{"canonical":"https://sealedbidder.com/opportunities/36c24725q0949","key":"36C24725Q0949","url":"https://sealedbidder.com/opportunities/36c24725q0949","title":"Q999--PATIENT CEILING LIFTS . . .","solicitation_number":"36C24725Q0949","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-09-12T15:00:00Z","first_posted":"2025-09-09","last_posted":"2025-09-09","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"247-NETWORK CONTRACT OFFICE 7 (36C247)","naics":"811310","psc":"Q999","set_aside":"SDVOSBC","place_state":"GA","place_scope":"site","site":null,"place_state_source":"sam_state_name","place_evidence":null,"place_county":"13245","place_county_name":"Richmond County","place_city":"1304204","place_city_name":"Augusta-Richmond County","winner":"PREMIER MEDICAL DISTRIBUTORS, LLC","award_amount":null,"publications":[{"notice_id":"365eddd2ae1745adbff96cccf870f6eb","title":"Q999--PATIENT CEILING LIFTS . . .","solicitation_number":"36C24725Q0949","notice_type":"k","base_type":"k","posted":"2025-09-09","posted_at":"2025-09-09T15:45:01.654Z","due_at":"2025-09-12T15:00:00Z","due_date":"2025-09-12","cancelled":false,"archived":true,"archive_date":"2025-11-11","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/365eddd2ae1745adbff96cccf870f6eb/view","enriched":true,"history":[{"index":3,"title":"Q999--PATIENT CEILING LIFTS . . .","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T15:45:01.654Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"365eddd2ae1745adbff96cccf870f6eb","solicitation_number":"36C24725Q0949"}]}],"latest_notice_id":"365eddd2ae1745adbff96cccf870f6eb","first_type":"k","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-09-09","posted_at":"2025-09-09T15:45:01.654Z","created_at":"2025-09-09T15:44:59.141Z","modified_at":"2025-11-12T04:55:46.985Z","response_deadline":{"raw":"2025-09-12T11:00:00-04:00","utc":"2025-09-12T15:00:00Z","date":"2025-09-12","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/365eddd2ae1745adbff96cccf870f6eb/view"},"naics":{"codes":["811310"],"primary":"811310"},"title":"Q999--PATIENT CEILING LIFTS . . .","agency":{"office":{"code":"36C247","name":"247-NETWORK CONTRACT OFFICE 7 (36C247)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"30904","city":"AUGUSTA","state":"GA","country":"USA"},"organization_id":"100170297","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-11-11","archive_type":"auto_custom"},"history":[{"index":3,"title":"Q999--PATIENT CEILING LIFTS . . .","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T15:45:01.654Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"365eddd2ae1745adbff96cccf870f6eb","solicitation_number":"36C24725Q0949"}],"contacts":[{"fax":"000-000-0000","name":"Joseph Locke","role":"primary","email":"joseph.locke@va.gov","phone":"803-979-0338","title":"Contracting Officer"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"365eddd2ae1745adbff96cccf870f6eb","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"365eddd2ae1745adbff96cccf870f6eb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-31T02:34:35.817204719Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"08f3a0fb81b6c605e2637a3be69b08c17d3b6cd1dfaaad872a7a7acb2cf2f80c","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-31T02:34:35.817204719Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Page 11 of 16\nPage 1 of \nPage 1 of \nPage 1 of \nVA AUGUSTA HEALTH CARE SYSTEM\nPERFORMANCE WORK STATEMENT (PWS)\nFOR ANNUAL PREVENTATIVE MAINTENANCE \nON CEILING MOUNTED PATIENT LIFTS MANUFACTURED BY GULDMANN INC\n\nGENERAL SECTION\nBackground: The VA Augusta Health Care System (VAAHCS) is currently comprised of two (2) divisions located in Augusta, Georgia. The facilities service approximately 430 available patient beds combined. Travel arrangements will be required to complete VAAHCS preventative maintenance, weight testing, and repairs. The patient ceiling lifts have been installed at the VA Augusta Health Care System to be in compliance with VHA Directive 1611 published 7/11/2023, Safe Patient Handling Program and the VAAHCS Safe Patient Handling Policy facility wide Standard Operating Procedure (SOP), SOP 4502.509.  This information, if needed, is available for view by written request to renee.neidhardt@va.gov.  Preventative maintenance (including annual weight testing certification) and repairs are required to maintain the operation of the patient ceiling lifts and to be in compliance with VHA Patient Safety Alert AL10-07 and VHA Patient Safety Alert AL14-07 dated July 28, 2014. This information, if needed, is available for view by written request only to renee.neidhardt@va.gov.  \n\nScope:\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty for *up to sixty-five (65) Guldmann patient lifts installed and owned by the Augusta VA Medical Center.  \nIncludes inspection, weight test, and recertification.  One-year (1 year) extended warranty, forty-eight (48) hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.  \nUtilizing a non-certified Guldmann technician will also nullify all existing standard manufacturing warranties related to the ceiling lift, accessories, rails and above ceiling support system and any assumed liability involving the entire Guldmann Ceiling Lift system becomes null and void, and Guldmann shall be held harmless from any injuries or issues which may occur.\n\n\n\n\n\n\n\n\n\n\nAudit Description: The awardee (to be determined) agrees to work directly with the designated contract point of contact (POC) to perform an on-site inspection(s) of Augusta, GA VA Medical Center both Uptown and Downtown locations to physically identify, verify and reconcile patient ceiling lifts that are not covered under any maintenance agreement\nAudit Purpose:Â The purpose of the audit is to ensure there is no duplication of services or unnecessary costs to the Augusta, GA VA Medical Center by documenting an exact count of patient ceiling lifts without any active maintenance agreement. \nAudit period of performance required start date:   Within a period not to exceed sixty (60) days after the effective date of the contract.\nAudit completion required end date: Within a period not to exceed one hundred and twenty (120) days after the effective date of the award.\nAudit certification: Certification of the figure of patient ceiling lifts shall be made by the Contract Point of Contact (POC) and reported directly to the Contracting Officer.  \nAudit documentation: The Contract POC is responsible completing the following reporting requirements:\nMicrosoft Excel Spreadsheet\nTwo Tabs\nTab 1: Uptown VA Location\nTab 2: Downtown VA Location\nIdentification of the VA Room Number for both locations\nIdentification of the VA MX # for both Uptown and Downtown locations\nReporting any discrepancies: The Contract Point of Contact (POC) is responsible for reporting all discrepancies identified during the audit.\nContract Modification: A contract modification is necessary if the certified number isÂ any quantity other than 65. If the number matches the expected 65, no further action is needed.\nAwardee s obligation: The contract awardee is required to submit specific documentation requested by the Contracting Officer to process a contract modification.\nContract Modification: Within ten (10) days after formal notification of the figure certified by the Contracting POC, the Contracting Officer shall prepare and issue a supplemental agreement, requiring signatures by the awardee and Contracting Officer, confirming their mutual agreement to revisions made to the basic contract.\n\n \nPERFORMANCE\nPeriod of Performance: The period of performance is for an initial base year with the possibility of four one-year extension options (exercised at the government's discretion) if successful results are achieved per VA Augusta Health Care System (VAAHCS) evaluation. \n\nBase Year\nOct 1, 2025, to Sep 30, 2026\nOption One (1)\nOct 1, 2026, to Sep 30, 2027\nOption Two (2)\nOct 1, 2027, to Sep 30, 2028\nOption Three (3)\nOct 1, 2028, to Sep 30, 2029\nOption Four (4)\nOct 1, 2029, to Sep 30, 2030\n\nHours of Performance: The contractor will provide the service during the hours of operation Monday   Friday, 7:30 AM   3:30 PM Eastern and is subject to change depending on the Governments need. Weekends may be added up through contract modification if funds permit. Unless otherwise specified the Government observes the following holidays:\n\nNew Year s Day\nJanuary 1\nMartin Luther King s Birthday\nThird Monday in February\nPresident s Day\nThird Monday in February\nMemorial Day\nLast Monday in May\nJune 19\nJuneteenth\nIndependence Day\nJuly 4\nLabor Day\nFirst Monday in September\nColumbus Day \nSecond Monday in October \nVeterans Day \nNovember 11\nThanksgiving Day\nFourth Thursday in November\nChristmas Day \nDecember 25\nAny other date specifically declared by the President of The United States to be a national holiday will also be observed.\n\nPlace of Performance: all work is to be performed at the VAAHCS Uptown and Downtown Divisions at the following addresses:\nUptown Division\nDowntown Division\n1 Freedom Way, Augusta, GA, 30904\n950 15th Street, Augusta, GA 30904\n\nTASKS\nThe contractor shall provide all parts, equipment, material, and labor including travel cost to perform the tests and correct any deficiencies identified by the tests.\n\nThe contractor shall perform all lift testing should be completed on a fiscal year basis within the timelines set forth in the table below. The locations are identified for each medical facility in section 2.3. Lifts should be tested in the timeframe noted below:\n\nFacility\nNumber of Lifts\nEstimated Completion Time (Days)\nDowntown\n184\n1   1.5 hour(s) per unit\nUptown\n116\n1   1.5 hour(s)per unit\n\n\n\nThe contractor shall perform preventative maintenance by check charging system, rails, hand control and cable, lifting strap, all hardware.\nAnnual Preventative Maintenance shall include a completed VA Augusta Health Care System (VAAHCS), Annual Preventative Maintenance form located at:  https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf#. The form must be provided electronically and in hard copy for each lift maintained.   \nThe contractor shall perform annual load testing and provide all certifications.\nThe contractor shall perform emergency maintenance to repair any non-functional ceiling patient lift. The contractor will be required to repair and supply parts for lifts that become non-functional within forty-eight (48) hours of being notified.  Contractor s are asked to clearly explain in 2-3 sentences how they intend to meet this requirement in their quotation submission.\nThe contractor shall take a photo of each weight test of a lift at 100% capacity, with the location (Downtown Division or Uptown Division), room number, lift identifier (Serial Number and EE/MX number), and date included in the photo. Photos must be supplied via email with the completed checklist https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf#. \nThe contractor shall load test each lift system at 150% of the specified capacity. Test will occur for a minimum of 15 minutes per bracket at the mounting point of each point of contact to the rail system. Contractor will check and inspect all electrical connections, rollers, bearings, and moving parts for proper clearances. Contractor will produce documentation for each test. Upon completion of testing and verification by, contractor will provide electronic documentation of test procedures for each individual room to VA staff.\nThe contractor shall check each individual ceiling mounted lift system to meet VHA Directives and certifies that it meets the Directive and the Veterans Health Administration (VHA) Patient Safety Alert, AL 10-07 and AL14-07.  Copies of both directives are available for view, if needed, by only by written request, to: renee.neidhardt@va.gov\n\nCONTRACTORS REASONABILITY \nProvide Qualified Technicians:\nThe Contractor who is performing testing and maintenance of the equipment shall be certified technicians to perform the required testing on the identified ceiling patient lifts. Certified technicians will have taken/been certified by the Guldmann  Certification Training Program/Recertification program.\nTechnicians shall be trained and certified technicians for any preventative maintenance and repair work on patient lifts.\nContractor must provide evidence of training, and certification, to inspect Guldmann  GH3 model patient ceiling lift, including wall mounts, ceiling mounts, hanger bars. At least one person who has been trained by the manufacturer on the equipment to be tested must lead each test.\nPrefer technicians to have a minimum of two (2) years  experience inspecting and working with Guldmann  equipment. \nThe contractor will provide OEM parts and labor to correct any deficiencies identified by the tests.\nThe contractor will work with the Contract Point of Contact (POC) to schedule maintenance and testing will be planned with the contractor and will flex to allow for room availability. Inpatient rooms will be prioritized first. Testing shall be completed within the contract dates.  Room availability will be arranged by POC. Contractor must deliver certification records from any given day to POC no later than one week after certification of each system. Contractor must notify POC immediately, separately from certification forms, of any damage that jeopardizes the safety of the hoist system and any corrective action required by this medical center.\nThe contractor shall certify for twelve (12) months following the completion of the testing and maintenance of each patient lift.\nThe contractor is responsible for supplying all material data sheets (MDS s) for associated materials, if any, to the Safety Officer and the Contract POC for approval before commencing any work.\nThe contractor is responsible to replace any items damaged by the contractor employees or sub-contractor employees, including but not limited to ceiling tiles or other VA medical equipment in the area.\nThe contractor is always responsible to keep work area clean preventing safety hazards to patients and medical staff. All debris shall be removed before contractor personnel at the end of the workday.\nThe contractor shall not interrupt any utility service or fire alarm service during the process of this job.\nThe contractor shall document all testing and inspections on the  Corrective and Preventative Maintenance Checklist for Ceiling Mounted Patient Lifts.  https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf# \nThe contractor shall be licensed to perform this service in the State of Georgia and provided the Government with all licenses and certifications needed. All licenses and certifications will be in the Prime Contractors name.\n\nGOVERNMENT RESPONSIBILITY\nThe Contract Point of Contract (POC) shall ensure that all contracted technicians are trained in proper repair methods and have current badges to enter the facilities.\nContract POC shall ensure that all patient rooms are available at the time services begin.\nContract POC shall ensure that all background checks have been cleared and results shall be provided to the Contracting Officer (CO) for electronic filing.\nScheduling will be arranged with the contract POC.Â Â The contractors do not need to be supervised by Veteran Affairs employees at all times but do need to check in with the designated person onsite at beginning of each workday. The contractor shall follow local policy in providing appropriate identification to on-site contractors.