{"canonical":"https://sealedbidder.com/opportunities/36c24626b0018","key":"36C24626B0018","url":"https://sealedbidder.com/opportunities/36c24626b0018","title":"4130--Campus Energy Management System Pre-Solicitation Notice","solicitation_number":"36C24626B0018","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-03-25T19:00:00Z","first_posted":"2026-01-20","last_posted":"2026-02-19","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"238220","psc":"4130","set_aside":"SDVOSBC","place_state":"NC","place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":"Product purchase (PSC 4130)","place_county":"37159","place_county_name":"Rowan County","place_city":"3758860","place_city_name":"Salisbury","winner":"ACCORD FEDERAL SERVICES, LLC","award_amount":null,"publications":[{"notice_id":"3039b251e1e94b7ab458445073264e39","title":"4130--Campus Energy Management System","solicitation_number":"36C24626B0018","notice_type":"r","base_type":"r","posted":"2026-01-20","posted_at":"2026-01-21T01:48:36.665Z","due_at":"2026-01-29T20:00:00Z","due_date":"2026-01-29","cancelled":false,"archived":true,"archive_date":"2026-05-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3039b251e1e94b7ab458445073264e39/view","enriched":true,"history":[{"index":6,"title":"4130--Campus Energy Management System","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-21T01:48:36.665Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"3039b251e1e94b7ab458445073264e39","solicitation_number":"36C24626B0018"},{"index":4,"title":"4130--Campus Energy Management System Pre-Solicitation Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-04T11:14:09.427Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a806bbd9941d4758ba945b7ae7409a50","solicitation_number":"36C24626B0018","related_opportunity_id":"3039b251e1e94b7ab458445073264e39"}]},{"notice_id":"a806bbd9941d4758ba945b7ae7409a50","title":"4130--Campus Energy Management System Pre-Solicitation Notice","solicitation_number":"36C24626B0018","notice_type":"p","base_type":"r","posted":"2026-02-04","posted_at":"2026-02-04T11:14:09.427Z","due_at":"2026-02-09T20:00:00Z","due_date":"2026-02-09","cancelled":false,"archived":true,"archive_date":"2026-04-10","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a806bbd9941d4758ba945b7ae7409a50/view","enriched":true,"history":[{"index":11,"title":"4130--Campus Energy Management System Pre-Solicitation Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-19T12:14:40.337Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ba5d038c17749ae92c83b3f9af9552b","solicitation_number":"36C24626B0018","related_opportunity_id":"a806bbd9941d4758ba945b7ae7409a50"},{"index":9,"title":"4130--Campus Energy Management System","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-21T01:48:36.665Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"3039b251e1e94b7ab458445073264e39","solicitation_number":"36C24626B0018"},{"index":7,"title":"4130--Campus Energy Management System Pre-Solicitation Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-04T11:14:09.427Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a806bbd9941d4758ba945b7ae7409a50","solicitation_number":"36C24626B0018","related_opportunity_id":"3039b251e1e94b7ab458445073264e39"},{"index":6,"title":"4130--Campus Energy Management System Solicitation Amendment Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T10:50:45.682Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"edbae0c4b4344301bebc7a6f17ab8d1a","solicitation_number":"36C24626B0018-0001","related_opportunity_id":"a806bbd9941d4758ba945b7ae7409a50"}]},{"notice_id":"6ba5d038c17749ae92c83b3f9af9552b","title":"4130--Campus Energy Management System Pre-Solicitation Notice","solicitation_number":"36C24626B0018","notice_type":"o","base_type":"p","posted":"2026-02-19","posted_at":"2026-02-19T12:14:40.337Z","due_at":"2026-03-25T19:00:00Z","due_date":"2026-03-25","cancelled":false,"archived":true,"archive_date":"2026-05-24","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6ba5d038c17749ae92c83b3f9af9552b/view","enriched":true,"history":[{"index":6,"title":"4130--Campus Energy Management System Pre-Solicitation Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-19T12:14:40.337Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ba5d038c17749ae92c83b3f9af9552b","solicitation_number":"36C24626B0018","related_opportunity_id":"a806bbd9941d4758ba945b7ae7409a50"},{"index":4,"title":"4130--Campus Energy Management System Pre-Solicitation Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-04T11:14:09.427Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a806bbd9941d4758ba945b7ae7409a50","solicitation_number":"36C24626B0018","related_opportunity_id":"3039b251e1e94b7ab458445073264e39"}]}],"latest_notice_id":"6ba5d038c17749ae92c83b3f9af9552b","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-01-20","posted_at":"2026-01-21T01:48:36.665Z","created_at":"2026-01-21T01:48:34.371Z","modified_at":"2026-05-09T04:06:38.805Z","response_deadline":{"raw":"2026-01-29T15:00:00-05:00","utc":"2026-01-29T20:00:00Z","date":"2026-01-29","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3039b251e1e94b7ab458445073264e39/view"},"naics":{"codes":["333415"],"primary":"333415"},"title":"4130--Campus Energy Management System","agency":{"office":{"code":"36C246","name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"organization_id":"100167096","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-05-08","archive_type":"auto_custom"},"history":[{"index":6,"title":"4130--Campus Energy Management System","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-21T01:48:36.665Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"3039b251e1e94b7ab458445073264e39","solicitation_number":"36C24626B0018"},{"index":4,"title":"4130--Campus Energy Management System Pre-Solicitation Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-04T11:14:09.427Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a806bbd9941d4758ba945b7ae7409a50","solicitation_number":"36C24626B0018","related_opportunity_id":"3039b251e1e94b7ab458445073264e39"}],"contacts":[{"name":"Mark Griffin","role":"primary","email":"mark.griffin2@va.gov","phone":"No telephone calls will be accepted","title":"Contract Specialist"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"3039b251e1e94b7ab458445073264e39","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"a806bbd9941d4758ba945b7ae7409a50","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-15T03:18:33.298555998Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"90a8847c1f34f191e93c6605e42273341ac397c5caba601727a0b80dbe818b61","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-15T03:18:33.298555998Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"THIS IS A SOURCES SOUGHT NOTICE ONLY. This notice does NOT constitute a request for proposals, request for quotes, or invitation for bids. No formal solicitation document exists at this time. We are seeking information for market research purposes only. The Government will not pay for any information solicited.\nThe Department of Veterans Affairs, Network Contracting Office 6 (NCO 6) is conducting market research to identify potential sources for Construction services to provide all labor, materials, tools, equipment, transportation, supervision, coordination, and services necessary for Campus Energy Management System (Project #659-22-100) located at the W. G. Hefner VA Medical Center Campus in Salisbury, North Carolina.\nThe proposed NAICS 333415   Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing. Contractors using this NAICS code are applicable to this acquisition with a size standard of 1,250 employees. \nThe proposed PSC code is 4130- Refrigeration and Air Conditioning Components.\nThe anticipated Magnitude of Construction is between $2,000,000 and $5,000,000 The anticipated Period of Performance is 365 days from the Notice to Proceed.\nScope of Work\nThe Scope of work associated with the project includes the following:\nNetwork & User Interface\nAppropriate modifications to the existing network and cabling layout (Ethernet & MSTP) for the purpose of integration, including the installation of new Desigo panels.\nTerminal Unit Controls\n1) Modifications required to replace the Tridium/Niagara controls with BACnet, Siemens Desigo compatible controllers and sensors (where required). Include in the recommendation, devices that can remain (relays, switches, valves, damper motors, sensors, etc.)\nTo include the following:\n(i) New Siemens server to replace the existing Siemens server.\n(ii) Front-End Graphical User Interface modifications, including new floor plans for every level of Buildings 2.\n(iii) Main equipment panel and controller installations.\n(iv) Panel installations.\n(v) Panel modifications and replacement, and controller replacements, required on the main systems.\n(vi) Ethernet-level networking modifications.\n(vii) BACnet MSTP networking modifications.\n(viii) Pneumatic terminal-unit controller replacements.\n(ix) Removal of the compressed air system serving control components and devices.\nto include all hardware, software, installation, wiring, cabling, programming of systems, graphics, and setup of alarms, schedules and trending; as well as networking requirements required to into a new Siemens server in accordance with the VA standards.\nSmall Business Requirements \nFor market research purposes, all responses to this notice will be reviewed, regardless of small business/socioeconomic category, including those firms that are identified as large businesses. Review of responses to this notice will support later determination of acquisition strategy and set aside requirements if a solicitation becomes available. Pursuant to 38 U.S.C. 8127(d), acquisitions will be set-aside for SDVOSBs or VOSBs, registered in the SBA VetCert database, whenever there is a reasonable expectation of receiving two or more offers/quotes from eligible, capable and verified firms, and that an award can be made at a fair and reasonable price that offers best value to the Government. However, if responses from qualified firms prove inadequate, an alternate set-aside or full and open competition may be considered.\nInstructions \nAll interested parties should use the attached Sources Sought Questionnaire to respond to this notice and email completed responses to the Contract Specialist, Mark Griffin, at mark.griffin2@va.gov. No telephone inquiries will be accepted. Your response is requested by Thursday, January 29, 2025, at 3:00 PM EDT.\nIn your response, please include the following: \nÂ· Company name \nÂ· Address \nÂ· Point of contact with email and phone number \nÂ· SAM Unique Entry ID number (see https://www.sam.gov for more information) \nÂ· Company Socio-Economic SIZE (example large, small, SDVOSB, VOSB, WOSB etc.) \nÂ· Proposed NAICS code or PSC (if different from above) \nÂ· Capabilities statement, to include experience with contracts of similar scope and magnitude \nÂ· Brief explanation of how your company will comply with the limitations on subcontracting (if applicable)\nIn addition to this information, please include responses to all of the following in your submission: \nÂ· What additional information would you require in order to provide a quote for this project? \nÂ· Approximately how long would it take to complete the project, including lead times for materials?\nÂ· Is the anticipated period of performance reasonable? If not, what would you recommend?\nÂ· Is our anticipated Magnitude of Construction appropriate for this project? \nÂ· Is there anything that would deter you from responding to this requirement?","text":"THIS IS A SOURCES SOUGHT NOTICE ONLY. This notice does NOT constitute a request for proposals, request for quotes, or invitation for bids. No formal solicitation document exists at this time. We are seeking information for market research purposes only. The Government will not pay for any information solicited.\nThe Department of Veterans Affairs, Network Contracting Office 6 (NCO 6) is conducting market research to identify potential sources for Construction services to provide all labor, materials, tools, equipment, transportation, supervision, coordination, and services necessary for Campus Energy Management System (Project #659-22-100) located at the W. G. Hefner VA Medical Center Campus in Salisbury, North Carolina.\nThe proposed NAICS 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing. Contractors using this NAICS code are applicable to this acquisition with a size standard of 1,250 employees.\nThe proposed PSC code is 4130- Refrigeration and Air Conditioning Components.\nThe anticipated Magnitude of Construction is between $2,000,000 and $5,000,000 The anticipated Period of Performance is 365 days from the Notice to Proceed.\nScope of Work\nThe Scope of work associated with the project includes the following:\nNetwork & User Interface\nAppropriate modifications to the existing network and cabling layout (Ethernet & MSTP) for the purpose of integration, including the installation of new Desigo panels.\nTerminal Unit Controls\n1) Modifications required to replace the Tridium/Niagara controls with BACnet, Siemens Desigo compatible controllers and sensors (where required). Include in the recommendation, devices that can remain (relays, switches, valves, damper motors, sensors, etc.)\nTo include the following:\n(i) New Siemens server to replace the existing Siemens server.\n(ii) Front-End Graphical User Interface modifications, including new floor plans for every level of Buildings 2.\n(iii) Main equipment panel and controller installations.\n(iv) Panel installations.\n(v) Panel modifications and replacement, and controller replacements, required on the main systems.\n(vi) Ethernet-level networking modifications.\n(vii) BACnet MSTP networking modifications.\n(viii) Pneumatic terminal-unit controller replacements.\n(ix) Removal of the compressed air system serving control components and devices.\nto include all hardware, software, installation, wiring, cabling, programming of systems, graphics, and setup of alarms, schedules and trending; as well as networking requirements required to into a new Siemens server in accordance with the VA standards.