase 2? \nACG Response: Temporary walls to be located as shown on sheet AD100\n Will temporary sprinklers be required during demolition or can we use Heat Detectors? \nSee attached\n Will we be required to test and balance the HVAC system once our work is complete? \nACG Response: Yes\n Who is the manufacturer of the current HVAC Controls? \nNot needed\n Please provide a contact for who services the current HVAC Controls? \nNot Needed\n Who is the manufacturer of the current Building Automation System? \nNot Needed\n Please provide a contact for who services the current Building Automation System? \nNot needed\n Who is the manufacturer of the current Nurse Call system \nBot needed\n Please provide a contact for who services the current Nurse Call System \nNot needed\n Who is the manufacturer of the current Fire Alarm system \nEdwards\n Please provide a contact for who services the current Fire Alarm System \n VA\nWho is the manufacturer of the current Security and Access Control system? \nSee drawings\n Please provide the contact information for the Johnson Controls PACs representative? \nSee drawings\n Who is the manufacturer of the current CCTV system? \nSee drawings\n Please provide a contact for who services the current CCTV System? \nSee drawings\n Is there any chance of uncovering hazardous materials? \nACG Response: It is not anticipated, but it is possible. Mastic under tile contains asbestos\nCan the VA provide the latest Asbestos/Hazardous Materials reports for the areas that will require abatement? \nIt is attached\nOn Sheet CS 100 will the contractor be allowed to leave the spoils from the bollards on site or will they have to be hauled off? \nIf they have to be hauled off, will the VA provide testing and inspection to make sure they are not contaminated soils? \nACG Response: Civil\nOn Sheet CS 100 there are several existing Underground Electrical lines where the contractor will be excavating for the bollards. How deep are these existing electrical lines  Depth unknown.\nAre they encased in concrete? \nACG Response: No, subsurface investigation indicates pipes are pvc and range from 0.75  - 3.5 \nWill the contractor be required to Hydro excavate in order to not disturb these utility lines?  \nACG Response: Contractor will be responsible for any damage caused to existing utilities shown to remain. Means and methods are at the contractor s discretion.\nWill the contractor be responsible for locating existing underground cabling? \nACG Response: Contractor will be responsible for any damage caused to existing utilities shown to remain. Means and methods are at the contractor s discretion.  \nWith the area of work being so small will any erosion control be required?  \nACG Response: Contractor is responsible for ensuring no sediment leaves the site or enters roadways or storm drains. \nWho is the existing signage contractor for this VA? \nCreative Signage\nWill the contractor be responsible for any permits? \nIf required\nOn Sheet A-100 please provide a wall section detail for Note #4 so all bidders are pricing the same patching? \nACG Response: See drawings.\nAre doors to be factory stained or stained finished? \nACG Response: See specification Section 08 14 00\nDetail 11 on Sheet A-601, could you please provide a layout or diagram indicating the spacing and frequency of the spot welds required to attach the diamond security mesh to the metal studs? The detail does not currently specify the weld pattern or spacing, and this clarification is needed to ensure proper installation and adherence to design intent. \nACG Response: New add 16 gauge studs to be added to existing from floor to underside of deck. The weld pattern is spot weld, 16  o.c. both ways. \nDetail 12 on sheet A-601, for bidding purposes please provide some kind of basis of design for the Plastic Laminate, so that the bidders are not guessing on what the VA will choose? \nACG Response: Wilsonart, High pressure laminate, Nile Velvet, 15515. Note: this is NOT the final selection.\nWhat is the existing flooring in Waiting G12? \nACG Response: Luxury Vinyl Tile (LVT)\nWhat is the existing flooring in Dispensing G12B? \nACG Response: Vinyl sheet good\nWhat is the existing flooring in Receiving G12G? \nACG Response: VCT\nWhat is the existing ceiling manufacturer and model in Waiting G12? \nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Dispensing G12B? \nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Receiving G12G?  \nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Corridor G12Q? \nACG Response: Not known, field verify\nWhat is the height from finished floor to bottom of deck above in the Area ? \nACG Response:\nWill the VA provide clear access for the contractor to perform their work in each area? \nACG Response: Yes\nWill the contractor be required to move any of the existing furniture or equipment? \nYes\nIf the contractor is responsible for moving the existing furniture, will storage be available from the VA for the furniture, equipment, or casework? \nYes\nAt the end of each night what are the requirements the contractor needs to meet to leave the area ready for the next days business? \nArea outside of work area will be clean.\nPlease confirm if specification 01 81 13 pertains to the work performed on this project? If so, please provide details of what sustainable construction requirements we are to perform? \nACG Response: All requirements are listed in specification section 01 81 13\nWill you send out the site visit sign in sheet? \nContracting will\nPlease confirm the contractor has to include an electronic bid bond in their proposal and does not have to mail the original bid bond? \nYes, Electronic bid bond is acceptable \nThere is no  Instructions to Offers  section included in the Solicitation to inform the offers what documents are required in their proposal submission. Please provide a list of documents and the order they need to be in for the acceptance of the proposal. \nSee attached\nIs a copy of the Limitations of Subcontracting required in the proposal? \nyes\nIs a copy of the contractors VETS4212 required in the proposal?  \nYes\nIs a copy of the contractor SAM Certification required in the proposal?  \nYes\nIs a copy of the solicitation sections 52.204-8, 52.504.24, 52.509-7, or 52.209-13 required in the proposal?  \nYes\nIs a copy of the contractor s latest EMR Letter required in the proposal? \nSee attached EMR form.\nCan the bid date for the project be extended to provide more time for contractors?  \nYes, New bid date will be 08/08/2025.\nCan a second round of RFIs be submitted once the initial RFI answers are provided as usually these answers call for more clarifications in most cases? \nDue to deadlines this will be the only round of RFIs\nWe are getting ready to change out the fire alarm system from Simplex to Edwards EST. Will these devices and relays be compatible with that system since these were not installed when the Fire Alarm design was done?    \nACG Response: In general, addressable simplex devices will not work with Edwards control panels. Some conventional devices may work. We would recommend replacing Simplex with Edwards devices.\nVA Response: We are going with Edward devices","text":"RFIs:\nWhat is the thickness of the existing wall to be modified in G12B?\nACG Response: Wall is believed to be 6 or 3 5/8 stud wall. Invasive survey was not permissible. The 3 5/8 16 ga studs to be added for welding the diamond mesh to will fit either scenario. 2 Â½\" 16 ga studs permissible if wall is 3 5/8 .\nCan new bollards be sleeved in lieu of paint?\nACG Response: Yes\nWhat is the thickness of the concrete on sheet CS100?\nACG Response: Borings of the concrete were not taken. Assume 6 thick.\nIt is unclear from detail 11/A-601 how to attach the new studs onto existing wall. Please provide additional front elevation showing height and attachment method for new studs.\nACG Response: The height of additional studs is from floor to underside of deck. Welding is called out 16 o.c. both ways, add 16 ga horizontal blocking where needed. There are mulitple acceptable ways of attachment for new studs to existing. This can be determined by cold form vendor.\nSheet A-100 Key Note 6 does not appear to be used in the drawing. Please indicate which windows are to receive this film and what size is needed.\nACG Response: Keynote 6 shows in 3 locations just below column line A. Size of film is listed in keynote.\nCan superintendent dual-hat as SSHO?\nYes\nDetail 11/A-601 shows 2 runs of stud horizontal in wall. Is this correct or are new studs attached vertically to existing studs?\nACG Response: Our partition details show partitions in section at floor and ceiling with break lines, then plans in the middle. Details are labeled. New 16 ga studs to be attached to existing vertical studs.\n01 45 00 3.4.B states the CQC System Manager must be a graduate engineer, architect, or construction manager. Can this be substituted with 5 years of quality control experience?\nYes\n01 00 00 1.23 states a project sign is required. Is a project sign needed?\nNo\n01 00 00 1.24 states a safety sign is required. Is a safety sign needed, or can safety information be displayed in the prime contractor s job trailer?\nYes\n01 00 00 1.25 and 1.26 requires the contractor to provide professional photo documentation and indexing. Is it acceptable for the prime contractor to provide this through ProCore?\nYes\nIs there a basis of design for the new pass window?\nACG Response: Basis of design is listed in keynote 3, A-100\nSome of the steel subcontactors have expressed concern about spot welding the security mesh onto metal studs, due to the possibility the welding process may melt through the studs and not provide a secure connection. Is it acceptable to use metal screws to fasten the security mesh onto the metal studs?\nACG Response: No\nDetail 3/E-501 shows a PACS panel but does not indicate if it is new or existing. Is the contractor to replace the physical access control panel or tie into existing?\nACG Response: Elect Tie into existing.\nDetail 1/E-501 shows locations for all access control devices around the doors (ie. Controller Box, RX, ES, DC, etc.). Is the contractor to replace all access control devices or only replace card readers?\nACG Response:Elect Install all new.\nDetail 1/E-501 notes seem to indicate new conduit, boxes, supports and cabling for the PACS devices at each door. Is this correct?\nACG Response:Elect Contractor may reuse conduit from PACS panel to door location. Contractor to install new cabling from PACS panel to door location. Provide new cabling and conduit at doors.\nIf cabling is to be replaced, is it to be replaced back to the panel, or just to the 8 x8 x4 Controller Box above the door?\nACG Response: LV - Contractor may reuse conduit from PACS panel to door location. Contractor to install new cabling from PACS panel to door location.\nIs any commissioning required on this project?\nACG Response: No\nIs a full-time on-site quality control manager required for this project?\nYes\nCan the Superintendent also be the quality control manager?\nYes\nIs a full-time on-site Safety and Health Officer required for this project?\nYes\nCan the Superintendent also be the site safety and Health Officer?\nYes\nCan the Superintendent be Triple hatted as the SSHO and QC Manager?\nYes\nAs is typical for most VA projects can the QC plan be implemented by the onsite superintendent and administrated by the PM without additional staff (other than what is required for commissioning) as called for in 01 45 00.?\nYes\nWhat is the total dollar amount that the VA has requested for this project?\nConstruction magnitude is between $500,000 and $1,000,000.\nHas the funding request been approved and full funding for this project available to the NCO station?\nFunds are subject to availability at the time of award.\nWhich scopes of work will be allowed to be performed during normal hours (6AM 5PM)?\nACG Response: All work to take place off Pharmacy business hours\nWill this project be done in phases?\nACG Response: See Sheet notes A-100\nWill each phase have to be fully completed before moving to the next or can some phases be completed simultaneously?\nACG Response: The only phasing is to keep one window operational,\nHow many areas will we be given at a time?\nACG Response: Off hours, contractors will have access to all work areas\nThe area of work is an interior room without an exterior window nearby to vent the negative air outside, is there another means of venting air from the space to achieve the negative pressure required by ICRA?\nACG Response: There are windows located in exterior wall adjacent to column line A.\nIs there any other openings we can use to vent our negative air to meet the ICRA requirements?\nACG Response: There are windows located in exterior wall adjacent to column line A.\nIn ICRA areas that require Category B Level 1 or 2, can we use zip-walls or plastic sheeting as containment?\nNo because this area is in the pharmacy. Walls are for security reasons\nIn any ICRA areas that require above Category B containment, can plastic wall panels be used for the ICRA walls, such as STARC Panels or Temporary Wall System s panels?\nACG Response: Starc walls or Edgeguard walls are permitted as long as barrier is not called out to be rated\nWill a temporary wall need to be placed inside the room dividing Phase 1 from Phase 2?\nACG Response: Temporary walls to be located as shown on sheet AD100\nWill temporary sprinklers be required during demolition or can we use Heat Detectors?