Â Â The facility Contract POC will designate the person to check in with at each facility to provide identification.\nContract POC shall notify the contractor of any changes in inspections that have been scheduled.\n \nQUALITY ASSURANCE SURVEILLANCE PLAN (QASP)\nMethods of Surveillance\nThe COTR shall use the surveillance methods listed below in the administration of this Quality Assurance Surveillance Plan (QASP);\nDirect Observation: Individual inspections of repairs;\nPeriodic Inspection: Inspections will be scheduled annually and after repairs;\nUser Survey: Customer complaints and annual inspections. \nComplaints are investigated and validated\nPerformance Standards\nPERFORMANCE BASED TASK\nINDICATIOR\nSTANDARD\nQUALITY ASSURANCE\nRATING\nProvide the facility with lift testing by certified technicians\n3.\nNo more than two incidents of not providing a finished within 48 hrs.\nDirect observation\nEXCEPTIONAL\nZero Incidents\n\nSATISFACTORY\nTwo Incidents\n\nUNSATISFACTORY\nThree or More Incidents\nVendor provides evidence of training as required by the PWS and to follow applicable safety rules and regulations \n\n4.1\nSubstantiated customer complaints of no more than 2 \n\nUser Survey\nEXCEPTIONAL\nZero Incidents\n\nSATISFACTORY\nTwo Incidents\n\nUNSATISFACTORY\nThree or More Incidents.\nComplete Lift Inspections Timely \n3.2\nNo more than 10 untimely inspections annually \nDirect Observation\nEXCEPTIONAL\nZero - Two Incidents\n\nSATISFACTORY\nThree   Ten Incidents\n\nUNSATISFACTORY\nMore than Ten Incidents\n\n\nINVOICING\nPayment will be made upon receipt of a properly prepared detailed invoice, prepared by the Contractor, validated by the Contract POC, and submitted electronically through OB-10.\nA properly prepared invoice will contain:\nInvoice Number and Date\nContractor s Name and Address\nAccurate Purchase Order Number\nSupply or Service provided\nTotal Amount Due\n\nCHANGES TO THE STATEMENT OF WORK\nAny changes to this PWS shall be authorized and approved only through written correspondence from the CO.  A copy of each change will be kept in a project folder along with all other products of the project.  Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.\n\nCONFLICTS OF INTEREST:\nThe Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of Veterans Affairs. Nor shall the Contractor employ any person who is a member of the immediate family of a VA employee, if the employment of that family member would create a conflict of interest, or the appearance of a conflict of interest, particularly with regard to influencing the contract negotiations, terms of the contract or the work carried out under the contract. In any case VA must review the matter and give its approval in accordance with agency ethics rules.\n\nCONTRACT MONITORING PROCEDURES:\nAt the time of the contract award, the Contracting Officer will appoint a Contract POC to assist with the contract monitoring requirements. The Contract POC will monitor such items as quality of service, timeliness of performance, customer service, cost control business relations. In accordance with FAR 1.601 (a)  Contracts may be entered into and signed on behalf of the Government only by contracting officers.  A Contract POC is not authorized to modify the stated terms of the contract, including extending the length of the contract period. Quality of service will be monitored through a continuous review of requested studies vs. performed studies, the appropriateness of images produced and morbidity and mortality figures. These factors will be rated by a consensus of radiologists interpreting the MRI studies and through a radiologist or resident in the MRI unit setting protocols for scan and observing patients and procedures through the study process.  Timeliness of performance will be measured through daily workload counts compared to daily number of studies ordered. Customer service will be monitored through periodic unannounced visits to the MRI unit and through patient satisfaction surveys completed by MRI patients. Cost control will be monitored through a comparison of overtime hours worked and the type and number of studies completed per day. Appropriate regulatory and accrediting standards will apply, and all adverse events will be reported in accordance with medical center and other applicable guidelines.\nThe delegated Contract POC will notify the Contracting Officer of any non-compliance immediately upon his/her gaining knowledge of any such situation or incident. Initial communication of such may be communicated by telephone. After such communication, the Contract POC will provide a written statement to the Contracting Officer along with any supporting documentation regarding the performance failure noticed.\nUpon receipt of a proper invoice, the Contract POC shall certify that the services identified have been performed. Once certification has been made, the invoice will be forward through the proper billing channels and payment shall be made to the Contractor.\nBoth parties shall jointly conduct a review of Contractor s performance to evaluate if services being provided are in accordance with the contract terms and if payments and billings are being properly handled. This review shall include but is not limited to analysis of all billings, payments, costs, administrative issues, patient satisfaction, quality of care and other related documentation that identifies that services have been received. Any concerns need to be brought to the Contractor/ Contract POC s attention at the time noted rather than an agreement reached prior to the expiration of services provided and consideration being received are satisfactory.\nUpon conclusion of the initial contract period and all option periods, and in coordination with the Contracting Officer, the using service shall provide a statement to the Contracting Officer providing a summary of the Contractor s actions and a statement that all requirements of the contract were fulfilled as agreed. This information shall be forwarded by the Contract POC to the Contracting Officer at least 90 days prior to the end of base period and each option period.\n\nB.2 PRICE/COST SCHEDULE\nITEM INFORMATION\nITEM NUMBER\nDESCRIPTION OF SUPPLIES/SERVICES\nQUANTITY\nUNIT\nUNIT PRICE\nAMOUNT\n0001\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts.  Includes inspection, weight test, and recertification.  One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty. \nContract Period: Base\nPOP Begin: 10-01-2025\nPOP End: 09-30-2026\n\n1001\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts.  Includes inspection, weight test, and recertification.  One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty. \nContract Period: Option 1\nPOP Begin: 10-01-2026\nPOP End: 09-30-2027\n\n1002\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts.  Includes inspection, weight test, and recertification.  One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty. \nContract Period: Option 2\nPOP Begin: 10-01-2027\nPOP End: 09-30-2028\n\n1003\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts.  Includes inspection, weight test, and recertification.  One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty. \nContract Period: Option 3\nPOP Begin: 10-01-2028\nPOP End: 09-30-2029\n\n1004\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts.  Includes inspection, weight test, and recertification.  One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty. \nContract Period: Option 4\nPOP Begin: 10-01-2029\nPOP End: 09-30-2030\n\n\n\n\n\nGRAND TOTAL\n__________________\n\nB.3 DELIVERY SCHEDULE\nITEM NUMBER\nSHIPPING INFORMATION\nQUANTITY\nDELIVERY DATE\n0001\n\n\n65.00\n10/1/2025 to 09/30/26\n1001\n\n\n65.00\n10/1/2026 to 09/30/27\n1002\n\n\n65.00\n10/1/2027 to 09/30/28\n1003\n\n\n65.00\n10/1/2028 to 09/30/29\n1004\n\n\n65.00\n10/1/2029 to 09/30/30\n\nThe full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.\n\n52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)\nThis solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these addresses: http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/\n\n\nFAR\nTitle\nDate\n52.204-7\nSYSTEM FOR AWARD MANAGEMENT\nOct 2018\n52.204-16\nCOMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING\nAug 2020\n52.204-24\nREPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)\nNov 2021\n52.204-29\nFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS REPRESENTATION AND DISCLOSURES\nDec 2023\n852.239-75\nINFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE\nFEB 2023\n\n\n\n\n\nPage 15 of 16\nPage 1 of \nPage 1 of \nPage 1 of \nThe following Commercial Item clauses apply to this acquisition:\n\n52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)\nThis contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):\nhttp://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/\n\nFAR\nTitle\nDate\n52.212-4\nCONTRACT TERMS AND CONDITIONS- COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES\nNOV 2023\n52.212-5\nCONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES \n\n    [X]  (5) 52.204 10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109 282) (31 U.S.C. 6101 note).\n    [X]  (9) 52.204 27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117 328).\n    [X]  (11)(i) 52.204 30, Federal Acquisition Supply Chain Security Act Orders  Prohibition. (DEC 2023) (Pub. L. 115 390, title II).\n    [X]  (12) 52.209 6, Protecting the Government s Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025) (31 U.S.C. 6101 note).\n    [X]  (25) 52.219 27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).\n    [X]  (26) (i) 52.219-28, Postaward Small Business Program Rerepresentation (JAN 2025) (15 U.S.C. 632(a)(2)).\n    [X]  (31) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).\n[X]  (36)(i) 52.222 36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).\n[X]  (39)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).\n    [X]  (46) 52.223-23, Sustainable Products and Services (MAY 2024) (DEVIATION FEB 2025) (7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671I).\n    [X]  (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).\n    [X]  (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024) (E.O. 13513)\n    [X]  (59) 52.232-33, Payment by Electronic Funds Transfer System for Award Management (OCT 2018) (31 U.S.C. 3332).\n    [X]  (61) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).\n    [X]  (63) 52.240 1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act Covered Foreign Entities (NOV 2024) (Sections 1821 1826, Pub. L. 118 31, 41 U.S.C. 3901 note prec.).\n    [X]  (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).\n    [X]  (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Requirements (MAY 2014) (41 U.S.C. chapter 67).\n[X]  (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022).\n    [X]  (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).\nJAN 2025; DEVIATION FEB 2025\n52.203-17\nCONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS\nNOV 2023\n52.204-9\nPERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL\nJAN 2011\n52.204-13\nSYSTEM FOR AWARD MANAGEMENT MAINTENANCE\nOCT 2018\n52.204-18\nCOMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE\nAUG 2020\n52.217-8\nOPTION TO EXTEND SERVICES\nNOV 1999\n52.217-9\nOPTION TO EXTEND THE TERM OF THE CONTRACT \nMAR 2000\n852.203-70\nCOMMERCIAL ADVERTISING\nMAY 2018\n852.204-70\nPERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL\nMAY 2020\n852.219-73\nVA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (DEVIATION)\nJAN 2023\n852.219-75\nVA NOTICE OF LIMITATIONS ON SUBCONTRACTING- CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (DEVIATION)\nJAN 2023\n852.232-72\nELECTRONIC SUBMISSION OF PAYMENT REQUESTS \nNOV 2018\n\n\n*Contractors are asked to ensure the following information at a minimum is provided as part of their quotation submission.\n\nCompany Name\nBusiness Address\nSystem for Award Management (SAM) Unique Identification Number (UEI)\nDuns Number (Dun and Bradstreet)\nVendor POC Name\nVendor POC E-Mail Address\nVendor POC Phone Number\n\n**Contractors are asked to provide a capability statement to include their technical capability to meet ALL requirements specified within the Statement of Work (SOW).\n\n52.217-8Â OPTION TO EXTEND SERVICESÂ (NOV 1999)\n The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to the prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months.Â The Contracting Officer may exercise the option by written notice to the Contractor withinÂ 30 days.Â Â Â Â Â \nÂ Â \nÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â \n52.217-9Â OPTION TO EXTEND THE TERM OF THE CONTRACTÂ (MAR 2000)\nÂ  (a) The Government may extend the term of this contract by written notice to the Contractor withinÂ 30 days; provided that the Government gives the ContractorÂ a preliminary written notice of its intent to extend at leastÂ 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.\n\nÂ  (b) If the Government exercises this option, the extended contract shall be considered to include this option clause.\n\nÂ  (c) The total duration of this contract, including the exercise of any options under this clause, shall not exceedÂ not exceed five (5) years.\n \nVAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)\nDefinitions. As used in this clause \nContract financing payment has the meaning given in FAR 32.001.\nDesignated agency office has the meaning given in 5 CFR 1315.2(m).\nElectronic form means an automated system transmitting information electronically according to the Accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests.\nInvoice payment has the meaning given in FAR 32.001.\nPayment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.\nElectronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.\nData transmission. A contractor must ensure that the data transmission method and format are through one of the following:\nVA s Electronic Invoice Presentment and Payment System. (See Web site at http://www.fsc.va.gov/einvoice.asp.)\nAny system that conforms to the X12 electronic data interchange (EDI) formats established by the Accredited Standards Center (ASC) and chartered by the American National Standards Institute (ANSI). The X12 EDI Web site (http://www.x12.org) includes additional information on EDI 810 and 811 formats.\nInvoice requirements. Invoices shall comply with FAR 32.905.\nExceptions. If, based on one of the circumstances below, the contracting officer directs that payment requests be made by mail, the contractor shall submit payment requests by mail through the United States Postal Service to the designated agency office. Submission of payment requests by mail may be required for:\nAwards made to foreign vendors for work performed outside the United States;\nClassified contracts or purchases when electronic submission and processing of payment requests could compromise the safeguarding of classified or privacy information;\nContracts awarded by contracting officers in the conduct of emergency operations, such as responses to national emergencies;\nSolicitations or contracts in which the designated agency office is a VA entity other than the VA Financial Services Center in Austin, Texas; or\nSolicitations or contracts in which the VA designated agency office does not have electronic invoicing capability as described above.