{"canonical":"https://sealedbidder.com/opportunities/36c24526q0637","key":"36C24526Q0637","url":"https://sealedbidder.com/opportunities/36c24526q0637","title":"N055--QUESTIONS AND ANSWERS","solicitation_number":"36C24526Q0637","notice_type":"s","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-10-09T17:00:00Z","first_posted":"2026-08-07","last_posted":"2026-11-10","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"238330","psc":"N055","set_aside":"SDVOSBC","place_state":"MD","place_scope":"site","site":null,"place_state_source":"site","place_evidence":"0 QUANTITIES THE COMBINED TOTAL FOR BALTIMORE VAMC","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","title":"N055--INSTALLATION OF LVT FLOORING","solicitation_number":"36C24526Q0637","notice_type":"k","base_type":"k","posted":"2026-08-07","posted_at":"2026-08-07T20:26:57.057Z","due_at":"2026-08-26T19:00:00Z","due_date":"2026-08-26","cancelled":false,"archived":true,"archive_date":"2026-09-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a29c73a5ba8f4ccebe694ee1ed2fedde/view","enriched":true,"history":[{"index":3,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.818Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"6203cfe444eb4785b1afb8d96d03045b","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":2,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.779Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cfaa8a2874ab4b93a432db9dd46a135e","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":1,"title":"N055--INSTALLATION OF LVT FLOORING","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-07T20:26:57.057Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","solicitation_number":"36C24526Q0637"}]},{"notice_id":"6203cfe444eb4785b1afb8d96d03045b","title":"N055--Extend the RFQ deadline date to 10/9/2026","solicitation_number":"36C24526Q0637","notice_type":"k","base_type":"k","posted":"2026-08-26","posted_at":"2026-08-26T14:05:15.818Z","due_at":"2026-10-09T17:00:00Z","due_date":"2026-10-09","cancelled":false,"archived":true,"archive_date":"2026-11-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6203cfe444eb4785b1afb8d96d03045b/view","enriched":true,"history":[{"index":4,"title":"N055--Extend the RFQ deadline date to 11/18/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-16T21:07:46.210Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"59d36725e1804ac6bdcc0ea818152faa","solicitation_number":"36C24526Q0637","related_opportunity_id":"6203cfe444eb4785b1afb8d96d03045b"},{"index":3,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.818Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"6203cfe444eb4785b1afb8d96d03045b","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":2,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.779Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cfaa8a2874ab4b93a432db9dd46a135e","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":1,"title":"N055--INSTALLATION OF LVT FLOORING","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-07T20:26:57.057Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","solicitation_number":"36C24526Q0637"}]},{"notice_id":"cfaa8a2874ab4b93a432db9dd46a135e","title":"N055--Extend the RFQ deadline date to 10/9/2026","solicitation_number":"36C24526Q0637","notice_type":"k","base_type":"k","posted":"2026-08-26","posted_at":"2026-08-26T14:05:15.779Z","due_at":"2026-10-09T17:00:00Z","due_date":"2026-10-09","cancelled":false,"archived":true,"archive_date":"2026-11-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/cfaa8a2874ab4b93a432db9dd46a135e/view","enriched":true,"history":[{"index":3,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.818Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"6203cfe444eb4785b1afb8d96d03045b","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":2,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.779Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cfaa8a2874ab4b93a432db9dd46a135e","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":1,"title":"N055--INSTALLATION OF LVT FLOORING","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-07T20:26:57.057Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","solicitation_number":"36C24526Q0637"}]},{"notice_id":"59d36725e1804ac6bdcc0ea818152faa","title":"N055--Extend the RFQ deadline date to 11/18/2026","solicitation_number":"36C24526Q0637","notice_type":"s","base_type":"k","posted":"2026-09-16","posted_at":"2026-09-16T21:07:46.210Z","due_at":"2026-11-18T19:00:00Z","due_date":"2026-11-18","cancelled":false,"archived":false,"archive_date":"2026-12-18","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/59d36725e1804ac6bdcc0ea818152faa/view","enriched":true,"history":[{"index":2,"title":"N055--Extend the RFQ deadline date to 11/18/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-16T21:07:46.210Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"59d36725e1804ac6bdcc0ea818152faa","solicitation_number":"36C24526Q0637","related_opportunity_id":"6203cfe444eb4785b1afb8d96d03045b"},{"index":1,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.818Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"6203cfe444eb4785b1afb8d96d03045b","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"}]},{"notice_id":"80f12d55b60544b1b7e44cd4934ed666","title":"N055--QUESTIONS AND ANSWERS","solicitation_number":"36C24526Q0637","notice_type":"s","base_type":"s","posted":"2026-11-10","posted_at":"2026-11-10T22:39:19.417Z","due_at":"2026-11-18T19:00:00Z","due_date":"2026-11-18","cancelled":false,"archived":false,"archive_date":"2026-12-18","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/80f12d55b60544b1b7e44cd4934ed666/view","enriched":true,"history":[{"index":2,"title":"N055--QUESTIONS AND ANSWERS","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-10T22:39:19.417Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"80f12d55b60544b1b7e44cd4934ed666","solicitation_number":"36C24526Q0637","parent_opportunity_id":"59d36725e1804ac6bdcc0ea818152faa"},{"index":1,"title":"N055--Extend the RFQ deadline date to 11/18/2026","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-16T21:07:46.210Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"59d36725e1804ac6bdcc0ea818152faa","solicitation_number":"36C24526Q0637","related_opportunity_id":"6203cfe444eb4785b1afb8d96d03045b"}]}],"latest_notice_id":"80f12d55b60544b1b7e44cd4934ed666","first_type":"k","notices":[{"dates":{"posted":"2026-08-07","posted_at":"2026-08-07T20:26:57.057Z","created_at":"2026-08-07T20:26:47.953Z","modified_at":"2026-08-26T14:05:15.779Z","response_deadline":{"raw":"2026-08-26T15:00:00-04:00","utc":"2026-08-26T19:00:00Z","date":"2026-08-26","time":"15:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a29c73a5ba8f4ccebe694ee1ed2fedde/view"},"naics":{"codes":["238330"],"primary":"238330"},"title":"N055--INSTALLATION OF LVT FLOORING","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":false,"publication":"published","archive_date":"2026-09-25","archive_type":"auto_custom"},"history":[{"index":3,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.818Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"6203cfe444eb4785b1afb8d96d03045b","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":2,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.779Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cfaa8a2874ab4b93a432db9dd46a135e","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":1,"title":"N055--INSTALLATION OF LVT FLOORING","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-07T20:26:57.057Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","solicitation_number":"36C24526Q0637"}],"contacts":[{"name":"Charles Willis","role":"primary","email":"charles.willis@va.gov","phone":"410-691-1328","title":"Contracting Officer"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-19T02:24:26.651369599Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"be5b55b19b729af7bdd453e30d78434d-26\"","fetched_at":"2026-10-06T03:48:34.605332942Z","row_sha256":"0c664354b09648b7cd68d9c5e4145e67da2d2b4c5a8bb0b8607edfefe34037e4","last_modified":"2026-10-06T03:30:43Z"},"updated_at":"2026-10-06T03:48:34.605332942Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"html":"Department of Veterans Affairs, VA Medical Center, Baltimore, MD is issuing Combined Synopsis/Solicitation.  The contractor shall provide flooring installation as defined in accordance to the statement of work.  \n\nThis is a request for quotations (RFQ).  The associated NAICS code for procurement is 238330 with a size standard of $19 million. \nAs a result of the solicitation, the Government intends to award Firm Fixed Price.  \nProspective quoters must be registered in sam.gov.  All SDVOSB/VOSB must be registered and current in U.S. Small Business Administration (SBA VetCert)  at Veteran Small Business Certification (sba.gov)  to be eligible for award.  Contractors that submit quotation for SDVOSB/VOSB set asides that are not listed in VIP will be deemed non-responsive.  \nAll quotes shall be submitted via email by August 26, 2026 at 3pm, EST.  All interested contractors shall submit quotation via email to Contracting Officer, Charles.willis@va.gov.  Prospective contractors are responsible for downloading attachments, and any issued amendments from https://beta.sam.gov.    Late proposals will be processed in accordance with FAR 52.212-1(f),  Late submission, modifications, revisions, and withdrawals of offers.","text":"Department of Veterans Affairs, VA Medical Center, Baltimore, MD is issuing Combined Synopsis/Solicitation. The contractor shall provide flooring installation as defined in accordance to the statement of work.\n\nThis is a request for quotations (RFQ). The associated NAICS code for procurement is 238330 with a size standard of $19 million.\nAs a result of the solicitation, the Government intends to award Firm Fixed Price.\nProspective quoters must be registered in sam.gov. All SDVOSB/VOSB must be registered and current in U.S. Small Business Administration (SBA VetCert) at Veteran Small Business Certification (sba.gov) to be eligible for award. Contractors that submit quotation for SDVOSB/VOSB set asides that are not listed in VIP will be deemed non-responsive.\nAll quotes shall be submitted via email by August 26, 2026 at 3pm, EST. All interested contractors shall submit quotation via email to Contracting Officer, Charles.willis@va.gov. Prospective contractors are responsible for downloading attachments, and any issued amendments from https://beta.sam.gov. Late proposals will be processed in accordance with FAR 52.212-1(f), Late submission, modifications, revisions, and withdrawals of offers.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C24526Q0637","place_of_performance":{"zip":"21201","street":"Department of Veterans Affairs VA Medical Center 10 N Greene St Baltimore, MD"},"product_service_code":"N055"},{"dates":{"posted":"2026-08-26","posted_at":"2026-08-26T14:05:15.818Z","created_at":"2026-08-26T14:05:13.315Z","modified_at":"2026-08-26T14:05:15.818Z","response_deadline":{"raw":"2026-10-09T13:00:00-04:00","utc":"2026-10-09T17:00:00Z","date":"2026-10-09","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6203cfe444eb4785b1afb8d96d03045b/view"},"naics":{"codes":["238330"],"primary":"238330"},"title":"N055--Extend the RFQ deadline date to 10/9/2026","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"publication":"published","archive_date":"2026-11-08","archive_type":"auto_custom"},"history":[{"index":4,"title":"N055--Extend the RFQ deadline date to 11/18/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-16T21:07:46.210Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"59d36725e1804ac6bdcc0ea818152faa","solicitation_number":"36C24526Q0637","related_opportunity_id":"6203cfe444eb4785b1afb8d96d03045b"},{"index":3,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.818Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"6203cfe444eb4785b1afb8d96d03045b","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":2,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.779Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cfaa8a2874ab4b93a432db9dd46a135e","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":1,"title":"N055--INSTALLATION OF LVT FLOORING","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-07T20:26:57.057Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","solicitation_number":"36C24526Q0637"}],"contacts":[{"name":"CHARLES WILLIS","role":"primary","email":"charles.willis@va.gov","phone":"410-691-1328","title":"Contracting Officer"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"6203cfe444eb4785b1afb8d96d03045b","lineage_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-17T07:26:49.676457399Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"282bcbad3427f546032a1801f858266cdc2ef9923db5e68d4ef263c05fc404d3","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-15T22:52:52.472456Z"},"description":{"html":"9/23/2026 site Visit\n9/30/2026 questions are due\n10/9/2026 solicitation closes","text":"9/23/2026 site Visit\n9/30/2026 questions are due\n10/9/2026 solicitation closes","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C24526Q0637","place_of_performance":{"street":"DEPARTMENT OF VETERANS AFFAIRS BALTIMORE, VA MEDICAL CENTER","country":{"code":"USA"}},"product_service_code":"N055"},{"dates":{"posted":"2026-08-26","posted_at":"2026-08-26T14:05:15.779Z","created_at":"2026-08-26T14:05:13.304Z","modified_at":"2026-08-26T14:05:15.818Z","response_deadline":{"raw":"2026-10-09T13:00:00-04:00","utc":"2026-10-09T17:00:00Z","date":"2026-10-09","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/cfaa8a2874ab4b93a432db9dd46a135e/view"},"naics":{"codes":["238330"],"primary":"238330"},"title":"N055--Extend the RFQ deadline date to 10/9/2026","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":false,"publication":"published","archive_date":"2026-11-08","archive_type":"auto_custom"},"history":[{"index":3,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.818Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"6203cfe444eb4785b1afb8d96d03045b","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":2,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.779Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"cfaa8a2874ab4b93a432db9dd46a135e","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"},{"index":1,"title":"N055--INSTALLATION OF LVT FLOORING","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-07T20:26:57.057Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","solicitation_number":"36C24526Q0637"}],"contacts":[{"name":"CHARLES WILLIS","role":"primary","email":"charles.willis@va.gov","phone":"410-691-1328","title":"Contracting Officer"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"cfaa8a2874ab4b93a432db9dd46a135e","lineage_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-17T07:56:54.231302748Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"d93a7a181239d683aea6f79ada6edc1af5107861af7ad30d0fb452b6287c76eb","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-15T22:52:52.472456Z"},"description":{"html":"9/23/2026 site Visit\n9/30/2026 questions are due\n10/9/2026 solicitation closes","text":"9/23/2026 site Visit\n9/30/2026 questions are due\n10/9/2026 solicitation closes","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C24526Q0637","place_of_performance":{"street":"DEPARTMENT OF VETERANS AFFAIRS BALTIMORE, VA MEDICAL CENTER","country":{"code":"USA"}},"product_service_code":"N055"},{"dates":{"posted":"2026-09-16","posted_at":"2026-09-16T21:07:46.210Z","created_at":"2026-09-16T21:07:41.092Z","modified_at":"2026-09-16T21:07:46.210Z","response_deadline":{"raw":"2026-11-18T14:00:00-05:00","utc":"2026-11-18T19:00:00Z","date":"2026-11-18","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/59d36725e1804ac6bdcc0ea818152faa/view"},"naics":{"codes":["238330"],"primary":"238330"},"title":"N055--Extend the RFQ deadline date to 11/18/2026","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-12-18","archive_type":"auto_custom"},"history":[{"index":2,"title":"N055--Extend the RFQ deadline date to 11/18/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-16T21:07:46.210Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"59d36725e1804ac6bdcc0ea818152faa","solicitation_number":"36C24526Q0637","related_opportunity_id":"6203cfe444eb4785b1afb8d96d03045b"},{"index":1,"title":"N055--Extend the RFQ deadline date to 10/9/2026","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-26T14:05:15.818Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"6203cfe444eb4785b1afb8d96d03045b","solicitation_number":"36C24526Q0637","parent_opportunity_id":"a29c73a5ba8f4ccebe694ee1ed2fedde"}],"contacts":[{"name":"CHARLES WILLIS","role":"primary","email":"charles.willis@va.gov","phone":"410-691-1328","title":"Contracting Officer"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"59d36725e1804ac6bdcc0ea818152faa","lineage_id":"a29c73a5ba8f4ccebe694ee1ed2fedde","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-23T10:16:27.739725221Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"b9f445823118eb5b24785571900644bc39b4c2ffb71d3a958d43938a6880d9b3","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-17T03:34:20.822145Z"},"description":{"html":"Baltimore VAMC and CBOC Flooring BPA\nAmendment #3 Update for site visits, questions, and revised quote submission date. \nSITE VISITS:\n\nSite Visit Baltimore VAMC, 10 N Greene St, Baltimore, MD 21201;10/20/2026 -  Time: 0800am\nParking: Lexington Market Garage\nPaca St, Baltimore, MD 2120 \n\nSite Visit Loch Raven CBOC, 3901 The Alameda, Baltimore, MD 21218;\n10/20/2026 -  Bldg 4, Rm 125\nTime: TBD Immediately following Baltimore site visit\nParking: in parking lot otherwise off campus in adjacent neighborhood\n** Parking Limited due to construction**\n\n\nSite Visit Perry Point VAMC, 361 Boiler House Rd, Perry Point, MD 21902; 10/21/2026 -  Meeting Location: Bldg 361 Lobby\nTime: 0800am\nParking: Adjacent Parking Lot\n\nFrom the south:Â Take Interstate 95 north. After passing the exit for Havre de Grace, Maryland, and after crossing the Susquehanna River, take exit 93 for State Route Route 222 east toward Perryville. At the traffic light at the end of the ramp, turn left onto State Route 222. Take State Route 222 for approximately 1 mile to the traffic light at State Route 40.Â  After crossing State Route 40, Route 222 will become Aiken Avenue. Continue on Aiken Avenue until it ends and turn right onto Broad Street. Take Broad Street through the town of Perryville until you come to the entrance of the medical center. Follow the signs to the appropriate building.\nFrom the north: Take Interstate 95 south.Â  After passing the exit for Rising Sun and North East, take exit 93 for State Route 222 east toward Perryville. At the traffic light at the end of the ramp, turn left onto State Route 222. Take State Route 222 for approximately 1 mile to the traffic light at State Route 40.Â  After crossing State Route 40, Route 222 will become Aiken Avenue. Continue on Aiken Avenue until it ends and turn right onto Broad Street. Take Broad Street through the town of Perryville until you come to the entrance of the medical center. Follow the signs to the appropriate building.\nFrom the Eastern Shore:Â Take U.S. Route 50 west. Make a slight right onto State Route 213 and continue for approximately 4 miles. Merge onto U.S. Route 301 North toward Wilmington and continue for approximately 49 miles. Turn left onto Pulaski Highway, U.S. Route 40, and continue for approximately 18 miles. Turn left onto State Route 222 just before the Thomas J. Hatem Bridge over the Susquehanna River. Take State Route 222 until it ends and turn right onto Broad Street. Take Broad Street through the town of Perryville until you come to the entrance of the medical center. Follow the signs to the appropriate building.\nQuestions are due: \nQuestions shall be emailed by   October 27th, no further questions will be entertained. ALL questions to include from site visit shall be in writing and submitted through SAM. \nAnswers to questions due:\nNovember 10th - will be provided one time only and this will be the final response. \n\nFinal Quotes due\nNovember 18th, 2026\nmake sure that this is your best and final quote, address all sites and flooring requirements.","text":"Baltimore VAMC and CBOC Flooring BPA\nAmendment #3 Update for site visits, questions, and revised quote submission date.\nSITE VISITS:\n\nSite Visit Baltimore VAMC, 10 N Greene St, Baltimore, MD 21201;10/20/2026 - Time: 0800am\nParking: Lexington Market Garage\nPaca St, Baltimore, MD 2120\n\nSite Visit Loch Raven CBOC, 3901 The Alameda, Baltimore, MD 21218;\n10/20/2026 - Bldg 4, Rm 125\nTime: TBD Immediately following Baltimore site visit\nParking: in parking lot otherwise off campus in adjacent neighborhood\n** Parking Limited due to construction**\n\nSite Visit Perry Point VAMC, 361 Boiler House Rd, Perry Point, MD 21902; 10/21/2026 - Meeting Location: Bldg 361 Lobby\nTime: 0800am\nParking: Adjacent Parking Lot\n\nFrom the south:Â Take Interstate 95 north. After passing the exit for Havre de Grace, Maryland, and after crossing the Susquehanna River, take exit 93 for State Route Route 222 east toward Perryville. At the traffic light at the end of the ramp, turn left onto State Route 222. Take State Route 222 for approximately 1 mile to the traffic light at State Route 40.Â After crossing State Route 40, Route 222 will become Aiken Avenue. Continue on Aiken Avenue until it ends and turn right onto Broad Street. Take Broad Street through the town of Perryville until you come to the entrance of the medical center. Follow the signs to the appropriate building.\nFrom the north: Take Interstate 95 south.Â After passing the exit for Rising Sun and North East, take exit 93 for State Route 222 east toward Perryville. At the traffic light at the end of the ramp, turn left onto State Route 222. Take State Route 222 for approximately 1 mile to the traffic light at State Route 40.Â After crossing State Route 40, Route 222 will become Aiken Avenue. Continue on Aiken Avenue until it ends and turn right onto Broad Street. Take Broad Street through the town of Perryville until you come to the entrance of the medical center. Follow the signs to the appropriate building.