\nSmall Business Requirements\nFor market research purposes, all responses to this notice will be reviewed, regardless of small business/socioeconomic category, including those firms that are identified as large businesses. Review of responses to this notice will support later determination of acquisition strategy and set aside requirements if a solicitation becomes available. Pursuant to 38 U.S.C. 8127(d), acquisitions will be set-aside for SDVOSBs or VOSBs, registered in the SBA VetCert database, whenever there is a reasonable expectation of receiving two or more offers/quotes from eligible, capable and verified firms, and that an award can be made at a fair and reasonable price that offers best value to the Government. However, if responses from qualified firms prove inadequate, an alternate set-aside or full and open competition may be considered.\nInstructions\nAll interested parties should use the attached Sources Sought Questionnaire to respond to this notice and email completed responses to the Contract Specialist, Mark Griffin, at mark.griffin2@va.gov. No telephone inquiries will be accepted. Your response is requested by Thursday, January 29, 2025, at 3:00 PM EDT.\nIn your response, please include the following:\nÂ· Company name\nÂ· Address\nÂ· Point of contact with email and phone number\nÂ· SAM Unique Entry ID number (see https://www.sam.gov for more information)\nÂ· Company Socio-Economic SIZE (example large, small, SDVOSB, VOSB, WOSB etc.)\nÂ· Proposed NAICS code or PSC (if different from above)\nÂ· Capabilities statement, to include experience with contracts of similar scope and magnitude\nÂ· Brief explanation of how your company will comply with the limitations on subcontracting (if applicable)\nIn addition to this information, please include responses to all of the following in your submission:\nÂ· What additional information would you require in order to provide a quote for this project?\nÂ· Approximately how long would it take to complete the project, including lead times for materials?\nÂ· Is the anticipated period of performance reasonable? If not, what would you recommend?\nÂ· Is our anticipated Magnitude of Construction appropriate for this project?\nÂ· Is there anything that would deter you from responding to this requirement?","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24626B0018","place_of_performance":{"zip":"28144","city":{"code":"58860","name":"Salisbury"},"state":{"code":"NC","name":"North Carolina"},"street":"W. G Hefner VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"1601 Brenner Ave."},"product_service_code":"4130"},{"award":{"awardee":{}},"dates":{"posted":"2026-02-04","posted_at":"2026-02-04T11:14:09.427Z","created_at":"2026-02-04T11:14:07.187Z","modified_at":"2026-04-10T04:04:31.638Z","response_deadline":{"raw":"2026-02-09T15:00:00-05:00","utc":"2026-02-09T20:00:00Z","date":"2026-02-09","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a806bbd9941d4758ba945b7ae7409a50/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"4130--Campus Energy Management System Pre-Solicitation Notice","agency":{"office":{"code":"36C246","name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"organization_id":"100167096","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-10","archive_type":"auto_custom"},"history":[{"index":11,"title":"4130--Campus Energy Management System Pre-Solicitation Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-19T12:14:40.337Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ba5d038c17749ae92c83b3f9af9552b","solicitation_number":"36C24626B0018","related_opportunity_id":"a806bbd9941d4758ba945b7ae7409a50"},{"index":9,"title":"4130--Campus Energy Management System","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-21T01:48:36.665Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"3039b251e1e94b7ab458445073264e39","solicitation_number":"36C24626B0018"},{"index":7,"title":"4130--Campus Energy Management System Pre-Solicitation Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-04T11:14:09.427Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a806bbd9941d4758ba945b7ae7409a50","solicitation_number":"36C24626B0018","related_opportunity_id":"3039b251e1e94b7ab458445073264e39"},{"index":6,"title":"4130--Campus Energy Management System Solicitation Amendment Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-17T10:50:45.682Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"edbae0c4b4344301bebc7a6f17ab8d1a","solicitation_number":"36C24626B0018-0001","related_opportunity_id":"a806bbd9941d4758ba945b7ae7409a50"}],"contacts":[{"name":"Mark Griffin","role":"primary","email":"mark.griffin2@va.gov","phone":"No telephone call will be accepted","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"a806bbd9941d4758ba945b7ae7409a50","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"edbae0c4b4344301bebc7a6f17ab8d1a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T03:33:38.046205051Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"3270d6a73e1d587c044c66fff9978ba8f575f036764bc2b83e518a6d99988a5a","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-14T03:33:38.046205051Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"The Department of Veterans Affairs, 1601 Brenner Ave. Salisbury NC 28144 has a requirement for a contractor to provide all labor, material, supplies, equipment, transportation, permits, license and qualified supervision for Project 659-22-100, to update and consolidate the energy management system providers serving building 2. \nGeneral Scope: The project involves the upgrade and consolidation of the Energy Management Systems (DDC) providers serving Buildings 2 on the Salisbury VAMC Campus. The new system will follow Native BACnet protocol and be able to replace existing JCI and Schneider components with a single front-end user interface compatible with Siemens. This project is to convert systems from both pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central system, where applicable, for Buildings 2.\n\nSCOPE OF WORK:\n\nThe Scope of work associated with the project includes the following:\n\nNetwork & User Interface\n\nAppropriate modifications to the existing network and cabling layout (Ethernet & MSTP) for the purpose of integration, including the installation of new Desigo panels.\n\nTerminal Unit Controls\n\n1) Modifications required to replace the Tridium/Niagara controls with BACnet, Siemens Desigo compatible controllers and sensors (where required). Include in the recommendation, devices that can remain (relays, switches, valves, damper motors, sensors, etc.)\n\nTo include the following:\n(i) New Siemens server to replace the existing Siemens server.\n(ii) Front-End Graphical User Interface modifications, including new floor plans for every level of Buildings 2.\n(iii) Main equipment panel and controller installations.\n(iv) Panel installations.\n(v) Panel modifications and replacement, and controller replacements, required on the main systems.\n(vi) Ethernet-level networking modifications.\n(vii) BACnet MSTP networking modifications.\n(viii) Pneumatic terminal-unit controller replacements.\n(ix) Removal of the compressed air system serving control components and devices.\n\nto include all hardware, software, installation, wiring, cabling, programming of systems, graphics, and setup of alarms, schedules and trending; as well as networking requirements required to into a new Siemens server in accordance with the VA standards.\n\nApplicable Codes and Standards:\n\n  DVA HVAC Design Manual, March 2024\n  ASHRAE Standard 13   Specifying Building Automation Systems\n  ASHRAE Standard 135   BACnet Communication Protocol\n  IEEE 802.3   Standard for Ethernet\n  NFPA 70   National Electrical Code\n\nEstimated construction magnitude is between $2,000,000 and $5,000,000.\nNAICS Code 238220  Size Standard Table: $19 Million\nThis solicitation is anticipated to be a Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. In accordance with Public Law 109-461 and VAAR 819.7003 (b), offerors must be registered and certified in the SBA Certification database as a SDVOSB. Only offers from certified SDVOSBs in the SBA database at the time of offer shall be deemed eligible for award.\nNetwork Contracting Office 6 (NCO 6) intends to issue a Request for Quotation (RFQ) and award a single, firm fixed-price contract. Solicitation material will be available on/about February 11, 2026. Any specifications, drawings and amendments will be posted on the System for Award Management (SAM) Contract Opportunities website (https://sam.gov/opportunities). The Contract Opportunities website is the only official location to obtain solicitation information and documents. Offers will be due approximately 30 days after issuance of the solicitation. Only one (1) site visit will be scheduled. Location and point(s) of contact for the site visit will be identified in the solicitation. \nThis notice is for informational purposes only and is not a request for quotation. The Government is not obligated to issue a solicitation as a result of this notice. No other information is available until issuance of the solicitation. No offerors list is maintained. All interested vendors should register on SAM.gov. Interested offerors are advised they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of offers and should revisit the website periodically for any amendments/notices to the solicitation. Prospective contractors must be registered in the SAM database in order to obtain access in Contract Opportunities. SAM and SBA Certification Database registration must be current and active to be eligible for contract award. Contractors please note: Online Representations and Certifications Applications (ORCA) apply to this solicitation. With ORCA; you now have the availability to enter and maintain your reps and certs with your proposal. \nAny questions regarding this announcement and all future announcements regarding this project must be emailed to the Contracting Officer, Mark Griffin, at mark.griffin2@va.gov. \nNO TELEPHONE REQUESTS FOR SOLICIATION MATERIAL WILL BE ACCEPTED.","text":"The Department of Veterans Affairs, 1601 Brenner Ave. Salisbury NC 28144 has a requirement for a contractor to provide all labor, material, supplies, equipment, transportation, permits, license and qualified supervision for Project 659-22-100, to update and consolidate the energy management system providers serving building 2.\nGeneral Scope: The project involves the upgrade and consolidation of the Energy Management Systems (DDC) providers serving Buildings 2 on the Salisbury VAMC Campus. The new system will follow Native BACnet protocol and be able to replace existing JCI and Schneider components with a single front-end user interface compatible with Siemens. This project is to convert systems from both pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central system, where applicable, for Buildings 2.\n\nSCOPE OF WORK:\n\nThe Scope of work associated with the project includes the following:\n\nNetwork & User Interface\n\nAppropriate modifications to the existing network and cabling layout (Ethernet & MSTP) for the purpose of integration, including the installation of new Desigo panels.\n\nTerminal Unit Controls\n\n1) Modifications required to replace the Tridium/Niagara controls with BACnet, Siemens Desigo compatible controllers and sensors (where required). Include in the recommendation, devices that can remain (relays, switches, valves, damper motors, sensors, etc.)\n\nTo include the following:\n(i) New Siemens server to replace the existing Siemens server.\n(ii) Front-End Graphical User Interface modifications, including new floor plans for every level of Buildings 2.\n(iii) Main equipment panel and controller installations.\n(iv) Panel installations.\n(v) Panel modifications and replacement, and controller replacements, required on the main systems.\n(vi) Ethernet-level networking modifications.\n(vii) BACnet MSTP networking modifications.\n(viii) Pneumatic terminal-unit controller replacements.\n(ix) Removal of the compressed air system serving control components and devices.\n\nto include all hardware, software, installation, wiring, cabling, programming of systems, graphics, and setup of alarms, schedules and trending; as well as networking requirements required to into a new Siemens server in accordance with the VA standards.\n\nApplicable Codes and Standards:\n\nDVA HVAC Design Manual, March 2024\nASHRAE Standard 13 Specifying Building Automation Systems\nASHRAE Standard 135 BACnet Communication Protocol\nIEEE 802.3 Standard for Ethernet\nNFPA 70 National Electrical Code\n\nEstimated construction magnitude is between $2,000,000 and $5,000,000.\nNAICS Code 238220 Size Standard Table: $19 Million\nThis solicitation is anticipated to be a Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. In accordance with Public Law 109-461 and VAAR 819.7003 (b), offerors must be registered and certified in the SBA Certification database as a SDVOSB. Only offers from certified SDVOSBs in the SBA database at the time of offer shall be deemed eligible for award.\nNetwork Contracting Office 6 (NCO 6) intends to issue a Request for Quotation (RFQ) and award a single, firm fixed-price contract. Solicitation material will be available on/about February 11, 2026. Any specifications, drawings and amendments will be posted on the System for Award Management (SAM) Contract Opportunities website (https://sam.gov/opportunities). The Contract Opportunities website is the only official location to obtain solicitation information and documents. Offers will be due approximately 30 days after issuance of the solicitation. Only one (1) site visit will be scheduled. Location and point(s) of contact for the site visit will be identified in the solicitation.