\nSee attached\nWill we be required to test and balance the HVAC system once our work is complete?\nACG Response: Yes\nWho is the manufacturer of the current HVAC Controls?\nNot needed\nPlease provide a contact for who services the current HVAC Controls?\nNot Needed\nWho is the manufacturer of the current Building Automation System?\nNot Needed\nPlease provide a contact for who services the current Building Automation System?\nNot needed\nWho is the manufacturer of the current Nurse Call system\nBot needed\nPlease provide a contact for who services the current Nurse Call System\nNot needed\nWho is the manufacturer of the current Fire Alarm system\nEdwards\nPlease provide a contact for who services the current Fire Alarm System\nVA\nWho is the manufacturer of the current Security and Access Control system?\nSee drawings\nPlease provide the contact information for the Johnson Controls PACs representative?\nSee drawings\nWho is the manufacturer of the current CCTV system?\nSee drawings\nPlease provide a contact for who services the current CCTV System?\nSee drawings\nIs there any chance of uncovering hazardous materials?\nACG Response: It is not anticipated, but it is possible. Mastic under tile contains asbestos\nCan the VA provide the latest Asbestos/Hazardous Materials reports for the areas that will require abatement?\nIt is attached\nOn Sheet CS 100 will the contractor be allowed to leave the spoils from the bollards on site or will they have to be hauled off?\nIf they have to be hauled off, will the VA provide testing and inspection to make sure they are not contaminated soils?\nACG Response: Civil\nOn Sheet CS 100 there are several existing Underground Electrical lines where the contractor will be excavating for the bollards. How deep are these existing electrical lines Depth unknown.\nAre they encased in concrete?\nACG Response: No, subsurface investigation indicates pipes are pvc and range from 0.75 - 3.5\nWill the contractor be required to Hydro excavate in order to not disturb these utility lines?\nACG Response: Contractor will be responsible for any damage caused to existing utilities shown to remain. Means and methods are at the contractor s discretion.\nWill the contractor be responsible for locating existing underground cabling?\nACG Response: Contractor will be responsible for any damage caused to existing utilities shown to remain. Means and methods are at the contractor s discretion.\nWith the area of work being so small will any erosion control be required?\nACG Response: Contractor is responsible for ensuring no sediment leaves the site or enters roadways or storm drains.\nWho is the existing signage contractor for this VA?\nCreative Signage\nWill the contractor be responsible for any permits?\nIf required\nOn Sheet A-100 please provide a wall section detail for Note #4 so all bidders are pricing the same patching?\nACG Response: See drawings.\nAre doors to be factory stained or stained finished?\nACG Response: See specification Section 08 14 00\nDetail 11 on Sheet A-601, could you please provide a layout or diagram indicating the spacing and frequency of the spot welds required to attach the diamond security mesh to the metal studs? The detail does not currently specify the weld pattern or spacing, and this clarification is needed to ensure proper installation and adherence to design intent.\nACG Response: New add 16 gauge studs to be added to existing from floor to underside of deck. The weld pattern is spot weld, 16 o.c. both ways.\nDetail 12 on sheet A-601, for bidding purposes please provide some kind of basis of design for the Plastic Laminate, so that the bidders are not guessing on what the VA will choose?\nACG Response: Wilsonart, High pressure laminate, Nile Velvet, 15515. Note: this is NOT the final selection.\nWhat is the existing flooring in Waiting G12?\nACG Response: Luxury Vinyl Tile (LVT)\nWhat is the existing flooring in Dispensing G12B?\nACG Response: Vinyl sheet good\nWhat is the existing flooring in Receiving G12G?\nACG Response: VCT\nWhat is the existing ceiling manufacturer and model in Waiting G12?\nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Dispensing G12B?\nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Receiving G12G?\nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Corridor G12Q?\nACG Response: Not known, field verify\nWhat is the height from finished floor to bottom of deck above in the Area ?\nACG Response:\nWill the VA provide clear access for the contractor to perform their work in each area?\nACG Response: Yes\nWill the contractor be required to move any of the existing furniture or equipment?\nYes\nIf the contractor is responsible for moving the existing furniture, will storage be available from the VA for the furniture, equipment, or casework?\nYes\nAt the end of each night what are the requirements the contractor needs to meet to leave the area ready for the next days business?\nArea outside of work area will be clean.\nPlease confirm if specification 01 81 13 pertains to the work performed on this project? If so, please provide details of what sustainable construction requirements we are to perform?\nACG Response: All requirements are listed in specification section 01 81 13\nWill you send out the site visit sign in sheet?\nContracting will\nPlease confirm the contractor has to include an electronic bid bond in their proposal and does not have to mail the original bid bond?\nYes, Electronic bid bond is acceptable\nThere is no Instructions to Offers section included in the Solicitation to inform the offers what documents are required in their proposal submission. Please provide a list of documents and the order they need to be in for the acceptance of the proposal.\nSee attached\nIs a copy of the Limitations of Subcontracting required in the proposal?\nyes\nIs a copy of the contractors VETS4212 required in the proposal?\nYes\nIs a copy of the contractor SAM Certification required in the proposal?\nYes\nIs a copy of the solicitation sections 52.204-8, 52.504.24, 52.509-7, or 52.209-13 required in the proposal?\nYes\nIs a copy of the contractor s latest EMR Letter required in the proposal?\nSee attached EMR form.\nCan the bid date for the project be extended to provide more time for contractors?\nYes, New bid date will be 08/08/2025.\nCan a second round of RFIs be submitted once the initial RFI answers are provided as usually these answers call for more clarifications in most cases?\nDue to deadlines this will be the only round of RFIs\nWe are getting ready to change out the fire alarm system from Simplex to Edwards EST. Will these devices and relays be compatible with that system since these were not installed when the Fire Alarm design was done?