{"canonical":"https://sealedbidder.com/opportunities/36c24526r0101","key":"36C24526R0101","url":"https://sealedbidder.com/opportunities/36c24526r0101","title":"C1DA-- Renovate Specialty Clinics on 2nd","solicitation_number":"36C24526R0101","notice_type":"r","open":true,"removed":false,"removed_at":null,"response_deadline":"2026-11-25T19:00:00Z","first_posted":"2026-09-24","last_posted":"2026-11-18","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541310","psc":"C1DA","set_aside":"SDVOSBC","place_state":"WV","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"54081","place_county_name":"Raleigh County","place_city":"5405332","place_city_name":"Beckley","winner":null,"award_amount":null,"publications":[{"notice_id":"7b6944d7728045038d081deff310ce05","title":"C1DA--Renovate Specialty Clinics on 2nd Floor","solicitation_number":"36C24526R0101","notice_type":"r","base_type":"r","posted":"2026-09-24","posted_at":"2026-09-24T15:12:32.372Z","due_at":"2026-10-26T18:00:00Z","due_date":"2026-10-26","cancelled":false,"archived":false,"archive_date":"2026-12-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7b6944d7728045038d081deff310ce05/view","enriched":true,"history":[{"index":1,"title":"C1DA--Renovate Specialty Clinics on 2nd Floor","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-24T15:12:32.372Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7b6944d7728045038d081deff310ce05","solicitation_number":"36C24526R0101"}]},{"notice_id":"2b0462021d53452a87f99d9857ade96e","title":"C1DA--Renovate Specialty Clinics on 2nd","solicitation_number":"36C24526R0101","notice_type":"r","base_type":"r","posted":"2026-10-21","posted_at":"2026-10-21T12:46:09.589Z","due_at":"2026-11-13T19:00:00Z","due_date":"2026-11-13","cancelled":false,"archived":false,"archive_date":"2027-01-12","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2b0462021d53452a87f99d9857ade96e/view","enriched":true,"history":[{"index":2,"title":"C1DA--Renovate Specialty Clinics on 2nd","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-21T12:46:09.589Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"2b0462021d53452a87f99d9857ade96e","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":1,"title":"C1DA--Renovate Specialty Clinics on 2nd Floor","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-24T15:12:32.372Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7b6944d7728045038d081deff310ce05","solicitation_number":"36C24526R0101"}]},{"notice_id":"cc0fd029e4f94dd28f101314a39d38cd","title":"C1DA--Renovate Specialty Clinics on 2nd","solicitation_number":"36C24526R0101","notice_type":"r","base_type":"r","posted":"2026-11-06","posted_at":"2026-11-06T20:14:16.116Z","due_at":"2026-11-20T19:00:00Z","due_date":"2026-11-20","cancelled":false,"archived":false,"archive_date":"2027-01-19","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/cc0fd029e4f94dd28f101314a39d38cd/view","enriched":true,"history":[{"index":3,"title":"C1DA--Renovate Specialty Clinics on 2nd","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-06T20:14:16.116Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"cc0fd029e4f94dd28f101314a39d38cd","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":2,"title":"C1DA--Renovate Specialty Clinics on 2nd","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-21T12:46:09.589Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"2b0462021d53452a87f99d9857ade96e","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":1,"title":"C1DA--Renovate Specialty Clinics on 2nd Floor","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-24T15:12:32.372Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7b6944d7728045038d081deff310ce05","solicitation_number":"36C24526R0101"}]},{"notice_id":"e84156527a944ee3bd5001d28af5d713","title":"C1DA-- Renovate Specialty Clinics on 2nd","solicitation_number":"36C24526R0101","notice_type":"r","base_type":"r","posted":"2026-11-18","posted_at":"2026-11-18T14:23:44.315Z","due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","cancelled":false,"archived":false,"archive_date":"2027-01-24","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e84156527a944ee3bd5001d28af5d713/view","enriched":true,"history":[{"index":4,"title":"C1DA-- Renovate Specialty Clinics on 2nd","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-18T14:23:44.315Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"e84156527a944ee3bd5001d28af5d713","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":3,"title":"C1DA--Renovate Specialty Clinics on 2nd","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-06T20:14:16.116Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"cc0fd029e4f94dd28f101314a39d38cd","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":2,"title":"C1DA--Renovate Specialty Clinics on 2nd","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-21T12:46:09.589Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"2b0462021d53452a87f99d9857ade96e","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":1,"title":"C1DA--Renovate Specialty Clinics on 2nd Floor","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-24T15:12:32.372Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7b6944d7728045038d081deff310ce05","solicitation_number":"36C24526R0101"}]}],"latest_notice_id":"e84156527a944ee3bd5001d28af5d713","first_type":"r","notices":[{"dates":{"posted":"2026-09-24","posted_at":"2026-09-24T15:12:32.372Z","created_at":"2026-09-24T15:12:30.129Z","modified_at":"2026-09-24T15:12:32.372Z","response_deadline":{"raw":"2026-10-26T14:00:00-04:00","utc":"2026-10-26T18:00:00Z","date":"2026-10-26","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7b6944d7728045038d081deff310ce05/view"},"naics":{"codes":["541310"],"primary":"541310"},"title":"C1DA--Renovate Specialty Clinics on 2nd Floor","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-12-25","archive_type":"auto_custom"},"history":[{"index":1,"title":"C1DA--Renovate Specialty Clinics on 2nd Floor","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-24T15:12:32.372Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7b6944d7728045038d081deff310ce05","solicitation_number":"36C24526R0101"}],"contacts":[{"name":"Contracting Officer","role":"primary","email":"millard.adkins@va.gov","phone":"304.255.2121 x4136","title":"Millard Adkins"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"7b6944d7728045038d081deff310ce05","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"7b6944d7728045038d081deff310ce05","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-26T00:27:42.726653911Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"e48da7f116f78ceb79f09453b6760585b0649e160b0874f4175fac4eda6925fb","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-25T04:24:42.881399783Z"},"description":{"html":"Renovate Specialty Clinics   2nd Floor \nProject #517-22-202\nAll information required for submission is provided herein. There is no separate RFP package to download.\nNAICS: 541310   Architectural Services (Sector: Professional, Scientific, and Technical Services).\nPSC: C1DA   Architect and Engineering   Construction: Hospitals and Infirmaries.\nThe Department of Veterans Affairs Medical Center (VAMC), HSA 1.3 Contracting, 200 Veterans Drive, Beckley, WV 25801, is soliciting Architect/Engineer (A/E) Services to provide Schematic Design, Life Cycle Cost Analysis (LCCA), Design Development, Construction and Bid Documents, Specifications, Construction Cost Estimates, and construction period services for the  Renovate Specialty Clinics on 2nd Floor  project at the Beckley VAMC, 200 Veterans Drive, Beckley, WV 25801.\nSet Aside\nThis acquisition is a 100% Service Disabled Veteran Owned Small Business (SDVOSB) set aside. Any subsequent award will require firms to be:\n  Registered in the System for Award Management (SAM) at www.sam.gov;\n  Visible and certified in the SBA Veteran Small Business Certification database at https://search.certifications.sba.gov;\n  Compliant with VETS 4212 reporting at https://www.dol.gov/agencies/vets/programs/vets4212.\nImportant Notice\nTHIS IS NOT A REQUEST FOR PROPOSAL. This is a request for SF 330 Architect/Engineer Qualifications packages only.\nSubmission Requirements\nThis acquisition is for A/E Services and is procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. To be considered for this contract, firms shall submit SF 330s electronically as follows:\n  Submit SF 330 Parts I and II by email to millard.adkins@va.gov as a single Adobe PDF file (no larger than 10 MB). No ZIP files. Receipt must be confirmed.\n  SF 330s are due no later than 2:00 p.m. Eastern Standard Time on October 26, 2026.\n  Your response shall follow the same order as the Evaluation Factors listed below. Failure to follow this format may result in rejection of the SF 330.\n  The SF 330 form can be found on the GSA forms website at www.gsa.gov.\n  All questions must be emailed to Millard.Adkins@va.gov no later than 2:00 p.m. Eastern Standard Time on October 14, 2026.\n  Potential contractors must be registered in SAM (www.sam.gov), visible and certified in https://search.certifications.sba.gov, and compliant in VETS 4212 (https://www.dol.gov/agencies/vets/programs/vets4212) at the time of submission and at the time of award.\n  Include an insert with the following: SAM UEI, Tax Identification Number, the email address and phone number of the primary point of contact, and a printed copy of the firm s SDVOSB certification/registry.\n  Offerors shall provide all documents listed and comply with all instructions for their proposal to be considered responsive. Unverified SDVOSBs will be considered nonresponsive and will not be evaluated.\nGeneral Information\nThis is a Service Disabled Veteran Owned Small Business set aside. NAICS 541310; size standard $12.5 million. No solicitation package or bidder/plan holder list will be issued, and no solicitation documents are available. This procurement is subject to the availability of funds. The Government is under no obligation to award a contract because of this announcement.\nA/E Eligibility and Disciplines\nThe selected A/E firm shall meet the FAR 2.101 definition of  Architect engineer services  as defined in 40 U.S.C. 1102 and FAR 36.6. The SDVOSB architectural firm must employ the principal Architect responsible for the design of this project and be heavily involved in all aspects of the design, including stamping drawings along with other team disciplines. A/Es signing drawings must be licensed; licenses are required at the time of award.\nDisciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary.\nProject Identification\nRenovate Specialty Clinics on 2nd Floor\nProject No. 517 22 202\nA/E SCOPE OF WORK\n\nGENERAL: This project, Non-recurring Maintenance, will engage an architectural/engineering (A/E) firm to provide a complete design for a new renovation of our 2nd floor specialty and support space to create updated clinic spaces. This project would provide much needed improvements at the VA Beckley Campus.  \n\nThis project will require extensive assistance from the A/E interior designer as this is an area that is viewed heavily by Veterans, family, visitors, and staff throughout the day to day while in the building.  Our facility presently does not have an interior designer on staff.  Therefore, this will require the A/E interior designer to be heavily engaged with the VA staff throughout the entire process to achieve an aesthetically pleasing appearance to the 2nd floor.  Although the project is for approximately 16,530 square feet on the 2nd, an all-inclusive concept will need to be created.  This will lay the groundwork to provide a world class care setting for this hospital. This project will help reinforce the quality of care that our Veterans receive.\n\nThe A/E would be expected to collaborate with other A/E firms involved in other projects throughout the facility.\n\nThe renovation is anticipated to be extensive due to the building s original construction dating back to the 1950 s. Given its age, significant upgrades to all systems are expected to be necessary to meet current code, standards, and VA requirements. \n\nPURPOSE: The desired result is to provide improvements for approximately 16,530 square feet of specialty clinic space, located on the 2nd floor of BECVAMC Building 1. The renovation will provide our veterans with an updated central check-in and waiting area, improved wayfinding through updated layout, and improved traffic flows.  It will also improve the clinic layout as the current clinic space was originally designed for medical surgical care.\n\nThe 2nd floor has approximately 58,853 square feet that must be evaluated to determine the optimum location and layout for clinic space. The existing conditions for specialty clinics are spread over many floors of the hospital with hopes to bring or relocate most/many to the 2nd floor.\n\nThis project would allow our facility to utilize a one-stop care approach by bringing services directly to our Veterans in their exam rooms. By creating correctly sized exam rooms it will help to accommodate the Veterans, their family, and caregivers who accompany them to their appointments. The design would also accommodate Veterans who use mobility scooters and larger wheelchairs.  Veteran privacy will be enhanced by reducing foot and equipment traffic \n\nThis project will renovate to provide space to meet VA guidelines. This project would establish a central check-in and waiting area for the 2nd floor clinics that would be easily accessible and accommodate Veterans and their caregivers.  The waiting area would also improve efficiency and wayfinding, as well as increase Veteran satisfaction.   \n\nLOCATION:  Building 1, primarily on the 2nd floor of the VA Medical Center in Beckley, WV.\n\nPROJECT:  This project includes but is not limited to the items listed below.\n\nThe architect shall produce construction drawings for a full design encompassing all disciplines. Such as demolition and new construction, interiors, phasing plans for work, infection control plans, outages, mechanical and temporary access during construction, as well as furniture, fixtures, and equipment.  \n\nVA Beckley has been approved for the renovation of the 2nd floor area and support space to create, expand clinics that will comply with VA guidelines.  \n\nThe architect shall verify and detail all utility moves and upgrades to support the renovation floorplans.\n\nAll Construction drawings, including phasing, estimates, preconstruction risk assessment and specifications shall be provided to execute a turnkey construction project.\n\nThe architect is to provide a plan for temporary relocation of existing clinical and support space to another location within the VA hospital (designated by COR), if needed.\n\nThe architect will provide a solution for the entire area in the design.\n\nThe architect will provide an interior designer to work extensively with the VA to develop a functional, safe, and aesthetically pleasing floor design. \n\nConstruction period services\n6.1  Submission review and/or approvals for 100% drawings, \n  estimate and specification changes. \n6.2    Site visits per VA request.\n   6.2.1 Minimum of 48 visits total (40 for design and 8 for construction). \n              6.3    Update drawings (as-built conditions from contractor red line drawings),  and VA correspondence during construction.\n\n      6.4 A/E will respond on site within a twenty-four (24) hour period when requested.  \n\nIn conjunction with the onsite kickoff meeting, that will include VA clinical staff, an onsite planning session with our Administrative Quad will be required.  The VA will provide existing drawings for informational purposes to the A/E firm to review prior to the planning session. During this session it is expected to have the 2nd floor reviewed to determine viable options for the location of the renovated clinics.  The goal would be to obtain quad approval moving forward in the design process by choosing the clinic location that best suits the needs of our facility. After the planning session takes place, an onsite kickoff meeting will be needed.  This meeting will involve VA staff and help further outline goals and needs of the project.  The A/E firm will collaborate with the VA to develop and review differing layout options for further development at the 15%.  The VA will conceptually approve the options before proceeding to the 15%.  The intent is for the VA to give approval and/or any recommendations/input so the project can proceed working to the 15%. Interior Designer will be required for these meetings and will showcase what the overall goal would be for this project.  The Interior Designer is expected to present general design concepts. One site visit by team. \n\nThe A/E will be onsite to provide the 15% design review, the revised/enhanced options shall be presented that include existing and proposed space. The objective for the session is to collaborate with clinical staff, as well as, other VA staff within a design charrette format.  The presentation and onsite A/E working session will review the provided options or combination of options/designs for VA to approve.  The end goal is to approve and finalize the intended area to be renovated, evaluate, and determine the best layout with the working session, and further develop the chosen option finalizing any other goals.  All presented options will need to be within budget. Interior Designer meeting will be required. Two site visits by team.