\nFrom the Eastern Shore:Â Take U.S. Route 50 west. Make a slight right onto State Route 213 and continue for approximately 4 miles. Merge onto U.S. Route 301 North toward Wilmington and continue for approximately 49 miles. Turn left onto Pulaski Highway, U.S. Route 40, and continue for approximately 18 miles. Turn left onto State Route 222 just before the Thomas J. Hatem Bridge over the Susquehanna River. Take State Route 222 until it ends and turn right onto Broad Street. Take Broad Street through the town of Perryville until you come to the entrance of the medical center. Follow the signs to the appropriate building.\nQuestions are due:\nQuestions shall be emailed by October 27th, no further questions will be entertained. ALL questions to include from site visit shall be in writing and submitted through SAM.\nAnswers to questions due:\nNovember 10th - will be provided one time only and this will be the final response.\n\nFinal Quotes due\nNovember 18th, 2026\nmake sure that this is your best and final quote, address all sites and flooring requirements.","origin":"detail"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"36C24526Q0637","product_service_code":"N055"},{"award":{"awardee":{}},"dates":{"posted":"2026-11-10","posted_at":"2026-11-10T22:39:19.417Z","created_at":"2026-11-10T22:39:13.485Z","modified_at":"2026-11-10T22:39:19.417Z","response_deadline":{"raw":"2026-11-18T14:00:00-05:00","utc":"2026-11-18T19:00:00Z","date":"2026-11-18","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/80f12d55b60544b1b7e44cd4934ed666/view"},"naics":{"codes":["238330"],"primary":"238330"},"title":"N055--QUESTIONS AND ANSWERS","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_id":"100173468","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-12-18","archive_type":"auto_custom"},"history":[{"index":2,"title":"N055--QUESTIONS AND ANSWERS","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-10T22:39:19.417Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"modify","opportunity_id":"80f12d55b60544b1b7e44cd4934ed666","solicitation_number":"36C24526Q0637","parent_opportunity_id":"59d36725e1804ac6bdcc0ea818152faa"},{"index":1,"title":"N055--Extend the RFQ deadline date to 11/18/2026","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-16T21:07:46.210Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"59d36725e1804ac6bdcc0ea818152faa","solicitation_number":"36C24526Q0637","related_opportunity_id":"6203cfe444eb4785b1afb8d96d03045b"}],"contacts":[{"name":"charles.willis@va.gov","role":"primary","email":"Charles.Willis@va.gov","phone":"410-691-1328","title":"CHARLES WILLIS"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"80f12d55b60544b1b7e44cd4934ed666","lineage_id":"59d36725e1804ac6bdcc0ea818152faa","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T12:27:22.670199777Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"0257206118ebe9482b80da2b24f1e441-27\"","fetched_at":"2026-11-11T04:50:18.941800608Z","row_sha256":"60e8d7a78dc3ea1e24cc23e653d2135ce1a14e7bb8da5549c3db8db928af05c5","last_modified":"2026-11-11T04:30:18Z"},"updated_at":"2026-11-11T12:27:22.670199777Z","first_seen_at":"2026-11-11T04:50:18.941800608Z"},"description":{"html":"Questions and Answers (84)   Solicitation 36C24526Q0637\nSet-aside status. The Amendment #3 notice on SAM.gov shows the Original Set Aside field as blank. The SF 1449 (Block 10) and VAAR 852.219-73 in the solicitation reflect a total set-aside for certified SDVOSBs. Please confirm whether this acquisition remains a 100% SDVOSB set-aside after Amendment #3.\nCorrect this BPA/RFQ remains a 100% SDVOSB set-aside\nEvaluation basis. For the LPTA evaluation, will the Government compare total price for the base year only, or the total of the base year plus all four option years? Will option-year pricing be evaluated?  \ntotal of the base year plus all four option years\nQuantities by site. Are the Section B.10 quantities the combined total for Baltimore VAMC, Loch Raven CBOC, and Perry Point VAMC? Please provide the breakdown by site, building, floor and flooring type, and confirm whether each quantity is an annual estimate for each contract year.\nThis is an annual estimate for all sites.\nLine item reconciliation. Several lines appear not to align, and we would like to price them correctly: \nTarkett Sheet Vinyl material is listed at 3,000 SY (27,000 SF), while Installation of Sheet Vinyl is listed at 9,000 SF. Which quantity is correct?\nSF should be SY. The SY is correct\nIs the 2,000 SY Tarkett Adapt (Woodlot Holly Oak) material line the material for the 2,000 SY Installation of Carpet Tile line?\nThe carpet tile should be a separate line item.\nGeneral Demolition, Floor Leveling and Smoothing and Furniture Lift (occupied spaces) are each listed at 30,778 SY. Does this quantity cover the combined area of the LVT and sheet vinyl installations? What is the Government's expectation for demolition and leveling on the Epoxy Flooring (15,000 SF) and Carpet Tile areas?\nYes--This combines both areas.\nThe expectation for epoxy flooring installation will not differ from LVT. The recommended application/method is to be specified by the contractor as the SME (Subject matter expert).\nMaterials and selections. Please confirm that the contractor furnishes all materials listed in B.10. Colors and styles are shown as TBD. When will selections be provided, and should offerors price a stated base or average cost? Will substitutions of equivalent products be considered?\nThere are no substitutions\nExisting floor condition. Has asbestos or lead testing been completed on the existing flooring and adhesives at all three sites? If material is found, who is responsible for abatement and for the related schedule impact? Are moisture and alkalinity test results available?\nAsbestos and lead testing is completed at all sites. VA ensures the proper personnel are in place for abatement. \nBPA terms, schedule and labor\nOrder limits. Section B.9 leaves the per-order limit and the ceiling amount blank. Please provide both, any minimum guarantee, the expected number and typical size of orders per year, and the typical lead time between an order and the start of work.\nThe Government estimates, but does not guarantee, that individual BPA Orders placed against this Agreement may reach $1,500,000.00/per Order. This Order Limit may be increased by mutual agreement of the parties as necessary, in whole or part.Â  The authorized Ceiling Limit of the Agreement is set at $6,000,000.00 over the period covered by the Agreement; this ceiling is also not a guarantee.Â  The Ceiling Limit may also be raised in association with order Limit increases or other conditions which, by mutual agreement of the parties, maybe considered necessary.Â  Authorization for individual Task Orders above the stated Task Order and/or Ceiling Limits must be coordinated through the Contracting Officer before larger valued orders can be issued and prior to commencement of work.Â  All unauthorized work, regardless of amount, will be processed through the ratification process.Â \n\nPeriod of performance. Section B.10 shows a base period of 09-01-2026 through 08-31-2027, and B.2 shows the BPA dates as TBD. Please confirm the revised base and option period dates, given the November 18 quote date. The Installation of Sheet Vinyl line shows a POP end date of 08-16-2027 while other lines show 08-31-2027. Please confirm which date applies.\nTime frame of contract award Base Year December 1, 2026 to November 30, 2027 plus 4 option renewal years\nWage determination. The attached wage determination is dated 7-22-2026 and is titled Baltimore. Does it apply to all three sites, including Perry Point (Cecil County)? Please confirm whether it is a Service Contract Labor Standards or a Davis-Bacon determination.\nWage Determination for Baltimore and Cecil County are attached\nService Contract Labor Standards\nWorking in occupied facilities. Please describe the requirements for working hours, after-hours and weekend work, infection control (ICRA) and phasing, badging and escorts, material staging and storage areas, and loading and elevator access at each site. Who moves furniture and equipment that is not covered by the Furniture Lift line?\nThe work hours are reflected in the RFQ. The VA observes all national holidays. After work hours are on a case by case and determined by the needs of the service.\n\n CLINs x007 \"Epoxy Flooring; Color TBD\" (B.10): is there a required epoxy system type (e.g., self-leveling, broadcast/slurry, mortar, or flake), minimum thickness, and performance criteria? \nThis will be determined prior to the project of any installations-as epoxy will not be a regular material used.\nFor epoxy areas, who is responsible for concrete moisture/RH and pH testing (ASTM F2170 / F1869)? If readings exceed the system's limits, is moisture mitigation priced under CLIN x009 or handled by task-order modification?\nhandled by task-order modification\n\n VAAR 852.219-75 (pp. 55-56) has no box checked. Which limitation on subcontracting applies: services (50%) or special trade construction (75%)? Please confirm that the cost of materials is excluded. Also, will 852.219-73(e) be measured by base/option period or per order?\nServices (50%)\n852.219-73(e) will be measured by base/option period. \n14. Does a Buy American requirement (FAR 52.225-1 or 52.225-9) apply to materials? The SF1449 says 52.212-5 is attached, but its text isn't in the posted RFQ.\n\n52.225-1 or 52.225-9 is not listed on the RFQ \n52.212-5 is not checked on the SF1449   therefore text would not be posted\n\n\n15.  E.3 (p.61) says award will be LPTA, but E.8 (p.65) says best value with technical, past performance, and price. Which governs? Also, what are the per-order limit and BPA ceiling in B.9, which are left blank (p.8)?\nRefer to question #7   Order Limits\n\n16. Carpet tile. Please provide the manufacturer, collection and product name, style number, color name and number, tile dimensions, fiber and construction, backing, installation pattern, and approved adhesive. Please confirm whether carpet material is contractor-furnished and identify the applicable material supply line.\nCarpet tile Spec: Tarkett Carpet Tile Hidden Arbor and Sweater Knit 24x24 color TBD\n17. LVT. Please provide the complete specification for the listed Tarkett Contour Series 6 by 48 inch LVT, including exact collection and product number, color name and number, overall thickness, wear-layer thickness, backing, finish, installation method, and approved adhesive. Please clarify how the separately listed Tarkett Adapt, Woodlot Holly Oak relates to this scope.\nThis will be determined prior to installation.\n18. Sheet vinyl. Please provide the manufacturer, collection and product name, product number, color name and number, homogeneous or heterogeneous construction, thickness, backing, roll width, finish, and approved adhesive. Please include the compatible weld rod, heat-welding requirements, flash-cove height, cove former, cap, and corner details.\nPlease provide product data sheets and identify any different product or color selections by facility or area.\nSheet vinyl spec: Tarkett IQ Optima Sheet Goods\n19. Please provide the required wall-base and transition specifications, including manufacturer, product, material, dimensions, profile, and color or finish. Please identify the required transitions between new flooring, existing finishes, and different flooring types.\nContractor will determine optimal wall transitions based on the project requirement, as the SME (subject matter expert).\n21. During the walkthroughs, we understood that all furniture moving would be performed in-house by the VA. Please confirm that the VA will clear furniture, contents, and equipment before work begins and return them after the required curing period, including any necessary disconnects and reconnects. \nPlease clarify whether Item 0012, \nFurniture Lift, remains applicable.\n22. Please confirm that LVT and sheet-vinyl work areas will be fully cleared and remain clear through installation and required curing, rather than requiring piecemeal installation around furniture.\nLVT and sheet-vinyl work areas will be fully cleared and remain clear through installation\n23. Please confirm whether the VA will provide dumpsters and pay disposal charges at each facility. Please identify the designated disposal locations and confirm whether the contractor is responsible for transporting demolition debris to onsite containers or for offsite hauling and disposal as well.\nThe VA has dumpsters for disposal at each site.  \n24. Please confirm whether temporary dust partitions, negative-air equipment, and associated monitoring will be provided by the VA or contractor. Please provide the required barrier-system specifications and applicable infection-control requirements, including responsibility for setup, maintenance, relocation, removal, and inspection.\nContractor is responsible for providing all ICRA/PICRA materials. To include materials required for wall barriers when required (Level 3 or 4). Contractors are expected to provide materials and construct the wall barriers required.\nNegative air pressure machine will be provided by the VA if needed.\n25. Please identify the VA representative responsible for coordinating room availability, occupant relocation, access, and infection-control approvals. Please confirm whether each released area will remain continuously available through demolition, preparation, installation, and required curing. Please identify any daily reopening requirements and who authorizes reopening.\nThe COR or Interior Designer will provide all necessary coordination for all projects. Contractor is not responsible for the opening of any room. \n26. Please reconcile the listed 7:00 a.m. and 7:30 a.m. start times and confirm normal working hours. Please identify any locations or activities that must be performed during evenings, nights, weekends, or holidays.\nAny work after hours will be coordinated prior to any installations. This will be determined by the needs of the applicable service.\n\n27. Reference: B.11 Scope, p. 26; B.5(c), p. 6.\nThe SOW requires a project manager or project designer and an installation foreman onsite. For each task order, please identify the required supervisory positions, minimum qualifications, approval submittals, and hours of physical presence. Must a superintendent or project manager be a direct employee of the prime, and must that person remain onsite whenever subcontractors work? \nEach task order will require a designer or project manager to monitor progress and ensure standards are in place. They will be a minimum of COR Level 1 certified. They are required to be onsite at time of the installation. There is no physical amount of time for this requirement, as each project varies. \nA qualified installation foreman may of course also be present but the VA will require a designer/COR level 1 employee to monitor project. \nNo-- Where projects possibly  run concurrently, each project will have it s own designer/project manager.\n\n28. Reference: B.11 Safety and Security Precautions and Personnel Qualifications, p. 28; B.6(a), p. 6.\nPlease identify whether each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative beyond the onsite personnel identified on page 26. Specify prime-employment requirements, certifications, experience, full-time coverage, and whether one qualified person may combine these roles with superintendent or foreman duties.\n\nEach task order will require it s own safety personnel, each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative based on the needs of the project. Each project may have it s own requirements (i.e patient care areas etc.)\n\n29. Identify the applicable safety/QC specifications, any EM 385-1-1 requirements and edition, required plans and daily reports, and whether staffing varies with task-order size, location, work shift, or hazard\nlevel.\nContractors are expected to comply with OSHA standards. \nNo-the Interior Design staff does not vary based on task orders.\n\n\n\n30. Reference: B.11 Objective and Scope, pp. 25-26.\nBefore pricing and issuance of each task order, who will prepare and approve the Infection Control Risk Assessment (ICRA), any Preconstruction Risk Assessment (PCRA), and the infection-control permit: VA Infection Prevention, the COR, the contractor, or another party? Please provide the applicable forms, assessment matrix, approving officials, and review time. Confirm that the required class, work-area limits, patient risk group, and controls will be identified in the task-order solicitation before its price and schedule are agreed, including orders at Baltimore, Loch Raven, and Perry Point\n\nInterior Design staff will prepare the ICRA & PCRA. ID will coordinate with Infection control for approval of the ICRA & PCRA prior to the start of any project.\nAll ICRA/PCRA requirements are expected to be performed by the contractor. Contractor will be expected to provide necessary materials and the construction of any wall barriers required by ICRA/PCRA.\n\n31. Reference: Site-visit discussion reported by J&G; B.11 Scope, p. 26; Unpacking/Uncrating, p. 27. Our understanding from the site visit is that the Government will remove all furniture before the flooring contractor begins each task order. Please confirm this applies to every order at all three campuses and that the flooring contractor is not required to lift, move, disassemble, store, protect in storage, or reinstall furniture. Clarify responsibility for workstations, beds, file cabinets, appliances, medical equipment, contents, and associated IT/electrical/plumbing disconnections and reconnections.\n\nInterior Design will remove all furniture prior to any installation. However, there may be an instant where some furniture may need to be moved/prior. Contractor will not be responsible for the removal of any medical equipment. Equipment or medical items will be removed by VA personnel/Biomed.  \n\n32. Confirm that the Government will deliver cleared work areas and keep them clear through installation and required curing and identify the procedure if an area is not ready as scheduled.\nID will ensure areas are cleared and remain clear through installation.\n\n33. Reference: B.10, CLINs 0008 and 0012 and corresponding option CLINs, pp. 10-23; E.3, pp. 61-62.CLIN 0012 includes 30,778 SY of Furniture Lift in occupied spaces, repeated in CLINs 1012, 2012,3012, and 4012. This appears inconsistent with the site-visit direction that the Government will remove furniture. Will these CLINs be deleted from the schedule and evaluated price? If retained, define the exact exceptional scope and when it may be ordered, and issue uniform instructions on whether bidders must quote a rate, enter zero, or use another designation. Please confirm that pricing these lines does not place furniture moving in the flooring installation rates or authorize it without an applicable order.\n\nID will ensure furniture is removed from the space prior to installation. However, if there is an instance where furniture must be removed by the contractor-it will be priced accordingly.  \n\n34. Reference: B.11 Scope, p. 26; Debris, p. 27; B.10, CLIN 0009 and option equivalents.\nThe SOW assigns removal and disposal to the contractor but directs debris to VA-provided dumpsters and a scrap cage. For each campus, confirm whether the Government provides containers, hauling, and final disposal at no charge for all nonhazardous carpet, carpet tile, pad, LVT/VCT, sheet flooring, epoxy debris, cove base, adhesive/mastic scrapings, underlayment, and floor-preparation waste. Identify prohibited materials, volume or weight limits, and any offsite disposal the contractor must price. Please state whether disposal labor is paid through the demolition CLIN or installation rates, so it is included once, and define payment for required contractor hauling and tipping fees.\n\nThe VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard.\n\n35. Reference: B.11 Debris, p. 27; Safety and Security Precautions, p. 28.\nPlease identify the approved debris routes, loading points, dumpster/scrap-cage locations, and cardboard recycling locations at each campus. Specify covered or sealed carts, bagging, elevator restrictions, daily removal, cleanup, and container exchange requirements. \n\nThe VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard.\n\n36. Are carpet take-back, flooring recycling, minimum diversion percentages, waste plans, weight tickets, or disposal receipts required? \nNo, they are not required\n\n37. Identify responsibility for overflow or un37available VA containers and any required contractor roll-off permits or containment. Where hazardous or contaminated waste is expressly included in an order, provide separate segregation, manifest, transporter, disposal-facility, and generator-signature responsibilities; confirm such waste may not enter the ordinary VA dumpsters.\n\nThere are no hazardous materials areas specified for flooring installations. \n\n38. Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28.\nFor each campus and task order, please identify required contractor site facilities, including a field Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28. For each campus and task order, please identify required contractor site facilities, including a field office or trailer, superintendent/QC workspace, meeting area, storage container, portable toilets, handwashing facilities, and temporary lighting or ventilation. \n\nNo. The VA will not provide storage containers, portable toilets, and temporary lighting or ventilation. Handwashing facilities are located in the restrooms in all facilities, all sites, all campuses.\n\nNo temporary facilities will be provided.\n\n 39. Reference: B.11 Scope, p. 26; Equipment and Tools and Work Areas, p. 28; Installation, p. 29. The SOW requires contractor storage, directs installation from shipments and warehouse stock, and requires removal of tools when the contractor leaves. Please identify available secure, conditioned storage and acclimation areas at each campus, including space for flooring, adhesives, and hazardous products. May approved tools, containment equipment, and materials remain secured onsite overnight or between phases? \n\nThere will be no storage provided for contractors. \n\n40. If daily removal is required, confirm the limits and available loading access.\nIdentify responsibility for material receipt, inventory, room tagging, double handling, damaged Government stock, and maintaining manufacturer-required temperature and humidity during storage, acclimation, installation, and cure.\n\nStorage for materials will not be provided-other than the immediate area within the project area. This will be included in the scope of the project.