{"canonical":"https://sealedbidder.com/opportunities/36c24626b0004","key":"36C24626B0004","url":"https://sealedbidder.com/opportunities/36c24626b0004","title":"Z2DA--Replace Auxiliary Chiller","solicitation_number":"36C24626B0004","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-01-26T20:00:00Z","first_posted":"2025-10-08","last_posted":"2026-03-10","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"238220","psc":"Z2DA","set_aside":"SDVOSBC","place_state":"NC","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"37051","place_county_name":"Cumberland County","place_city":"3722920","place_city_name":"Fayetteville","winner":"ACRO CONSTRUCTION, LLC","award_amount":"678000.00","publications":[{"notice_id":"5f533fd708574cceb41e5def8ac6b22d","title":"Z2DA--Replace Auxiliary Chiller","solicitation_number":"36C24626B0004","notice_type":"r","base_type":"r","posted":"2025-10-08","posted_at":"2025-10-08T14:39:19.257Z","due_at":"2025-10-22T19:00:00Z","due_date":"2025-10-22","cancelled":false,"archived":true,"archive_date":"2026-01-29","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5f533fd708574cceb41e5def8ac6b22d/view","enriched":true,"history":[{"index":6,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:16:36.247Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1ed3faaf32a442f6921d04291114ebb8","solicitation_number":"36C24626B0004","related_opportunity_id":"5f533fd708574cceb41e5def8ac6b22d"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-08T14:39:19.257Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"5f533fd708574cceb41e5def8ac6b22d","solicitation_number":"36C24626B0004"}]},{"notice_id":"1ed3faaf32a442f6921d04291114ebb8","title":"Z2DA--Replace Auxiliary Chiller","solicitation_number":"36C24626B0004","notice_type":"p","base_type":"r","posted":"2025-11-17","posted_at":"2025-11-17T13:16:36.247Z","due_at":"2026-01-26T16:00:00Z","due_date":"2026-01-26","cancelled":false,"archived":true,"archive_date":"2026-05-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1ed3faaf32a442f6921d04291114ebb8/view","enriched":true,"history":[{"index":7,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:16:36.247Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1ed3faaf32a442f6921d04291114ebb8","solicitation_number":"36C24626B0004","related_opportunity_id":"5f533fd708574cceb41e5def8ac6b22d"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-08T14:39:19.257Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"5f533fd708574cceb41e5def8ac6b22d","solicitation_number":"36C24626B0004"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}]},{"notice_id":"855bfa65a7514b52924b5f14bb4308c8","title":"Z2DA--Replace Auxiliary Chiller","solicitation_number":"36C24626B0004","notice_type":"o","base_type":"p","posted":"2025-12-09","posted_at":"2025-12-09T20:49:07.028Z","due_at":"2026-01-26T20:00:00Z","due_date":"2026-01-26","cancelled":false,"archived":true,"archive_date":"2026-05-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/855bfa65a7514b52924b5f14bb4308c8/view","enriched":true,"history":[{"index":8,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:16:36.247Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1ed3faaf32a442f6921d04291114ebb8","solicitation_number":"36C24626B0004","related_opportunity_id":"5f533fd708574cceb41e5def8ac6b22d"},{"index":7,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-10T19:42:55.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3968854f3ba64bc9938328ed476a6bed","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":5,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:16:51.602Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5cfa2ede33fb47db97eaa470cc7a80cc","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:15:38.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b2f90a6378bd46988e0337fc6751ba7d","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T18:06:27.123Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e6830a693a324a468677025e04cc5b4a","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":2,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}]},{"notice_id":"5cfa2ede33fb47db97eaa470cc7a80cc","title":"Z2DA--Replace Auxiliary Chiller","solicitation_number":"36C24626B0004","notice_type":"o","base_type":"o","posted":"2026-01-20","posted_at":"2026-01-20T19:16:51.602Z","due_at":"2026-01-26T20:00:00Z","due_date":"2026-01-26","cancelled":false,"archived":true,"archive_date":"2026-02-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5cfa2ede33fb47db97eaa470cc7a80cc/view","enriched":true,"history":[{"index":8,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:16:36.247Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1ed3faaf32a442f6921d04291114ebb8","solicitation_number":"36C24626B0004","related_opportunity_id":"5f533fd708574cceb41e5def8ac6b22d"},{"index":7,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-10T19:42:55.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3968854f3ba64bc9938328ed476a6bed","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":5,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:16:51.602Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5cfa2ede33fb47db97eaa470cc7a80cc","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:15:38.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b2f90a6378bd46988e0337fc6751ba7d","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T18:06:27.123Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e6830a693a324a468677025e04cc5b4a","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":2,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}]},{"notice_id":"b2f90a6378bd46988e0337fc6751ba7d","title":"Z2DA--Replace Auxiliary Chiller","solicitation_number":"36C24626B0004","notice_type":"o","base_type":"o","posted":"2026-01-20","posted_at":"2026-01-20T19:15:38.569Z","due_at":"2026-01-26T22:00:00Z","due_date":"2026-01-26","cancelled":false,"archived":true,"archive_date":"2026-02-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b2f90a6378bd46988e0337fc6751ba7d/view","enriched":true,"history":[{"index":8,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:16:36.247Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1ed3faaf32a442f6921d04291114ebb8","solicitation_number":"36C24626B0004","related_opportunity_id":"5f533fd708574cceb41e5def8ac6b22d"},{"index":7,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-10T19:42:55.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3968854f3ba64bc9938328ed476a6bed","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":5,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:16:51.602Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5cfa2ede33fb47db97eaa470cc7a80cc","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:15:38.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b2f90a6378bd46988e0337fc6751ba7d","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T18:06:27.123Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e6830a693a324a468677025e04cc5b4a","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":2,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}]},{"notice_id":"e6830a693a324a468677025e04cc5b4a","title":"Z2DA--Replace Auxiliary Chiller","solicitation_number":"36C24626B0004","notice_type":"o","base_type":"o","posted":"2026-01-20","posted_at":"2026-01-20T18:06:27.123Z","due_at":"2026-01-26T22:00:00Z","due_date":"2026-01-26","cancelled":false,"archived":true,"archive_date":"2026-02-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e6830a693a324a468677025e04cc5b4a/view","enriched":true,"history":[{"index":6,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-10T19:42:55.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3968854f3ba64bc9938328ed476a6bed","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:16:51.602Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5cfa2ede33fb47db97eaa470cc7a80cc","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:15:38.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b2f90a6378bd46988e0337fc6751ba7d","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":2,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T18:06:27.123Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e6830a693a324a468677025e04cc5b4a","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":1,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}]},{"notice_id":"3968854f3ba64bc9938328ed476a6bed","title":"Z2DA--Replace Auxiliary Chiller","solicitation_number":"36C24626B0004","notice_type":"o","base_type":"o","posted":"2026-02-10","posted_at":"2026-02-10T19:42:55.617Z","due_at":"2026-01-26T20:00:00Z","due_date":"2026-01-26","cancelled":false,"archived":true,"archive_date":"2026-02-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3968854f3ba64bc9938328ed476a6bed/view","enriched":true,"history":[{"index":6,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-10T19:42:55.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3968854f3ba64bc9938328ed476a6bed","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:16:51.602Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5cfa2ede33fb47db97eaa470cc7a80cc","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:15:38.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b2f90a6378bd46988e0337fc6751ba7d","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":2,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T18:06:27.123Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e6830a693a324a468677025e04cc5b4a","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":1,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}]},{"notice_id":"e469a050f09f4d4f99e0a1f587af42d7","title":"Z2DA--Replace Auxiliary Chiller","solicitation_number":"36C24626B0004","notice_type":"a","base_type":"a","posted":"2026-03-10","posted_at":"2026-03-10T13:30:23.083Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2026-06-17","removed_at":null,"award_number":"36C24626C0024","awardee_name":"ACRO CONSTRUCTION, LLC","amount":"678000.00","link_sam":"https://sam.gov/workspace/contract/opp/e469a050f09f4d4f99e0a1f587af42d7/view","enriched":true,"history":[{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-10T13:30:23.083Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"e469a050f09f4d4f99e0a1f587af42d7","solicitation_number":"36C24626B0004"}]}],"latest_notice_id":"e469a050f09f4d4f99e0a1f587af42d7","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-10-08","posted_at":"2025-10-08T14:39:19.257Z","created_at":"2025-10-08T14:39:17.029Z","modified_at":"2026-01-30T05:04:27.302Z","response_deadline":{"raw":"2025-10-22T15:00:00-04:00","utc":"2025-10-22T19:00:00Z","date":"2025-10-22","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5f533fd708574cceb41e5def8ac6b22d/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Z2DA--Replace Auxiliary Chiller","agency":{"office":{"code":"36C246","name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"organization_id":"100167096","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-29","archive_type":"auto_custom"},"history":[{"index":6,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:16:36.247Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1ed3faaf32a442f6921d04291114ebb8","solicitation_number":"36C24626B0004","related_opportunity_id":"5f533fd708574cceb41e5def8ac6b22d"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-08T14:39:19.257Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"5f533fd708574cceb41e5def8ac6b22d","solicitation_number":"36C24626B0004"}],"contacts":[{"name":"Michael Proctor","role":"primary","email":"Michael.Proctor2@va.gov","phone":"EMAIL ONLY","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"5f533fd708574cceb41e5def8ac6b22d","lineage_id":"5f533fd708574cceb41e5def8ac6b22d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-26T03:59:04.515715067Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"6e2a4d6af8efc04c9ff232de79c63fb6cae7eb2b76cbfd77cef32e2f052a4e5a","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-26T03:59:04.515715067Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"THIS IS A SOURCES SOUGHT NOTICE ONLY. This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. No formal solicitation document exists at this time. We are seeking information for market research purposes only. The Government will not pay for any information solicited.