\nThis notice is for informational purposes only and is not a request for quotation. The Government is not obligated to issue a solicitation as a result of this notice. No other information is available until issuance of the solicitation. No offerors list is maintained. All interested vendors should register on SAM.gov. Interested offerors are advised they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of offers and should revisit the website periodically for any amendments/notices to the solicitation. Prospective contractors must be registered in the SAM database in order to obtain access in Contract Opportunities. SAM and SBA Certification Database registration must be current and active to be eligible for contract award. Contractors please note: Online Representations and Certifications Applications (ORCA) apply to this solicitation. With ORCA; you now have the availability to enter and maintain your reps and certs with your proposal.\nAny questions regarding this announcement and all future announcements regarding this project must be emailed to the Contracting Officer, Mark Griffin, at mark.griffin2@va.gov.\nNO TELEPHONE REQUESTS FOR SOLICIATION MATERIAL WILL BE ACCEPTED.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C24626B0018","place_of_performance":{"zip":"28144","city":{"code":"58860","name":"Salisbury"},"state":{"code":"NC","name":"North Carolina"},"street":"W.G. Hefner VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"1601 Brenner Ave."},"product_service_code":"4130"},{"award":{"awardee":{}},"dates":{"posted":"2026-02-19","posted_at":"2026-02-19T12:14:40.337Z","created_at":"2026-02-19T12:13:44.491Z","modified_at":"2026-05-25T03:55:44.975Z","response_deadline":{"raw":"2026-03-25T15:00:00-04:00","utc":"2026-03-25T19:00:00Z","date":"2026-03-25","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6ba5d038c17749ae92c83b3f9af9552b/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"4130--Campus Energy Management System Pre-Solicitation Notice","agency":{"office":{"code":"36C246","name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"organization_id":"100167096","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-05-24","archive_type":"auto_custom"},"history":[{"index":6,"title":"4130--Campus Energy Management System Pre-Solicitation Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-19T12:14:40.337Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6ba5d038c17749ae92c83b3f9af9552b","solicitation_number":"36C24626B0018","related_opportunity_id":"a806bbd9941d4758ba945b7ae7409a50"},{"index":4,"title":"4130--Campus Energy Management System Pre-Solicitation Notice","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-04T11:14:09.427Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a806bbd9941d4758ba945b7ae7409a50","solicitation_number":"36C24626B0018","related_opportunity_id":"3039b251e1e94b7ab458445073264e39"}],"contacts":[{"name":"Mark C Griffin","role":"primary","email":"Mark.Griffin2@va.gov","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"6ba5d038c17749ae92c83b3f9af9552b","lineage_id":"a806bbd9941d4758ba945b7ae7409a50","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-12T11:19:13.386170992Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"3d3eb22a9921b85cab77964e2ad1921272cdb8148616c8bb3638e66f218ba18d","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-12T11:19:13.386170992Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"W.G. (Bill) Hefner\nDepartment of Veterans Affairs Medical Center\n1601 Brenner Avenue\n     Salisbury, North Carolina 28144\n\n Subject: Statement of Work: Install Campus Energy Management System\nLocation: Campus \nProject #: 659-22-100\nDate: 12 December 2025\nSTATEMENT OF WORK\nMechanical\nGeneral:  \nThe project involves the upgrade and consolidation of the Energy Management Systems (DDC) providers serving Buildings 2 on the Salisbury VAMC Campus. The new system will follow Native BACnet protocol and be able to replace existing JCI and Schneider components with a single front-end user interface compatible with Siemens. This project is to convert systems from both pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central system, where applicable, for Buildings 2. This project should be completed in 365 days and include a 1 year warranty on all items. \n\nSCOPE OF WORK:\n\nThe Scope of work associated with the project includes the following:\n\nNetwork & User Interface\n\nAppropriate modifications to the existing network and cabling layout (Ethernet & MSTP) for the purpose of integration, including the installation of new Desigo panels.\n\nTerminal Unit Controls\n\n1) Modifications required to replace the Tridium/Niagara controls with BACnet, Siemens Desigo compatible controllers and sensors (where required). Include in the recommendation, devices that can remain (relays, switches, valves, damper motors, sensors, etc.)\n\nTo include the following:\n(i) New Siemens server to replace the existing Siemens server.\n(ii) Front-End Graphical User Interface modifications, including new floor plans for every level of Buildings 2.\n(iii) Main equipment panel and controller installations.\n(iv) Panel installations.\n(v) Panel modifications and replacement, and controller replacements, required on the main systems.\n(vi) Ethernet-level networking modifications.\n(vii) BACnet MSTP networking modifications.\n(viii) Pneumatic terminal-unit controller replacements.\n(ix) Removal of the compressed air system serving control components and devices.\n\nto include all hardware, software, installation, wiring, cabling, programming of systems, graphics, and setup of alarms, schedules and trending; as well as networking requirements required to into a new Siemens server in accordance with the VA standards.\n\nApplicable Codes and Standards:\n\n  DVA HVAC Design Manual, March 2024\n  ASHRAE Standard 13   Specifying Building Automation Systems\n  ASHRAE Standard 135   BACnet Communication Protocol\n  IEEE 802.3   Standard for Ethernet\n  NFPA 70   National Electrical Code\n\nEXISTING CONDITIONS\n\nNetwork Level\n\n1) The existing Building Automation System (BAS) consists of three (3) separate\nvender systems: Siemens Desigo, JCI Metasys, and Schneider SmartStruxure. All three (3) headend systems and HMIs are in Building 31 chiller plant offices.\n\n2) The internet modem for the Siemens system-to-remain is in Building 5,\nRoom G048A.\n\nBuilding 2\n\n1) The Siemens Desigo system is currently communicating with most of the areas in\nBuilding 2. This control system will remain. The known areas under control by\nSiemens:\n\n(i) Air handling unit 2-AHU-2\n(ii) Air handling unit 2-AHU-3 (ongoing work)\n(iii) Air handling unit 2-AHU-4\n(iv) Air handling unit 2-AHU-4B\n(v) Air handling unit 2-AHU-11\n(vi) Chilled water pumps\n(vii) O.R. chillers\n(viii) 1st Floor isolation rooms\n(ix) 3rd Floor isolation rooms\n(x) 3rd Floor isolation EFs\n(xi) 3rd Floor hot water system\n(xii) 3rd Floor temperature zones\n(xiii) 4th Floor isolation rooms\n(xiv) 4th Floor isolation EFs\n(xv) 4th Floor temperature zones\n(xvi) 5th Floor isolation rooms\n(xvii) 5th Floor isolation EFs\n(xviii) 5th Floor temperature zones\n\n2) The JCI Metasys system is active but has had some equipment migrated over to\nthe Siemens system. The remaining known equipment/areas under JCI control:\n\n(i) Air handling unit 2-AHU-1 (AHU-5 in the field)\n(ii) Air handling unit 2-AHU-7\n(iii) Air handling unit 2-AHU-15\n(iv) Air handling unit 2-AHU-16 (presently being migrated to Siemens)\n(v) Ground Floor exhaust fans\n(vi) Ground Floor hot water system\n(vii) Ground Floor temperature zones\n(viii) Ground Floor differential space pressure monitors\n(ix) 4th Floor isolation rooms\n\nThe Schneider SmartStruxure system contains the majority of the systems that are to be integrated into the Siemens Desigo system. The known equipment/areas under Schneider control:\n\n(i) Air handling unit 2-AHU-X\n(ii) Air handling unit 2-AHU-6\n(iii) Air handling unit 2-AHU-9\n(iv) Air handling unit 2-AHU-10\n(v) Air handling unit 2-AHU-12\n(vi) Air handling unit 2-AHU-14\n(vii) Air handling unit 2-RTU-1\n(viii) Air handling unit 2-RTU-Cardiology\n(ix) Air handling unit 2-RTU-Lab\n(x) 3rd Floor hot water system\n(xi) 3rd Floor temperature zones\n(xii) Penthouse hot water systems (Qty 3)\n(xiii) Steam zone valves (Qty 6)\n\nSurvey items remaining for Building 2 scope of work:\n\n(i) Field locations of JCI and Schneider network components for the purpose\nof developing demolition drawings\n(ii) Trace out any remaining pneumatic components associated with building\nautomation\n(iii) Fan coil controls\n(iv) Temperature zones of the Ground, 1st, and 2nd Floors\n\nDESIGN APPROACH\n\nNetwork Level\n\n1) A new server will be provided to replace the existing Siemens server. The server\nis in Building 31 chiller plant offices. Network Cabling from Building 5\nwill be re-used to connect to the new server.\n\n2) The building 5 network switch that connects to the Siemens server and to the\nbuilding #2 fiber network switch will remain in its existing configuration.\n\nBuilding 2\n\n1) The existing fiber network switch, located in the Ground Floor Mechanical\nEquipment Room G009 will be expanded with a CAT6 to a new network switch,\nlocated in the same room.\n\nThe new switch shall serve Ground Floor equipment, differential space pressure\nmonitors, and temperature zone controls currently being served by the JCI system.\nIt is anticipated that the existing JCI cabinet enclosures serving air handling units\n2-AHU-5 and 2-AHU-15 can be re-used.\n\nExisting air handling unit 2-AHU-5 will require pneumatic device change-out for the modulating outside air, return air, and relief air control dampers, 2-way cooling\ncoil control valve, and supply and return airflow measuring devices.\n\nThe Schneider-controlled steam zone valves, associated sensors, and controller\nwill be replaced and integrated into the Siemens system. The cabinet enclosure\nwill need to be replaced. This work is expected to occur during the summer\nmonths.\n\nThe points connected to the additional Schneider I/O modules (4 total) in\nMechanical Equipment Room G009 that are located in two (2) of the older cabinet\nenclosures, have yet to be identified.\n\n2) The existing network switch located on the 3rd Floor, Room 3177 will either be\nexpanded or replaced as needed to integrate the Schneider-controlled equipment\non this floor. Currently, this switch has one (1) available port.\n\nNew CAT6 cabling will be installed in the ceiling space of the occupied 3rd Floor\nin order to connect the new Siemens controllers serving existing air handling units\n2-AHU-X and 2-AHU-6, temperature zones, and hot water heat exchanger and\npump set.\n\n3) The existing network switch located on the 4th Floor, Room 4167 will remain asis.\nCurrently, this switch is being used to replace rooftop equipment controls to\nexisting air handling units 2-AHU-2 and 2-AHU-3, along with the dilution exhaust\nfans and miscellaneous points.\n\n4) The existing network switch located on the 5th Floor, Room 5003 currently serves\nthe rooftop chillers, air handling units, and occupied areas of the 4th and 5th Floors.\nThe 5th Floor switch is intended to connect to the new Penthouse switch and to\nintegrate the remaining JCI and Schneider-controlled equipment that are on the 5th\nFloor level (4th Floor roof included).\n\nNew CAT6 cabling will be installed in the ceiling space of the occupied 5th Floor\nin order to connect the new Siemens controllers serving existing air handling unit\n2-AHU-4-OR, temperature zones, and hot water heat exchanger and pump set.\n\n5) A new 24-port network switch will be installed in the Penthouse and will carry the\nbulk of the equipment being integrated into the Siemens system. Each CAT6 cable\nto the switch will be dedicated to each equipment controller. The new 24-port\nswitch will have a network drop down to the existing 5th Floor network switch.\n\n(i) Existing air handling unit 2-AHU-7 is currently under DDC control. The\nnew Siemens controller shall replace the existing JCI controller in the\nsame cabinet enclosure.\n(ii) Existing air handling unit 2-AHU-8 will require pneumatic device changeout\nfor the 2-position outside air control damper, face-and-bypass steam\npreheat coil, and 3-way modulating cooling coil control valve. A new\ncontrol cabinet enclosure will be installed for this unit. This will require\nextending device signal wiring.\n(iii) Existing air handling units 2-AHU-9 and 2-AHU-10 will require\npneumatic device change-out for the 2-position outside air control damper,\nface-and-bypass steam preheat coil, 3-way modulating cooling coil control\nvalve, and humidifier control valve. Devices associated with the\nhumidifier will be new. They include a new discharge humidistat,\ndischarge high-limit switch, and space humidistat. The existing cabinet\nenclosure can be re-used for these units.\n(iv) Existing air handling units 2-AHU-12 and 2-AHU-14 are currently under\nDDC control. The new Siemens controllers shall replace the existing\nSchneider/ Andover controllers. The existing 2-AHU-14 cabinet\nenclosure can be re-used, but 2-AHU-12 will need to be separated from\nthe shared cabinet enclosure with 2-AHU-9. This will require extending\ndevice signal wiring for 2-AHU-12.\n(v) Existing air handling unit 2-AHU-13 will require pneumatic device\nchange-out for the 2-position outside air control damper, steam preheat\ncoil, and 2-way modulating cooling coil control valve. A new control\ncabinet enclosure will be installed for this unit. This will require extending\ndevice signal wiring.\n(vi) Existing air handling unit 2-RTU-1 will require pneumatic device changeout\nfor the 2-position outside air control damper, modulating steam preheat coil control valve, 2-way modulating cooling coil control valve, modulating steam reheat coil control valve, and humidifier control valve. Devices associated with the humidifier will be new. They include a new discharge humidistat, discharge high-limit switch, and return air ductmounted humidistat. A new control cabinet enclosure will be installed for this unit. This will require extending device signal wiring.\n(vii) Existing heating hot water systems, exhaust fans, and other miscellaneous\npoints in the Penthouse are expected to be housed in three (3) new cabinet\nenclosures. This will require extending device signal wiring.\n\nProgramming for the sequences of operation and graphics mapping will be required for all equipment associated with work in Building 2. New programming will utilize existing, new, and change-over devices and therefore, will only meet ASHRAE 36 guidelines for high-performance sequences of operation where such devices already exist. For example, using AHU static pressure reset by poling VAV box damper positions.