\n\n41. Reference: B.11, pp. 25-30; Baltimore floor plans and campus visitor maps; Amendment #3 site-visit notice. The furnished maps identify visitor services and campus locations rather than dimensioned flooring work limits. Before each task-order quote, will the Government provide marked plans identifying buildings, rooms, areas, existing and new flooring, demolition limits, and phasing? \n\nYes prior to the start of any project, the VA/COR will provide building location, room information and floor plans with applicable dimensions to reference. \n\n42. Confirm field measurement access before pricing. Identify contractor entrances, loading docks, freight elevators and reservations, floor-load limits, haul distances, escort requirements, and delivery/parking arrangements at all three campuses. \n\nYes measurements will be provided to the contractor prior to the start of each project.\n\n43. Clarify the Loch Raven buildings covered by the BPA, including the Alameda\nclinic versus the broader Loch Raven campus, and any access restrictions caused by ongoing construction.\n\nAll buildings located on the Loch Raven campus are included in the BPA. Ongoing construction will be assessed for access, determined by the current activities.\n\n44. Reference: B.11 Scope, p. 26; B.10, pp. 9-24.\nThe SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and 120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF. \n\nCorrect the figure should reflect 800,000 SY instead of SF. This a rough estimate, of the exact amount of flooring that needs changed it will change over time. \n\n45. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping supply-only quantities, and confirm the quantities controlling price evaluation and ordering. Reference: B.11 Scope, p. 26; B.10, pp. 9-24.\n\nThe 3.5 total is an educated estimate. As we will now know exactly how much flooring we will utilize each year.\n\n\n46. The SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF. Separately, the annual scheduled flooring product/system quantities total 310,000 SF if CLINs 0001, 0003, 0006, and 0007 are distinct. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping or supply-only quantities and confirm the quantities controlling price evaluation and ordering.\n\nThe total 3.5 is over the base plus 4 years. It is an estimate of 700k for each year. As we do not know exactly how much we will use each year funds or materials.\n\n47. Reference: B.10, CLINs 0003 and 0013 and corresponding option CLINs, pp. 9-23.\nSheet-vinyl material is listed at 3,000 SF, equivalent to 27,000 SF, while sheet-vinyl installation is listed at 9,000 SF in each year. Please confirm whether material quantity should be 1,000 SY, and the installation quantity should be 27,000 SF. \n\nCorrect-the material quantity should be 1,000 SY, installation quantity should be 27,000 SF\n\n48. Reference: B.10, CLIN 0009 and option equivalents, pp. 10-23; B.11 Scope, p. 26.\nCLIN 0009 includes 30,778 SY, equivalent to 277,002 SF, for General Demolition, Floor Leveling and Smoothing. Please identify the flooring types, number of existing layers, adhesive removal method, and substrate conditions included in this rate. Is it payable only where demolition is ordered,separately from installation, including Government-furnished material installations? \nEach flooring type may be different. Most areas are being replaced with carpet/tiles\n\nThe spaces can include and are not limited to cove-base removal, bonded epoxy removal, mechanical grinding, and underlayment removal are included or separately priced. \nUnderlayment are line items and priced within the task order. \n\n49. Reference: B.10, CLINs 0001-0015 and option equivalents, pp. 9-24; B.11 Scope, p. 26.\nPlease provide a CLIN inclusion matrix defining material-only, labor-only, and furnish-and-install items. In particular, identify the material paired with carpet installation 0008; confirm the relationship of LVT 0006 to installation 0011 and sheet vinyl 0003 to installation 0013; and define whether epoxy 0007 is a complete installed system. Identify where freight, adhesive, fasteners, demolition/disposal, skim coat, protection, transitions, supervision, and final cleaning belong. The SOW says pricing includes demolition and preparation, while CLIN 0009 prices them separately; please establish a\nconsistent method that avoids either duplication or unpaid scope. \n\nEach task order will price materials required prior to the installation. This will be determined by the scope each project.\n\n\n50. Reference: B.6, pp. 6-7; B.9, p. 8; B.10, pp. 9-24; B.11 Ordering Procedures, p. 27.\nOrders may vary from small to large, but the schedule has no separate mobilization, supervision, ICRA, temporary-facility, testing, or hazardous-material line items. \n\nEach project has its own needs and is specific to requirements and will be priced accordingly i.e ICRA requirements.\nThe VA will not provide any temporary facility or storage.\n\n51. Please identify any minimum task order size or charge and the expected order-size range and frequency. \n\nNo--there is no minimum task order size.\n\nReference: B.10, pp. 9-24; B.11 Ordering Procedures and Performance Monitoring, pp. 27-29.Please define the measurement and payment basis for each unit. Are flooring quantities net installed area, gross room area, or purchased material including cutting waste, pattern match, attic stock, and full-carton/roll rounding?\n\n52. It is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided.  The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals.\n53. Reference: B.10, CLINs 0001, 0003, 0006, 0008 and 0011, pp. 9-11; B.11 Scope, p. 26.\nPlease provide complete specifications and current product identifiers for Tarkett Adapt/Woodlot Holly Oak, sheet vinyl, and Contour 6-by-48-inch LVT. Confirm the product category paired with carpet installation and whether VCT, although named in installation CLIN 0011, is Governmentfurnished or requires another supply item. Specify thickness, wear layer/backing, dimensions, performance and fire/smoke criteria, slip resistance, chemical resistance, approved adhesives, colors,and required installer qualifications. Are named products mandatory or are approved equals permitted?\n\nAll Tarkett materials and specs have been provided. There are no substitutions for Tarkett materials. \n\n\n54. Reference: B.10, CLIN 0007 and option equivalents, pp. 10-22; B.11 Scope, p. 26.\nFor the 15,000 SF annual epoxy item, please identify the required system, manufacturer or\nperformance basis, total thickness, primer, body coats, aggregate, topcoat, finish, and slip/chemicalresistance criteria. \n\nThe epoxy will be used seldom-therefore it will be specified/determined upon each task order.\nWhen used, it will include removal, repairs and all necessary actions to install. \n\n55. Reference: B.10, CLINs 0002, 0004, 0005 and option equivalents, pp. 9-23.\nPlease confirm that one CO for each adhesive means one complete four-gallon pail, and define one EA of weld rod by diameter and length per spool. Verify the annual quantities of 18 C-EX pails, 195 Roll Smart pails, and 15 weld-rod units against the corrected product quantities and manufacturer coverage, including which adhesive serves each flooring product and where LVT adhesive is priced. Are these quantities fixed evaluation estimates, actual consumable quantities, or allowances? \n\nIt is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided.  The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals.\n\n56. Identify whether residual adhesive/rod remains Government property and how additional manufacturer-required consumption is authorized and paid.\n\nAny unused materials will be government property. Any unusable material may be disposed of.\n\n57. transitions without a separate CLIN. For 1,600 FT of heat welding and 50 FT of Flash Cove and Corners, define seam requirements, cove height, cove former, cap strip, and inside/outside corner details. Should corners be measured individually rather than by FT, and are weld rod and flash-cove accessories furnished under these rates or other CLINs?\n\nMeasurements and methods are to be determined by the contractor for efficiency of materials and labor.\n\n\n58. Reference: B.11 Scope, p. 26; B.10, CLIN 0009 and option equivalents.\nPlease define the quantitative limits of minor preparation/skim coat included in the rates, including maximum depth, average thickness, coverage percentage, flatness tolerance, and required adhesiveresidue removal. \n\nThe VA cannot determine such rare instances pre-maturely.\n\n59. Distinguish routine patching from self-leveling underlayment, deep fills, failed substrate removal, structural repairs, crack repair, joint treatment, and replacement of deteriorated\nwood or gypsum underlayment. \n\nMeasurements and methods are to be determined by the contractor for efficiency of materials and labor. \n\n60. Will each task order identify known repairs before pricing? \n\nYes, each task order will identify known repairs before pricing\n\n61. Establish separate measurable items or another approved pricing mechanism for concealed deterioration or preparation exceeding the defined limits after demolition.\n\nThis will be determined before installation and will be included in pricing.\n\n62. Reference: B.11 Objective and Scope, pp. 25-26; Installation, p. 29.\nWho performs and pays for substrate moisture, relative-humidity, pH, adhesion, and other\nmanufacturer-required testing on each task order, and what standards, frequency, and acceptance limits apply? \n\nIf spaces are identified with moisture issues, the VA will identify these instances prior if needed and make determining factors to rectify prior to installation. \n\n63. Reference: B.11 Scope, p. 26; Installation, p. 29; C.1(b), p. 31.\nPlease identify required product data, room layouts, samples, mockups, installer credentials, shop\ndrawings, and approval periods for each task order. For flooring supplied from Government warehouse\nstock, identify who verifies condition, quantity, compatibility, batch/shade, and warranty eligibility\nSpecify required contractor workmanship and manufacturer warranties, their\nduration and commencement, and responsibility for defects in Government-furnished products or preexisting substrate conditions. Identify whether attic stock, maintenance instructions, product/lot records, manufacturer inspections, or warranty registrations are required and the CLIN covering these deliverables.\n\nManufacture warranties will apply to all installations. \n\n64. Reference: B.11, pp. 25-29; furnished campus maps and Baltimore floor plans.\nBefore each task order is priced, will the Government define the number and size of phases, room vacancy windows, sequencing, and maximum area that may remain out of service? \n\nYes, it will be defined\n\n65. Please identify any daily requirement to reopen rooms or corridors, remove/rebuild containment, install temporary walking surfaces, or protect uncured flooring. Confirm responsibility for patient/staff relocation,clinical shutdowns, alternate egress, fire-alarm/HVAC coordination, permits, and after-hours escorts.\n\nRe-opening of rooms is the responsibility of VA personnel and the subject matter experts i.e the COR, Infection control, safety etc.\n\n66. Establish the process for Government-directed resequencing and additional mobilizations when rooms cannot be released together or operations interrupt the approved installation/cure sequence.\n\nVA/COR will determine.\n\n67. Reference: B.7, p. 7; B.11 Contractor Responsibilities, p. 27; Installation and Overtime, pp. 29-30.\nThe SOW gives a 7:30 a.m. start on page 27 and a 7:00 a.m. installation start on page 29, with occasional evening/weekend work. Please confirm the normal shift, billable/productive hours, delivery windows, and the portion of work bidders must assume occurs after hours. \n\nRegular Hours are defined in the RFQ.\nAfter hours will be rare and determined based on the service needs. Quoted prior to installation.\n\n68. How are premium shifts,\novertime, weekend/holiday work, and repeated short shifts priced when the schedule has no premiumrate\nitems? Clarify the daily/seventh-day overtime wording on page 30 and the required written\napproval authority, including reconciliation of service-chief approval with CO authorization for additional price or holiday work.\n\nCOR will coordinate work overtime with service chief prior to installation.\n\n69. Clarify how a task order issued near year-end is completed and which rates apply when performance spans an option boundary or a Government-directed delay\n\nIssued by CO   Firm Fixed Price\n\n70. Reference: B.9 Authorized Limits, p. 8; B.11, pp. 25-27.\nThe BPA order limit and overall ceiling are blank, and the SOW anticipates emergent failures. Please provide the intended per-order limit, BPA ceiling, anticipated annual spending/order count, typical order size, and any minimum purchase commitment. What maximum number of simultaneous task orders, sites, and shifts must the contractor support? Define routine and emergency response times, estimating turnaround, start/completion requirements, and whether emergency standby or priority\nservice must be included in standard rates. Clarify whether the listed annual quantities are evaluation estimates only and whether no minimum work volume is guaranteed.\n\nEstimates only. The VA cannot determine such rare occurrences pre-maturely.\n\n71. Reference: C.2, pp. 37-38; D.1, p. 58; attached Wage Determination 2015-4265, Revision 33, pp. 1-7.The RFQ incorporates Service Contract Labor Standards and attaches WD 2015-4265, Revision 33, dated May 13, 2026. Please confirm the applicable labor-standard treatment for flooring demolition, preparation, replacement, and installation, including any construction wage determination required for particular orders. Identify the governing determination and revision for each campus; the attached locality list does not identify Cecil County for Perry Point. Clarify required classifications for resilient flooring, carpet, epoxy/coating, demolition/preparation, and hazardous-material work; the conformance procedure for unlisted work; applicable fringe benefits; and required payroll reporting.Please issue all governing determinations before final pricing.\n\nPlease refer to the Wage Determination for Baltimore and Cecil County\n\n72. Bidders must quote the base and four option years. Please clarify whether each year has independently proposed fixed unit rates and how incorporated wage/fringe adjustment provisions will be applied without duplicating escalation already priced. Identify the effective wage-determination revision for each period, required supporting documentation, notice deadlines, and treatment of orders spanning periods. Are any material-price, freight, tariff, or product-discontinuation adjustments permitted during a period, or must those risks be covered entirely in the quoted annual rates? \n\nFirm Fixed pricing/ those risks must be covered entirely in the quoted annual rates \n\n73. Define how approved substitute flooring systems are priced if the listed product becomes unavailable during the BPA.\n\nNo substitutions\n\n74. Reference: C.7-C.8, pp. 40-41; B.9, p. 8.\nC.8 leaves the general-liability and automobile-liability amounts blank and requires general-liability coverage without an asbestos exclusion before award. \n\nCannot be determined as this will be a case by case occurrence.\n\n75. Please provide all required limits and endorsements and explain whether the asbestos provision applies when testing/abatement is performed by a separate Government contractor. \n\nYes, asbestos provision applies when testing/abatement is performed by a separate Government contractor.\n\n80. Identify any required pollution/professional coverage and whether approved specialty-subcontractor coverage satisfies any portion. Please also confirm whether bid, payment, performance bonds, or other payment protection will be required at BPA award or by individual task order, the applicable order thresholds, and how associated premiums are to be priced.\n\nContractor is expected to maintain all applicable insurance coverages.\n\n81. Confirm whether compliance is measured separately for each task order or over the base and each option period. \n\nCompliance is required on all task orders. \n\nDoes the latest solicitation remain a Service-Disabled Veteran-Owned Small Business set-aside, or has it been revised to unrestricted/full-and-open competition? The public notices and third-party listings appear inconsistent.\nCorrect it is a Service-Disabled Veteran-Owned Small Business set-aside,\nWere the October 20 21 site visits mandatory for quotation eligibility, or may a contractor that did not attend still quote based on the published documents?\nOne member of the desired contracting bidder must have attended the walk-thru\nMay a prime contractor use qualified flooring subcontractors for portions of the work, provided it quotes and manages all three VA locations and meets all applicable limitations on subcontracting?\nContractors must meet all requirements for all three sites.","text":"Questions and Answers (84) Solicitation 36C24526Q0637\nSet-aside status. The Amendment #3 notice on SAM.gov shows the Original Set Aside field as blank. The SF 1449 (Block 10) and VAAR 852.219-73 in the solicitation reflect a total set-aside for certified SDVOSBs. Please confirm whether this acquisition remains a 100% SDVOSB set-aside after Amendment #3.\nCorrect this BPA/RFQ remains a 100% SDVOSB set-aside\nEvaluation basis. For the LPTA evaluation, will the Government compare total price for the base year only, or the total of the base year plus all four option years? Will option-year pricing be evaluated?\ntotal of the base year plus all four option years\nQuantities by site. Are the Section B.10 quantities the combined total for Baltimore VAMC, Loch Raven CBOC, and Perry Point VAMC? Please provide the breakdown by site, building, floor and flooring type, and confirm whether each quantity is an annual estimate for each contract year.\nThis is an annual estimate for all sites.\nLine item reconciliation. Several lines appear not to align, and we would like to price them correctly:\nTarkett Sheet Vinyl material is listed at 3,000 SY (27,000 SF), while Installation of Sheet Vinyl is listed at 9,000 SF. Which quantity is correct?\nSF should be SY. The SY is correct\nIs the 2,000 SY Tarkett Adapt (Woodlot Holly Oak) material line the material for the 2,000 SY Installation of Carpet Tile line?\nThe carpet tile should be a separate line item.\nGeneral Demolition, Floor Leveling and Smoothing and Furniture Lift (occupied spaces) are each listed at 30,778 SY. Does this quantity cover the combined area of the LVT and sheet vinyl installations? What is the Government's expectation for demolition and leveling on the Epoxy Flooring (15,000 SF) and Carpet Tile areas?\nYes--This combines both areas.\nThe expectation for epoxy flooring installation will not differ from LVT. The recommended application/method is to be specified by the contractor as the SME (Subject matter expert).\nMaterials and selections. Please confirm that the contractor furnishes all materials listed in B.10. Colors and styles are shown as TBD. When will selections be provided, and should offerors price a stated base or average cost? Will substitutions of equivalent products be considered?\nThere are no substitutions\nExisting floor condition. Has asbestos or lead testing been completed on the existing flooring and adhesives at all three sites? If material is found, who is responsible for abatement and for the related schedule impact? Are moisture and alkalinity test results available?\nAsbestos and lead testing is completed at all sites. VA ensures the proper personnel are in place for abatement.\nBPA terms, schedule and labor\nOrder limits. Section B.9 leaves the per-order limit and the ceiling amount blank. Please provide both, any minimum guarantee, the expected number and typical size of orders per year, and the typical lead time between an order and the start of work.\nThe Government estimates, but does not guarantee, that individual BPA Orders placed against this Agreement may reach $1,500,000.00/per Order. This Order Limit may be increased by mutual agreement of the parties as necessary, in whole or part.Â The authorized Ceiling Limit of the Agreement is set at $6,000,000.00 over the period covered by the Agreement; this ceiling is also not a guarantee.Â The Ceiling Limit may also be raised in association with order Limit increases or other conditions which, by mutual agreement of the parties, maybe considered necessary.Â Authorization for individual Task Orders above the stated Task Order and/or Ceiling Limits must be coordinated through the Contracting Officer before larger valued orders can be issued and prior to commencement of work.Â All unauthorized work, regardless of amount, will be processed through the ratification process.Â\n\nPeriod of performance. Section B.10 shows a base period of 09-01-2026 through 08-31-2027, and B.2 shows the BPA dates as TBD. Please confirm the revised base and option period dates, given the November 18 quote date. The Installation of Sheet Vinyl line shows a POP end date of 08-16-2027 while other lines show 08-31-2027. Please confirm which date applies.\nTime frame of contract award Base Year December 1, 2026 to November 30, 2027 plus 4 option renewal years\nWage determination. The attached wage determination is dated 7-22-2026 and is titled Baltimore. Does it apply to all three sites, including Perry Point (Cecil County)? Please confirm whether it is a Service Contract Labor Standards or a Davis-Bacon determination.\nWage Determination for Baltimore and Cecil County are attached\nService Contract Labor Standards\nWorking in occupied facilities. Please describe the requirements for working hours, after-hours and weekend work, infection control (ICRA) and phasing, badging and escorts, material staging and storage areas, and loading and elevator access at each site. Who moves furniture and equipment that is not covered by the Furniture Lift line?\nThe work hours are reflected in the RFQ. The VA observes all national holidays. After work hours are on a case by case and determined by the needs of the service.\n\nCLINs x007 \"Epoxy Flooring; Color TBD\" (B.10): is there a required epoxy system type (e.g., self-leveling, broadcast/slurry, mortar, or flake), minimum thickness, and performance criteria?