# Renovate Building 110 Ground Floor

Canonical: https://sealedbidder.com/opportunities/36c24625b0013

- Solicitation number: 36C24625B0013
- Notice type: Award notice (first published as presolicitation)
- Status: Awarded to Chesapeake Planning and Consulting LLC for $1,998,500.00
- Department: Department of Veterans Affairs
- Contracting office: 246-Network Contracting Office 6 (36C246)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Y1DA Construction Of Hospitals And Infirmaries
- Set-aside: Service-disabled veteran-owned small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236220)
- Place of performance: Hampton, Virginia
- County: City of Hampton (FIPS 51650). https://sealedbidder.com/counties/city-of-hampton-va-51650
- City: Hampton. https://sealedbidder.com/cities/hampton-va-5135000
- First posted: January 15, 2025
- Last posted: August 21, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/bffc7558d6594f569332a3d3cb4a1b93/view

## Reading this notice

- Kind of notice: Award notice. Who won, when, and for how much.
- Who may compete: Service-disabled veteran-owned small business set-aside. Reserved for service-disabled veteran-owned small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 54 days from the day the solicitation was posted, April 18, 2025, to the deadline. The deadline moved 7 times: it was first February 4, 2025 and ended as June 11, 2025.
- Before the solicitation: The agency published a presolicitation on January 15, 2025, 93 days before the solicitation.
- How it ended: Awarded to Chesapeake Planning and Consulting LLC on July 31, 2025, 50 days after offers were due. The contracting office reported 5 offers (full and open competition after exclusion of sources).

## Description

ADDITIONAL CONTRACTORS RFIs Respecting the government s response to question #4 in Amendment 4, we request the following. In order to provide the shop drawings that are being requested, we will require a set of the as-built drawings of the existing system. These as-builts we will be needed during the bid proposal stage in order to quantify the level of effort the contractor is to include in our bids. Please provide the as-built drawings of the existing system. The VA does not have As-built shop drawings to provide at this time, and no future time frame for it to be made available. Respecting the government s response to question #8 in Amendment 4, the government responded that the specifications for the existing vinyl wall guard product will be provided. However, this information is needed during the estimate phase in order to obtain a material quote from the manufacturer. Please provide the specifications for the existing product. The VA will provide specifications for the existing vinyl wall guard product. (Refer to the Handrail submittals document attached) Respecting the government s response to question #22 in Amendment 4, what is the height of the corner guards to be provided? Mount corner guard 4 A.F.F. 48 to top o corner guard A.F.F.. Drawing MG102 and MG202 requires the existing medical gas alarm panel to be removed, stored for reinstallation. The permanent location is shown on drawing MG202 and is located on the new wall partition to be installed. In order to avoid having to relocate it twice due to the phasing requirements, can the alarm panel be relocated to an existing wall versus be located on the new wall partition? The alarm panel must remain functional throughout construction as the Dialysis area will remain operational throughout construction. The panel must be relocated twice, or a temporary panel must be provided within the Phase 1 dialysis area to meet this requirement. Regarding Sheet T300, details 1, 2, and 3 and the notes leaves the contractor believing that the existing frames (telecom racks) and patch panels will be replaced with new components and will be positioned in a new location as described in detail 1. What is the government plan to maintain network user connectivity while the contractor disconnects every existing cable from its patch panel position, for migration to the new rack location? Replace existing racks with new racks in TR. Field coordinate to float existing patch panels to maintain connectivity on any cables that are needed during this time. Is it the governments intent to have the contractor re-route the existing network cabling through the new conduits being installed as described in detail #2? Existing conduits can be maintained for existing cables that are to be kept in service. Sleeve/conduits standards should be met for firestop, etc. What if some of the existing cabling isn t long enough to reach the new rack locations? Document and report cables that are not long enough to be rerouted. Installation of new cables will need to take place on a case-by-case basis.

## Attachments

- [36C24625B0013.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0f0c02eb8ea3416b91f0db8923007c5c/download)
- [36C24625B0013_IFB.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d90eb7145b124d7bad8538f9110bbcd3/download)
- [36C24625C0040_1.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5610308b01a7458883b6cf0236087045/download)
- [SPECIFICATIONS.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8d4cb545199942bebe979d6b7c4a4f70/download)
- [DRAWINGS.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b5f8e593681c40949a8dcc74b3eda5e2/download)
- [BID ITEMS COST BREAKDOWN.xlsx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e23131db0b0c488db091380a7b95ff92/download)
- [MARKET SURVEY CONSTRUCTION MATERIALS TEMPLATE.xlsx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/72c99656e61c46e0b8b9d4437c8fa6e0/download)
- [WAGE DETERMINATIONS - DAVIS-BACON ACT.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f56f4dc262d140febabeebf2c903285c/download)
- [36C24625B0013 0001.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/67fedecbbb2947ccb49b39fc3363b3d8/download)
- [36C24625B0013 0002.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/10a1b327a599490ba111c539e7d1c33a/download)
- [SITE VISIT ATTENDEES LOG SHEET.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2dd7680e2a17443db49051b67581e794/download)
- [36C24625B0013 0003.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4b2c8d2e251d477f81194c56687e5115/download)
- [SITE VISIT ATTENDEES LOG SHEET - 28 April 2025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/625be811b5de44d69cb127f31655c6a8/download)
- [36C24625B0013 0004.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/281a0eafbc0d4f13bf9df49dc593b283/download)
- [ROOFSCAN REPORT.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c36f2bf8bd2f4576aeea327d986defab/download)
- [36C24625B0013 0005.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/18a6303eb02744c5b4fe0b9c06c4b81d/download)
- [HANDRAIL SUBMITTALS REDACTED.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/05fd07bc455640d4a09c4fb2c9be25ec/download)