\n\n Testing, Adjusting, and Balancing Contractor will be required to calibrate new airflow measuring devices and to calibrate the feedback from existing VAV boxes.\n\nElectrical\n\nGENERAL\n\nThe project involves the upgrade and consolidation of the Energy Management Systems (DDC)\nproviders serving Buildings 2 on the Salisbury VAMC Campus. The new system will\nfollow Native BACnet protocol and be able to replace existing JCI and Schneider components with\na single front-end user interface compatible with Siemens. This project is to convert systems from\nboth pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central\nsystem, where applicable, for Buildings 2.\n\nSCOPE OF WORK\nThe following systems will be modified to suit the electrical demands of the project:\n\nNormal Electrical Distribution at 208/120-volts\nEmergency Electrical Distribution at 208/120-volts\nLighting systems and controls\n\nB. The electrical design shall be in accordance with, but not limited to the following VA design\nstandards:\n\n  VA Electrical Design Manual for New Hospitals, Replacement Hospitals,\nAmbulatory Care, Clinical Additions, Energy Centers, Outpatient Clinics, Animal Research Facilities, and Laboratory Buildings.\n  NFPA 70 National Electrical Code\n  National Fire Protection Association (NFPA) Standard 101 Life Safety Code\n\nEXISTING CONDITIONS\n\nPower\n\n1) Emergency life safety and critical power branch panels are located on every floor\nof the building. The majority of the panels have spare circuit breakers or spaces to add a new circuit breaker as required.\n\nDESIGN APPROACH\n\nPower and Lighting\n\n1) The intent of the design shall be to install new BAS panels adjacent to the existing\noutdated panels. Generally it was impossible to trace the power source of the\nexisting BAS panel, therefore new 120-volt emergency branch circuit shall be routed to the new BAS network controller panel power supplies. This is required by VA standards.\n2) Additionally, new network switches shall be installed in various locations throughout the three buildings. Local emergency 120-volt emergency branch circuits shall be provided for network switches as shown on drawings.\n3) Where necessary, existing lighting and other ceiling mounted electrical devices shall be taken down and reinstalled in the same location during the course of the construction.\n4) The circuits for all mechanical equipment, which have been scheduled for demolition, shall be removed back to the source.\n\nEquipment Grounding and Wiring Devices\n\n1) In general, 20-amp duplex receptacles will be located where required. All receptacles shall be hospital-grade, plug-tail type receptacles complying with NEC Art. 517.13(B).\n2) All non-current carrying metallic parts of the electrical distribution system will be\nbonded to the grounding electrode system or building steel.\n3) An insulated grounding conductor will be run with all power feeder and branch circuits to supplement the conduit ground.\n4) All wiring shall be solid for wire #10 and smaller and stranded for wires larger than #10.\n5) Nonflexible metallic conduit will be provided for all emergency circuits due to the\nneed to provide redundant grounding and protection of the branch circuit.\nMetal-Clad cabling, Type MC, will be permitted for branch circuit wiring where concealed within partitions and above ceilings for lighting fixtures. In addition, liquid-tight flexible metal conduit will be used at motor and other vibration transmissive locations.\n\nContractor Trades:\nMechanical Contractor\nCoordinate with the controls contractor to ensure seamless HVAC equipment interface and integration.\nModify or relocate existing mechanical systems as needed to accommodate new control infrastructure.\nProvide support during system commissioning, functional performance testing, and final acceptance.\nEnsure all mechanical work complies with VA HVAC standards and ASHRAE guidelines.\nQualifications:\nLicensed mechanical contractor with experience in healthcare environments.\nFamiliarity with Siemens Desigo systems and BACnet protocol preferred.\nControls Contractor (Siemens Certified)\nInstall and program Siemens Desigo BACnet control systems, including hardware and software components.\nReplace existing pneumatic and outdated DDC controls with modern digital systems.\nIntegrate HVAC equipment into the new Energy Management System (EMS).\nConduct full commissioning, calibration, and validation of control systems.\nProvide end-user training and documentation for system operation and maintenance.\nQualifications:\nSiemens-certified technician or firm with demonstrated experience in federal or VA projects.\nMust comply with VA cybersecurity and interoperability standards.\nElectrical Contractor\nProvide dedicated power supply to Siemens control cabinets and associated network switches.\nRemove and dispose of obsolete electrical components (e.g., Johnson Controls, Schneider Electric).\nInstall new branch circuits, electrical panels, and conduit routing per NEC and VA specifications.\nCoordinate electrical shutdowns and temporary power solutions to maintain facility operations.\nPerform firestopping and patching of all penetrations created during electrical work.\nQualifications:\nLicensed electrician with experience in hospital or healthcare facility electrical systems.\nMust be familiar with VA electrical safety protocols and infection control procedures.\nLow Voltage / Communications Contractor\nInstall CAT6 or higher-rated network cabling for control panels, switches, and EMS components.\nTerminate and test all cable runs to ensure compliance with VA telecom standards.\nCoordinate with VA IT department for switch integration and IP address assignments.\nLabel and document all cabling and connections for future maintenance.\nQualifications:\nBICSI-certified technician or equivalent.\nExperience with VA telecom infrastructure and patch panel standards.\nGeneral Contractor\nProvide overall coordination and scheduling of all subcontracted trades.\nManage ceiling removal and replacement as indicated in demolition and construction plans.\nPerform wall patching, painting, and restoration following electrical and control installations.\nDevelop phasing plans to minimize disruption to patient care and facility operations.\nEnsure infection control measures are in place during construction activities.\nQualifications:\nLicensed general contractor with experience in VA or federal healthcare construction.\nMust comply with VA Interim Life Safety Measures (ILSM) and infection control protocols.\nFirestopping Contractor\nSeal all penetrations through rated walls and floors created during conduit and cable installations.\nUse UL-listed firestopping materials and methods.\nEnsure compliance with NFPA 101, VA standards, and local fire codes.\nQualifications:\nCertified firestopping technician.\nExperience in healthcare facility fire barrier restoration.\nCommissioning Agent (CxA)\nVerify that all installed systems meet the design intent and operational requirements.\nConduct functional performance testing and provide commissioning reports.\nCoordinate with VA stakeholders for final acceptance and turnover.\nQualifications:\nIndependent third-party CxA with experience in VA commissioning protocols.\nMust be familiar with ASHRAE Guideline 0 and VA Cx standards.","text":"W.G. (Bill) Hefner\nDepartment of Veterans Affairs Medical Center\n1601 Brenner Avenue\nSalisbury, North Carolina 28144\n\nSubject: Statement of Work: Install Campus Energy Management System\nLocation: Campus\nProject #: 659-22-100\nDate: 12 December 2025\nSTATEMENT OF WORK\nMechanical\nGeneral:\nThe project involves the upgrade and consolidation of the Energy Management Systems (DDC) providers serving Buildings 2 on the Salisbury VAMC Campus. The new system will follow Native BACnet protocol and be able to replace existing JCI and Schneider components with a single front-end user interface compatible with Siemens. This project is to convert systems from both pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central system, where applicable, for Buildings 2. This project should be completed in 365 days and include a 1 year warranty on all items.\n\nSCOPE OF WORK:\n\nThe Scope of work associated with the project includes the following:\n\nNetwork & User Interface\n\nAppropriate modifications to the existing network and cabling layout (Ethernet & MSTP) for the purpose of integration, including the installation of new Desigo panels.\n\nTerminal Unit Controls\n\n1) Modifications required to replace the Tridium/Niagara controls with BACnet, Siemens Desigo compatible controllers and sensors (where required). Include in the recommendation, devices that can remain (relays, switches, valves, damper motors, sensors, etc.)\n\nTo include the following:\n(i) New Siemens server to replace the existing Siemens server.\n(ii) Front-End Graphical User Interface modifications, including new floor plans for every level of Buildings 2.\n(iii) Main equipment panel and controller installations.\n(iv) Panel installations.\n(v) Panel modifications and replacement, and controller replacements, required on the main systems.\n(vi) Ethernet-level networking modifications.\n(vii) BACnet MSTP networking modifications.\n(viii) Pneumatic terminal-unit controller replacements.\n(ix) Removal of the compressed air system serving control components and devices.\n\nto include all hardware, software, installation, wiring, cabling, programming of systems, graphics, and setup of alarms, schedules and trending; as well as networking requirements required to into a new Siemens server in accordance with the VA standards.\n\nApplicable Codes and Standards:\n\nDVA HVAC Design Manual, March 2024\nASHRAE Standard 13 Specifying Building Automation Systems\nASHRAE Standard 135 BACnet Communication Protocol\nIEEE 802.3 Standard for Ethernet\nNFPA 70 National Electrical Code\n\nEXISTING CONDITIONS\n\nNetwork Level\n\n1) The existing Building Automation System (BAS) consists of three (3) separate\nvender systems: Siemens Desigo, JCI Metasys, and Schneider SmartStruxure. All three (3) headend systems and HMIs are in Building 31 chiller plant offices.\n\n2) The internet modem for the Siemens system-to-remain is in Building 5,\nRoom G048A.\n\nBuilding 2\n\n1) The Siemens Desigo system is currently communicating with most of the areas in\nBuilding 2. This control system will remain. The known areas under control by\nSiemens:\n\n(i) Air handling unit 2-AHU-2\n(ii) Air handling unit 2-AHU-3 (ongoing work)\n(iii) Air handling unit 2-AHU-4\n(iv) Air handling unit 2-AHU-4B\n(v) Air handling unit 2-AHU-11\n(vi) Chilled water pumps\n(vii) O.R. chillers\n(viii) 1st Floor isolation rooms\n(ix) 3rd Floor isolation rooms\n(x) 3rd Floor isolation EFs\n(xi) 3rd Floor hot water system\n(xii) 3rd Floor temperature zones\n(xiii) 4th Floor isolation rooms\n(xiv) 4th Floor isolation EFs\n(xv) 4th Floor temperature zones\n(xvi) 5th Floor isolation rooms\n(xvii) 5th Floor isolation EFs\n(xviii) 5th Floor temperature zones\n\n2) The JCI Metasys system is active but has had some equipment migrated over to\nthe Siemens system. The remaining known equipment/areas under JCI control:\n\n(i) Air handling unit 2-AHU-1 (AHU-5 in the field)\n(ii) Air handling unit 2-AHU-7\n(iii) Air handling unit 2-AHU-15\n(iv) Air handling unit 2-AHU-16 (presently being migrated to Siemens)\n(v) Ground Floor exhaust fans\n(vi) Ground Floor hot water system\n(vii) Ground Floor temperature zones\n(viii) Ground Floor differential space pressure monitors\n(ix) 4th Floor isolation rooms\n\nThe Schneider SmartStruxure system contains the majority of the systems that are to be integrated into the Siemens Desigo system. The known equipment/areas under Schneider control:\n\n(i) Air handling unit 2-AHU-X\n(ii) Air handling unit 2-AHU-6\n(iii) Air handling unit 2-AHU-9\n(iv) Air handling unit 2-AHU-10\n(v) Air handling unit 2-AHU-12\n(vi) Air handling unit 2-AHU-14\n(vii) Air handling unit 2-RTU-1\n(viii) Air handling unit 2-RTU-Cardiology\n(ix) Air handling unit 2-RTU-Lab\n(x) 3rd Floor hot water system\n(xi) 3rd Floor temperature zones\n(xii) Penthouse hot water systems (Qty 3)\n(xiii) Steam zone valves (Qty 6)\n\nSurvey items remaining for Building 2 scope of work:\n\n(i) Field locations of JCI and Schneider network components for the purpose\nof developing demolition drawings\n(ii) Trace out any remaining pneumatic components associated with building\nautomation\n(iii) Fan coil controls\n(iv) Temperature zones of the Ground, 1st, and 2nd Floors\n\nDESIGN APPROACH\n\nNetwork Level\n\n1) A new server will be provided to replace the existing Siemens server. The server\nis in Building 31 chiller plant offices. Network Cabling from Building 5\nwill be re-used to connect to the new server.\n\n2) The building 5 network switch that connects to the Siemens server and to the\nbuilding #2 fiber network switch will remain in its existing configuration.\n\nBuilding 2\n\n1) The existing fiber network switch, located in the Ground Floor Mechanical\nEquipment Room G009 will be expanded with a CAT6 to a new network switch,\nlocated in the same room.\n\nThe new switch shall serve Ground Floor equipment, differential space pressure\nmonitors, and temperature zone controls currently being served by the JCI system.\nIt is anticipated that the existing JCI cabinet enclosures serving air handling units\n2-AHU-5 and 2-AHU-15 can be re-used.\n\nExisting air handling unit 2-AHU-5 will require pneumatic device change-out for the modulating outside air, return air, and relief air control dampers, 2-way cooling\ncoil control valve, and supply and return airflow measuring devices.\n\nThe Schneider-controlled steam zone valves, associated sensors, and controller\nwill be replaced and integrated into the Siemens system. The cabinet enclosure\nwill need to be replaced. This work is expected to occur during the summer\nmonths.