\nThis will be determined prior to the project of any installations-as epoxy will not be a regular material used.\nFor epoxy areas, who is responsible for concrete moisture/RH and pH testing (ASTM F2170 / F1869)? If readings exceed the system's limits, is moisture mitigation priced under CLIN x009 or handled by task-order modification?\nhandled by task-order modification\n\nVAAR 852.219-75 (pp. 55-56) has no box checked. Which limitation on subcontracting applies: services (50%) or special trade construction (75%)? Please confirm that the cost of materials is excluded. Also, will 852.219-73(e) be measured by base/option period or per order?\nServices (50%)\n852.219-73(e) will be measured by base/option period.\n14. Does a Buy American requirement (FAR 52.225-1 or 52.225-9) apply to materials? The SF1449 says 52.212-5 is attached, but its text isn't in the posted RFQ.\n\n52.225-1 or 52.225-9 is not listed on the RFQ\n52.212-5 is not checked on the SF1449 therefore text would not be posted\n\n15. E.3 (p.61) says award will be LPTA, but E.8 (p.65) says best value with technical, past performance, and price. Which governs? Also, what are the per-order limit and BPA ceiling in B.9, which are left blank (p.8)?\nRefer to question #7 Order Limits\n\n16. Carpet tile. Please provide the manufacturer, collection and product name, style number, color name and number, tile dimensions, fiber and construction, backing, installation pattern, and approved adhesive. Please confirm whether carpet material is contractor-furnished and identify the applicable material supply line.\nCarpet tile Spec: Tarkett Carpet Tile Hidden Arbor and Sweater Knit 24x24 color TBD\n17. LVT. Please provide the complete specification for the listed Tarkett Contour Series 6 by 48 inch LVT, including exact collection and product number, color name and number, overall thickness, wear-layer thickness, backing, finish, installation method, and approved adhesive. Please clarify how the separately listed Tarkett Adapt, Woodlot Holly Oak relates to this scope.\nThis will be determined prior to installation.\n18. Sheet vinyl. Please provide the manufacturer, collection and product name, product number, color name and number, homogeneous or heterogeneous construction, thickness, backing, roll width, finish, and approved adhesive. Please include the compatible weld rod, heat-welding requirements, flash-cove height, cove former, cap, and corner details.\nPlease provide product data sheets and identify any different product or color selections by facility or area.\nSheet vinyl spec: Tarkett IQ Optima Sheet Goods\n19. Please provide the required wall-base and transition specifications, including manufacturer, product, material, dimensions, profile, and color or finish. Please identify the required transitions between new flooring, existing finishes, and different flooring types.\nContractor will determine optimal wall transitions based on the project requirement, as the SME (subject matter expert).\n21. During the walkthroughs, we understood that all furniture moving would be performed in-house by the VA. Please confirm that the VA will clear furniture, contents, and equipment before work begins and return them after the required curing period, including any necessary disconnects and reconnects.\nPlease clarify whether Item 0012,\nFurniture Lift, remains applicable.\n22. Please confirm that LVT and sheet-vinyl work areas will be fully cleared and remain clear through installation and required curing, rather than requiring piecemeal installation around furniture.\nLVT and sheet-vinyl work areas will be fully cleared and remain clear through installation\n23. Please confirm whether the VA will provide dumpsters and pay disposal charges at each facility. Please identify the designated disposal locations and confirm whether the contractor is responsible for transporting demolition debris to onsite containers or for offsite hauling and disposal as well.\nThe VA has dumpsters for disposal at each site.\n24. Please confirm whether temporary dust partitions, negative-air equipment, and associated monitoring will be provided by the VA or contractor. Please provide the required barrier-system specifications and applicable infection-control requirements, including responsibility for setup, maintenance, relocation, removal, and inspection.\nContractor is responsible for providing all ICRA/PICRA materials. To include materials required for wall barriers when required (Level 3 or 4). Contractors are expected to provide materials and construct the wall barriers required.\nNegative air pressure machine will be provided by the VA if needed.\n25. Please identify the VA representative responsible for coordinating room availability, occupant relocation, access, and infection-control approvals. Please confirm whether each released area will remain continuously available through demolition, preparation, installation, and required curing. Please identify any daily reopening requirements and who authorizes reopening.\nThe COR or Interior Designer will provide all necessary coordination for all projects. Contractor is not responsible for the opening of any room.\n26. Please reconcile the listed 7:00 a.m. and 7:30 a.m. start times and confirm normal working hours. Please identify any locations or activities that must be performed during evenings, nights, weekends, or holidays.\nAny work after hours will be coordinated prior to any installations. This will be determined by the needs of the applicable service.\n\n27. Reference: B.11 Scope, p. 26; B.5(c), p. 6.\nThe SOW requires a project manager or project designer and an installation foreman onsite. For each task order, please identify the required supervisory positions, minimum qualifications, approval submittals, and hours of physical presence. Must a superintendent or project manager be a direct employee of the prime, and must that person remain onsite whenever subcontractors work?\nEach task order will require a designer or project manager to monitor progress and ensure standards are in place. They will be a minimum of COR Level 1 certified. They are required to be onsite at time of the installation. There is no physical amount of time for this requirement, as each project varies.\nA qualified installation foreman may of course also be present but the VA will require a designer/COR level 1 employee to monitor project.\nNo-- Where projects possibly run concurrently, each project will have it s own designer/project manager.\n\n28. Reference: B.11 Safety and Security Precautions and Personnel Qualifications, p. 28; B.6(a), p. 6.\nPlease identify whether each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative beyond the onsite personnel identified on page 26. Specify prime-employment requirements, certifications, experience, full-time coverage, and whether one qualified person may combine these roles with superintendent or foreman duties.\n\nEach task order will require it s own safety personnel, each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative based on the needs of the project. Each project may have it s own requirements (i.e patient care areas etc.)\n\n29. Identify the applicable safety/QC specifications, any EM 385-1-1 requirements and edition, required plans and daily reports, and whether staffing varies with task-order size, location, work shift, or hazard\nlevel.\nContractors are expected to comply with OSHA standards.\nNo-the Interior Design staff does not vary based on task orders.\n\n30. Reference: B.11 Objective and Scope, pp. 25-26.\nBefore pricing and issuance of each task order, who will prepare and approve the Infection Control Risk Assessment (ICRA), any Preconstruction Risk Assessment (PCRA), and the infection-control permit: VA Infection Prevention, the COR, the contractor, or another party? Please provide the applicable forms, assessment matrix, approving officials, and review time. Confirm that the required class, work-area limits, patient risk group, and controls will be identified in the task-order solicitation before its price and schedule are agreed, including orders at Baltimore, Loch Raven, and Perry Point\n\nInterior Design staff will prepare the ICRA & PCRA. ID will coordinate with Infection control for approval of the ICRA & PCRA prior to the start of any project.\nAll ICRA/PCRA requirements are expected to be performed by the contractor. Contractor will be expected to provide necessary materials and the construction of any wall barriers required by ICRA/PCRA.\n\n31. Reference: Site-visit discussion reported by J&G; B.11 Scope, p. 26; Unpacking/Uncrating, p. 27. Our understanding from the site visit is that the Government will remove all furniture before the flooring contractor begins each task order. Please confirm this applies to every order at all three campuses and that the flooring contractor is not required to lift, move, disassemble, store, protect in storage, or reinstall furniture. Clarify responsibility for workstations, beds, file cabinets, appliances, medical equipment, contents, and associated IT/electrical/plumbing disconnections and reconnections.\n\nInterior Design will remove all furniture prior to any installation. However, there may be an instant where some furniture may need to be moved/prior. Contractor will not be responsible for the removal of any medical equipment. Equipment or medical items will be removed by VA personnel/Biomed.\n\n32. Confirm that the Government will deliver cleared work areas and keep them clear through installation and required curing and identify the procedure if an area is not ready as scheduled.\nID will ensure areas are cleared and remain clear through installation.\n\n33. Reference: B.10, CLINs 0008 and 0012 and corresponding option CLINs, pp. 10-23; E.3, pp. 61-62.CLIN 0012 includes 30,778 SY of Furniture Lift in occupied spaces, repeated in CLINs 1012, 2012,3012, and 4012. This appears inconsistent with the site-visit direction that the Government will remove furniture. Will these CLINs be deleted from the schedule and evaluated price? If retained, define the exact exceptional scope and when it may be ordered, and issue uniform instructions on whether bidders must quote a rate, enter zero, or use another designation. Please confirm that pricing these lines does not place furniture moving in the flooring installation rates or authorize it without an applicable order.\n\nID will ensure furniture is removed from the space prior to installation. However, if there is an instance where furniture must be removed by the contractor-it will be priced accordingly.\n\n34. Reference: B.11 Scope, p. 26; Debris, p. 27; B.10, CLIN 0009 and option equivalents.\nThe SOW assigns removal and disposal to the contractor but directs debris to VA-provided dumpsters and a scrap cage. For each campus, confirm whether the Government provides containers, hauling, and final disposal at no charge for all nonhazardous carpet, carpet tile, pad, LVT/VCT, sheet flooring, epoxy debris, cove base, adhesive/mastic scrapings, underlayment, and floor-preparation waste. Identify prohibited materials, volume or weight limits, and any offsite disposal the contractor must price. Please state whether disposal labor is paid through the demolition CLIN or installation rates, so it is included once, and define payment for required contractor hauling and tipping fees.\n\nThe VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard.\n\n35. Reference: B.11 Debris, p. 27; Safety and Security Precautions, p. 28.\nPlease identify the approved debris routes, loading points, dumpster/scrap-cage locations, and cardboard recycling locations at each campus. Specify covered or sealed carts, bagging, elevator restrictions, daily removal, cleanup, and container exchange requirements.\n\nThe VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard.\n\n36. Are carpet take-back, flooring recycling, minimum diversion percentages, waste plans, weight tickets, or disposal receipts required?\nNo, they are not required\n\n37. Identify responsibility for overflow or un37available VA containers and any required contractor roll-off permits or containment. Where hazardous or contaminated waste is expressly included in an order, provide separate segregation, manifest, transporter, disposal-facility, and generator-signature responsibilities; confirm such waste may not enter the ordinary VA dumpsters.\n\nThere are no hazardous materials areas specified for flooring installations.\n\n38. Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28.\nFor each campus and task order, please identify required contractor site facilities, including a field Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28. For each campus and task order, please identify required contractor site facilities, including a field office or trailer, superintendent/QC workspace, meeting area, storage container, portable toilets, handwashing facilities, and temporary lighting or ventilation.\n\nNo. The VA will not provide storage containers, portable toilets, and temporary lighting or ventilation. Handwashing facilities are located in the restrooms in all facilities, all sites, all campuses.\n\nNo temporary facilities will be provided.\n\n39. Reference: B.11 Scope, p. 26; Equipment and Tools and Work Areas, p. 28; Installation, p. 29. The SOW requires contractor storage, directs installation from shipments and warehouse stock, and requires removal of tools when the contractor leaves. Please identify available secure, conditioned storage and acclimation areas at each campus, including space for flooring, adhesives, and hazardous products. May approved tools, containment equipment, and materials remain secured onsite overnight or between phases?\n\nThere will be no storage provided for contractors.\n\n40. If daily removal is required, confirm the limits and available loading access.\nIdentify responsibility for material receipt, inventory, room tagging, double handling, damaged Government stock, and maintaining manufacturer-required temperature and humidity during storage, acclimation, installation, and cure.\n\nStorage for materials will not be provided-other than the immediate area within the project area. This will be included in the scope of the project.\n\n41. Reference: B.11, pp. 25-30; Baltimore floor plans and campus visitor maps; Amendment #3 site-visit notice. The furnished maps identify visitor services and campus locations rather than dimensioned flooring work limits. Before each task-order quote, will the Government provide marked plans identifying buildings, rooms, areas, existing and new flooring, demolition limits, and phasing?\n\nYes prior to the start of any project, the VA/COR will provide building location, room information and floor plans with applicable dimensions to reference.\n\n42. Confirm field measurement access before pricing. Identify contractor entrances, loading docks, freight elevators and reservations, floor-load limits, haul distances, escort requirements, and delivery/parking arrangements at all three campuses.\n\nYes measurements will be provided to the contractor prior to the start of each project.\n\n43. Clarify the Loch Raven buildings covered by the BPA, including the Alameda\nclinic versus the broader Loch Raven campus, and any access restrictions caused by ongoing construction.\n\nAll buildings located on the Loch Raven campus are included in the BPA. Ongoing construction will be assessed for access, determined by the current activities.\n\n44. Reference: B.11 Scope, p. 26; B.10, pp. 9-24.\nThe SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and 120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF.\n\nCorrect the figure should reflect 800,000 SY instead of SF. This a rough estimate, of the exact amount of flooring that needs changed it will change over time.\n\n45. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping supply-only quantities, and confirm the quantities controlling price evaluation and ordering. Reference: B.11 Scope, p. 26; B.10, pp. 9-24.\n\nThe 3.5 total is an educated estimate. As we will now know exactly how much flooring we will utilize each year.\n\n46. The SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF. Separately, the annual scheduled flooring product/system quantities total 310,000 SF if CLINs 0001, 0003, 0006, and 0007 are distinct. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping or supply-only quantities and confirm the quantities controlling price evaluation and ordering.\n\nThe total 3.5 is over the base plus 4 years. It is an estimate of 700k for each year. As we do not know exactly how much we will use each year funds or materials.\n\n47. Reference: B.10, CLINs 0003 and 0013 and corresponding option CLINs, pp. 9-23.\nSheet-vinyl material is listed at 3,000 SF, equivalent to 27,000 SF, while sheet-vinyl installation is listed at 9,000 SF in each year. Please confirm whether material quantity should be 1,000 SY, and the installation quantity should be 27,000 SF.\n\nCorrect-the material quantity should be 1,000 SY, installation quantity should be 27,000 SF\n\n48. Reference: B.10, CLIN 0009 and option equivalents, pp. 10-23; B.11 Scope, p. 26.\nCLIN 0009 includes 30,778 SY, equivalent to 277,002 SF, for General Demolition, Floor Leveling and Smoothing. Please identify the flooring types, number of existing layers, adhesive removal method, and substrate conditions included in this rate. Is it payable only where demolition is ordered,separately from installation, including Government-furnished material installations?\nEach flooring type may be different. Most areas are being replaced with carpet/tiles\n\nThe spaces can include and are not limited to cove-base removal, bonded epoxy removal, mechanical grinding, and underlayment removal are included or separately priced.\nUnderlayment are line items and priced within the task order.\n\n49. Reference: B.10, CLINs 0001-0015 and option equivalents, pp. 9-24; B.11 Scope, p. 26.\nPlease provide a CLIN inclusion matrix defining material-only, labor-only, and furnish-and-install items. In particular, identify the material paired with carpet installation 0008; confirm the relationship of LVT 0006 to installation 0011 and sheet vinyl 0003 to installation 0013; and define whether epoxy 0007 is a complete installed system. Identify where freight, adhesive, fasteners, demolition/disposal, skim coat, protection, transitions, supervision, and final cleaning belong. The SOW says pricing includes demolition and preparation, while CLIN 0009 prices them separately; please establish a\nconsistent method that avoids either duplication or unpaid scope.\n\nEach task order will price materials required prior to the installation. This will be determined by the scope each project.\n\n50. Reference: B.6, pp. 6-7; B.9, p. 8; B.10, pp. 9-24; B.11 Ordering Procedures, p. 27.\nOrders may vary from small to large, but the schedule has no separate mobilization, supervision, ICRA, temporary-facility, testing, or hazardous-material line items.\n\nEach project has its own needs and is specific to requirements and will be priced accordingly i.e ICRA requirements.\nThe VA will not provide any temporary facility or storage.\n\n51. Please identify any minimum task order size or charge and the expected order-size range and frequency.\n\nNo--there is no minimum task order size.\n\nReference: B.10, pp. 9-24; B.11 Ordering Procedures and Performance Monitoring, pp. 27-29.Please define the measurement and payment basis for each unit. Are flooring quantities net installed area, gross room area, or purchased material including cutting waste, pattern match, attic stock, and full-carton/roll rounding?\n\n52. It is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided. The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals.\n53. Reference: B.10, CLINs 0001, 0003, 0006, 0008 and 0011, pp. 9-11; B.11 Scope, p. 26.\nPlease provide complete specifications and current product identifiers for Tarkett Adapt/Woodlot Holly Oak, sheet vinyl, and Contour 6-by-48-inch LVT. Confirm the product category paired with carpet installation and whether VCT, although named in installation CLIN 0011, is Governmentfurnished or requires another supply item. Specify thickness, wear layer/backing, dimensions, performance and fire/smoke criteria, slip resistance, chemical resistance, approved adhesives, colors,and required installer qualifications. Are named products mandatory or are approved equals permitted?\n\nAll Tarkett materials and specs have been provided. There are no substitutions for Tarkett materials.\n\n54. Reference: B.10, CLIN 0007 and option equivalents, pp. 10-22; B.11 Scope, p. 26.\nFor the 15,000 SF annual epoxy item, please identify the required system, manufacturer or\nperformance basis, total thickness, primer, body coats, aggregate, topcoat, finish, and slip/chemicalresistance criteria.\n\nThe epoxy will be used seldom-therefore it will be specified/determined upon each task order.\nWhen used, it will include removal, repairs and all necessary actions to install.\n\n55. Reference: B.10, CLINs 0002, 0004, 0005 and option equivalents, pp. 9-23.\nPlease confirm that one CO for each adhesive means one complete four-gallon pail, and define one EA of weld rod by diameter and length per spool. Verify the annual quantities of 18 C-EX pails, 195 Roll Smart pails, and 15 weld-rod units against the corrected product quantities and manufacturer coverage, including which adhesive serves each flooring product and where LVT adhesive is priced. Are these quantities fixed evaluation estimates, actual consumable quantities, or allowances?\n\nIt is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided. The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals.\n\n56. Identify whether residual adhesive/rod remains Government property and how additional manufacturer-required consumption is authorized and paid.\n\nAny unused materials will be government property. Any unusable material may be disposed of.\n\n57. transitions without a separate CLIN. For 1,600 FT of heat welding and 50 FT of Flash Cove and Corners, define seam requirements, cove height, cove former, cap strip, and inside/outside corner details. Should corners be measured individually rather than by FT, and are weld rod and flash-cove accessories furnished under these rates or other CLINs?\n\nMeasurements and methods are to be determined by the contractor for efficiency of materials and labor.\n\n58. Reference: B.11 Scope, p. 26; B.10, CLIN 0009 and option equivalents.