{"canonical":"https://sealedbidder.com/opportunities/36c24526q0514","key":"36C24526Q0514","url":"https://sealedbidder.com/opportunities/36c24526q0514","title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","solicitation_number":"36C24526Q0514","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-05-18T12:00:00Z","first_posted":"2026-05-11","last_posted":"2026-05-11","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561210","psc":"J045","set_aside":"SBA","place_state":"MD","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"24510","place_county_name":"City of Baltimore","place_city":"2404000","place_city_name":"Baltimore","winner":null,"award_amount":null,"publications":[{"notice_id":"37fc7d8438a64e59884f8e96b3a47cab","title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","solicitation_number":"36C24526Q0514","notice_type":"o","base_type":"r","posted":"2026-05-11","posted_at":"2026-05-11T18:33:08.744Z","due_at":"2026-05-18T12:00:00Z","due_date":"2026-05-18","cancelled":false,"archived":true,"archive_date":"2026-06-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/37fc7d8438a64e59884f8e96b3a47cab/view","enriched":true,"history":[{"index":6,"title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-11T18:33:08.744Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"37fc7d8438a64e59884f8e96b3a47cab","solicitation_number":"36C24526Q0514","related_opportunity_id":"830083b55e284b2e9050b675ad6efa04"},{"index":4,"title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-11T18:24:47.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"830083b55e284b2e9050b675ad6efa04","solicitation_number":"36C24526Q0514"}]},{"notice_id":"830083b55e284b2e9050b675ad6efa04","title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","solicitation_number":"36C24526Q0514","notice_type":"r","base_type":"r","posted":"2026-05-11","posted_at":"2026-05-11T18:24:47.307Z","due_at":"2026-05-18T12:00:00Z","due_date":"2026-05-18","cancelled":false,"archived":true,"archive_date":"2026-06-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/830083b55e284b2e9050b675ad6efa04/view","enriched":true,"history":[{"index":6,"title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-11T18:33:08.744Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"37fc7d8438a64e59884f8e96b3a47cab","solicitation_number":"36C24526Q0514","related_opportunity_id":"830083b55e284b2e9050b675ad6efa04"},{"index":4,"title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-11T18:24:47.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"830083b55e284b2e9050b675ad6efa04","solicitation_number":"36C24526Q0514"}]}],"latest_notice_id":"830083b55e284b2e9050b675ad6efa04","first_type":"o","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-05-11","posted_at":"2026-05-11T18:33:08.744Z","created_at":"2026-05-11T18:33:06.521Z","modified_at":"2026-06-18T03:55:44.622Z","response_deadline":{"raw":"2026-05-18T08:00:00-04:00","utc":"2026-05-18T12:00:00Z","date":"2026-05-18","time":"08:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/37fc7d8438a64e59884f8e96b3a47cab/view"},"naics":{"codes":["561210"],"primary":"561210"},"title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_id":"100173468","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-17","archive_type":"auto_custom"},"history":[{"index":6,"title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-11T18:33:08.744Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"37fc7d8438a64e59884f8e96b3a47cab","solicitation_number":"36C24526Q0514","related_opportunity_id":"830083b55e284b2e9050b675ad6efa04"},{"index":4,"title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-11T18:24:47.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"830083b55e284b2e9050b675ad6efa04","solicitation_number":"36C24526Q0514"}],"contacts":[{"name":"Keysha Gorman","role":"primary","email":"Keysha.Gorman74@va.gov","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"37fc7d8438a64e59884f8e96b3a47cab","lineage_id":"830083b55e284b2e9050b675ad6efa04","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-04T04:35:39.236489616Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"116d1e9c01c0b61cdb34b10499cf5298b254acf12ecae56a42c1619fc19daebe","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-04T04:35:39.236489616Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"STATEMENT OF WORK  |  HVAC / DX PM Services   41 Units  |  LAJ VAMC  |  Document No. LAJ-ENG-SOW-HVAC-PM-2026-001 Rev.1 FOR OFFICIAL USE ONLY   PRE-AWARD SENSITIVE\nPage 1 Deputy Chief Engineer   LAJ VAMC Facilities Management  |  Rev. March 2026  |  v4.0\n\nSTATEMENT OF WORK  &  IGCE\nPreventive Maintenance & Cleaning   41 DX HVAC Units  |  IAW Manufacturers' IFU\nMini-Splits     Condensing Units     Packaged RTUs     Precision Cooling / CRAC     Air-Cooled Chillers\nRefrigerants: R-410A Â· R-134A Â· R-22 Â· R-407C Â· R-404A  |  1.5 Ton   ~273 Ton  |  41 Units  |  14 Locations\nRegulatory Baseline: NFPA 70E-2024     NFPA 70B-2023     NFPA 99-2024     ASHRAE 170-2025     ASHRAE 180-2018     TJC EC.02.05.01/.02     VHA Dir. 1028 / 1061(4)     VA PG-18-10 (Rev. 3/1/2024)     EPA AIM Act\n\nDocument No.\nLAJ-ENG-SOW-HVAC-PM-2026-001\nSolicitation #\n[TBD at Award]\nPrepared By\nDeputy Chief Engineer, FMS\nRev. Date\nMarch 2026\nTotal Units\n41 DX Units / 14 Locations\nContract Type\nFFP / T&M NTE / Cost (CLINs)\nPeriod of Perf.\nBase Year + 3 Option Years\nNAICS\n238220   Plumbing, Heating & AC\n \nSECTION 1   PURPOSE, SCOPE & REGULATORY FOUNDATION\n1.1  Purpose\nThis Statement of Work (SOW) establishes performance requirements for a qualified mechanical contractor to provide preventive maintenance (PM), cleaning, inspection, and regulatory-compliance services for forty-one (41) direct expansion (DX) HVAC and refrigeration units at the Louis A. Johnson (LAJ) VA Medical Center, Clarksburg, West Virginia (VISN 5 / NCO 5). The equipment inventory spans 14 locations and ranges in capacity from 1.5-ton ductless mini-splits to a 273-ton York YVAA air-cooled chiller. Services shall be performed in strict accordance with each unit's manufacturer Instructions for Use (IFU), the applicable codes and standards cited in Section 1.2, VHA Directives, VA Technical Information Library (TIL) publications, and The Joint Commission (TJC) Environment of Care requirements. This SOW is performance-based: the Contractor is responsible for achieving the outcomes defined herein and shall exercise professional judgment within the boundaries established by the IFU and applicable standards.\n1.2  Regulatory Foundation   Current Editions (as of Award Date)\nThe Contractor's program shall be governed by the most current editions of all applicable standards. The following hierarchy of authority applies. In cases of conflict, the more stringent requirement governs.\nVA/VHA Directives and VA CFM Technical Information Library (TIL) publications   highest authority for VA medical facilities.