\nThe VHA Network Contracting Office 6 (NCO 6) is conducting a market survey to find qualified vendors to provide all labor, materials, tools, equipment, transportation, supervision, coordination, and services necessary to complete the below scope of work. \nThe proposed NAICS 238220 is applicable to this acquisition; with a size standard of $19.0 million.\nThe anticipated Magnitude of Construction is between $250,000 and $500,000. The anticipated Period of Performance is 6 months from the Notice to Proceed.\nScope of Work: \nRemove and replace the existing 120-ton auxiliary chiller at Building 3. The purpose of this chiller is to provide chilled water redundancy to Building 3. The new auxiliary chiller shall be the same size/capacity as the existing chiller and shall be fully functional.\nThe contractor shall replace and install all required piping, valves, supports, and controls. The new auxiliary chiller shall be integrated with the existing Building Automation System (BAS). Chiller controller shall be BACNET compliant, and all data points should be pulled through the BACNET connection. The contractor shall install minimum (hard wired) data points to include but not limited to (1) Start/Stop, (2) Status, and (3) Alarm (hard wired). All low voltage control wirings must be installed in blue control conduit. All graphics/trends and digital alarming associated with the new chiller must be updated on the Tridium Direct Digital Control (DDC) Supervisor located in Room 2 in Building no. 35.\nThe contractor shall replace two (2) 250 gpm pumps located in an adjacent mechanical room. Contractor may reuse the existing concrete pads. Replace/reroute piping, if required, to install the new pumps. Pumps shall be programmed into the BAS with the same data points as the chiller.\nInstructions:\nThe CO will consider responses received for this Sources Sought Notice, along with any other market research that is conducted, when determining the appropriate acquisition strategy. Pursuant to 38 U.S.C. 8127(d), CO s must set aside all acquisitions for SDVOSBs or VOSBs whenever there is a reasonable expectation of receiving two or more offers/quotes from eligible, capable and verified firms, and that an award can be made at a fair and reasonable price that offers best value to the Government. However, if responses from qualified firms prove inadequate, an alternate set-aside or full and open competition may be considered.\nIn order to be considered eligible for an SDVOSB or VOSB Set-Aside, interested firms must confirm in their response to this Sources Sought Notice that they will be able to comply with all the following criteria:\nVA Acquisition Regulation (VAAR) 819.7003 - Eligibility\nVAAR Clause 852.219-73   SDVOSB Set-Aside or 852.219-74   VOSB Set-Aside\nVAAR Clause 852.219-75   VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction.\nAll interested parties should respond, in writing via email to Michael.Proctor2@va.gov. No telephone inquiries will be accepted. Your response is required by 3:00 PM EDT on Wednesday, October 22, 2025. In your response, please include the following: \nCompany name\nAddress\nPoint of contact with email and phone number\nSAM Unique Entry ID number and evidence of current SAM registration (see https://www.sam.gov for more information)\nProposed NAICS code (if different from above)\nCapabilities statement, to include experience with contracts of similar scope and magnitude\nInformation describing your interest\nInformation demonstrating your company has the capacity to complete this project, to include available bonding capacity\nCompany Socio-Economic SIZE (example large, small, SDVOSB, VOSB, WOSB etc.)\nA brief statement on how you will comply with the Limitations on Subcontracting, if applicable\nIn addition to this information, please include responses to all of the following in your submission:\nWhat additional information would you require in order to provide an offer for this project?\nIs the anticipated Period of Performance sufficient to complete the project?\nIs the anticipated Magnitude of Construction appropriate for this project?","text":"THIS IS A SOURCES SOUGHT NOTICE ONLY. This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. No formal solicitation document exists at this time. We are seeking information for market research purposes only. The Government will not pay for any information solicited.\nThe VHA Network Contracting Office 6 (NCO 6) is conducting a market survey to find qualified vendors to provide all labor, materials, tools, equipment, transportation, supervision, coordination, and services necessary to complete the below scope of work.\nThe proposed NAICS 238220 is applicable to this acquisition; with a size standard of $19.0 million.\nThe anticipated Magnitude of Construction is between $250,000 and $500,000. The anticipated Period of Performance is 6 months from the Notice to Proceed.\nScope of Work:\nRemove and replace the existing 120-ton auxiliary chiller at Building 3. The purpose of this chiller is to provide chilled water redundancy to Building 3. The new auxiliary chiller shall be the same size/capacity as the existing chiller and shall be fully functional.\nThe contractor shall replace and install all required piping, valves, supports, and controls. The new auxiliary chiller shall be integrated with the existing Building Automation System (BAS). Chiller controller shall be BACNET compliant, and all data points should be pulled through the BACNET connection. The contractor shall install minimum (hard wired) data points to include but not limited to (1) Start/Stop, (2) Status, and (3) Alarm (hard wired). All low voltage control wirings must be installed in blue control conduit. All graphics/trends and digital alarming associated with the new chiller must be updated on the Tridium Direct Digital Control (DDC) Supervisor located in Room 2 in Building no. 35.\nThe contractor shall replace two (2) 250 gpm pumps located in an adjacent mechanical room. Contractor may reuse the existing concrete pads. Replace/reroute piping, if required, to install the new pumps. Pumps shall be programmed into the BAS with the same data points as the chiller.\nInstructions:\nThe CO will consider responses received for this Sources Sought Notice, along with any other market research that is conducted, when determining the appropriate acquisition strategy. Pursuant to 38 U.S.C. 8127(d), CO s must set aside all acquisitions for SDVOSBs or VOSBs whenever there is a reasonable expectation of receiving two or more offers/quotes from eligible, capable and verified firms, and that an award can be made at a fair and reasonable price that offers best value to the Government. However, if responses from qualified firms prove inadequate, an alternate set-aside or full and open competition may be considered.\nIn order to be considered eligible for an SDVOSB or VOSB Set-Aside, interested firms must confirm in their response to this Sources Sought Notice that they will be able to comply with all the following criteria:\nVA Acquisition Regulation (VAAR) 819.7003 - Eligibility\nVAAR Clause 852.219-73 SDVOSB Set-Aside or 852.219-74 VOSB Set-Aside\nVAAR Clause 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction.\nAll interested parties should respond, in writing via email to Michael.Proctor2@va.gov. No telephone inquiries will be accepted. Your response is required by 3:00 PM EDT on Wednesday, October 22, 2025. In your response, please include the following:\nCompany name\nAddress\nPoint of contact with email and phone number\nSAM Unique Entry ID number and evidence of current SAM registration (see https://www.sam.gov for more information)\nProposed NAICS code (if different from above)\nCapabilities statement, to include experience with contracts of similar scope and magnitude\nInformation describing your interest\nInformation demonstrating your company has the capacity to complete this project, to include available bonding capacity\nCompany Socio-Economic SIZE (example large, small, SDVOSB, VOSB, WOSB etc.)\nA brief statement on how you will comply with the Limitations on Subcontracting, if applicable\nIn addition to this information, please include responses to all of the following in your submission:\nWhat additional information would you require in order to provide an offer for this project?\nIs the anticipated Period of Performance sufficient to complete the project?\nIs the anticipated Magnitude of Construction appropriate for this project?","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24626B0004","place_of_performance":{"zip":"28301","city":{"code":"22920","name":"Fayetteville"},"state":{"code":"NC","name":"North Carolina"},"street":"Fayetteville Veterans Affairs Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"2300 Ramsey Street"},"product_service_code":"Z2DA"},{"award":{"awardee":{}},"dates":{"posted":"2025-11-17","posted_at":"2025-11-17T13:16:36.247Z","created_at":"2025-11-17T13:16:33.918Z","modified_at":"2026-05-06T03:55:45.882Z","response_deadline":{"raw":"2026-01-26T11:00:00-05:00","utc":"2026-01-26T16:00:00Z","date":"2026-01-26","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1ed3faaf32a442f6921d04291114ebb8/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Z2DA--Replace Auxiliary Chiller","agency":{"office":{"code":"36C246","name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"organization_id":"100167096","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-05-05","archive_type":"auto_custom"},"history":[{"index":7,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:16:36.247Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1ed3faaf32a442f6921d04291114ebb8","solicitation_number":"36C24626B0004","related_opportunity_id":"5f533fd708574cceb41e5def8ac6b22d"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-08T14:39:19.257Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"5f533fd708574cceb41e5def8ac6b22d","solicitation_number":"36C24626B0004"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}],"contacts":[{"name":"Michael Proctor","role":"primary","email":"michael.proctor2@va.gov","phone":"EMAIL ONLY","title":"Contract Specialist"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"1ed3faaf32a442f6921d04291114ebb8","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"855bfa65a7514b52924b5f14bb4308c8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-22T02:52:59.656195604Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"bd944690d077907e1395217787b3974fb041ce238d9f64ec13c62a03b999c0d5","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-22T02:52:59.656195604Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"The Department of Veterans Affairs, 2300 Ramsey Street, Fayetteville, NC 28301 has a requirement for a contractor to provide all labor, material, supplies, transportation, permits, license and qualified supervision for Project 565-24-113, Replace Auxiliary Chiller located at the Fayetteville VA Medical Center, Fayetteville, NC.\nGeneral Scope: Remove and replace the existing 120-ton auxiliary chiller at Building 3. The purpose of this chiller is to provide chilled water redundancy to Building 3. The new auxiliary chiller shall be the same size/capacity as the existing chiller and shall be fully functional. \nThe contractor shall replace and install all required piping, valves, supports, and controls. The new auxiliary chiller shall be integrated with the existing Building Automation System (BAS). Chiller controller shall be BACNET compliant, and all data points should be pulled through the BACNET connection. The contractor shall install minimum (hard wired) data points to include but not limited to (1) Start/Stop, (2) Status, and (3) Alarm (hard wired). All low voltage control wirings must be installed in blue control conduit. All graphics/trends and digital alarming associated with the new chiller must be updated on the Tridium Direct Digital Control (DDC) Supervisor located in Room 2 in Building no. 35.