\nPlease define the quantitative limits of minor preparation/skim coat included in the rates, including maximum depth, average thickness, coverage percentage, flatness tolerance, and required adhesiveresidue removal.\n\nThe VA cannot determine such rare instances pre-maturely.\n\n59. Distinguish routine patching from self-leveling underlayment, deep fills, failed substrate removal, structural repairs, crack repair, joint treatment, and replacement of deteriorated\nwood or gypsum underlayment.\n\nMeasurements and methods are to be determined by the contractor for efficiency of materials and labor.\n\n60. Will each task order identify known repairs before pricing?\n\nYes, each task order will identify known repairs before pricing\n\n61. Establish separate measurable items or another approved pricing mechanism for concealed deterioration or preparation exceeding the defined limits after demolition.\n\nThis will be determined before installation and will be included in pricing.\n\n62. Reference: B.11 Objective and Scope, pp. 25-26; Installation, p. 29.\nWho performs and pays for substrate moisture, relative-humidity, pH, adhesion, and other\nmanufacturer-required testing on each task order, and what standards, frequency, and acceptance limits apply?\n\nIf spaces are identified with moisture issues, the VA will identify these instances prior if needed and make determining factors to rectify prior to installation.\n\n63. Reference: B.11 Scope, p. 26; Installation, p. 29; C.1(b), p. 31.\nPlease identify required product data, room layouts, samples, mockups, installer credentials, shop\ndrawings, and approval periods for each task order. For flooring supplied from Government warehouse\nstock, identify who verifies condition, quantity, compatibility, batch/shade, and warranty eligibility\nSpecify required contractor workmanship and manufacturer warranties, their\nduration and commencement, and responsibility for defects in Government-furnished products or preexisting substrate conditions. Identify whether attic stock, maintenance instructions, product/lot records, manufacturer inspections, or warranty registrations are required and the CLIN covering these deliverables.\n\nManufacture warranties will apply to all installations.\n\n64. Reference: B.11, pp. 25-29; furnished campus maps and Baltimore floor plans.\nBefore each task order is priced, will the Government define the number and size of phases, room vacancy windows, sequencing, and maximum area that may remain out of service?\n\nYes, it will be defined\n\n65. Please identify any daily requirement to reopen rooms or corridors, remove/rebuild containment, install temporary walking surfaces, or protect uncured flooring. Confirm responsibility for patient/staff relocation,clinical shutdowns, alternate egress, fire-alarm/HVAC coordination, permits, and after-hours escorts.\n\nRe-opening of rooms is the responsibility of VA personnel and the subject matter experts i.e the COR, Infection control, safety etc.\n\n66. Establish the process for Government-directed resequencing and additional mobilizations when rooms cannot be released together or operations interrupt the approved installation/cure sequence.\n\nVA/COR will determine.\n\n67. Reference: B.7, p. 7; B.11 Contractor Responsibilities, p. 27; Installation and Overtime, pp. 29-30.\nThe SOW gives a 7:30 a.m. start on page 27 and a 7:00 a.m. installation start on page 29, with occasional evening/weekend work. Please confirm the normal shift, billable/productive hours, delivery windows, and the portion of work bidders must assume occurs after hours.\n\nRegular Hours are defined in the RFQ.\nAfter hours will be rare and determined based on the service needs. Quoted prior to installation.\n\n68. How are premium shifts,\novertime, weekend/holiday work, and repeated short shifts priced when the schedule has no premiumrate\nitems? Clarify the daily/seventh-day overtime wording on page 30 and the required written\napproval authority, including reconciliation of service-chief approval with CO authorization for additional price or holiday work.\n\nCOR will coordinate work overtime with service chief prior to installation.\n\n69. Clarify how a task order issued near year-end is completed and which rates apply when performance spans an option boundary or a Government-directed delay\n\nIssued by CO Firm Fixed Price\n\n70. Reference: B.9 Authorized Limits, p. 8; B.11, pp. 25-27.\nThe BPA order limit and overall ceiling are blank, and the SOW anticipates emergent failures. Please provide the intended per-order limit, BPA ceiling, anticipated annual spending/order count, typical order size, and any minimum purchase commitment. What maximum number of simultaneous task orders, sites, and shifts must the contractor support? Define routine and emergency response times, estimating turnaround, start/completion requirements, and whether emergency standby or priority\nservice must be included in standard rates. Clarify whether the listed annual quantities are evaluation estimates only and whether no minimum work volume is guaranteed.\n\nEstimates only. The VA cannot determine such rare occurrences pre-maturely.\n\n71. Reference: C.2, pp. 37-38; D.1, p. 58; attached Wage Determination 2015-4265, Revision 33, pp. 1-7.The RFQ incorporates Service Contract Labor Standards and attaches WD 2015-4265, Revision 33, dated May 13, 2026. Please confirm the applicable labor-standard treatment for flooring demolition, preparation, replacement, and installation, including any construction wage determination required for particular orders. Identify the governing determination and revision for each campus; the attached locality list does not identify Cecil County for Perry Point. Clarify required classifications for resilient flooring, carpet, epoxy/coating, demolition/preparation, and hazardous-material work; the conformance procedure for unlisted work; applicable fringe benefits; and required payroll reporting.Please issue all governing determinations before final pricing.\n\nPlease refer to the Wage Determination for Baltimore and Cecil County\n\n72. Bidders must quote the base and four option years. Please clarify whether each year has independently proposed fixed unit rates and how incorporated wage/fringe adjustment provisions will be applied without duplicating escalation already priced. Identify the effective wage-determination revision for each period, required supporting documentation, notice deadlines, and treatment of orders spanning periods. Are any material-price, freight, tariff, or product-discontinuation adjustments permitted during a period, or must those risks be covered entirely in the quoted annual rates?\n\nFirm Fixed pricing/ those risks must be covered entirely in the quoted annual rates\n\n73. Define how approved substitute flooring systems are priced if the listed product becomes unavailable during the BPA.\n\nNo substitutions\n\n74. Reference: C.7-C.8, pp. 40-41; B.9, p. 8.\nC.8 leaves the general-liability and automobile-liability amounts blank and requires general-liability coverage without an asbestos exclusion before award.\n\nCannot be determined as this will be a case by case occurrence.\n\n75. Please provide all required limits and endorsements and explain whether the asbestos provision applies when testing/abatement is performed by a separate Government contractor.\n\nYes, asbestos provision applies when testing/abatement is performed by a separate Government contractor.\n\n80. Identify any required pollution/professional coverage and whether approved specialty-subcontractor coverage satisfies any portion. Please also confirm whether bid, payment, performance bonds, or other payment protection will be required at BPA award or by individual task order, the applicable order thresholds, and how associated premiums are to be priced.\n\nContractor is expected to maintain all applicable insurance coverages.\n\n81. Confirm whether compliance is measured separately for each task order or over the base and each option period.\n\nCompliance is required on all task orders.\n\nDoes the latest solicitation remain a Service-Disabled Veteran-Owned Small Business set-aside, or has it been revised to unrestricted/full-and-open competition? The public notices and third-party listings appear inconsistent.\nCorrect it is a Service-Disabled Veteran-Owned Small Business set-aside,\nWere the October 20 21 site visits mandatory for quotation eligibility, or may a contractor that did not attend still quote based on the published documents?\nOne member of the desired contracting bidder must have attended the walk-thru\nMay a prime contractor use qualified flooring subcontractors for portions of the work, provided it quotes and manages all three VA locations and meets all applicable limitations on subcontracting?\nContractors must meet all requirements for all three sites.","origin":"detail"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"36C24526Q0637","product_service_code":"N055"}],"due_at":"2026-10-09T17:00:00Z","due_date":"2026-10-09","closes_at":"2026-10-09T17:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","state":"MD","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","state_source":"site","state_evidence":"0 QUANTITIES THE COMBINED TOTAL FOR BALTIMORE VAMC","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-11-11T04:53:52.348876Z","principal_notice_id":"80f12d55b60544b1b7e44cd4934ed666","description":{"text":"Questions and Answers (84) Solicitation 36C24526Q0637\nSet-aside status. The Amendment #3 notice on SAM.gov shows the Original Set Aside field as blank. The SF 1449 (Block 10) and VAAR 852.219-73 in the solicitation reflect a total set-aside for certified SDVOSBs. Please confirm whether this acquisition remains a 100% SDVOSB set-aside after Amendment #3.\nCorrect this BPA/RFQ remains a 100% SDVOSB set-aside\nEvaluation basis. For the LPTA evaluation, will the Government compare total price for the base year only, or the total of the base year plus all four option years? Will option-year pricing be evaluated?\ntotal of the base year plus all four option years\nQuantities by site. Are the Section B.10 quantities the combined total for Baltimore VAMC, Loch Raven CBOC, and Perry Point VAMC? Please provide the breakdown by site, building, floor and flooring type, and confirm whether each quantity is an annual estimate for each contract year.\nThis is an annual estimate for all sites.\nLine item reconciliation. Several lines appear not to align, and we would like to price them correctly:\nTarkett Sheet Vinyl material is listed at 3,000 SY (27,000 SF), while Installation of Sheet Vinyl is listed at 9,000 SF. Which quantity is correct?\nSF should be SY. The SY is correct\nIs the 2,000 SY Tarkett Adapt (Woodlot Holly Oak) material line the material for the 2,000 SY Installation of Carpet Tile line?\nThe carpet tile should be a separate line item.\nGeneral Demolition, Floor Leveling and Smoothing and Furniture Lift (occupied spaces) are each listed at 30,778 SY. Does this quantity cover the combined area of the LVT and sheet vinyl installations? What is the Government's expectation for demolition and leveling on the Epoxy Flooring (15,000 SF) and Carpet Tile areas?\nYes--This combines both areas.\nThe expectation for epoxy flooring installation will not differ from LVT. The recommended application/method is to be specified by the contractor as the SME (Subject matter expert).\nMaterials and selections. Please confirm that the contractor furnishes all materials listed in B.10. Colors and styles are shown as TBD. When will selections be provided, and should offerors price a stated base or average cost? Will substitutions of equivalent products be considered?\nThere are no substitutions\nExisting floor condition. Has asbestos or lead testing been completed on the existing flooring and adhesives at all three sites? If material is found, who is responsible for abatement and for the related schedule impact? Are moisture and alkalinity test results available?\nAsbestos and lead testing is completed at all sites. VA ensures the proper personnel are in place for abatement.\nBPA terms, schedule and labor\nOrder limits. Section B.9 leaves the per-order limit and the ceiling amount blank. Please provide both, any minimum guarantee, the expected number and typical size of orders per year, and the typical lead time between an order and the start of work.\nThe Government estimates, but does not guarantee, that individual BPA Orders placed against this Agreement may reach $1,500,000.00/per Order. This Order Limit may be increased by mutual agreement of the parties as necessary, in whole or part.Â The authorized Ceiling Limit of the Agreement is set at $6,000,000.00 over the period covered by the Agreement; this ceiling is also not a guarantee.Â The Ceiling Limit may also be raised in association with order Limit increases or other conditions which, by mutual agreement of the parties, maybe considered necessary.Â Authorization for individual Task Orders above the stated Task Order and/or Ceiling Limits must be coordinated through the Contracting Officer before larger valued orders can be issued and prior to commencement of work.Â All unauthorized work, regardless of amount, will be processed through the ratification process.Â\n\nPeriod of performance. Section B.10 shows a base period of 09-01-2026 through 08-31-2027, and B.2 shows the BPA dates as TBD. Please confirm the revised base and option period dates, given the November 18 quote date. The Installation of Sheet Vinyl line shows a POP end date of 08-16-2027 while other lines show 08-31-2027. Please confirm which date applies.\nTime frame of contract award Base Year December 1, 2026 to November 30, 2027 plus 4 option renewal years\nWage determination. The attached wage determination is dated 7-22-2026 and is titled Baltimore. Does it apply to all three sites, including Perry Point (Cecil County)? Please confirm whether it is a Service Contract Labor Standards or a Davis-Bacon determination.\nWage Determination for Baltimore and Cecil County are attached\nService Contract Labor Standards\nWorking in occupied facilities. Please describe the requirements for working hours, after-hours and weekend work, infection control (ICRA) and phasing, badging and escorts, material staging and storage areas, and loading and elevator access at each site. Who moves furniture and equipment that is not covered by the Furniture Lift line?\nThe work hours are reflected in the RFQ. The VA observes all national holidays. After work hours are on a case by case and determined by the needs of the service.\n\nCLINs x007 \"Epoxy Flooring; Color TBD\" (B.10): is there a required epoxy system type (e.g., self-leveling, broadcast/slurry, mortar, or flake), minimum thickness, and performance criteria?\nThis will be determined prior to the project of any installations-as epoxy will not be a regular material used.\nFor epoxy areas, who is responsible for concrete moisture/RH and pH testing (ASTM F2170 / F1869)? If readings exceed the system's limits, is moisture mitigation priced under CLIN x009 or handled by task-order modification?\nhandled by task-order modification\n\nVAAR 852.219-75 (pp. 55-56) has no box checked. Which limitation on subcontracting applies: services (50%) or special trade construction (75%)? Please confirm that the cost of materials is excluded. Also, will 852.219-73(e) be measured by base/option period or per order?\nServices (50%)\n852.219-73(e) will be measured by base/option period.\n14. Does a Buy American requirement (FAR 52.225-1 or 52.225-9) apply to materials? The SF1449 says 52.212-5 is attached, but its text isn't in the posted RFQ.\n\n52.225-1 or 52.225-9 is not listed on the RFQ\n52.212-5 is not checked on the SF1449 therefore text would not be posted\n\n15. E.3 (p.61) says award will be LPTA, but E.8 (p.65) says best value with technical, past performance, and price. Which governs? Also, what are the per-order limit and BPA ceiling in B.9, which are left blank (p.8)?\nRefer to question #7 Order Limits\n\n16. Carpet tile. Please provide the manufacturer, collection and product name, style number, color name and number, tile dimensions, fiber and construction, backing, installation pattern, and approved adhesive. Please confirm whether carpet material is contractor-furnished and identify the applicable material supply line.\nCarpet tile Spec: Tarkett Carpet Tile Hidden Arbor and Sweater Knit 24x24 color TBD\n17. LVT. Please provide the complete specification for the listed Tarkett Contour Series 6 by 48 inch LVT, including exact collection and product number, color name and number, overall thickness, wear-layer thickness, backing, finish, installation method, and approved adhesive. Please clarify how the separately listed Tarkett Adapt, Woodlot Holly Oak relates to this scope.\nThis will be determined prior to installation.\n18. Sheet vinyl. Please provide the manufacturer, collection and product name, product number, color name and number, homogeneous or heterogeneous construction, thickness, backing, roll width, finish, and approved adhesive. Please include the compatible weld rod, heat-welding requirements, flash-cove height, cove former, cap, and corner details.\nPlease provide product data sheets and identify any different product or color selections by facility or area.\nSheet vinyl spec: Tarkett IQ Optima Sheet Goods\n19. Please provide the required wall-base and transition specifications, including manufacturer, product, material, dimensions, profile, and color or finish. Please identify the required transitions between new flooring, existing finishes, and different flooring types.\nContractor will determine optimal wall transitions based on the project requirement, as the SME (subject matter expert).\n21. During the walkthroughs, we understood that all furniture moving would be performed in-house by the VA. Please confirm that the VA will clear furniture, contents, and equipment before work begins and return them after the required curing period, including any necessary disconnects and reconnects.\nPlease clarify whether Item 0012,\nFurniture Lift, remains applicable.\n22. Please confirm that LVT and sheet-vinyl work areas will be fully cleared and remain clear through installation and required curing, rather than requiring piecemeal installation around furniture.\nLVT and sheet-vinyl work areas will be fully cleared and remain clear through installation\n23. Please confirm whether the VA will provide dumpsters and pay disposal charges at each facility. Please identify the designated disposal locations and confirm whether the contractor is responsible for transporting demolition debris to onsite containers or for offsite hauling and disposal as well.\nThe VA has dumpsters for disposal at each site.\n24. Please confirm whether temporary dust partitions, negative-air equipment, and associated monitoring will be provided by the VA or contractor. Please provide the required barrier-system specifications and applicable infection-control requirements, including responsibility for setup, maintenance, relocation, removal, and inspection.\nContractor is responsible for providing all ICRA/PICRA materials. To include materials required for wall barriers when required (Level 3 or 4). Contractors are expected to provide materials and construct the wall barriers required.\nNegative air pressure machine will be provided by the VA if needed.\n25. Please identify the VA representative responsible for coordinating room availability, occupant relocation, access, and infection-control approvals. Please confirm whether each released area will remain continuously available through demolition, preparation, installation, and required curing. Please identify any daily reopening requirements and who authorizes reopening.\nThe COR or Interior Designer will provide all necessary coordination for all projects. Contractor is not responsible for the opening of any room.\n26. Please reconcile the listed 7:00 a.m. and 7:30 a.m. start times and confirm normal working hours. Please identify any locations or activities that must be performed during evenings, nights, weekends, or holidays.\nAny work after hours will be coordinated prior to any installations. This will be determined by the needs of the applicable service.\n\n27. Reference: B.11 Scope, p. 26; B.5(c), p. 6.\nThe SOW requires a project manager or project designer and an installation foreman onsite. For each task order, please identify the required supervisory positions, minimum qualifications, approval submittals, and hours of physical presence. Must a superintendent or project manager be a direct employee of the prime, and must that person remain onsite whenever subcontractors work?\nEach task order will require a designer or project manager to monitor progress and ensure standards are in place. They will be a minimum of COR Level 1 certified. They are required to be onsite at time of the installation. There is no physical amount of time for this requirement, as each project varies.\nA qualified installation foreman may of course also be present but the VA will require a designer/COR level 1 employee to monitor project.\nNo-- Where projects possibly run concurrently, each project will have it s own designer/project manager.\n\n28. Reference: B.11 Safety and Security Precautions and Personnel Qualifications, p. 28; B.6(a), p. 6.\nPlease identify whether each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative beyond the onsite personnel identified on page 26. Specify prime-employment requirements, certifications, experience, full-time coverage, and whether one qualified person may combine these roles with superintendent or foreman duties.\n\nEach task order will require it s own safety personnel, each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative based on the needs of the project. Each project may have it s own requirements (i.e patient care areas etc.)\n\n29. Identify the applicable safety/QC specifications, any EM 385-1-1 requirements and edition, required plans and daily reports, and whether staffing varies with task-order size, location, work shift, or hazard\nlevel.\nContractors are expected to comply with OSHA standards.\nNo-the Interior Design staff does not vary based on task orders.\n\n30. Reference: B.11 Objective and Scope, pp. 25-26.