\nThe Joint Commission (TJC) Hospital Accreditation Standards   EC.02.05.01 (Utility Systems) and EC.02.05.02 (Water Management Program); non-compliance constitutes a TJC finding reportable to facility leadership.\nNFPA codes and standards   mandatory reference for healthcare occupancies under NFPA 99-2024, NFPA 101-2021, NFPA 110-2022, NFPA 70E-2024, NFPA 70B-2023, NFPA 90A-2024, NFPA 90B-2024.\nASHRAE standards   ASHRAE 170-2025 (ventilation), ASHRAE 180-2018 (HVAC PM), ASHRAE 15-2022 (refrigeration safety), ASHRAE 34-2022 (refrigerant classification), ASHRAE 188-2021 (Legionella risk management).\nEPA regulations   40 CFR Part 82 Subpart F (Section 608), AIM Act / 40 CFR Part 84 (HFC phasedown and Technology Transitions).\nOSHA standards   29 CFR 1910.147 (LOTO), 29 CFR 1910.134 (respiratory protection), 29 CFR 1910 Subpart S (electrical safety).\nManufacturer IFU / O&M manuals   minimum PM task baseline; manufacturer requirements shall not be waived without written COR approval.\n1.3  Objectives\nMaintain all 41 DX units in peak operating condition and full regulatory compliance throughout the period of performance (POP).\nSustain TJC EC.02.05.01 compliance: verify and document ventilation pressure relationships, ACH, filtration efficiency, temperature, and humidity per ASHRAE 170-2025 for all units serving patient-care areas.\nSupport the facility's NFPA 70B-2023 Electrical Maintenance Program (EMP) through proper documentation of all electrical PM findings, Equipment Condition Assessments (ECAs), and corrective actions.\nManage all regulated refrigerants (R-410A, R-134A, R-22, R-407C, R-404A) in full compliance with EPA Section 608 and AIM Act provisions; provide written advisory to COR on any legacy refrigerant unit requiring > 1 lb addition per service visit.\nSupport facility compliance with VHA Directive 1061(4)   Legionella Prevention: inspect, clean, and treat condensate drain systems and humidifier sections of CRAC/precision cooling units at every PM visit.\nDocument all PM activities in the format required by ASHRAE 180-2018, TJC EC.02.05.01, and the facility's Utility Systems Management Plan (USMP).\n1.4  NFPA 70B-2023   Mandatory Electrical Maintenance Program (EMP) Integration\nNFPA 70B-2023 is now a mandatory Standard (not a recommended practice). The 2023 edition converts all 'should' language to 'shall,' requiring facilities to implement a documented Electrical Maintenance Program (EMP). The Contractor's electrical PM tasks under this contract shall align with and contribute to the facility's EMP per Chapter 4 of NFPA 70B-2023.\nContractor shall perform all electrical PM in accordance with NFPA 70B-2023 Chapter 9, Table 9.2.2, using an Equipment Condition Assessment (ECA) that evaluates: (1) physical condition, (2) criticality, and (3) operating environment.\nInfrared (IR) thermography of electrical components is now mandatory per NFPA 70B-2023. Contractor shall perform IR scanning of all compressor contactors, motor control wiring, and disconnect panels at each PM visit, or at minimum annually. IR findings shall be included in PM Service Reports.\nAll electrical PM findings shall be documented in the facility's EMP records system within 5 business days of service.\nSystem studies (short-circuit, coordination, arc flash) are not within scope of this contract but Contractor shall notify COR if any PM finding suggests a deficiency in existing arc flash label accuracy.\n1.5  AIM Act / EPA Refrigerant Compliance   Current Status (as of 2026)\nCRITICAL   AIM Act / 40 CFR Part 84: R-410A new equipment manufacture prohibited effective January 1, 2025 (GWP limit 700 for new comfort cooling). EXISTING systems using R-410A, R-22, R-404A, and R-407C may continue to be SERVICED with original refrigerant throughout useful life. Only reclaimed R-22 and R-404A may be used. R-410A service refrigerant supply is constrained and prices are rising. Contractor shall advise COR in writing if any unit's charge loss trajectory suggests end-of-useful-life within the POP.\nR-22 units (Units 13, 14, 19, 20, 38): Only reclaimed R-22 may be used for service. Contractor shall document supplier and source of all R-22 used. Any addition > 1 lb requires COR notification within 24 hours.\nR-404A (Unit 37) and R-407C (Units 33 36): Both are high-GWP refrigerants under phasedown. Only reclaimed product available for service. COR notification required for any addition.\nR-410A (30 units): Still available for service as reclaimed or newly produced product through the phasedown schedule. Monitor supply cost and availability; report supply constraints to COR.\nR-134A (Unit 39, York YVAA ~273-ton chiller): R-134a is subject to HFC phasedown allowance reductions. Coordinate with York authorized service on reclaimed refrigerant procurement for annual chiller service.\nEPA AIM Act Technology Transitions Rule reconsideration was proposed October 3, 2025. Contractor shall monitor EPA regulatory updates and immediately notify COR of any changes affecting service refrigerant availability.\n \nSECTION 2   EQUIPMENT INVENTORY  (41 Units)\n2.1  Government Furnished Equipment List (GFEL)\nAll 41 units are listed below. Red refrigerant text denotes legacy / AIM Act phasedown refrigerants requiring special handling. Units marked   in Category column require COR notification upon any refrigerant addition. Units marked * in Charge column require verified charge documentation at first PM visit per IFU.\n\n#\nEquipment Name\nModel Number\nSerial Number\nLocation\nRefrig.\nCharge / Capacity\nCategory\n1\nPanasonic\nCU-KE36NKU\n0001351\n7th Floor\nR-410A\n6.5 lbs\nMini-Split / Ductless\n2\nPanasonic\nCU-KE36NKU\n0002251\n7th Floor\nR-410A\n6.5 lbs\nMini-Split / Ductless\n3\nPanasonic\nCU-KE36NKU\n0004851\n7th Floor\nR-410A\n6.5 lbs\nMini-Split / Ductless\n4\nPanasonic\nCU-KE36NKU\n0005551\n7th Floor\nR-410A\n6.5 lbs\nMini-Split / Ductless\n5\nFujitsu\nAOU18RLXFW1\nBPS002868\n6th Floor\nR-410A\n4 lbs 10 oz\nMini-Split / Ductless\n6\nDaikin\nRZR24PVJU\nA002782\n1st Floor\nR-410A\n5.1 lbs\nMini-Split / Ductless\n7\nMitsubishi\nPUZA18NKA7\n82U09519A\nRoof\nR-410A\n4 lbs 14 oz\nMini-Split / Ductless\n8\nMitsubishi\nPUMY-P36NKMU1\n6YU01844A\nRoof\nR-410A\n10 lbs 9 oz\nMini-Split / Ductless\n9\nYork\nYCJD18S41S1HA\nW2F0995365\nBldg 20\nR-410A\n3 lbs 3 oz\nMini-Split / Ductless\n10\nCarrier Puron Unit 1\n38TXA048330\n3203E07364\nBldg 5\nR-410A\n10.13 lbs\nCondensing Unit / Split\n11\nCarrier Puron Unit 2\n38TXA048320\n3202E08320\nBldg 5\nR-410A\n10.13 lbs\nCondensing Unit / Split\n12\nCarrier Puron Unit 3\n38TXA030330\n3203E06515\nBldg 5\nR-410A\n6 lbs\nCondensing Unit / Split\n13\nCarrier\n38ARZ008-501LA\n5004G50052\nAHU 43\nR-22\n2 lbs\nCondensing Unit / Split  \n14\nGoodman\nGSC130361DE\n0810203289\n2nd Floor\nR-22\n119 oz (7.4 lbs)\nCondensing Unit / Split  \n15\nAir Temp\nVS6BF-036K\nVSF170602498\n2nd Floor\nR-410A\n78 oz (4.9 lbs)\nCondensing Unit / Split\n16\nDuctless Air\nDA27-3Z-0\n340E45337051\nBuilding 