\nThe contractor shall replace two (2) 250 gpm pumps located in an adjacent mechanical room. Contractor may reuse the existing concrete pads. Replace/reroute piping, if required, to install the new pumps. Pumps shall be programmed into the BAS with the same data points as the chiller.\nEstimated construction magnitude is between $250,000 and $500,000.\nNAICS CODE: 238220 Size Standard: $19.0 Million\nThis solicitation is anticipated to be a Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. In accordance with Public Law 109-461 and VAAR 819.7003 (b), offerors must be registered and certified in the SBA Certification database as a SDVOSB. Only offers from certified SDVOSBs in the SBA database at the time of offer shall be deemed eligible for award.\nNetwork Contracting Office 6 (NCO 6) intends to issue a Invitation for Bids (IFB) and award a single, firm fixed-price contract. Solicitation material will be available on/about December 9, 2025. Any specifications, drawings and amendments will be posted on the System for Award Management (SAM) Contract Opportunities website (https://sam.gov/opportunities). The Contract Opportunities website is the only official location to obtain solicitation information and documents. Offers will be due approximately 48 days after issuance of the solicitation. Only one (1) site visit will be scheduled. Location and point(s) of contact for the site visit will be identified in the solicitation. \nThis notice is for informational purposes only and is not a request for quotation. The Government is not obligated to issue a solicitation as a result of this notice. No other information is available until issuance of the solicitation. No offerors list is maintained. All interested vendors should register on SAM.gov. Interested offerors are advised they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of offers and should revisit the website periodically for any amendments/notices to the solicitation. Prospective contractors must be registered in the SAM database in order to obtain access in Contract Opportunities. SAM and SBA Certification Database registration must be current and active to be eligible for contract award. Contractors please note: Online Representations and Certifications Applications (ORCA) apply to this solicitation. With ORCA; you now have the availability to enter and maintain your reps and certs with your proposal. \nAny questions regarding this announcement and all future announcements regarding this project must be emailed to the Contract Specialist, Michael Proctor, at Michael.proctor2@va.gov.  \nNO TELEPHONE REQUESTS FOR SOLICIATION MATERIAL WILL BE ACCEPTED.","text":"The Department of Veterans Affairs, 2300 Ramsey Street, Fayetteville, NC 28301 has a requirement for a contractor to provide all labor, material, supplies, transportation, permits, license and qualified supervision for Project 565-24-113, Replace Auxiliary Chiller located at the Fayetteville VA Medical Center, Fayetteville, NC.\nGeneral Scope: Remove and replace the existing 120-ton auxiliary chiller at Building 3. The purpose of this chiller is to provide chilled water redundancy to Building 3. The new auxiliary chiller shall be the same size/capacity as the existing chiller and shall be fully functional.\nThe contractor shall replace and install all required piping, valves, supports, and controls. The new auxiliary chiller shall be integrated with the existing Building Automation System (BAS). Chiller controller shall be BACNET compliant, and all data points should be pulled through the BACNET connection. The contractor shall install minimum (hard wired) data points to include but not limited to (1) Start/Stop, (2) Status, and (3) Alarm (hard wired). All low voltage control wirings must be installed in blue control conduit. All graphics/trends and digital alarming associated with the new chiller must be updated on the Tridium Direct Digital Control (DDC) Supervisor located in Room 2 in Building no. 35.\nThe contractor shall replace two (2) 250 gpm pumps located in an adjacent mechanical room. Contractor may reuse the existing concrete pads. Replace/reroute piping, if required, to install the new pumps. Pumps shall be programmed into the BAS with the same data points as the chiller.\nEstimated construction magnitude is between $250,000 and $500,000.\nNAICS CODE: 238220 Size Standard: $19.0 Million\nThis solicitation is anticipated to be a Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. In accordance with Public Law 109-461 and VAAR 819.7003 (b), offerors must be registered and certified in the SBA Certification database as a SDVOSB. Only offers from certified SDVOSBs in the SBA database at the time of offer shall be deemed eligible for award.\nNetwork Contracting Office 6 (NCO 6) intends to issue a Invitation for Bids (IFB) and award a single, firm fixed-price contract. Solicitation material will be available on/about December 9, 2025. Any specifications, drawings and amendments will be posted on the System for Award Management (SAM) Contract Opportunities website (https://sam.gov/opportunities). The Contract Opportunities website is the only official location to obtain solicitation information and documents. Offers will be due approximately 48 days after issuance of the solicitation. Only one (1) site visit will be scheduled. Location and point(s) of contact for the site visit will be identified in the solicitation.\nThis notice is for informational purposes only and is not a request for quotation. The Government is not obligated to issue a solicitation as a result of this notice. No other information is available until issuance of the solicitation. No offerors list is maintained. All interested vendors should register on SAM.gov. Interested offerors are advised they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of offers and should revisit the website periodically for any amendments/notices to the solicitation. Prospective contractors must be registered in the SAM database in order to obtain access in Contract Opportunities. SAM and SBA Certification Database registration must be current and active to be eligible for contract award. Contractors please note: Online Representations and Certifications Applications (ORCA) apply to this solicitation. With ORCA; you now have the availability to enter and maintain your reps and certs with your proposal.\nAny questions regarding this announcement and all future announcements regarding this project must be emailed to the Contract Specialist, Michael Proctor, at Michael.proctor2@va.gov.\nNO TELEPHONE REQUESTS FOR SOLICIATION MATERIAL WILL BE ACCEPTED.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C24626B0004","place_of_performance":{"zip":"28301","city":{"code":"22920","name":"Fayetteville"},"state":{"code":"NC","name":"North Carolina"},"street":"Fayetteville VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"2300 Ramsey Street"},"product_service_code":"Z2DA"},{"award":{"awardee":{}},"dates":{"posted":"2025-12-09","posted_at":"2025-12-09T20:49:07.028Z","created_at":"2025-12-09T20:49:00.875Z","modified_at":"2026-02-26T04:55:45.048Z","response_deadline":{"raw":"2026-01-26T15:00:00-05:00","utc":"2026-01-26T20:00:00Z","date":"2026-01-26","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/855bfa65a7514b52924b5f14bb4308c8/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Z2DA--Replace Auxiliary Chiller","agency":{"office":{"code":"36C246","name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"organization_id":"100167096","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-05-05","archive_type":"auto_custom"},"history":[{"index":8,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:16:36.247Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1ed3faaf32a442f6921d04291114ebb8","solicitation_number":"36C24626B0004","related_opportunity_id":"5f533fd708574cceb41e5def8ac6b22d"},{"index":7,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-10T19:42:55.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3968854f3ba64bc9938328ed476a6bed","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":5,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:16:51.602Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5cfa2ede33fb47db97eaa470cc7a80cc","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:15:38.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b2f90a6378bd46988e0337fc6751ba7d","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T18:06:27.123Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e6830a693a324a468677025e04cc5b4a","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":2,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}],"contacts":[{"name":"Michael R Proctor","role":"primary","email":"Michael.Proctor2@va.gov","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"855bfa65a7514b52924b5f14bb4308c8","lineage_id":"855bfa65a7514b52924b5f14bb4308c8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-20T00:04:49.891013689Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"e7195d247f252bb29d8de2e7b0d9ef4a359701223df1bed157c1f4396b0fd3a2","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-20T00:04:49.891013689Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"Scope of Work\n Replace Auxiliary Chiller at Building 3\nProject Number: 565-24-113\n\nScope of Work\n\nLocation: 2300 Ramsey Street, Fayetteville, NC 28601, Located outside of Building 3\n\nScope:\nRemove and replace the existing 120-ton auxiliary chiller at Building 3. The purpose of this chiller is to provide chilled water redundancy to Building 3. The new auxiliary chiller shall be the same size/capacity as the existing chiller and shall be fully functional.\n\nThe contractor shall replace and install all required piping, valves, supports, and controls. The new auxiliary chiller shall be integrated with the existing Building Automation System (BAS). Chiller controller shall be BACNET compliant, and all data points should be pulled through the BACNET connection. The contractor shall install minimum (hard wired) data points to include but not limited to (1) Start/Stop, (2) Status, and (3) Alarm (hard wired). All low voltage control wirings must be installed in blue control conduit. All graphics/trends and digital alarming associated with the new chiller must be updated on the Tridium Direct Digital Control (DDC) Supervisor located in Room 2 in Building no. 35.\n\nThe contractor shall replace two (2) 250 gpm pumps located in an adjacent mechanical room; shown on Sheet M103 as B-20A. Contractor may reuse the existing concrete pads. Replace/reroute piping, if required, to install the new pumps. Pumps shall be programmed into the BAS with the same data points as the chiller.\n\n*Note that the existing auxiliary chiller has two electrical circuits.\n\nContractors are strongly encouraged to attend the pre-bid site visit. The date is to be determined.  \n\nRequirements:\nAll work shall be performed in full accordance with applicable local and Federal regulations. All equipment and installation shall conform to the VA master specifications, recommendations of the National Fire Protection Association (NFPA), and Underwriters Laboratories, Inc. The contractor shall use good safety practices during demolition and installation.\nThe contractor shall conduct a pre-installation site visit to verify field conditions.\nThe contractor shall attend a pre-construction meeting with VA stakeholders\nThe contractor shall perform testing and demonstrate proper operations of new chiller with VA maintenance. \nThe contractor shall submit the following to the VA upon completion:\nOperation & Maintenance manuals\nWarranty documentation\n\nStorage: No storage of any material will be allowed on VA property.