Special notice, service-disabled veteran-owned small business set-aside, first published as presolicitation
CANCELLED--PROJECT 675-23-801, Bid-Build (BB) Improve Lake Baldwin Electrical Distribution
36C24825R0042
Department of Veterans Affairs, 248-Network Contract Office 8. Commercial and Institutional Building Construction.
Status
Cancelled
The agency cancelled this solicitation, so it takes no offers. Responses had been due April 23, 2025 at 1:00 PM EDT. Last posted June 18, 2025, first published March 20, 2025.
Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities
This one closed in 2025
192 like it are open now in commercial and institutional building construction
- Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support
Department of the Air Force, FA6648 482 LSS LGC
Sources soughtNAICS 236220Ship to Homestead, FLHARBSS-2027-01Due in 2 daysNov 27 - HANGAR 140 RENOVATIONS AT NAVAL AIR STATON (NAS) JACKSONVILLE (JAX), JACKSONVILLE, FLORIDA
Department of the Navy, Navfacsyscom Southeast
Sources soughtNAICS 236220Jacksonville, FLN6945027RH140Due in 5 daysNov 30 - Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, Florida
Department of the Air Force, FA6648 482 LSS LGC
Due in 7 daysDec 2
All 192 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
- Who may compete
- Service-disabled veteran-owned small business set-aside. Reserved for service-disabled veteran-owned small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. Open SDVOSB opportunities
- Time to respond
- Bidders had 30 days from the day the solicitation was posted, March 24, 2025, to the deadline. The deadline moved once: it was first April 4, 2025 and ended as April 23, 2025.
- Before the solicitation
- The agency published a presolicitation on March 20, 2025, 4 days before the solicitation.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 36C24825R0042 0002_1.docx22 KB, June 18, 2025
- 36C24825R0042.docx29 KB, March 20, 2025
- Solicitation 36C24825R0042.pdf781 KB, March 24, 2025
- AMENDMENT 36C24825R0042 0002.pdf419 KB, June 18, 2025
- ATTACHMENT 1 - 100 Analysis Drawings Lake Baldwin Electrical.pdf680 KB, March 24, 2025
- ATTACHMENT 1 - Statement of Work.pdf239 KB, March 20, 2025
- ATTACHMENT 2 - 100 Design Narrative Lake Baldwin Electrical.pdf1.4 MB, March 24, 2025
- ATTACHMENT 3 - 100 Drawings Lake Baldwin Electrical.pdf10.3 MB, March 24, 2025
- ATTACHMENT 5 - 100 Emergency Analysis Report.pdf544 KB, March 24, 2025
- ATTACHMENT 4 - 100 Specs Lake Baldwin Electrical.pdf4.5 MB, March 24, 2025
- ATTACHMENT 6 - 100 Structural Calculations Lake Baldwin Electrical.pdf764 KB, March 24, 2025
- ATTACHMENT 7 - DBA Wage Determination 03.14.2025.pdf1.9 MB, March 24, 2025
- ATTACHMENT 8 - Contract Progress Schedule.docx53 KB, March 24, 2025
- ATTACHMENT 9 - EMR.pdf231 KB, March 24, 2025
- ATTACHMENT 10 - Experience Information Sheet.pdf797 KB, March 24, 2025
- ATTACHMENT 11 - Limitation of Subcontracting Certificate.docx15 KB, March 24, 2025
- ATTACHMENT 12 - Past Performance Questionnaire.docx34 KB, March 24, 2025
- ATTACHMENT 13 - Base Offer Price Breakdown.xlsx23 KB, March 24, 2025
- Amendment 36C24825R0042 0001.pdf324 KB, April 11, 2025
- ATTACHMENT - Site Visit SIGN-IN SHEET.pdf85 KB, April 11, 2025
- RFI Attachment 1 - Pad Mounted Transformer Optional Features.pdf229 KB, April 11, 2025
- RFI Attachment 2 - Four Position Sectionalizing Loadbreak Switches.pdf487 KB, April 11, 2025
- RFI Attachment 5 - Power Pole mentioned for replacement.pdf143 KB, April 11, 2025
- RFI Attachment 3 - Existing ATS Prefered For Replacements.jpg2.9 MB, April 11, 2025
- RFI Attachment 4 - Prefered GW Medium Voltage ATS Cutsheet PDF.pdf1.8 MB, April 11, 2025
- RFI Attachment 6 - SC Vista Switch.png87 KB, April 11, 2025
- RFI Attachment 7 - Conflicting ATS Locations.pdf75 KB, April 11, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 20, 2025
Presolicitation
PROJECT 675-23-801, Bid-Build (BB) Improve Lake Baldwin Electrical Distribution
Due April 4, 2025 at 1:00 PM EDT. SAM.gov, notice cb28d1213b8843ff8c4369a723389ff2
3 revisions on SAM
- June 18, 2025: publish, special notice
- March 20, 2025: publish, presolicitation
- March 24, 2025: publish, solicitation
March 24, 2025
Solicitation, originally presolicitation
PROJECT 675-23-801, Bid-Build (BB) Improve Lake Baldwin Electrical Distribution
Due April 23, 2025 at 1:00 PM EDT. SAM.gov, notice 468624396b014248828d54b729b1953a
3 revisions on SAM
- March 20, 2025: publish, presolicitation
- April 11, 2025: publish, solicitation
- March 24, 2025: publish, solicitation
April 11, 2025
Solicitation
PROJECT 675-23-801, Bid-Build (BB) Improve Lake Baldwin Electrical Distribution
Due April 23, 2025 at 1:00 PM EDT. SAM.gov, notice 2e854c8f32a24c5c977359793af1cefd
2 revisions on SAM
- April 11, 2025: publish, solicitation
- March 24, 2025: publish, solicitation
June 18, 2025
Special notice, originally presolicitation
SAM.gov, notice f31e334356f0421d8cadb5fd8833c645
2 revisions on SAM
- June 18, 2025: publish, special notice
- March 20, 2025: publish, presolicitation
Points of contact
- Elizabeth Romero, Contracting Officerelizabeth.romero@va.gov407-399-7526