7\nR-410A\n98.8 oz (6.2 lbs)\nMini-Split / Ductless\n17\nAir Temp\nVS4BD-042KB\nVSG170522724\nHR Roof\nR-410A\n59 oz (3.7 lbs)\nCondensing Unit / Split\n18\nAir Temp\nVSA1BF4M1SN42K\nVSG190117061\nHR Roof\nR-410A\n97 oz (6.1 lbs)\nCondensing Unit / Split\n19\nAaon\nCA0358\n200508CCCI05164\n2nd Floor\nR-22\nSide 1: 80 oz / Side 2: 80 oz\nPackaged / RTU  \n20\nAaon\n68418\n200602-AMCJ02869\n2nd Floor\nR-22\nSide 1: 144 oz / Side 2: 144 oz\nPackaged / RTU  \n21\nAHU 35 (J. Controls)\nJ15XPC00R4A2BCA1E1\nN1M8394756\nRoof\nR-410A\nSys 1: 23 lbs / Sys 2: 23 lbs 4 oz\nPackaged / RTU\n22\nMcQuay\nRPS042DLS\nFBOU10040070301\nRoof\nR-410A\nCkt 1: 30 lbs / Ckt 2: 30 lbs\nPackaged / RTU\n23\nJohnson Controls\nJ12YDC00A4GLB4\nN2A0568880\nRoof\nR-410A\nNo Precharge Label *\nPackaged / RTU\n24\nJohnson Controls\nJ40YDC00A4BAA2\nN1E9947000\nRoom 2134\nR-410A\nNo Precharge Label *\nPackaged / RTU\n25\nAddison\nPROH240C4K4DAC20M6\n210405001-001\nRoof\nR-410A\nCkt 1: 47 lbs / Ckt 2: 47 lbs\nPrecision Cooling / CRAC\n26\nVertiv Liebert\nMCS028E1ADR546\nY21DAX0001\nRoof\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n27\nEmerson Liebert\nMCS028E1YDA093\nY16FAX0029\n1st Floor\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n28\nEmerson Liebert\nMCS028E1YDA093\nY16FAX0028\n1st Floor\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n29\nLiebert Vertiv Unit 1\nMCL055E1ADQ192\nY20CAZ0184\nOutside NW Entrance\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n30\nLiebert Vertiv Unit 2\nMCL055E1ADQ192\nY20CAZ0182\nOutside NW Entrance\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n31\nLiebert Vertiv Unit 3\nMCL055E1ADQ192\nY20CAZ0183\nOutside NW Entrance\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n32\nLiebert Vertiv Unit 4\nMCL055E1ADQ192\nY20CAZ0185\nOutside NW Entrance\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n33\nAirstack\nASP10A\nJI 11 10A\nOutside B241\nR-407C\n30 lbs\nPrecision Cooling / CRAC  \n34\nAirstack\nASP10A\nJI 11-138\nOutside B241\nR-407C\n30 lbs\nPrecision Cooling / CRAC  \n35\nAirstack\nASP10A\nJI 11-139\nOutside B241\nR-407C\n30 lbs\nPrecision Cooling / CRAC  \n36\nAirstack\nMCS028E1ADR546\nJI 11-140\nOutside B241\nR-407C\n30 lbs\nPrecision Cooling / CRAC  \n37\nClimate Control\nCCH0015MBACHA0000\nT22G22697\nOutside NW Entrance\nR-404A\n14 lbs 8 oz\nCondensing Unit / Split  \n38\nCondensing Unit\nRAUCC20EB203ABD000020\nC09D13669\nOutside NW Entrance\nR-22\n70 lbs\nCondensing Unit / Split  \n39\nYork Air-Cooled Chiller\nYVAA0273DGF46BAV...\nSNFM-295810\n4th Floor\nR-134A\nSys 1: 265 lbs / Sys 2: 265 lbs\nAir-Cooled Chiller\n40\nYork Chiller #1\nYCAL0033EE17XEBS...\nSGFM-169510\nBldg 20\nR-410A\n45 lbs\nAir-Cooled Chiller\n41\nYork Chiller #2\nYCAL0033EE17XEBS...\nSEFM-127220\nBldg 20\nR-410A\n45 lbs\nAir-Cooled Chiller\n* No Precharge Label   Contractor shall establish verified charge at first PM visit using manufacturer service data; document on EPA refrigerant tracking log and submit to COR within 30 days.\n  Legacy / Phasedown Refrigerant   R-22, R-407C, and R-404A are subject to EPA AIM Act phasedown. See Section 1.5 and Section 4.4 for handling requirements.\n \nSECTION 3   SPECIFIC TASKS, DELIVERABLES & REGULATORY COMPLIANCE\n3.1  Universal Requirements   All 41 Units (Every PM Visit)\nThe following requirements apply to every PM visit on every unit under this contract, regardless of unit type, in addition to the unit-category-specific tasks in Sections 3.2 3.6.\n3.1.1  Pre-Work Safety   NFPA 70E-2024 & OSHA 29 CFR 1910.147\nPerform a task-specific arc flash and shock hazard analysis per NFPA 70E-2024 Section 130.5 prior to commencing any electrical work. Document analysis on pre-task planning form submitted to COR.\nObtain facility-issued Energized Electrical Work Permit (EWP) per NFPA 70E-2024 Section 130.2 for any task requiring exposure to energized conductors above 50V. Work on de-energized equipment requires LOTO per OSHA 29 CFR 1910.147 and facility LOTO procedures.\nSelect and verify PPE per NFPA 70E-2024 Table 130.7(C)(15)(a) and (b) based on incident energy analysis or PPE category method. Minimum PPE for HVAC disconnects: Category 1 (arc-rated face shield, gloves, clothing).\nVerify all arc flash labels per IEEE 1584-2018 are present, legible, and current (system study not older than 5 years per NFPA 70B-2023 Chapter 6). Report any missing or outdated labels to COR in writing.\nFor refrigerant work in enclosed mechanical rooms: verify adequate ventilation per ASHRAE 15-2022 Section 8 before proceeding. Use portable oxygen / refrigerant detector where applicable.\n3.1.2  Documentation   ASHRAE 180-2018, NFPA 70B-2023, TJC EC.02.05.01\nRecord all measured operating parameters on the standardized PM Service Report (see Section 4.3). Report shall follow the data elements required by ASHRAE 180-2018 Section 4.3 (Implementation) and TJC EC.02.05.01.\nClassify all deficiencies found using the NFPA 70B-2023 Equipment Condition Assessment (ECA) scale and the facility's deficiency classification system: Critical (immediate safety hazard), Urgent (< 30 days), Routine (< 90 days). COR notification protocol per Section 4.3.\nComplete EPA Form 608 refrigerant tracking log for every refrigerant addition or removal, regardless of quantity. Submit to COR within 30 calendar days of service.\n3.1.3  Filter Maintenance   VA PG-18-10 (Rev. 3/1/2024) & ASHRAE 52.2-2022\nVA PG-18-10 Update (3/1/2024): The March 2024 revision to the VA HVAC Design Manual mandates MERV-13 filtration (Filter Bank PF2) where MERV-11 was previously the highest level. Contractor shall verify installed filter MERV rating at every PM visit and document compliance. Any unit found with sub-MERV-13 filtration in patient-care areas shall be reported to COR immediately.\nInspect and record installed filter MERV rating, pressure drop (where gauges are installed), and physical condition at every PM visit.\nReplace filters per IFU schedule or when pressure drop exceeds manufacturer limits. Replacement filters shall meet or exceed VA PG-18-10 MERV-13 requirement for AHUs and packaged units serving patient-care areas.\nDispose of used filters in accordance with facility infection control requirements and applicable regulations.\n3.2  Mini-Split & Ductless Systems (Units 1 9, 16)   Semi-Annual PM\n10 units; R-410A; 1.5 3 ton. Manufacturers: Panasonic, Fujitsu, Daikin, Mitsubishi, York. All tasks per applicable manufacturer IFU, ASHRAE 180-2018 Table 5 (Unitary Equipment), and NFPA 70B-2023 Chapter 9.\n3.2.1  Air-Side & Coil System   ASHRAE 180-2018 Â§5\nClean evaporator and condenser coil fins; straighten with fin comb. Measure and document pre/post coil Delta-T as a PM performance metric.\nWash coils with manufacturer-approved coil cleaner; rinse and verify drying before restart.\nClean or replace air filters; verify and document MERV rating against VA PG-18-10 standard.