\n\nPeriod of Performance: To be completed within 6 months of NTP. This should allow adequate time for product lead times. \n\nHours of Operation: Normal working hours: 0800-1700, M-F. Evening and weekend work may be approved by COR.\n\nUtility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR.  Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements.  The contractor shall submit a request to interrupt any such services to COR, in writing, 28 days in advance of the proposed interruption.\n\nAttachments:\nAttachment 1-M103 AHU 30 Bldg. 3 Mech Room 20 Chilled Water 2014   drawing from a 2014 construction project\nPhoto 1-Existing Airstack Chiller at Bldg. 3\nPhoto 2-Data Plate west Airstack   existing chiller data plate\nSpecs AuxChillBldg3\n\n\n\n\nEND SCOPE OF WORK","text":"Scope of Work\nReplace Auxiliary Chiller at Building 3\nProject Number: 565-24-113\n\nScope of Work\n\nLocation: 2300 Ramsey Street, Fayetteville, NC 28601, Located outside of Building 3\n\nScope:\nRemove and replace the existing 120-ton auxiliary chiller at Building 3. The purpose of this chiller is to provide chilled water redundancy to Building 3. The new auxiliary chiller shall be the same size/capacity as the existing chiller and shall be fully functional.\n\nThe contractor shall replace and install all required piping, valves, supports, and controls. The new auxiliary chiller shall be integrated with the existing Building Automation System (BAS). Chiller controller shall be BACNET compliant, and all data points should be pulled through the BACNET connection. The contractor shall install minimum (hard wired) data points to include but not limited to (1) Start/Stop, (2) Status, and (3) Alarm (hard wired). All low voltage control wirings must be installed in blue control conduit. All graphics/trends and digital alarming associated with the new chiller must be updated on the Tridium Direct Digital Control (DDC) Supervisor located in Room 2 in Building no. 35.\n\nThe contractor shall replace two (2) 250 gpm pumps located in an adjacent mechanical room; shown on Sheet M103 as B-20A. Contractor may reuse the existing concrete pads. Replace/reroute piping, if required, to install the new pumps. Pumps shall be programmed into the BAS with the same data points as the chiller.\n\n*Note that the existing auxiliary chiller has two electrical circuits.\n\nContractors are strongly encouraged to attend the pre-bid site visit. The date is to be determined.\n\nRequirements:\nAll work shall be performed in full accordance with applicable local and Federal regulations. All equipment and installation shall conform to the VA master specifications, recommendations of the National Fire Protection Association (NFPA), and Underwriters Laboratories, Inc. The contractor shall use good safety practices during demolition and installation.\nThe contractor shall conduct a pre-installation site visit to verify field conditions.\nThe contractor shall attend a pre-construction meeting with VA stakeholders\nThe contractor shall perform testing and demonstrate proper operations of new chiller with VA maintenance.\nThe contractor shall submit the following to the VA upon completion:\nOperation & Maintenance manuals\nWarranty documentation\n\nStorage: No storage of any material will be allowed on VA property.\n\nPeriod of Performance: To be completed within 6 months of NTP. This should allow adequate time for product lead times.\n\nHours of Operation: Normal working hours: 0800-1700, M-F. Evening and weekend work may be approved by COR.\n\nUtility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. The contractor shall submit a request to interrupt any such services to COR, in writing, 28 days in advance of the proposed interruption.\n\nAttachments:\nAttachment 1-M103 AHU 30 Bldg. 3 Mech Room 20 Chilled Water 2014 drawing from a 2014 construction project\nPhoto 1-Existing Airstack Chiller at Bldg. 3\nPhoto 2-Data Plate west Airstack existing chiller data plate\nSpecs AuxChillBldg3\n\nEND SCOPE OF WORK","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24626B0004","product_service_code":"Z2DA"},{"award":{"awardee":{}},"dates":{"posted":"2026-01-20","posted_at":"2026-01-20T19:16:51.602Z","created_at":"2026-01-20T19:15:57.122Z","modified_at":"2026-02-26T04:55:45.048Z","response_deadline":{"raw":"2026-01-26T15:00:00-05:00","utc":"2026-01-26T20:00:00Z","date":"2026-01-26","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5cfa2ede33fb47db97eaa470cc7a80cc/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Z2DA--Replace Auxiliary Chiller","agency":{"office":{"code":"36C246","name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"organization_id":"100167096","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-25","archive_type":"auto_custom"},"history":[{"index":8,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:16:36.247Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1ed3faaf32a442f6921d04291114ebb8","solicitation_number":"36C24626B0004","related_opportunity_id":"5f533fd708574cceb41e5def8ac6b22d"},{"index":7,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-10T19:42:55.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3968854f3ba64bc9938328ed476a6bed","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":5,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:16:51.602Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5cfa2ede33fb47db97eaa470cc7a80cc","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:15:38.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b2f90a6378bd46988e0337fc6751ba7d","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T18:06:27.123Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e6830a693a324a468677025e04cc5b4a","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":2,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}],"contacts":[{"name":"Michael R Proctor","role":"primary","email":"Michael.Proctor2@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5cfa2ede33fb47db97eaa470cc7a80cc","lineage_id":"855bfa65a7514b52924b5f14bb4308c8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-15T03:25:27.810259979Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"68cf95dc973b902108ba83cdab4529ffcae6684198cdd8f08159290bcb777c26","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-15T03:25:27.810259979Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Replace Auxiliary Chiller Building 3\nProject no: 565-24-113\nPre-Bid Questions\n\n\nDoes the SuperintendentÂ need to be directly employed by the Prime Contractor? Superintendent must be authorized to act in the name of the prime contractor. \nMust the Superintendent be on site at all times while work is commencing? Yes\nDoes the SSHO (Site Safety Health Officer) need to be directly employed by the Prime Contractor? SSHO must be authorized to act in the name of the prime contractor.\nMust theÂ SSHO be on site at all times while work is commencing? Yes\nCan the Superintendent & SSHO be a dual-hatted individualÂ assuming that individual is qualifiedÂ for both roles? Yes, see Spec 01 35 26.1.9 section heading:  The Site Superintendent may also serve as SSHO if considered qualified by VA Engineering. \nAre there any other mandatory on-site roles required in this contract? No\nWhen does the VA expect the project to start following the award? The VA generally expects the project to start shortly after the award has been granted. The exact start date will be determined based on the completion of any necessary preparatory steps.\nAre there any concerns for Asbestos Containing Material or Lead in the areas being worked in? There is no known ACM or lead as part of this project.\nAre there any ICRA requirementsÂ for this project? Work will be completed inside a mechanical room and outside Building 3. Dust generation must be kept to a minimum. It is not anticipated that negative air, sticky mats, plastic barriers, or similar would be required.\nWho is the current Controls provider at the VA? There is not one controls contractor. This is an open BACNET system as per the SOW.\nDoes the awarded contractor have to use this company's quote in our bid for controls integration? Not applicable\nIf yes, can the VA please provide contact info? Not applicable\nSite Visit sign in sheet posted? See Attached Sign-In sheet\nWhat manufacturer chiller is required to be replaced? None specified. Must meet Buy American and SOW requirements.\nWhat is the physical size of the new chiller? If bigger than existing, does the VA want to increase the size of the concrete pad or provide steel framing? Contractor to utilize the current concrete pad. If contractor s proposed chiller exceeds the size and capacity of the current concrete pad, contractor will be responsible for any demolition and construction at no additional cost to the government. Contractor would have to first seek VA approval to exceed the current footprint as space is a premium.\nPlease confirm laydown and parking areas to be provided to contractor. Contractor may park in any available parking space at the facility. Laydown, if necessary, would be as directed by the COR. Assume the laydown area would be at the southeastern end of the facility, near the back gate.\nPlease confirm the VA will coordinate with awardee to only need 1 mobilization. Generally this job should only require 1 mobilization, assuming the VA will allow it. If the contractor mobilizes on site and the VA reschedules, this would be added cost. This question is unclear as to why multiple mobilizations are required. Contractor will provide the VA a proposed schedule and both parties will work towards those dates. Contractor will be responsible for submitting utility outage requests weeks before the desired date.\nScope states that the pumps be programed into the BAS   Pumps can not be programed that have existing ( Old ) drives. Should drives be replaced. If so, are there specs? If pumps are independently controlled, then they should have new drives. Otherwise, new pumps to be controlled by the new chiller. \nChiller Specs ( equivalent vender ) design requirements ( Screw, Recep, modular ) ? Screw or scroll chiller is what should be submitted for approval. See Spec Section 23 64 00 Packaged Water Chillers\nChiller power scope is not clear; there are two existing circuits which to be used and what to be done on the second. Correct, there are two electrical circuits for the existing chiller. The VA expects the two circuits to be reused with the replacement chiller unless only one circuit is required. Contractor to ensure adequate amperage is available for their proposed chiller. If second circuit isn t required for new chiller, contractor to properly abandon circuit in place.\nWill submittals be required on all products and approved? Yes.\nTypes of materials   can fusion piping be used? No. Welded steel is appropriate. See specification section 23 21 13 Hydronic Piping.\nNo specs on Insulation or heat tape requirements. See specification section 23 07 11 attached.\nIs there a road closure permit required for the site for purpose of the crane to be set up? See Spec Section 01 00 00.1.6.L&M. Contractor must minimize impact to the facility. Any potential, temporary road closures and crane lift plans would have to be approved by the VA engineering and safety. \nPlease provide provisions if existing isolation valves do not hold VA will assist contractor by providing information and assistance with coordination so to avoid or address this potential problem.\nControls   scope states integration into BACNET card and into the BAS. Please clarify who has to be used for the integration and has access to program in system. Any certified controls contractor who is qualified to work on a Tridium DDC.\nExisting Expansion tank   Has it been verified to work and / or leave off scope? This is an expansion tank; estimated at 44 gallons. Contractor to verify this current tank volume is adequate for proposed new chiller.