Special notice, total small business set-aside
36C24726Q0802 Amendment 0001
36C24726Q0802_1
Department of Veterans Affairs, 247-Network Contract Office 7. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
September 8, 2026 at 12:00 PM EDT
Closed 78 days ago. Posted September 2, 2026. Scheduled to archive September 23, 2026.
Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities
This one closed in 2026
42 like it are open now in electrical contractors and other wiring installation contractors
- INSTALLATION OF PROXIMITY SENSORS FOR AUTOMATIC DOORS
Department of Veterans Affairs, 246-Network Contracting Office 6
SolicitationNAICS 238210Ship to Fayetteville, NC36C24627Q0114Due todayNov 25 - Electrical Installation of 5-Station Cubicle and One Single Hotel Desk Arrangement
Agricultural Research Service, USDA ARS Afm Apd
Combined synopsis and solicitationSmall businessNAICS 238210Madison, WI1232SA27Q0021Due todayNov 25 - USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements
Forest Service, Usda-Fs, Csa Intermountain 9
Combined synopsis and solicitationSmall businessNAICS 238210West Yellowstone, MT1240LU26Q0132Due tomorrowNov 26
All 42 open in electrical contractors and other wiring installation contractors
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238210 (electrical contractors and other wiring installation contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Questions and Answers
The purpose of this amendment is provide answers to the additional questions received after the question period. The due date for offers is extended until September 08, 2026, at 12:00PM EST.
**Offerors must acknowledge receipt of Amendment 0001 with their offers**
Q1: Does the soundboard need to be analog or digital?
A1: Digital
Q2: If digital, how many faders are required?
A2: 24 faders
Q3: How many watts per channel on the Crown amplifiers?
A3: 650W @ 8 Ohms
Q4: How many channels per amplifier?
A4: 2
Q5: How many HDMI outputs on the HDMI Splitter?
A5: 4
Q6: The Description of Need lists an audio inserter but that is not in the requirements, please specify if an audio inserter is required.
A6: Combining the audio feed from the sound board with the video feed from the camera is a requirement
Q7: The Description of Need lists a digital camera, is the contractor to provide a camera?
A7: Yes
Q8: The Description of Need lists a HDMI switcher but that is not in the requirements, please specify if an HDMI switcher is required and if so how many inputs and outputs.
A8: It is required. The switcher needs to support a minimum of 4 input channels
Q9: The description of Need lists microphones but none are listed in the requirements, are microphones to be reused or is the contractor to quote microphones?
A9: The existing microphones will be reused
Q10: If microphones are requested to be provided, please specify how many, wired or wireless, and what type of wireless (i.e. handheld, lavalier, or head worn)
A10: Not required
Q11: If so, please specify if it needs to be a Pan-Tilt-Zoom (PTZ) camera or a professional/handheld camera?
A11: PTZ
Q12: If the customer requests a PTZ camera, do they want a control system to control the camera, HDMI switching, and audio from a wireless touch panel?
A12: The camera needs to be controlled with a handheld remote
Q13: If a control system is requested would the customer prefer to control volume from an iPad instead of a physical soundboard?
A13: Control from a physical soundboard
Q14: Is fiber distribution already in place for all rooms that the Fiber Command is to tie into?
A14: No. Fiber optic cables will need to be installed to each Samsung television.
Q15: If not please specify how many rooms and approximate distances required.
A15: All monitors will be placed in the same room. Approximate distance is 75.
Q16: Is the snake to be analog or digital?
A16: Analog
Q17: If analog, how long does the snake need to be?
A17: Approximately 25'
Q18: How is the snake to be ran? (i.e. in conduit, through basement, surface mount, through the ceiling)
A18: Surface mount
Q19: If digital, is there a CAT line already in place for use?
A19: NA
Q20: If cables need ran in the ceiling how high is the ceiling?
A20: 30'
Q21: Is it open rafters?
A21: Yes
Q22: Can we get a lift or scaffolding in to run cables or would a ladder work?
A22: It is an open vaulted ceiling approximately
Q23: Is the Fractal Audio AXE-FX III to be utilized for a guitar or as a digital signal processor?
A23: It is to be utilized for 2 guitars and a base guitar and needs to be fully configured as part of the project.
Q24: Is the contractor to provide mounts for the TVs or will those also be purchased by the customer?
A24: Mounts should be provided by contractor
Q25: How high are the TVs to be hung and on what type of wall?
A25: One wall is cinder block and the other is sheetrock.
Q26: If the contractor is to provide the TV mounts are they required to be full motion mounts?
A26: Flat mounts are fine.
Q27: Please provide a list of existing equipment that is to be reused.
A27: The only existing equipment to be reused is the 4 existing microphones.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- IMG_0105.jpeg2.6 MB, September 2, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 2, 2026
Special notice, originally combined synopsis and solicitation
Due September 8, 2026 at 12:00 PM EDT. SAM.gov, notice aeb93c34cc044c27b93b5b93cc1c8251
2 revisions on SAM
- September 2, 2026: publish, special notice
- August 20, 2026: publish, combined synopsis and solicitation
Points of contact
- THADDEUS GRAY, CONTRACT SPECIALISTTHADDEUS.GRAY@VA.GOV303-712-5739