\nInspect, clean, and treat condensate drain pans, drain lines, and P-traps with EPA-registered biocide   required at every PM visit per VHA Directive 1061(4) Legionella prevention. Document biocide product, concentration, and application date.\nInspect and clean blower wheel and housing.\n3.2.2  Refrigeration Circuit   ASHRAE 15-2022, EPA 40 CFR Part 82\nMeasure and record: suction pressure, discharge pressure, superheat, subcooling, and ambient temperature.\nLeak-check all refrigerant joints, service valves, and fittings using EPA-approved electronic detector (sensitivity   0.1 oz/yr). For R-22 units: note EPA Section 608 leak rate threshold   refrigerant loss > 125 lbs/yr must be reported.\nDocument refrigerant type, any quantity added or removed, and source (virgin vs. reclaimed) on EPA tracking log. For R-22, reclaimed only. Submit log to COR within 30 days.\nCheck reversing valve in both heating and cooling modes (heat pump units); document mode-switching response time and pressure differentials.\nInspect metering device (TXV/EEV/orifice); verify superheat per IFU.\n3.2.3  Electrical & Controls   NFPA 70E-2024, NFPA 70B-2023\nInspect, clean, and torque all electrical terminations. Perform IR thermography scan of all contactors, capacitors, and disconnect per NFPA 70B-2023 Â§7.9.\nTest capacitors (start and run) with digital capacitance meter; replace if outside Â±6% of nameplate. Record pre- and post-replacement values.\nMeasure and record compressor RLA, FLA, and supply voltage; flag any amperage within 10% of nameplate max.\nTest all safety controls: high-pressure cutout, low-pressure cutout, freeze protection, high-discharge-temperature thermostat, and loss-of-charge protection. Document setpoints and trip test values.\nVerify controller/thermostat calibration against NIST-traceable reference thermometer; document offset if found.\n3.2.4  Mechanical\nLubricate motors and bearings per IFU (type, quantity, frequency as specified by manufacturer).\nInspect and tighten all mounting hardware and vibration isolators.\nClean unit interior cabinet and exterior surfaces.\n3.3  Condensing Units & DX Splits (Units 10 15, 17 18, 37 38)   Semi-Annual PM\n9 units; R-410A, R-22, R-404A; 2 4 ton. Manufacturers: Carrier, Goodman, Air Temp, Climate Control, RAUCC. All tasks in Section 3.2 apply plus the following.\nInspect liquid line filter-drier and sight glass; replace drier if moisture indicator shows wet or color change. Document replacement with refrigerant log entry.\nInspect and test crankcase heater (scroll/recip compressor units); measure current draw; verify energized 24 hours before startup following seasonal shutdown.\nInspect service valve cores and caps; verify valve position and packing condition.\nFor R-22 Units (13, 14, 38): Use only EPA-certified reclaimed R-22. Any addition requires COR notification within 24 hours. Document recovery cylinder ID per 40 CFR Part 82 Subpart F. Evaluate end-of-life trajectory and report to COR if unit is projected to require > 2 lbs per year.\nFor R-404A Unit (37): Only reclaimed R-404A may be used for service. COR notification required for any addition. Evaluate retrofit/replacement options and provide written assessment to COR at first PM visit.\n3.4  Packaged Units / RTUs (Units 19 24)   Semi-Annual PM\n6 units; R-22 and R-410A; multi-circuit units (Aaon CA0358, Aaon 68418, AHU 35, McQuay RPS042 have dual circuits). Manufacturers: Aaon, Johnson Controls, McQuay. All tasks in Sections 3.2 3.3 apply per circuit plus the following.\nTreat each refrigerant circuit independently: perform separate leak check, refrigerant measurement, and EPA documentation per circuit.\nInspect, clean, and lubricate economizer dampers and actuators where equipped; verify economizer control sequence through BAS/DDC per COR direction. Document damper % opening at test completion.\nInspect supply and return air plenums; clean accessible surfaces; verify flex connection integrity.\nGas heat section (where applicable): inspect burner assembly; inspect heat exchanger for cracks, pinholes, or deterioration using inspection mirror, camera, or pressurization test per manufacturer IFU; inspect flue connections and combustion air provisions. Perform combustion analysis using a calibrated combustion analyzer: measure CO (ppm), CO2 (%), O2 (%), stack temperature, and combustion efficiency. Flag any flue gas CO reading > 100 ppm (air-free) as Critical; notify COR immediately. Flag combustion efficiency below 75% as Urgent. Document all findings. Any cracked or perforated heat exchanger shall be classified Critical, unit shall be immediately shut down and tagged out, and COR notified by phone within 1 hour.\nVerify outdoor air (OA) damper operation. Measure and document OA volumetric flow rate (CFM) using a balometer, pitot tube traverse, or equivalent calibrated instrument at each semi-annual visit. Compare measured OA CFM to design minimum OA requirement per ASHRAE 62.1-2022 Table 6.2.2. Any unit delivering less than 90% of design minimum OA shall be classified Urgent and reported to the COR within 24 hours.\nVerify unit sequence of operations through BAS/DDC integration point; document setpoints and mode confirmation.\nFor R-22 units (19, 20): Same legacy refrigerant requirements as Section 3.3.\nNFPA 90A-2024 Â§6.1: Inspect accessible ductwork connections, flex connectors, and smoke dampers associated with each RTU. Verify smoke damper blade and actuator condition; document accessibility for required testing. Report any obstructed or non-functional smoke damper to COR as Urgent deficiency. Smoke damper full-open/full-close testing remains the responsibility of the facility Fire Protection PM program; Contractor shall coordinate visibility of damper condition during HVAC PM.\n3.5  Precision Cooling / CRAC Units (Units 25 36)   Semi-Annual PM\n13 units: Addison (1), Vertiv Liebert (1), Emerson Liebert (2), Liebert Vertiv (4), Airstack (4), Johnson Controls (1); R-410A and R-407C. 8 of these units carry 'No Precharge Label'   mandatory charge verification at first PM visit. Critical healthcare HVAC assets supporting data/server rooms and clinical spaces.\n3.5.1  Legionella Prevention   VHA Directive 1061(4) & TJC EC.02.05.02\nVHA Directive 1061(4)   2024 Revision: The 2024 revision expands Legionella prevention requirements to include condensate systems and non-potable aerosol-generating systems. CRAC unit condensate pans and humidifier sections are within scope. Biocide treatment and documentation are mandatory at every PM visit.\nInspect, clean, and treat condensate drain pans and drain lines at every PM visit. Apply EPA-registered biocide; document product name, EPA registration number, concentration, and application date.\nHumidifier sections (where equipped): clean distributor pans and canister, inspect electrode condition, flush stagnant water, test fill/drain cycle, verify conductivity setpoints. Per ASHRAE Guideline 12-2020, ultrasonic humidifiers are prohibited in VA healthcare facilities (VA PG-18-10). Report any non-compliant humidifier type to COR.