\n\nAt the 30% design review, the design option with estimated costs shall be presented based on the previous (15% review) in a design charrette. VA leadership will make a final option selection after the 30% review. The preferred options will be executed in the remaining design effort and rendered as 3D output provided to the VA. This expected deliverable should be similar to Revit software animation. Interior Designer meeting will be required. Four site visits by team.\n\nAt the 60% design review, narrative report addressing bid deduct alternatives, construction phasing, design calculations or analysis, itemized cost estimate and specifications of the selected design shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. Interior Designer meeting will be required. Three site visits.\n\nAt the 100% design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. Two site visits by team. \n\nAt the final design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The final review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings.\n\nFinal Inspection with one site visit.\n\nDesign shall comply with all current VA design requirements and specifications. It shall also comply/meet the requirements set forth in the Design Guide/s (latest edition). \n\nDesign manuals and specifications can be found at http://www.cfm.va.gov/TIL/. \n\nWork is located at the VA Medical Center in Beckley, WV, primarily on the 2nd floor of Building 1. \n\nThe selected A/E will attend pre-bid job showing. Selected A/E shall provide responses to questions asked by potential bidders and issue written responses.\n\nProject shall be designed and constructed to meet all VHA requirements including VA sustainability and green energy initiatives. See Department of Veterans Affairs Sustainable Design Manual (latest version) located at http://www.cfm.va.gov/TIL/.  \n\nProject shall be designed with coordination with all VA staff input for various program areas that have impact on this project.\n\nPlanning must include a total of 10% deductive bid alternates that will need to be identified and incorporated as part of the bidding documents.    \n\n\nSPECIFICS:\n\nThis design should be for a construction budget not to exceed $19,912,000. Completed design shall result in a cost that is within the budget limitations. If the base bid cost exceeds budget, the A/E shall re-design or take necessary steps to reduce the cost so that budget limitations are not exceeded. Deducts will need to be coordinated with the VA and noted on specifications and Final Design drawings.\n      \nProvide contract specifications utilizing only the most current VA Master Specifications and edited to remove all impertinent specs for this project.\n\nAttend specified design review meetings and make all necessary site visits during design to gather information necessary from the existing sites, building plans, utility plans, etc. to provide a complete assessment of the proposed work. A thorough as-built shall be conducted of the existing site conditions to complete a full detailed set of documents.  \n\nAssess the intent and scope of this project and work with the Medical Center staff to develop a final design, specifications and cost estimate to best suit the needs and constraints of the government, while incorporating VAMC Beckley Engineering/Facilities Management Service, Safety, Infection Control, National Offices, and Contracting Officer comments into the final design package.\n\nIncorporate in the preliminary drawings the pre-construction risk assessment evaluations that include noise, vibration and infection control. \n\nProvide bound specifications and 100% construction drawings with all references bound. Construction documents will be required to be furnished in hard copy, electronic .dwg & PDF files (AutoCAD 2018 or most current at the time of final design submission) and electronic .pdf files. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its  Project Browser/Navigator .\n\nVA cannot send or receive any emails that contains more than 5mb of data. AE shall bind or combine files to conform to the 5mb limit. \n\nCost estimates will be formulated detailing quantities of materials, labor, profit, overhead, insurance, taxes, etc. in the format found at  \nhttp://www.cfm.va.gov\n\nFinal drawings will detail measures to be taken by the contractor to assure life safety and infection control. A stated above a preconstruction risk assessment will be completed finalized and included in project submissions.\n\nPlans for phasing construction to minimize impact on the medical center will be incorporated into the construction documents. Plan construction activities to include impacts on the medical center such as relocating patient and staff, equipment, providing temporary barriers, providing temporary utilities, minimizing impact on patient flow, etc.\n\nProvide construction administration to include shop drawings/submittal review, site inspections, and RFI response.\n\n\n\n\n\nSITE INVESTIGATIONS:\n\nA/E shall make site visits as necessary to verify existing conditions and interview VA staff. Note: Information including drawings and other documentation provided to the A/E is used as reference only. All dimensions and existing conditions will be field verified and documented by the AE in the final design package. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov/TIL/. A/E shall field verify every aspect that relates to the project.  Coordinate visits with the Project Manager/Contracting Officer Representative (COR) \nassigned after award. The A/E shall arrange for and oversee the performance of such investigations. Auto CAD architectural background drawings will be provided by the VA upon request.  \n\nThe A/E shall independently field verify all existing dimensions, wall layouts, utilities, material types and every other design aspect that relates to the project.\n\n\nEXPECTATION: Submit review package so they are received on the noted day. \n\nReview \n*Due Date \n*Days from last review\n(Calendar Days After NTP)\nKickoff Initial Site Investigation & Design Charrette\n1\n0\nÂ \n30\n29\n15% Design Review & Design Charrette\nÂ \n55\n25\nVA 15% Review - Completed\nÂ \n95\n35\n30% Design Review & Design Charrette\nÂ \n130\n30\nVA 30% Review - Completed\nÂ \n160\n30\n60% Design Review & Presentation\nÂ \n185\n25\nVA 60% Review - Completed\nÂ \n100% Construction Documents\n210\n25\nÂ \n235\n20\nVA 100% Review - Completed\nFinal Construction Documents\n245\n10\n*Design and design review time can be faster than indicated in the schedule above and may result in faster completion of the project design (or float in the VA or A/E schedule reviews). The design must be reviewed by higher level VA central office and could have an impact on time. \n\nNote: An onsite kickoff meeting will be scheduled with the A/E and VA staff for the start of the project to further outline goals and needs of the project.  \n\n\nDESIGN REQUIREMENTS:\n\nExpectations: Submit complete review package in accordance with the following requirements and guidelines outlined in https://www.cfm.va.gov/contract/ae.asp. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E and VA team may elect to delete individual submissions which are not required.\n\nDeliver:\nAll design packages will be delivered directly to FMSL (Engineering) on the established dates for VA review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C November 2008. The manual is available at the following address: http://www.cfm.va.gov/contract/aeDesSubReq.asp. Prepare working drawings on AutoCAD MEP/Architecture, 2018 versions or most current at the time of final design submission, utilizing its  smart  capabilities chases. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its  Project Browser/Navigator .\n\nNote: In the interest of time, electronic submittals of design documents are preferred to expedite review time. PDF Email Attachments (5mb limit) or an internet Share Point site for file downloads are acceptable. Final and As Built copies should be supplied in both electronic and Hard Copy formats.\n\nDesign Development 100%:  Attachment  D  100% Submission Requirements\nRequirements for the 100% Design Development. Address all comments from the 100% review and finalize required submittals.\n  \nFINAL Contract Documents (CD):  Attachment  E  Submission Requirements\nSubmit a complete document of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\n\n\n\n\nCONSTRUCTION PERIOD SERVICES:\n\nThe A/E will attend pre-bid job showing.  A/E shall provide responses to questions asked by potential bidders and issue written responses.  \n\nProvide assistance to the VA to determine whether the contractor or subcontractor meets qualification requirements, support by written recommendations of any problems or litigation encountered in past based on firsthand knowledge.\n\nThe A/E will review all submissions and provide recommendations to the VA within five  \ncalendar days upon request. AE will review and provide replies to contractor / VA generated RFIs when required by the project manager within five calendar days.\n\nAE will review contractor's cost estimates, methods of work, materials and provide recommendations to the VA.\n\nMake site visits on requests of the VA and prepare written reports to include agreed upon changes in design as determined necessary during the construction. Visits made based on errors and omissions in design will be at no cost to the VA.\n\nParticipate in partial/final acceptance inspections as scheduled and generate punch list items for completion. The punch list shall reference the contract documents for specific deficiencies (i.e. specification section, drawing detail, etc.)\n\nPrepare as-built drawings on original set with A/E s stamp, based on record drawings that the contractor kept during construction. Transpose contractor s as-builts to \nAutoCAD (.dwg) and provide a set of updated as-builts on CD within 30 days to the Project Engineer. Final drawing submittal will include hard copies as described for other submissions as well as a CD clearly labeled with the project name, number and submittal date containing: Folder labeled  bid documents . All specifications bound in one (1) word document (make sure spec sections are separated by page breaks). All drawing sheets in one .pdf file.\n\nAll bound or combined files shall be limited to 5mb.\nFolder labeled  DWG s  with subfolders containing engineering disciplines (Architectural, MEP, Structural, Civil, etc.) which includes the .arj file (for every discipline) to launch and organize the drawing file system and make all drawings the current project inside of AutoCAD.\n\nFolder labeled  PDF sheets  containing separate .pdf documents for each discipline.\n\nFolder labeled  cost estimate  containing a copy of the final construction cost estimate documents.\n\nFolder labeled  calculations  containing final calculation documents.\n\nFolder labeled  specifications  with a word document for each spec section.\n\nFolder labeled  misc  for IH reports, materials testing, VPDES permit, soils tests, sustainability checklist, etc.\nUpon construction completion, red line drawings will be furnished to the A/E to prepare as built drawings. Final as built drawings will be furnished as master building drawings in a project manager format prescribed by the VA.  \n\nThe A/E shall review and approve all specified equipment and installation submittals and shop drawings. The A/E shall attend the pre-construction conference to review and \nconfirm project scope. During construction, the A/E shall allow for a minimum of 8 site visits as directed and scheduled by the COR.   \n\n\nArchitect/Engineer Energy Scope of Work\nEnergy Requirements for the Procurement of all New Construction, Major & Minor Renovation Projects:\n\n1.  New Construction:  \n\nAll new construction shall be designed to achieve an energy consumption level that is at least 30% below the level achieved under the latest ASHRAE Standard, if life-cycle cost effective. Use Appendix G of ASHRAE Standard 90.1-2004 to document the energy savings.\n\nShould the 30% reduction in energy consumption prove not to be life-cycle cost effective, then the A/E shall evaluate alternative designs at 5% successive decrements to identify the most energy-efficient design that is life-cycle cost effective.\n\nThe following parameters shall be used for performing the analysis:\n\n20-year life-cycle period for system comparisons\nUse Public domain programs such as TRACE, E-CUBE, Carrier E20-II, etc.\n7% Discount Factor\nNeither include taxes, nor insurance while computing cost.\n\n2.  Major & Minor Renovations and Major Equipment Replacements:\n\nFor Major Renovations: Shall include any renovation where an entire area is  gutted  and rebuilt. Any replacement of central HVAC equipment or changes in air distribution shall be considered a  Major Renovation. \n\nReduce the energy cost budget by 20% below pre-renovations 2003 baseline. A/E shall estimate 2003 baseline energy consumption before the renovation and compare it to the proposed design after the renovation and document the 20% savings. The primary unit for energy budget reporting is the British Thermal Unit (BTU) per square foot of the area to be renovated. A/E shall develop the energy budget as required in ASHRAE 90.1-2004, Appendix G, using the same parameters outlined above for new construction. \n\nFor Minor Renovations: Shall be defined as a small portion of a building, where only architectural treatments, or simple equipment replacement is planned. The renovation will have little to no impact on the central HVAC System, or energy use within the renovated area. \n\nAny part of the renovation which impacts energy consumption shall be designed with the mandate to reduce energy consumption. For example, if exterior walls are part of \n\nthe project, then their R-Value shall be increased. If lighting fixtures are to be replaced, then they shall be replaced with the most energy efficient fixture that is cost effective (20-year life).\n\n3.  Renewable Energy Resources: \n\nFor any work, renewable (geothermal, heat recovery, wind, PV solar, solar hot water, etc.) shall be evaluated for life-cycle cost effectiveness.  \n\nATTACHMENT  A \n\n Design Development 15% Submission Requirements\n\nDeliver the following (labeled with 15% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #10.  Three design options shall be presented in a design charrette. The presentation will provide 3 options of floorplan designs for VA Management to review. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)  \n\n4 half size sets of all drawings produced on the latest version of AutoCAD     software.  \n\n1 copy of itemized total project cost by design option. Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit) \n\n\n\n\n\n\n\n\n\nATTACHMENT  B \n\n Design Development 30% Submission Requirements\n\nDeliver the following (labeled with 30% submission) and include this attachment as a checklist with your submission:\n\n1 copies of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations.   Complete all items listed in the A/E scope of work #11.  Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)  \n\n4 half size sets of all drawings required by project, produced on the latest version of AutoCAD software.  \n\n1 copy of itemized cost estimate by specification section or trade (labor, material and equipment). Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit) \n\n\n\n\n\n\n\n\n\n\n\nATTACHMENT  C \n \n Design Development 60% Submission Requirements\n\nDeliver the following (labeled with 60% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 60% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #12.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n1 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n4 half size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n \n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word.    (.pdf files for email shall not exceed the 5mb limit. AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit. \n\nATTACHMENT  D \n\n Design Development 100% Submission Requirements\n\nDeliver the following (labeled with 100% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 100% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #13.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n1 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n4 half size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review.  Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review.  Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n \n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word.    (.pdf files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit. \n\n\n\n                                    ATTACHMENT  E \n\n      Final Contract Document Submission Requirements\n1 copy of the construction drawings Cover Sheet in AutoCAD format for FINAL VA signatures.  Forward copy via email. (.pdf files for email shall not exceed the 5mb email limit)\n1 copy of FINAL design narrative report forwarding the design submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items on the A/E scope of work #14.  The report shall identify bid deducts, recommended construction phasing and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)    \n2 full size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of FINAL itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of FINAL edited VA Master Specifications of sections to be used for the construction project. (Make sure that all proof reading edits marks and lined through text have been removed. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of the FINAL master submittal list identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the FINAL Construction Scope of Work. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n \n1 copy of FINAL drawings in AutoCAD (.dwg files) and FINAL Specifications in Microsoft Word. (word files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit. \n\nEvaluation and Selection Information\nThis acquisition is for Architect/Engineer services and is procured in accordance with the Brooks Act (FAR Subpart 36.6). All submissions will be evaluated in accordance with the criteria below. A shortlist of approximately three to five firms deemed most highly qualified after initial source selection will be chosen for interviews (teleconference or virtual). The Government will not pay or reimburse any costs associated with responding to this request and is under no obligation to award a contract as a result of this announcement.\nEvaluation Factors (SF 330): Factors I, II, and III are of equal importance and are collectively more important than factors IV, V and VI. Factor V is more important than Factors IV and VI. Factors IV and VI are of equal importance.\nI. Professional Qualifications Necessary for Satisfactory Performance of Required Services\n   Identify the proposed Project Manager (PM) and each proposed key discipline lead. State each person s discipline, project role, responsibility, availability, and relevant experience. Describe the PM s discipline, years of relevant project management experience, and experience managing outpatient healthcare or clinic renovation projects comparable in scope and complexity. Describe experience applying relevant VA design criteria, technical requirements, life safety requirements, infection control/occupied facility constraints, and VA project delivery processes applicable to the announced scope. Describe the proposed team s experience designing and supporting construction of outpatient clinic renovations or fit outs in existing facilities, including construction phase services and occupied facility coordination.\nII. Specialized Experience and Technical Competence in Comparable Healthcare/Clinic Renovation Work\n   Identify the proposed discipline leads and specialty consultants required by the scope, including architecture, interior design, mechanical, electrical, plumbing/fire protection, and other disciplines as applicable. Describe the firm s and proposed team s experience with project specific technical features (e.g., MEP renovation, electrical distribution, emergency power, HVAC modifications, clinical space systems, fire protection/life safety systems, low voltage/IT coordination, medical gas systems, infection control/occupied facility coordination). Relevant VA experience and comparable non VA healthcare experience will be considered. Greater credit may be given for demonstrated familiarity with requirements materially applicable to this project. For this factor, recent experience means projects completed, substantially completed, or actively performed within five years before the response due date.\nIII. Past Performance on Contracts with Government Agencies and Private Industry in Terms of Cost Control, Quality of Work, and Compliance with Performance Schedules\n   Discuss the firm s recent, relevant experience on Government and private sector projects, emphasizing healthcare/clinic/patient care or comparable renovation projects in existing facilities. Describe the firm s performance related to quality of A/E services, cost control and design to budget efforts, schedule compliance, coordination, and work in occupied or phased environments, as applicable. Identify up to five projects most relevant to this requirement; for each, briefly describe the scope, the firm s role, roles of proposed key personnel, schedule and cost control performance, and final outcome. Include one lesson learned or challenge from a relevant project and the action taken to address it. Disclose any final, substantiated adverse performance finding, final judgment, or final arbitration decision issued within the past five years materially related to the firm s A/E services (design quality, coordination, cost control, schedule performance). For each matter, provide project name, client, issue, final outcome, and corrective action taken. Do not include privileged, sealed, confidential settlement, or otherwise legally protected information. Unresolved allegations, pending claims, or pending disputes do not need to be disclosed.\nIV. Organization, Management, and Quality Control\n   Describe the proposed project organization (key personnel, subconsultants, responsibilities, and reporting relationships). Explain the firm s approach to team and subconsultant management, discipline coordination, quality control reviews, Government communication, issue resolution, and corrective action. Describe how the approach addresses risks of renovating specialty clinics in an existing/occupied facility, including phasing and applicable healthcare/VA requirements. Provide one comparable project example demonstrating successful use of the proposed approach.\nV. Capacity to Accomplish the Work in the Required Time\n   Describe the firm s capacity to perform the required services within the anticipated project schedule. Identify the PM, key personnel, and subconsultants; their responsibilities; current workload and other material commitments; and availability for this project. Describe how the firm will staff and manage the work through project milestones without adversely affecting schedule, quality, or coordination. Identify potential resource conflicts and the firm s plan to address them, including contingency resources available if needed.\nVI. Geographic Location in the General Geographical Area and Knowledge of Locality\n   Describe the firm s ability to provide timely and effective support for this project at VAMC Beckley, West Virginia. Identify the staffed office(s) that will perform the work; location of the PM and key personnel; anticipated availability for site visits, meetings, and construction phase support; and any local/regional resources that will support the project. Describe the firm s knowledge of local conditions relevant to this requirement, including familiarity with VAMC Beckley or comparable regional healthcare facilities; existing facility and campus coordination; regional construction and logistical conditions; and applicable local permitting, utility, or stakeholder coordination requirements.\nNote Upon Award\nA/E disciplines include, but are not limited to, Architectural, Civil, and Mechanical/Electrical/Plumbing (MEP) (estimating; structural; mechanical [HVAC]; electrical; plumbing; geotechnical; certified physical security specialist; and healthcare related engineering services). Award is contingent upon the availability of funds.\n\nContracting Office Address and Point of Contact\nDepartment of Veterans Affairs\nMillard Adkins, Contracting Officer (CO)\n517/90C\nBuilding 2\n200 Veterans Drive\nBeckley, WV 25801\nPoint of Contact: Millard M. Adkins, Contracting Officer   millard.adkins@va.gov","text":"Renovate Specialty Clinics 2nd Floor\nProject #517-22-202\nAll information required for submission is provided herein. There is no separate RFP package to download.\nNAICS: 541310 Architectural Services (Sector: Professional, Scientific, and Technical Services).\nPSC: C1DA Architect and Engineering Construction: Hospitals and Infirmaries.\nThe Department of Veterans Affairs Medical Center (VAMC), HSA 1.3 Contracting, 200 Veterans Drive, Beckley, WV 25801, is soliciting Architect/Engineer (A/E) Services to provide Schematic Design, Life Cycle Cost Analysis (LCCA), Design Development, Construction and Bid Documents, Specifications, Construction Cost Estimates, and construction period services for the Renovate Specialty Clinics on 2nd Floor project at the Beckley VAMC, 200 Veterans Drive, Beckley, WV 25801.\nSet Aside\nThis acquisition is a 100% Service Disabled Veteran Owned Small Business (SDVOSB) set aside. Any subsequent award will require firms to be:\nRegistered in the System for Award Management (SAM) at www.sam.gov;\nVisible and certified in the SBA Veteran Small Business Certification database at https://search.certifications.sba.gov;\nCompliant with VETS 4212 reporting at https://www.dol.gov/agencies/vets/programs/vets4212.\nImportant Notice\nTHIS IS NOT A REQUEST FOR PROPOSAL. This is a request for SF 330 Architect/Engineer Qualifications packages only.\nSubmission Requirements\nThis acquisition is for A/E Services and is procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. To be considered for this contract, firms shall submit SF 330s electronically as follows:\nSubmit SF 330 Parts I and II by email to millard.adkins@va.gov as a single Adobe PDF file (no larger than 10 MB). No ZIP files. Receipt must be confirmed.\nSF 330s are due no later than 2:00 p.m. Eastern Standard Time on October 26, 2026.\nYour response shall follow the same order as the Evaluation Factors listed below. Failure to follow this format may result in rejection of the SF 330.\nThe SF 330 form can be found on the GSA forms website at www.gsa.gov.\nAll questions must be emailed to Millard.Adkins@va.gov no later than 2:00 p.m. Eastern Standard Time on October 14, 2026.\nPotential contractors must be registered in SAM (www.sam.gov), visible and certified in https://search.certifications.sba.gov, and compliant in VETS 4212 (https://www.dol.gov/agencies/vets/programs/vets4212) at the time of submission and at the time of award.\nInclude an insert with the following: SAM UEI, Tax Identification Number, the email address and phone number of the primary point of contact, and a printed copy of the firm s SDVOSB certification/registry.\nOfferors shall provide all documents listed and comply with all instructions for their proposal to be considered responsive. Unverified SDVOSBs will be considered nonresponsive and will not be evaluated.\nGeneral Information\nThis is a Service Disabled Veteran Owned Small Business set aside. NAICS 541310; size standard $12.5 million. No solicitation package or bidder/plan holder list will be issued, and no solicitation documents are available. This procurement is subject to the availability of funds. The Government is under no obligation to award a contract because of this announcement.\nA/E Eligibility and Disciplines\nThe selected A/E firm shall meet the FAR 2.101 definition of Architect engineer services as defined in 40 U.S.C. 1102 and FAR 36.6. The SDVOSB architectural firm must employ the principal Architect responsible for the design of this project and be heavily involved in all aspects of the design, including stamping drawings along with other team disciplines. A/Es signing drawings must be licensed; licenses are required at the time of award.\nDisciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary.\nProject Identification\nRenovate Specialty Clinics on 2nd Floor\nProject No. 517 22 202\nA/E SCOPE OF WORK\n\nGENERAL: This project, Non-recurring Maintenance, will engage an architectural/engineering (A/E) firm to provide a complete design for a new renovation of our 2nd floor specialty and support space to create updated clinic spaces. This project would provide much needed improvements at the VA Beckley Campus.\n\nThis project will require extensive assistance from the A/E interior designer as this is an area that is viewed heavily by Veterans, family, visitors, and staff throughout the day to day while in the building. Our facility presently does not have an interior designer on staff. Therefore, this will require the A/E interior designer to be heavily engaged with the VA staff throughout the entire process to achieve an aesthetically pleasing appearance to the 2nd floor. Although the project is for approximately 16,530 square feet on the 2nd, an all-inclusive concept will need to be created. This will lay the groundwork to provide a world class care setting for this hospital. This project will help reinforce the quality of care that our Veterans receive.\n\nThe A/E would be expected to collaborate with other A/E firms involved in other projects throughout the facility.\n\nThe renovation is anticipated to be extensive due to the building s original construction dating back to the 1950 s. Given its age, significant upgrades to all systems are expected to be necessary to meet current code, standards, and VA requirements.\n\nPURPOSE: The desired result is to provide improvements for approximately 16,530 square feet of specialty clinic space, located on the 2nd floor of BECVAMC Building 1. The renovation will provide our veterans with an updated central check-in and waiting area, improved wayfinding through updated layout, and improved traffic flows. It will also improve the clinic layout as the current clinic space was originally designed for medical surgical care.\n\nThe 2nd floor has approximately 58,853 square feet that must be evaluated to determine the optimum location and layout for clinic space. The existing conditions for specialty clinics are spread over many floors of the hospital with hopes to bring or relocate most/many to the 2nd floor.\n\nThis project would allow our facility to utilize a one-stop care approach by bringing services directly to our Veterans in their exam rooms. By creating correctly sized exam rooms it will help to accommodate the Veterans, their family, and caregivers who accompany them to their appointments. The design would also accommodate Veterans who use mobility scooters and larger wheelchairs. Veteran privacy will be enhanced by reducing foot and equipment traffic\n\nThis project will renovate to provide space to meet VA guidelines. This project would establish a central check-in and waiting area for the 2nd floor clinics that would be easily accessible and accommodate Veterans and their caregivers. The waiting area would also improve efficiency and wayfinding, as well as increase Veteran satisfaction.\n\nLOCATION: Building 1, primarily on the 2nd floor of the VA Medical Center in Beckley, WV.\n\nPROJECT: This project includes but is not limited to the items listed below.\n\nThe architect shall produce construction drawings for a full design encompassing all disciplines. Such as demolition and new construction, interiors, phasing plans for work, infection control plans, outages, mechanical and temporary access during construction, as well as furniture, fixtures, and equipment.\n\nVA Beckley has been approved for the renovation of the 2nd floor area and support space to create, expand clinics that will comply with VA guidelines.\n\nThe architect shall verify and detail all utility moves and upgrades to support the renovation floorplans.\n\nAll Construction drawings, including phasing, estimates, preconstruction risk assessment and specifications shall be provided to execute a turnkey construction project.\n\nThe architect is to provide a plan for temporary relocation of existing clinical and support space to another location within the VA hospital (designated by COR), if needed.\n\nThe architect will provide a solution for the entire area in the design.\n\nThe architect will provide an interior designer to work extensively with the VA to develop a functional, safe, and aesthetically pleasing floor design.\n\nConstruction period services\n6.1 Submission review and/or approvals for 100% drawings,\nestimate and specification changes.\n6.2 Site visits per VA request.\n6.2.1 Minimum of 48 visits total (40 for design and 8 for construction).\n6.3 Update drawings (as-built conditions from contractor red line drawings), and VA correspondence during construction.\n\n6.4 A/E will respond on site within a twenty-four (24) hour period when requested.\n\nIn conjunction with the onsite kickoff meeting, that will include VA clinical staff, an onsite planning session with our Administrative Quad will be required. The VA will provide existing drawings for informational purposes to the A/E firm to review prior to the planning session. During this session it is expected to have the 2nd floor reviewed to determine viable options for the location of the renovated clinics. The goal would be to obtain quad approval moving forward in the design process by choosing the clinic location that best suits the needs of our facility. After the planning session takes place, an onsite kickoff meeting will be needed. This meeting will involve VA staff and help further outline goals and needs of the project. The A/E firm will collaborate with the VA to develop and review differing layout options for further development at the 15%. The VA will conceptually approve the options before proceeding to the 15%. The intent is for the VA to give approval and/or any recommendations/input so the project can proceed working to the 15%. Interior Designer will be required for these meetings and will showcase what the overall goal would be for this project. The Interior Designer is expected to present general design concepts. One site visit by team.