\nAir separator to be vented external of building per A2L code requirements Not applicable.\nNo defined scope on pumps ( manufacture, base mounted as existing, how should they be built out { Tripple Duty valves, gauges and temps} Alignment? Lots to know on theses. See spec Section 23 21 23 Hydronic Pumps.\nHow many on site Pre Con meetings required? There will be one Pre Con meeting.\nScope doesn t state any required pre or post T&B - Please confirm if required. T&B not required. Contractor to verify flow is adequate across the primary chiller loop.\nIs the intent for the new chiller to match the exciting modulating heat pump chiller? No.","text":"Replace Auxiliary Chiller Building 3\nProject no: 565-24-113\nPre-Bid Questions\n\nDoes the SuperintendentÂ need to be directly employed by the Prime Contractor? Superintendent must be authorized to act in the name of the prime contractor.\nMust the Superintendent be on site at all times while work is commencing? Yes\nDoes the SSHO (Site Safety Health Officer) need to be directly employed by the Prime Contractor? SSHO must be authorized to act in the name of the prime contractor.\nMust theÂ SSHO be on site at all times while work is commencing? Yes\nCan the Superintendent & SSHO be a dual-hatted individualÂ assuming that individual is qualifiedÂ for both roles? Yes, see Spec 01 35 26.1.9 section heading: The Site Superintendent may also serve as SSHO if considered qualified by VA Engineering.\nAre there any other mandatory on-site roles required in this contract? No\nWhen does the VA expect the project to start following the award? The VA generally expects the project to start shortly after the award has been granted. The exact start date will be determined based on the completion of any necessary preparatory steps.\nAre there any concerns for Asbestos Containing Material or Lead in the areas being worked in? There is no known ACM or lead as part of this project.\nAre there any ICRA requirementsÂ for this project? Work will be completed inside a mechanical room and outside Building 3. Dust generation must be kept to a minimum. It is not anticipated that negative air, sticky mats, plastic barriers, or similar would be required.\nWho is the current Controls provider at the VA? There is not one controls contractor. This is an open BACNET system as per the SOW.\nDoes the awarded contractor have to use this company's quote in our bid for controls integration? Not applicable\nIf yes, can the VA please provide contact info? Not applicable\nSite Visit sign in sheet posted? See Attached Sign-In sheet\nWhat manufacturer chiller is required to be replaced? None specified. Must meet Buy American and SOW requirements.\nWhat is the physical size of the new chiller? If bigger than existing, does the VA want to increase the size of the concrete pad or provide steel framing? Contractor to utilize the current concrete pad. If contractor s proposed chiller exceeds the size and capacity of the current concrete pad, contractor will be responsible for any demolition and construction at no additional cost to the government. Contractor would have to first seek VA approval to exceed the current footprint as space is a premium.\nPlease confirm laydown and parking areas to be provided to contractor. Contractor may park in any available parking space at the facility. Laydown, if necessary, would be as directed by the COR. Assume the laydown area would be at the southeastern end of the facility, near the back gate.\nPlease confirm the VA will coordinate with awardee to only need 1 mobilization. Generally this job should only require 1 mobilization, assuming the VA will allow it. If the contractor mobilizes on site and the VA reschedules, this would be added cost. This question is unclear as to why multiple mobilizations are required. Contractor will provide the VA a proposed schedule and both parties will work towards those dates. Contractor will be responsible for submitting utility outage requests weeks before the desired date.\nScope states that the pumps be programed into the BAS Pumps can not be programed that have existing ( Old ) drives. Should drives be replaced. If so, are there specs? If pumps are independently controlled, then they should have new drives. Otherwise, new pumps to be controlled by the new chiller.\nChiller Specs ( equivalent vender ) design requirements ( Screw, Recep, modular ) ? Screw or scroll chiller is what should be submitted for approval. See Spec Section 23 64 00 Packaged Water Chillers\nChiller power scope is not clear; there are two existing circuits which to be used and what to be done on the second. Correct, there are two electrical circuits for the existing chiller. The VA expects the two circuits to be reused with the replacement chiller unless only one circuit is required. Contractor to ensure adequate amperage is available for their proposed chiller. If second circuit isn t required for new chiller, contractor to properly abandon circuit in place.\nWill submittals be required on all products and approved? Yes.\nTypes of materials can fusion piping be used? No. Welded steel is appropriate. See specification section 23 21 13 Hydronic Piping.\nNo specs on Insulation or heat tape requirements. See specification section 23 07 11 attached.\nIs there a road closure permit required for the site for purpose of the crane to be set up? See Spec Section 01 00 00.1.6.L&M. Contractor must minimize impact to the facility. Any potential, temporary road closures and crane lift plans would have to be approved by the VA engineering and safety.\nPlease provide provisions if existing isolation valves do not hold VA will assist contractor by providing information and assistance with coordination so to avoid or address this potential problem.\nControls scope states integration into BACNET card and into the BAS. Please clarify who has to be used for the integration and has access to program in system. Any certified controls contractor who is qualified to work on a Tridium DDC.\nExisting Expansion tank Has it been verified to work and / or leave off scope? This is an expansion tank; estimated at 44 gallons. Contractor to verify this current tank volume is adequate for proposed new chiller.\nAir separator to be vented external of building per A2L code requirements Not applicable.\nNo defined scope on pumps ( manufacture, base mounted as existing, how should they be built out { Tripple Duty valves, gauges and temps} Alignment? Lots to know on theses. See spec Section 23 21 23 Hydronic Pumps.\nHow many on site Pre Con meetings required? There will be one Pre Con meeting.\nScope doesn t state any required pre or post T&B - Please confirm if required. T&B not required. Contractor to verify flow is adequate across the primary chiller loop.\nIs the intent for the new chiller to match the exciting modulating heat pump chiller? No.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24626B0004","product_service_code":"Z2DA"},{"award":{"awardee":{}},"dates":{"posted":"2026-01-20","posted_at":"2026-01-20T19:15:38.569Z","created_at":"2026-01-20T19:13:21.496Z","modified_at":"2026-02-26T04:55:45.048Z","response_deadline":{"raw":"2026-01-26T17:00:00-05:00","utc":"2026-01-26T22:00:00Z","date":"2026-01-26","time":"17:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b2f90a6378bd46988e0337fc6751ba7d/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Z2DA--Replace Auxiliary Chiller","agency":{"office":{"code":"36C246","name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"organization_id":"100167096","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-25","archive_type":"auto_custom"},"history":[{"index":8,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:16:36.247Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"1ed3faaf32a442f6921d04291114ebb8","solicitation_number":"36C24626B0004","related_opportunity_id":"5f533fd708574cceb41e5def8ac6b22d"},{"index":7,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-10T19:42:55.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3968854f3ba64bc9938328ed476a6bed","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":5,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:16:51.602Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5cfa2ede33fb47db97eaa470cc7a80cc","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:15:38.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b2f90a6378bd46988e0337fc6751ba7d","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T18:06:27.123Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e6830a693a324a468677025e04cc5b4a","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":2,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}],"contacts":[{"name":"Michael R Proctor","role":"primary","email":"Michael.Proctor2@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"b2f90a6378bd46988e0337fc6751ba7d","lineage_id":"855bfa65a7514b52924b5f14bb4308c8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-15T03:39:27.508352605Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"9a43cc0781da8cbeff2791e902a5da18ed4c256e1501586c1cb0d8f7390dfe40","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-15T03:39:27.508352605Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Replace Auxiliary Chiller Building 3\nProject no: 565-24-113\nPre-Bid Questions\n\n\nDoes the SuperintendentÂ need to be directly employed by the Prime Contractor? Superintendent must be authorized to act in the name of the prime contractor. \nMust the Superintendent be on site at all times while work is commencing? Yes\nDoes the SSHO (Site Safety Health Officer) need to be directly employed by the Prime Contractor? SSHO must be authorized to act in the name of the prime contractor.\nMust theÂ SSHO be on site at all times while work is commencing? Yes\nCan the Superintendent & SSHO be a dual-hatted individualÂ assuming that individual is qualifiedÂ for both roles? Yes, see Spec 01 35 26.1.9 section heading:  The Site Superintendent may also serve as SSHO if considered qualified by VA Engineering. \nAre there any other mandatory on-site roles required in this contract? No\nWhen does the VA expect the project to start following the award? The VA generally expects the project to start shortly after the award has been granted. The exact start date will be determined based on the completion of any necessary preparatory steps.\nAre there any concerns for Asbestos Containing Material or Lead in the areas being worked in? There is no known ACM or lead as part of this project.\nAre there any ICRA requirementsÂ for this project? Work will be completed inside a mechanical room and outside Building 3. Dust generation must be kept to a minimum. It is not anticipated that negative air, sticky mats, plastic barriers, or similar would be required.\nWho is the current Controls provider at the VA? There is not one controls contractor. This is an open BACNET system as per the SOW.\nDoes the awarded contractor have to use this company's quote in our bid for controls integration? Not applicable\nIf yes, can the VA please provide contact info? Not applicable\nSite Visit sign in sheet posted? See Attached Sign-In sheet\nWhat manufacturer chiller is required to be replaced? None specified. Must meet Buy American and SOW requirements.\nWhat is the physical size of the new chiller? If bigger than existing, does the VA want to increase the size of the concrete pad or provide steel framing? Contractor to utilize the current concrete pad. If contractor s proposed chiller exceeds the size and capacity of the current concrete pad, contractor will be responsible for any demolition and construction at no additional cost to the government. Contractor would have to first seek VA approval to exceed the current footprint as space is a premium.\nPlease confirm laydown and parking areas to be provided to contractor. Contractor may park in any available parking space at the facility. Laydown, if necessary, would be as directed by the COR. Assume the laydown area would be at the southeastern end of the facility, near the back gate.