\nDocument findings in the format required by the facility's Water Management Program (WMP) under TJC EC.02.05.02. Provide signed copy to COR for WMP file within 5 business days.\n3.5.2  Refrigeration & Electrical   All CRAC Units\nAll refrigerant circuit tasks in Section 3.2.2 apply. For R-407C units (33 36, Airstack): verify charge using subcooling method at condenser outlet per Airstack IFU (R-407C is a zeotropic blend   use subcooling, not superheat alone, for charge verification). COR notification required for any addition.\nInspect, clean, and test EC/direct-drive plenum fans; check bearing condition via sound and vibration.\nInspect and test reheat coils and electric heat elements; measure current draw per element; verify thermal cutout trip temperature.\nInspect Variable Speed Drives (VSDs) if equipped; clean cooling fans and heatsinks; verify drive parameters.\nVerify thermal management controller: setpoints, alarm thresholds, remote notification paths. Confirm integration with BAS/DCIM where present.\n3.5.3  Initial Visit   No Precharge Label Units (Units 23, 24, 26 32, 37)\nAt the first PM visit on each unit marked 'No Precharge Label' (Units 23, 24, 26 32, and 37   9 units total): obtain the manufacturer IFU or service manual and determine the factory-specified refrigerant charge. Recover the existing charge using EPA-certified recovery equipment, weigh it, and recharge to the verified specification. Record pre- and post-recovery charge weights on EPA Form 608 refrigerant tracking log. Document the verified design charge for each unit in the facility CMMS and submit a completed Charge Verification Record to the COR within 30 calendar days of the visit.\n3.6  Air-Cooled Chillers (Units 39 41)   Quarterly PM\n3 chillers: York YVAA0273 (~273 ton, R-134A, 4th Floor mechanical room) and York YCAL0033 #1 and #2 (33 ton each, R-410A, Bldg 20). These are high-criticality healthcare utility assets. TJC EC.02.05.01 compliance documentation is mandatory.\nTJC EC.02.05.01   Chiller Compliance: Standard EC.02.05.01 EP 15 requires ventilation systems in critical care areas to maintain appropriate pressure relationships, ACH, temperature (68 75Â°F in ORs), and humidity (20 60% RH) per NFPA 99-2024 and ASHRAE 170-2025. Chiller performance directly affects these parameters. Chiller degradation or failure must be reported to COR within 2 hours when it results in critical-area parameter excursions.\n3.6.1  Refrigeration System   ASHRAE 15-2022, EPA 40 CFR Part 82\nRecord all operating parameters at each quarterly visit: suction/discharge pressures and temperatures, approach temperatures, leaving chilled water temperature (LCHWT) and return, condenser entering/leaving temperatures, compressor oil pressure differential, and all active alarms/faults.\nCompare measured performance to design operating envelope; flag any parameter > 10% from design and classify as Urgent deficiency.\nLeak-check all refrigerant circuits, service valves, oil fittings, and Schrader ports using electronic leak detector (sensitivity   0.1 oz/yr). For R-134A (Unit 39): EPA Section 608 institutional owner leak rate threshold is 20% of charge   265-lb charge yields 53-lb trigger. Report any leak exceeding 10 lbs/yr to COR immediately.\nClean condenser coils by pressure washing or pH-neutral foam cleaner per York IFU; document pre-wash and post-wash ambient Delta-T to verify cleaning effectiveness.\nInspect, clean, and test oil separator (where equipped). Pull and submit compressor oil sample for spectrographic analysis annually; provide oil analysis report to COR.\nInspect and test expansion devices, suction line filter-driers, and sight glass/moisture indicators.\nPurge non-condensable gases from refrigerant circuit per IFU procedure when indicated by elevated head pressure at known ambient conditions.\n3.6.2  Compressor System\nRecord per-compressor: suction/discharge pressure, oil pressure differential, suction/discharge temperature, amperage (all three phases), supply voltage (balance check).\nVerify crankcase heater operation; measure current draw. Heater must be energized minimum 24 hours before startup after any power interruption.\nReview on-board controller fault/alarm log; download if capable; clear only with COR written approval. Provide fault history report at each quarterly visit.\nInspect compressor vibration isolators and mounting hardware. Measure and record vibration levels (velocity, in/sec peak) at each accessible compressor bearing location using a calibrated vibration meter or analyzer. Compare readings to the baseline established at contract start (per Section 4B.1) and to manufacturer alarm limits. Flag any reading exceeding the manufacturer alert level, or any reading that has increased > 50% from the established baseline, as Urgent. Flag any reading at or above the manufacturer danger/shutdown level as Critical.\n3.6.3  Electrical & Controls   NFPA 70E-2024, NFPA 70B-2023\nInspect, clean, and torque all electrical connections in chiller control panel and power section. Perform IR thermography per NFPA 70B-2023 Â§7.9.\nVerify all safety cutouts: high-pressure, low-pressure, high-discharge temperature, low-oil-pressure, motor overload, freeze protection, and flow switch   test each safety per IFU; document setpoints and verified trip values.\nCalibrate LCHWT sensor against NIST-traceable reference (accuracy Â±0.5Â°F); document calibration date, as-found, and as-left values.\nTest VFDs (where equipped): inspect drive panel, clean cooling fans, verify parameters, check drive efficiency mode operation.\nPerform motor winding megohm test annually at the beginning of each cooling season, using a 500V or 1000V insulation resistance tester per IEEE 43-2013. Document: test voltage, ambient temperature and humidity, measured resistance in M , and polarization index (PI) if multi-minute test is performed. Compare to prior year baseline. Flag any reading < 100 M  as requiring trend investigation and report to COR within 3 business days; flag any reading < 1 M  as Critical   unit shall not be started and COR shall be notified immediately.\n3.6.4  Fluid System & TJC EC.02.05.02\nInspect chilled water side: inlet strainers, isolation valves, flow switch, expansion tank, and visible piping insulation. Coordinate all outages with COR minimum 5 business days in advance.\nVerify and document flow switch operation (chiller interlock function); document make/break current at test.\nCoordinate with facility water treatment contractor: document current water chemistry parameters (pH, conductivity, inhibitor levels, biological activity) against treatment specification. Report any out-of-range values to COR for WMP file (TJC EC.02.05.02).\nInspect and document visible condensate connections from chiller to building drain. Clean and treat any accessible condensate pan per VHA Directive 1061(4).