## Award on USAspending

- Recipient: Chesapeake Planning and Consulting LLC (UEI LEQSL7NKG796)
- Contract: 36C24625C0040, definitive contract
- Obligated: $1,998,500.00
- Competition: Full and Open Competition After Exclusion of Sources, 5 offers received
- Link: award number 36C24625C0040 equals the contract number; same awarding office 36C246 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_36C24625C0040_3600_-NONE-_-NONE-/


## Open now in the same industry

188 open in NAICS 236220.

- Replace HVAC System and Components at CAD593 (N4008527R0013), due December 2, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/n4008527r0013
- 652-23-109 Renovate SPS Phase 3 (36C24627R0011), due December 2, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/36c24627r0011
- Sources Sought/PLA Notice REFRESH for DB/DBB MATOC Construction, USACE Norfolk District/AOR (W9123627X1AW1), due December 9, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/w9123627x1aw1

## Publications

- January 15, 2025: Presolicitation, due February 4, 2025 at 2:00 PM EST. Notice 3cc678f114f2442088aac14cca50f063. https://sam.gov/workspace/contract/opp/3cc678f114f2442088aac14cca50f063/view
- January 15, 2025: Presolicitation, due February 4, 2025 at 2:00 PM EST. Notice 9cd3f10ba02d483491a7abeead225612. https://sam.gov/workspace/contract/opp/9cd3f10ba02d483491a7abeead225612/view
- April 18, 2025: Solicitation, due May 22, 2025 at 2:00 PM EDT. Notice 1590b5a15e1d458f943a13c515f6f776. https://sam.gov/workspace/contract/opp/1590b5a15e1d458f943a13c515f6f776/view
- April 18, 2025: Solicitation, due March 21, 2025 at 2:00 PM EDT. Notice 4329357b751c4a2baec08da58dd54388. https://sam.gov/workspace/contract/opp/4329357b751c4a2baec08da58dd54388/view
- April 24, 2025: Solicitation, due May 22, 2025 at 2:00 PM EDT. Notice b6e87f8ac04c4a2293ee6535030e1c39. https://sam.gov/workspace/contract/opp/b6e87f8ac04c4a2293ee6535030e1c39/view
- April 30, 2025: Solicitation, due May 22, 2025 at 2:00 PM EDT. Notice 0386d157c27447c480f0b967d6ee2852. https://sam.gov/workspace/contract/opp/0386d157c27447c480f0b967d6ee2852/view
- April 30, 2025: Solicitation, due May 22, 2025 at 2:00 PM EDT. Notice de217f0353c448f68e8348744723629f. https://sam.gov/workspace/contract/opp/de217f0353c448f68e8348744723629f/view
- May 13, 2025: Solicitation, due May 16, 2025 at 10:00 AM EDT. Notice cea0c026a2c647dc878460b0e14caf62. https://sam.gov/workspace/contract/opp/cea0c026a2c647dc878460b0e14caf62/view
- May 19, 2025: Solicitation, due May 30, 2025 at 2:00 PM EDT. Notice 03923f7b06f34083b51b8163efeac32a. https://sam.gov/workspace/contract/opp/03923f7b06f34083b51b8163efeac32a/view
- May 28, 2025: Solicitation, due June 4, 2025 at 2:00 PM EDT. Notice 9f74219862634491a0ac1938a2462790. https://sam.gov/workspace/contract/opp/9f74219862634491a0ac1938a2462790/view
- June 3, 2025: Solicitation, due June 11, 2025 at 2:00 PM EDT. Notice 69e1b5113aee4da98349b1df503516fa. https://sam.gov/workspace/contract/opp/69e1b5113aee4da98349b1df503516fa/view
- June 3, 2025: Solicitation, due June 11, 2025 at 2:00 PM EDT. Notice a818473c154d4181869c662d3fcd41ed. https://sam.gov/workspace/contract/opp/a818473c154d4181869c662d3fcd41ed/view
- June 3, 2025: Solicitation, due June 11, 2025 at 2:00 PM EDT. Notice f6456e20d5c74009963eb90e344e18a0. https://sam.gov/workspace/contract/opp/f6456e20d5c74009963eb90e344e18a0/view
- August 21, 2025: Award notice. Notice bffc7558d6594f569332a3d3cb4a1b93. https://sam.gov/workspace/contract/opp/bffc7558d6594f569332a3d3cb4a1b93/view

## Points of contact

- Moses Deng, Contract Specialist, moses.deng2@va.gov, 910-475-6807

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/36c24625b0013.