\n\nThe points connected to the additional Schneider I/O modules (4 total) in\nMechanical Equipment Room G009 that are located in two (2) of the older cabinet\nenclosures, have yet to be identified.\n\n2) The existing network switch located on the 3rd Floor, Room 3177 will either be\nexpanded or replaced as needed to integrate the Schneider-controlled equipment\non this floor. Currently, this switch has one (1) available port.\n\nNew CAT6 cabling will be installed in the ceiling space of the occupied 3rd Floor\nin order to connect the new Siemens controllers serving existing air handling units\n2-AHU-X and 2-AHU-6, temperature zones, and hot water heat exchanger and\npump set.\n\n3) The existing network switch located on the 4th Floor, Room 4167 will remain asis.\nCurrently, this switch is being used to replace rooftop equipment controls to\nexisting air handling units 2-AHU-2 and 2-AHU-3, along with the dilution exhaust\nfans and miscellaneous points.\n\n4) The existing network switch located on the 5th Floor, Room 5003 currently serves\nthe rooftop chillers, air handling units, and occupied areas of the 4th and 5th Floors.\nThe 5th Floor switch is intended to connect to the new Penthouse switch and to\nintegrate the remaining JCI and Schneider-controlled equipment that are on the 5th\nFloor level (4th Floor roof included).\n\nNew CAT6 cabling will be installed in the ceiling space of the occupied 5th Floor\nin order to connect the new Siemens controllers serving existing air handling unit\n2-AHU-4-OR, temperature zones, and hot water heat exchanger and pump set.\n\n5) A new 24-port network switch will be installed in the Penthouse and will carry the\nbulk of the equipment being integrated into the Siemens system. Each CAT6 cable\nto the switch will be dedicated to each equipment controller. The new 24-port\nswitch will have a network drop down to the existing 5th Floor network switch.\n\n(i) Existing air handling unit 2-AHU-7 is currently under DDC control. The\nnew Siemens controller shall replace the existing JCI controller in the\nsame cabinet enclosure.\n(ii) Existing air handling unit 2-AHU-8 will require pneumatic device changeout\nfor the 2-position outside air control damper, face-and-bypass steam\npreheat coil, and 3-way modulating cooling coil control valve. A new\ncontrol cabinet enclosure will be installed for this unit. This will require\nextending device signal wiring.\n(iii) Existing air handling units 2-AHU-9 and 2-AHU-10 will require\npneumatic device change-out for the 2-position outside air control damper,\nface-and-bypass steam preheat coil, 3-way modulating cooling coil control\nvalve, and humidifier control valve. Devices associated with the\nhumidifier will be new. They include a new discharge humidistat,\ndischarge high-limit switch, and space humidistat. The existing cabinet\nenclosure can be re-used for these units.\n(iv) Existing air handling units 2-AHU-12 and 2-AHU-14 are currently under\nDDC control. The new Siemens controllers shall replace the existing\nSchneider/ Andover controllers. The existing 2-AHU-14 cabinet\nenclosure can be re-used, but 2-AHU-12 will need to be separated from\nthe shared cabinet enclosure with 2-AHU-9. This will require extending\ndevice signal wiring for 2-AHU-12.\n(v) Existing air handling unit 2-AHU-13 will require pneumatic device\nchange-out for the 2-position outside air control damper, steam preheat\ncoil, and 2-way modulating cooling coil control valve. A new control\ncabinet enclosure will be installed for this unit. This will require extending\ndevice signal wiring.\n(vi) Existing air handling unit 2-RTU-1 will require pneumatic device changeout\nfor the 2-position outside air control damper, modulating steam preheat coil control valve, 2-way modulating cooling coil control valve, modulating steam reheat coil control valve, and humidifier control valve. Devices associated with the humidifier will be new. They include a new discharge humidistat, discharge high-limit switch, and return air ductmounted humidistat. A new control cabinet enclosure will be installed for this unit. This will require extending device signal wiring.\n(vii) Existing heating hot water systems, exhaust fans, and other miscellaneous\npoints in the Penthouse are expected to be housed in three (3) new cabinet\nenclosures. This will require extending device signal wiring.\n\nProgramming for the sequences of operation and graphics mapping will be required for all equipment associated with work in Building 2. New programming will utilize existing, new, and change-over devices and therefore, will only meet ASHRAE 36 guidelines for high-performance sequences of operation where such devices already exist. For example, using AHU static pressure reset by poling VAV box damper positions.\n\nTesting, Adjusting, and Balancing Contractor will be required to calibrate new airflow measuring devices and to calibrate the feedback from existing VAV boxes.\n\nElectrical\n\nGENERAL\n\nThe project involves the upgrade and consolidation of the Energy Management Systems (DDC)\nproviders serving Buildings 2 on the Salisbury VAMC Campus. The new system will\nfollow Native BACnet protocol and be able to replace existing JCI and Schneider components with\na single front-end user interface compatible with Siemens. This project is to convert systems from\nboth pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central\nsystem, where applicable, for Buildings 2.\n\nSCOPE OF WORK\nThe following systems will be modified to suit the electrical demands of the project:\n\nNormal Electrical Distribution at 208/120-volts\nEmergency Electrical Distribution at 208/120-volts\nLighting systems and controls\n\nB. The electrical design shall be in accordance with, but not limited to the following VA design\nstandards:\n\nVA Electrical Design Manual for New Hospitals, Replacement Hospitals,\nAmbulatory Care, Clinical Additions, Energy Centers, Outpatient Clinics, Animal Research Facilities, and Laboratory Buildings.\nNFPA 70 National Electrical Code\nNational Fire Protection Association (NFPA) Standard 101 Life Safety Code\n\nEXISTING CONDITIONS\n\nPower\n\n1) Emergency life safety and critical power branch panels are located on every floor\nof the building. The majority of the panels have spare circuit breakers or spaces to add a new circuit breaker as required.\n\nDESIGN APPROACH\n\nPower and Lighting\n\n1) The intent of the design shall be to install new BAS panels adjacent to the existing\noutdated panels. Generally it was impossible to trace the power source of the\nexisting BAS panel, therefore new 120-volt emergency branch circuit shall be routed to the new BAS network controller panel power supplies. This is required by VA standards.\n2) Additionally, new network switches shall be installed in various locations throughout the three buildings. Local emergency 120-volt emergency branch circuits shall be provided for network switches as shown on drawings.\n3) Where necessary, existing lighting and other ceiling mounted electrical devices shall be taken down and reinstalled in the same location during the course of the construction.\n4) The circuits for all mechanical equipment, which have been scheduled for demolition, shall be removed back to the source.\n\nEquipment Grounding and Wiring Devices\n\n1) In general, 20-amp duplex receptacles will be located where required. All receptacles shall be hospital-grade, plug-tail type receptacles complying with NEC Art. 517.13(B).\n2) All non-current carrying metallic parts of the electrical distribution system will be\nbonded to the grounding electrode system or building steel.\n3) An insulated grounding conductor will be run with all power feeder and branch circuits to supplement the conduit ground.\n4) All wiring shall be solid for wire #10 and smaller and stranded for wires larger than #10.\n5) Nonflexible metallic conduit will be provided for all emergency circuits due to the\nneed to provide redundant grounding and protection of the branch circuit.\nMetal-Clad cabling, Type MC, will be permitted for branch circuit wiring where concealed within partitions and above ceilings for lighting fixtures. In addition, liquid-tight flexible metal conduit will be used at motor and other vibration transmissive locations.\n\nContractor Trades:\nMechanical Contractor\nCoordinate with the controls contractor to ensure seamless HVAC equipment interface and integration.\nModify or relocate existing mechanical systems as needed to accommodate new control infrastructure.\nProvide support during system commissioning, functional performance testing, and final acceptance.\nEnsure all mechanical work complies with VA HVAC standards and ASHRAE guidelines.\nQualifications:\nLicensed mechanical contractor with experience in healthcare environments.\nFamiliarity with Siemens Desigo systems and BACnet protocol preferred.\nControls Contractor (Siemens Certified)\nInstall and program Siemens Desigo BACnet control systems, including hardware and software components.\nReplace existing pneumatic and outdated DDC controls with modern digital systems.\nIntegrate HVAC equipment into the new Energy Management System (EMS).\nConduct full commissioning, calibration, and validation of control systems.\nProvide end-user training and documentation for system operation and maintenance.\nQualifications:\nSiemens-certified technician or firm with demonstrated experience in federal or VA projects.\nMust comply with VA cybersecurity and interoperability standards.\nElectrical Contractor\nProvide dedicated power supply to Siemens control cabinets and associated network switches.\nRemove and dispose of obsolete electrical components (e.g., Johnson Controls, Schneider Electric).\nInstall new branch circuits, electrical panels, and conduit routing per NEC and VA specifications.\nCoordinate electrical shutdowns and temporary power solutions to maintain facility operations.\nPerform firestopping and patching of all penetrations created during electrical work.\nQualifications:\nLicensed electrician with experience in hospital or healthcare facility electrical systems.\nMust be familiar with VA electrical safety protocols and infection control procedures.\nLow Voltage / Communications Contractor\nInstall CAT6 or higher-rated network cabling for control panels, switches, and EMS components.\nTerminate and test all cable runs to ensure compliance with VA telecom standards.\nCoordinate with VA IT department for switch integration and IP address assignments.\nLabel and document all cabling and connections for future maintenance.\nQualifications:\nBICSI-certified technician or equivalent.\nExperience with VA telecom infrastructure and patch panel standards.\nGeneral Contractor\nProvide overall coordination and scheduling of all subcontracted trades.\nManage ceiling removal and replacement as indicated in demolition and construction plans.\nPerform wall patching, painting, and restoration following electrical and control installations.\nDevelop phasing plans to minimize disruption to patient care and facility operations.\nEnsure infection control measures are in place during construction activities.\nQualifications:\nLicensed general contractor with experience in VA or federal healthcare construction.\nMust comply with VA Interim Life Safety Measures (ILSM) and infection control protocols.\nFirestopping Contractor\nSeal all penetrations through rated walls and floors created during conduit and cable installations.\nUse UL-listed firestopping materials and methods.\nEnsure compliance with NFPA 101, VA standards, and local fire codes.\nQualifications:\nCertified firestopping technician.\nExperience in healthcare facility fire barrier restoration.\nCommissioning Agent (CxA)\nVerify that all installed systems meet the design intent and operational requirements.\nConduct functional performance testing and provide commissioning reports.\nCoordinate with VA stakeholders for final acceptance and turnover.\nQualifications:\nIndependent third-party CxA with experience in VA commissioning protocols.\nMust be familiar with ASHRAE Guideline 0 and VA Cx standards.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24626B0018","product_service_code":"4130"}],"due_at":"2026-03-25T19:00:00Z","due_date":"2026-03-25","closes_at":"2026-03-25T19:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","state":"NC","county":"37159","county_name":"Rowan County","city":"3758860","city_name":"Salisbury","country":"USA","state_source":null,"state_evidence":"Product purchase (PSC 4130)","site_key":null,"winner_key":"FNBQK6RYKE85","amount":null,"linked_awards":3,"cancelled":false,"archived":true,"updated_at":"2026-10-12T11:51:50.810979Z","principal_notice_id":"6ba5d038c17749ae92c83b3f9af9552b","description":{"text":"W.G. (Bill) Hefner\nDepartment of Veterans Affairs Medical Center\n1601 Brenner Avenue\nSalisbury, North Carolina 28144\n\nSubject: Statement of Work: Install Campus Energy Management System\nLocation: Campus\nProject #: 659-22-100\nDate: 12 December 2025\nSTATEMENT OF WORK\nMechanical\nGeneral:\nThe project involves the upgrade and consolidation of the Energy Management Systems (DDC) providers serving Buildings 2 on the Salisbury VAMC Campus. The new system will follow Native BACnet protocol and be able to replace existing JCI and Schneider components with a single front-end user interface compatible with Siemens. This project is to convert systems from both pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central system, where applicable, for Buildings 2. This project should be completed in 365 days and include a 1 year warranty on all items.\n\nSCOPE OF WORK:\n\nThe Scope of work associated with the project includes the following:\n\nNetwork & User Interface\n\nAppropriate modifications to the existing network and cabling layout (Ethernet & MSTP) for the purpose of integration, including the installation of new Desigo panels.\n\nTerminal Unit Controls\n\n1) Modifications required to replace the Tridium/Niagara controls with BACnet, Siemens Desigo compatible controllers and sensors (where required). Include in the recommendation, devices that can remain (relays, switches, valves, damper motors, sensors, etc.)\n\nTo include the following:\n(i) New Siemens server to replace the existing Siemens server.