{"canonical":"https://sealedbidder.com/opportunities/36c24826r0028","key":"36C24826R0028","url":"https://sealedbidder.com/opportunities/36c24826r0028","title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","solicitation_number":"36C24826R0028","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-04-27T15:00:00Z","first_posted":"2025-10-15","last_posted":"2026-04-20","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"248-NETWORK CONTRACT OFFICE 8 (36C248)","naics":"236220","psc":"Y1NB","set_aside":null,"place_state":"FL","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"12086","place_county_name":"Miami-Dade County","place_city":"1245000","place_city_name":"Miami","winner":"POINTER CONSTRUCTION GROUP LLC","award_amount":null,"publications":[{"notice_id":"7454223e8b2c48099b0fa1acb0bfeca0","title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","solicitation_number":"36C24826R0028","notice_type":"r","base_type":"r","posted":"2025-10-15","posted_at":"2025-10-15T21:47:55.882Z","due_at":"2025-10-29T14:00:00Z","due_date":"2025-10-29","cancelled":false,"archived":true,"archive_date":"2026-01-27","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7454223e8b2c48099b0fa1acb0bfeca0/view","enriched":true,"history":[{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}]},{"notice_id":"41e5a84b38874961aafb6e6990c9076a","title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","solicitation_number":"36C24826R0028","notice_type":"o","base_type":"r","posted":"2026-03-03","posted_at":"2026-03-03T22:15:31.004Z","due_at":"2026-04-13T15:00:00Z","due_date":"2026-04-13","cancelled":false,"archived":true,"archive_date":"2026-08-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/41e5a84b38874961aafb6e6990c9076a/view","enriched":true,"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}]},{"notice_id":"22cd2fd58f854810a2d02231ee7821dd","title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","solicitation_number":"36C24826R0028","notice_type":"o","base_type":"o","posted":"2026-03-06","posted_at":"2026-03-06T20:21:44.897Z","due_at":"2026-04-13T15:00:00Z","due_date":"2026-04-13","cancelled":false,"archived":true,"archive_date":"2026-08-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/22cd2fd58f854810a2d02231ee7821dd/view","enriched":true,"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}]},{"notice_id":"964a3e2c32294ffa97119078cf6787ad","title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","solicitation_number":"36C24826R0028","notice_type":"o","base_type":"o","posted":"2026-03-06","posted_at":"2026-03-06T20:23:51.280Z","due_at":"2026-04-13T15:00:00Z","due_date":"2026-04-13","cancelled":false,"archived":true,"archive_date":"2026-08-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/964a3e2c32294ffa97119078cf6787ad/view","enriched":true,"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}]},{"notice_id":"4de32774e0444118b1416f245a631773","title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","solicitation_number":"36C24826R0028","notice_type":"o","base_type":"o","posted":"2026-04-13","posted_at":"2026-04-13T12:43:42.713Z","due_at":"2026-04-21T15:00:00Z","due_date":"2026-04-21","cancelled":false,"archived":true,"archive_date":"2026-08-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4de32774e0444118b1416f245a631773/view","enriched":true,"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}]},{"notice_id":"6abf9a1b4cf744bf9e42a05d6a733a92","title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","solicitation_number":"36C24826R0028","notice_type":"o","base_type":"o","posted":"2026-04-16","posted_at":"2026-04-16T04:05:12.457Z","due_at":"2026-04-21T15:00:00Z","due_date":"2026-04-21","cancelled":false,"archived":true,"archive_date":"2026-08-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6abf9a1b4cf744bf9e42a05d6a733a92/view","enriched":true,"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}]},{"notice_id":"566da056153847aa9877b549f58b75ad","title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","solicitation_number":"36C24826R0028","notice_type":"o","base_type":"o","posted":"2026-04-20","posted_at":"2026-04-20T15:15:29.335Z","due_at":"2026-04-27T15:00:00Z","due_date":"2026-04-27","cancelled":false,"archived":true,"archive_date":"2026-08-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/566da056153847aa9877b549f58b75ad/view","enriched":true,"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}]}],"latest_notice_id":"566da056153847aa9877b549f58b75ad","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-10-15","posted_at":"2025-10-15T21:47:55.882Z","created_at":"2025-10-15T21:47:53.132Z","modified_at":"2026-01-28T04:55:48.275Z","response_deadline":{"raw":"2025-10-29T10:00:00-04:00","utc":"2025-10-29T14:00:00Z","date":"2025-10-29","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7454223e8b2c48099b0fa1acb0bfeca0/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","agency":{"office":{"code":"36C248","name":"248-NETWORK CONTRACT OFFICE 8 (36C248)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"33637","city":"TAMPA","state":"FL","country":"USA"},"organization_id":"100167097","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-27","archive_type":"auto_custom"},"history":[{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}],"contacts":[{"name":"Aldwyn Singleton","role":"primary","email":"aldwyn.singleton@va.gov","phone":"407-646-4061","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"7454223e8b2c48099b0fa1acb0bfeca0","lineage_id":"7454223e8b2c48099b0fa1acb0bfeca0","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-26T01:46:22.881704228Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"16328ada7757f86d5b638056f9ecd4d8d6f08d53fc93660a15b1e38940b2c016","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-26T01:46:22.881704228Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"Sources Sought","text":"Sources Sought","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24826R0028","place_of_performance":{"zip":"33125","city":{"name":"Miami"},"state":{"name":"FL"},"street":"Miami VA Medical Center 1201 NW 16th Street"},"product_service_code":"Y1NB"},{"dates":{"posted":"2026-03-03","posted_at":"2026-03-03T22:15:31.004Z","created_at":"2026-03-03T22:06:40.097Z","modified_at":"2026-08-05T05:06:25.107Z","response_deadline":{"raw":"2026-04-13T11:00:00-04:00","utc":"2026-04-13T15:00:00Z","date":"2026-04-13","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/41e5a84b38874961aafb6e6990c9076a/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","agency":{"office":{"code":"36C248","name":"248-NETWORK CONTRACT OFFICE 8 (36C248)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"33637","city":"TAMPA","state":"FL","country":"USA"},"organization_id":"100167097","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-05","archive_type":"auto_custom"},"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}],"contacts":[{"name":"Aldwyn Singleton","role":"primary","email":"aldwyn.singleton@va.gov","phone":"407-646-4061","title":"Contracting Officer"},{"name":"Jean Olivier Pierre","role":"secondary","email":"jean.pierre1@va.gov"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"41e5a84b38874961aafb6e6990c9076a","lineage_id":"41e5a84b38874961aafb6e6990c9076a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-12T00:57:12.488737649Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"ecc0d0b46f20c72a43be9a36f41fcf831ebbfb66964d7c787f9ef80838bc7e11","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-12T00:57:12.488737649Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p><strong>The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 &ndash; Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW). </strong></p>\n\n<p></p>\n\n<p><strong>Period of Performance (POP) Dates: 730 Calendar Days from the notice to proceed (NTP).</strong></p>\n\n<p><br />\n<strong>PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.<br />\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.</strong></p>","text":"The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 – Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW).\n\nPeriod of Performance (POP) Dates: 730 Calendar Days from the notice to proceed (NTP).\n\nPRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.\n\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24826R0028","place_of_performance":{"zip":"33125","state":{"code":"FL","name":"Florida"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2026-03-06","posted_at":"2026-03-06T20:21:44.897Z","created_at":"2026-03-06T20:16:20.109Z","modified_at":"2026-08-05T05:06:25.107Z","response_deadline":{"raw":"2026-04-13T11:00:00-04:00","utc":"2026-04-13T15:00:00Z","date":"2026-04-13","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/22cd2fd58f854810a2d02231ee7821dd/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","agency":{"office":{"code":"36C248","name":"248-NETWORK CONTRACT OFFICE 8 (36C248)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"33637","city":"TAMPA","state":"FL","country":"USA"},"organization_id":"100167097","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-05","archive_type":"auto_custom"},"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}],"contacts":[{"name":"Aldwyn Singleton","role":"primary","email":"aldwyn.singleton@va.gov","phone":"407-646-4061","title":"Contracting Officer"},{"name":"Jean Olivier Pierre","role":"secondary","email":"jean.pierre1@va.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"22cd2fd58f854810a2d02231ee7821dd","lineage_id":"41e5a84b38874961aafb6e6990c9076a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-11T11:57:08.353314084Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"7bac86932683da2d8fefb0a69c43d42105c26bc04dab97ac7c38552e5da81686","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-11T11:57:08.353314084Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p><strong>The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 &ndash; Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW). </strong></p>\n\n<p></p>\n\n<p><strong>Period of Performance (POP) Dates: 730 Calendar Days from the notice to proceed (NTP).