\n\nThe A/E will be onsite to provide the 15% design review, the revised/enhanced options shall be presented that include existing and proposed space. The objective for the session is to collaborate with clinical staff, as well as, other VA staff within a design charrette format. The presentation and onsite A/E working session will review the provided options or combination of options/designs for VA to approve. The end goal is to approve and finalize the intended area to be renovated, evaluate, and determine the best layout with the working session, and further develop the chosen option finalizing any other goals. All presented options will need to be within budget. Interior Designer meeting will be required. Two site visits by team.\n\nAt the 30% design review, the design option with estimated costs shall be presented based on the previous (15% review) in a design charrette. VA leadership will make a final option selection after the 30% review. The preferred options will be executed in the remaining design effort and rendered as 3D output provided to the VA. This expected deliverable should be similar to Revit software animation. Interior Designer meeting will be required. Four site visits by team.\n\nAt the 60% design review, narrative report addressing bid deduct alternatives, construction phasing, design calculations or analysis, itemized cost estimate and specifications of the selected design shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. Interior Designer meeting will be required. Three site visits.\n\nAt the 100% design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. Two site visits by team.\n\nAt the final design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The final review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings.\n\nFinal Inspection with one site visit.\n\nDesign shall comply with all current VA design requirements and specifications. It shall also comply/meet the requirements set forth in the Design Guide/s (latest edition).\n\nDesign manuals and specifications can be found at http://www.cfm.va.gov/TIL/.\n\nWork is located at the VA Medical Center in Beckley, WV, primarily on the 2nd floor of Building 1.\n\nThe selected A/E will attend pre-bid job showing. Selected A/E shall provide responses to questions asked by potential bidders and issue written responses.\n\nProject shall be designed and constructed to meet all VHA requirements including VA sustainability and green energy initiatives. See Department of Veterans Affairs Sustainable Design Manual (latest version) located at http://www.cfm.va.gov/TIL/.\n\nProject shall be designed with coordination with all VA staff input for various program areas that have impact on this project.\n\nPlanning must include a total of 10% deductive bid alternates that will need to be identified and incorporated as part of the bidding documents.\n\nSPECIFICS:\n\nThis design should be for a construction budget not to exceed $19,912,000. Completed design shall result in a cost that is within the budget limitations. If the base bid cost exceeds budget, the A/E shall re-design or take necessary steps to reduce the cost so that budget limitations are not exceeded. Deducts will need to be coordinated with the VA and noted on specifications and Final Design drawings.\n\nProvide contract specifications utilizing only the most current VA Master Specifications and edited to remove all impertinent specs for this project.\n\nAttend specified design review meetings and make all necessary site visits during design to gather information necessary from the existing sites, building plans, utility plans, etc. to provide a complete assessment of the proposed work. A thorough as-built shall be conducted of the existing site conditions to complete a full detailed set of documents.\n\nAssess the intent and scope of this project and work with the Medical Center staff to develop a final design, specifications and cost estimate to best suit the needs and constraints of the government, while incorporating VAMC Beckley Engineering/Facilities Management Service, Safety, Infection Control, National Offices, and Contracting Officer comments into the final design package.\n\nIncorporate in the preliminary drawings the pre-construction risk assessment evaluations that include noise, vibration and infection control.\n\nProvide bound specifications and 100% construction drawings with all references bound. Construction documents will be required to be furnished in hard copy, electronic .dwg & PDF files (AutoCAD 2018 or most current at the time of final design submission) and electronic .pdf files. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its Project Browser/Navigator .\n\nVA cannot send or receive any emails that contains more than 5mb of data. AE shall bind or combine files to conform to the 5mb limit.\n\nCost estimates will be formulated detailing quantities of materials, labor, profit, overhead, insurance, taxes, etc. in the format found at\nhttp://www.cfm.va.gov\n\nFinal drawings will detail measures to be taken by the contractor to assure life safety and infection control. A stated above a preconstruction risk assessment will be completed finalized and included in project submissions.\n\nPlans for phasing construction to minimize impact on the medical center will be incorporated into the construction documents. Plan construction activities to include impacts on the medical center such as relocating patient and staff, equipment, providing temporary barriers, providing temporary utilities, minimizing impact on patient flow, etc.\n\nProvide construction administration to include shop drawings/submittal review, site inspections, and RFI response.\n\nSITE INVESTIGATIONS:\n\nA/E shall make site visits as necessary to verify existing conditions and interview VA staff. Note: Information including drawings and other documentation provided to the A/E is used as reference only. All dimensions and existing conditions will be field verified and documented by the AE in the final design package. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov/TIL/. A/E shall field verify every aspect that relates to the project. Coordinate visits with the Project Manager/Contracting Officer Representative (COR)\nassigned after award. The A/E shall arrange for and oversee the performance of such investigations. Auto CAD architectural background drawings will be provided by the VA upon request.\n\nThe A/E shall independently field verify all existing dimensions, wall layouts, utilities, material types and every other design aspect that relates to the project.\n\nEXPECTATION: Submit review package so they are received on the noted day.\n\nReview\n*Due Date\n*Days from last review\n(Calendar Days After NTP)\nKickoff Initial Site Investigation & Design Charrette\n1\n0\nÂ\n30\n29\n15% Design Review & Design Charrette\nÂ\n55\n25\nVA 15% Review - Completed\nÂ\n95\n35\n30% Design Review & Design Charrette\nÂ\n130\n30\nVA 30% Review - Completed\nÂ\n160\n30\n60% Design Review & Presentation\nÂ\n185\n25\nVA 60% Review - Completed\nÂ\n100% Construction Documents\n210\n25\nÂ\n235\n20\nVA 100% Review - Completed\nFinal Construction Documents\n245\n10\n*Design and design review time can be faster than indicated in the schedule above and may result in faster completion of the project design (or float in the VA or A/E schedule reviews). The design must be reviewed by higher level VA central office and could have an impact on time.\n\nNote: An onsite kickoff meeting will be scheduled with the A/E and VA staff for the start of the project to further outline goals and needs of the project.\n\nDESIGN REQUIREMENTS:\n\nExpectations: Submit complete review package in accordance with the following requirements and guidelines outlined in https://www.cfm.va.gov/contract/ae.asp. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E and VA team may elect to delete individual submissions which are not required.\n\nDeliver:\nAll design packages will be delivered directly to FMSL (Engineering) on the established dates for VA review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C November 2008. The manual is available at the following address: http://www.cfm.va.gov/contract/aeDesSubReq.asp. Prepare working drawings on AutoCAD MEP/Architecture, 2018 versions or most current at the time of final design submission, utilizing its smart capabilities chases. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its Project Browser/Navigator .\n\nNote: In the interest of time, electronic submittals of design documents are preferred to expedite review time. PDF Email Attachments (5mb limit) or an internet Share Point site for file downloads are acceptable. Final and As Built copies should be supplied in both electronic and Hard Copy formats.\n\nDesign Development 100%: Attachment D 100% Submission Requirements\nRequirements for the 100% Design Development. Address all comments from the 100% review and finalize required submittals.\n\nFINAL Contract Documents (CD): Attachment E Submission Requirements\nSubmit a complete document of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\n\nCONSTRUCTION PERIOD SERVICES:\n\nThe A/E will attend pre-bid job showing. A/E shall provide responses to questions asked by potential bidders and issue written responses.\n\nProvide assistance to the VA to determine whether the contractor or subcontractor meets qualification requirements, support by written recommendations of any problems or litigation encountered in past based on firsthand knowledge.\n\nThe A/E will review all submissions and provide recommendations to the VA within five\ncalendar days upon request. AE will review and provide replies to contractor / VA generated RFIs when required by the project manager within five calendar days.\n\nAE will review contractor's cost estimates, methods of work, materials and provide recommendations to the VA.\n\nMake site visits on requests of the VA and prepare written reports to include agreed upon changes in design as determined necessary during the construction. Visits made based on errors and omissions in design will be at no cost to the VA.\n\nParticipate in partial/final acceptance inspections as scheduled and generate punch list items for completion. The punch list shall reference the contract documents for specific deficiencies (i.e. specification section, drawing detail, etc.)\n\nPrepare as-built drawings on original set with A/E s stamp, based on record drawings that the contractor kept during construction. Transpose contractor s as-builts to\nAutoCAD (.dwg) and provide a set of updated as-builts on CD within 30 days to the Project Engineer. Final drawing submittal will include hard copies as described for other submissions as well as a CD clearly labeled with the project name, number and submittal date containing: Folder labeled bid documents . All specifications bound in one (1) word document (make sure spec sections are separated by page breaks). All drawing sheets in one .pdf file.\n\nAll bound or combined files shall be limited to 5mb.\nFolder labeled DWG s with subfolders containing engineering disciplines (Architectural, MEP, Structural, Civil, etc.) which includes the .arj file (for every discipline) to launch and organize the drawing file system and make all drawings the current project inside of AutoCAD.\n\nFolder labeled PDF sheets containing separate .pdf documents for each discipline.\n\nFolder labeled cost estimate containing a copy of the final construction cost estimate documents.\n\nFolder labeled calculations containing final calculation documents.\n\nFolder labeled specifications with a word document for each spec section.\n\nFolder labeled misc for IH reports, materials testing, VPDES permit, soils tests, sustainability checklist, etc.\nUpon construction completion, red line drawings will be furnished to the A/E to prepare as built drawings. Final as built drawings will be furnished as master building drawings in a project manager format prescribed by the VA.\n\nThe A/E shall review and approve all specified equipment and installation submittals and shop drawings. The A/E shall attend the pre-construction conference to review and\nconfirm project scope. During construction, the A/E shall allow for a minimum of 8 site visits as directed and scheduled by the COR.\n\nArchitect/Engineer Energy Scope of Work\nEnergy Requirements for the Procurement of all New Construction, Major & Minor Renovation Projects:\n\n1. New Construction:\n\nAll new construction shall be designed to achieve an energy consumption level that is at least 30% below the level achieved under the latest ASHRAE Standard, if life-cycle cost effective. Use Appendix G of ASHRAE Standard 90.1-2004 to document the energy savings.\n\nShould the 30% reduction in energy consumption prove not to be life-cycle cost effective, then the A/E shall evaluate alternative designs at 5% successive decrements to identify the most energy-efficient design that is life-cycle cost effective.\n\nThe following parameters shall be used for performing the analysis:\n\n20-year life-cycle period for system comparisons\nUse Public domain programs such as TRACE, E-CUBE, Carrier E20-II, etc.\n7% Discount Factor\nNeither include taxes, nor insurance while computing cost.\n\n2. Major & Minor Renovations and Major Equipment Replacements:\n\nFor Major Renovations: Shall include any renovation where an entire area is gutted and rebuilt. Any replacement of central HVAC equipment or changes in air distribution shall be considered a Major Renovation.\n\nReduce the energy cost budget by 20% below pre-renovations 2003 baseline. A/E shall estimate 2003 baseline energy consumption before the renovation and compare it to the proposed design after the renovation and document the 20% savings. The primary unit for energy budget reporting is the British Thermal Unit (BTU) per square foot of the area to be renovated. A/E shall develop the energy budget as required in ASHRAE 90.1-2004, Appendix G, using the same parameters outlined above for new construction.\n\nFor Minor Renovations: Shall be defined as a small portion of a building, where only architectural treatments, or simple equipment replacement is planned. The renovation will have little to no impact on the central HVAC System, or energy use within the renovated area.\n\nAny part of the renovation which impacts energy consumption shall be designed with the mandate to reduce energy consumption. For example, if exterior walls are part of\n\nthe project, then their R-Value shall be increased. If lighting fixtures are to be replaced, then they shall be replaced with the most energy efficient fixture that is cost effective (20-year life).\n\n3. Renewable Energy Resources:\n\nFor any work, renewable (geothermal, heat recovery, wind, PV solar, solar hot water, etc.) shall be evaluated for life-cycle cost effectiveness.\n\nATTACHMENT A\n\nDesign Development 15% Submission Requirements\n\nDeliver the following (labeled with 15% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #10. Three design options shall be presented in a design charrette. The presentation will provide 3 options of floorplan designs for VA Management to review. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n\n4 half size sets of all drawings produced on the latest version of AutoCAD software.\n\n1 copy of itemized total project cost by design option. Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit)\n\nATTACHMENT B\n\nDesign Development 30% Submission Requirements\n\nDeliver the following (labeled with 30% submission) and include this attachment as a checklist with your submission:\n\n1 copies of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #11. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n\n4 half size sets of all drawings required by project, produced on the latest version of AutoCAD software.\n\n1 copy of itemized cost estimate by specification section or trade (labor, material and equipment). Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit)\n\nATTACHMENT C\n\nDesign Development 60% Submission Requirements\n\nDeliver the following (labeled with 60% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 60% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #12. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n1 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n4 half size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word. (.pdf files for email shall not exceed the 5mb limit. AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\n\nATTACHMENT D\n\nDesign Development 100% Submission Requirements\n\nDeliver the following (labeled with 100% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 100% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #13. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n1 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n4 half size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word. (.pdf files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\n\nATTACHMENT E\n\nFinal Contract Document Submission Requirements\n1 copy of the construction drawings Cover Sheet in AutoCAD format for FINAL VA signatures. Forward copy via email. (.pdf files for email shall not exceed the 5mb email limit)\n1 copy of FINAL design narrative report forwarding the design submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items on the A/E scope of work #14. The report shall identify bid deducts, recommended construction phasing and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of FINAL itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of FINAL edited VA Master Specifications of sections to be used for the construction project. (Make sure that all proof reading edits marks and lined through text have been removed. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of the FINAL master submittal list identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the FINAL Construction Scope of Work. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of FINAL drawings in AutoCAD (.dwg files) and FINAL Specifications in Microsoft Word. (word files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\n\nEvaluation and Selection Information\nThis acquisition is for Architect/Engineer services and is procured in accordance with the Brooks Act (FAR Subpart 36.6). All submissions will be evaluated in accordance with the criteria below. A shortlist of approximately three to five firms deemed most highly qualified after initial source selection will be chosen for interviews (teleconference or virtual). The Government will not pay or reimburse any costs associated with responding to this request and is under no obligation to award a contract as a result of this announcement.\nEvaluation Factors (SF 330): Factors I, II, and III are of equal importance and are collectively more important than factors IV, V and VI. Factor V is more important than Factors IV and VI. Factors IV and VI are of equal importance.\nI. Professional Qualifications Necessary for Satisfactory Performance of Required Services\nIdentify the proposed Project Manager (PM) and each proposed key discipline lead. State each person s discipline, project role, responsibility, availability, and relevant experience. Describe the PM s discipline, years of relevant project management experience, and experience managing outpatient healthcare or clinic renovation projects comparable in scope and complexity. Describe experience applying relevant VA design criteria, technical requirements, life safety requirements, infection control/occupied facility constraints, and VA project delivery processes applicable to the announced scope. Describe the proposed team s experience designing and supporting construction of outpatient clinic renovations or fit outs in existing facilities, including construction phase services and occupied facility coordination.\nII. Specialized Experience and Technical Competence in Comparable Healthcare/Clinic Renovation Work\nIdentify the proposed discipline leads and specialty consultants required by the scope, including architecture, interior design, mechanical, electrical, plumbing/fire protection, and other disciplines as applicable. Describe the firm s and proposed team s experience with project specific technical features (e.g., MEP renovation, electrical distribution, emergency power, HVAC modifications, clinical space systems, fire protection/life safety systems, low voltage/IT coordination, medical gas systems, infection control/occupied facility coordination). Relevant VA experience and comparable non VA healthcare experience will be considered. Greater credit may be given for demonstrated familiarity with requirements materially applicable to this project. For this factor, recent experience means projects completed, substantially completed, or actively performed within five years before the response due date.\nIII. Past Performance on Contracts with Government Agencies and Private Industry in Terms of Cost Control, Quality of Work, and Compliance with Performance Schedules\nDiscuss the firm s recent, relevant experience on Government and private sector projects, emphasizing healthcare/clinic/patient care or comparable renovation projects in existing facilities. Describe the firm s performance related to quality of A/E services, cost control and design to budget efforts, schedule compliance, coordination, and work in occupied or phased environments, as applicable. Identify up to five projects most relevant to this requirement; for each, briefly describe the scope, the firm s role, roles of proposed key personnel, schedule and cost control performance, and final outcome. Include one lesson learned or challenge from a relevant project and the action taken to address it. Disclose any final, substantiated adverse performance finding, final judgment, or final arbitration decision issued within the past five years materially related to the firm s A/E services (design quality, coordination, cost control, schedule performance). For each matter, provide project name, client, issue, final outcome, and corrective action taken. Do not include privileged, sealed, confidential settlement, or otherwise legally protected information. Unresolved allegations, pending claims, or pending disputes do not need to be disclosed.\nIV. Organization, Management, and Quality Control\nDescribe the proposed project organization (key personnel, subconsultants, responsibilities, and reporting relationships). Explain the firm s approach to team and subconsultant management, discipline coordination, quality control reviews, Government communication, issue resolution, and corrective action. Describe how the approach addresses risks of renovating specialty clinics in an existing/occupied facility, including phasing and applicable healthcare/VA requirements. Provide one comparable project example demonstrating successful use of the proposed approach.\nV. Capacity to Accomplish the Work in the Required Time\nDescribe the firm s capacity to perform the required services within the anticipated project schedule. Identify the PM, key personnel, and subconsultants; their responsibilities; current workload and other material commitments; and availability for this project. Describe how the firm will staff and manage the work through project milestones without adversely affecting schedule, quality, or coordination. Identify potential resource conflicts and the firm s plan to address them, including contingency resources available if needed.\nVI. Geographic Location in the General Geographical Area and Knowledge of Locality\nDescribe the firm s ability to provide timely and effective support for this project at VAMC Beckley, West Virginia. Identify the staffed office(s) that will perform the work; location of the PM and key personnel; anticipated availability for site visits, meetings, and construction phase support; and any local/regional resources that will support the project. Describe the firm s knowledge of local conditions relevant to this requirement, including familiarity with VAMC Beckley or comparable regional healthcare facilities; existing facility and campus coordination; regional construction and logistical conditions; and applicable local permitting, utility, or stakeholder coordination requirements.\nNote Upon Award\nA/E disciplines include, but are not limited to, Architectural, Civil, and Mechanical/Electrical/Plumbing (MEP) (estimating; structural; mechanical [HVAC]; electrical; plumbing; geotechnical; certified physical security specialist; and healthcare related engineering services). Award is contingent upon the availability of funds.\n\nContracting Office Address and Point of Contact\nDepartment of Veterans Affairs\nMillard Adkins, Contracting Officer (CO)\n517/90C\nBuilding 2\n200 Veterans Drive\nBeckley, WV 25801\nPoint of Contact: Millard M. Adkins, Contracting Officer millard.adkins@va.gov","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24526R0101","place_of_performance":{"zip":"25801","city":{"name":"Beckley"},"state":{"code":"WV"},"street":"Beckley VAMC 200 Veterans Ave.","country":{"code":"USA"}},"product_service_code":"C1DA"},{"dates":{"posted":"2026-10-21","posted_at":"2026-10-21T12:46:09.589Z","created_at":"2026-10-21T12:46:07.358Z","modified_at":"2026-10-21T12:46:09.589Z","response_deadline":{"raw":"2026-11-13T14:00:00-05:00","utc":"2026-11-13T19:00:00Z","date":"2026-11-13","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2b0462021d53452a87f99d9857ade96e/view"},"naics":{"codes":["541310"],"primary":"541310"},"title":"C1DA--Renovate Specialty Clinics on 2nd","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-01-12","archive_type":"auto_custom"},"history":[{"index":2,"title":"C1DA--Renovate Specialty Clinics on 2nd","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-21T12:46:09.589Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"2b0462021d53452a87f99d9857ade96e","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":1,"title":"C1DA--Renovate Specialty Clinics on 2nd Floor","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-24T15:12:32.372Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7b6944d7728045038d081deff310ce05","solicitation_number":"36C24526R0101"}],"contacts":[{"name":"Contracting Officer","role":"primary","email":"millard.adkins@va.gov","phone":"304-255-2121 4136","title":"Millard Adkins"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"2b0462021d53452a87f99d9857ade96e","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"7b6944d7728045038d081deff310ce05","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-22T04:27:46.805649380Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"4fc8280be7a6e20fe9b836723d9cfcd94e187115695ef52d821294e33a16532f","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-10-22T04:05:36.750841648Z"},"description":{"html":"Please be advised that the submission deadline for SF 330 has been extended from October 26, 2026, to November 13, 2026, at 2:00 PM EST. Responses to the RFIs are currently being prepared and will be posted prior to the revised due date.","text":"Please be advised that the submission deadline for SF 330 has been extended from October 26, 2026, to November 13, 2026, at 2:00 PM EST. Responses to the RFIs are currently being prepared and will be posted prior to the revised due date.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24526R0101","place_of_performance":{"zip":"25801","city":{"name":"Beckley"},"state":{"name":"WV"},"street":"Beckley VAMC 200 Veterans Ave."},"product_service_code":"C1DA"},{"award":{"awardee":{}},"dates":{"posted":"2026-11-06","posted_at":"2026-11-06T20:14:16.116Z","created_at":"2026-11-06T20:14:13.825Z","modified_at":"2026-11-06T20:14:16.116Z","response_deadline":{"raw":"2026-11-20T14:00:00-05:00","utc":"2026-11-20T19:00:00Z","date":"2026-11-20","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/cc0fd029e4f94dd28f101314a39d38cd/view"},"naics":{"codes":["541310"],"primary":"541310"},"title":"C1DA--Renovate Specialty Clinics on 2nd","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_id":"100173468","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-01-19","archive_type":"auto_custom"},"history":[{"index":3,"title":"C1DA--Renovate Specialty Clinics on 2nd","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-06T20:14:16.116Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"cc0fd029e4f94dd28f101314a39d38cd","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":2,"title":"C1DA--Renovate Specialty Clinics on 2nd","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-21T12:46:09.589Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"2b0462021d53452a87f99d9857ade96e","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":1,"title":"C1DA--Renovate Specialty Clinics on 2nd Floor","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-24T15:12:32.372Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7b6944d7728045038d081deff310ce05","solicitation_number":"36C24526R0101"}],"contacts":[{"name":"Millard Adkins","role":"primary","email":"millard.adkins@va.gov","phone":"304-255-2121","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"cc0fd029e4f94dd28f101314a39d38cd","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"7b6944d7728045038d081deff310ce05","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T08:19:21.995934033Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"57c8b2c7b6efa6082d148b072197517b-27\"","fetched_at":"2026-11-07T04:49:22.571963856Z","row_sha256":"6936899f0ad05f7c55ad740fba54300c77ae3a6b12f23e5566cfcc2d77922bfe","last_modified":"2026-11-07T04:30:20Z"},"updated_at":"2026-11-12T08:19:21.995934033Z","first_seen_at":"2026-11-07T04:49:22.571963856Z"},"description":{"html":"Please be advised that the submission deadline for SF 330 has been extended from November 13, 2026, to November 20, 2026, at 2:00 PM EST. Responses to the RFIs are currently being prepared and will be posted prior to the revised due date.","text":"Please be advised that the submission deadline for SF 330 has been extended from November 13, 2026, to November 20, 2026, at 2:00 PM EST. Responses to the RFIs are currently being prepared and will be posted prior to the revised due date.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24526R0101","place_of_performance":{"zip":"25801","city":{"name":"Beckley"},"state":{"name":"WV"},"street":"Beckley VAMC 200 Veterans Ave."},"product_service_code":"C1DA"},{"award":{"awardee":{}},"dates":{"posted":"2026-11-18","posted_at":"2026-11-18T14:23:44.315Z","created_at":"2026-11-18T14:23:42.991Z","modified_at":"2026-11-18T14:23:44.315Z","response_deadline":{"raw":"2026-11-25T14:00:00-05:00","utc":"2026-11-25T19:00:00Z","date":"2026-11-25","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e84156527a944ee3bd5001d28af5d713/view"},"naics":{"codes":["541310"],"primary":"541310"},"title":"C1DA-- Renovate Specialty Clinics on 2nd","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_id":"100173468","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-01-24","archive_type":"auto_custom"},"history":[{"index":4,"title":"C1DA-- Renovate Specialty Clinics on 2nd","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-18T14:23:44.315Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"e84156527a944ee3bd5001d28af5d713","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":3,"title":"C1DA--Renovate Specialty Clinics on 2nd","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-06T20:14:16.116Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"cc0fd029e4f94dd28f101314a39d38cd","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":2,"title":"C1DA--Renovate Specialty Clinics on 2nd","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-21T12:46:09.589Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"2b0462021d53452a87f99d9857ade96e","solicitation_number":"36C24526R0101","parent_opportunity_id":"7b6944d7728045038d081deff310ce05"},{"index":1,"title":"C1DA--Renovate Specialty Clinics on 2nd Floor","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-24T15:12:32.372Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"7b6944d7728045038d081deff310ce05","solicitation_number":"36C24526R0101"}],"contacts":[{"name":"Millard Adkins","role":"primary","email":"millard.adkins@va.gov","phone":"304-255-2121","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"e84156527a944ee3bd5001d28af5d713","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"7b6944d7728045038d081deff310ce05","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-19T07:01:07.504318249Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"6ef056520f5b764db7a4b6f45118f236-27\"","fetched_at":"2026-11-19T04:37:24.575886376Z","row_sha256":"500b581181698ed400d96eb8ec18ec0e8c82e89bf8031be7bdca09a9d616ab9a","last_modified":"2026-11-19T04:30:19Z"},"updated_at":"2026-11-19T07:01:07.504318249Z","first_seen_at":"2026-11-19T04:37:24.575886376Z"},"description":{"html":"Please be advised that the submission deadline for SF 330 has been extended from November 20, 2026, to November 25, 2026, at 2:00 PM EST. See responses to RFI s below.\nVA responses to RFI s are bold below.\nCould you please clarify which disciplines are anticipated to be required? For example, regarding surveying, would the scope include a building measured survey, utility survey, site topographic survey, or a combination of these? Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary.\n\nMust a licensed surveyor be included as a named member of the SF330 team, or may surveying services be provided by a consultant on an as-needed basis? Identify the proposed discipline leads and specialty consultants required by the scope, including architecture, interior design, mechanical, electrical, plumbing/fire protection, and other disciplines as applicable. Describe the firm s and proposed team s experience with project specific technical features (e.g., MEP renovation, electrical distribution, emergency power, HVAC modifications, clinical space systems, fire protection/life safety systems, low voltage/IT coordination, medical gas systems, infection control/occupied facility coordination). Relevant VA experience and comparable non VA healthcare experience will be considered.\n\nGiven that the primary scope involves renovating the existing second-floor clinic area, is new field surveying anticipated for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions. \nThe notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore:\nExisting-building measured documentation: required.\nVerification of utilities affecting the design: required.\n\n\nPlease confirm if there is a page limit in addition to the 10MB PDF file size for the SF330 submission. 10MB PDF file size no page limit.\n\nFor Factor II   Specialized Experience and Technical Competence, the solicitation states that \"recent experience means projects completed, substantially completed, or actively performed within five years before the response due date.\" Can the VA clarify whether this requirement is based on completion of the A/E design services? For this factor, recent experience means projects completed, substantially completed, or actively performed within five years before the response due date.