\n(ii) Front-End Graphical User Interface modifications, including new floor plans for every level of Buildings 2.\n(iii) Main equipment panel and controller installations.\n(iv) Panel installations.\n(v) Panel modifications and replacement, and controller replacements, required on the main systems.\n(vi) Ethernet-level networking modifications.\n(vii) BACnet MSTP networking modifications.\n(viii) Pneumatic terminal-unit controller replacements.\n(ix) Removal of the compressed air system serving control components and devices.\n\nto include all hardware, software, installation, wiring, cabling, programming of systems, graphics, and setup of alarms, schedules and trending; as well as networking requirements required to into a new Siemens server in accordance with the VA standards.\n\nApplicable Codes and Standards:\n\nDVA HVAC Design Manual, March 2024\nASHRAE Standard 13 Specifying Building Automation Systems\nASHRAE Standard 135 BACnet Communication Protocol\nIEEE 802.3 Standard for Ethernet\nNFPA 70 National Electrical Code\n\nEXISTING CONDITIONS\n\nNetwork Level\n\n1) The existing Building Automation System (BAS) consists of three (3) separate\nvender systems: Siemens Desigo, JCI Metasys, and Schneider SmartStruxure. All three (3) headend systems and HMIs are in Building 31 chiller plant offices.\n\n2) The internet modem for the Siemens system-to-remain is in Building 5,\nRoom G048A.\n\nBuilding 2\n\n1) The Siemens Desigo system is currently communicating with most of the areas in\nBuilding 2. This control system will remain. The known areas under control by\nSiemens:\n\n(i) Air handling unit 2-AHU-2\n(ii) Air handling unit 2-AHU-3 (ongoing work)\n(iii) Air handling unit 2-AHU-4\n(iv) Air handling unit 2-AHU-4B\n(v) Air handling unit 2-AHU-11\n(vi) Chilled water pumps\n(vii) O.R. chillers\n(viii) 1st Floor isolation rooms\n(ix) 3rd Floor isolation rooms\n(x) 3rd Floor isolation EFs\n(xi) 3rd Floor hot water system\n(xii) 3rd Floor temperature zones\n(xiii) 4th Floor isolation rooms\n(xiv) 4th Floor isolation EFs\n(xv) 4th Floor temperature zones\n(xvi) 5th Floor isolation rooms\n(xvii) 5th Floor isolation EFs\n(xviii) 5th Floor temperature zones\n\n2) The JCI Metasys system is active but has had some equipment migrated over to\nthe Siemens system. The remaining known equipment/areas under JCI control:\n\n(i) Air handling unit 2-AHU-1 (AHU-5 in the field)\n(ii) Air handling unit 2-AHU-7\n(iii) Air handling unit 2-AHU-15\n(iv) Air handling unit 2-AHU-16 (presently being migrated to Siemens)\n(v) Ground Floor exhaust fans\n(vi) Ground Floor hot water system\n(vii) Ground Floor temperature zones\n(viii) Ground Floor differential space pressure monitors\n(ix) 4th Floor isolation rooms\n\nThe Schneider SmartStruxure system contains the majority of the systems that are to be integrated into the Siemens Desigo system. The known equipment/areas under Schneider control:\n\n(i) Air handling unit 2-AHU-X\n(ii) Air handling unit 2-AHU-6\n(iii) Air handling unit 2-AHU-9\n(iv) Air handling unit 2-AHU-10\n(v) Air handling unit 2-AHU-12\n(vi) Air handling unit 2-AHU-14\n(vii) Air handling unit 2-RTU-1\n(viii) Air handling unit 2-RTU-Cardiology\n(ix) Air handling unit 2-RTU-Lab\n(x) 3rd Floor hot water system\n(xi) 3rd Floor temperature zones\n(xii) Penthouse hot water systems (Qty 3)\n(xiii) Steam zone valves (Qty 6)\n\nSurvey items remaining for Building 2 scope of work:\n\n(i) Field locations of JCI and Schneider network components for the purpose\nof developing demolition drawings\n(ii) Trace out any remaining pneumatic components associated with building\nautomation\n(iii) Fan coil controls\n(iv) Temperature zones of the Ground, 1st, and 2nd Floors\n\nDESIGN APPROACH\n\nNetwork Level\n\n1) A new server will be provided to replace the existing Siemens server. The server\nis in Building 31 chiller plant offices. Network Cabling from Building 5\nwill be re-used to connect to the new server.\n\n2) The building 5 network switch that connects to the Siemens server and to the\nbuilding #2 fiber network switch will remain in its existing configuration.\n\nBuilding 2\n\n1) The existing fiber network switch, located in the Ground Floor Mechanical\nEquipment Room G009 will be expanded with a CAT6 to a new network switch,\nlocated in the same room.\n\nThe new switch shall serve Ground Floor equipment, differential space pressure\nmonitors, and temperature zone controls currently being served by the JCI system.\nIt is anticipated that the existing JCI cabinet enclosures serving air handling units\n2-AHU-5 and 2-AHU-15 can be re-used.\n\nExisting air handling unit 2-AHU-5 will require pneumatic device change-out for the modulating outside air, return air, and relief air control dampers, 2-way cooling\ncoil control valve, and supply and return airflow measuring devices.\n\nThe Schneider-controlled steam zone valves, associated sensors, and controller\nwill be replaced and integrated into the Siemens system. The cabinet enclosure\nwill need to be replaced. This work is expected to occur during the summer\nmonths.\n\nThe points connected to the additional Schneider I/O modules (4 total) in\nMechanical Equipment Room G009 that are located in two (2) of the older cabinet\nenclosures, have yet to be identified.\n\n2) The existing network switch located on the 3rd Floor, Room 3177 will either be\nexpanded or replaced as needed to integrate the Schneider-controlled equipment\non this floor. Currently, this switch has one (1) available port.\n\nNew CAT6 cabling will be installed in the ceiling space of the occupied 3rd Floor\nin order to connect the new Siemens controllers serving existing air handling units\n2-AHU-X and 2-AHU-6, temperature zones, and hot water heat exchanger and\npump set.\n\n3) The existing network switch located on the 4th Floor, Room 4167 will remain asis.\nCurrently, this switch is being used to replace rooftop equipment controls to\nexisting air handling units 2-AHU-2 and 2-AHU-3, along with the dilution exhaust\nfans and miscellaneous points.\n\n4) The existing network switch located on the 5th Floor, Room 5003 currently serves\nthe rooftop chillers, air handling units, and occupied areas of the 4th and 5th Floors.\nThe 5th Floor switch is intended to connect to the new Penthouse switch and to\nintegrate the remaining JCI and Schneider-controlled equipment that are on the 5th\nFloor level (4th Floor roof included).\n\nNew CAT6 cabling will be installed in the ceiling space of the occupied 5th Floor\nin order to connect the new Siemens controllers serving existing air handling unit\n2-AHU-4-OR, temperature zones, and hot water heat exchanger and pump set.\n\n5) A new 24-port network switch will be installed in the Penthouse and will carry the\nbulk of the equipment being integrated into the Siemens system. Each CAT6 cable\nto the switch will be dedicated to each equipment controller. The new 24-port\nswitch will have a network drop down to the existing 5th Floor network switch.\n\n(i) Existing air handling unit 2-AHU-7 is currently under DDC control. The\nnew Siemens controller shall replace the existing JCI controller in the\nsame cabinet enclosure.\n(ii) Existing air handling unit 2-AHU-8 will require pneumatic device changeout\nfor the 2-position outside air control damper, face-and-bypass steam\npreheat coil, and 3-way modulating cooling coil control valve. A new\ncontrol cabinet enclosure will be installed for this unit. This will require\nextending device signal wiring.\n(iii) Existing air handling units 2-AHU-9 and 2-AHU-10 will require\npneumatic device change-out for the 2-position outside air control damper,\nface-and-bypass steam preheat coil, 3-way modulating cooling coil control\nvalve, and humidifier control valve. Devices associated with the\nhumidifier will be new. They include a new discharge humidistat,\ndischarge high-limit switch, and space humidistat. The existing cabinet\nenclosure can be re-used for these units.\n(iv) Existing air handling units 2-AHU-12 and 2-AHU-14 are currently under\nDDC control. The new Siemens controllers shall replace the existing\nSchneider/ Andover controllers. The existing 2-AHU-14 cabinet\nenclosure can be re-used, but 2-AHU-12 will need to be separated from\nthe shared cabinet enclosure with 2-AHU-9. This will require extending\ndevice signal wiring for 2-AHU-12.\n(v) Existing air handling unit 2-AHU-13 will require pneumatic device\nchange-out for the 2-position outside air control damper, steam preheat\ncoil, and 2-way modulating cooling coil control valve. A new control\ncabinet enclosure will be installed for this unit. This will require extending\ndevice signal wiring.\n(vi) Existing air handling unit 2-RTU-1 will require pneumatic device changeout\nfor the 2-position outside air control damper, modulating steam preheat coil control valve, 2-way modulating cooling coil control valve, modulating steam reheat coil control valve, and humidifier control valve. Devices associated with the humidifier will be new. They include a new discharge humidistat, discharge high-limit switch, and return air ductmounted humidistat. A new control cabinet enclosure will be installed for this unit. This will require extending device signal wiring.\n(vii) Existing heating hot water systems, exhaust fans, and other miscellaneous\npoints in the Penthouse are expected to be housed in three (3) new cabinet\nenclosures. This will require extending device signal wiring.\n\nProgramming for the sequences of operation and graphics mapping will be required for all equipment associated with work in Building 2. New programming will utilize existing, new, and change-over devices and therefore, will only meet ASHRAE 36 guidelines for high-performance sequences of operation where such devices already exist. For example, using AHU static pressure reset by poling VAV box damper positions.\n\nTesting, Adjusting, and Balancing Contractor will be required to calibrate new airflow measuring devices and to calibrate the feedback from existing VAV boxes.\n\nElectrical\n\nGENERAL\n\nThe project involves the upgrade and consolidation of the Energy Management Systems (DDC)\nproviders serving Buildings 2 on the Salisbury VAMC Campus. The new system will\nfollow Native BACnet protocol and be able to replace existing JCI and Schneider components with\na single front-end user interface compatible with Siemens. This project is to convert systems from\nboth pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central\nsystem, where applicable, for Buildings 2.\n\nSCOPE OF WORK\nThe following systems will be modified to suit the electrical demands of the project:\n\nNormal Electrical Distribution at 208/120-volts\nEmergency Electrical Distribution at 208/120-volts\nLighting systems and controls\n\nB. The electrical design shall be in accordance with, but not limited to the following VA design\nstandards:\n\nVA Electrical Design Manual for New Hospitals, Replacement Hospitals,\nAmbulatory Care, Clinical Additions, Energy Centers, Outpatient Clinics, Animal Research Facilities, and Laboratory Buildings.\nNFPA 70 National Electrical Code\nNational Fire Protection Association (NFPA) Standard 101 Life Safety Code\n\nEXISTING CONDITIONS\n\nPower\n\n1) Emergency life safety and critical power branch panels are located on every floor\nof the building. The majority of the panels have spare circuit breakers or spaces to add a new circuit breaker as required.\n\nDESIGN APPROACH\n\nPower and Lighting\n\n1) The intent of the design shall be to install new BAS panels adjacent to the existing\noutdated panels. Generally it was impossible to trace the power source of the\nexisting BAS panel, therefore new 120-volt emergency branch circuit shall be routed to the new BAS network controller panel power supplies. This is required by VA standards.\n2) Additionally, new network switches shall be installed in various locations throughout the three buildings. Local emergency 120-volt emergency branch circuits shall be provided for network switches as shown on drawings.\n3) Where necessary, existing lighting and other ceiling mounted electrical devices shall be taken down and reinstalled in the same location during the course of the construction.\n4) The circuits for all mechanical equipment, which have been scheduled for demolition, shall be removed back to the source.\n\nEquipment Grounding and Wiring Devices\n\n1) In general, 20-amp duplex receptacles will be located where required. All receptacles shall be hospital-grade, plug-tail type receptacles complying with NEC Art. 517.13(B).\n2) All non-current carrying metallic parts of the electrical distribution system will be\nbonded to the grounding electrode system or building steel.\n3) An insulated grounding conductor will be run with all power feeder and branch circuits to supplement the conduit ground.\n4) All wiring shall be solid for wire #10 and smaller and stranded for wires larger than #10.\n5) Nonflexible metallic conduit will be provided for all emergency circuits due to the\nneed to provide redundant grounding and protection of the branch circuit.\nMetal-Clad cabling, Type MC, will be permitted for branch circuit wiring where concealed within partitions and above ceilings for lighting fixtures. In addition, liquid-tight flexible metal conduit will be used at motor and other vibration transmissive locations.\n\nContractor Trades:\nMechanical Contractor\nCoordinate with the controls contractor to ensure seamless HVAC equipment interface and integration.\nModify or relocate existing mechanical systems as needed to accommodate new control infrastructure.\nProvide support during system commissioning, functional performance testing, and final acceptance.\nEnsure all mechanical work complies with VA HVAC standards and ASHRAE guidelines.\nQualifications:\nLicensed mechanical contractor with experience in healthcare environments.\nFamiliarity with Siemens Desigo systems and BACnet protocol preferred.\nControls Contractor (Siemens Certified)\nInstall and program Siemens Desigo BACnet control systems, including hardware and software components.\nReplace existing pneumatic and outdated DDC controls with modern digital systems.\nIntegrate HVAC equipment into the new Energy Management System (EMS).