\n(End of Clause)\n\n \n\n\n\n\n\n\nPage 16 of 16\nInstruction to Offerors\n\nAll quoters shall submit your Quotes no later than Friday, September 12, 2025, at 11:00AM (EST), via email to joseph.locke@va.gov. Please place in  ATTENTION: 36C24725Q949 PM PATIENT CEILING LIFTS  in the subject line of your email. All offers must include the solicitation number. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). \n\nThe contract award decision will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government.\nThe following are the decision factors:\n\nAll quoters must possess ability to perform preventative maintenance services without loss of the above stated warranty and liability coverage identified in the contract scope.\n\nMeets ALL technical requirements specified within the SOW.\n\nPrice\n\nPoint of Contact\nJoseph Locke\nContracting Officer\nNetwork Contracting Office 7 joseph.locke@va.gov","text":"Page 11 of 16\nPage 1 of\nPage 1 of\nPage 1 of\nVA AUGUSTA HEALTH CARE SYSTEM\nPERFORMANCE WORK STATEMENT (PWS)\nFOR ANNUAL PREVENTATIVE MAINTENANCE\nON CEILING MOUNTED PATIENT LIFTS MANUFACTURED BY GULDMANN INC\n\nGENERAL SECTION\nBackground: The VA Augusta Health Care System (VAAHCS) is currently comprised of two (2) divisions located in Augusta, Georgia. The facilities service approximately 430 available patient beds combined. Travel arrangements will be required to complete VAAHCS preventative maintenance, weight testing, and repairs. The patient ceiling lifts have been installed at the VA Augusta Health Care System to be in compliance with VHA Directive 1611 published 7/11/2023, Safe Patient Handling Program and the VAAHCS Safe Patient Handling Policy facility wide Standard Operating Procedure (SOP), SOP 4502.509. This information, if needed, is available for view by written request to renee.neidhardt@va.gov. Preventative maintenance (including annual weight testing certification) and repairs are required to maintain the operation of the patient ceiling lifts and to be in compliance with VHA Patient Safety Alert AL10-07 and VHA Patient Safety Alert AL14-07 dated July 28, 2014. This information, if needed, is available for view by written request only to renee.neidhardt@va.gov.\n\nScope:\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty for *up to sixty-five (65) Guldmann patient lifts installed and owned by the Augusta VA Medical Center.\nIncludes inspection, weight test, and recertification. One-year (1 year) extended warranty, forty-eight (48) hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nUtilizing a non-certified Guldmann technician will also nullify all existing standard manufacturing warranties related to the ceiling lift, accessories, rails and above ceiling support system and any assumed liability involving the entire Guldmann Ceiling Lift system becomes null and void, and Guldmann shall be held harmless from any injuries or issues which may occur.\n\nAudit Description: The awardee (to be determined) agrees to work directly with the designated contract point of contact (POC) to perform an on-site inspection(s) of Augusta, GA VA Medical Center both Uptown and Downtown locations to physically identify, verify and reconcile patient ceiling lifts that are not covered under any maintenance agreement\nAudit Purpose:Â The purpose of the audit is to ensure there is no duplication of services or unnecessary costs to the Augusta, GA VA Medical Center by documenting an exact count of patient ceiling lifts without any active maintenance agreement.\nAudit period of performance required start date: Within a period not to exceed sixty (60) days after the effective date of the contract.\nAudit completion required end date: Within a period not to exceed one hundred and twenty (120) days after the effective date of the award.\nAudit certification: Certification of the figure of patient ceiling lifts shall be made by the Contract Point of Contact (POC) and reported directly to the Contracting Officer.\nAudit documentation: The Contract POC is responsible completing the following reporting requirements:\nMicrosoft Excel Spreadsheet\nTwo Tabs\nTab 1: Uptown VA Location\nTab 2: Downtown VA Location\nIdentification of the VA Room Number for both locations\nIdentification of the VA MX # for both Uptown and Downtown locations\nReporting any discrepancies: The Contract Point of Contact (POC) is responsible for reporting all discrepancies identified during the audit.\nContract Modification: A contract modification is necessary if the certified number isÂ any quantity other than 65. If the number matches the expected 65, no further action is needed.\nAwardee s obligation: The contract awardee is required to submit specific documentation requested by the Contracting Officer to process a contract modification.\nContract Modification: Within ten (10) days after formal notification of the figure certified by the Contracting POC, the Contracting Officer shall prepare and issue a supplemental agreement, requiring signatures by the awardee and Contracting Officer, confirming their mutual agreement to revisions made to the basic contract.\n\nPERFORMANCE\nPeriod of Performance: The period of performance is for an initial base year with the possibility of four one-year extension options (exercised at the government's discretion) if successful results are achieved per VA Augusta Health Care System (VAAHCS) evaluation.\n\nBase Year\nOct 1, 2025, to Sep 30, 2026\nOption One (1)\nOct 1, 2026, to Sep 30, 2027\nOption Two (2)\nOct 1, 2027, to Sep 30, 2028\nOption Three (3)\nOct 1, 2028, to Sep 30, 2029\nOption Four (4)\nOct 1, 2029, to Sep 30, 2030\n\nHours of Performance: The contractor will provide the service during the hours of operation Monday Friday, 7:30 AM 3:30 PM Eastern and is subject to change depending on the Governments need. Weekends may be added up through contract modification if funds permit. Unless otherwise specified the Government observes the following holidays:\n\nNew Year s Day\nJanuary 1\nMartin Luther King s Birthday\nThird Monday in February\nPresident s Day\nThird Monday in February\nMemorial Day\nLast Monday in May\nJune 19\nJuneteenth\nIndependence Day\nJuly 4\nLabor Day\nFirst Monday in September\nColumbus Day\nSecond Monday in October\nVeterans Day\nNovember 11\nThanksgiving Day\nFourth Thursday in November\nChristmas Day\nDecember 25\nAny other date specifically declared by the President of The United States to be a national holiday will also be observed.\n\nPlace of Performance: all work is to be performed at the VAAHCS Uptown and Downtown Divisions at the following addresses:\nUptown Division\nDowntown Division\n1 Freedom Way, Augusta, GA, 30904\n950 15th Street, Augusta, GA 30904\n\nTASKS\nThe contractor shall provide all parts, equipment, material, and labor including travel cost to perform the tests and correct any deficiencies identified by the tests.\n\nThe contractor shall perform all lift testing should be completed on a fiscal year basis within the timelines set forth in the table below. The locations are identified for each medical facility in section 2.3. Lifts should be tested in the timeframe noted below:\n\nFacility\nNumber of Lifts\nEstimated Completion Time (Days)\nDowntown\n184\n1 1.5 hour(s) per unit\nUptown\n116\n1 1.5 hour(s)per unit\n\nThe contractor shall perform preventative maintenance by check charging system, rails, hand control and cable, lifting strap, all hardware.\nAnnual Preventative Maintenance shall include a completed VA Augusta Health Care System (VAAHCS), Annual Preventative Maintenance form located at: https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf#. The form must be provided electronically and in hard copy for each lift maintained.\nThe contractor shall perform annual load testing and provide all certifications.\nThe contractor shall perform emergency maintenance to repair any non-functional ceiling patient lift. The contractor will be required to repair and supply parts for lifts that become non-functional within forty-eight (48) hours of being notified. Contractor s are asked to clearly explain in 2-3 sentences how they intend to meet this requirement in their quotation submission.\nThe contractor shall take a photo of each weight test of a lift at 100% capacity, with the location (Downtown Division or Uptown Division), room number, lift identifier (Serial Number and EE/MX number), and date included in the photo. Photos must be supplied via email with the completed checklist https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf#.\nThe contractor shall load test each lift system at 150% of the specified capacity. Test will occur for a minimum of 15 minutes per bracket at the mounting point of each point of contact to the rail system. Contractor will check and inspect all electrical connections, rollers, bearings, and moving parts for proper clearances. Contractor will produce documentation for each test. Upon completion of testing and verification by, contractor will provide electronic documentation of test procedures for each individual room to VA staff.\nThe contractor shall check each individual ceiling mounted lift system to meet VHA Directives and certifies that it meets the Directive and the Veterans Health Administration (VHA) Patient Safety Alert, AL 10-07 and AL14-07. Copies of both directives are available for view, if needed, by only by written request, to: renee.neidhardt@va.gov\n\nCONTRACTORS REASONABILITY\nProvide Qualified Technicians:\nThe Contractor who is performing testing and maintenance of the equipment shall be certified technicians to perform the required testing on the identified ceiling patient lifts. Certified technicians will have taken/been certified by the Guldmann Certification Training Program/Recertification program.\nTechnicians shall be trained and certified technicians for any preventative maintenance and repair work on patient lifts.\nContractor must provide evidence of training, and certification, to inspect Guldmann GH3 model patient ceiling lift, including wall mounts, ceiling mounts, hanger bars. At least one person who has been trained by the manufacturer on the equipment to be tested must lead each test.\nPrefer technicians to have a minimum of two (2) years experience inspecting and working with Guldmann equipment.\nThe contractor will provide OEM parts and labor to correct any deficiencies identified by the tests.\nThe contractor will work with the Contract Point of Contact (POC) to schedule maintenance and testing will be planned with the contractor and will flex to allow for room availability. Inpatient rooms will be prioritized first. Testing shall be completed within the contract dates. Room availability will be arranged by POC. Contractor must deliver certification records from any given day to POC no later than one week after certification of each system. Contractor must notify POC immediately, separately from certification forms, of any damage that jeopardizes the safety of the hoist system and any corrective action required by this medical center.\nThe contractor shall certify for twelve (12) months following the completion of the testing and maintenance of each patient lift.\nThe contractor is responsible for supplying all material data sheets (MDS s) for associated materials, if any, to the Safety Officer and the Contract POC for approval before commencing any work.\nThe contractor is responsible to replace any items damaged by the contractor employees or sub-contractor employees, including but not limited to ceiling tiles or other VA medical equipment in the area.\nThe contractor is always responsible to keep work area clean preventing safety hazards to patients and medical staff. All debris shall be removed before contractor personnel at the end of the workday.\nThe contractor shall not interrupt any utility service or fire alarm service during the process of this job.\nThe contractor shall document all testing and inspections on the Corrective and Preventative Maintenance Checklist for Ceiling Mounted Patient Lifts. https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf#\nThe contractor shall be licensed to perform this service in the State of Georgia and provided the Government with all licenses and certifications needed. All licenses and certifications will be in the Prime Contractors name.\n\nGOVERNMENT RESPONSIBILITY\nThe Contract Point of Contract (POC) shall ensure that all contracted technicians are trained in proper repair methods and have current badges to enter the facilities.\nContract POC shall ensure that all patient rooms are available at the time services begin.\nContract POC shall ensure that all background checks have been cleared and results shall be provided to the Contracting Officer (CO) for electronic filing.\nScheduling will be arranged with the contract POC.Â Â The contractors do not need to be supervised by Veteran Affairs employees at all times but do need to check in with the designated person onsite at beginning of each workday. The contractor shall follow local policy in providing appropriate identification to on-site contractors.Â Â The facility Contract POC will designate the person to check in with at each facility to provide identification.\nContract POC shall notify the contractor of any changes in inspections that have been scheduled.\n\nQUALITY ASSURANCE SURVEILLANCE PLAN (QASP)\nMethods of Surveillance\nThe COTR shall use the surveillance methods listed below in the administration of this Quality Assurance Surveillance Plan (QASP);\nDirect Observation: Individual inspections of repairs;\nPeriodic Inspection: Inspections will be scheduled annually and after repairs;\nUser Survey: Customer complaints and annual inspections.\nComplaints are investigated and validated\nPerformance Standards\nPERFORMANCE BASED TASK\nINDICATIOR\nSTANDARD\nQUALITY ASSURANCE\nRATING\nProvide the facility with lift testing by certified technicians\n3.\nNo more than two incidents of not providing a finished within 48 hrs.\nDirect observation\nEXCEPTIONAL\nZero Incidents\n\nSATISFACTORY\nTwo Incidents\n\nUNSATISFACTORY\nThree or More Incidents\nVendor provides evidence of training as required by the PWS and to follow applicable safety rules and regulations\n\n4.1\nSubstantiated customer complaints of no more than 2\n\nUser Survey\nEXCEPTIONAL\nZero Incidents\n\nSATISFACTORY\nTwo Incidents\n\nUNSATISFACTORY\nThree or More Incidents.\nComplete Lift Inspections Timely\n3.2\nNo more than 10 untimely inspections annually\nDirect Observation\nEXCEPTIONAL\nZero - Two Incidents\n\nSATISFACTORY\nThree Ten Incidents\n\nUNSATISFACTORY\nMore than Ten Incidents\n\nINVOICING\nPayment will be made upon receipt of a properly prepared detailed invoice, prepared by the Contractor, validated by the Contract POC, and submitted electronically through OB-10.\nA properly prepared invoice will contain:\nInvoice Number and Date\nContractor s Name and Address\nAccurate Purchase Order Number\nSupply or Service provided\nTotal Amount Due\n\nCHANGES TO THE STATEMENT OF WORK\nAny changes to this PWS shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.\n\nCONFLICTS OF INTEREST:\nThe Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of Veterans Affairs. Nor shall the Contractor employ any person who is a member of the immediate family of a VA employee, if the employment of that family member would create a conflict of interest, or the appearance of a conflict of interest, particularly with regard to influencing the contract negotiations, terms of the contract or the work carried out under the contract. In any case VA must review the matter and give its approval in accordance with agency ethics rules.