\nPlease confirm the VA will coordinate with awardee to only need 1 mobilization. Generally this job should only require 1 mobilization, assuming the VA will allow it. If the contractor mobilizes on site and the VA reschedules, this would be added cost. This question is unclear as to why multiple mobilizations are required. Contractor will provide the VA a proposed schedule and both parties will work towards those dates. Contractor will be responsible for submitting utility outage requests weeks before the desired date.\nScope states that the pumps be programed into the BAS   Pumps can not be programed that have existing ( Old ) drives. Should drives be replaced. If so, are there specs? If pumps are independently controlled, then they should have new drives. Otherwise, new pumps to be controlled by the new chiller. \nChiller Specs ( equivalent vender ) design requirements ( Screw, Recep, modular ) ? Screw or scroll chiller is what should be submitted for approval. See Spec Section 23 64 00 Packaged Water Chillers\nChiller power scope is not clear; there are two existing circuits which to be used and what to be done on the second. Correct, there are two electrical circuits for the existing chiller. The VA expects the two circuits to be reused with the replacement chiller unless only one circuit is required. Contractor to ensure adequate amperage is available for their proposed chiller. If second circuit isn t required for new chiller, contractor to properly abandon circuit in place.\nWill submittals be required on all products and approved? Yes.\nTypes of materials   can fusion piping be used? No. Welded steel is appropriate. See specification section 23 21 13 Hydronic Piping.\nNo specs on Insulation or heat tape requirements. See specification section 23 07 11 attached.\nIs there a road closure permit required for the site for purpose of the crane to be set up? See Spec Section 01 00 00.1.6.L&M. Contractor must minimize impact to the facility. Any potential, temporary road closures and crane lift plans would have to be approved by the VA engineering and safety. \nPlease provide provisions if existing isolation valves do not hold VA will assist contractor by providing information and assistance with coordination so to avoid or address this potential problem.\nControls   scope states integration into BACNET card and into the BAS. Please clarify who has to be used for the integration and has access to program in system. Any certified controls contractor who is qualified to work on a Tridium DDC.\nExisting Expansion tank   Has it been verified to work and / or leave off scope? This is an expansion tank; estimated at 44 gallons. Contractor to verify this current tank volume is adequate for proposed new chiller.\nAir separator to be vented external of building per A2L code requirements Not applicable.\nNo defined scope on pumps ( manufacture, base mounted as existing, how should they be built out { Tripple Duty valves, gauges and temps} Alignment? Lots to know on theses. See spec Section 23 21 23 Hydronic Pumps.\nHow many on site Pre Con meetings required? There will be one Pre Con meeting.\nScope doesn t state any required pre or post T&B - Please confirm if required. T&B not required. Contractor to verify flow is adequate across the primary chiller loop.\nIs the intent for the new chiller to match the exciting modulating heat pump chiller? No.","text":"Replace Auxiliary Chiller Building 3\nProject no: 565-24-113\nPre-Bid Questions\n\nDoes the SuperintendentÂ need to be directly employed by the Prime Contractor? Superintendent must be authorized to act in the name of the prime contractor.\nMust the Superintendent be on site at all times while work is commencing? Yes\nDoes the SSHO (Site Safety Health Officer) need to be directly employed by the Prime Contractor? SSHO must be authorized to act in the name of the prime contractor.\nMust theÂ SSHO be on site at all times while work is commencing? Yes\nCan the Superintendent & SSHO be a dual-hatted individualÂ assuming that individual is qualifiedÂ for both roles? Yes, see Spec 01 35 26.1.9 section heading: The Site Superintendent may also serve as SSHO if considered qualified by VA Engineering.\nAre there any other mandatory on-site roles required in this contract? No\nWhen does the VA expect the project to start following the award? The VA generally expects the project to start shortly after the award has been granted. The exact start date will be determined based on the completion of any necessary preparatory steps.\nAre there any concerns for Asbestos Containing Material or Lead in the areas being worked in? There is no known ACM or lead as part of this project.\nAre there any ICRA requirementsÂ for this project? Work will be completed inside a mechanical room and outside Building 3. Dust generation must be kept to a minimum. It is not anticipated that negative air, sticky mats, plastic barriers, or similar would be required.\nWho is the current Controls provider at the VA? There is not one controls contractor. This is an open BACNET system as per the SOW.\nDoes the awarded contractor have to use this company's quote in our bid for controls integration? Not applicable\nIf yes, can the VA please provide contact info? Not applicable\nSite Visit sign in sheet posted? See Attached Sign-In sheet\nWhat manufacturer chiller is required to be replaced? None specified. Must meet Buy American and SOW requirements.\nWhat is the physical size of the new chiller? If bigger than existing, does the VA want to increase the size of the concrete pad or provide steel framing? Contractor to utilize the current concrete pad. If contractor s proposed chiller exceeds the size and capacity of the current concrete pad, contractor will be responsible for any demolition and construction at no additional cost to the government. Contractor would have to first seek VA approval to exceed the current footprint as space is a premium.\nPlease confirm laydown and parking areas to be provided to contractor. Contractor may park in any available parking space at the facility. Laydown, if necessary, would be as directed by the COR. Assume the laydown area would be at the southeastern end of the facility, near the back gate.\nPlease confirm the VA will coordinate with awardee to only need 1 mobilization. Generally this job should only require 1 mobilization, assuming the VA will allow it. If the contractor mobilizes on site and the VA reschedules, this would be added cost. This question is unclear as to why multiple mobilizations are required. Contractor will provide the VA a proposed schedule and both parties will work towards those dates. Contractor will be responsible for submitting utility outage requests weeks before the desired date.\nScope states that the pumps be programed into the BAS Pumps can not be programed that have existing ( Old ) drives. Should drives be replaced. If so, are there specs? If pumps are independently controlled, then they should have new drives. Otherwise, new pumps to be controlled by the new chiller.\nChiller Specs ( equivalent vender ) design requirements ( Screw, Recep, modular ) ? Screw or scroll chiller is what should be submitted for approval. See Spec Section 23 64 00 Packaged Water Chillers\nChiller power scope is not clear; there are two existing circuits which to be used and what to be done on the second. Correct, there are two electrical circuits for the existing chiller. The VA expects the two circuits to be reused with the replacement chiller unless only one circuit is required. Contractor to ensure adequate amperage is available for their proposed chiller. If second circuit isn t required for new chiller, contractor to properly abandon circuit in place.\nWill submittals be required on all products and approved? Yes.\nTypes of materials can fusion piping be used? No. Welded steel is appropriate. See specification section 23 21 13 Hydronic Piping.\nNo specs on Insulation or heat tape requirements. See specification section 23 07 11 attached.\nIs there a road closure permit required for the site for purpose of the crane to be set up? See Spec Section 01 00 00.1.6.L&M. Contractor must minimize impact to the facility. Any potential, temporary road closures and crane lift plans would have to be approved by the VA engineering and safety.\nPlease provide provisions if existing isolation valves do not hold VA will assist contractor by providing information and assistance with coordination so to avoid or address this potential problem.\nControls scope states integration into BACNET card and into the BAS. Please clarify who has to be used for the integration and has access to program in system. Any certified controls contractor who is qualified to work on a Tridium DDC.\nExisting Expansion tank Has it been verified to work and / or leave off scope? This is an expansion tank; estimated at 44 gallons. Contractor to verify this current tank volume is adequate for proposed new chiller.\nAir separator to be vented external of building per A2L code requirements Not applicable.\nNo defined scope on pumps ( manufacture, base mounted as existing, how should they be built out { Tripple Duty valves, gauges and temps} Alignment? Lots to know on theses. See spec Section 23 21 23 Hydronic Pumps.\nHow many on site Pre Con meetings required? There will be one Pre Con meeting.\nScope doesn t state any required pre or post T&B - Please confirm if required. T&B not required. Contractor to verify flow is adequate across the primary chiller loop.\nIs the intent for the new chiller to match the exciting modulating heat pump chiller? No.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24626B0004","product_service_code":"Z2DA"},{"award":{"awardee":{}},"dates":{"posted":"2026-01-20","posted_at":"2026-01-20T18:06:27.123Z","created_at":"2026-01-20T18:06:23.861Z","modified_at":"2026-02-26T04:55:45.048Z","response_deadline":{"raw":"2026-01-26T17:00:00-05:00","utc":"2026-01-26T22:00:00Z","date":"2026-01-26","time":"17:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e6830a693a324a468677025e04cc5b4a/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Z2DA--Replace Auxiliary Chiller","agency":{"office":{"code":"36C246","name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"organization_id":"100167096","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-25","archive_type":"auto_custom"},"history":[{"index":6,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-10T19:42:55.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3968854f3ba64bc9938328ed476a6bed","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:16:51.602Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5cfa2ede33fb47db97eaa470cc7a80cc","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:15:38.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b2f90a6378bd46988e0337fc6751ba7d","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":2,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T18:06:27.123Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e6830a693a324a468677025e04cc5b4a","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":1,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}],"contacts":[{"name":"Michael R Proctor","role":"primary","email":"Michael.Proctor2@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e6830a693a324a468677025e04cc5b4a","lineage_id":"855bfa65a7514b52924b5f14bb4308c8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-15T03:46:37.526630928Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"f77902accb2414827eac03913cb4878514b05008a7f253620eb023bc15d1814b","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-15T03:46:37.526630928Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Replace Auxiliary Chiller Building 3\nProject no: 565-24-113\nPre-Bid Questions\n\n\nDoes the SuperintendentÂ need to be directly employed by the Prime Contractor? Superintendent must be authorized to act in the name of the prime contractor. \nMust the Superintendent be on site at all times while work is commencing? Yes\nDoes the SSHO (Site Safety Health Officer) need to be directly employed by the Prime Contractor? SSHO must be authorized to act in the name of the prime contractor.