</strong></p>\n\n<p><br />\n<strong>PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.<br />\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.</strong></p>","text":"The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 – Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW).\n\nPeriod of Performance (POP) Dates: 730 Calendar Days from the notice to proceed (NTP).\n\nPRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.\n\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24826R0028","place_of_performance":{"zip":"33125","state":{"code":"FL","name":"Florida"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2026-03-06","posted_at":"2026-03-06T20:23:51.280Z","created_at":"2026-03-06T20:23:05.853Z","modified_at":"2026-08-05T05:06:25.107Z","response_deadline":{"raw":"2026-04-13T11:00:00-04:00","utc":"2026-04-13T15:00:00Z","date":"2026-04-13","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/964a3e2c32294ffa97119078cf6787ad/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","agency":{"office":{"code":"36C248","name":"248-NETWORK CONTRACT OFFICE 8 (36C248)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"33637","city":"TAMPA","state":"FL","country":"USA"},"organization_id":"100167097","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-05","archive_type":"auto_custom"},"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}],"contacts":[{"name":"Aldwyn Singleton","role":"primary","email":"aldwyn.singleton@va.gov","phone":"407-646-4061","title":"Contracting Officer"},{"name":"Jean Olivier Pierre","role":"secondary","email":"jean.pierre1@va.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"964a3e2c32294ffa97119078cf6787ad","lineage_id":"41e5a84b38874961aafb6e6990c9076a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-11T12:14:46.433907069Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"70561a94ff418b07c2cdee34c5cda2b4d91b413eb4d0f57adcdb2db9d0ec6ee1","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-11T12:14:46.433907069Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p><strong>The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 &ndash; Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW). </strong></p>\n\n<p></p>\n\n<p><strong>Period of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP).</strong></p>\n\n<p><br />\n<strong>PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.<br />\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.</strong></p>","text":"The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 – Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW).\n\nPeriod of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP).\n\nPRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.\n\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24826R0028","place_of_performance":{"zip":"33125","state":{"code":"FL","name":"Florida"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2026-04-13","posted_at":"2026-04-13T12:43:42.713Z","created_at":"2026-04-13T12:36:01.830Z","modified_at":"2026-08-05T05:06:25.107Z","response_deadline":{"raw":"2026-04-21T11:00:00-04:00","utc":"2026-04-21T15:00:00Z","date":"2026-04-21","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4de32774e0444118b1416f245a631773/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","agency":{"office":{"code":"36C248","name":"248-NETWORK CONTRACT OFFICE 8 (36C248)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"33637","city":"TAMPA","state":"FL","country":"USA"},"organization_id":"100167097","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-05","archive_type":"auto_custom"},"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}],"contacts":[{"name":"Aldwyn Singleton","role":"primary","email":"aldwyn.singleton@va.gov","phone":"407-646-4061","title":"Contracting Officer"},{"name":"Jean Olivier Pierre","role":"secondary","email":"jean.pierre1@va.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4de32774e0444118b1416f245a631773","lineage_id":"41e5a84b38874961aafb6e6990c9076a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-07T02:04:06.374270502Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"6a1d640eb2d5fc7065fac106c606357f6b9b6ab79ea9ad0f71cce51ec2433758","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-07T02:04:06.374270502Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p><strong>The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 &ndash; Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW). </strong></p>\n\n<p></p>\n\n<p><strong>Period of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP).</strong></p>\n\n<p><br />\n<strong>PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.<br />\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.</strong></p>","text":"The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 – Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW).\n\nPeriod of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP).\n\nPRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.