\nACG Response: In general, addressable simplex devices will not work with Edwards control panels. Some conventional devices may work. We would recommend replacing Simplex with Edwards devices.\nVA Response: We are going with Edward devices","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24925B0007","product_service_code":"Z1DA"}],"due_at":"2025-08-08T18:00:00Z","due_date":"2025-08-08","closes_at":"2025-08-08T18:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","state":"TN","county":"47149","county_name":"Rutherford County","city":"4751560","city_name":"Murfreesboro","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"KV1NW9F8M7W6","amount":null,"linked_awards":3,"cancelled":false,"archived":true,"updated_at":"2026-11-06T04:28:41.894858Z","principal_notice_id":"8de60b7c04d343129b0e6fc9e97379df","description":{"text":"RFIs:\nWhat is the thickness of the existing wall to be modified in G12B?\nACG Response: Wall is believed to be 6 or 3 5/8 stud wall. Invasive survey was not permissible. The 3 5/8 16 ga studs to be added for welding the diamond mesh to will fit either scenario. 2 Â½\" 16 ga studs permissible if wall is 3 5/8 .\nCan new bollards be sleeved in lieu of paint?\nACG Response: Yes\nWhat is the thickness of the concrete on sheet CS100?\nACG Response: Borings of the concrete were not taken. Assume 6 thick.\nIt is unclear from detail 11/A-601 how to attach the new studs onto existing wall. Please provide additional front elevation showing height and attachment method for new studs.\nACG Response: The height of additional studs is from floor to underside of deck. Welding is called out 16 o.c. both ways, add 16 ga horizontal blocking where needed. There are mulitple acceptable ways of attachment for new studs to existing. This can be determined by cold form vendor.\nSheet A-100 Key Note 6 does not appear to be used in the drawing. Please indicate which windows are to receive this film and what size is needed.\nACG Response: Keynote 6 shows in 3 locations just below column line A. Size of film is listed in keynote.\nCan superintendent dual-hat as SSHO?\nYes\nDetail 11/A-601 shows 2 runs of stud horizontal in wall. Is this correct or are new studs attached vertically to existing studs?\nACG Response: Our partition details show partitions in section at floor and ceiling with break lines, then plans in the middle. Details are labeled. New 16 ga studs to be attached to existing vertical studs.\n01 45 00 3.4.B states the CQC System Manager must be a graduate engineer, architect, or construction manager. Can this be substituted with 5 years of quality control experience?\nYes\n01 00 00 1.23 states a project sign is required. Is a project sign needed?\nNo\n01 00 00 1.24 states a safety sign is required. Is a safety sign needed, or can safety information be displayed in the prime contractor s job trailer?\nYes\n01 00 00 1.25 and 1.26 requires the contractor to provide professional photo documentation and indexing. Is it acceptable for the prime contractor to provide this through ProCore?\nYes\nIs there a basis of design for the new pass window?\nACG Response: Basis of design is listed in keynote 3, A-100\nSome of the steel subcontactors have expressed concern about spot welding the security mesh onto metal studs, due to the possibility the welding process may melt through the studs and not provide a secure connection. Is it acceptable to use metal screws to fasten the security mesh onto the metal studs?\nACG Response: No\nDetail 3/E-501 shows a PACS panel but does not indicate if it is new or existing. Is the contractor to replace the physical access control panel or tie into existing?\nACG Response: Elect Tie into existing.\nDetail 1/E-501 shows locations for all access control devices around the doors (ie. Controller Box, RX, ES, DC, etc.). Is the contractor to replace all access control devices or only replace card readers?\nACG Response:Elect Install all new.\nDetail 1/E-501 notes seem to indicate new conduit, boxes, supports and cabling for the PACS devices at each door. Is this correct?\nACG Response:Elect Contractor may reuse conduit from PACS panel to door location. Contractor to install new cabling from PACS panel to door location. Provide new cabling and conduit at doors.\nIf cabling is to be replaced, is it to be replaced back to the panel, or just to the 8 x8 x4 Controller Box above the door?\nACG Response: LV - Contractor may reuse conduit from PACS panel to door location. Contractor to install new cabling from PACS panel to door location.\nIs any commissioning required on this project?\nACG Response: No\nIs a full-time on-site quality control manager required for this project?\nYes\nCan the Superintendent also be the quality control manager?\nYes\nIs a full-time on-site Safety and Health Officer required for this project?\nYes\nCan the Superintendent also be the site safety and Health Officer?\nYes\nCan the Superintendent be Triple hatted as the SSHO and QC Manager?\nYes\nAs is typical for most VA projects can the QC plan be implemented by the onsite superintendent and administrated by the PM without additional staff (other than what is required for commissioning) as called for in 01 45 00.?\nYes\nWhat is the total dollar amount that the VA has requested for this project?\nConstruction magnitude is between $500,000 and $1,000,000.\nHas the funding request been approved and full funding for this project available to the NCO station?\nFunds are subject to availability at the time of award.\nWhich scopes of work will be allowed to be performed during normal hours (6AM 5PM)?\nACG Response: All work to take place off Pharmacy business hours\nWill this project be done in phases?\nACG Response: See Sheet notes A-100\nWill each phase have to be fully completed before moving to the next or can some phases be completed simultaneously?\nACG Response: The only phasing is to keep one window operational,\nHow many areas will we be given at a time?\nACG Response: Off hours, contractors will have access to all work areas\nThe area of work is an interior room without an exterior window nearby to vent the negative air outside, is there another means of venting air from the space to achieve the negative pressure required by ICRA?\nACG Response: There are windows located in exterior wall adjacent to column line A.\nIs there any other openings we can use to vent our negative air to meet the ICRA requirements?\nACG Response: There are windows located in exterior wall adjacent to column line A.\nIn ICRA areas that require Category B Level 1 or 2, can we use zip-walls or plastic sheeting as containment?\nNo because this area is in the pharmacy. Walls are for security reasons\nIn any ICRA areas that require above Category B containment, can plastic wall panels be used for the ICRA walls, such as STARC Panels or Temporary Wall System s panels?