Solicitation, service-disabled veteran-owned small business set-aside, first published as presolicitation
558-22-172, Replace Chillers in AHU 1 and 2
36C24626B0029
Department of Veterans Affairs, 246-Network Contracting Office 6. Commercial and Institutional Building Construction.
Awarded
$3,612,114.00 obligated so far on USAspending
Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities
This one was awarded in 2026
195 like it are open now in commercial and institutional building construction
- Repair Auto Maintenance Facility Bldg 575 (230040)
Department of the Navy, Navfacsyscom Mid-Atlantic
Combined synopsis and solicitationSmall businessNAICS 236220North CarolinaN4008527R9000Due in 7 daysDec 2 - FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)
Department of Veterans Affairs, 246-Network Contracting Office 6
PresolicitationSDVOSBNAICS 236220North Carolina36C24626B0041Closes in 8 daysDec 3 - NH100 Engine Control Unit Replacement
Department of the Navy, Navfacsyscom Mid-Atlantic
Combined synopsis and solicitationSmall businessNAICS 236220North CarolinaN4008527R9006Closes in 9 daysDec 4
All 195 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Service-disabled veteran-owned small business set-aside. Reserved for service-disabled veteran-owned small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. Open SDVOSB opportunities
- Time to respond
- Bidders had 34 days from the day the solicitation was posted, July 24, 2026, to the deadline.
- Before the solicitation
- The agency published a presolicitation on July 8, 2026, 16 days before the solicitation.
- How it ended
- Awarded to Valiant Construction LLC on November 9, 2026, 74 days after offers were due. The contracting office reported 5 offers (full and open competition after exclusion of sources).
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
STATEMENT OF WORK
Project Number: 558-22-172 Replace Chillers for AHU 1 and 2
- Scope:
- The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications.
- Construction Period -
- Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed.
- Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants.
- Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting.
- As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats.
- Hours of Operation and Phasing:
- Construction should be phased and timed such that:
- General Operation of the affected areas is not interrupted
- The facility operates on a 24-hour, 7 day per week schedule
- Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs. 1st shift construction activities will be allowed with approval of the COR.
- Contractor to develop and coordinate phasing plan with input from staff and final approval of COR.
- General Operation of the affected areas is not interrupted
- Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend. Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date.
- Construction should be phased and timed such that:
- Storage: No storage of any material will be allowed on VA property unless approved by the COR.
- Period of Performance: Contractor shall complete this project no later than 270 days after issue of notice to proceed (NTP).
- Utility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. The contractor shall submit a request to interrupt any such services to COR, in writing, 20 days in advance of proposed interruption.
- General Requirements
- The contractor’s employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site.
- Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space.
- Means of Egress: Do not block existing egress for occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements. Minimize disruptions and coordinate with COR.
- All buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period.
- Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Manager at least 48 hours in advance.
- New work shall be installed and connected to existing work neatly, safely and professionally. Contractor to coordinate periodic VA inspection to ensure satisfactory workmanship of GC and Subcontractors. Any portion of the VAMC that is disturbed or damaged shall be replaced or repaired to its prior condition.
- The contractor is required to notify the COR upon arrival and departure of personnel at the work site every day work is performed during the execution of this project.
END OF SCOPE OF WORK
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 36C24626B0029_1.docx16 KB, July 8, 2026
- 36C24627C0005_1 award notice.docx22 KB, November 10, 2026
- 558-22-172_Durham Chillers_Specs.pdf10.5 MB, July 24, 2026
- 558-22-172_VA Durham_Replace Chillers Drawings.pdf16.9 MB, July 24, 2026
- 36C24626B0029 POST 07242026.pdf482 KB, July 24, 2026
- 36C24626B0029 0001--site visit map.pdf2.8 MB, July 29, 2026
- 36C24626B0029 0002 AVAIL OF FUNDS.pdf88 KB, July 29, 2026
- 13 05 41 - SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.pdf76 KB, August 21, 2026
- chillers July 30 sign in.pdf1.1 MB, August 21, 2026
- 36C24626B0029 0003 RFI responses site sign in seismic specs 08212026.pdf318 KB, August 21, 2026
- 36C24626B0029 0004 posting abstract 08312026.pdf106 KB, August 31, 2026
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Valiant Construction LLC
- UEI
- UJMKBK5AMBS4
- CAGE
- 5KY95
- Vendor location
- Louisville, KY
- Contract
- 36C24627C0005, definitive contract
- Obligated
- $3,612,114.00
- Actions
- 1 between November 9, 2026 and November 9, 2026
- Competition
- Full and Open Competition After Exclusion of Sources, 5 offers received
- Set-aside reported
- Service Disabled Veteran Owned Small Business SET-ASIDE
- Described as
- Labor, Materials, Equipment Iaw Drawings and Specs for Ahus 1 and 2
- Match
- solicitation number 36C24626B0029 equals the FPDS solicitation identifier; same awarding office 36C246 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 8, 2026
Presolicitation
SAM.gov, notice e9eafc37f473406fa82e2e907f574779
2 revisions on SAM
- July 8, 2026: publish, presolicitation
- July 24, 2026: publish, solicitation
July 24, 2026
Solicitation, originally presolicitation
Due August 27, 2026 at 2:00 PM EDT. SAM.gov, notice 999ac6aa51a743de828df73cc50fedfd
6 revisions on SAM
- August 31, 2026: publish, solicitation
- July 8, 2026: publish, presolicitation
- August 21, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 24, 2026: publish, solicitation
July 29, 2026
Solicitation
Due August 27, 2026 at 2:00 PM EDT. SAM.gov, notice 266c25644859456eab997e670f11b6cd
6 revisions on SAM
- August 31, 2026: publish, solicitation
- July 8, 2026: publish, presolicitation
- August 21, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 24, 2026: publish, solicitation
July 29, 2026
Solicitation
Due August 27, 2026 at 2:00 PM EDT. SAM.gov, notice 5d022616ea9d4b3abe4e9ac429edebed
6 revisions on SAM
- August 31, 2026: publish, solicitation
- July 8, 2026: publish, presolicitation
- August 21, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 24, 2026: publish, solicitation
August 21, 2026
Solicitation
Due August 27, 2026 at 2:00 PM EDT. SAM.gov, notice 6fe1db8b106b4bb08a24a608de71bdc8
6 revisions on SAM
- August 31, 2026: publish, solicitation
- July 8, 2026: publish, presolicitation
- August 21, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 24, 2026: publish, solicitation
August 31, 2026
Solicitation
Due August 27, 2026 at 2:00 PM EDT. SAM.gov, notice 485a1beb808b474f9019afc653e58f4b
6 revisions on SAM
- August 31, 2026: publish, solicitation
- July 8, 2026: publish, presolicitation
- August 21, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 24, 2026: publish, solicitation
November 10, 2026
Award notice, originally solicitation
Awarded to Valiant Construction LLC for $3,612,114. SAM.gov, notice 07582f338daf49428b6548c4ea212d35
2 revisions on SAM
- November 10, 2026: publish, award notice
- November 10, 2026: publish, solicitation
November 10, 2026
Solicitation
Due August 27, 2026 at 2:00 PM EDT. SAM.gov, notice 4a9df970c0894b23bffa419934f02519
8 revisions on SAM
- November 10, 2026: publish, award notice
- November 10, 2026: publish, solicitation
- August 31, 2026: publish, solicitation
- July 8, 2026: publish, presolicitation
- August 21, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 29, 2026: publish, solicitation
- July 24, 2026: publish, solicitation
Points of contact
- Alice Custis, Contract Specialistalice.custis@va.gov757.722.9961 ext 18670