\n\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24826R0028","place_of_performance":{"zip":"33125","state":{"code":"FL","name":"Florida"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2026-04-16","posted_at":"2026-04-16T04:05:12.457Z","created_at":"2026-04-16T02:18:41.745Z","modified_at":"2026-08-05T05:06:25.107Z","response_deadline":{"raw":"2026-04-21T11:00:00-04:00","utc":"2026-04-21T15:00:00Z","date":"2026-04-21","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6abf9a1b4cf744bf9e42a05d6a733a92/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","agency":{"office":{"code":"36C248","name":"248-NETWORK CONTRACT OFFICE 8 (36C248)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"33637","city":"TAMPA","state":"FL","country":"USA"},"organization_id":"100167097","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-05","archive_type":"auto_custom"},"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}],"contacts":[{"name":"Aldwyn Singleton","role":"primary","email":"aldwyn.singleton@va.gov","phone":"407-646-4061","title":"Contracting Officer"},{"name":"Jean Olivier Pierre","role":"secondary","email":"jean.pierre1@va.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"6abf9a1b4cf744bf9e42a05d6a733a92","lineage_id":"41e5a84b38874961aafb6e6990c9076a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-06T11:29:35.067495655Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"96b898d0df9515a05dbf7dbecf9f5f51db4fa1fa0ad58b81e7f6c40432202d57","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-06T11:29:35.067495655Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p><strong>The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 &ndash; Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW). </strong></p>\n\n<p></p>\n\n<p><strong>Period of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP).</strong></p>\n\n<p><br />\n<strong>PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.<br />\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.</strong></p>","text":"The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 – Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW).\n\nPeriod of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP).\n\nPRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.\n\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24826R0028","place_of_performance":{"zip":"33125","state":{"code":"FL","name":"Florida"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"},{"dates":{"posted":"2026-04-20","posted_at":"2026-04-20T15:15:29.335Z","created_at":"2026-04-20T15:13:24.143Z","modified_at":"2026-08-05T05:06:25.107Z","response_deadline":{"raw":"2026-04-27T11:00:00-04:00","utc":"2026-04-27T15:00:00Z","date":"2026-04-27","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/566da056153847aa9877b549f58b75ad/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","agency":{"office":{"code":"36C248","name":"248-NETWORK CONTRACT OFFICE 8 (36C248)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"33637","city":"TAMPA","state":"FL","country":"USA"},"organization_id":"100167097","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-05","archive_type":"auto_custom"},"history":[{"index":10,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-20T15:15:29.335Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"566da056153847aa9877b549f58b75ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":8,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-16T04:05:12.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"6abf9a1b4cf744bf9e42a05d6a733a92","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":7,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-13T12:43:42.713Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4de32774e0444118b1416f245a631773","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":6,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:23:51.280Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"964a3e2c32294ffa97119078cf6787ad","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":5,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-06T20:21:44.897Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"22cd2fd58f854810a2d02231ee7821dd","solicitation_number":"36C24826R0028","parent_opportunity_id":"41e5a84b38874961aafb6e6990c9076a","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":4,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T22:15:31.004Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"41e5a84b38874961aafb6e6990c9076a","solicitation_number":"36C24826R0028","related_opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0"},{"index":3,"title":"Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T21:47:55.882Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7454223e8b2c48099b0fa1acb0bfeca0","solicitation_number":"36C24826R0028"}],"contacts":[{"name":"Aldwyn Singleton","role":"primary","email":"aldwyn.singleton@va.gov","phone":"407-646-4061","title":"Contracting Officer"},{"name":"Jean Olivier Pierre","role":"secondary","email":"jean.pierre1@va.