\n\nCONTRACT MONITORING PROCEDURES:\nAt the time of the contract award, the Contracting Officer will appoint a Contract POC to assist with the contract monitoring requirements. The Contract POC will monitor such items as quality of service, timeliness of performance, customer service, cost control business relations. In accordance with FAR 1.601 (a) Contracts may be entered into and signed on behalf of the Government only by contracting officers. A Contract POC is not authorized to modify the stated terms of the contract, including extending the length of the contract period. Quality of service will be monitored through a continuous review of requested studies vs. performed studies, the appropriateness of images produced and morbidity and mortality figures. These factors will be rated by a consensus of radiologists interpreting the MRI studies and through a radiologist or resident in the MRI unit setting protocols for scan and observing patients and procedures through the study process. Timeliness of performance will be measured through daily workload counts compared to daily number of studies ordered. Customer service will be monitored through periodic unannounced visits to the MRI unit and through patient satisfaction surveys completed by MRI patients. Cost control will be monitored through a comparison of overtime hours worked and the type and number of studies completed per day. Appropriate regulatory and accrediting standards will apply, and all adverse events will be reported in accordance with medical center and other applicable guidelines.\nThe delegated Contract POC will notify the Contracting Officer of any non-compliance immediately upon his/her gaining knowledge of any such situation or incident. Initial communication of such may be communicated by telephone. After such communication, the Contract POC will provide a written statement to the Contracting Officer along with any supporting documentation regarding the performance failure noticed.\nUpon receipt of a proper invoice, the Contract POC shall certify that the services identified have been performed. Once certification has been made, the invoice will be forward through the proper billing channels and payment shall be made to the Contractor.\nBoth parties shall jointly conduct a review of Contractor s performance to evaluate if services being provided are in accordance with the contract terms and if payments and billings are being properly handled. This review shall include but is not limited to analysis of all billings, payments, costs, administrative issues, patient satisfaction, quality of care and other related documentation that identifies that services have been received. Any concerns need to be brought to the Contractor/ Contract POC s attention at the time noted rather than an agreement reached prior to the expiration of services provided and consideration being received are satisfactory.\nUpon conclusion of the initial contract period and all option periods, and in coordination with the Contracting Officer, the using service shall provide a statement to the Contracting Officer providing a summary of the Contractor s actions and a statement that all requirements of the contract were fulfilled as agreed. This information shall be forwarded by the Contract POC to the Contracting Officer at least 90 days prior to the end of base period and each option period.\n\nB.2 PRICE/COST SCHEDULE\nITEM INFORMATION\nITEM NUMBER\nDESCRIPTION OF SUPPLIES/SERVICES\nQUANTITY\nUNIT\nUNIT PRICE\nAMOUNT\n0001\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts. Includes inspection, weight test, and recertification. One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nContract Period: Base\nPOP Begin: 10-01-2025\nPOP End: 09-30-2026\n\n1001\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts. Includes inspection, weight test, and recertification. One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nContract Period: Option 1\nPOP Begin: 10-01-2026\nPOP End: 09-30-2027\n\n1002\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts. Includes inspection, weight test, and recertification. One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nContract Period: Option 2\nPOP Begin: 10-01-2027\nPOP End: 09-30-2028\n\n1003\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts. Includes inspection, weight test, and recertification. One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nContract Period: Option 3\nPOP Begin: 10-01-2028\nPOP End: 09-30-2029\n\n1004\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts. Includes inspection, weight test, and recertification. One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nContract Period: Option 4\nPOP Begin: 10-01-2029\nPOP End: 09-30-2030\n\nGRAND TOTAL\n__________________\n\nB.3 DELIVERY SCHEDULE\nITEM NUMBER\nSHIPPING INFORMATION\nQUANTITY\nDELIVERY DATE\n0001\n\n65.00\n10/1/2025 to 09/30/26\n1001\n\n65.00\n10/1/2026 to 09/30/27\n1002\n\n65.00\n10/1/2027 to 09/30/28\n1003\n\n65.00\n10/1/2028 to 09/30/29\n1004\n\n65.00\n10/1/2029 to 09/30/30\n\nThe full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.\n\n52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)\nThis solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these addresses: http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/\n\nFAR\nTitle\nDate\n52.204-7\nSYSTEM FOR AWARD MANAGEMENT\nOct 2018\n52.204-16\nCOMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING\nAug 2020\n52.204-24\nREPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)\nNov 2021\n52.204-29\nFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS REPRESENTATION AND DISCLOSURES\nDec 2023\n852.239-75\nINFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE\nFEB 2023\n\nPage 15 of 16\nPage 1 of\nPage 1 of\nPage 1 of\nThe following Commercial Item clauses apply to this acquisition:\n\n52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)\nThis contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):\nhttp://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/\n\nFAR\nTitle\nDate\n52.212-4\nCONTRACT TERMS AND CONDITIONS- COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES\nNOV 2023\n52.212-5\nCONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES\n\n[X] (5) 52.204 10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109 282) (31 U.S.C. 6101 note).\n[X] (9) 52.204 27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117 328).\n[X] (11)(i) 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (DEC 2023) (Pub. L. 115 390, title II).\n[X] (12) 52.209 6, Protecting the Government s Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025) (31 U.S.C. 6101 note).\n[X] (25) 52.219 27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).\n[X] (26) (i) 52.219-28, Postaward Small Business Program Rerepresentation (JAN 2025) (15 U.S.C. 632(a)(2)).\n[X] (31) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).\n[X] (36)(i) 52.222 36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).\n[X] (39)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).\n[X] (46) 52.223-23, Sustainable Products and Services (MAY 2024) (DEVIATION FEB 2025) (7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671I).\n[X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).\n[X] (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024) (E.O. 13513)\n[X] (59) 52.232-33, Payment by Electronic Funds Transfer System for Award Management (OCT 2018) (31 U.S.C. 3332).\n[X] (61) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).\n[X] (63) 52.240 1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act Covered Foreign Entities (NOV 2024) (Sections 1821 1826, Pub. L. 118 31, 41 U.S.C. 3901 note prec.).\n[X] (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).\n[X] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Requirements (MAY 2014) (41 U.S.C. chapter 67).\n[X] (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022).\n[X] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).\nJAN 2025; DEVIATION FEB 2025\n52.203-17\nCONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS\nNOV 2023\n52.204-9\nPERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL\nJAN 2011\n52.204-13\nSYSTEM FOR AWARD MANAGEMENT MAINTENANCE\nOCT 2018\n52.204-18\nCOMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE\nAUG 2020\n52.217-8\nOPTION TO EXTEND SERVICES\nNOV 1999\n52.217-9\nOPTION TO EXTEND THE TERM OF THE CONTRACT\nMAR 2000\n852.203-70\nCOMMERCIAL ADVERTISING\nMAY 2018\n852.204-70\nPERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL\nMAY 2020\n852.219-73\nVA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (DEVIATION)\nJAN 2023\n852.219-75\nVA NOTICE OF LIMITATIONS ON SUBCONTRACTING- CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (DEVIATION)\nJAN 2023\n852.232-72\nELECTRONIC SUBMISSION OF PAYMENT REQUESTS\nNOV 2018\n\n*Contractors are asked to ensure the following information at a minimum is provided as part of their quotation submission.\n\nCompany Name\nBusiness Address\nSystem for Award Management (SAM) Unique Identification Number (UEI)\nDuns Number (Dun and Bradstreet)\nVendor POC Name\nVendor POC E-Mail Address\nVendor POC Phone Number\n\n**Contractors are asked to provide a capability statement to include their technical capability to meet ALL requirements specified within the Statement of Work (SOW).\n\n52.217-8Â OPTION TO EXTEND SERVICESÂ (NOV 1999)\nThe Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to the prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months.Â The Contracting Officer may exercise the option by written notice to the Contractor withinÂ 30 days.Â Â Â Â Â\nÂ Â\nÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â\n52.217-9Â OPTION TO EXTEND THE TERM OF THE CONTRACTÂ (MAR 2000)\nÂ (a) The Government may extend the term of this contract by written notice to the Contractor withinÂ 30 days; provided that the Government gives the ContractorÂ a preliminary written notice of its intent to extend at leastÂ 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.\n\nÂ (b) If the Government exercises this option, the extended contract shall be considered to include this option clause.\n\nÂ (c) The total duration of this contract, including the exercise of any options under this clause, shall not exceedÂ not exceed five (5) years.\n\nVAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)\nDefinitions. As used in this clause\nContract financing payment has the meaning given in FAR 32.001.\nDesignated agency office has the meaning given in 5 CFR 1315.2(m).\nElectronic form means an automated system transmitting information electronically according to the Accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests.\nInvoice payment has the meaning given in FAR 32.001.\nPayment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.\nElectronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.\nData transmission. A contractor must ensure that the data transmission method and format are through one of the following:\nVA s Electronic Invoice Presentment and Payment System. (See Web site at http://www.fsc.va.gov/einvoice.asp.)\nAny system that conforms to the X12 electronic data interchange (EDI) formats established by the Accredited Standards Center (ASC) and chartered by the American National Standards Institute (ANSI). The X12 EDI Web site (http://www.x12.org) includes additional information on EDI 810 and 811 formats.\nInvoice requirements. Invoices shall comply with FAR 32.905.\nExceptions. If, based on one of the circumstances below, the contracting officer directs that payment requests be made by mail, the contractor shall submit payment requests by mail through the United States Postal Service to the designated agency office. Submission of payment requests by mail may be required for:\nAwards made to foreign vendors for work performed outside the United States;\nClassified contracts or purchases when electronic submission and processing of payment requests could compromise the safeguarding of classified or privacy information;\nContracts awarded by contracting officers in the conduct of emergency operations, such as responses to national emergencies;\nSolicitations or contracts in which the designated agency office is a VA entity other than the VA Financial Services Center in Austin, Texas; or\nSolicitations or contracts in which the VA designated agency office does not have electronic invoicing capability as described above.\n(End of Clause)\n\nPage 16 of 16\nInstruction to Offerors\n\nAll quoters shall submit your Quotes no later than Friday, September 12, 2025, at 11:00AM (EST), via email to joseph.locke@va.gov. Please place in ATTENTION: 36C24725Q949 PM PATIENT CEILING LIFTS in the subject line of your email. All offers must include the solicitation number. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f).\n\nThe contract award decision will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government.\nThe following are the decision factors:\n\nAll quoters must possess ability to perform preventative maintenance services without loss of the above stated warranty and liability coverage identified in the contract scope.\n\nMeets ALL technical requirements specified within the SOW.\n\nPrice\n\nPoint of Contact\nJoseph Locke\nContracting Officer\nNetwork Contracting Office 7 joseph.locke@va.gov","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C24725Q0949","place_of_performance":{"zip":"30904","city":{"name":"Augusta"},"state":{"name":"GA"},"street":"Augusta VA Medical Center Uptown and Downtown Divisions","country":{"name":"United States"},"street2":"1 Freedom Way, Augusta, GA 30904 950 15th Street, Augusta, GA 30904"},"product_service_code":"Q999"}],"due_at":"2025-09-12T15:00:00Z","due_date":"2025-09-12","closes_at":"2025-09-12T15:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C247","office_name":"247-NETWORK CONTRACT OFFICE 7 (36C247)","state":"GA","county":"13245","county_name":"Richmond County","city":"1304204","city_name":"Augusta-Richmond County","country":null,"state_source":"sam_state_name","state_evidence":null,"site_key":null,"winner_key":"NXG6V8L9SY13","amount":null,"linked_awards":1,"cancelled":false,"archived":true,"updated_at":"2026-10-31T03:13:48.729550Z","principal_notice_id":"365eddd2ae1745adbff96cccf870f6eb","description":{"text":"Page 11 of 16\nPage 1 of\nPage 1 of\nPage 1 of\nVA AUGUSTA HEALTH CARE SYSTEM\nPERFORMANCE WORK STATEMENT (PWS)\nFOR ANNUAL PREVENTATIVE MAINTENANCE\nON CEILING MOUNTED PATIENT LIFTS MANUFACTURED BY GULDMANN INC\n\nGENERAL SECTION\nBackground: The VA Augusta Health Care System (VAAHCS) is currently comprised of two (2) divisions located in Augusta, Georgia. The facilities service approximately 430 available patient beds combined. Travel arrangements will be required to complete VAAHCS preventative maintenance, weight testing, and repairs. The patient ceiling lifts have been installed at the VA Augusta Health Care System to be in compliance with VHA Directive 1611 published 7/11/2023, Safe Patient Handling Program and the VAAHCS Safe Patient Handling Policy facility wide Standard Operating Procedure (SOP), SOP 4502.509. This information, if needed, is available for view by written request to renee.neidhardt@va.gov. Preventative maintenance (including annual weight testing certification) and repairs are required to maintain the operation of the patient ceiling lifts and to be in compliance with VHA Patient Safety Alert AL10-07 and VHA Patient Safety Alert AL14-07 dated July 28, 2014. This information, if needed, is available for view by written request only to renee.neidhardt@va.gov.