\nACG Response: Starc walls or Edgeguard walls are permitted as long as barrier is not called out to be rated\nWill a temporary wall need to be placed inside the room dividing Phase 1 from Phase 2?\nACG Response: Temporary walls to be located as shown on sheet AD100\nWill temporary sprinklers be required during demolition or can we use Heat Detectors?\nSee attached\nWill we be required to test and balance the HVAC system once our work is complete?\nACG Response: Yes\nWho is the manufacturer of the current HVAC Controls?\nNot needed\nPlease provide a contact for who services the current HVAC Controls?\nNot Needed\nWho is the manufacturer of the current Building Automation System?\nNot Needed\nPlease provide a contact for who services the current Building Automation System?\nNot needed\nWho is the manufacturer of the current Nurse Call system\nBot needed\nPlease provide a contact for who services the current Nurse Call System\nNot needed\nWho is the manufacturer of the current Fire Alarm system\nEdwards\nPlease provide a contact for who services the current Fire Alarm System\nVA\nWho is the manufacturer of the current Security and Access Control system?\nSee drawings\nPlease provide the contact information for the Johnson Controls PACs representative?\nSee drawings\nWho is the manufacturer of the current CCTV system?\nSee drawings\nPlease provide a contact for who services the current CCTV System?\nSee drawings\nIs there any chance of uncovering hazardous materials?\nACG Response: It is not anticipated, but it is possible. Mastic under tile contains asbestos\nCan the VA provide the latest Asbestos/Hazardous Materials reports for the areas that will require abatement?\nIt is attached\nOn Sheet CS 100 will the contractor be allowed to leave the spoils from the bollards on site or will they have to be hauled off?\nIf they have to be hauled off, will the VA provide testing and inspection to make sure they are not contaminated soils?\nACG Response: Civil\nOn Sheet CS 100 there are several existing Underground Electrical lines where the contractor will be excavating for the bollards. How deep are these existing electrical lines Depth unknown.\nAre they encased in concrete?\nACG Response: No, subsurface investigation indicates pipes are pvc and range from 0.75 - 3.5\nWill the contractor be required to Hydro excavate in order to not disturb these utility lines?\nACG Response: Contractor will be responsible for any damage caused to existing utilities shown to remain. Means and methods are at the contractor s discretion.\nWill the contractor be responsible for locating existing underground cabling?\nACG Response: Contractor will be responsible for any damage caused to existing utilities shown to remain. Means and methods are at the contractor s discretion.\nWith the area of work being so small will any erosion control be required?\nACG Response: Contractor is responsible for ensuring no sediment leaves the site or enters roadways or storm drains.\nWho is the existing signage contractor for this VA?\nCreative Signage\nWill the contractor be responsible for any permits?\nIf required\nOn Sheet A-100 please provide a wall section detail for Note #4 so all bidders are pricing the same patching?\nACG Response: See drawings.\nAre doors to be factory stained or stained finished?\nACG Response: See specification Section 08 14 00\nDetail 11 on Sheet A-601, could you please provide a layout or diagram indicating the spacing and frequency of the spot welds required to attach the diamond security mesh to the metal studs? The detail does not currently specify the weld pattern or spacing, and this clarification is needed to ensure proper installation and adherence to design intent.\nACG Response: New add 16 gauge studs to be added to existing from floor to underside of deck. The weld pattern is spot weld, 16 o.c. both ways.\nDetail 12 on sheet A-601, for bidding purposes please provide some kind of basis of design for the Plastic Laminate, so that the bidders are not guessing on what the VA will choose?\nACG Response: Wilsonart, High pressure laminate, Nile Velvet, 15515. Note: this is NOT the final selection.\nWhat is the existing flooring in Waiting G12?\nACG Response: Luxury Vinyl Tile (LVT)\nWhat is the existing flooring in Dispensing G12B?\nACG Response: Vinyl sheet good\nWhat is the existing flooring in Receiving G12G?\nACG Response: VCT\nWhat is the existing ceiling manufacturer and model in Waiting G12?\nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Dispensing G12B?\nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Receiving G12G?\nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Corridor G12Q?\nACG Response: Not known, field verify\nWhat is the height from finished floor to bottom of deck above in the Area ?\nACG Response:\nWill the VA provide clear access for the contractor to perform their work in each area?\nACG Response: Yes\nWill the contractor be required to move any of the existing furniture or equipment?\nYes\nIf the contractor is responsible for moving the existing furniture, will storage be available from the VA for the furniture, equipment, or casework?\nYes\nAt the end of each night what are the requirements the contractor needs to meet to leave the area ready for the next days business?\nArea outside of work area will be clean.\nPlease confirm if specification 01 81 13 pertains to the work performed on this project? If so, please provide details of what sustainable construction requirements we are to perform?\nACG Response: All requirements are listed in specification section 01 81 13\nWill you send out the site visit sign in sheet?\nContracting will\nPlease confirm the contractor has to include an electronic bid bond in their proposal and does not have to mail the original bid bond?\nYes, Electronic bid bond is acceptable\nThere is no Instructions to Offers section included in the Solicitation to inform the offers what documents are required in their proposal submission. Please provide a list of documents and the order they need to be in for the acceptance of the proposal.\nSee attached\nIs a copy of the Limitations of Subcontracting required in the proposal?\nyes\nIs a copy of the contractors VETS4212 required in the proposal?\nYes\nIs a copy of the contractor SAM Certification required in the proposal?\nYes\nIs a copy of the solicitation sections 52.204-8, 52.504.24, 52.509-7, or 52.209-13 required in the proposal?\nYes\nIs a copy of the contractor s latest EMR Letter required in the proposal?\nSee attached EMR form.\nCan the bid date for the project be extended to provide more time for contractors?\nYes, New bid date will be 08/08/2025.\nCan a second round of RFIs be submitted once the initial RFI answers are provided as usually these answers call for more clarifications in most cases?