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"566da056153847aa9877b549f58b75ad","lineage_id":"41e5a84b38874961aafb6e6990c9076a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-06T09:06:20.861552710Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"0ad23ff073f78e761933d016cb647db83bb52f8883e3bc65a74af30922a5a7e1","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-06T09:06:20.861552710Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p><strong>The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 &ndash; Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW). </strong></p>\n\n<p></p>\n\n<p><strong>Period of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP).</strong></p>\n\n<p><br />\n<strong>PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.<br />\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.</strong></p>","text":"The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 – Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW).\n\nPeriod of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP).\n\nPRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.\n\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24826R0028","place_of_performance":{"zip":"33125","state":{"code":"FL","name":"Florida"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1NB"}],"due_at":"2026-04-27T15:00:00Z","due_date":"2026-04-27","closes_at":"2026-04-27T15:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C248","office_name":"248-NETWORK CONTRACT OFFICE 8 (36C248)","state":"FL","county":"12086","county_name":"Miami-Dade County","city":"1245000","city_name":"Miami","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"RNUHGU3NWEC8","amount":null,"linked_awards":7,"cancelled":false,"archived":true,"updated_at":"2026-10-24T06:27:33.716446Z","principal_notice_id":"566da056153847aa9877b549f58b75ad","description":{"text":"The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 – Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW).\n\nPeriod of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP).\n\nPRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.\n\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.","html":"<p><strong>The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 &ndash; Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on the second level of the building addition and installing a new two-cell cooling tower on the roof. Additionally, electrical gear supporting the new equipment will be located on the third level, and the fourth level will be the housing for an additional Electrical Generator (to be procured under a separate project). The Contractor shall prepare the site for building operations in accordance with the 100% Design, Narrative, Addendum, and Specifications. This includes demolition and removal of existing structures, furnishing labor and materials, and completing all tasks as per this Statement of Work (SOW). </strong></p>\n\n<p></p>\n\n<p><strong>Period of Performance (POP) Dates: 1095 Calendar Days from the notice to proceed (NTP).</strong></p>\n\n<p><br />\n<strong>PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction.<br />\nPRODUCT/SERVICE CODE: Y1NB - Construction of Heating and Cooling Plants.</strong></p>","origin":"detail"},"contacts":[{"name":"Aldwyn Singleton","role":"primary","email":"aldwyn.singleton@va.gov","phone":"407-646-4061","title":"Contracting Officer"},{"name":"Jean Olivier Pierre","role":"secondary","email":"jean.pierre1@va.gov"}],"place_of_performance":{"zip":"33125","state":{"code":"FL","name":"Florida"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"33637","city":"TAMPA","state":"FL","country":"USA"},"naics_codes":["236220"],"award":null,"attachments":[{"resource_id":"98ea89c9c05a4c048563bedd6cc57c32","name":"ATTACHMENT 6 - Limitation of Subcontracting Certificate.docx","kind":"file","mime_type":".docx","size_bytes":16470,"posted_at":"2026-03-03T22:15:31.004Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/98ea89c9c05a4c048563bedd6cc57c32/download","mirrored":false},{"resource_id":"79fa913b334440bb9f81cae8acba49fa","name":"S02 - Sources Sought Notice - 36C24826R0028.pdf","kind":"file","mime_type":".pdf","size_bytes":165760,"posted_at":"2025-10-15T21:47:55.882Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/79fa913b334440bb9f81cae8acba49fa/download","mirrored":false},{"resource_id":"93e4408734774d18853d7dcf846f2cc3","name":"ATTACHMENT 9 - Past Performance Questionnaire.docx","kind":"file","mime_type":".docx","size_bytes":35258,"posted_at":"2026-03-03T22:15:31.004Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/93e4408734774d18853d7dcf846f2cc3/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C24827C0007_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C24827C0007_3600_-NONE-_-NONE-/","piid":"36C24827C0007","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"RNUHGU3NWEC8","recipient_name":"POINTER CONSTRUCTION GROUP LLC","recipient_uei":"RNUHGU3NWEC8","recipient_cage":"5KVS3","recipient_city":"FORT LAUDERDALE","recipient_state":"FL","sub_name":"Department of Veterans Affairs","office_name":"248-NETWORK CONTRACT OFFICE 8 (36C248)","office_key":"o-36C248","first_action_date":"2026-10-21","last_action_date":"2026-10-21","actions":1,"obligated":"17278188.00","current_total_value":"17278188.00","potential_total_value":"17278188.00","naics":"236220","psc":"Y1NB","extent_competed":"FULL