\n\nScope:\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty for *up to sixty-five (65) Guldmann patient lifts installed and owned by the Augusta VA Medical Center.\nIncludes inspection, weight test, and recertification. One-year (1 year) extended warranty, forty-eight (48) hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nUtilizing a non-certified Guldmann technician will also nullify all existing standard manufacturing warranties related to the ceiling lift, accessories, rails and above ceiling support system and any assumed liability involving the entire Guldmann Ceiling Lift system becomes null and void, and Guldmann shall be held harmless from any injuries or issues which may occur.\n\nAudit Description: The awardee (to be determined) agrees to work directly with the designated contract point of contact (POC) to perform an on-site inspection(s) of Augusta, GA VA Medical Center both Uptown and Downtown locations to physically identify, verify and reconcile patient ceiling lifts that are not covered under any maintenance agreement\nAudit Purpose:Â The purpose of the audit is to ensure there is no duplication of services or unnecessary costs to the Augusta, GA VA Medical Center by documenting an exact count of patient ceiling lifts without any active maintenance agreement.\nAudit period of performance required start date: Within a period not to exceed sixty (60) days after the effective date of the contract.\nAudit completion required end date: Within a period not to exceed one hundred and twenty (120) days after the effective date of the award.\nAudit certification: Certification of the figure of patient ceiling lifts shall be made by the Contract Point of Contact (POC) and reported directly to the Contracting Officer.\nAudit documentation: The Contract POC is responsible completing the following reporting requirements:\nMicrosoft Excel Spreadsheet\nTwo Tabs\nTab 1: Uptown VA Location\nTab 2: Downtown VA Location\nIdentification of the VA Room Number for both locations\nIdentification of the VA MX # for both Uptown and Downtown locations\nReporting any discrepancies: The Contract Point of Contact (POC) is responsible for reporting all discrepancies identified during the audit.\nContract Modification: A contract modification is necessary if the certified number isÂ any quantity other than 65. If the number matches the expected 65, no further action is needed.\nAwardee s obligation: The contract awardee is required to submit specific documentation requested by the Contracting Officer to process a contract modification.\nContract Modification: Within ten (10) days after formal notification of the figure certified by the Contracting POC, the Contracting Officer shall prepare and issue a supplemental agreement, requiring signatures by the awardee and Contracting Officer, confirming their mutual agreement to revisions made to the basic contract.\n\nPERFORMANCE\nPeriod of Performance: The period of performance is for an initial base year with the possibility of four one-year extension options (exercised at the government's discretion) if successful results are achieved per VA Augusta Health Care System (VAAHCS) evaluation.\n\nBase Year\nOct 1, 2025, to Sep 30, 2026\nOption One (1)\nOct 1, 2026, to Sep 30, 2027\nOption Two (2)\nOct 1, 2027, to Sep 30, 2028\nOption Three (3)\nOct 1, 2028, to Sep 30, 2029\nOption Four (4)\nOct 1, 2029, to Sep 30, 2030\n\nHours of Performance: The contractor will provide the service during the hours of operation Monday Friday, 7:30 AM 3:30 PM Eastern and is subject to change depending on the Governments need. Weekends may be added up through contract modification if funds permit. Unless otherwise specified the Government observes the following holidays:\n\nNew Year s Day\nJanuary 1\nMartin Luther King s Birthday\nThird Monday in February\nPresident s Day\nThird Monday in February\nMemorial Day\nLast Monday in May\nJune 19\nJuneteenth\nIndependence Day\nJuly 4\nLabor Day\nFirst Monday in September\nColumbus Day\nSecond Monday in October\nVeterans Day\nNovember 11\nThanksgiving Day\nFourth Thursday in November\nChristmas Day\nDecember 25\nAny other date specifically declared by the President of The United States to be a national holiday will also be observed.\n\nPlace of Performance: all work is to be performed at the VAAHCS Uptown and Downtown Divisions at the following addresses:\nUptown Division\nDowntown Division\n1 Freedom Way, Augusta, GA, 30904\n950 15th Street, Augusta, GA 30904\n\nTASKS\nThe contractor shall provide all parts, equipment, material, and labor including travel cost to perform the tests and correct any deficiencies identified by the tests.\n\nThe contractor shall perform all lift testing should be completed on a fiscal year basis within the timelines set forth in the table below. The locations are identified for each medical facility in section 2.3. Lifts should be tested in the timeframe noted below:\n\nFacility\nNumber of Lifts\nEstimated Completion Time (Days)\nDowntown\n184\n1 1.5 hour(s) per unit\nUptown\n116\n1 1.5 hour(s)per unit\n\nThe contractor shall perform preventative maintenance by check charging system, rails, hand control and cable, lifting strap, all hardware.\nAnnual Preventative Maintenance shall include a completed VA Augusta Health Care System (VAAHCS), Annual Preventative Maintenance form located at: https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf#. The form must be provided electronically and in hard copy for each lift maintained.\nThe contractor shall perform annual load testing and provide all certifications.\nThe contractor shall perform emergency maintenance to repair any non-functional ceiling patient lift. The contractor will be required to repair and supply parts for lifts that become non-functional within forty-eight (48) hours of being notified. Contractor s are asked to clearly explain in 2-3 sentences how they intend to meet this requirement in their quotation submission.\nThe contractor shall take a photo of each weight test of a lift at 100% capacity, with the location (Downtown Division or Uptown Division), room number, lift identifier (Serial Number and EE/MX number), and date included in the photo. Photos must be supplied via email with the completed checklist https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf#.\nThe contractor shall load test each lift system at 150% of the specified capacity. Test will occur for a minimum of 15 minutes per bracket at the mounting point of each point of contact to the rail system. Contractor will check and inspect all electrical connections, rollers, bearings, and moving parts for proper clearances. Contractor will produce documentation for each test. Upon completion of testing and verification by, contractor will provide electronic documentation of test procedures for each individual room to VA staff.\nThe contractor shall check each individual ceiling mounted lift system to meet VHA Directives and certifies that it meets the Directive and the Veterans Health Administration (VHA) Patient Safety Alert, AL 10-07 and AL14-07. Copies of both directives are available for view, if needed, by only by written request, to: renee.neidhardt@va.gov\n\nCONTRACTORS REASONABILITY\nProvide Qualified Technicians:\nThe Contractor who is performing testing and maintenance of the equipment shall be certified technicians to perform the required testing on the identified ceiling patient lifts. Certified technicians will have taken/been certified by the Guldmann Certification Training Program/Recertification program.\nTechnicians shall be trained and certified technicians for any preventative maintenance and repair work on patient lifts.\nContractor must provide evidence of training, and certification, to inspect Guldmann GH3 model patient ceiling lift, including wall mounts, ceiling mounts, hanger bars. At least one person who has been trained by the manufacturer on the equipment to be tested must lead each test.\nPrefer technicians to have a minimum of two (2) years experience inspecting and working with Guldmann equipment.\nThe contractor will provide OEM parts and labor to correct any deficiencies identified by the tests.\nThe contractor will work with the Contract Point of Contact (POC) to schedule maintenance and testing will be planned with the contractor and will flex to allow for room availability. Inpatient rooms will be prioritized first. Testing shall be completed within the contract dates. Room availability will be arranged by POC. Contractor must deliver certification records from any given day to POC no later than one week after certification of each system. Contractor must notify POC immediately, separately from certification forms, of any damage that jeopardizes the safety of the hoist system and any corrective action required by this medical center.\nThe contractor shall certify for twelve (12) months following the completion of the testing and maintenance of each patient lift.\nThe contractor is responsible for supplying all material data sheets (MDS s) for associated materials, if any, to the Safety Officer and the Contract POC for approval before commencing any work.\nThe contractor is responsible to replace any items damaged by the contractor employees or sub-contractor employees, including but not limited to ceiling tiles or other VA medical equipment in the area.\nThe contractor is always responsible to keep work area clean preventing safety hazards to patients and medical staff. All debris shall be removed before contractor personnel at the end of the workday.\nThe contractor shall not interrupt any utility service or fire alarm service during the process of this job.\nThe contractor shall document all testing and inspections on the Corrective and Preventative Maintenance Checklist for Ceiling Mounted Patient Lifts. https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf#\nThe contractor shall be licensed to perform this service in the State of Georgia and provided the Government with all licenses and certifications needed. All licenses and certifications will be in the Prime Contractors name.\n\nGOVERNMENT RESPONSIBILITY\nThe Contract Point of Contract (POC) shall ensure that all contracted technicians are trained in proper repair methods and have current badges to enter the facilities.\nContract POC shall ensure that all patient rooms are available at the time services begin.\nContract POC shall ensure that all background checks have been cleared and results shall be provided to the Contracting Officer (CO) for electronic filing.\nScheduling will be arranged with the contract POC.Â Â The contractors do not need to be supervised by Veteran Affairs employees at all times but do need to check in with the designated person onsite at beginning of each workday. The contractor shall follow local policy in providing appropriate identification to on-site contractors.Â Â The facility Contract POC will designate the person to check in with at each facility to provide identification.\nContract POC shall notify the contractor of any changes in inspections that have been scheduled.\n\nQUALITY ASSURANCE SURVEILLANCE PLAN (QASP)\nMethods of Surveillance\nThe COTR shall use the surveillance methods listed below in the administration of this Quality Assurance Surveillance Plan (QASP);\nDirect Observation: Individual inspections of repairs;\nPeriodic Inspection: Inspections will be scheduled annually and after repairs;\nUser Survey: Customer complaints and annual inspections.\nComplaints are investigated and validated\nPerformance Standards\nPERFORMANCE BASED TASK\nINDICATIOR\nSTANDARD\nQUALITY ASSURANCE\nRATING\nProvide the facility with lift testing by certified technicians\n3.\nNo more than two incidents of not providing a finished within 48 hrs.\nDirect observation\nEXCEPTIONAL\nZero Incidents\n\nSATISFACTORY\nTwo Incidents\n\nUNSATISFACTORY\nThree or More Incidents\nVendor provides evidence of training as required by the PWS and to follow applicable safety rules and regulations\n\n4.1\nSubstantiated customer complaints of no more than 2\n\nUser Survey\nEXCEPTIONAL\nZero Incidents\n\nSATISFACTORY\nTwo Incidents\n\nUNSATISFACTORY\nThree or More Incidents.\nComplete Lift Inspections Timely\n3.2\nNo more than 10 untimely inspections annually\nDirect Observation\nEXCEPTIONAL\nZero - Two Incidents\n\nSATISFACTORY\nThree Ten Incidents\n\nUNSATISFACTORY\nMore than Ten Incidents\n\nINVOICING\nPayment will be made upon receipt of a properly prepared detailed invoice, prepared by the Contractor, validated by the Contract POC, and submitted electronically through OB-10.\nA properly prepared invoice will contain:\nInvoice Number and Date\nContractor s Name and Address\nAccurate Purchase Order Number\nSupply or Service provided\nTotal Amount Due\n\nCHANGES TO THE STATEMENT OF WORK\nAny changes to this PWS shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.\n\nCONFLICTS OF INTEREST:\nThe Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of Veterans Affairs. Nor shall the Contractor employ any person who is a member of the immediate family of a VA employee, if the employment of that family member would create a conflict of interest, or the appearance of a conflict of interest, particularly with regard to influencing the contract negotiations, terms of the contract or the work carried out under the contract. In any case VA must review the matter and give its approval in accordance with agency ethics rules.\n\nCONTRACT MONITORING PROCEDURES:\nAt the time of the contract award, the Contracting Officer will appoint a Contract POC to assist with the contract monitoring requirements. The Contract POC will monitor such items as quality of service, timeliness of performance, customer service, cost control business relations. In accordance with FAR 1.601 (a) Contracts may be entered into and signed on behalf of the Government only by contracting officers. A Contract POC is not authorized to modify the stated terms of the contract, including extending the length of the contract period. Quality of service will be monitored through a continuous review of requested studies vs. performed studies, the appropriateness of images produced and morbidity and mortality figures. These factors will be rated by a consensus of radiologists interpreting the MRI studies and through a radiologist or resident in the MRI unit setting protocols for scan and observing patients and procedures through the study process. Timeliness of performance will be measured through daily workload counts compared to daily number of studies ordered. Customer service will be monitored through periodic unannounced visits to the MRI unit and through patient satisfaction surveys completed by MRI patients. Cost control will be monitored through a comparison of overtime hours worked and the type and number of studies completed per day. Appropriate regulatory and accrediting standards will apply, and all adverse events will be reported in accordance with medical center and other applicable guidelines.\nThe delegated Contract POC will notify the Contracting Officer of any non-compliance immediately upon his/her gaining knowledge of any such situation or incident. Initial communication of such may be communicated by telephone. After such communication, the Contract POC will provide a written statement to the Contracting Officer along with any supporting documentation regarding the performance failure noticed.