\nMust theÂ SSHO be on site at all times while work is commencing? Yes\nCan the Superintendent & SSHO be a dual-hatted individualÂ assuming that individual is qualifiedÂ for both roles? Yes, see Spec 01 35 26.1.9 section heading:  The Site Superintendent may also serve as SSHO if considered qualified by VA Engineering. \nAre there any other mandatory on-site roles required in this contract? No\nWhen does the VA expect the project to start following the award? The VA generally expects the project to start shortly after the award has been granted. The exact start date will be determined based on the completion of any necessary preparatory steps.\nAre there any concerns for Asbestos Containing Material or Lead in the areas being worked in? There is no known ACM or lead as part of this project.\nAre there any ICRA requirementsÂ for this project? Work will be completed inside a mechanical room and outside Building 3. Dust generation must be kept to a minimum. It is not anticipated that negative air, sticky mats, plastic barriers, or similar would be required.\nWho is the current Controls provider at the VA? There is not one controls contractor. This is an open BACNET system as per the SOW.\nDoes the awarded contractor have to use this company's quote in our bid for controls integration? Not applicable\nIf yes, can the VA please provide contact info? Not applicable\nSite Visit sign in sheet posted? See Attached Sign-In sheet\nWhat manufacturer chiller is required to be replaced? None specified. Must meet Buy American and SOW requirements.\nWhat is the physical size of the new chiller? If bigger than existing, does the VA want to increase the size of the concrete pad or provide steel framing? Contractor to utilize the current concrete pad. If contractor s proposed chiller exceeds the size and capacity of the current concrete pad, contractor will be responsible for any demolition and construction at no additional cost to the government. Contractor would have to first seek VA approval to exceed the current footprint as space is a premium.\nPlease confirm laydown and parking areas to be provided to contractor. Contractor may park in any available parking space at the facility. Laydown, if necessary, would be as directed by the COR. Assume the laydown area would be at the southeastern end of the facility, near the back gate.\nPlease confirm the VA will coordinate with awardee to only need 1 mobilization. Generally this job should only require 1 mobilization, assuming the VA will allow it. If the contractor mobilizes on site and the VA reschedules, this would be added cost. This question is unclear as to why multiple mobilizations are required. Contractor will provide the VA a proposed schedule and both parties will work towards those dates. Contractor will be responsible for submitting utility outage requests weeks before the desired date.\nScope states that the pumps be programed into the BAS   Pumps can not be programed that have existing ( Old ) drives. Should drives be replaced. If so, are there specs? If pumps are independently controlled, then they should have new drives. Otherwise, new pumps to be controlled by the new chiller. \nChiller Specs ( equivalent vender ) design requirements ( Screw, Recep, modular ) ? Screw or scroll chiller is what should be submitted for approval. See Spec Section 23 64 00 Packaged Water Chillers\nChiller power scope is not clear; there are two existing circuits which to be used and what to be done on the second. Correct, there are two electrical circuits for the existing chiller. The VA expects the two circuits to be reused with the replacement chiller unless only one circuit is required. Contractor to ensure adequate amperage is available for their proposed chiller. If second circuit isn t required for new chiller, contractor to properly abandon circuit in place.\nWill submittals be required on all products and approved? Yes.\nTypes of materials   can fusion piping be used? No. Welded steel is appropriate. See specification section 23 21 13 Hydronic Piping.\nNo specs on Insulation or heat tape requirements. See specification section 23 07 11 attached.\nIs there a road closure permit required for the site for purpose of the crane to be set up? See Spec Section 01 00 00.1.6.L&M. Contractor must minimize impact to the facility. Any potential, temporary road closures and crane lift plans would have to be approved by the VA engineering and safety. \nPlease provide provisions if existing isolation valves do not hold VA will assist contractor by providing information and assistance with coordination so to avoid or address this potential problem.\nControls   scope states integration into BACNET card and into the BAS. Please clarify who has to be used for the integration and has access to program in system. Any certified controls contractor who is qualified to work on a Tridium DDC.\nExisting Expansion tank   Has it been verified to work and / or leave off scope? This is an expansion tank; estimated at 44 gallons. Contractor to verify this current tank volume is adequate for proposed new chiller.\nAir separator to be vented external of building per A2L code requirements Not applicable.\nNo defined scope on pumps ( manufacture, base mounted as existing, how should they be built out { Tripple Duty valves, gauges and temps} Alignment? Lots to know on theses. See spec Section 23 21 23 Hydronic Pumps.\nHow many on site Pre Con meetings required? There will be one Pre Con meeting.\nScope doesn t state any required pre or post T&B - Please confirm if required. T&B not required. Contractor to verify flow is adequate across the primary chiller loop.\nIs the intent for the new chiller to match the exciting modulating heat pump chiller? No.","text":"Replace Auxiliary Chiller Building 3\nProject no: 565-24-113\nPre-Bid Questions\n\nDoes the SuperintendentÂ need to be directly employed by the Prime Contractor? Superintendent must be authorized to act in the name of the prime contractor.\nMust the Superintendent be on site at all times while work is commencing? Yes\nDoes the SSHO (Site Safety Health Officer) need to be directly employed by the Prime Contractor? SSHO must be authorized to act in the name of the prime contractor.\nMust theÂ SSHO be on site at all times while work is commencing? Yes\nCan the Superintendent & SSHO be a dual-hatted individualÂ assuming that individual is qualifiedÂ for both roles? Yes, see Spec 01 35 26.1.9 section heading: The Site Superintendent may also serve as SSHO if considered qualified by VA Engineering.\nAre there any other mandatory on-site roles required in this contract? No\nWhen does the VA expect the project to start following the award? The VA generally expects the project to start shortly after the award has been granted. The exact start date will be determined based on the completion of any necessary preparatory steps.\nAre there any concerns for Asbestos Containing Material or Lead in the areas being worked in? There is no known ACM or lead as part of this project.\nAre there any ICRA requirementsÂ for this project? Work will be completed inside a mechanical room and outside Building 3. Dust generation must be kept to a minimum. It is not anticipated that negative air, sticky mats, plastic barriers, or similar would be required.\nWho is the current Controls provider at the VA? There is not one controls contractor. This is an open BACNET system as per the SOW.\nDoes the awarded contractor have to use this company's quote in our bid for controls integration? Not applicable\nIf yes, can the VA please provide contact info? Not applicable\nSite Visit sign in sheet posted? See Attached Sign-In sheet\nWhat manufacturer chiller is required to be replaced? None specified. Must meet Buy American and SOW requirements.\nWhat is the physical size of the new chiller? If bigger than existing, does the VA want to increase the size of the concrete pad or provide steel framing? Contractor to utilize the current concrete pad. If contractor s proposed chiller exceeds the size and capacity of the current concrete pad, contractor will be responsible for any demolition and construction at no additional cost to the government. Contractor would have to first seek VA approval to exceed the current footprint as space is a premium.\nPlease confirm laydown and parking areas to be provided to contractor. Contractor may park in any available parking space at the facility. Laydown, if necessary, would be as directed by the COR. Assume the laydown area would be at the southeastern end of the facility, near the back gate.\nPlease confirm the VA will coordinate with awardee to only need 1 mobilization. Generally this job should only require 1 mobilization, assuming the VA will allow it. If the contractor mobilizes on site and the VA reschedules, this would be added cost. This question is unclear as to why multiple mobilizations are required. Contractor will provide the VA a proposed schedule and both parties will work towards those dates. Contractor will be responsible for submitting utility outage requests weeks before the desired date.\nScope states that the pumps be programed into the BAS Pumps can not be programed that have existing ( Old ) drives. Should drives be replaced. If so, are there specs? If pumps are independently controlled, then they should have new drives. Otherwise, new pumps to be controlled by the new chiller.\nChiller Specs ( equivalent vender ) design requirements ( Screw, Recep, modular ) ? Screw or scroll chiller is what should be submitted for approval. See Spec Section 23 64 00 Packaged Water Chillers\nChiller power scope is not clear; there are two existing circuits which to be used and what to be done on the second. Correct, there are two electrical circuits for the existing chiller. The VA expects the two circuits to be reused with the replacement chiller unless only one circuit is required. Contractor to ensure adequate amperage is available for their proposed chiller. If second circuit isn t required for new chiller, contractor to properly abandon circuit in place.\nWill submittals be required on all products and approved? Yes.\nTypes of materials can fusion piping be used? No. Welded steel is appropriate. See specification section 23 21 13 Hydronic Piping.\nNo specs on Insulation or heat tape requirements. See specification section 23 07 11 attached.\nIs there a road closure permit required for the site for purpose of the crane to be set up? See Spec Section 01 00 00.1.6.L&M. Contractor must minimize impact to the facility. Any potential, temporary road closures and crane lift plans would have to be approved by the VA engineering and safety.\nPlease provide provisions if existing isolation valves do not hold VA will assist contractor by providing information and assistance with coordination so to avoid or address this potential problem.\nControls scope states integration into BACNET card and into the BAS. Please clarify who has to be used for the integration and has access to program in system. Any certified controls contractor who is qualified to work on a Tridium DDC.\nExisting Expansion tank Has it been verified to work and / or leave off scope? This is an expansion tank; estimated at 44 gallons. Contractor to verify this current tank volume is adequate for proposed new chiller.\nAir separator to be vented external of building per A2L code requirements Not applicable.\nNo defined scope on pumps ( manufacture, base mounted as existing, how should they be built out { Tripple Duty valves, gauges and temps} Alignment? Lots to know on theses. See spec Section 23 21 23 Hydronic Pumps.\nHow many on site Pre Con meetings required? There will be one Pre Con meeting.