\n\nDo the requirements outlined under Factor 3   Past Performance pertain to our Section F project examples? Section F project description will not necessarily satisfy Factor III by itself. Add the required performance information and cross-reference the project numbers rather than merely repeating scope descriptions.\nAre CPARS / PPQs required to be included with our submission? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission.\nAs the Solicitation  expects the A/E to collaborate with other A/E firms involved in other projects throughout the facility,  can the VA provide the names of the actual other A/E firms and the other projects? No.\nIs a space program or a list of the specific specialty clinics to be consolidated on the 2nd Floor available and can it be provided at this time? No, not at this time.\nThe anticipated disciplines include Surveying. Given that the project is primarily an interior renovation within Building 1, can the VA clarify the anticipated scope of surveying services required for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions. \nThe notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore:\nExisting-building measured documentation: required.\nVerification of utilities affecting the design: required.\n\nCan the VA clarify whether replacement of the air handling unit(s) serving the renovated 2nd Floor area is anticipated as part of this project, or whether the design should evaluate and determine HVAC system modifications necessary to support the renovated space? The SOW anticipates significant system upgrades, utility verification, and HVAC design, but it does not identify units to replace or establish replacement as a mandatory solution. \nThe supported interpretation is that the A/E must evaluate existing systems and develop modifications or replacement recommendations needed for the approved renovation. VA architectural guidance likewise calls for investigating whether existing systems have sufficient capacity for renovations. That guidance does not establish that these particular AHUs require replacement\nWill the 2nd Floor space be vacated during construction or will phased construction be required? Full vacancy is not promised. The SOW expressly requires construction phasing, infection-control planning, outage and temporary-access planning, and a temporary relocation plan if needed. Firms should demonstrate occupied-facility and phasing capability; the actual decanting and construction sequence remain to be determined with VA.\nThe SOW states that \"an all-inclusive concept will need to be created\" for the approximately 16,530 SF renovation area. Can the VA clarify whether the interior design concept is intended to encompass only the renovated specialty clinic space or also adjacent public and circulation areas on the 2nd Floor?  The all-inclusive interior design concept applies to the approximately 16,530-square-foot specialty clinic renovation area identified in the SOW. The A/E shall coordinate the renovated area with directly adjacent public and circulation areas as necessary to provide appropriate transitions and maintain operational continuity. Design of other portions of the second floor is not included unless specifically identified or authorized by the VA.\nDeadline time zone: Please confirm that  2:00 p.m. Eastern Standard Time  for the October 14, 2026 question deadline and October 26, 2026 submission deadline means 2:00 p.m. prevailing Eastern Time on those dates. 2:00 pm EASTERN TIME, NEW YORK, USA\nPage and formatting limits: Please confirm that there is no page limit, minimum font size, or separate length limit for supplemental qualification statements, provided the complete submission is a single PDF no larger than 10 MB. Submit SF 330 Parts I and II by email to millard.adkins@va.gov as a single Adobe PDF file (no larger than 10 MB). No ZIP files. Receipt must be confirmed. No page limit or minimum font size.\nPast-performance documentation: Should firms attach Contractor Performance Assessment Reporting System (CPARS) reports or Past Performance Questionnaires (PPQs), or should Factor III be addressed through narrative only unless supporting records are requested? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission.\n\nProject examples: May the up to five projects discussed under Factor III be the same projects presented in SF330 Section F? May Section F include more than five projects if the Factor III discussion is limited to five? Yes. The projects discussed under Factor III may be the same projects presented in SF330 Section F. However, the Factor III response must provide the specific past-performance information requested by that factor, including the firm s performance regarding quality, cost control, schedule compliance, coordination, project outcome, and the roles of proposed key personnel, as applicable. Firms may cross-reference the corresponding Section F project number rather than repeat the full project description. The Factor III discussion is limited to no more than five projects.\nAdditional projects may be included in Section F to the extent permitted by the SF330 requirements and the submission size limitation, but only the five projects identified for Factor III will be evaluated under the specific Factor III project-example requirements.\n\nSection E resumes: Which disciplines does the Government expect firms to treat as  key discipline leads  requiring Section E resumes? Please clarify whether resumes are required for every discipline listed under  A/E Eligibility and Disciplines,  or only the proposed key leads applicable to this project. The notice expressly asks for the PM and proposed key discipline leads, with architecture, interior design, mechanical, electrical, and plumbing/fire protection identified in Factor II. It does not expressly demand a separate resume for every discipline on the broad eligibility list. Include the PM and each proposed key lead, including specialty consultants who meet that definition including but not limited to cost estimator an Quality Manager.\nReceipt confirmation: The solicitation states that receipt must be confirmed. What form of confirmation is acceptable? If acknowledgment is not received before the submission deadline, whom should the firm contact, and through what method? Receipt will be confirmed by the contracting officer by email once received. The POC is Millard Adkins and can be contacted by email to Millard.Adkins@va.gov\nProject completion status: For projects presented in Section F and discussed under Factor III, must design be complete, construction be complete, or both? Factor II allows projects completed, substantially completed, or actively performed within the preceding five years; please clarify whether that same eligibility standard applies to Section F and Factor III. For Factor II, a project may be completed, substantially completed, or actively being performed, provided the qualifying work occurred within five years before the response due date. Neither design nor construction must necessarily be fully complete for a project to qualify under Factor II.\nFor Factor III, firms should submit up to five recent and relevant projects that provide sufficient performance information for the Government to evaluate quality, cost control, schedule compliance, coordination, and project outcome. If a project is ongoing, the firm should clearly identify the work completed to date and the performance information available for evaluation.\n\nRegarding the subject solicitation, can you please confirm if this effort will require commissioning and life safety and if those roles are required to be third-party? Life safety is expressly required. The SOW requires final drawings addressing life safety and infection control, includes fire-protection drawings, and calls for relevant life-safety expertise in evaluation. It does not establish a separate third-party life-safety consultant requirement. \nCommissioning is not expressly assigned as a distinct service in the supplied SOW. Nevertheless, the cited requirement to comply with VA design criteria is significant: VA HVAC guidance requires commissioning practices tailored to project size and complexity and compliance with VA s commissioning manual.\n\nCivil Engineering and Surveying disciplines: The solicitation's required disciplines list includes Civil Engineering and Surveying, but neither discipline is addressed anywhere in the body of the SOW. Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary.\n\nCan you confirm whether Civil Engineering and Surveying services are in fact required for this project? They remain listed as anticipated disciplines\n\nCan you provide the anticipated scope of responsibilities for these two disciplines, since the current SOW does not describe any site, civil, or survey work for this second story interior renovation? No significant civil engineering or land surveying effort is currently anticipated for the second-floor renovation itself. However, firms should include civil engineering and surveying capabilities sufficient to support any site-related work that may become necessary as a result of construction phasing, utility modifications, temporary facilities, or continuity-of-operations requirements identified during design development. The VA has not predetermined the temporary relocation strategy.\n\nWe wanted to clarify, for our SF330 submission if we needed to utilize the GSA SF330 form?Â   Can we utilize a modified form to showcase photographs to reinforce our narrative about project examples provided in Part F. Preserve the SF330 sections, information, project identifiers, and signature certifications. GSA also provides a separate reproducible Section F. use only concise project-relevant images if space permits.","text":"Please be advised that the submission deadline for SF 330 has been extended from November 20, 2026, to November 25, 2026, at 2:00 PM EST. See responses to RFI s below.\nVA responses to RFI s are bold below.\nCould you please clarify which disciplines are anticipated to be required? For example, regarding surveying, would the scope include a building measured survey, utility survey, site topographic survey, or a combination of these? Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary.\n\nMust a licensed surveyor be included as a named member of the SF330 team, or may surveying services be provided by a consultant on an as-needed basis? Identify the proposed discipline leads and specialty consultants required by the scope, including architecture, interior design, mechanical, electrical, plumbing/fire protection, and other disciplines as applicable. Describe the firm s and proposed team s experience with project specific technical features (e.g., MEP renovation, electrical distribution, emergency power, HVAC modifications, clinical space systems, fire protection/life safety systems, low voltage/IT coordination, medical gas systems, infection control/occupied facility coordination). Relevant VA experience and comparable non VA healthcare experience will be considered.\n\nGiven that the primary scope involves renovating the existing second-floor clinic area, is new field surveying anticipated for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions.\nThe notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore:\nExisting-building measured documentation: required.\nVerification of utilities affecting the design: required.\n\nPlease confirm if there is a page limit in addition to the 10MB PDF file size for the SF330 submission. 10MB PDF file size no page limit.\n\nFor Factor II Specialized Experience and Technical Competence, the solicitation states that \"recent experience means projects completed, substantially completed, or actively performed within five years before the response due date.\" Can the VA clarify whether this requirement is based on completion of the A/E design services? For this factor, recent experience means projects completed, substantially completed, or actively performed within five years before the response due date.\n\nDo the requirements outlined under Factor 3 Past Performance pertain to our Section F project examples? Section F project description will not necessarily satisfy Factor III by itself. Add the required performance information and cross-reference the project numbers rather than merely repeating scope descriptions.\nAre CPARS / PPQs required to be included with our submission? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission.\nAs the Solicitation expects the A/E to collaborate with other A/E firms involved in other projects throughout the facility, can the VA provide the names of the actual other A/E firms and the other projects? No.\nIs a space program or a list of the specific specialty clinics to be consolidated on the 2nd Floor available and can it be provided at this time? No, not at this time.\nThe anticipated disciplines include Surveying. Given that the project is primarily an interior renovation within Building 1, can the VA clarify the anticipated scope of surveying services required for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions.\nThe notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore:\nExisting-building measured documentation: required.\nVerification of utilities affecting the design: required.\n\nCan the VA clarify whether replacement of the air handling unit(s) serving the renovated 2nd Floor area is anticipated as part of this project, or whether the design should evaluate and determine HVAC system modifications necessary to support the renovated space? The SOW anticipates significant system upgrades, utility verification, and HVAC design, but it does not identify units to replace or establish replacement as a mandatory solution.\nThe supported interpretation is that the A/E must evaluate existing systems and develop modifications or replacement recommendations needed for the approved renovation. VA architectural guidance likewise calls for investigating whether existing systems have sufficient capacity for renovations. That guidance does not establish that these particular AHUs require replacement\nWill the 2nd Floor space be vacated during construction or will phased construction be required? Full vacancy is not promised. The SOW expressly requires construction phasing, infection-control planning, outage and temporary-access planning, and a temporary relocation plan if needed. Firms should demonstrate occupied-facility and phasing capability; the actual decanting and construction sequence remain to be determined with VA.\nThe SOW states that \"an all-inclusive concept will need to be created\" for the approximately 16,530 SF renovation area. Can the VA clarify whether the interior design concept is intended to encompass only the renovated specialty clinic space or also adjacent public and circulation areas on the 2nd Floor? The all-inclusive interior design concept applies to the approximately 16,530-square-foot specialty clinic renovation area identified in the SOW. The A/E shall coordinate the renovated area with directly adjacent public and circulation areas as necessary to provide appropriate transitions and maintain operational continuity. Design of other portions of the second floor is not included unless specifically identified or authorized by the VA.\nDeadline time zone: Please confirm that 2:00 p.m. Eastern Standard Time for the October 14, 2026 question deadline and October 26, 2026 submission deadline means 2:00 p.m. prevailing Eastern Time on those dates. 2:00 pm EASTERN TIME, NEW YORK, USA\nPage and formatting limits: Please confirm that there is no page limit, minimum font size, or separate length limit for supplemental qualification statements, provided the complete submission is a single PDF no larger than 10 MB. Submit SF 330 Parts I and II by email to millard.adkins@va.gov as a single Adobe PDF file (no larger than 10 MB). No ZIP files. Receipt must be confirmed. No page limit or minimum font size.\nPast-performance documentation: Should firms attach Contractor Performance Assessment Reporting System (CPARS) reports or Past Performance Questionnaires (PPQs), or should Factor III be addressed through narrative only unless supporting records are requested? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission.\n\nProject examples: May the up to five projects discussed under Factor III be the same projects presented in SF330 Section F? May Section F include more than five projects if the Factor III discussion is limited to five? Yes. The projects discussed under Factor III may be the same projects presented in SF330 Section F. However, the Factor III response must provide the specific past-performance information requested by that factor, including the firm s performance regarding quality, cost control, schedule compliance, coordination, project outcome, and the roles of proposed key personnel, as applicable. Firms may cross-reference the corresponding Section F project number rather than repeat the full project description. The Factor III discussion is limited to no more than five projects.\nAdditional projects may be included in Section F to the extent permitted by the SF330 requirements and the submission size limitation, but only the five projects identified for Factor III will be evaluated under the specific Factor III project-example requirements.