\nUpon receipt of a proper invoice, the Contract POC shall certify that the services identified have been performed. Once certification has been made, the invoice will be forward through the proper billing channels and payment shall be made to the Contractor.\nBoth parties shall jointly conduct a review of Contractor s performance to evaluate if services being provided are in accordance with the contract terms and if payments and billings are being properly handled. This review shall include but is not limited to analysis of all billings, payments, costs, administrative issues, patient satisfaction, quality of care and other related documentation that identifies that services have been received. Any concerns need to be brought to the Contractor/ Contract POC s attention at the time noted rather than an agreement reached prior to the expiration of services provided and consideration being received are satisfactory.\nUpon conclusion of the initial contract period and all option periods, and in coordination with the Contracting Officer, the using service shall provide a statement to the Contracting Officer providing a summary of the Contractor s actions and a statement that all requirements of the contract were fulfilled as agreed. This information shall be forwarded by the Contract POC to the Contracting Officer at least 90 days prior to the end of base period and each option period.\n\nB.2 PRICE/COST SCHEDULE\nITEM INFORMATION\nITEM NUMBER\nDESCRIPTION OF SUPPLIES/SERVICES\nQUANTITY\nUNIT\nUNIT PRICE\nAMOUNT\n0001\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts. Includes inspection, weight test, and recertification. One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nContract Period: Base\nPOP Begin: 10-01-2025\nPOP End: 09-30-2026\n\n1001\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts. Includes inspection, weight test, and recertification. One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nContract Period: Option 1\nPOP Begin: 10-01-2026\nPOP End: 09-30-2027\n\n1002\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts. Includes inspection, weight test, and recertification. One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nContract Period: Option 2\nPOP Begin: 10-01-2027\nPOP End: 09-30-2028\n\n1003\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts. Includes inspection, weight test, and recertification. One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nContract Period: Option 3\nPOP Begin: 10-01-2028\nPOP End: 09-30-2029\n\n1004\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts. Includes inspection, weight test, and recertification. One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.\nContract Period: Option 4\nPOP Begin: 10-01-2029\nPOP End: 09-30-2030\n\nGRAND TOTAL\n__________________\n\nB.3 DELIVERY SCHEDULE\nITEM NUMBER\nSHIPPING INFORMATION\nQUANTITY\nDELIVERY DATE\n0001\n\n65.00\n10/1/2025 to 09/30/26\n1001\n\n65.00\n10/1/2026 to 09/30/27\n1002\n\n65.00\n10/1/2027 to 09/30/28\n1003\n\n65.00\n10/1/2028 to 09/30/29\n1004\n\n65.00\n10/1/2029 to 09/30/30\n\nThe full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.\n\n52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)\nThis solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these addresses: http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/\n\nFAR\nTitle\nDate\n52.204-7\nSYSTEM FOR AWARD MANAGEMENT\nOct 2018\n52.204-16\nCOMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING\nAug 2020\n52.204-24\nREPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)\nNov 2021\n52.204-29\nFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS REPRESENTATION AND DISCLOSURES\nDec 2023\n852.239-75\nINFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE\nFEB 2023\n\nPage 15 of 16\nPage 1 of\nPage 1 of\nPage 1 of\nThe following Commercial Item clauses apply to this acquisition:\n\n52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)\nThis contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):\nhttp://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/\n\nFAR\nTitle\nDate\n52.212-4\nCONTRACT TERMS AND CONDITIONS- COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES\nNOV 2023\n52.212-5\nCONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES\n\n[X] (5) 52.204 10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109 282) (31 U.S.C. 6101 note).\n[X] (9) 52.204 27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117 328).\n[X] (11)(i) 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (DEC 2023) (Pub. L. 115 390, title II).\n[X] (12) 52.209 6, Protecting the Government s Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025) (31 U.S.C. 6101 note).\n[X] (25) 52.219 27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).\n[X] (26) (i) 52.219-28, Postaward Small Business Program Rerepresentation (JAN 2025) (15 U.S.C. 632(a)(2)).\n[X] (31) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).\n[X] (36)(i) 52.222 36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).\n[X] (39)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).\n[X] (46) 52.223-23, Sustainable Products and Services (MAY 2024) (DEVIATION FEB 2025) (7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671I).\n[X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).\n[X] (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024) (E.O. 13513)\n[X] (59) 52.232-33, Payment by Electronic Funds Transfer System for Award Management (OCT 2018) (31 U.S.C. 3332).\n[X] (61) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).\n[X] (63) 52.240 1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act Covered Foreign Entities (NOV 2024) (Sections 1821 1826, Pub. L. 118 31, 41 U.S.C. 3901 note prec.).\n[X] (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).\n[X] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Requirements (MAY 2014) (41 U.S.C. chapter 67).\n[X] (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022).\n[X] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).\nJAN 2025; DEVIATION FEB 2025\n52.203-17\nCONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS\nNOV 2023\n52.204-9\nPERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL\nJAN 2011\n52.204-13\nSYSTEM FOR AWARD MANAGEMENT MAINTENANCE\nOCT 2018\n52.204-18\nCOMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE\nAUG 2020\n52.217-8\nOPTION TO EXTEND SERVICES\nNOV 1999\n52.217-9\nOPTION TO EXTEND THE TERM OF THE CONTRACT\nMAR 2000\n852.203-70\nCOMMERCIAL ADVERTISING\nMAY 2018\n852.204-70\nPERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL\nMAY 2020\n852.219-73\nVA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (DEVIATION)\nJAN 2023\n852.219-75\nVA NOTICE OF LIMITATIONS ON SUBCONTRACTING- CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (DEVIATION)\nJAN 2023\n852.232-72\nELECTRONIC SUBMISSION OF PAYMENT REQUESTS\nNOV 2018\n\n*Contractors are asked to ensure the following information at a minimum is provided as part of their quotation submission.\n\nCompany Name\nBusiness Address\nSystem for Award Management (SAM) Unique Identification Number (UEI)\nDuns Number (Dun and Bradstreet)\nVendor POC Name\nVendor POC E-Mail Address\nVendor POC Phone Number\n\n**Contractors are asked to provide a capability statement to include their technical capability to meet ALL requirements specified within the Statement of Work (SOW).\n\n52.217-8Â OPTION TO EXTEND SERVICESÂ (NOV 1999)\nThe Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to the prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months.Â The Contracting Officer may exercise the option by written notice to the Contractor withinÂ 30 days.Â Â Â Â Â\nÂ Â\nÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â\n52.217-9Â OPTION TO EXTEND THE TERM OF THE CONTRACTÂ (MAR 2000)\nÂ (a) The Government may extend the term of this contract by written notice to the Contractor withinÂ 30 days; provided that the Government gives the ContractorÂ a preliminary written notice of its intent to extend at leastÂ 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.\n\nÂ (b) If the Government exercises this option, the extended contract shall be considered to include this option clause.\n\nÂ (c) The total duration of this contract, including the exercise of any options under this clause, shall not exceedÂ not exceed five (5) years.\n\nVAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)\nDefinitions. As used in this clause\nContract financing payment has the meaning given in FAR 32.001.\nDesignated agency office has the meaning given in 5 CFR 1315.2(m).\nElectronic form means an automated system transmitting information electronically according to the Accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests.\nInvoice payment has the meaning given in FAR 32.001.\nPayment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.\nElectronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.\nData transmission. A contractor must ensure that the data transmission method and format are through one of the following:\nVA s Electronic Invoice Presentment and Payment System. (See Web site at http://www.fsc.va.gov/einvoice.asp.)\nAny system that conforms to the X12 electronic data interchange (EDI) formats established by the Accredited Standards Center (ASC) and chartered by the American National Standards Institute (ANSI). The X12 EDI Web site (http://www.x12.org) includes additional information on EDI 810 and 811 formats.\nInvoice requirements. Invoices shall comply with FAR 32.905.\nExceptions. If, based on one of the circumstances below, the contracting officer directs that payment requests be made by mail, the contractor shall submit payment requests by mail through the United States Postal Service to the designated agency office. Submission of payment requests by mail may be required for:\nAwards made to foreign vendors for work performed outside the United States;\nClassified contracts or purchases when electronic submission and processing of payment requests could compromise the safeguarding of classified or privacy information;\nContracts awarded by contracting officers in the conduct of emergency operations, such as responses to national emergencies;\nSolicitations or contracts in which the designated agency office is a VA entity other than the VA Financial Services Center in Austin, Texas; or\nSolicitations or contracts in which the VA designated agency office does not have electronic invoicing capability as described above.\n(End of Clause)\n\nPage 16 of 16\nInstruction to Offerors\n\nAll quoters shall submit your Quotes no later than Friday, September 12, 2025, at 11:00AM (EST), via email to joseph.locke@va.gov. Please place in ATTENTION: 36C24725Q949 PM PATIENT CEILING LIFTS in the subject line of your email. All offers must include the solicitation number. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f).\n\nThe contract award decision will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government.\nThe following are the decision factors:\n\nAll quoters must possess ability to perform preventative maintenance services without loss of the above stated warranty and liability coverage identified in the contract scope.\n\nMeets ALL technical requirements specified within the SOW.\n\nPrice\n\nPoint of Contact\nJoseph Locke\nContracting Officer\nNetwork Contracting Office 7 joseph.locke@va.gov","html":"Page 11 of 16\nPage 1 of \nPage 1 of \nPage 1 of \nVA AUGUSTA HEALTH CARE SYSTEM\nPERFORMANCE WORK STATEMENT (PWS)\nFOR ANNUAL PREVENTATIVE MAINTENANCE \nON CEILING MOUNTED PATIENT LIFTS MANUFACTURED BY GULDMANN INC\n\nGENERAL SECTION\nBackground: The VA Augusta Health Care System (VAAHCS) is currently comprised of two (2) divisions located in Augusta, Georgia. The facilities service approximately 430 available patient beds combined. Travel arrangements will be required to complete VAAHCS preventative maintenance, weight testing, and repairs. The patient ceiling lifts have been installed at the VA Augusta Health Care System to be in compliance with VHA Directive 1611 published 7/11/2023, Safe Patient Handling Program and the VAAHCS Safe Patient Handling Policy facility wide Standard Operating Procedure (SOP), SOP 4502.509.  This information, if needed, is available for view by written request to renee.neidhardt@va.gov.  Preventative maintenance (including annual weight testing certification) and repairs are required to maintain the operation of the patient ceiling lifts and to be in compliance with VHA Patient Safety Alert AL10-07 and VHA Patient Safety Alert AL14-07 dated July 28, 2014. This information, if needed, is available for view by written request only to renee.neidhardt@va.gov.  \n\nScope:\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty for *up to sixty-five (65) Guldmann patient lifts installed and owned by the Augusta VA Medical Center.  \nIncludes inspection, weight test, and recertification.  One-year (1 year) extended warranty, forty-eight (48) hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty.  \nUtilizing a non-certified Guldmann technician will also nullify all existing standard manufacturing warranties related to the ceiling lift, accessories, rails and above ceiling support system and any assumed liability involving the entire Guldmann Ceiling Lift system becomes null and void, and Guldmann shall be held harmless from any injuries or issues which may occur.\n\n\n\n\n\n\n\n\n\n\nAudit Description: The awardee (to be determined) agrees to work directly with the designated contract point of contact (POC) to perform an on-site inspection(s) of Augusta, GA VA Medical Center both Uptown and Downtown locations to physically identify, verify and reconcile patient ceiling lifts that are not covered under any maintenance agreement\nAudit Purpose:Â The purpose of the audit is to ensure there is no duplication of services or unnecessary costs to the Augusta, GA VA Medical Center by documenting an exact count of patient ceiling lifts without any active maintenance agreement. \nAudit period of performance required start date:   Within a period not to exceed sixty (60) days after the effective date of the contract.\nAudit completion required end date: Within a period not to exceed one hundred and twenty (120) days after the effective date of the award.\nAudit certification: Certification of the figure of patient ceiling lifts shall be made by the Contract Point of Contact (POC) and reported directly to the Contracting Officer.  \nAudit documentation: The Contract POC is responsible completing the following reporting requirements:\nMicrosoft Excel Spreadsheet\nTwo Tabs\nTab 1: Uptown VA Location\nTab 2: Downtown VA Location\nIdentification of the VA Room Number for both locations\nIdentification of the VA MX # for both Uptown and Downtown locations\nReporting any discrepancies: The Contract Point of Contact (POC) is responsible for reporting all discrepancies identified during the audit.\nContract Modification: A contract modification is necessary if the certified number isÂ any quantity other than 65. If the number matches the expected 65, no further action is needed.\nAwardee s obligation: The contract awardee is required to submit specific documentation requested by the Contracting Officer to process a contract modification.\nContract Modification: Within ten (10) days after formal notification of the figure certified by the Contracting POC, the Contracting Officer shall prepare and issue a supplemental agreement, requiring signatures by the awardee and Contracting Officer, confirming their mutual agreement to revisions made to the basic contract.