AND OPEN COMPETITION","set_aside":"NO SET ASIDE USED.","offers_received":3,"description":"CREATE REDUNDANCY CHILLER PLAN AT BUILDING 44.","method":"solicitation","confidence":"high","evidence":["solicitation number 36C24826R0028 equals the FPDS solicitation identifier","same awarding office 36C248"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C24827Q0051","latest_notice_id":"d56f5324e7874602ba56b5268afbad47","title":"J065--Neptune Rover Medical Surgical Maintenance Base plus Four (4) Option Years","solicitation_number":"36C24827Q0051","notice_type":"o","first_type":"p","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":3,"due_at":"2026-11-25T18:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C248","office_name":"248-NETWORK CONTRACT OFFICE 8 (36C248)","naics":"811210","psc":"J065","set_aside":null,"state":"FL","county":"12103","county_name":"Pinellas County","city":"1204200","city_name":"Bay Pines","country":null,"place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T07:01:08.699328Z"},{"key":"36C24827Q0155","latest_notice_id":"831665dca3fc431482f486284606c5a5","title":"J026--Pneumatic Tube System Preventive Maintenance","solicitation_number":"36C24827Q0155","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-26T16:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C248","office_name":"248-NETWORK CONTRACT OFFICE 8 (36C248)","naics":"238290","psc":"J026","set_aside":null,"state":"PR","county":"72127","county_name":"San Juan Municipio","city":"7276770","city_name":"San Juan","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C24827Q0143","latest_notice_id":"06bab5721d954ba4a41ceb4b0ae7266c","title":"H199--FY27 Cathodic Protection Inspection and Testing","solicitation_number":"36C24827Q0143","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C248","office_name":"248-NETWORK CONTRACT OFFICE 8 (36C248)","naics":"541380","psc":"H199","set_aside":null,"state":"FL","county":"12095","county_name":"Orange County","city":"1253000","city_name":"Orlando","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24827Q0085","latest_notice_id":"deec231df02144f98098a3d7c681c25c","title":"W065--FY27 Mobile CT Scanner Lease","solicitation_number":"36C24827Q0085","notice_type":"k","first_type":"k","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-30T21:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C248","office_name":"248-NETWORK CONTRACT OFFICE 8 (36C248)","naics":"334510","psc":"W065","set_aside":null,"state":"FL","county":"12095","county_name":"Orange County","city":"1253000","city_name":"Orlando","country":null,"place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-15T00:31:52.781180Z"},{"key":"36C24827Q0152","latest_notice_id":"d164c447673a46eab4845cf7111b79ac","title":"6515--Fresenius 5008X Machines","solicitation_number":"36C24827Q0152","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C248","office_name":"248-NETWORK CONTRACT OFFICE 8 (36C248)","naics":"334510","psc":"6515","set_aside":null,"state":"PR","county":"72127","county_name":"San Juan Municipio","city":"7276770","city_name":"San Juan","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open":[{"key":"HARBSS202701","latest_notice_id":"22963d82312349a99befea586884297c","title":"Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support","solicitation_number":"HARBSS-2027-01","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA6648","office_name":"FA6648 482 LSS LGC","naics":"236220","psc":"5670","set_aside":null,"state":"FL","county":"12086","county_name":"Miami-Dade County","city":"1232275","city_name":"Homestead","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"N6945027RH140","latest_notice_id":"fbe79c7a8c9142a4871ef92b4bc3e9f0","title":"HANGAR 140 RENOVATIONS AT NAVAL AIR STATON (NAS) JACKSONVILLE (JAX), JACKSONVILLE, FLORIDA","solicitation_number":"N6945027RH140","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-19","notices":5,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N69450","office_name":"NAVFACSYSCOM SOUTHEAST","naics":"236220","psc":"Z2JZ","set_aside":null,"state":"FL","county":"12031","county_name":"Duval County","city":"1235000","city_name":"Jacksonville","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"FA664827R0001","latest_notice_id":"7e7667761a8c401eb59ba40df103975d","title":"Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, Florida","solicitation_number":"FA664827R0001","notice_type":"o","first_type":"o","first_posted":"2026-10-30","last_posted":"2026-11-17","notices":7,"due_at":"2026-12-02T17:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA6648","office_name":"FA6648 482 LSS LGC","naics":"236220","psc":"Y1AZ","set_aside":null,"state":"FL","county":"12086","county_name":"Miami-Dade County","city":"1232275","city_name":"Homestead","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Homestead Air Reserve Base","site_key":"homestead-air-reserve-base-fl","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open_total":193,"indexable":false}