\nBefore pricing and issuance of each task order, who will prepare and approve the Infection Control Risk Assessment (ICRA), any Preconstruction Risk Assessment (PCRA), and the infection-control permit: VA Infection Prevention, the COR, the contractor, or another party? Please provide the applicable forms, assessment matrix, approving officials, and review time. Confirm that the required class, work-area limits, patient risk group, and controls will be identified in the task-order solicitation before its price and schedule are agreed, including orders at Baltimore, Loch Raven, and Perry Point\n\nInterior Design staff will prepare the ICRA & PCRA. ID will coordinate with Infection control for approval of the ICRA & PCRA prior to the start of any project.\nAll ICRA/PCRA requirements are expected to be performed by the contractor. Contractor will be expected to provide necessary materials and the construction of any wall barriers required by ICRA/PCRA.\n\n31. Reference: Site-visit discussion reported by J&G; B.11 Scope, p. 26; Unpacking/Uncrating, p. 27. Our understanding from the site visit is that the Government will remove all furniture before the flooring contractor begins each task order. Please confirm this applies to every order at all three campuses and that the flooring contractor is not required to lift, move, disassemble, store, protect in storage, or reinstall furniture. Clarify responsibility for workstations, beds, file cabinets, appliances, medical equipment, contents, and associated IT/electrical/plumbing disconnections and reconnections.\n\nInterior Design will remove all furniture prior to any installation. However, there may be an instant where some furniture may need to be moved/prior. Contractor will not be responsible for the removal of any medical equipment. Equipment or medical items will be removed by VA personnel/Biomed.\n\n32. Confirm that the Government will deliver cleared work areas and keep them clear through installation and required curing and identify the procedure if an area is not ready as scheduled.\nID will ensure areas are cleared and remain clear through installation.\n\n33. Reference: B.10, CLINs 0008 and 0012 and corresponding option CLINs, pp. 10-23; E.3, pp. 61-62.CLIN 0012 includes 30,778 SY of Furniture Lift in occupied spaces, repeated in CLINs 1012, 2012,3012, and 4012. This appears inconsistent with the site-visit direction that the Government will remove furniture. Will these CLINs be deleted from the schedule and evaluated price? If retained, define the exact exceptional scope and when it may be ordered, and issue uniform instructions on whether bidders must quote a rate, enter zero, or use another designation. Please confirm that pricing these lines does not place furniture moving in the flooring installation rates or authorize it without an applicable order.\n\nID will ensure furniture is removed from the space prior to installation. However, if there is an instance where furniture must be removed by the contractor-it will be priced accordingly.\n\n34. Reference: B.11 Scope, p. 26; Debris, p. 27; B.10, CLIN 0009 and option equivalents.\nThe SOW assigns removal and disposal to the contractor but directs debris to VA-provided dumpsters and a scrap cage. For each campus, confirm whether the Government provides containers, hauling, and final disposal at no charge for all nonhazardous carpet, carpet tile, pad, LVT/VCT, sheet flooring, epoxy debris, cove base, adhesive/mastic scrapings, underlayment, and floor-preparation waste. Identify prohibited materials, volume or weight limits, and any offsite disposal the contractor must price. Please state whether disposal labor is paid through the demolition CLIN or installation rates, so it is included once, and define payment for required contractor hauling and tipping fees.\n\nThe VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard.\n\n35. Reference: B.11 Debris, p. 27; Safety and Security Precautions, p. 28.\nPlease identify the approved debris routes, loading points, dumpster/scrap-cage locations, and cardboard recycling locations at each campus. Specify covered or sealed carts, bagging, elevator restrictions, daily removal, cleanup, and container exchange requirements.\n\nThe VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard.\n\n36. Are carpet take-back, flooring recycling, minimum diversion percentages, waste plans, weight tickets, or disposal receipts required?\nNo, they are not required\n\n37. Identify responsibility for overflow or un37available VA containers and any required contractor roll-off permits or containment. Where hazardous or contaminated waste is expressly included in an order, provide separate segregation, manifest, transporter, disposal-facility, and generator-signature responsibilities; confirm such waste may not enter the ordinary VA dumpsters.\n\nThere are no hazardous materials areas specified for flooring installations.\n\n38. Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28.\nFor each campus and task order, please identify required contractor site facilities, including a field Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28. For each campus and task order, please identify required contractor site facilities, including a field office or trailer, superintendent/QC workspace, meeting area, storage container, portable toilets, handwashing facilities, and temporary lighting or ventilation.\n\nNo. The VA will not provide storage containers, portable toilets, and temporary lighting or ventilation. Handwashing facilities are located in the restrooms in all facilities, all sites, all campuses.\n\nNo temporary facilities will be provided.\n\n39. Reference: B.11 Scope, p. 26; Equipment and Tools and Work Areas, p. 28; Installation, p. 29. The SOW requires contractor storage, directs installation from shipments and warehouse stock, and requires removal of tools when the contractor leaves. Please identify available secure, conditioned storage and acclimation areas at each campus, including space for flooring, adhesives, and hazardous products. May approved tools, containment equipment, and materials remain secured onsite overnight or between phases?\n\nThere will be no storage provided for contractors.\n\n40. If daily removal is required, confirm the limits and available loading access.\nIdentify responsibility for material receipt, inventory, room tagging, double handling, damaged Government stock, and maintaining manufacturer-required temperature and humidity during storage, acclimation, installation, and cure.\n\nStorage for materials will not be provided-other than the immediate area within the project area. This will be included in the scope of the project.\n\n41. Reference: B.11, pp. 25-30; Baltimore floor plans and campus visitor maps; Amendment #3 site-visit notice. The furnished maps identify visitor services and campus locations rather than dimensioned flooring work limits. Before each task-order quote, will the Government provide marked plans identifying buildings, rooms, areas, existing and new flooring, demolition limits, and phasing?\n\nYes prior to the start of any project, the VA/COR will provide building location, room information and floor plans with applicable dimensions to reference.\n\n42. Confirm field measurement access before pricing. Identify contractor entrances, loading docks, freight elevators and reservations, floor-load limits, haul distances, escort requirements, and delivery/parking arrangements at all three campuses.\n\nYes measurements will be provided to the contractor prior to the start of each project.\n\n43. Clarify the Loch Raven buildings covered by the BPA, including the Alameda\nclinic versus the broader Loch Raven campus, and any access restrictions caused by ongoing construction.\n\nAll buildings located on the Loch Raven campus are included in the BPA. Ongoing construction will be assessed for access, determined by the current activities.\n\n44. Reference: B.11 Scope, p. 26; B.10, pp. 9-24.\nThe SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and 120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF.\n\nCorrect the figure should reflect 800,000 SY instead of SF. This a rough estimate, of the exact amount of flooring that needs changed it will change over time.\n\n45. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping supply-only quantities, and confirm the quantities controlling price evaluation and ordering. Reference: B.11 Scope, p. 26; B.10, pp. 9-24.\n\nThe 3.5 total is an educated estimate. As we will now know exactly how much flooring we will utilize each year.\n\n46. The SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF. Separately, the annual scheduled flooring product/system quantities total 310,000 SF if CLINs 0001, 0003, 0006, and 0007 are distinct. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping or supply-only quantities and confirm the quantities controlling price evaluation and ordering.\n\nThe total 3.5 is over the base plus 4 years. It is an estimate of 700k for each year. As we do not know exactly how much we will use each year funds or materials.\n\n47. Reference: B.10, CLINs 0003 and 0013 and corresponding option CLINs, pp. 9-23.\nSheet-vinyl material is listed at 3,000 SF, equivalent to 27,000 SF, while sheet-vinyl installation is listed at 9,000 SF in each year. Please confirm whether material quantity should be 1,000 SY, and the installation quantity should be 27,000 SF.\n\nCorrect-the material quantity should be 1,000 SY, installation quantity should be 27,000 SF\n\n48. Reference: B.10, CLIN 0009 and option equivalents, pp. 10-23; B.11 Scope, p. 26.\nCLIN 0009 includes 30,778 SY, equivalent to 277,002 SF, for General Demolition, Floor Leveling and Smoothing. Please identify the flooring types, number of existing layers, adhesive removal method, and substrate conditions included in this rate. Is it payable only where demolition is ordered,separately from installation, including Government-furnished material installations?\nEach flooring type may be different. Most areas are being replaced with carpet/tiles\n\nThe spaces can include and are not limited to cove-base removal, bonded epoxy removal, mechanical grinding, and underlayment removal are included or separately priced.\nUnderlayment are line items and priced within the task order.\n\n49. Reference: B.10, CLINs 0001-0015 and option equivalents, pp. 9-24; B.11 Scope, p. 26.\nPlease provide a CLIN inclusion matrix defining material-only, labor-only, and furnish-and-install items. In particular, identify the material paired with carpet installation 0008; confirm the relationship of LVT 0006 to installation 0011 and sheet vinyl 0003 to installation 0013; and define whether epoxy 0007 is a complete installed system. Identify where freight, adhesive, fasteners, demolition/disposal, skim coat, protection, transitions, supervision, and final cleaning belong. The SOW says pricing includes demolition and preparation, while CLIN 0009 prices them separately; please establish a\nconsistent method that avoids either duplication or unpaid scope.\n\nEach task order will price materials required prior to the installation. This will be determined by the scope each project.\n\n50. Reference: B.6, pp. 6-7; B.9, p. 8; B.10, pp. 9-24; B.11 Ordering Procedures, p. 27.\nOrders may vary from small to large, but the schedule has no separate mobilization, supervision, ICRA, temporary-facility, testing, or hazardous-material line items.\n\nEach project has its own needs and is specific to requirements and will be priced accordingly i.e ICRA requirements.\nThe VA will not provide any temporary facility or storage.\n\n51. Please identify any minimum task order size or charge and the expected order-size range and frequency.\n\nNo--there is no minimum task order size.\n\nReference: B.10, pp. 9-24; B.11 Ordering Procedures and Performance Monitoring, pp. 27-29.Please define the measurement and payment basis for each unit. Are flooring quantities net installed area, gross room area, or purchased material including cutting waste, pattern match, attic stock, and full-carton/roll rounding?\n\n52. It is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided. The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals.\n53. Reference: B.10, CLINs 0001, 0003, 0006, 0008 and 0011, pp. 9-11; B.11 Scope, p. 26.\nPlease provide complete specifications and current product identifiers for Tarkett Adapt/Woodlot Holly Oak, sheet vinyl, and Contour 6-by-48-inch LVT. Confirm the product category paired with carpet installation and whether VCT, although named in installation CLIN 0011, is Governmentfurnished or requires another supply item. Specify thickness, wear layer/backing, dimensions, performance and fire/smoke criteria, slip resistance, chemical resistance, approved adhesives, colors,and required installer qualifications. Are named products mandatory or are approved equals permitted?\n\nAll Tarkett materials and specs have been provided. There are no substitutions for Tarkett materials.\n\n54. Reference: B.10, CLIN 0007 and option equivalents, pp. 10-22; B.11 Scope, p. 26.\nFor the 15,000 SF annual epoxy item, please identify the required system, manufacturer or\nperformance basis, total thickness, primer, body coats, aggregate, topcoat, finish, and slip/chemicalresistance criteria.\n\nThe epoxy will be used seldom-therefore it will be specified/determined upon each task order.\nWhen used, it will include removal, repairs and all necessary actions to install.\n\n55. Reference: B.10, CLINs 0002, 0004, 0005 and option equivalents, pp. 9-23.\nPlease confirm that one CO for each adhesive means one complete four-gallon pail, and define one EA of weld rod by diameter and length per spool. Verify the annual quantities of 18 C-EX pails, 195 Roll Smart pails, and 15 weld-rod units against the corrected product quantities and manufacturer coverage, including which adhesive serves each flooring product and where LVT adhesive is priced. Are these quantities fixed evaluation estimates, actual consumable quantities, or allowances?\n\nIt is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided. The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals.\n\n56. Identify whether residual adhesive/rod remains Government property and how additional manufacturer-required consumption is authorized and paid.\n\nAny unused materials will be government property. Any unusable material may be disposed of.\n\n57. transitions without a separate CLIN. For 1,600 FT of heat welding and 50 FT of Flash Cove and Corners, define seam requirements, cove height, cove former, cap strip, and inside/outside corner details. Should corners be measured individually rather than by FT, and are weld rod and flash-cove accessories furnished under these rates or other CLINs?\n\nMeasurements and methods are to be determined by the contractor for efficiency of materials and labor.\n\n58. Reference: B.11 Scope, p. 26; B.10, CLIN 0009 and option equivalents.\nPlease define the quantitative limits of minor preparation/skim coat included in the rates, including maximum depth, average thickness, coverage percentage, flatness tolerance, and required adhesiveresidue removal.\n\nThe VA cannot determine such rare instances pre-maturely.\n\n59. Distinguish routine patching from self-leveling underlayment, deep fills, failed substrate removal, structural repairs, crack repair, joint treatment, and replacement of deteriorated\nwood or gypsum underlayment.\n\nMeasurements and methods are to be determined by the contractor for efficiency of materials and labor.\n\n60. Will each task order identify known repairs before pricing?\n\nYes, each task order will identify known repairs before pricing\n\n61. Establish separate measurable items or another approved pricing mechanism for concealed deterioration or preparation exceeding the defined limits after demolition.\n\nThis will be determined before installation and will be included in pricing.\n\n62. Reference: B.11 Objective and Scope, pp. 25-26; Installation, p. 29.\nWho performs and pays for substrate moisture, relative-humidity, pH, adhesion, and other\nmanufacturer-required testing on each task order, and what standards, frequency, and acceptance limits apply?\n\nIf spaces are identified with moisture issues, the VA will identify these instances prior if needed and make determining factors to rectify prior to installation.\n\n63. Reference: B.11 Scope, p. 26; Installation, p. 29; C.1(b), p. 31.\nPlease identify required product data, room layouts, samples, mockups, installer credentials, shop\ndrawings, and approval periods for each task order. For flooring supplied from Government warehouse\nstock, identify who verifies condition, quantity, compatibility, batch/shade, and warranty eligibility\nSpecify required contractor workmanship and manufacturer warranties, their\nduration and commencement, and responsibility for defects in Government-furnished products or preexisting substrate conditions. Identify whether attic stock, maintenance instructions, product/lot records, manufacturer inspections, or warranty registrations are required and the CLIN covering these deliverables.\n\nManufacture warranties will apply to all installations.\n\n64. Reference: B.11, pp. 25-29; furnished campus maps and Baltimore floor plans.\nBefore each task order is priced, will the Government define the number and size of phases, room vacancy windows, sequencing, and maximum area that may remain out of service?\n\nYes, it will be defined\n\n65. Please identify any daily requirement to reopen rooms or corridors, remove/rebuild containment, install temporary walking surfaces, or protect uncured flooring. Confirm responsibility for patient/staff relocation,clinical shutdowns, alternate egress, fire-alarm/HVAC coordination, permits, and after-hours escorts.\n\nRe-opening of rooms is the responsibility of VA personnel and the subject matter experts i.e the COR, Infection control, safety etc.\n\n66. Establish the process for Government-directed resequencing and additional mobilizations when rooms cannot be released together or operations interrupt the approved installation/cure sequence.\n\nVA/COR will determine.\n\n67. Reference: B.7, p. 7; B.11 Contractor Responsibilities, p. 27; Installation and Overtime, pp. 29-30.\nThe SOW gives a 7:30 a.m. start on page 27 and a 7:00 a.m. installation start on page 29, with occasional evening/weekend work. Please confirm the normal shift, billable/productive hours, delivery windows, and the portion of work bidders must assume occurs after hours.\n\nRegular Hours are defined in the RFQ.\nAfter hours will be rare and determined based on the service needs. Quoted prior to installation.\n\n68. How are premium shifts,\novertime, weekend/holiday work, and repeated short shifts priced when the schedule has no premiumrate\nitems? Clarify the daily/seventh-day overtime wording on page 30 and the required written\napproval authority, including reconciliation of service-chief approval with CO authorization for additional price or holiday work.\n\nCOR will coordinate work overtime with service chief prior to installation.\n\n69. Clarify how a task order issued near year-end is completed and which rates apply when performance spans an option boundary or a Government-directed delay\n\nIssued by CO Firm Fixed Price\n\n70. Reference: B.9 Authorized Limits, p. 8; B.11, pp. 25-27.\nThe BPA order limit and overall ceiling are blank, and the SOW anticipates emergent failures. Please provide the intended per-order limit, BPA ceiling, anticipated annual spending/order count, typical order size, and any minimum purchase commitment. What maximum number of simultaneous task orders, sites, and shifts must the contractor support? Define routine and emergency response times, estimating turnaround, start/completion requirements, and whether emergency standby or priority\nservice must be included in standard rates. Clarify whether the listed annual quantities are evaluation estimates only and whether no minimum work volume is guaranteed.\n\nEstimates only. The VA cannot determine such rare occurrences pre-maturely.\n\n71. Reference: C.2, pp. 37-38; D.1, p. 58; attached Wage Determination 2015-4265, Revision 33, pp. 1-7.The RFQ incorporates Service Contract Labor Standards and attaches WD 2015-4265, Revision 33, dated May 13, 2026. Please confirm the applicable labor-standard treatment for flooring demolition, preparation, replacement, and installation, including any construction wage determination required for particular orders. Identify the governing determination and revision for each campus; the attached locality list does not identify Cecil County for Perry Point. Clarify required classifications for resilient flooring, carpet, epoxy/coating, demolition/preparation, and hazardous-material work; the conformance procedure for unlisted work; applicable fringe benefits; and required payroll reporting.Please issue all governing determinations before final pricing.\n\nPlease refer to the Wage Determination for Baltimore and Cecil County\n\n72. Bidders must quote the base and four option years. Please clarify whether each year has independently proposed fixed unit rates and how incorporated wage/fringe adjustment provisions will be applied without duplicating escalation already priced. Identify the effective wage-determination revision for each period, required supporting documentation, notice deadlines, and treatment of orders spanning periods. Are any material-price, freight, tariff, or product-discontinuation adjustments permitted during a period, or must those risks be covered entirely in the quoted annual rates?\n\nFirm Fixed pricing/ those risks must be covered entirely in the quoted annual rates\n\n73. Define how approved substitute flooring systems are priced if the listed product becomes unavailable during the BPA.\n\nNo substitutions\n\n74. Reference: C.7-C.8, pp. 40-41; B.9, p. 8.\nC.8 leaves the general-liability and automobile-liability amounts blank and requires general-liability coverage without an asbestos exclusion before award.\n\nCannot be determined as this will be a case by case occurrence.\n\n75. Please provide all required limits and endorsements and explain whether the asbestos provision applies when testing/abatement is performed by a separate Government contractor.\n\nYes, asbestos provision applies when testing/abatement is performed by a separate Government contractor.\n\n80. Identify any required pollution/professional coverage and whether approved specialty-subcontractor coverage satisfies any portion. Please also confirm whether bid, payment, performance bonds, or other payment protection will be required at BPA award or by individual task order, the applicable order thresholds, and how associated premiums are to be priced.\n\nContractor is expected to maintain all applicable insurance coverages.