\n\n \nPERFORMANCE\nPeriod of Performance: The period of performance is for an initial base year with the possibility of four one-year extension options (exercised at the government's discretion) if successful results are achieved per VA Augusta Health Care System (VAAHCS) evaluation. \n\nBase Year\nOct 1, 2025, to Sep 30, 2026\nOption One (1)\nOct 1, 2026, to Sep 30, 2027\nOption Two (2)\nOct 1, 2027, to Sep 30, 2028\nOption Three (3)\nOct 1, 2028, to Sep 30, 2029\nOption Four (4)\nOct 1, 2029, to Sep 30, 2030\n\nHours of Performance: The contractor will provide the service during the hours of operation Monday   Friday, 7:30 AM   3:30 PM Eastern and is subject to change depending on the Governments need. Weekends may be added up through contract modification if funds permit. Unless otherwise specified the Government observes the following holidays:\n\nNew Year s Day\nJanuary 1\nMartin Luther King s Birthday\nThird Monday in February\nPresident s Day\nThird Monday in February\nMemorial Day\nLast Monday in May\nJune 19\nJuneteenth\nIndependence Day\nJuly 4\nLabor Day\nFirst Monday in September\nColumbus Day \nSecond Monday in October \nVeterans Day \nNovember 11\nThanksgiving Day\nFourth Thursday in November\nChristmas Day \nDecember 25\nAny other date specifically declared by the President of The United States to be a national holiday will also be observed.\n\nPlace of Performance: all work is to be performed at the VAAHCS Uptown and Downtown Divisions at the following addresses:\nUptown Division\nDowntown Division\n1 Freedom Way, Augusta, GA, 30904\n950 15th Street, Augusta, GA 30904\n\nTASKS\nThe contractor shall provide all parts, equipment, material, and labor including travel cost to perform the tests and correct any deficiencies identified by the tests.\n\nThe contractor shall perform all lift testing should be completed on a fiscal year basis within the timelines set forth in the table below. The locations are identified for each medical facility in section 2.3. Lifts should be tested in the timeframe noted below:\n\nFacility\nNumber of Lifts\nEstimated Completion Time (Days)\nDowntown\n184\n1   1.5 hour(s) per unit\nUptown\n116\n1   1.5 hour(s)per unit\n\n\n\nThe contractor shall perform preventative maintenance by check charging system, rails, hand control and cable, lifting strap, all hardware.\nAnnual Preventative Maintenance shall include a completed VA Augusta Health Care System (VAAHCS), Annual Preventative Maintenance form located at:  https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf#. The form must be provided electronically and in hard copy for each lift maintained.   \nThe contractor shall perform annual load testing and provide all certifications.\nThe contractor shall perform emergency maintenance to repair any non-functional ceiling patient lift. The contractor will be required to repair and supply parts for lifts that become non-functional within forty-eight (48) hours of being notified.  Contractor s are asked to clearly explain in 2-3 sentences how they intend to meet this requirement in their quotation submission.\nThe contractor shall take a photo of each weight test of a lift at 100% capacity, with the location (Downtown Division or Uptown Division), room number, lift identifier (Serial Number and EE/MX number), and date included in the photo. Photos must be supplied via email with the completed checklist https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf#. \nThe contractor shall load test each lift system at 150% of the specified capacity. Test will occur for a minimum of 15 minutes per bracket at the mounting point of each point of contact to the rail system. Contractor will check and inspect all electrical connections, rollers, bearings, and moving parts for proper clearances. Contractor will produce documentation for each test. Upon completion of testing and verification by, contractor will provide electronic documentation of test procedures for each individual room to VA staff.\nThe contractor shall check each individual ceiling mounted lift system to meet VHA Directives and certifies that it meets the Directive and the Veterans Health Administration (VHA) Patient Safety Alert, AL 10-07 and AL14-07.  Copies of both directives are available for view, if needed, by only by written request, to: renee.neidhardt@va.gov\n\nCONTRACTORS REASONABILITY \nProvide Qualified Technicians:\nThe Contractor who is performing testing and maintenance of the equipment shall be certified technicians to perform the required testing on the identified ceiling patient lifts. Certified technicians will have taken/been certified by the Guldmann  Certification Training Program/Recertification program.\nTechnicians shall be trained and certified technicians for any preventative maintenance and repair work on patient lifts.\nContractor must provide evidence of training, and certification, to inspect Guldmann  GH3 model patient ceiling lift, including wall mounts, ceiling mounts, hanger bars. At least one person who has been trained by the manufacturer on the equipment to be tested must lead each test.\nPrefer technicians to have a minimum of two (2) years  experience inspecting and working with Guldmann  equipment. \nThe contractor will provide OEM parts and labor to correct any deficiencies identified by the tests.\nThe contractor will work with the Contract Point of Contact (POC) to schedule maintenance and testing will be planned with the contractor and will flex to allow for room availability. Inpatient rooms will be prioritized first. Testing shall be completed within the contract dates.  Room availability will be arranged by POC. Contractor must deliver certification records from any given day to POC no later than one week after certification of each system. Contractor must notify POC immediately, separately from certification forms, of any damage that jeopardizes the safety of the hoist system and any corrective action required by this medical center.\nThe contractor shall certify for twelve (12) months following the completion of the testing and maintenance of each patient lift.\nThe contractor is responsible for supplying all material data sheets (MDS s) for associated materials, if any, to the Safety Officer and the Contract POC for approval before commencing any work.\nThe contractor is responsible to replace any items damaged by the contractor employees or sub-contractor employees, including but not limited to ceiling tiles or other VA medical equipment in the area.\nThe contractor is always responsible to keep work area clean preventing safety hazards to patients and medical staff. All debris shall be removed before contractor personnel at the end of the workday.\nThe contractor shall not interrupt any utility service or fire alarm service during the process of this job.\nThe contractor shall document all testing and inspections on the  Corrective and Preventative Maintenance Checklist for Ceiling Mounted Patient Lifts.  https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf# \nThe contractor shall be licensed to perform this service in the State of Georgia and provided the Government with all licenses and certifications needed. All licenses and certifications will be in the Prime Contractors name.\n\nGOVERNMENT RESPONSIBILITY\nThe Contract Point of Contract (POC) shall ensure that all contracted technicians are trained in proper repair methods and have current badges to enter the facilities.\nContract POC shall ensure that all patient rooms are available at the time services begin.\nContract POC shall ensure that all background checks have been cleared and results shall be provided to the Contracting Officer (CO) for electronic filing.\nScheduling will be arranged with the contract POC.Â Â The contractors do not need to be supervised by Veteran Affairs employees at all times but do need to check in with the designated person onsite at beginning of each workday. The contractor shall follow local policy in providing appropriate identification to on-site contractors.Â Â The facility Contract POC will designate the person to check in with at each facility to provide identification.\nContract POC shall notify the contractor of any changes in inspections that have been scheduled.\n \nQUALITY ASSURANCE SURVEILLANCE PLAN (QASP)\nMethods of Surveillance\nThe COTR shall use the surveillance methods listed below in the administration of this Quality Assurance Surveillance Plan (QASP);\nDirect Observation: Individual inspections of repairs;\nPeriodic Inspection: Inspections will be scheduled annually and after repairs;\nUser Survey: Customer complaints and annual inspections. \nComplaints are investigated and validated\nPerformance Standards\nPERFORMANCE BASED TASK\nINDICATIOR\nSTANDARD\nQUALITY ASSURANCE\nRATING\nProvide the facility with lift testing by certified technicians\n3.\nNo more than two incidents of not providing a finished within 48 hrs.\nDirect observation\nEXCEPTIONAL\nZero Incidents\n\nSATISFACTORY\nTwo Incidents\n\nUNSATISFACTORY\nThree or More Incidents\nVendor provides evidence of training as required by the PWS and to follow applicable safety rules and regulations \n\n4.1\nSubstantiated customer complaints of no more than 2 \n\nUser Survey\nEXCEPTIONAL\nZero Incidents\n\nSATISFACTORY\nTwo Incidents\n\nUNSATISFACTORY\nThree or More Incidents.\nComplete Lift Inspections Timely \n3.2\nNo more than 10 untimely inspections annually \nDirect Observation\nEXCEPTIONAL\nZero - Two Incidents\n\nSATISFACTORY\nThree   Ten Incidents\n\nUNSATISFACTORY\nMore than Ten Incidents\n\n\nINVOICING\nPayment will be made upon receipt of a properly prepared detailed invoice, prepared by the Contractor, validated by the Contract POC, and submitted electronically through OB-10.\nA properly prepared invoice will contain:\nInvoice Number and Date\nContractor s Name and Address\nAccurate Purchase Order Number\nSupply or Service provided\nTotal Amount Due\n\nCHANGES TO THE STATEMENT OF WORK\nAny changes to this PWS shall be authorized and approved only through written correspondence from the CO.  A copy of each change will be kept in a project folder along with all other products of the project.  Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.\n\nCONFLICTS OF INTEREST:\nThe Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of Veterans Affairs. Nor shall the Contractor employ any person who is a member of the immediate family of a VA employee, if the employment of that family member would create a conflict of interest, or the appearance of a conflict of interest, particularly with regard to influencing the contract negotiations, terms of the contract or the work carried out under the contract. In any case VA must review the matter and give its approval in accordance with agency ethics rules.\n\nCONTRACT MONITORING PROCEDURES:\nAt the time of the contract award, the Contracting Officer will appoint a Contract POC to assist with the contract monitoring requirements. The Contract POC will monitor such items as quality of service, timeliness of performance, customer service, cost control business relations. In accordance with FAR 1.601 (a)  Contracts may be entered into and signed on behalf of the Government only by contracting officers.  A Contract POC is not authorized to modify the stated terms of the contract, including extending the length of the contract period. Quality of service will be monitored through a continuous review of requested studies vs. performed studies, the appropriateness of images produced and morbidity and mortality figures. These factors will be rated by a consensus of radiologists interpreting the MRI studies and through a radiologist or resident in the MRI unit setting protocols for scan and observing patients and procedures through the study process.  Timeliness of performance will be measured through daily workload counts compared to daily number of studies ordered. Customer service will be monitored through periodic unannounced visits to the MRI unit and through patient satisfaction surveys completed by MRI patients. Cost control will be monitored through a comparison of overtime hours worked and the type and number of studies completed per day. Appropriate regulatory and accrediting standards will apply, and all adverse events will be reported in accordance with medical center and other applicable guidelines.\nThe delegated Contract POC will notify the Contracting Officer of any non-compliance immediately upon his/her gaining knowledge of any such situation or incident. Initial communication of such may be communicated by telephone. After such communication, the Contract POC will provide a written statement to the Contracting Officer along with any supporting documentation regarding the performance failure noticed.\nUpon receipt of a proper invoice, the Contract POC shall certify that the services identified have been performed. Once certification has been made, the invoice will be forward through the proper billing channels and payment shall be made to the Contractor.\nBoth parties shall jointly conduct a review of Contractor s performance to evaluate if services being provided are in accordance with the contract terms and if payments and billings are being properly handled. This review shall include but is not limited to analysis of all billings, payments, costs, administrative issues, patient satisfaction, quality of care and other related documentation that identifies that services have been received. Any concerns need to be brought to the Contractor/ Contract POC s attention at the time noted rather than an agreement reached prior to the expiration of services provided and consideration being received are satisfactory.\nUpon conclusion of the initial contract period and all option periods, and in coordination with the Contracting Officer, the using service shall provide a statement to the Contracting Officer providing a summary of the Contractor s actions and a statement that all requirements of the contract were fulfilled as agreed. This information shall be forwarded by the Contract POC to the Contracting Officer at least 90 days prior to the end of base period and each option period.\n\nB.2 PRICE/COST SCHEDULE\nITEM INFORMATION\nITEM NUMBER\nDESCRIPTION OF SUPPLIES/SERVICES\nQUANTITY\nUNIT\nUNIT PRICE\nAMOUNT\n0001\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts.  Includes inspection, weight test, and recertification.  One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty. \nContract Period: Base\nPOP Begin: 10-01-2025\nPOP End: 09-30-2026\n\n1001\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts.  Includes inspection, weight test, and recertification.  One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty. \nContract Period: Option 1\nPOP Begin: 10-01-2026\nPOP End: 09-30-2027\n\n1002\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts.  Includes inspection, weight test, and recertification.  One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty. \nContract Period: Option 2\nPOP Begin: 10-01-2027\nPOP End: 09-30-2028\n\n1003\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts.  Includes inspection, weight test, and recertification.  One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty. \nContract Period: Option 3\nPOP Begin: 10-01-2028\nPOP End: 09-30-2029\n\n1004\n\n65.00\nJB\n__________________\n__________________\n\nPatient Ceiling Lift Annual inspection, preventive maintenance and extended warranty on Guldmann patient lifts.  