\nConduct full commissioning, calibration, and validation of control systems.\nProvide end-user training and documentation for system operation and maintenance.\nQualifications:\nSiemens-certified technician or firm with demonstrated experience in federal or VA projects.\nMust comply with VA cybersecurity and interoperability standards.\nElectrical Contractor\nProvide dedicated power supply to Siemens control cabinets and associated network switches.\nRemove and dispose of obsolete electrical components (e.g., Johnson Controls, Schneider Electric).\nInstall new branch circuits, electrical panels, and conduit routing per NEC and VA specifications.\nCoordinate electrical shutdowns and temporary power solutions to maintain facility operations.\nPerform firestopping and patching of all penetrations created during electrical work.\nQualifications:\nLicensed electrician with experience in hospital or healthcare facility electrical systems.\nMust be familiar with VA electrical safety protocols and infection control procedures.\nLow Voltage / Communications Contractor\nInstall CAT6 or higher-rated network cabling for control panels, switches, and EMS components.\nTerminate and test all cable runs to ensure compliance with VA telecom standards.\nCoordinate with VA IT department for switch integration and IP address assignments.\nLabel and document all cabling and connections for future maintenance.\nQualifications:\nBICSI-certified technician or equivalent.\nExperience with VA telecom infrastructure and patch panel standards.\nGeneral Contractor\nProvide overall coordination and scheduling of all subcontracted trades.\nManage ceiling removal and replacement as indicated in demolition and construction plans.\nPerform wall patching, painting, and restoration following electrical and control installations.\nDevelop phasing plans to minimize disruption to patient care and facility operations.\nEnsure infection control measures are in place during construction activities.\nQualifications:\nLicensed general contractor with experience in VA or federal healthcare construction.\nMust comply with VA Interim Life Safety Measures (ILSM) and infection control protocols.\nFirestopping Contractor\nSeal all penetrations through rated walls and floors created during conduit and cable installations.\nUse UL-listed firestopping materials and methods.\nEnsure compliance with NFPA 101, VA standards, and local fire codes.\nQualifications:\nCertified firestopping technician.\nExperience in healthcare facility fire barrier restoration.\nCommissioning Agent (CxA)\nVerify that all installed systems meet the design intent and operational requirements.\nConduct functional performance testing and provide commissioning reports.\nCoordinate with VA stakeholders for final acceptance and turnover.\nQualifications:\nIndependent third-party CxA with experience in VA commissioning protocols.\nMust be familiar with ASHRAE Guideline 0 and VA Cx standards.","html":"W.G. (Bill) Hefner\nDepartment of Veterans Affairs Medical Center\n1601 Brenner Avenue\n     Salisbury, North Carolina 28144\n\n Subject: Statement of Work: Install Campus Energy Management System\nLocation: Campus \nProject #: 659-22-100\nDate: 12 December 2025\nSTATEMENT OF WORK\nMechanical\nGeneral:  \nThe project involves the upgrade and consolidation of the Energy Management Systems (DDC) providers serving Buildings 2 on the Salisbury VAMC Campus. The new system will follow Native BACnet protocol and be able to replace existing JCI and Schneider components with a single front-end user interface compatible with Siemens. This project is to convert systems from both pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central system, where applicable, for Buildings 2. This project should be completed in 365 days and include a 1 year warranty on all items. \n\nSCOPE OF WORK:\n\nThe Scope of work associated with the project includes the following:\n\nNetwork & User Interface\n\nAppropriate modifications to the existing network and cabling layout (Ethernet & MSTP) for the purpose of integration, including the installation of new Desigo panels.\n\nTerminal Unit Controls\n\n1) Modifications required to replace the Tridium/Niagara controls with BACnet, Siemens Desigo compatible controllers and sensors (where required). Include in the recommendation, devices that can remain (relays, switches, valves, damper motors, sensors, etc.)\n\nTo include the following:\n(i) New Siemens server to replace the existing Siemens server.\n(ii) Front-End Graphical User Interface modifications, including new floor plans for every level of Buildings 2.\n(iii) Main equipment panel and controller installations.\n(iv) Panel installations.\n(v) Panel modifications and replacement, and controller replacements, required on the main systems.\n(vi) Ethernet-level networking modifications.\n(vii) BACnet MSTP networking modifications.\n(viii) Pneumatic terminal-unit controller replacements.\n(ix) Removal of the compressed air system serving control components and devices.\n\nto include all hardware, software, installation, wiring, cabling, programming of systems, graphics, and setup of alarms, schedules and trending; as well as networking requirements required to into a new Siemens server in accordance with the VA standards.\n\nApplicable Codes and Standards:\n\n  DVA HVAC Design Manual, March 2024\n  ASHRAE Standard 13   Specifying Building Automation Systems\n  ASHRAE Standard 135   BACnet Communication Protocol\n  IEEE 802.3   Standard for Ethernet\n  NFPA 70   National Electrical Code\n\nEXISTING CONDITIONS\n\nNetwork Level\n\n1) The existing Building Automation System (BAS) consists of three (3) separate\nvender systems: Siemens Desigo, JCI Metasys, and Schneider SmartStruxure. All three (3) headend systems and HMIs are in Building 31 chiller plant offices.\n\n2) The internet modem for the Siemens system-to-remain is in Building 5,\nRoom G048A.\n\nBuilding 2\n\n1) The Siemens Desigo system is currently communicating with most of the areas in\nBuilding 2. This control system will remain. The known areas under control by\nSiemens:\n\n(i) Air handling unit 2-AHU-2\n(ii) Air handling unit 2-AHU-3 (ongoing work)\n(iii) Air handling unit 2-AHU-4\n(iv) Air handling unit 2-AHU-4B\n(v) Air handling unit 2-AHU-11\n(vi) Chilled water pumps\n(vii) O.R. chillers\n(viii) 1st Floor isolation rooms\n(ix) 3rd Floor isolation rooms\n(x) 3rd Floor isolation EFs\n(xi) 3rd Floor hot water system\n(xii) 3rd Floor temperature zones\n(xiii) 4th Floor isolation rooms\n(xiv) 4th Floor isolation EFs\n(xv) 4th Floor temperature zones\n(xvi) 5th Floor isolation rooms\n(xvii) 5th Floor isolation EFs\n(xviii) 5th Floor temperature zones\n\n2) The JCI Metasys system is active but has had some equipment migrated over to\nthe Siemens system. The remaining known equipment/areas under JCI control:\n\n(i) Air handling unit 2-AHU-1 (AHU-5 in the field)\n(ii) Air handling unit 2-AHU-7\n(iii) Air handling unit 2-AHU-15\n(iv) Air handling unit 2-AHU-16 (presently being migrated to Siemens)\n(v) Ground Floor exhaust fans\n(vi) Ground Floor hot water system\n(vii) Ground Floor temperature zones\n(viii) Ground Floor differential space pressure monitors\n(ix) 4th Floor isolation rooms\n\nThe Schneider SmartStruxure system contains the majority of the systems that are to be integrated into the Siemens Desigo system. The known equipment/areas under Schneider control:\n\n(i) Air handling unit 2-AHU-X\n(ii) Air handling unit 2-AHU-6\n(iii) Air handling unit 2-AHU-9\n(iv) Air handling unit 2-AHU-10\n(v) Air handling unit 2-AHU-12\n(vi) Air handling unit 2-AHU-14\n(vii) Air handling unit 2-RTU-1\n(viii) Air handling unit 2-RTU-Cardiology\n(ix) Air handling unit 2-RTU-Lab\n(x) 3rd Floor hot water system\n(xi) 3rd Floor temperature zones\n(xii) Penthouse hot water systems (Qty 3)\n(xiii) Steam zone valves (Qty 6)\n\nSurvey items remaining for Building 2 scope of work:\n\n(i) Field locations of JCI and Schneider network components for the purpose\nof developing demolition drawings\n(ii) Trace out any remaining pneumatic components associated with building\nautomation\n(iii) Fan coil controls\n(iv) Temperature zones of the Ground, 1st, and 2nd Floors\n\nDESIGN APPROACH\n\nNetwork Level\n\n1) A new server will be provided to replace the existing Siemens server. The server\nis in Building 31 chiller plant offices. Network Cabling from Building 5\nwill be re-used to connect to the new server.\n\n2) The building 5 network switch that connects to the Siemens server and to the\nbuilding #2 fiber network switch will remain in its existing configuration.\n\nBuilding 2\n\n1) The existing fiber network switch, located in the Ground Floor Mechanical\nEquipment Room G009 will be expanded with a CAT6 to a new network switch,\nlocated in the same room.\n\nThe new switch shall serve Ground Floor equipment, differential space pressure\nmonitors, and temperature zone controls currently being served by the JCI system.\nIt is anticipated that the existing JCI cabinet enclosures serving air handling units\n2-AHU-5 and 2-AHU-15 can be re-used.\n\nExisting air handling unit 2-AHU-5 will require pneumatic device change-out for the modulating outside air, return air, and relief air control dampers, 2-way cooling\ncoil control valve, and supply and return airflow measuring devices.\n\nThe Schneider-controlled steam zone valves, associated sensors, and controller\nwill be replaced and integrated into the Siemens system. The cabinet enclosure\nwill need to be replaced. This work is expected to occur during the summer\nmonths.\n\nThe points connected to the additional Schneider I/O modules (4 total) in\nMechanical Equipment Room G009 that are located in two (2) of the older cabinet\nenclosures, have yet to be identified.\n\n2) The existing network switch located on the 3rd Floor, Room 3177 will either be\nexpanded or replaced as needed to integrate the Schneider-controlled equipment\non this floor. Currently, this switch has one (1) available port.\n\nNew CAT6 cabling will be installed in the ceiling space of the occupied 3rd Floor\nin order to connect the new Siemens controllers serving existing air handling units\n2-AHU-X and 2-AHU-6, temperature zones, and hot water heat exchanger and\npump set.\n\n3) The existing network switch located on the 4th Floor, Room 4167 will remain asis.\nCurrently, this switch is being used to replace rooftop equipment controls to\nexisting air handling units 2-AHU-2 and 2-AHU-3, along with the dilution exhaust\nfans and miscellaneous points.\n\n4) The existing network switch located on the 5th Floor, Room 5003 currently serves\nthe rooftop chillers, air handling units, and occupied areas of the 4th and 5th Floors.\nThe 5th Floor switch is intended to connect to the new Penthouse switch and to\nintegrate the remaining JCI and Schneider-controlled equipment that are on the 5th\nFloor level (4th Floor roof included).\n\nNew CAT6 cabling will be installed in the ceiling space of the occupied 5th Floor\nin order to connect the new Siemens controllers serving existing air handling unit\n2-AHU-4-OR, temperature zones, and hot water heat exchanger and pump set.\n\n5) A new 24-port network switch will be installed in the Penthouse and will carry the\nbulk of the equipment being integrated into the Siemens system. Each CAT6 cable\nto the switch will be dedicated to each equipment controller. The new 24-port\nswitch will have a network drop down to the existing 5th Floor network switch.\n\n(i) Existing air handling unit 2-AHU-7 is currently under DDC control. The\nnew Siemens controller shall replace the existing JCI controller in the\nsame cabinet enclosure.\n(ii) Existing air handling unit 2-AHU-8 will require pneumatic device changeout\nfor the 2-position outside air control damper, face-and-bypass steam\npreheat coil, and 3-way modulating cooling coil control valve. A new\ncontrol cabinet enclosure will be installed for this unit. This will require\nextending device signal wiring.\n(iii) Existing air handling units 2-AHU-9 and 2-AHU-10 will require\npneumatic device change-out for the 2-position outside air control damper,\nface-and-bypass steam preheat coil, 3-way modulating cooling coil control\nvalve, and humidifier control valve. Devices associated with the\nhumidifier will be new. They include a new discharge humidistat,\ndischarge high-limit switch, and space humidistat. The existing cabinet\nenclosure can be re-used for these units.\n(iv) Existing air handling units 2-AHU-12 and 2-AHU-14 are currently under\nDDC control. The new Siemens controllers shall replace the existing\nSchneider/ Andover controllers. The existing 2-AHU-14 cabinet\nenclosure can be re-used, but 2-AHU-12 will need to be separated from\nthe shared cabinet enclosure with 2-AHU-9. This will require extending\ndevice signal wiring for 2-AHU-12.\n(v) Existing air handling unit 2-AHU-13 will require pneumatic device\nchange-out for the 2-position outside air control damper, steam preheat\ncoil, and 2-way modulating cooling coil control valve. A new control\ncabinet enclosure will be installed for this unit. This will require extending\ndevice signal wiring.\n(vi) Existing air handling unit 2-RTU-1 will require pneumatic device changeout\nfor the 2-position outside air control damper, modulating steam preheat coil control valve, 2-way modulating cooling coil control valve, modulating steam reheat coil control valve, and humidifier control valve. Devices associated with the humidifier will be new. They include a new discharge humidistat, discharge high-limit switch, and return air ductmounted humidistat. A new control cabinet enclosure will be installed for this unit. This will require extending device signal wiring.\n(vii) Existing heating hot water systems, exhaust fans, and other miscellaneous\npoints in the Penthouse are expected to be housed in three (3) new cabinet\nenclosures. This will require extending device signal wiring.\n\nProgramming for the sequences of operation and graphics mapping will be required for all equipment associated with work in Building 2. New programming will utilize existing, new, and change-over devices and therefore, will only meet ASHRAE 36 guidelines for high-performance sequences of operation where such devices already exist. For example, using AHU static pressure reset by poling VAV box damper positions.