\n \nSECTION 4   PERFORMANCE REQUIREMENTS\n4.1  Scheduling & Coordination\nMaster PM Schedule submitted within 15 calendar days of contract award for COR approval, per ASHRAE 180-2018 Section 4.2 (Implementation Planning).\nAll scheduled PM visits: 5-business-day advance notice to COR minimum. Advance notice to facility infection control officer required for any PM work in patient care areas (ICRA coordination per facility policy).\nChiller PM (Units 39 41): schedule during off-peak hours or weekends, or during planned chiller shutdowns, unless otherwise approved by COR in writing.\nEmergency service response (non-critical areas): Contractor shall be on-site within 4 hours of Government notification, 24/7/365. For HVAC failures in patient care areas (ICU, ORs, AII rooms, clinical spaces): Contractor shall be on-site within 2 hours of notification. These are enforceable performance requirements, not targets; see Section 4B.6 AQL table.\nContractor shall coordinate any work affecting building pressurization, smoke control, or egress with the COR and Facility Safety Officer per NFPA 101-2021 requirements.\n4.2  Technician Qualifications   Tiered by Equipment Type\nEquipment Category\nRequired Qualifications\nDocumentation Required\nMini-Splits & Condensing Units\nEPA Section 608 Universal Certification; minimum 3 years field experience with residential/light commercial DX systems\nCopy of EPA cert card; resume or employer attestation\nPackaged RTUs (Aaon, JCI, McQuay)\nEPA 608 Universal; manufacturer or NATE-certified in commercial HVAC; OSHA 10-hour minimum\nAbove plus NATE cert or manufacturer training record\nPrecision Cooling / CRAC (Liebert, Vertiv, Airstack)\nEPA 608 Universal; Vertiv/Liebert ASP (Authorized Service Provider) certification or equivalent vendor training\nASP cert or Vertiv/Emerson factory training certificate\nAir-Cooled Chillers (York YVAA, YCAL)\nEPA 608 Universal; York factory-authorized chiller technician certification; documented chiller service experience\nYork authorization letter; EPA cert; experience log\nAll Electrical PM Work\nQualified Electrical Worker per NFPA 70E-2024 Chapter 1; documented arc flash safety training within 3 years; employer-verified competency per NFPA 70B-2023 Â§4.5\nTraining certificate; employer qualification letter; NFPA 70E training date\n4.3  Reporting & Documentation   ASHRAE 180-2018, NFPA 70B-2023, TJC EC.02.05.01\nPM Service Report (PMSR) submitted within 3 business days of each visit in electronic format compatible with the facility CMMS (currently Maximo or equivalent as directed by COR). The Contractor may use its own service report format provided all required data fields are present; the COR will provide a PMSR template within 10 days of award if requested. Minimum required content: unit ID/asset number, location, date/time (in/out), technician name and EPA cert number, all measured operating parameters, filter MERV rating verified, IR scan findings with anomaly images if applicable, parts replaced with part numbers and quantities, refrigerant log (type, quantity, source: virgin vs. reclaimed), all deficiencies noted with ECA classification, and technician signature with date.\nCritical deficiency: notify COR by phone within 1 hour of discovery; follow up with written PMSR within 24 hours.\nUrgent deficiency: written notification within 24 hours; PMSR within 3 business days.\nRoutine deficiency: included in PMSR; documented in Quarterly Summary Report.\nQuarterly Summary Report (QSR) submitted by the 10th calendar day of the month following each quarter. Content: all units serviced, compliance status matrix (by unit), open deficiency log, refrigerant consumption summary by type, and IR thermography anomaly log.\nAnnual Chiller Performance Report (for Units 39 41): submitted within 30 days of the last quarterly PM of the contract year. Content: annual operating hours, operating parameter trends, oil analysis results, megohm test results, refrigerant consumption, and Contractor recommendations for next year.\nRefrigerant EPA Tracking Log: submitted to COR within 30 calendar days of any addition or removal. Separate logs by refrigerant type; include recovery cylinder ID where applicable.\nTJC Utility Systems Documentation: Contractor shall provide all service records in a format compatible with the facility's Utility Systems Management Plan (USMP) and readily retrievable during TJC survey. Records shall be retained by Contractor for minimum 3 years.\n4.4  Materials, Refrigerant & Parts\nAll replacement parts shall be OEM or OEM-equivalent meeting or exceeding original specifications. Non-OEM parts require written COR approval before installation.\nWritten COR approval required prior to replacement of any component valued > $500. For components > $1,000, the Contractor shall obtain three competitive price quotes and provide them to the COR with the approval request; this shall be completed within 5 business days of identifying the need for replacement. Where a single OEM source exists and competition is not practicable, the Contractor shall document the sole-source justification in writing for COR review.\nRefrigerant: all types (R-410A, R-134A, R-22, R-407C, R-404A) supplied by Contractor under Cost CLIN, invoiced at actual cost with source documentation. Virgin refrigerant is prohibited for R-22 and R-404A   reclaimed product only.\nConsumables (standard filters, capacitors, contactors, belts, standard lubricants, coil cleaner, biocide) are included in the FFP CLIN pricing. Non-standard or unusual consumables require COR approval.\nContractor shall maintain a minimum 2-week spare parts inventory for high-failure-rate components (capacitors, contactors, filters) to support emergency response timelines.\n4.5  Safety & Regulatory Compliance\nNFPA 70E-2024: All electrical PM performed by Qualified Electrical Workers as defined in NFPA 70E Chapter 1. Energized Electrical Work Permits required per Section 130.2. Contractor's electrical safety program shall be submitted to COR within 15 days of contract award.\nOSHA 29 CFR 1910.147: Contractor LOTO procedure submitted to COR within 15 days of contract award. Facility-specific LOTO procedures shall be obtained from the COR for each identified energy source prior to first PM.\nNFPA 70B-2023 Â§4.5: Contractor shall designate a qualified person responsible for implementing the contractor's EMP contribution under this contract. Name and qualifications submitted to COR within 15 days of award.\nASHRAE 15-2022: Verify refrigerant concentration levels via portable detector prior to entering any enclosed mechanical room containing refrigerant systems. OSHA 29 CFR 1910.134 respiratory protection: Contractor shall provide and require the use of NIOSH-approved respirators for: (1) refrigerant recovery or transfer operations in enclosed spaces; (2) any work in spaces where refrigerant concentration may exceed ASHRAE 15-2022 Section 7.4 concentration limits; and (3) coil cleaning with chemical cleaners in confined or poorly-ventilated areas. Contractor's respiratory protection program shall be maintained in accordance with 29 CFR 1910.134.