Includes inspection, weight test, and recertification.  One-year extended warranty, 48 hours response time during normal business hours, all parts shall be supplied as needed, and equipment under warranty. \nContract Period: Option 4\nPOP Begin: 10-01-2029\nPOP End: 09-30-2030\n\n\n\n\n\nGRAND TOTAL\n__________________\n\nB.3 DELIVERY SCHEDULE\nITEM NUMBER\nSHIPPING INFORMATION\nQUANTITY\nDELIVERY DATE\n0001\n\n\n65.00\n10/1/2025 to 09/30/26\n1001\n\n\n65.00\n10/1/2026 to 09/30/27\n1002\n\n\n65.00\n10/1/2027 to 09/30/28\n1003\n\n\n65.00\n10/1/2028 to 09/30/29\n1004\n\n\n65.00\n10/1/2029 to 09/30/30\n\nThe full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.\n\n52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)\nThis solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these addresses: http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/\n\n\nFAR\nTitle\nDate\n52.204-7\nSYSTEM FOR AWARD MANAGEMENT\nOct 2018\n52.204-16\nCOMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING\nAug 2020\n52.204-24\nREPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)\nNov 2021\n52.204-29\nFEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS REPRESENTATION AND DISCLOSURES\nDec 2023\n852.239-75\nINFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE\nFEB 2023\n\n\n\n\n\nPage 15 of 16\nPage 1 of \nPage 1 of \nPage 1 of \nThe following Commercial Item clauses apply to this acquisition:\n\n52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)\nThis contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):\nhttp://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/\n\nFAR\nTitle\nDate\n52.212-4\nCONTRACT TERMS AND CONDITIONS- COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES\nNOV 2023\n52.212-5\nCONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES \n\n    [X]  (5) 52.204 10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109 282) (31 U.S.C. 6101 note).\n    [X]  (9) 52.204 27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117 328).\n    [X]  (11)(i) 52.204 30, Federal Acquisition Supply Chain Security Act Orders  Prohibition. (DEC 2023) (Pub. L. 115 390, title II).\n    [X]  (12) 52.209 6, Protecting the Government s Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025) (31 U.S.C. 6101 note).\n    [X]  (25) 52.219 27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).\n    [X]  (26) (i) 52.219-28, Postaward Small Business Program Rerepresentation (JAN 2025) (15 U.S.C. 632(a)(2)).\n    [X]  (31) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).\n[X]  (36)(i) 52.222 36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).\n[X]  (39)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).\n    [X]  (46) 52.223-23, Sustainable Products and Services (MAY 2024) (DEVIATION FEB 2025) (7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671I).\n    [X]  (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).\n    [X]  (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024) (E.O. 13513)\n    [X]  (59) 52.232-33, Payment by Electronic Funds Transfer System for Award Management (OCT 2018) (31 U.S.C. 3332).\n    [X]  (61) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).\n    [X]  (63) 52.240 1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act Covered Foreign Entities (NOV 2024) (Sections 1821 1826, Pub. L. 118 31, 41 U.S.C. 3901 note prec.).\n    [X]  (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).\n    [X]  (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Requirements (MAY 2014) (41 U.S.C. chapter 67).\n[X]  (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022).\n    [X]  (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).\nJAN 2025; DEVIATION FEB 2025\n52.203-17\nCONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS\nNOV 2023\n52.204-9\nPERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL\nJAN 2011\n52.204-13\nSYSTEM FOR AWARD MANAGEMENT MAINTENANCE\nOCT 2018\n52.204-18\nCOMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE\nAUG 2020\n52.217-8\nOPTION TO EXTEND SERVICES\nNOV 1999\n52.217-9\nOPTION TO EXTEND THE TERM OF THE CONTRACT \nMAR 2000\n852.203-70\nCOMMERCIAL ADVERTISING\nMAY 2018\n852.204-70\nPERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL\nMAY 2020\n852.219-73\nVA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (DEVIATION)\nJAN 2023\n852.219-75\nVA NOTICE OF LIMITATIONS ON SUBCONTRACTING- CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (DEVIATION)\nJAN 2023\n852.232-72\nELECTRONIC SUBMISSION OF PAYMENT REQUESTS \nNOV 2018\n\n\n*Contractors are asked to ensure the following information at a minimum is provided as part of their quotation submission.\n\nCompany Name\nBusiness Address\nSystem for Award Management (SAM) Unique Identification Number (UEI)\nDuns Number (Dun and Bradstreet)\nVendor POC Name\nVendor POC E-Mail Address\nVendor POC Phone Number\n\n**Contractors are asked to provide a capability statement to include their technical capability to meet ALL requirements specified within the Statement of Work (SOW).\n\n52.217-8Â OPTION TO EXTEND SERVICESÂ (NOV 1999)\n The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to the prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months.Â The Contracting Officer may exercise the option by written notice to the Contractor withinÂ 30 days.Â Â Â Â Â \nÂ Â \nÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â \n52.217-9Â OPTION TO EXTEND THE TERM OF THE CONTRACTÂ (MAR 2000)\nÂ  (a) The Government may extend the term of this contract by written notice to the Contractor withinÂ 30 days; provided that the Government gives the ContractorÂ a preliminary written notice of its intent to extend at leastÂ 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.\n\nÂ  (b) If the Government exercises this option, the extended contract shall be considered to include this option clause.\n\nÂ  (c) The total duration of this contract, including the exercise of any options under this clause, shall not exceedÂ not exceed five (5) years.\n \nVAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)\nDefinitions. As used in this clause \nContract financing payment has the meaning given in FAR 32.001.\nDesignated agency office has the meaning given in 5 CFR 1315.2(m).\nElectronic form means an automated system transmitting information electronically according to the Accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests.\nInvoice payment has the meaning given in FAR 32.001.\nPayment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.\nElectronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.\nData transmission. A contractor must ensure that the data transmission method and format are through one of the following:\nVA s Electronic Invoice Presentment and Payment System. (See Web site at http://www.fsc.va.gov/einvoice.asp.)\nAny system that conforms to the X12 electronic data interchange (EDI) formats established by the Accredited Standards Center (ASC) and chartered by the American National Standards Institute (ANSI). The X12 EDI Web site (http://www.x12.org) includes additional information on EDI 810 and 811 formats.\nInvoice requirements. Invoices shall comply with FAR 32.905.\nExceptions. If, based on one of the circumstances below, the contracting officer directs that payment requests be made by mail, the contractor shall submit payment requests by mail through the United States Postal Service to the designated agency office. Submission of payment requests by mail may be required for:\nAwards made to foreign vendors for work performed outside the United States;\nClassified contracts or purchases when electronic submission and processing of payment requests could compromise the safeguarding of classified or privacy information;\nContracts awarded by contracting officers in the conduct of emergency operations, such as responses to national emergencies;\nSolicitations or contracts in which the designated agency office is a VA entity other than the VA Financial Services Center in Austin, Texas; or\nSolicitations or contracts in which the VA designated agency office does not have electronic invoicing capability as described above.\n(End of Clause)\n\n \n\n\n\n\n\n\nPage 16 of 16\nInstruction to Offerors\n\nAll quoters shall submit your Quotes no later than Friday, September 12, 2025, at 11:00AM (EST), via email to joseph.locke@va.gov. Please place in  ATTENTION: 36C24725Q949 PM PATIENT CEILING LIFTS  in the subject line of your email. All offers must include the solicitation number. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). \n\nThe contract award decision will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government.\nThe following are the decision factors:\n\nAll quoters must possess ability to perform preventative maintenance services without loss of the above stated warranty and liability coverage identified in the contract scope.\n\nMeets ALL technical requirements specified within the SOW.\n\nPrice\n\nPoint of Contact\nJoseph Locke\nContracting Officer\nNetwork Contracting Office 7 joseph.locke@va.gov","origin":"detail"},"contacts":[{"fax":"000-000-0000","name":"Joseph Locke","role":"primary","email":"joseph.locke@va.gov","phone":"803-979-0338","title":"Contracting Officer"}],"place_of_performance":{"zip":"30904","city":{"name":"Augusta"},"state":{"name":"GA"},"street":"Augusta VA Medical Center Uptown and Downtown Divisions","country":{"name":"United States"},"street2":"1 Freedom Way, Augusta, GA 30904 950 15th Street, Augusta, GA 30904"},"office_address":{"zip":"30904","city":"AUGUSTA","state":"GA","country":"USA"},"naics_codes":["811310"],"award":{"awardee":{}},"attachments":[{"resource_id":"1d5f439356504177baa25ece771775ce","name":"va.gov","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-09-09T15:45:01.654Z","export_controlled":false,"sha256":null,"url":"https://www.va.gov/augusta-health-care/","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C24726P0026_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C24726P0026_3600_-NONE-_-NONE-/","piid":"36C24726P0026","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"NXG6V8L9SY13","recipient_name":"PREMIER MEDICAL DISTRIBUTORS, LLC","recipient_uei":"NXG6V8L9SY13","recipient_cage":"8HVU5","recipient_city":"MYRTLE BEACH","recipient_state":"SC","sub_name":"Department of Veterans Affairs","office_name":"247-NETWORK CONTRACT OFFICE 7 (36C247)","office_key":"o-36C247","first_action_date":"2025-10-01","last_action_date":"2026-10-01","actions":4,"obligated":"156400.00","current_total_value":"201091.00","potential_total_value":"201091.00","naics":"811310","psc":"Q999","extent_competed":"COMPETED UNDER SAP","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":2,"description":"CEILING LIFT PM SERVICES","method":"solicitation","confidence":"high","evidence":["solicitation number 36C24725Q0949 equals the FPDS solicitation identifier","same awarding office 36C247"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C24727Q0118","latest_notice_id":"27bcc9cdef604254982ea444d657d39d","title":"6515--STERILIZATION CONTAINERS","solicitation_number":"36C24727Q0118","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C247","office_name":"247-NETWORK CONTRACT OFFICE 7 (36C247)","naics":"339113","psc":"6515","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6515)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24726R0134","latest_notice_id":"8f0c90b43099494cb8a8201cd475406f","title":"Y1DA | 521-24-102 | Renovate Wards 2K and 2B for Optometry/Ophthalmology Clinical Use","solicitation_number":"36C24726R0134","notice_type":"o","first_type":"p","first_posted":"2026-09-25","last_posted":"2026-11-18","notices":7,"due_at":"2026-11-26T18:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C247","office_name":"247-NETWORK CONTRACT OFFICE 7 (36C247)","naics":"236220","psc":"Y1DA","set_aside":"SDVOSBC","state":"AL","county":"01073","county_name":"Jefferson County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24727Q0119","latest_notice_id":"81776fecabf149c9867d6253acdc2478","title":"Vivarium Tunnel Washer","solicitation_number":"36C24727Q0119","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-20","notices":2,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C247","office_name":"247-NETWORK CONTRACT OFFICE 7 (36C247)","naics":"339112","psc":"6640","set_aside":null,"state":"GA","county":"13089","county_name":"DeKalb County","city":"1322052","city_name":"Decatur","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C24727Q0067","latest_notice_id":"f75d8541b0604a57a55c64094b365d82","title":"J065--Building 3 Dental Vacuum Pump Replacement","solicitation_number":"36C24727Q0067","notice_type":"k","first_type":"r","first_posted":"2026-11-02","last_posted":"2026-11-23","notices":6,"due_at":"2026-11-30T17:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C247","office_name":"247-NETWORK CONTRACT OFFICE 7 (36C247)","naics":"811210","psc":"J065","set_aside":"SDVOSBC","state":"GA","county":"13175","county_name":"Laurens County","city":"1324376","city_name":"Dublin","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C24727Q0115","latest_notice_id":"58ac14c8858846ce9a8d172472648821","title":"C1DA--544-27-110 | Update Facility Masterplan Architect and Engineering","solicitation_number":"36C24727Q0115","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C247","office_name":"247-NETWORK CONTRACT OFFICE 7 (36C247)","naics":"541330","psc":"C1DA","set_aside":"SDVOSBC","state":"SC","county":"45079","county_name":"Richland County","city":"4516000","city_name":"Columbia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"}],"similar_open":[{"key":"36C25627Q0131","latest_notice_id":"c34b2da547fb4d8fb1ceaf2fb177c660","title":"J012--Kitchen Exhaust Cleaning, Kitchen Fire Suppression System Service, and Portable Fire Extinguisher Service","solicitation_number":"36C25627Q0131","notice_type":"r","first_type":"r","first_posted":"2026-11-05","last_posted":"2026-11-20","notices":2,"due_at":"2026-11-25T16:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C256","office_name":"256-NETWORK CONTRACT OFFICE 16 (36C256)","naics":"811310","psc":"J012","set_aside":null,"state":"AR","county":"05119","county_name":"Pulaski County","city":"0550450","city_name":"North Little Rock","country":null,"place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"70Z02727RFQ000010","latest_notice_id":"d442a8374a9f40518aefb30b4adc715a","title":"USCG IPD Cape May Crane Repairs","solicitation_number":"70Z02727RFQ000010","notice_type":"o","first_type":"o","first_posted":"2026-11-02","last_posted":"2026-11-23","notices":3,"due_at":"2026-11-25T22:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70ZL30","office_name":"BASE PORTSMOUTH","naics":"811310","psc":"J039","set_aside":"SBA","state":"NJ","county":"34009","county_name":"Cape May County","city":"3410270","city_name":"Cape May","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"W50S6Y27RA002","latest_notice_id":"87cba3e75e354d12990453adb59fe26e","title":"Halon Bottle Inspection","solicitation_number":"W50S6Y27RA002","notice_type":"o","first_type":"r","first_posted":"2026-11-07","last_posted":"2026-11-20","notices":6,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W50S6Y","office_name":"W7M2 USPFO ACTIVITY FLANG 125","naics":"811310","psc":"J042","set_aside":"SBA","state":"FL","county":"12031","county_name":"Duval County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":58,"indexable":false}