\n\n Testing, Adjusting, and Balancing Contractor will be required to calibrate new airflow measuring devices and to calibrate the feedback from existing VAV boxes.\n\nElectrical\n\nGENERAL\n\nThe project involves the upgrade and consolidation of the Energy Management Systems (DDC)\nproviders serving Buildings 2 on the Salisbury VAMC Campus. The new system will\nfollow Native BACnet protocol and be able to replace existing JCI and Schneider components with\na single front-end user interface compatible with Siemens. This project is to convert systems from\nboth pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central\nsystem, where applicable, for Buildings 2.\n\nSCOPE OF WORK\nThe following systems will be modified to suit the electrical demands of the project:\n\nNormal Electrical Distribution at 208/120-volts\nEmergency Electrical Distribution at 208/120-volts\nLighting systems and controls\n\nB. The electrical design shall be in accordance with, but not limited to the following VA design\nstandards:\n\n  VA Electrical Design Manual for New Hospitals, Replacement Hospitals,\nAmbulatory Care, Clinical Additions, Energy Centers, Outpatient Clinics, Animal Research Facilities, and Laboratory Buildings.\n  NFPA 70 National Electrical Code\n  National Fire Protection Association (NFPA) Standard 101 Life Safety Code\n\nEXISTING CONDITIONS\n\nPower\n\n1) Emergency life safety and critical power branch panels are located on every floor\nof the building. The majority of the panels have spare circuit breakers or spaces to add a new circuit breaker as required.\n\nDESIGN APPROACH\n\nPower and Lighting\n\n1) The intent of the design shall be to install new BAS panels adjacent to the existing\noutdated panels. Generally it was impossible to trace the power source of the\nexisting BAS panel, therefore new 120-volt emergency branch circuit shall be routed to the new BAS network controller panel power supplies. This is required by VA standards.\n2) Additionally, new network switches shall be installed in various locations throughout the three buildings. Local emergency 120-volt emergency branch circuits shall be provided for network switches as shown on drawings.\n3) Where necessary, existing lighting and other ceiling mounted electrical devices shall be taken down and reinstalled in the same location during the course of the construction.\n4) The circuits for all mechanical equipment, which have been scheduled for demolition, shall be removed back to the source.\n\nEquipment Grounding and Wiring Devices\n\n1) In general, 20-amp duplex receptacles will be located where required. All receptacles shall be hospital-grade, plug-tail type receptacles complying with NEC Art. 517.13(B).\n2) All non-current carrying metallic parts of the electrical distribution system will be\nbonded to the grounding electrode system or building steel.\n3) An insulated grounding conductor will be run with all power feeder and branch circuits to supplement the conduit ground.\n4) All wiring shall be solid for wire #10 and smaller and stranded for wires larger than #10.\n5) Nonflexible metallic conduit will be provided for all emergency circuits due to the\nneed to provide redundant grounding and protection of the branch circuit.\nMetal-Clad cabling, Type MC, will be permitted for branch circuit wiring where concealed within partitions and above ceilings for lighting fixtures. In addition, liquid-tight flexible metal conduit will be used at motor and other vibration transmissive locations.\n\nContractor Trades:\nMechanical Contractor\nCoordinate with the controls contractor to ensure seamless HVAC equipment interface and integration.\nModify or relocate existing mechanical systems as needed to accommodate new control infrastructure.\nProvide support during system commissioning, functional performance testing, and final acceptance.\nEnsure all mechanical work complies with VA HVAC standards and ASHRAE guidelines.\nQualifications:\nLicensed mechanical contractor with experience in healthcare environments.\nFamiliarity with Siemens Desigo systems and BACnet protocol preferred.\nControls Contractor (Siemens Certified)\nInstall and program Siemens Desigo BACnet control systems, including hardware and software components.\nReplace existing pneumatic and outdated DDC controls with modern digital systems.\nIntegrate HVAC equipment into the new Energy Management System (EMS).\nConduct full commissioning, calibration, and validation of control systems.\nProvide end-user training and documentation for system operation and maintenance.\nQualifications:\nSiemens-certified technician or firm with demonstrated experience in federal or VA projects.\nMust comply with VA cybersecurity and interoperability standards.\nElectrical Contractor\nProvide dedicated power supply to Siemens control cabinets and associated network switches.\nRemove and dispose of obsolete electrical components (e.g., Johnson Controls, Schneider Electric).\nInstall new branch circuits, electrical panels, and conduit routing per NEC and VA specifications.\nCoordinate electrical shutdowns and temporary power solutions to maintain facility operations.\nPerform firestopping and patching of all penetrations created during electrical work.\nQualifications:\nLicensed electrician with experience in hospital or healthcare facility electrical systems.\nMust be familiar with VA electrical safety protocols and infection control procedures.\nLow Voltage / Communications Contractor\nInstall CAT6 or higher-rated network cabling for control panels, switches, and EMS components.\nTerminate and test all cable runs to ensure compliance with VA telecom standards.\nCoordinate with VA IT department for switch integration and IP address assignments.\nLabel and document all cabling and connections for future maintenance.\nQualifications:\nBICSI-certified technician or equivalent.\nExperience with VA telecom infrastructure and patch panel standards.\nGeneral Contractor\nProvide overall coordination and scheduling of all subcontracted trades.\nManage ceiling removal and replacement as indicated in demolition and construction plans.\nPerform wall patching, painting, and restoration following electrical and control installations.\nDevelop phasing plans to minimize disruption to patient care and facility operations.\nEnsure infection control measures are in place during construction activities.\nQualifications:\nLicensed general contractor with experience in VA or federal healthcare construction.\nMust comply with VA Interim Life Safety Measures (ILSM) and infection control protocols.\nFirestopping Contractor\nSeal all penetrations through rated walls and floors created during conduit and cable installations.\nUse UL-listed firestopping materials and methods.\nEnsure compliance with NFPA 101, VA standards, and local fire codes.\nQualifications:\nCertified firestopping technician.\nExperience in healthcare facility fire barrier restoration.\nCommissioning Agent (CxA)\nVerify that all installed systems meet the design intent and operational requirements.\nConduct functional performance testing and provide commissioning reports.\nCoordinate with VA stakeholders for final acceptance and turnover.\nQualifications:\nIndependent third-party CxA with experience in VA commissioning protocols.\nMust be familiar with ASHRAE Guideline 0 and VA Cx standards.","origin":"detail"},"contacts":[{"name":"Mark C Griffin","role":"primary","email":"Mark.Griffin2@va.gov","title":"Contract Specialist"}],"place_of_performance":null,"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"naics_codes":["238220"],"award":{"awardee":{}},"attachments":[{"resource_id":"331c60ddf53240e6ba20896834a50a88","name":"36C24626B0018.docx","kind":"file","mime_type":".docx","size_bytes":17851,"posted_at":"2026-01-21T01:48:36.665Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/331c60ddf53240e6ba20896834a50a88/download","mirrored":false},{"resource_id":"088a857e69c04f6c8c2ea8b3ed2fac8c","name":"36C24626B0018_1.docx","kind":"file","mime_type":".docx","size_bytes":19255,"posted_at":"2026-02-04T11:14:09.427Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/088a857e69c04f6c8c2ea8b3ed2fac8c/download","mirrored":false},{"resource_id":"e334f0ad0de6422d93a4f79bb5630210","name":"36C24626B0018_2_.pdf","kind":"file","mime_type":".pdf","size_bytes":615452,"posted_at":"2026-02-19T12:14:40.337Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e334f0ad0de6422d93a4f79bb5630210/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C24626C0032_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C24626C0032_3600_-NONE-_-NONE-/","piid":"36C24626C0032","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"FNBQK6RYKE85","recipient_name":"ACCORD FEDERAL SERVICES, LLC","recipient_uei":"FNBQK6RYKE85","recipient_cage":"61P79","recipient_city":"KNOXVILLE","recipient_state":"TN","sub_name":"Department of Veterans Affairs","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","office_key":"o-36C246","first_action_date":"2026-04-09","last_action_date":"2026-05-13","actions":2,"obligated":"4682337.00","current_total_value":"4682337.00","potential_total_value":"4682337.00","naics":"238220","psc":"Z1DA","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":2,"description":"INSTALL CAMPUS ENERGY MANAGEMENT SYSTEM","method":"solicitation","confidence":"high","evidence":["solicitation number 36C24626B0018 equals the FPDS solicitation identifier","same awarding office 36C246"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C24627Q0114","latest_notice_id":"9464cbfda7004348805568dfa367e88c","title":"5975--INSTALLATION OF PROXIMITY SENSORS FOR AUTOMATIC DOORS","solicitation_number":"36C24627Q0114","notice_type":"o","first_type":"r","first_posted":"2026-11-04","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-25T15:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"238210","psc":"5975","set_aside":null,"state":"NC","county":"37051","county_name":"Cumberland County","city":"3722920","city_name":"Fayetteville","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":"Product purchase (PSC 5975)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C24627Q0089","latest_notice_id":"ae159e2fd01a497898d98fab5ce61da1","title":"Q301-- FISH TECH Testing","solicitation_number":"36C24627Q0089","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-25T15:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"621511","psc":"Q301","set_aside":null,"state":"VA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"RACT AWARD. FOR LABORATORY SAMPLES, RICHMOND VAMC","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24627Q0113","latest_notice_id":"dd890cb683014f54b3c473a4fac2948f","title":"7230--WINDOW TREATMENT","solicitation_number":"36C24627Q0113","notice_type":"o","first_type":"p","first_posted":"2026-11-06","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-25T16:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"337920","psc":"7230","set_aside":"SBA","state":"VA","county":"51650","county_name":"City of Hampton","city":"5135000","city_name":"Hampton","country":"USA","place_scope":"nationwide","state_source":"sam_state_name","state_evidence":"Product purchase (PSC 7230)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C24627Q0149","latest_notice_id":"0f55c0d6fb1b4b4c8be2a3cdcb19cfc5","title":"5670--Dumpster Area Roll Up Door Replacement","solicitation_number":"36C24627Q0149","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-27T14:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T14:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"332321","psc":"5670","set_aside":null,"state":"VA","county":"51760","county_name":"City of Richmond","city":"5167000","city_name":"Richmond","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24627Q0153","latest_notice_id":"4d24e9c5db104196af7772b612e1b14c","title":"8470-- Police Ballistic Vests","solicitation_number":"36C24627Q0153","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"315990","psc":"8470","set_aside":null,"state":"VA","county":"51760","county_name":"City of Richmond","city":"5167000","city_name":"Richmond","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open":[{"key":"1240BE27Q0025","latest_notice_id":"c21abfebfc5d4ee1a6b74dffe96d5bdf","title":"Research Triangle Park Forestry Sciences Laboratory HVAC Repair","solicitation_number":"1240BE27Q0025","notice_type":"k","first_type":"k","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-01T22:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-124568","office_name":"SOUTHERN RESEARCH STATION","naics":"238220","psc":"J041","set_aside":"SBA","state":"NC","county":"37063","county_name":"Durham County","city":"3719000","city_name":"Durham","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C25627Q0087","latest_notice_id":"cd7d881bb8cc47e4b482d18db8376dea","title":"Z2NZ--Turn Key Chiller Equipment (Purchase and Install)","solicitation_number":"36C25627Q0087","notice_type":"o","first_type":"o","first_posted":"2026-10-26","last_posted":"2026-11-16","notices":5,"due_at":"2026-12-02T16:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C256","office_name":"256-NETWORK CONTRACT OFFICE 16 (36C256)","naics":"238220","psc":"Z2NZ","set_aside":"SDVOSBC","state":"NC","county":"37119","county_name":"Mecklenburg County","city":"3752220","city_name":"Pineville","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"W911PT27QA020","latest_notice_id":"084d5efc5ec44a9885a37b90e6705ffa","title":"REMOVE AND REPAIR TWO HIGH VELOCITY AIR HANDLING UNITS","solicitation_number":"W911PT27QA020","notice_type":"k","first_type":"k","first_posted":"2026-11-05","last_posted":"2026-11-05","notices":1,"due_at":"2026-11-25T18:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911PT","office_name":"W6QK ACC WVA","naics":"238220","psc":"Z2NB","set_aside":"SBA","state":"NY","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"description","state_evidence":"IGH VELOCITY AIR HANDLING UNITSPROJECT LOCATION: WATERVLIET ARSENAL","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"}],"similar_open_total":59,"indexable":false}