\n\nSection E resumes: Which disciplines does the Government expect firms to treat as key discipline leads requiring Section E resumes? Please clarify whether resumes are required for every discipline listed under A/E Eligibility and Disciplines, or only the proposed key leads applicable to this project. The notice expressly asks for the PM and proposed key discipline leads, with architecture, interior design, mechanical, electrical, and plumbing/fire protection identified in Factor II. It does not expressly demand a separate resume for every discipline on the broad eligibility list. Include the PM and each proposed key lead, including specialty consultants who meet that definition including but not limited to cost estimator an Quality Manager.\nReceipt confirmation: The solicitation states that receipt must be confirmed. What form of confirmation is acceptable? If acknowledgment is not received before the submission deadline, whom should the firm contact, and through what method? Receipt will be confirmed by the contracting officer by email once received. The POC is Millard Adkins and can be contacted by email to Millard.Adkins@va.gov\nProject completion status: For projects presented in Section F and discussed under Factor III, must design be complete, construction be complete, or both? Factor II allows projects completed, substantially completed, or actively performed within the preceding five years; please clarify whether that same eligibility standard applies to Section F and Factor III. For Factor II, a project may be completed, substantially completed, or actively being performed, provided the qualifying work occurred within five years before the response due date. Neither design nor construction must necessarily be fully complete for a project to qualify under Factor II.\nFor Factor III, firms should submit up to five recent and relevant projects that provide sufficient performance information for the Government to evaluate quality, cost control, schedule compliance, coordination, and project outcome. If a project is ongoing, the firm should clearly identify the work completed to date and the performance information available for evaluation.\n\nRegarding the subject solicitation, can you please confirm if this effort will require commissioning and life safety and if those roles are required to be third-party? Life safety is expressly required. The SOW requires final drawings addressing life safety and infection control, includes fire-protection drawings, and calls for relevant life-safety expertise in evaluation. It does not establish a separate third-party life-safety consultant requirement.\nCommissioning is not expressly assigned as a distinct service in the supplied SOW. Nevertheless, the cited requirement to comply with VA design criteria is significant: VA HVAC guidance requires commissioning practices tailored to project size and complexity and compliance with VA s commissioning manual.\n\nCivil Engineering and Surveying disciplines: The solicitation's required disciplines list includes Civil Engineering and Surveying, but neither discipline is addressed anywhere in the body of the SOW. Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary.\n\nCan you confirm whether Civil Engineering and Surveying services are in fact required for this project? They remain listed as anticipated disciplines\n\nCan you provide the anticipated scope of responsibilities for these two disciplines, since the current SOW does not describe any site, civil, or survey work for this second story interior renovation? No significant civil engineering or land surveying effort is currently anticipated for the second-floor renovation itself. However, firms should include civil engineering and surveying capabilities sufficient to support any site-related work that may become necessary as a result of construction phasing, utility modifications, temporary facilities, or continuity-of-operations requirements identified during design development. The VA has not predetermined the temporary relocation strategy.\n\nWe wanted to clarify, for our SF330 submission if we needed to utilize the GSA SF330 form?Â Can we utilize a modified form to showcase photographs to reinforce our narrative about project examples provided in Part F. Preserve the SF330 sections, information, project identifiers, and signature certifications. GSA also provides a separate reproducible Section F. use only concise project-relevant images if space permits.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24526R0101","place_of_performance":{"zip":"25801","city":{"code":"5332","name":"Beckley"},"state":{"code":"WV","name":"West Virginia"},"street":"Beckley VAMC 200 Veterans Ave.","country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"C1DA"}],"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","state":"WV","county":"54081","county_name":"Raleigh County","city":"5405332","city_name":"Beckley","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-11-19T04:41:36.780616Z","principal_notice_id":"e84156527a944ee3bd5001d28af5d713","description":{"text":"Please be advised that the submission deadline for SF 330 has been extended from November 20, 2026, to November 25, 2026, at 2:00 PM EST. See responses to RFI s below.\nVA responses to RFI s are bold below.\nCould you please clarify which disciplines are anticipated to be required? For example, regarding surveying, would the scope include a building measured survey, utility survey, site topographic survey, or a combination of these? Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary.\n\nMust a licensed surveyor be included as a named member of the SF330 team, or may surveying services be provided by a consultant on an as-needed basis? Identify the proposed discipline leads and specialty consultants required by the scope, including architecture, interior design, mechanical, electrical, plumbing/fire protection, and other disciplines as applicable. Describe the firm s and proposed team s experience with project specific technical features (e.g., MEP renovation, electrical distribution, emergency power, HVAC modifications, clinical space systems, fire protection/life safety systems, low voltage/IT coordination, medical gas systems, infection control/occupied facility coordination). Relevant VA experience and comparable non VA healthcare experience will be considered.\n\nGiven that the primary scope involves renovating the existing second-floor clinic area, is new field surveying anticipated for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions.\nThe notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore:\nExisting-building measured documentation: required.\nVerification of utilities affecting the design: required.\n\nPlease confirm if there is a page limit in addition to the 10MB PDF file size for the SF330 submission. 10MB PDF file size no page limit.\n\nFor Factor II Specialized Experience and Technical Competence, the solicitation states that \"recent experience means projects completed, substantially completed, or actively performed within five years before the response due date.\" Can the VA clarify whether this requirement is based on completion of the A/E design services? For this factor, recent experience means projects completed, substantially completed, or actively performed within five years before the response due date.\n\nDo the requirements outlined under Factor 3 Past Performance pertain to our Section F project examples? Section F project description will not necessarily satisfy Factor III by itself. Add the required performance information and cross-reference the project numbers rather than merely repeating scope descriptions.\nAre CPARS / PPQs required to be included with our submission? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission.\nAs the Solicitation expects the A/E to collaborate with other A/E firms involved in other projects throughout the facility, can the VA provide the names of the actual other A/E firms and the other projects? No.\nIs a space program or a list of the specific specialty clinics to be consolidated on the 2nd Floor available and can it be provided at this time? No, not at this time.\nThe anticipated disciplines include Surveying. Given that the project is primarily an interior renovation within Building 1, can the VA clarify the anticipated scope of surveying services required for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions.\nThe notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore:\nExisting-building measured documentation: required.\nVerification of utilities affecting the design: required.\n\nCan the VA clarify whether replacement of the air handling unit(s) serving the renovated 2nd Floor area is anticipated as part of this project, or whether the design should evaluate and determine HVAC system modifications necessary to support the renovated space? The SOW anticipates significant system upgrades, utility verification, and HVAC design, but it does not identify units to replace or establish replacement as a mandatory solution.\nThe supported interpretation is that the A/E must evaluate existing systems and develop modifications or replacement recommendations needed for the approved renovation. VA architectural guidance likewise calls for investigating whether existing systems have sufficient capacity for renovations. That guidance does not establish that these particular AHUs require replacement\nWill the 2nd Floor space be vacated during construction or will phased construction be required? Full vacancy is not promised. The SOW expressly requires construction phasing, infection-control planning, outage and temporary-access planning, and a temporary relocation plan if needed. Firms should demonstrate occupied-facility and phasing capability; the actual decanting and construction sequence remain to be determined with VA.\nThe SOW states that \"an all-inclusive concept will need to be created\" for the approximately 16,530 SF renovation area. Can the VA clarify whether the interior design concept is intended to encompass only the renovated specialty clinic space or also adjacent public and circulation areas on the 2nd Floor? The all-inclusive interior design concept applies to the approximately 16,530-square-foot specialty clinic renovation area identified in the SOW. The A/E shall coordinate the renovated area with directly adjacent public and circulation areas as necessary to provide appropriate transitions and maintain operational continuity. Design of other portions of the second floor is not included unless specifically identified or authorized by the VA.\nDeadline time zone: Please confirm that 2:00 p.m. Eastern Standard Time for the October 14, 2026 question deadline and October 26, 2026 submission deadline means 2:00 p.m. prevailing Eastern Time on those dates. 2:00 pm EASTERN TIME, NEW YORK, USA\nPage and formatting limits: Please confirm that there is no page limit, minimum font size, or separate length limit for supplemental qualification statements, provided the complete submission is a single PDF no larger than 10 MB. Submit SF 330 Parts I and II by email to millard.adkins@va.gov as a single Adobe PDF file (no larger than 10 MB). No ZIP files. Receipt must be confirmed. No page limit or minimum font size.\nPast-performance documentation: Should firms attach Contractor Performance Assessment Reporting System (CPARS) reports or Past Performance Questionnaires (PPQs), or should Factor III be addressed through narrative only unless supporting records are requested? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission.\n\nProject examples: May the up to five projects discussed under Factor III be the same projects presented in SF330 Section F? May Section F include more than five projects if the Factor III discussion is limited to five? Yes. The projects discussed under Factor III may be the same projects presented in SF330 Section F. However, the Factor III response must provide the specific past-performance information requested by that factor, including the firm s performance regarding quality, cost control, schedule compliance, coordination, project outcome, and the roles of proposed key personnel, as applicable. Firms may cross-reference the corresponding Section F project number rather than repeat the full project description. The Factor III discussion is limited to no more than five projects.\nAdditional projects may be included in Section F to the extent permitted by the SF330 requirements and the submission size limitation, but only the five projects identified for Factor III will be evaluated under the specific Factor III project-example requirements.\n\nSection E resumes: Which disciplines does the Government expect firms to treat as key discipline leads requiring Section E resumes? Please clarify whether resumes are required for every discipline listed under A/E Eligibility and Disciplines, or only the proposed key leads applicable to this project. The notice expressly asks for the PM and proposed key discipline leads, with architecture, interior design, mechanical, electrical, and plumbing/fire protection identified in Factor II. It does not expressly demand a separate resume for every discipline on the broad eligibility list. Include the PM and each proposed key lead, including specialty consultants who meet that definition including but not limited to cost estimator an Quality Manager.\nReceipt confirmation: The solicitation states that receipt must be confirmed. What form of confirmation is acceptable? If acknowledgment is not received before the submission deadline, whom should the firm contact, and through what method? Receipt will be confirmed by the contracting officer by email once received. The POC is Millard Adkins and can be contacted by email to Millard.Adkins@va.gov\nProject completion status: For projects presented in Section F and discussed under Factor III, must design be complete, construction be complete, or both? Factor II allows projects completed, substantially completed, or actively performed within the preceding five years; please clarify whether that same eligibility standard applies to Section F and Factor III. For Factor II, a project may be completed, substantially completed, or actively being performed, provided the qualifying work occurred within five years before the response due date. Neither design nor construction must necessarily be fully complete for a project to qualify under Factor II.\nFor Factor III, firms should submit up to five recent and relevant projects that provide sufficient performance information for the Government to evaluate quality, cost control, schedule compliance, coordination, and project outcome. If a project is ongoing, the firm should clearly identify the work completed to date and the performance information available for evaluation.\n\nRegarding the subject solicitation, can you please confirm if this effort will require commissioning and life safety and if those roles are required to be third-party? Life safety is expressly required. The SOW requires final drawings addressing life safety and infection control, includes fire-protection drawings, and calls for relevant life-safety expertise in evaluation. It does not establish a separate third-party life-safety consultant requirement.\nCommissioning is not expressly assigned as a distinct service in the supplied SOW. Nevertheless, the cited requirement to comply with VA design criteria is significant: VA HVAC guidance requires commissioning practices tailored to project size and complexity and compliance with VA s commissioning manual.\n\nCivil Engineering and Surveying disciplines: The solicitation's required disciplines list includes Civil Engineering and Surveying, but neither discipline is addressed anywhere in the body of the SOW. Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary.\n\nCan you confirm whether Civil Engineering and Surveying services are in fact required for this project? They remain listed as anticipated disciplines\n\nCan you provide the anticipated scope of responsibilities for these two disciplines, since the current SOW does not describe any site, civil, or survey work for this second story interior renovation? No significant civil engineering or land surveying effort is currently anticipated for the second-floor renovation itself. However, firms should include civil engineering and surveying capabilities sufficient to support any site-related work that may become necessary as a result of construction phasing, utility modifications, temporary facilities, or continuity-of-operations requirements identified during design development. The VA has not predetermined the temporary relocation strategy.\n\nWe wanted to clarify, for our SF330 submission if we needed to utilize the GSA SF330 form?Â Can we utilize a modified form to showcase photographs to reinforce our narrative about project examples provided in Part F. Preserve the SF330 sections, information, project identifiers, and signature certifications. GSA also provides a separate reproducible Section F. use only concise project-relevant images if space permits.","html":"Please be advised that the submission deadline for SF 330 has been extended from November 20, 2026, to November 25, 2026, at 2:00 PM EST. See responses to RFI s below.\nVA responses to RFI s are bold below.\nCould you please clarify which disciplines are anticipated to be required? For example, regarding surveying, would the scope include a building measured survey, utility survey, site topographic survey, or a combination of these? Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary.\n\nMust a licensed surveyor be included as a named member of the SF330 team, or may surveying services be provided by a consultant on an as-needed basis? Identify the proposed discipline leads and specialty consultants required by the scope, including architecture, interior design, mechanical, electrical, plumbing/fire protection, and other disciplines as applicable. Describe the firm s and proposed team s experience with project specific technical features (e.g., MEP renovation, electrical distribution, emergency power, HVAC modifications, clinical space systems, fire protection/life safety systems, low voltage/IT coordination, medical gas systems, infection control/occupied facility coordination). Relevant VA experience and comparable non VA healthcare experience will be considered.\n\nGiven that the primary scope involves renovating the existing second-floor clinic area, is new field surveying anticipated for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions. \nThe notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore:\nExisting-building measured documentation: required.\nVerification of utilities affecting the design: required.\n\n\nPlease confirm if there is a page limit in addition to the 10MB PDF file size for the SF330 submission. 10MB PDF file size no page limit.\n\nFor Factor II   Specialized Experience and Technical Competence, the solicitation states that \"recent experience means projects completed, substantially completed, or actively performed within five years before the response due date.\" Can the VA clarify whether this requirement is based on completion of the A/E design services? For this factor, recent experience means projects completed, substantially completed, or actively performed within five years before the response due date.\n\nDo the requirements outlined under Factor 3   Past Performance pertain to our Section F project examples? Section F project description will not necessarily satisfy Factor III by itself. Add the required performance information and cross-reference the project numbers rather than merely repeating scope descriptions.\nAre CPARS / PPQs required to be included with our submission? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission.\nAs the Solicitation  expects the A/E to collaborate with other A/E firms involved in other projects throughout the facility,  can the VA provide the names of the actual other A/E firms and the other projects? No.\nIs a space program or a list of the specific specialty clinics to be consolidated on the 2nd Floor available and can it be provided at this time? No, not at this time.\nThe anticipated disciplines include Surveying. Given that the project is primarily an interior renovation within Building 1, can the VA clarify the anticipated scope of surveying services required for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions. \nThe notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore:\nExisting-building measured documentation: required.\nVerification of utilities affecting the design: required.\n\nCan the VA clarify whether replacement of the air handling unit(s) serving the renovated 2nd Floor area is anticipated as part of this project, or whether the design should evaluate and determine HVAC system modifications necessary to support the renovated space? The SOW anticipates significant system upgrades, utility verification, and HVAC design, but it does not identify units to replace or establish replacement as a mandatory solution. \nThe supported interpretation is that the A/E must evaluate existing systems and develop modifications or replacement recommendations needed for the approved renovation. VA architectural guidance likewise calls for investigating whether existing systems have sufficient capacity for renovations. That guidance does not establish that these particular AHUs require replacement\nWill the 2nd Floor space be vacated during construction or will phased construction be required? Full vacancy is not promised. The SOW expressly requires construction phasing, infection-control planning, outage and temporary-access planning, and a temporary relocation plan if needed. Firms should demonstrate occupied-facility and phasing capability; the actual decanting and construction sequence remain to be determined with VA.\nThe SOW states that \"an all-inclusive concept will need to be created\" for the approximately 16,530 SF renovation area. Can the VA clarify whether the interior design concept is intended to encompass only the renovated specialty clinic space or also adjacent public and circulation areas on the 2nd Floor?  The all-inclusive interior design concept applies to the approximately 16,530-square-foot specialty clinic renovation area identified in the SOW. The A/E shall coordinate the renovated area with directly adjacent public and circulation areas as necessary to provide appropriate transitions and maintain operational continuity. Design of other portions of the second floor is not included unless specifically identified or authorized by the VA.\nDeadline time zone: Please confirm that  2:00 p.m. Eastern Standard Time  for the October 14, 2026 question deadline and October 26, 2026 submission deadline means 2:00 p.m. prevailing Eastern Time on those dates. 2:00 pm EASTERN TIME, NEW YORK, USA\nPage and formatting limits: Please confirm that there is no page limit, minimum font size, or separate length limit for supplemental qualification statements, provided the complete submission is a single PDF no larger than 10 MB. Submit SF 330 Parts I and II by email to millard.adkins@va.gov as a single Adobe PDF file (no larger than 10 MB). No ZIP files. Receipt must be confirmed. No page limit or minimum font size.\nPast-performance documentation: Should firms attach Contractor Performance Assessment Reporting System (CPARS) reports or Past Performance Questionnaires (PPQs), or should Factor III be addressed through narrative only unless supporting records are requested? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission.\n\nProject examples: May the up to five projects discussed under Factor III be the same projects presented in SF330 Section F? May Section F include more than five projects if the Factor III discussion is limited to five? Yes. The projects discussed under Factor III may be the same projects presented in SF330 Section F. However, the Factor III response must provide the specific past-performance information requested by that factor, including the firm s performance regarding quality, cost control, schedule compliance, coordination, project outcome, and the roles of proposed key personnel, as applicable. Firms may cross-reference the corresponding Section F project number rather than repeat the full project description. The Factor III discussion is limited to no more than five projects.\nAdditional projects may be included in Section F to the extent permitted by the SF330 requirements and the submission size limitation, but only the five projects identified for Factor III will be evaluated under the specific Factor III project-example requirements.\n\nSection E resumes: Which disciplines does the Government expect firms to treat as  key discipline leads  requiring Section E resumes? Please clarify whether resumes are required for every discipline listed under  A/E Eligibility and Disciplines,  or only the proposed key leads applicable to this project. The notice expressly asks for the PM and proposed key discipline leads, with architecture, interior design, mechanical, electrical, and plumbing/fire protection identified in Factor II. It does not expressly demand a separate resume for every discipline on the broad eligibility list. Include the PM and each proposed key lead, including specialty consultants who meet that definition including but not limited to cost estimator an Quality Manager.\nReceipt confirmation: The solicitation states that receipt must be confirmed. What form of confirmation is acceptable? If acknowledgment is not received before the submission deadline, whom should the firm contact, and through what method? Receipt will be confirmed by the contracting officer by email once received. The POC is Millard Adkins and can be contacted by email to Millard.Adkins@va.gov\nProject completion status: For projects presented in Section F and discussed under Factor III, must design be complete, construction be complete, or both? Factor II allows projects completed, substantially completed, or actively performed within the preceding five years; please clarify whether that same eligibility standard applies to Section F and Factor III. For Factor II, a project may be completed, substantially completed, or actively being performed, provided the qualifying work occurred within five years before the response due date. Neither design nor construction must necessarily be fully complete for a project to qualify under Factor II.\nFor Factor III, firms should submit up to five recent and relevant projects that provide sufficient performance information for the Government to evaluate quality, cost control, schedule compliance, coordination, and project outcome. If a project is ongoing, the firm should clearly identify the work completed to date and the performance information available for evaluation.\n\nRegarding the subject solicitation, can you please confirm if this effort will require commissioning and life safety and if those roles are required to be third-party? Life safety is expressly required. The SOW requires final drawings addressing life safety and infection control, includes fire-protection drawings, and calls for relevant life-safety expertise in evaluation. It does not establish a separate third-party life-safety consultant requirement. \nCommissioning is not expressly assigned as a distinct service in the supplied SOW. Nevertheless, the cited requirement to comply with VA design criteria is significant: VA HVAC guidance requires commissioning practices tailored to project size and complexity and compliance with VA s commissioning manual.\n\nCivil Engineering and Surveying disciplines: The solicitation's required disciplines list includes Civil Engineering and Surveying, but neither discipline is addressed anywhere in the body of the SOW. Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary.\n\nCan you confirm whether Civil Engineering and Surveying services are in fact required for this project? They remain listed as anticipated disciplines\n\nCan you provide the anticipated scope of responsibilities for these two disciplines, since the current SOW does not describe any site, civil, or survey work for this second story interior renovation? No significant civil engineering or land surveying effort is currently anticipated for the second-floor renovation itself. However, firms should include civil engineering and surveying capabilities sufficient to support any site-related work that may become necessary as a result of construction phasing, utility modifications, temporary facilities, or continuity-of-operations requirements identified during design development. The VA has not predetermined the temporary relocation strategy.\n\nWe wanted to clarify, for our SF330 submission if we needed to utilize the GSA SF330 form?Â   Can we utilize a modified form to showcase photographs to reinforce our narrative about project examples provided in Part F. Preserve the SF330 sections, information, project identifiers, and signature certifications. GSA also provides a separate reproducible Section F. use only concise project-relevant images if space permits.","origin":"detail"},"contacts":[{"name":"Millard Adkins","role":"primary","email":"millard.adkins@va.gov","phone":"304-255-2121","title":"Contracting Officer"}],"place_of_performance":{"zip":"25801","city":{"code":"5332","name":"Beckley"},"state":{"code":"WV","name":"West Virginia"},"street":"Beckley VAMC 200 Veterans Ave.","country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"naics_codes":["541310"],"award":{"awardee":{}},"attachments":[{"resource_id":"e115a6606dc04754b4be49f59cb48078","name":"36C24526R0101.docx","kind":"file","mime_type":".docx","size_bytes":41192,"posted_at":"2026-09-24T15:12:32.372Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e115a6606dc04754b4be49f59cb48078/download","mirrored":false},{"resource_id":"54d8720137134e1b826bbac1dbc5e002","name":"Beckley VAMC","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-09-24T15:12:32.372Z","export_controlled":false,"sha256":null,"url":"http://VAWWW.Beckley.VA.gov","mirrored":false},{"resource_id":"5f003a048fbf4da0a1c03cd72c36cf9a","name":"36C24526R0101_1.docx","kind":"file","mime_type":".docx","size_bytes":15400,"posted_at":"2026-10-21T12:46:09.589Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5f003a048fbf4da0a1c03cd72c36cf9a/download","mirrored":false},{"resource_id":"6fab60f6a7b24f1a90261ce2e674df86","name":"36C24526R0101_3.docx","kind":"file","mime_type":".docx","size_bytes":14506,"posted_at":"2026-11-06T20:14:16.116Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6fab60f6a7b24f1a90261ce2e674df86/download","mirrored":false},{"resource_id":"f74e6ca287c54931bde9f2ffe3c08846","name":"36C24526R0101_4.docx","kind":"file","mime_type":".docx","size_bytes":22158,"posted_at":"2026-11-18T14:23:44.315Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f74e6ca287c54931bde9f2ffe3c08846/download","mirrored":false}],"awards":[],"related":[{"key":"36C24527Q0058","latest_notice_id":"740a0ce07bb64f898a0cbfb567da2a5c","title":"F014--TREE REMOVAL VAMC MARTINSBURG","solicitation_number":"36C24527Q0058","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-25T15:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561730","psc":"F014","set_aside":null,"state":"WV","county":"54003","county_name":"Berkeley County","city":"5452060","city_name":"Martinsburg","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24527Q0070","latest_notice_id":"b0b1581a6a1441b9a46d407375bc44d0","title":"6550--FLOW CYTOMETERY REAGENTS AND SUPPLIES (VA-27-00016081) |","solicitation_number":"36C24527Q0070","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"325413","psc":"6550","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T00:57:17.217280Z"},{"key":"36C24527Q0061","latest_notice_id":"0db5662de5914b458655bed9898980cf","title":"J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT","solicitation_number":"36C24527Q0061","notice_type":"o","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-18","notices":3,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561210","psc":"J065","set_aside":"SBA","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24527Q0081","latest_notice_id":"77e2cd670c3040a6ad2a1fc44daa2bc5","title":"DJ10--Alertus Enhanced Notification Licensing & Premier Support","solicitation_number":"36C24527Q0081","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541519","psc":"DJ10","set_aside":null,"state":"WV","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"SOFTWARE LICENSING AND SUPPORT MARTINSBURG VA MEDICAL CENTER","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C24527Q0073","latest_notice_id":"6ce8b040a9be44d0972b338bc7b6cf88","title":"Arc Flash Hazard Analysis Services","solicitation_number":"36C24527Q0073","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"334515","psc":"6625","set_aside":null,"state":"WV","county":"54033","county_name":"Harrison County","city":"5415628","city_name":"Clarksburg","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open":[{"key":"AEASSERVICES2027","latest_notice_id":"a11b054dddee4d1c8ba20ff7d12e4d8c","title":"Sources Sought Advisory and Assistance Services contract.","solicitation_number":"A-E_A-SServices2027","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-12-03T17:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA2521","office_name":"FA2521 45 CONS PK","naics":"541310","psc":"C219","set_aside":"8A","state":"FL","county":"12009","county_name":"Brevard County","city":"1255375","city_name":"Patrick AFB","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T07:05:05.540398Z"},{"key":"N6247026R0022","latest_notice_id":"e9f785e4103446a2af5d74da35cccc31","title":"INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) CONTRACT FOR ARCHITECT-ENGINEER (A-E) SERVICES FOR FACILITIES WITH SECURED SPACES LOCATED THROUGHOUT NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND AREA OF RESPONSIBILITY, WORLDWIDE","solicitation_number":"N6247026R0022","notice_type":"k","first_type":"r","first_posted":"2026-04-01","last_posted":"2026-11-19","notices":7,"due_at":"2026-12-10T19:00:00Z","due_date":"2026-12-10","closes_at":"2026-12-10T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62470","office_name":"NAVFACSYSCOM ATLANTIC","naics":"541310","psc":"C211","set_aside":null,"state":"VA","county":"51710","county_name":"City of Norfolk","city":"5157000","city_name":"Norfolk","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"N6133127R0003","latest_notice_id":"f2bd14d4bf0044e6a488bb704fb2797f","title":"Multi-Discipline Architect-Engineer (A-E) services","solicitation_number":"N6133127R0003","notice_type":"k","first_type":"k","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2027-01-04T22:00:00Z","due_date":"2027-01-04","closes_at":"2027-01-04T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N61331","office_name":"NAVAL SURFACE WARFARE CENTER","naics":"541310","psc":"C215","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":4,"indexable":true}