\nEPA 40 CFR Part 82, Subpart F: All refrigerant recovery, recycling, and reclaim activities shall comply with Section 608. Recovery equipment shall be certified by an EPA-recognized laboratory. Technicians shall use approved recovery cylinders; no venting under any circumstances.\nAIM Act compliance: Contractor shall maintain documentation of refrigerant sources (virgin vs. reclaimed) and shall not purchase or use refrigerants in violation of AIM Act Technology Transitions restrictions. Any regulatory change during the POP shall be brought to COR's attention within 10 business days.\nVHA Directive 1028: All work on electrical systems at LAJ VAMC shall comply with VHA Directive 1028, including requirements for the Utility Systems Management Plan. Contractor electrical safety incidents shall be reported per VHA incident reporting requirements.\n \nSECTION 4A   CONTRACTOR DELIVERABLES MATRIX\nThe following table consolidates all contractor deliverables required under this SOW. This matrix serves as the authoritative reference for both parties. Additional detail on each deliverable is found in the referenced section.\nDeliverable\nSOW Ref.\nDue Date\nSubmit To\nFormat\nQuality Control Plan (QCP)\n4B.2\nWithin 15 cal. days of award\nKO (for approval)\nElectronic PDF\nProposed Key Personnel   Resumes & Credentials\n4B.3\nWithin 15 cal. days of award\nCOR\nElectronic PDF\nContractor LOTO Program\n4.5\nWithin 15 cal. days of award\nCOR\nElectronic PDF\nContractor Electrical Safety Program (NFPA 70E)\n4.5\nWithin 15 cal. days of award\nCOR\nElectronic PDF\nPersonnel Badging Information (background investigation)\n4B.5\nWithin 10 cal. days of award\nCOR / VA Police\nVA-specified forms\nMaster PM Schedule\n4.1\nWithin 15 cal. days of award\nCOR (for approval)\nElectronic / CMMS\nBaseline Condition Assessment (BCA) Report\n4B.1\nWithin 10 cal. days of completing BCA ( 30 days after award)\nCOR\nElectronic PDF\nBaseline Vibration Readings   Chillers (Units 39 41)\n4B.1\nWith BCA Report\nCOR\nElectronic, tabular format\nBaseline Megohm Test Values   Chiller Compressors\n4B.1\nWith BCA Report\nCOR\nElectronic, tabular format\nPM Service Report (PMSR)   Per Visit\n4.3\nWithin 3 business days of each visit\nCOR\nElectronic / CMMS-compatible\nCritical Deficiency Notification (phone)\n4.3\nWithin 1 hour of discovery\nCOR\nPhone; written follow-up within 24 hrs\nUrgent Deficiency Written Notification\n4.3\nWithin 24 hours of discovery\nCOR\nElectronic email + PMSR\nRefrigerant EPA Tracking Log\n4.3\nWithin 30 cal. days of any add/remove\nCOR\nElectronic; per refrigerant type\nCharge Verification Record   No Precharge Label Units\n3.5.3\nWithin 30 cal. days of first visit to each unit\nCOR\nEPA Form 608 basis; electronic\nWMP-Related Findings (Condensate / Humidifier)\n3.5.1\nWithin 5 business days of each visit\nCOR / WMP Administrator\nElectronic PDF\nQuarterly Summary Report (QSR)\n4.3\nBy 10th of month following each quarter\nCOR\nElectronic PDF\nAnnual Chiller Performance Report (Units 39 41)\n4.3\nWithin 30 cal. days of final quarterly PM of year\nCOR\nElectronic PDF\nYork Chiller Compressor Oil Analysis Report\n3.6.1\nAnnually; with Annual Chiller Report\nCOR\nLab report + Contractor summary\nPMSR Combustion Analysis Results (gas heat units)\n3.4\nWith each semi-annual PMSR for gas units\nCOR\nIncluded in PMSR\nOA CFM Measurement Results (RTU units)\n3.4\nWith each semi-annual PMSR for RTU units\nCOR\nIncluded in PMSR\nIR Thermography Report with Anomaly Images\n3.2.3\nWith PMSR for any IR anomaly found\nCOR\nElectronic; thermal images attached\nQCP Internal Inspection Records (10% sample)\n4B.2\nAvailable upon COR request; referenced in QSR\nCOR (on request)\nElectronic\nFinal Summary Report (Close-Out)\n4B.7\nWithin 30 cal. days of contract expiration\nCOR + KO\nElectronic PDF\nAll Service Records   Electronic Transfer to CMMS\n4B.7\nWithin 30 cal. days of contract expiration\nCOR\nCMMS-compatible format\nReturn of GFP (badges, keys, documents)\n4B.7\nWithin 5 business days of contract expiration\nCOR / VA Police\nPhysical return + written confirmation\n \nSECTION 4B   ADDITIONAL CONTRACT REQUIREMENTS\n4B.1  Mobilization & Baseline Condition Assessment\nWithin 30 calendar days of contract award, and prior to commencing routine scheduled PM, the Contractor shall perform a one-time Baseline Condition Assessment (BCA) on all 41 units. The BCA protects both parties by establishing the as-found condition of all equipment at contract inception.\nInspect every unit in the GFEL and complete a Baseline Condition Assessment Form documenting: unit ID, date inspected, operating status, visible deficiencies, existing damage or non-standard modifications, refrigerant charge status (including verified charge for all No Precharge Label units), filter condition and MERV rating, and technician name and EPA cert number.\nRecord baseline vibration signature readings on all three York chillers (Units 39 41) using a calibrated vibration meter; document at each bearing location. These readings establish the baseline for quarterly trending throughout the POP.\nRecord baseline motor winding megohm test values for all chiller compressors. Document test voltage, measured insulation resistance (M ), and ambient temperature/humidity conditions.\nSubmit the completed BCA Report to the COR within 10 calendar days of completing all inspections. The COR will review and either accept or formally dispute any pre-existing conditions within 10 calendar days of receipt. Undisputed pre-existing conditions shall be documented as Government-accepted prior conditions, not attributable to Contractor negligence.\nContractor shall coordinate the BCA schedule with the COR; individual unit access may be scheduled across the 30-day window to minimize operational disruption.\n4B.2  Quality Control Plan (QCP)   FAR 46.401\nThis contract exceeds the FAR 46.401 threshold requiring a Quality Control Plan. The Contractor's QCP establishes how it will ensure the quality of services delivered and is a contract deliverable, not optional.\nThe Contractor shall submit a QCP for COR review and KO approval within 15 calendar days of contract award. The KO must approve the QCP before the Contractor may begin scheduled PM visits.\nThe QCP shall address, at minimum: (1) organizational chart and personnel qualifications verification process; (2) inspection procedures for each equipment category; (3) self-inspection checklist format; (4) corrective action process for internal quality findings; (5) records management and PMSR submission process; (6) subcontractor oversight if applicable; and (7) customer complaint resolution process.\nThe Contractor shall conduct internal quality inspections on a minimum of 10% of all PM visits per quarter, documenting results and corrective actions. Internal inspection records shall be available to the COR upon request.