\nDue to deadlines this will be the only round of RFIs\nWe are getting ready to change out the fire alarm system from Simplex to Edwards EST. Will these devices and relays be compatible with that system since these were not installed when the Fire Alarm design was done?\nACG Response: In general, addressable simplex devices will not work with Edwards control panels. Some conventional devices may work. We would recommend replacing Simplex with Edwards devices.\nVA Response: We are going with Edward devices","html":"RFIs:\nWhat is the thickness of the existing wall to be modified in G12B?\nACG Response: Wall is believed to be 6  or 3 5/8  stud wall. Invasive survey was not permissible.  The 3 5/8  16 ga studs to be added for welding the diamond mesh to will fit either scenario. 2 Â½\" 16 ga studs permissible if wall is 3 5/8 .\nCan new bollards be sleeved in lieu of paint?\nACG Response: Yes\nWhat is the thickness of the concrete on sheet CS100?\nACG Response: Borings of the concrete were not taken. Assume 6  thick.\nIt is unclear from detail 11/A-601 how to attach the new studs onto existing wall. Please provide additional front elevation showing height and attachment method for new studs.\nACG Response: The height of additional studs is from floor to underside of deck. Welding is called out 16  o.c. both ways, add 16 ga horizontal blocking where needed.  There are  mulitple acceptable ways of attachment for new studs to existing. This can be determined by cold form vendor. \nSheet A-100 Key Note 6 does not appear to be used in the drawing. Please indicate which windows are to receive this film and what size is needed.\nACG Response: Keynote 6 shows in 3 locations just below column line A. Size of film is listed in keynote.\nCan superintendent dual-hat as SSHO?\nYes\nDetail 11/A-601 shows 2 runs of stud horizontal in wall. Is this correct or are new studs attached vertically to existing studs?\nACG Response: Our partition details show partitions in section at floor and ceiling with break lines, then plans in the middle. Details are labeled. New 16 ga studs to be attached to existing vertical studs.\n01 45 00 3.4.B states the CQC System Manager must be a graduate engineer, architect, or construction manager. Can this be substituted with 5 years of quality control experience?\nYes\n01 00 00 1.23 states a project sign is required. Is a project sign needed?\nNo\n01 00 00 1.24 states a safety sign is required. Is a safety sign needed, or can safety information be displayed in the prime contractor s job trailer?\nYes\n01 00 00 1.25 and 1.26 requires the contractor to provide professional photo documentation and indexing. Is it acceptable for the prime contractor to provide this through ProCore?\nYes\nIs there a basis of design for the new pass window?\nACG Response: Basis of design is listed in keynote 3, A-100\nSome of the steel subcontactors have expressed concern about spot welding the security mesh onto metal studs, due to the possibility the welding process may melt through the studs and not provide a secure connection. Is it acceptable to use metal screws to fasten the security mesh onto the metal studs?\nACG Response: No\nDetail 3/E-501 shows a PACS panel but does not indicate if it is new or existing. Is the contractor to replace the physical access control panel or tie into existing?\nACG Response: Elect   Tie into existing.\nDetail 1/E-501 shows locations for all access control devices around the doors (ie. Controller Box, RX, ES, DC, etc.). Is the contractor to replace all access control devices or only replace card readers?\nACG Response:Elect   Install all new.\nDetail 1/E-501 notes seem to indicate new conduit, boxes, supports and cabling for the PACS devices at each door. Is this correct?\nACG Response:Elect   Contractor may reuse conduit from PACS panel to door location. Contractor to install new cabling from PACS panel to door location. Provide new cabling and conduit at doors.\nIf cabling is to be replaced, is it to be replaced back to the panel, or just to the 8 x8 x4  Controller Box above the door?\nACG Response: LV - Contractor may reuse conduit from PACS panel to door location. Contractor to install new cabling from PACS panel to door location.\nIs any commissioning required on this project? \nACG Response: No\nIs a full-time on-site quality control manager required for this project? \nYes\nCan the Superintendent also be the quality control manager? \nYes\nIs a full-time on-site Safety and Health Officer required for this project? \nYes\nCan the Superintendent also be the site safety and Health Officer? \nYes\nCan the Superintendent be Triple hatted as the SSHO and QC Manager? \nYes\nAs is typical for most VA projects can the QC plan be implemented by the onsite superintendent and administrated by the PM without additional staff (other than what is required for commissioning) as called for in 01 45 00.? \nYes\nWhat is the total dollar amount that the VA has requested for this project? \nConstruction magnitude is between $500,000 and $1,000,000.\nHas the funding request been approved and full funding for this project available to the NCO station?  \nFunds are subject to availability at the time of award.\n Which scopes of work will be allowed to be performed during normal hours (6AM   5PM)? \nACG Response: All work to take place off Pharmacy business hours\n Will this project be done in phases? \nACG Response: See Sheet notes A-100\n Will each phase have to be fully completed before moving to the next or can some phases be completed simultaneously? \nACG Response: The only phasing is to keep one window operational,\n How many areas will we be given at a time? \nACG Response: Off hours, contractors will have access to all work areas\n The area of work is an interior room without an exterior window nearby to vent the negative air outside, is there another means of venting air from the space to achieve the negative pressure required by ICRA? \nACG Response: There are windows located in exterior wall adjacent to column line A.\n Is there any other openings we can use to vent our negative air to meet the ICRA requirements? \nACG Response: There are windows located in exterior wall adjacent to column line A.