\nScope doesn t state any required pre or post T&B - Please confirm if required. T&B not required. Contractor to verify flow is adequate across the primary chiller loop.\nIs the intent for the new chiller to match the exciting modulating heat pump chiller? No.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24626B0004","product_service_code":"Z2DA"},{"award":{"awardee":{}},"dates":{"posted":"2026-02-10","posted_at":"2026-02-10T19:42:55.617Z","created_at":"2026-02-10T19:42:52.847Z","modified_at":"2026-02-26T04:55:45.048Z","response_deadline":{"raw":"2026-01-26T15:00:00-05:00","utc":"2026-01-26T20:00:00Z","date":"2026-01-26","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3968854f3ba64bc9938328ed476a6bed/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Z2DA--Replace Auxiliary Chiller","agency":{"office":{"code":"36C246","name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"organization_id":"100167096","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-25","archive_type":"auto_custom"},"history":[{"index":6,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-10T19:42:55.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"3968854f3ba64bc9938328ed476a6bed","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":4,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:16:51.602Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5cfa2ede33fb47db97eaa470cc7a80cc","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T19:15:38.569Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b2f90a6378bd46988e0337fc6751ba7d","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"},{"index":2,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T18:06:27.123Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e6830a693a324a468677025e04cc5b4a","solicitation_number":"36C24626B0004","parent_opportunity_id":"855bfa65a7514b52924b5f14bb4308c8"},{"index":1,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-09T20:49:07.028Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"855bfa65a7514b52924b5f14bb4308c8","solicitation_number":"36C24626B0004","related_opportunity_id":"1ed3faaf32a442f6921d04291114ebb8"}],"contacts":[{"name":"Michael R Proctor","role":"primary","email":"Michael.Proctor2@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3968854f3ba64bc9938328ed476a6bed","lineage_id":"855bfa65a7514b52924b5f14bb4308c8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-13T03:51:55.538986404Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"30abbeafd9cca44576e60de3d79644c212f8aef496d0824c08b373dc7ef73dcd","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-13T03:51:55.538986404Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Ignore","text":"Ignore","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24626B0004","product_service_code":"Z2DA"},{"award":{"date":"2026-03-09","amount":"678000.00","number":"36C24626C0024","awardee":{"raw":"ACRO CONSTRUCTION, LLC PANAMA CITY 32401 FLK","uei":"EERXQPG9J2W7","cage":"4HUW4","name":"ACRO CONSTRUCTION, LLC","location":{"zip":"32401","city":{"name":"PANAMA CITY"},"state":{"name":"FL"},"country":{"code":"FLK","name":"FALKLAND ISLANDS (ISLAS MALVINAS)"}}}},"dates":{"posted":"2026-03-10","posted_at":"2026-03-10T13:30:23.083Z","award_date":"2026-03-09","created_at":"2026-03-10T13:30:20.840Z","modified_at":"2026-06-18T03:55:44.622Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/e469a050f09f4d4f99e0a1f587af42d7/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Z2DA--Replace Auxiliary Chiller","agency":{"office":{"code":"36C246","name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"organization_id":"100167096","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-17","archive_type":"auto_custom"},"history":[{"index":3,"title":"Z2DA--Replace Auxiliary Chiller","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-10T13:30:23.083Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"e469a050f09f4d4f99e0a1f587af42d7","solicitation_number":"36C24626B0004"}],"contacts":[{"name":"Michael Proctor","role":"primary","email":"michael.proctor2@va.gov","phone":"Email Only","title":"Contract Specialist"}],"base_type":{"code":"a","label":"Award Notice"},"notice_id":"e469a050f09f4d4f99e0a1f587af42d7","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"e469a050f09f4d4f99e0a1f587af42d7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-11T10:05:23.427787984Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"d6c5ac04348980f8eb4e683d00c3ce3214a1c82d9ddc99d0d35925b51146accd","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-11T10:05:23.427787984Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"36C24626B0004","product_service_code":"Z2DA"}],"due_at":"2026-01-26T20:00:00Z","due_date":"2026-01-26","closes_at":"2026-01-26T20:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","state":"NC","county":"37051","county_name":"Cumberland County","city":"3722920","city_name":"Fayetteville","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"EERXQPG9J2W7","amount":"678000.00","linked_awards":8,"cancelled":false,"archived":true,"updated_at":"2026-10-11T10:17:07.895858Z","principal_notice_id":"3968854f3ba64bc9938328ed476a6bed","description":{"text":"Ignore","html":"Ignore","origin":"detail"},"contacts":[{"name":"Michael Proctor","role":"primary","email":"michael.proctor2@va.gov","phone":"Email Only","title":"Contract Specialist"}],"place_of_performance":null,"office_address":{"zip":"23667","city":"HAMPTON","state":"VA","country":"USA"},"naics_codes":["238220"],"award":{"awardee":{}},"attachments":[{"resource_id":"051d608828a84184852dc9b395604455","name":"va.gov","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-10-08T14:39:19.257Z","export_controlled":false,"sha256":null,"url":"https://www.va.gov/","mirrored":false},{"resource_id":"364c26be6e5b4f0b96535453ffb3c1d2","name":"va.gov","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-03-10T13:30:23.083Z","export_controlled":false,"sha256":null,"url":"https://www.va.gov/","mirrored":false},{"resource_id":"d59b52a9f84a42cfb064c2fa491216d1","name":"36C24626B0004_1.docx","kind":"file","mime_type":".docx","size_bytes":20185,"posted_at":"2025-11-17T13:16:36.247Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d59b52a9f84a42cfb064c2fa491216d1/download","mirrored":false},{"resource_id":"fba56c10485c46d684b6e32b61ee12bd","name":"36C24626B0004_2.docx","kind":"file","mime_type":".docx","size_bytes":271910,"posted_at":"2025-12-09T20:49:07.028Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fba56c10485c46d684b6e32b61ee12bd/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C24626C0024_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C24626C0024_3600_-NONE-_-NONE-/","piid":"36C24626C0024","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"EERXQPG9J2W7","recipient_name":"ACRO CONSTRUCTION, LLC","recipient_uei":"EERXQPG9J2W7","recipient_cage":"4HUW4","recipient_city":"PANAMA CITY","recipient_state":"FL","sub_name":"Department of Veterans Affairs","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","office_key":"o-36C246","first_action_date":"2026-03-09","last_action_date":"2026-08-28","actions":2,"obligated":"682941.60","current_total_value":"682941.60","potential_total_value":"682941.60","naics":"238220","psc":"Z2DA","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":4,"description":"REPLACE AUX CHILLER","method":"piid","confidence":"high","evidence":["award number 36C24626C0024 equals the contract number","same awarding office 36C246"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C24627Q0114","latest_notice_id":"9464cbfda7004348805568dfa367e88c","title":"5975--INSTALLATION OF PROXIMITY SENSORS FOR AUTOMATIC DOORS","solicitation_number":"36C24627Q0114","notice_type":"o","first_type":"r","first_posted":"2026-11-04","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-25T15:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"238210","psc":"5975","set_aside":null,"state":"NC","county":"37051","county_name":"Cumberland County","city":"3722920","city_name":"Fayetteville","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":"Product purchase (PSC 5975)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C24627Q0089","latest_notice_id":"ae159e2fd01a497898d98fab5ce61da1","title":"Q301-- FISH TECH Testing","solicitation_number":"36C24627Q0089","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-25T15:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"621511","psc":"Q301","set_aside":null,"state":"VA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"RACT AWARD. FOR LABORATORY SAMPLES, RICHMOND VAMC","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24627Q0113","latest_notice_id":"dd890cb683014f54b3c473a4fac2948f","title":"7230--WINDOW TREATMENT","solicitation_number":"36C24627Q0113","notice_type":"o","first_type":"p","first_posted":"2026-11-06","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-25T16:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"337920","psc":"7230","set_aside":"SBA","state":"VA","county":"51650","county_name":"City of Hampton","city":"5135000","city_name":"Hampton","country":"USA","place_scope":"nationwide","state_source":"sam_state_name","state_evidence":"Product purchase (PSC 7230)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C24627Q0149","latest_notice_id":"0f55c0d6fb1b4b4c8be2a3cdcb19cfc5","title":"5670--Dumpster Area Roll Up Door Replacement","solicitation_number":"36C24627Q0149","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-27T14:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T14:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"332321","psc":"5670","set_aside":null,"state":"VA","county":"51760","county_name":"City of Richmond","city":"5167000","city_name":"Richmond","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24627Q0153","latest_notice_id":"4d24e9c5db104196af7772b612e1b14c","title":"8470-- Police Ballistic Vests","solicitation_number":"36C24627Q0153","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"315990","psc":"8470","set_aside":null,"state":"VA","county":"51760","county_name":"City of Richmond","city":"5167000","city_name":"Richmond","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open":[{"key":"1240BE27Q0025","latest_notice_id":"c21abfebfc5d4ee1a6b74dffe96d5bdf","title":"Research Triangle Park Forestry Sciences Laboratory HVAC Repair","solicitation_number":"1240BE27Q0025","notice_type":"k","first_type":"k","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-01T22:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-124568","office_name":"SOUTHERN RESEARCH STATION","naics":"238220","psc":"J041","set_aside":"SBA","state":"NC","county":"37063","county_name":"Durham County","city":"3719000","city_name":"Durham","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C25627Q0087","latest_notice_id":"cd7d881bb8cc47e4b482d18db8376dea","title":"Z2NZ--Turn Key Chiller Equipment (Purchase and Install)","solicitation_number":"36C25627Q0087","notice_type":"o","first_type":"o","first_posted":"2026-10-26","last_posted":"2026-11-16","notices":5,"due_at":"2026-12-02T16:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C256","office_name":"256-NETWORK CONTRACT OFFICE 16 (36C256)","naics":"238220","psc":"Z2NZ","set_aside":"SDVOSBC","state":"NC","county":"37119","county_name":"Mecklenburg County","city":"3752220","city_name":"Pineville","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"W911PT27QA020","latest_notice_id":"084d5efc5ec44a9885a37b90e6705ffa","title":"REMOVE AND REPAIR TWO HIGH VELOCITY AIR HANDLING UNITS","solicitation_number":"W911PT27QA020","notice_type":"k","first_type":"k","first_posted":"2026-11-05","last_posted":"2026-11-05","notices":1,"due_at":"2026-11-25T18:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911PT","office_name":"W6QK ACC WVA","naics":"238220","psc":"Z2NB","set_aside":"SBA","state":"NY","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"description","state_evidence":"IGH VELOCITY AIR HANDLING UNITSPROJECT LOCATION: WATERVLIET ARSENAL","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"}],"similar_open_total":59,"indexable":false}