\n\n81. Confirm whether compliance is measured separately for each task order or over the base and each option period.\n\nCompliance is required on all task orders.\n\nDoes the latest solicitation remain a Service-Disabled Veteran-Owned Small Business set-aside, or has it been revised to unrestricted/full-and-open competition? The public notices and third-party listings appear inconsistent.\nCorrect it is a Service-Disabled Veteran-Owned Small Business set-aside,\nWere the October 20 21 site visits mandatory for quotation eligibility, or may a contractor that did not attend still quote based on the published documents?\nOne member of the desired contracting bidder must have attended the walk-thru\nMay a prime contractor use qualified flooring subcontractors for portions of the work, provided it quotes and manages all three VA locations and meets all applicable limitations on subcontracting?\nContractors must meet all requirements for all three sites.","html":"Questions and Answers (84)   Solicitation 36C24526Q0637\nSet-aside status. The Amendment #3 notice on SAM.gov shows the Original Set Aside field as blank. The SF 1449 (Block 10) and VAAR 852.219-73 in the solicitation reflect a total set-aside for certified SDVOSBs. Please confirm whether this acquisition remains a 100% SDVOSB set-aside after Amendment #3.\nCorrect this BPA/RFQ remains a 100% SDVOSB set-aside\nEvaluation basis. For the LPTA evaluation, will the Government compare total price for the base year only, or the total of the base year plus all four option years? Will option-year pricing be evaluated?  \ntotal of the base year plus all four option years\nQuantities by site. Are the Section B.10 quantities the combined total for Baltimore VAMC, Loch Raven CBOC, and Perry Point VAMC? Please provide the breakdown by site, building, floor and flooring type, and confirm whether each quantity is an annual estimate for each contract year.\nThis is an annual estimate for all sites.\nLine item reconciliation. Several lines appear not to align, and we would like to price them correctly: \nTarkett Sheet Vinyl material is listed at 3,000 SY (27,000 SF), while Installation of Sheet Vinyl is listed at 9,000 SF. Which quantity is correct?\nSF should be SY. The SY is correct\nIs the 2,000 SY Tarkett Adapt (Woodlot Holly Oak) material line the material for the 2,000 SY Installation of Carpet Tile line?\nThe carpet tile should be a separate line item.\nGeneral Demolition, Floor Leveling and Smoothing and Furniture Lift (occupied spaces) are each listed at 30,778 SY. Does this quantity cover the combined area of the LVT and sheet vinyl installations? What is the Government's expectation for demolition and leveling on the Epoxy Flooring (15,000 SF) and Carpet Tile areas?\nYes--This combines both areas.\nThe expectation for epoxy flooring installation will not differ from LVT. The recommended application/method is to be specified by the contractor as the SME (Subject matter expert).\nMaterials and selections. Please confirm that the contractor furnishes all materials listed in B.10. Colors and styles are shown as TBD. When will selections be provided, and should offerors price a stated base or average cost? Will substitutions of equivalent products be considered?\nThere are no substitutions\nExisting floor condition. Has asbestos or lead testing been completed on the existing flooring and adhesives at all three sites? If material is found, who is responsible for abatement and for the related schedule impact? Are moisture and alkalinity test results available?\nAsbestos and lead testing is completed at all sites. VA ensures the proper personnel are in place for abatement. \nBPA terms, schedule and labor\nOrder limits. Section B.9 leaves the per-order limit and the ceiling amount blank. Please provide both, any minimum guarantee, the expected number and typical size of orders per year, and the typical lead time between an order and the start of work.\nThe Government estimates, but does not guarantee, that individual BPA Orders placed against this Agreement may reach $1,500,000.00/per Order. This Order Limit may be increased by mutual agreement of the parties as necessary, in whole or part.Â  The authorized Ceiling Limit of the Agreement is set at $6,000,000.00 over the period covered by the Agreement; this ceiling is also not a guarantee.Â  The Ceiling Limit may also be raised in association with order Limit increases or other conditions which, by mutual agreement of the parties, maybe considered necessary.Â  Authorization for individual Task Orders above the stated Task Order and/or Ceiling Limits must be coordinated through the Contracting Officer before larger valued orders can be issued and prior to commencement of work.Â  All unauthorized work, regardless of amount, will be processed through the ratification process.Â \n\nPeriod of performance. Section B.10 shows a base period of 09-01-2026 through 08-31-2027, and B.2 shows the BPA dates as TBD. Please confirm the revised base and option period dates, given the November 18 quote date. The Installation of Sheet Vinyl line shows a POP end date of 08-16-2027 while other lines show 08-31-2027. Please confirm which date applies.\nTime frame of contract award Base Year December 1, 2026 to November 30, 2027 plus 4 option renewal years\nWage determination. The attached wage determination is dated 7-22-2026 and is titled Baltimore. Does it apply to all three sites, including Perry Point (Cecil County)? Please confirm whether it is a Service Contract Labor Standards or a Davis-Bacon determination.\nWage Determination for Baltimore and Cecil County are attached\nService Contract Labor Standards\nWorking in occupied facilities. Please describe the requirements for working hours, after-hours and weekend work, infection control (ICRA) and phasing, badging and escorts, material staging and storage areas, and loading and elevator access at each site. Who moves furniture and equipment that is not covered by the Furniture Lift line?\nThe work hours are reflected in the RFQ. The VA observes all national holidays. After work hours are on a case by case and determined by the needs of the service.\n\n CLINs x007 \"Epoxy Flooring; Color TBD\" (B.10): is there a required epoxy system type (e.g., self-leveling, broadcast/slurry, mortar, or flake), minimum thickness, and performance criteria? \nThis will be determined prior to the project of any installations-as epoxy will not be a regular material used.\nFor epoxy areas, who is responsible for concrete moisture/RH and pH testing (ASTM F2170 / F1869)? If readings exceed the system's limits, is moisture mitigation priced under CLIN x009 or handled by task-order modification?\nhandled by task-order modification\n\n VAAR 852.219-75 (pp. 55-56) has no box checked. Which limitation on subcontracting applies: services (50%) or special trade construction (75%)? Please confirm that the cost of materials is excluded. Also, will 852.219-73(e) be measured by base/option period or per order?\nServices (50%)\n852.219-73(e) will be measured by base/option period. \n14. Does a Buy American requirement (FAR 52.225-1 or 52.225-9) apply to materials? The SF1449 says 52.212-5 is attached, but its text isn't in the posted RFQ.\n\n52.225-1 or 52.225-9 is not listed on the RFQ \n52.212-5 is not checked on the SF1449   therefore text would not be posted\n\n\n15.  E.3 (p.61) says award will be LPTA, but E.8 (p.65) says best value with technical, past performance, and price. Which governs? Also, what are the per-order limit and BPA ceiling in B.9, which are left blank (p.8)?\nRefer to question #7   Order Limits\n\n16. Carpet tile. Please provide the manufacturer, collection and product name, style number, color name and number, tile dimensions, fiber and construction, backing, installation pattern, and approved adhesive. Please confirm whether carpet material is contractor-furnished and identify the applicable material supply line.\nCarpet tile Spec: Tarkett Carpet Tile Hidden Arbor and Sweater Knit 24x24 color TBD\n17. LVT. Please provide the complete specification for the listed Tarkett Contour Series 6 by 48 inch LVT, including exact collection and product number, color name and number, overall thickness, wear-layer thickness, backing, finish, installation method, and approved adhesive. Please clarify how the separately listed Tarkett Adapt, Woodlot Holly Oak relates to this scope.\nThis will be determined prior to installation.\n18. Sheet vinyl. Please provide the manufacturer, collection and product name, product number, color name and number, homogeneous or heterogeneous construction, thickness, backing, roll width, finish, and approved adhesive. Please include the compatible weld rod, heat-welding requirements, flash-cove height, cove former, cap, and corner details.\nPlease provide product data sheets and identify any different product or color selections by facility or area.\nSheet vinyl spec: Tarkett IQ Optima Sheet Goods\n19. Please provide the required wall-base and transition specifications, including manufacturer, product, material, dimensions, profile, and color or finish. Please identify the required transitions between new flooring, existing finishes, and different flooring types.\nContractor will determine optimal wall transitions based on the project requirement, as the SME (subject matter expert).\n21. During the walkthroughs, we understood that all furniture moving would be performed in-house by the VA. Please confirm that the VA will clear furniture, contents, and equipment before work begins and return them after the required curing period, including any necessary disconnects and reconnects. \nPlease clarify whether Item 0012, \nFurniture Lift, remains applicable.\n22. Please confirm that LVT and sheet-vinyl work areas will be fully cleared and remain clear through installation and required curing, rather than requiring piecemeal installation around furniture.\nLVT and sheet-vinyl work areas will be fully cleared and remain clear through installation\n23. Please confirm whether the VA will provide dumpsters and pay disposal charges at each facility. Please identify the designated disposal locations and confirm whether the contractor is responsible for transporting demolition debris to onsite containers or for offsite hauling and disposal as well.\nThe VA has dumpsters for disposal at each site.  \n24. Please confirm whether temporary dust partitions, negative-air equipment, and associated monitoring will be provided by the VA or contractor. Please provide the required barrier-system specifications and applicable infection-control requirements, including responsibility for setup, maintenance, relocation, removal, and inspection.\nContractor is responsible for providing all ICRA/PICRA materials. To include materials required for wall barriers when required (Level 3 or 4). Contractors are expected to provide materials and construct the wall barriers required.\nNegative air pressure machine will be provided by the VA if needed.\n25. Please identify the VA representative responsible for coordinating room availability, occupant relocation, access, and infection-control approvals. Please confirm whether each released area will remain continuously available through demolition, preparation, installation, and required curing. Please identify any daily reopening requirements and who authorizes reopening.\nThe COR or Interior Designer will provide all necessary coordination for all projects. Contractor is not responsible for the opening of any room. \n26. Please reconcile the listed 7:00 a.m. and 7:30 a.m. start times and confirm normal working hours. Please identify any locations or activities that must be performed during evenings, nights, weekends, or holidays.\nAny work after hours will be coordinated prior to any installations. This will be determined by the needs of the applicable service.\n\n27. Reference: B.11 Scope, p. 26; B.5(c), p. 6.\nThe SOW requires a project manager or project designer and an installation foreman onsite. For each task order, please identify the required supervisory positions, minimum qualifications, approval submittals, and hours of physical presence. Must a superintendent or project manager be a direct employee of the prime, and must that person remain onsite whenever subcontractors work? \nEach task order will require a designer or project manager to monitor progress and ensure standards are in place. They will be a minimum of COR Level 1 certified. They are required to be onsite at time of the installation. There is no physical amount of time for this requirement, as each project varies. \nA qualified installation foreman may of course also be present but the VA will require a designer/COR level 1 employee to monitor project. \nNo-- Where projects possibly  run concurrently, each project will have it s own designer/project manager.\n\n28. Reference: B.11 Safety and Security Precautions and Personnel Qualifications, p. 28; B.6(a), p. 6.\nPlease identify whether each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative beyond the onsite personnel identified on page 26. Specify prime-employment requirements, certifications, experience, full-time coverage, and whether one qualified person may combine these roles with superintendent or foreman duties.\n\nEach task order will require it s own safety personnel, each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative based on the needs of the project. Each project may have it s own requirements (i.e patient care areas etc.)\n\n29. Identify the applicable safety/QC specifications, any EM 385-1-1 requirements and edition, required plans and daily reports, and whether staffing varies with task-order size, location, work shift, or hazard\nlevel.\nContractors are expected to comply with OSHA standards. \nNo-the Interior Design staff does not vary based on task orders.\n\n\n\n30. Reference: B.11 Objective and Scope, pp. 25-26.\nBefore pricing and issuance of each task order, who will prepare and approve the Infection Control Risk Assessment (ICRA), any Preconstruction Risk Assessment (PCRA), and the infection-control permit: VA Infection Prevention, the COR, the contractor, or another party? Please provide the applicable forms, assessment matrix, approving officials, and review time. Confirm that the required class, work-area limits, patient risk group, and controls will be identified in the task-order solicitation before its price and schedule are agreed, including orders at Baltimore, Loch Raven, and Perry Point\n\nInterior Design staff will prepare the ICRA & PCRA. ID will coordinate with Infection control for approval of the ICRA & PCRA prior to the start of any project.\nAll ICRA/PCRA requirements are expected to be performed by the contractor. Contractor will be expected to provide necessary materials and the construction of any wall barriers required by ICRA/PCRA.\n\n31. Reference: Site-visit discussion reported by J&G; B.11 Scope, p. 26; Unpacking/Uncrating, p. 27. Our understanding from the site visit is that the Government will remove all furniture before the flooring contractor begins each task order. Please confirm this applies to every order at all three campuses and that the flooring contractor is not required to lift, move, disassemble, store, protect in storage, or reinstall furniture. Clarify responsibility for workstations, beds, file cabinets, appliances, medical equipment, contents, and associated IT/electrical/plumbing disconnections and reconnections.\n\nInterior Design will remove all furniture prior to any installation. However, there may be an instant where some furniture may need to be moved/prior. Contractor will not be responsible for the removal of any medical equipment. Equipment or medical items will be removed by VA personnel/Biomed.  \n\n32. Confirm that the Government will deliver cleared work areas and keep them clear through installation and required curing and identify the procedure if an area is not ready as scheduled.\nID will ensure areas are cleared and remain clear through installation.\n\n33. Reference: B.10, CLINs 0008 and 0012 and corresponding option CLINs, pp. 10-23; E.3, pp. 61-62.CLIN 0012 includes 30,778 SY of Furniture Lift in occupied spaces, repeated in CLINs 1012, 2012,3012, and 4012. This appears inconsistent with the site-visit direction that the Government will remove furniture. Will these CLINs be deleted from the schedule and evaluated price? If retained, define the exact exceptional scope and when it may be ordered, and issue uniform instructions on whether bidders must quote a rate, enter zero, or use another designation. Please confirm that pricing these lines does not place furniture moving in the flooring installation rates or authorize it without an applicable order.\n\nID will ensure furniture is removed from the space prior to installation. However, if there is an instance where furniture must be removed by the contractor-it will be priced accordingly.  \n\n34. Reference: B.11 Scope, p. 26; Debris, p. 27; B.10, CLIN 0009 and option equivalents.\nThe SOW assigns removal and disposal to the contractor but directs debris to VA-provided dumpsters and a scrap cage. For each campus, confirm whether the Government provides containers, hauling, and final disposal at no charge for all nonhazardous carpet, carpet tile, pad, LVT/VCT, sheet flooring, epoxy debris, cove base, adhesive/mastic scrapings, underlayment, and floor-preparation waste. Identify prohibited materials, volume or weight limits, and any offsite disposal the contractor must price. Please state whether disposal labor is paid through the demolition CLIN or installation rates, so it is included once, and define payment for required contractor hauling and tipping fees.\n\nThe VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard.\n\n35. Reference: B.11 Debris, p. 27; Safety and Security Precautions, p. 28.\nPlease identify the approved debris routes, loading points, dumpster/scrap-cage locations, and cardboard recycling locations at each campus. Specify covered or sealed carts, bagging, elevator restrictions, daily removal, cleanup, and container exchange requirements. \n\nThe VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard.\n\n36. Are carpet take-back, flooring recycling, minimum diversion percentages, waste plans, weight tickets, or disposal receipts required? \nNo, they are not required\n\n37. Identify responsibility for overflow or un37available VA containers and any required contractor roll-off permits or containment. Where hazardous or contaminated waste is expressly included in an order, provide separate segregation, manifest, transporter, disposal-facility, and generator-signature responsibilities; confirm such waste may not enter the ordinary VA dumpsters.\n\nThere are no hazardous materials areas specified for flooring installations. \n\n38. Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28.\nFor each campus and task order, please identify required contractor site facilities, including a field Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28. For each campus and task order, please identify required contractor site facilities, including a field office or trailer, superintendent/QC workspace, meeting area, storage container, portable toilets, handwashing facilities, and temporary lighting or ventilation. \n\nNo. The VA will not provide storage containers, portable toilets, and temporary lighting or ventilation. Handwashing facilities are located in the restrooms in all facilities, all sites, all campuses.\n\nNo temporary facilities will be provided.\n\n 39. Reference: B.11 Scope, p. 26; Equipment and Tools and Work Areas, p. 28; Installation, p. 29. The SOW requires contractor storage, directs installation from shipments and warehouse stock, and requires removal of tools when the contractor leaves. Please identify available secure, conditioned storage and acclimation areas at each campus, including space for flooring, adhesives, and hazardous products. May approved tools, containment equipment, and materials remain secured onsite overnight or between phases? \n\nThere will be no storage provided for contractors. \n\n40. If daily removal is required, confirm the limits and available loading access.\nIdentify responsibility for material receipt, inventory, room tagging, double handling, damaged Government stock, and maintaining manufacturer-required temperature and humidity during storage, acclimation, installation, and cure.\n\nStorage for materials will not be provided-other than the immediate area within the project area. This will be included in the scope of the project.\n\n41. Reference: B.11, pp. 25-30; Baltimore floor plans and campus visitor maps; Amendment #3 site-visit notice. The furnished maps identify visitor services and campus locations rather than dimensioned flooring work limits. Before each task-order quote, will the Government provide marked plans identifying buildings, rooms, areas, existing and new flooring, demolition limits, and phasing? \n\nYes prior to the start of any project, the VA/COR will provide building location, room information and floor plans with applicable dimensions to reference. \n\n42. Confirm field measurement access before pricing. Identify contractor entrances, loading docks, freight elevators and reservations, floor-load limits, haul distances, escort requirements, and delivery/parking arrangements at all three campuses. \n\nYes measurements will be provided to the contractor prior to the start of each project.\n\n43. Clarify the Loch Raven buildings covered by the BPA, including the Alameda\nclinic versus the broader Loch Raven campus, and any access restrictions caused by ongoing construction.\n\nAll buildings located on the Loch Raven campus are included in the BPA. Ongoing construction will be assessed for access, determined by the current activities.\n\n44. Reference: B.11 Scope, p. 26; B.10, pp. 9-24.\nThe SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and 120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF. \n\nCorrect the figure should reflect 800,000 SY instead of SF. This a rough estimate, of the exact amount of flooring that needs changed it will change over time. \n\n45. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping supply-only quantities, and confirm the quantities controlling price evaluation and ordering. Reference: B.11 Scope, p. 26; B.10, pp. 9-24.\n\nThe 3.5 total is an educated estimate. As we will now know exactly how much flooring we will utilize each year.