\n In ICRA areas that require Category B Level 1 or 2, can we use zip-walls or plastic sheeting as containment? \nNo because this area is in the pharmacy. Walls are for security reasons\n In any ICRA areas that require above Category B containment, can plastic wall panels be used for the ICRA walls, such as STARC Panels or Temporary Wall System s panels? \nACG Response: Starc walls or Edgeguard walls are permitted as long as barrier is not called out to be rated\n Will a temporary wall need to be placed inside the room dividing Phase 1 from Phase 2? \nACG Response: Temporary walls to be located as shown on sheet AD100\n Will temporary sprinklers be required during demolition or can we use Heat Detectors? \nSee attached\n Will we be required to test and balance the HVAC system once our work is complete? \nACG Response: Yes\n Who is the manufacturer of the current HVAC Controls? \nNot needed\n Please provide a contact for who services the current HVAC Controls? \nNot Needed\n Who is the manufacturer of the current Building Automation System? \nNot Needed\n Please provide a contact for who services the current Building Automation System? \nNot needed\n Who is the manufacturer of the current Nurse Call system \nBot needed\n Please provide a contact for who services the current Nurse Call System \nNot needed\n Who is the manufacturer of the current Fire Alarm system \nEdwards\n Please provide a contact for who services the current Fire Alarm System \n VA\nWho is the manufacturer of the current Security and Access Control system? \nSee drawings\n Please provide the contact information for the Johnson Controls PACs representative? \nSee drawings\n Who is the manufacturer of the current CCTV system? \nSee drawings\n Please provide a contact for who services the current CCTV System? \nSee drawings\n Is there any chance of uncovering hazardous materials? \nACG Response: It is not anticipated, but it is possible. Mastic under tile contains asbestos\nCan the VA provide the latest Asbestos/Hazardous Materials reports for the areas that will require abatement? \nIt is attached\nOn Sheet CS 100 will the contractor be allowed to leave the spoils from the bollards on site or will they have to be hauled off? \nIf they have to be hauled off, will the VA provide testing and inspection to make sure they are not contaminated soils? \nACG Response: Civil\nOn Sheet CS 100 there are several existing Underground Electrical lines where the contractor will be excavating for the bollards. How deep are these existing electrical lines  Depth unknown.\nAre they encased in concrete? \nACG Response: No, subsurface investigation indicates pipes are pvc and range from 0.75  - 3.5 \nWill the contractor be required to Hydro excavate in order to not disturb these utility lines?  \nACG Response: Contractor will be responsible for any damage caused to existing utilities shown to remain. Means and methods are at the contractor s discretion.\nWill the contractor be responsible for locating existing underground cabling? \nACG Response: Contractor will be responsible for any damage caused to existing utilities shown to remain. Means and methods are at the contractor s discretion.  \nWith the area of work being so small will any erosion control be required?  \nACG Response: Contractor is responsible for ensuring no sediment leaves the site or enters roadways or storm drains. \nWho is the existing signage contractor for this VA? \nCreative Signage\nWill the contractor be responsible for any permits? \nIf required\nOn Sheet A-100 please provide a wall section detail for Note #4 so all bidders are pricing the same patching? \nACG Response: See drawings.\nAre doors to be factory stained or stained finished? \nACG Response: See specification Section 08 14 00\nDetail 11 on Sheet A-601, could you please provide a layout or diagram indicating the spacing and frequency of the spot welds required to attach the diamond security mesh to the metal studs? The detail does not currently specify the weld pattern or spacing, and this clarification is needed to ensure proper installation and adherence to design intent. \nACG Response: New add 16 gauge studs to be added to existing from floor to underside of deck. The weld pattern is spot weld, 16  o.c. both ways. \nDetail 12 on sheet A-601, for bidding purposes please provide some kind of basis of design for the Plastic Laminate, so that the bidders are not guessing on what the VA will choose? \nACG Response: Wilsonart, High pressure laminate, Nile Velvet, 15515. Note: this is NOT the final selection.\nWhat is the existing flooring in Waiting G12? \nACG Response: Luxury Vinyl Tile (LVT)\nWhat is the existing flooring in Dispensing G12B? \nACG Response: Vinyl sheet good\nWhat is the existing flooring in Receiving G12G? \nACG Response: VCT\nWhat is the existing ceiling manufacturer and model in Waiting G12? \nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Dispensing G12B? \nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Receiving G12G?  \nACG Response: Not known, field verify\nWhat is the existing ceiling manufacturer and model in Corridor G12Q? \nACG Response: Not known, field verify\nWhat is the height from finished floor to bottom of deck above in the Area ? \nACG Response:\nWill the VA provide clear access for the contractor to perform their work in each area? \nACG Response: Yes\nWill the contractor be required to move any of the existing furniture or equipment? \nYes\nIf the contractor is responsible for moving the existing furniture, will storage be available from the VA for the furniture, equipment, or casework? \nYes\nAt the end of each night what are the requirements the contractor needs to meet to leave the area ready for the next days business? \nArea outside of work area will be clean.\nPlease confirm if specification 01 81 13 pertains to the work performed on this project? If so, please provide details of what sustainable construction requirements we are to perform? \nACG Response: All requirements are listed in specification section 01 81 13\nWill you send out the site visit sign in sheet? \nContracting will\nPlease confirm the contractor has to include an electronic bid bond in their proposal and does not have to mail the original bid bond? \nYes, Electronic bid bond is acceptable \nThere is no  Instructions to Offers  section included in the Solicitation to inform the offers what documents are required in their proposal submission. Please provide a list of documents and the order they need to be in for the acceptance of the proposal. \nSee attached\nIs a copy of the Limitations of Subcontracting required in the proposal? \nyes\nIs a copy of the contractors VETS4212 required in the proposal?  \nYes\nIs a copy of the contractor SAM Certification required in the proposal?  \nYes\nIs a copy of the solicitation sections 52.204-8, 52.504.24, 52.509-7, or 52.209-13 required in the proposal?  \nYes\nIs a copy of the contractor s latest EMR Letter required in the proposal? \nSee attached EMR form.\nCan the bid date for the project be extended to provide more time for contractors?  \nYes, New bid date will be 08/08/2025.\nCan a second round of RFIs be submitted once the initial RFI answers are provided as usually these answers call for more clarifications in most cases? \nDue to deadlines this will be the only round of RFIs\nWe are getting ready to change out the fire alarm system from Simplex to Edwards EST. Will these devices and relays be compatible with that system since these were not installed when the Fire Alarm design was done?    \nACG Response: In general, addressable simplex devices will not work with Edwards control panels. Some conventional devices may work. We would recommend replacing Simplex with Edwards devices.\nVA Response: We are going with Edward devices","origin":"detail"},"contacts":[{"name":"Jen Jamieson","role":"primary","email":"jen.jamieson@va.gov","title":"Contract Specialist"}],"place_of_performance":null,"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"naics_codes":["236220"],"award":{"awardee":{}},"attachments":[{"resource_id":"f7532c5e40674479bfa1dc92b594dfed","name":"36C24925B0007.docx","kind":"file","mime_type":".docx","size_bytes":16819,"posted_at":"2025-06-03T15:16:46.400Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f7532c5e40674479bfa1dc92b594dfed/download","mirrored":false},{"resource_id":"fd3292296c6845938d953874108f99ec","name":"36C24925B0007_1.docx","kind":"file","mime_type":".docx","size_bytes":87834,"posted_at":"2025-07-02T12:38:41.767Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fd3292296c6845938d953874108f99ec/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C24925C0062_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C24925C0062_3600_-NONE-_-NONE-/","piid":"36C24925C0062","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"KV1NW9F8M7W6","recipient_name":"PARAMOUNT CONSTRUCTION GROUP, LLC","recipient_uei":"KV1NW9F8M7W6","recipient_cage":"675Y2","recipient_city":"MADISON","recipient_state":"MS","sub_name":"Department of Veterans Affairs","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","office_key":"o-36C249","first_action_date":"2025-09-11","last_action_date":"2025-09-11","actions":1,"obligated":"414887.00","current_total_value":"414887.00","potential_total_value":"414887.00","naics":"236220","psc":"Z1DA","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":5,"description":"IMPROVE YORK SECURITY","method":"solicitation","confidence":"high","evidence":["solicitation number 36C24925B0007 equals the FPDS solicitation identifier","same awarding office 36C249"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C24927AP1027","latest_notice_id":"6960cc2ab4be4d428eac6e0f6ece061f","title":"APT Generator Switchgear Testing – Alvin C. York VA Medical Center","solicitation_number":"36C249-27-AP-1027","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":1,"due_at":"2026-11-26T18:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"541380","psc":"H261","set_aside":null,"state":"TN","county":"47149","county_name":"Rutherford County","city":"4751560","city_name":"Murfreesboro","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C24927B0001","latest_notice_id":"3505c1f7e0584df499030ca75a30294e","title":"R602--Medical Courier Services","solicitation_number":"36C24927B0001","notice_type":"p","first_type":"p","first_posted":"2026-10-16","last_posted":"2026-10-16","notices":1,"due_at":"2026-11-30T17:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"492110","psc":"R602","set_aside":"SDVOSBC","state":"KY","county":"21111","county_name":"Jefferson County","city":"2148000","city_name":"Louisville","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-17T03:49:26.118050Z"},{"key":"36C24927Q0014","latest_notice_id":"e3fccfa4b53f4e26947a8776f1a55af3","title":"R614--Tennessee Valley Healthcare Services Document Destruction Shredding Services Base plus 4 year contract","solicitation_number":"36C24927Q0014","notice_type":"o","first_type":"p","first_posted":"2026-10-15","last_posted":"2026-11-23","notices":6,"due_at":"2026-12-02T16:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"561990","psc":"R614","set_aside":"SDVOSBC","state":"TN","county":"47149","county_name":"Rutherford County","city":"4751560","city_name":"Murfreesboro","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C24927R0021","latest_notice_id":"74731079f9214f979cc1b669d71e504a","title":"Z1DA--Design Building (DB) 626-27-504 MHEOCC Compliance TVHS VAMC (Nashville Campus)","solicitation_number":"36C24927R0021","notice_type":"p","first_type":"p","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":2,"due_at":"2026-12-02T19:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":"TN","county":"47037","county_name":"Davidson County","city":"4752006","city_name":"Nashville-Davidson","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C24927B0002","latest_notice_id":"d4fbb4ac5a81458a955b193f1cef4be0","title":"Z2LZ--626-25-104 Garage Suicide Protection","solicitation_number":"36C24927B0002","notice_type":"o","first_type":"p","first_posted":"2026-10-13","last_posted":"2026-11-16","notices":3,"due_at":"2026-12-03T16:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"236220","psc":"Z2LZ","set_aside":"SDVOSBC","state":"TN","county":"47037","county_name":"Davidson County","city":"4752006","city_name":"Nashville-Davidson","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"}],"similar_open":[{"key":"36C77627B00031","latest_notice_id":"f4ea125ebcfe45ffb023ffe066a36f10","title":"614-326 Construct Parking Garage West Lot Addition Minor Construction","solicitation_number":"36C77627B0003_1","notice_type":"p","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-11-26T18:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C776","office_name":"PCAC (36C776)","naics":"236220","psc":"Z2LZ","set_aside":"SDVOSBC","state":"TN","county":"47157","county_name":"Shelby County","city":"4748000","city_name":"Memphis","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"removed_at":null,"updated_at":"2026-11-23T06:19:14.199153Z"},{"key":"36C24927R0021","latest_notice_id":"74731079f9214f979cc1b669d71e504a","title":"Z1DA--Design Building (DB) 626-27-504 MHEOCC Compliance TVHS VAMC (Nashville Campus)","solicitation_number":"36C24927R0021","notice_type":"p","first_type":"p","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":2,"due_at":"2026-12-02T19:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":"TN","county":"47037","county_name":"Davidson County","city":"4752006","city_name":"Nashville-Davidson","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C24927B0002","latest_notice_id":"d4fbb4ac5a81458a955b193f1cef4be0","title":"Z2LZ--626-25-104 Garage Suicide Protection","solicitation_number":"36C24927B0002","notice_type":"o","first_type":"p","first_posted":"2026-10-13","last_posted":"2026-11-16","notices":3,"due_at":"2026-12-03T16:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"236220","psc":"Z2LZ","set_aside":"SDVOSBC","state":"TN","county":"47037","county_name":"Davidson County","city":"4752006","city_name":"Nashville-Davidson","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"}],"similar_open_total":192,"indexable":false}