\n\n\n46. The SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF. Separately, the annual scheduled flooring product/system quantities total 310,000 SF if CLINs 0001, 0003, 0006, and 0007 are distinct. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping or supply-only quantities and confirm the quantities controlling price evaluation and ordering.\n\nThe total 3.5 is over the base plus 4 years. It is an estimate of 700k for each year. As we do not know exactly how much we will use each year funds or materials.\n\n47. Reference: B.10, CLINs 0003 and 0013 and corresponding option CLINs, pp. 9-23.\nSheet-vinyl material is listed at 3,000 SF, equivalent to 27,000 SF, while sheet-vinyl installation is listed at 9,000 SF in each year. Please confirm whether material quantity should be 1,000 SY, and the installation quantity should be 27,000 SF. \n\nCorrect-the material quantity should be 1,000 SY, installation quantity should be 27,000 SF\n\n48. Reference: B.10, CLIN 0009 and option equivalents, pp. 10-23; B.11 Scope, p. 26.\nCLIN 0009 includes 30,778 SY, equivalent to 277,002 SF, for General Demolition, Floor Leveling and Smoothing. Please identify the flooring types, number of existing layers, adhesive removal method, and substrate conditions included in this rate. Is it payable only where demolition is ordered,separately from installation, including Government-furnished material installations? \nEach flooring type may be different. Most areas are being replaced with carpet/tiles\n\nThe spaces can include and are not limited to cove-base removal, bonded epoxy removal, mechanical grinding, and underlayment removal are included or separately priced. \nUnderlayment are line items and priced within the task order. \n\n49. Reference: B.10, CLINs 0001-0015 and option equivalents, pp. 9-24; B.11 Scope, p. 26.\nPlease provide a CLIN inclusion matrix defining material-only, labor-only, and furnish-and-install items. In particular, identify the material paired with carpet installation 0008; confirm the relationship of LVT 0006 to installation 0011 and sheet vinyl 0003 to installation 0013; and define whether epoxy 0007 is a complete installed system. Identify where freight, adhesive, fasteners, demolition/disposal, skim coat, protection, transitions, supervision, and final cleaning belong. The SOW says pricing includes demolition and preparation, while CLIN 0009 prices them separately; please establish a\nconsistent method that avoids either duplication or unpaid scope. \n\nEach task order will price materials required prior to the installation. This will be determined by the scope each project.\n\n\n50. Reference: B.6, pp. 6-7; B.9, p. 8; B.10, pp. 9-24; B.11 Ordering Procedures, p. 27.\nOrders may vary from small to large, but the schedule has no separate mobilization, supervision, ICRA, temporary-facility, testing, or hazardous-material line items. \n\nEach project has its own needs and is specific to requirements and will be priced accordingly i.e ICRA requirements.\nThe VA will not provide any temporary facility or storage.\n\n51. Please identify any minimum task order size or charge and the expected order-size range and frequency. \n\nNo--there is no minimum task order size.\n\nReference: B.10, pp. 9-24; B.11 Ordering Procedures and Performance Monitoring, pp. 27-29.Please define the measurement and payment basis for each unit. Are flooring quantities net installed area, gross room area, or purchased material including cutting waste, pattern match, attic stock, and full-carton/roll rounding?\n\n52. It is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided.  The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals.\n53. Reference: B.10, CLINs 0001, 0003, 0006, 0008 and 0011, pp. 9-11; B.11 Scope, p. 26.\nPlease provide complete specifications and current product identifiers for Tarkett Adapt/Woodlot Holly Oak, sheet vinyl, and Contour 6-by-48-inch LVT. Confirm the product category paired with carpet installation and whether VCT, although named in installation CLIN 0011, is Governmentfurnished or requires another supply item. Specify thickness, wear layer/backing, dimensions, performance and fire/smoke criteria, slip resistance, chemical resistance, approved adhesives, colors,and required installer qualifications. Are named products mandatory or are approved equals permitted?\n\nAll Tarkett materials and specs have been provided. There are no substitutions for Tarkett materials. \n\n\n54. Reference: B.10, CLIN 0007 and option equivalents, pp. 10-22; B.11 Scope, p. 26.\nFor the 15,000 SF annual epoxy item, please identify the required system, manufacturer or\nperformance basis, total thickness, primer, body coats, aggregate, topcoat, finish, and slip/chemicalresistance criteria. \n\nThe epoxy will be used seldom-therefore it will be specified/determined upon each task order.\nWhen used, it will include removal, repairs and all necessary actions to install. \n\n55. Reference: B.10, CLINs 0002, 0004, 0005 and option equivalents, pp. 9-23.\nPlease confirm that one CO for each adhesive means one complete four-gallon pail, and define one EA of weld rod by diameter and length per spool. Verify the annual quantities of 18 C-EX pails, 195 Roll Smart pails, and 15 weld-rod units against the corrected product quantities and manufacturer coverage, including which adhesive serves each flooring product and where LVT adhesive is priced. Are these quantities fixed evaluation estimates, actual consumable quantities, or allowances? \n\nIt is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided.  The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals.\n\n56. Identify whether residual adhesive/rod remains Government property and how additional manufacturer-required consumption is authorized and paid.\n\nAny unused materials will be government property. Any unusable material may be disposed of.\n\n57. transitions without a separate CLIN. For 1,600 FT of heat welding and 50 FT of Flash Cove and Corners, define seam requirements, cove height, cove former, cap strip, and inside/outside corner details. Should corners be measured individually rather than by FT, and are weld rod and flash-cove accessories furnished under these rates or other CLINs?\n\nMeasurements and methods are to be determined by the contractor for efficiency of materials and labor.\n\n\n58. Reference: B.11 Scope, p. 26; B.10, CLIN 0009 and option equivalents.\nPlease define the quantitative limits of minor preparation/skim coat included in the rates, including maximum depth, average thickness, coverage percentage, flatness tolerance, and required adhesiveresidue removal. \n\nThe VA cannot determine such rare instances pre-maturely.\n\n59. Distinguish routine patching from self-leveling underlayment, deep fills, failed substrate removal, structural repairs, crack repair, joint treatment, and replacement of deteriorated\nwood or gypsum underlayment. \n\nMeasurements and methods are to be determined by the contractor for efficiency of materials and labor. \n\n60. Will each task order identify known repairs before pricing? \n\nYes, each task order will identify known repairs before pricing\n\n61. Establish separate measurable items or another approved pricing mechanism for concealed deterioration or preparation exceeding the defined limits after demolition.\n\nThis will be determined before installation and will be included in pricing.\n\n62. Reference: B.11 Objective and Scope, pp. 25-26; Installation, p. 29.\nWho performs and pays for substrate moisture, relative-humidity, pH, adhesion, and other\nmanufacturer-required testing on each task order, and what standards, frequency, and acceptance limits apply? \n\nIf spaces are identified with moisture issues, the VA will identify these instances prior if needed and make determining factors to rectify prior to installation. \n\n63. Reference: B.11 Scope, p. 26; Installation, p. 29; C.1(b), p. 31.\nPlease identify required product data, room layouts, samples, mockups, installer credentials, shop\ndrawings, and approval periods for each task order. For flooring supplied from Government warehouse\nstock, identify who verifies condition, quantity, compatibility, batch/shade, and warranty eligibility\nSpecify required contractor workmanship and manufacturer warranties, their\nduration and commencement, and responsibility for defects in Government-furnished products or preexisting substrate conditions. Identify whether attic stock, maintenance instructions, product/lot records, manufacturer inspections, or warranty registrations are required and the CLIN covering these deliverables.\n\nManufacture warranties will apply to all installations. \n\n64. Reference: B.11, pp. 25-29; furnished campus maps and Baltimore floor plans.\nBefore each task order is priced, will the Government define the number and size of phases, room vacancy windows, sequencing, and maximum area that may remain out of service? \n\nYes, it will be defined\n\n65. Please identify any daily requirement to reopen rooms or corridors, remove/rebuild containment, install temporary walking surfaces, or protect uncured flooring. Confirm responsibility for patient/staff relocation,clinical shutdowns, alternate egress, fire-alarm/HVAC coordination, permits, and after-hours escorts.\n\nRe-opening of rooms is the responsibility of VA personnel and the subject matter experts i.e the COR, Infection control, safety etc.\n\n66. Establish the process for Government-directed resequencing and additional mobilizations when rooms cannot be released together or operations interrupt the approved installation/cure sequence.\n\nVA/COR will determine.\n\n67. Reference: B.7, p. 7; B.11 Contractor Responsibilities, p. 27; Installation and Overtime, pp. 29-30.\nThe SOW gives a 7:30 a.m. start on page 27 and a 7:00 a.m. installation start on page 29, with occasional evening/weekend work. Please confirm the normal shift, billable/productive hours, delivery windows, and the portion of work bidders must assume occurs after hours. \n\nRegular Hours are defined in the RFQ.\nAfter hours will be rare and determined based on the service needs. Quoted prior to installation.\n\n68. How are premium shifts,\novertime, weekend/holiday work, and repeated short shifts priced when the schedule has no premiumrate\nitems? Clarify the daily/seventh-day overtime wording on page 30 and the required written\napproval authority, including reconciliation of service-chief approval with CO authorization for additional price or holiday work.\n\nCOR will coordinate work overtime with service chief prior to installation.\n\n69. Clarify how a task order issued near year-end is completed and which rates apply when performance spans an option boundary or a Government-directed delay\n\nIssued by CO   Firm Fixed Price\n\n70. Reference: B.9 Authorized Limits, p. 8; B.11, pp. 25-27.\nThe BPA order limit and overall ceiling are blank, and the SOW anticipates emergent failures. Please provide the intended per-order limit, BPA ceiling, anticipated annual spending/order count, typical order size, and any minimum purchase commitment. What maximum number of simultaneous task orders, sites, and shifts must the contractor support? Define routine and emergency response times, estimating turnaround, start/completion requirements, and whether emergency standby or priority\nservice must be included in standard rates. Clarify whether the listed annual quantities are evaluation estimates only and whether no minimum work volume is guaranteed.\n\nEstimates only. The VA cannot determine such rare occurrences pre-maturely.\n\n71. Reference: C.2, pp. 37-38; D.1, p. 58; attached Wage Determination 2015-4265, Revision 33, pp. 1-7.The RFQ incorporates Service Contract Labor Standards and attaches WD 2015-4265, Revision 33, dated May 13, 2026. Please confirm the applicable labor-standard treatment for flooring demolition, preparation, replacement, and installation, including any construction wage determination required for particular orders. Identify the governing determination and revision for each campus; the attached locality list does not identify Cecil County for Perry Point. Clarify required classifications for resilient flooring, carpet, epoxy/coating, demolition/preparation, and hazardous-material work; the conformance procedure for unlisted work; applicable fringe benefits; and required payroll reporting.Please issue all governing determinations before final pricing.\n\nPlease refer to the Wage Determination for Baltimore and Cecil County\n\n72. Bidders must quote the base and four option years. Please clarify whether each year has independently proposed fixed unit rates and how incorporated wage/fringe adjustment provisions will be applied without duplicating escalation already priced. Identify the effective wage-determination revision for each period, required supporting documentation, notice deadlines, and treatment of orders spanning periods. Are any material-price, freight, tariff, or product-discontinuation adjustments permitted during a period, or must those risks be covered entirely in the quoted annual rates? \n\nFirm Fixed pricing/ those risks must be covered entirely in the quoted annual rates \n\n73. Define how approved substitute flooring systems are priced if the listed product becomes unavailable during the BPA.\n\nNo substitutions\n\n74. Reference: C.7-C.8, pp. 40-41; B.9, p. 8.\nC.8 leaves the general-liability and automobile-liability amounts blank and requires general-liability coverage without an asbestos exclusion before award. \n\nCannot be determined as this will be a case by case occurrence.\n\n75. Please provide all required limits and endorsements and explain whether the asbestos provision applies when testing/abatement is performed by a separate Government contractor. \n\nYes, asbestos provision applies when testing/abatement is performed by a separate Government contractor.\n\n80. Identify any required pollution/professional coverage and whether approved specialty-subcontractor coverage satisfies any portion. Please also confirm whether bid, payment, performance bonds, or other payment protection will be required at BPA award or by individual task order, the applicable order thresholds, and how associated premiums are to be priced.\n\nContractor is expected to maintain all applicable insurance coverages.\n\n81. Confirm whether compliance is measured separately for each task order or over the base and each option period. \n\nCompliance is required on all task orders. \n\nDoes the latest solicitation remain a Service-Disabled Veteran-Owned Small Business set-aside, or has it been revised to unrestricted/full-and-open competition? The public notices and third-party listings appear inconsistent.\nCorrect it is a Service-Disabled Veteran-Owned Small Business set-aside,\nWere the October 20 21 site visits mandatory for quotation eligibility, or may a contractor that did not attend still quote based on the published documents?\nOne member of the desired contracting bidder must have attended the walk-thru\nMay a prime contractor use qualified flooring subcontractors for portions of the work, provided it quotes and manages all three VA locations and meets all applicable limitations on subcontracting?\nContractors must meet all requirements for all three sites.","origin":"detail"},"contacts":[{"name":"charles.willis@va.gov","role":"primary","email":"Charles.Willis@va.gov","phone":"410-691-1328","title":"CHARLES WILLIS"}],"place_of_performance":null,"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"naics_codes":["238330"],"award":{"awardee":{}},"attachments":[{"resource_id":"767c1fb154c5499e83275d5475e378d7","name":"36C24526Q0637 0001_2.docx","kind":"file","mime_type":".docx","size_bytes":18032,"posted_at":"2026-09-16T21:07:46.210Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/767c1fb154c5499e83275d5475e378d7/download","mirrored":false},{"resource_id":"5e9da1318d9b437a897a91a9e994cc89","name":"36C24526Q0637_1.docx","kind":"file","mime_type":".docx","size_bytes":16407,"posted_at":"2026-08-07T20:26:57.057Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5e9da1318d9b437a897a91a9e994cc89/download","mirrored":false},{"resource_id":"43a16134ac474dd2ab3cc9ebf3d12dbc","name":"LR_VAMC_Visitor-Map Guide.pdf","kind":"file","mime_type":".pdf","size_bytes":3577204,"posted_at":"2026-09-16T21:07:46.210Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/43a16134ac474dd2ab3cc9ebf3d12dbc/download","mirrored":false},{"resource_id":"3bbbee6ff6354d76b5bedd97cf8aaefc","name":"Baltimore VAMC Directions and Map.pdf","kind":"file","mime_type":".pdf","size_bytes":170460,"posted_at":"2026-09-16T21:07:46.210Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3bbbee6ff6354d76b5bedd97cf8aaefc/download","mirrored":false},{"resource_id":"80aeeea11ae14e51b4c8d985ac5ba0c5","name":"PP Visitor-Map_guide.pdf","kind":"file","mime_type":".pdf","size_bytes":3033988,"posted_at":"2026-09-16T21:07:46.210Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/80aeeea11ae14e51b4c8d985ac5ba0c5/download","mirrored":false},{"resource_id":"fb4967564e274062a6b7b4b184d657a5","name":"Baltmire VA floor plans.pdf","kind":"file","mime_type":".pdf","size_bytes":534988,"posted_at":"2026-09-16T21:07:46.210Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fb4967564e274062a6b7b4b184d657a5/download","mirrored":false},{"resource_id":"9ca95fd03df745298a17f3501dc90fe2","name":"36C24526Q0637 0001_3.docx","kind":"file","mime_type":".docx","size_bytes":34648,"posted_at":"2026-11-10T22:39:19.417Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9ca95fd03df745298a17f3501dc90fe2/download","mirrored":false},{"resource_id":"e27c1b232cc442cf8717b45bd9ce5732","name":"Additional Information to Solicitation 36C24526Q0637.docx","kind":"file","mime_type":".docx","size_bytes":22818,"posted_at":"2026-11-10T22:39:19.417Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e27c1b232cc442cf8717b45bd9ce5732/download","mirrored":false},{"resource_id":"8f40e6e3be9d4d12b5c620e2626b15f8","name":"Cecil County Wage Determination.pdf","kind":"file","mime_type":".pdf","size_bytes":4374489,"posted_at":"2026-11-10T22:39:19.417Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8f40e6e3be9d4d12b5c620e2626b15f8/download","mirrored":false},{"resource_id":"52b8f9a54ed648eeb95c3591ddb8c47d","name":"Baltimore Wage Determination.pdf","kind":"file","mime_type":".pdf","size_bytes":4290890,"posted_at":"2026-11-10T22:39:19.417Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/52b8f9a54ed648eeb95c3591ddb8c47d/download","mirrored":false}],"awards":[],"related":[{"key":"36C24527Q0070","latest_notice_id":"b0b1581a6a1441b9a46d407375bc44d0","title":"6550--FLOW CYTOMETERY REAGENTS AND SUPPLIES (VA-27-00016081) |","solicitation_number":"36C24527Q0070","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"325413","psc":"6550","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T00:57:17.217280Z"},{"key":"36C24527Q0061","latest_notice_id":"0db5662de5914b458655bed9898980cf","title":"J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT","solicitation_number":"36C24527Q0061","notice_type":"o","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-18","notices":3,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561210","psc":"J065","set_aside":"SBA","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24527Q0081","latest_notice_id":"77e2cd670c3040a6ad2a1fc44daa2bc5","title":"DJ10--Alertus Enhanced Notification Licensing & Premier Support","solicitation_number":"36C24527Q0081","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541519","psc":"DJ10","set_aside":null,"state":"WV","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"SOFTWARE LICENSING AND SUPPORT MARTINSBURG VA MEDICAL CENTER","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C24527Q0073","latest_notice_id":"6ce8b040a9be44d0972b338bc7b6cf88","title":"Arc Flash Hazard Analysis Services","solicitation_number":"36C24527Q0073","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"334515","psc":"6625","set_aside":null,"state":"WV","county":"54033","county_name":"Harrison County","city":"5415628","city_name":"Clarksburg","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24527Q0076","latest_notice_id":"9c0733493507403293e3d1367a3d19b5","title":"6530--MILITARY LITTERS, STANDS AND CARTS","solicitation_number":"36C24527Q0076","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":2,"due_at":"2026-12-02T17:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"337127","psc":"6530","set_aside":null,"state":"WV","county":"54037","county_name":"Jefferson County","city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":"sam_zip","state_evidence":"25430","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"}],"similar_open":[{"key":"FA500027Q0003","latest_notice_id":"74cbaf3f9739463a836b2373a404e841","title":"Carpet Replacement Building 606","solicitation_number":"FA500027Q0003","notice_type":"k","first_type":"k","first_posted":"2026-11-19","last_posted":"2026-11-24","notices":3,"due_at":"2026-11-30T21:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA5000","office_name":"FA5000 673 CONS PKB","naics":"238330","psc":"7220","set_aside":"SBA","state":"AK","county":"02020","county_name":"Anchorage Municipality","city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"124PCA27Q0008","latest_notice_id":"edaec52edc34480c8b49cb3f55572967","title":"MSB Lab Floor Coating Repairs","solicitation_number":"124PCA27Q0008","notice_type":"k","first_type":"k","first_posted":"2026-11-09","last_posted":"2026-11-23","notices":5,"due_at":"2026-12-01T12:30:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T12:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12H2","sub_name":"AGRICULTURAL RESEARCH SERVICE","office_key":"o-1232SA","office_name":"USDA ARS AFM APD","naics":"238330","psc":"Z2AA","set_aside":null,"state":"PA","county":"42091","county_name":"Montgomery County","city":"4229808","city_name":"Glenside","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C26026Q0827","latest_notice_id":"89863b96a0e4443fa90c8586e3e2c5b1","title":"Grout Maintenance for the Puget Sound VA","solicitation_number":"36C26026Q0827","notice_type":"o","first_type":"o","first_posted":"2026-10-22","last_posted":"2026-11-20","notices":4,"due_at":"2026-12-02T18:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C260","office_name":"260-NETWORK CONTRACT OFFICE 20 (36C260)","naics":"238330","psc":"S119","set_aside":"SBA","state":"WA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":"site","state_evidence":"OUT MAINTENANCE FOR THE SEATTLE AND AMERICAN LAKE","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":12,"indexable":true}