\nThe Government reserves the right to perform Quality Assurance (QA) surveillance of contractor performance at any time. Surveillance methods may include: direct observation, PMSR review, re-inspection of recently serviced equipment, and review of refrigerant tracking logs.\n4B.3  Key Personnel\nThe following positions are designated as Key Personnel for this contract. Key Personnel are critical to successful contract performance. The Government's approval is required before any Key Personnel substitution takes effect.\nKey Personnel Position\nMinimum Qualifications\nSubstitution Lead Time\nContract Manager / Lead Technician\nEPA 608 Universal; OSHA 30-hour; minimum 5 years commercial HVAC PM experience; designated single point of contact for COR\n30 calendar days written notice to KO; COR concurrence required\nYork Chiller Specialist (Units 39 41)\nEPA 608 Universal; York factory-authorized chiller service certification for YVAA and YCAL platforms; minimum 3 years documented chiller experience\n30 calendar days written notice to KO; KO approval required\nPrecision Cooling Specialist (Units 25 36)\nEPA 608 Universal; Vertiv/Emerson Authorized Service Provider (ASP) certification or documented factory training equivalent\n21 calendar days written notice to KO; COR concurrence required\nContractor shall submit resumes and supporting credentials for all proposed Key Personnel with the QCP submittal (within 15 calendar days of award). The Government reserves the right to reject proposed Key Personnel who do not meet stated qualifications.\n4B.4  Infection Control Risk Assessment (ICRA) Requirements\nLAJ VAMC is an acute-care healthcare facility with active patient care on all floors and in multiple buildings. Any maintenance activity that may generate dust, disturb ceiling tiles, open wall cavities, or affect air pressure relationships in patient care areas requires ICRA coordination prior to commencement of work.\nBefore each PM visit in patient care areas (7th Floor, 6th Floor, 4th Floor, 1st Floor, 2nd Floor, Room 2134, and any clinical space), the Contractor shall notify the COR and Infection Control Officer (ICO) a minimum of 5 business days in advance to allow ICRA evaluation.\nThe Contractor shall comply with all ICRA conditions established by the ICO, which may include use of dust containment barriers, HEPA vacuuming of disturbed areas, pre-dampening of surfaces before cleaning, use of N95 respirators, isolation of air handling systems from patient areas during coil cleaning, and post-maintenance inspection by infection control staff before restoring normal airflow.\nCoil washing activities on units serving patient care spaces shall use only EPA-registered no-rinse or low-vapor-pressure coil cleaners. Application shall be performed with the AHU in shutdown and supply/return grilles isolated. Allow full drying before restart per IFU and ICRA conditions.\nThe Contractor shall immediately notify the COR and ICO of any activity that inadvertently disturbs ceiling tiles, generates visible airborne dust in a patient care area, or causes an unexpected pressure relationship change. The COR and ICO will direct the required response, which may include immediate shutdown of the affected AHU.\nThe Contractor is responsible for providing its own ICRA-required PPE (dust masks, booties, gloves, barriers). The Government will provide access to ICRA carts and supplies for barrier installation upon advance request to the COR.\nSECTION 6   REGULATORY REFERENCES & STANDARDS MATRIX\n5.1  Applicable Standards   Current Editions\nAll standards listed below shall be applied in their most current edition at time of contract award and as updated during the period of performance. The Contractor shall monitor applicable standards for updates and notify the COR of any code change affecting contract scope within 30 calendar days of publication.\n\nStandard / Authority\nTitle / Scope\nEdition\nApplicability\nNFPA 90A\nStandard for the Installation of Air-Conditioning and Ventilating Systems   fire/smoke hazard provisions in forced-air systems; duct construction, filter requirements\n2024\nFire-smoke protection in all HVAC ductwork; smoke damper compliance during PM\nNFPA 90B\nStandard for the Installation of Warm Air Heating and Air-Conditioning Systems   residential/light commercial (buildings < 25,000 cu ft)\n2024\nApplicable to mini-split and light commercial condensing units (Units 1 18)\nNFPA 70E\nStandard for Electrical Safety in the Workplace   LOTO, PPE, arc flash, energized work permits\n2024\nAll electrical PM tasks; Section 130.3 energized work; Table 130.7(C)(15)\nNFPA 70B\nStandard for Electrical Equipment Maintenance   Mandatory EMP, maintenance intervals (Ch. 9), IR thermography\n2023\nElectrical PM frequency & documentation; Equipment Condition Assessment (ECA)\nNFPA 99\nHealth Care Facilities Code   HVAC, medical gas, essential electrical systems\n2024\nAll HVAC work in healthcare occupancies; Chapter 6 (HVAC), Chapter 4 (electrical)\nNFPA 101\nLife Safety Code   Means of egress, fire protection maintenance\n2021\nHVAC work affecting compartmentation, smoke control, egress\nNFPA 110\nStandard for Emergency & Standby Power Systems\n2022\nEES/generator HVAC impacts; load bank requirements Â§8.4.9\nASHRAE 15\nSafety Standard for Refrigeration Systems   machinery room requirements, leak detection\n2022\nAll refrigerant handling, machinery room classification\nASHRAE 34\nDesignation & Safety Classification of Refrigerants   A2L classification\n2022\nContractor awareness of A2L flammability (R-32 on future equip.)\nASHRAE 52.2\nMethod of Testing Air-Cleaning Devices   MERV filter ratings\n2022\nFilter verification; MERV-13 requirement per VA PG-18-10 rev. 3/1/2024\nASHRAE 55\nThermal Environmental Conditions for Human Occupancy\n2023\nSpace temp/humidity verification during PM\nASHRAE 62.1\nVentilation for Acceptable Indoor Air Quality\n2022\nOA verification on packaged units and AHUs\nASHRAE 170\nVentilation of Health Care Facilities   pressure, ACH, filtration per space type\n2025\nAll patient-care area HVAC; operating rooms 68 75Â°F / 20 60% RH\nASHRAE 180\nStandard Practice for Inspection and Maintenance of Commercial Building HVAC Systems\n2018\nBaseline PM task framework; program initiation and documentation\nASHRAE 188\nLegionellosis: Risk Management for Building Water Systems\n2021\nCondensate and chilled water systems; tie to TJC EC.02.05.02\nASHRAE Guideline 12\nMinimizing the Risk of Legionellosis   humidifier guidance\n2020\nHumidifier sections of CRAC units; resonates with VHA Dir. 1061(4)\nTJC EC.02.05.01\nUtility Systems Management   ventilation compliance in critical care areas, documentation\nCurrent\nHVAC PM documentation, pressure relationships, ACH, humidity tracking\nTJC EC.02.05.02\nWater Management Program   Legionella and waterborne pathogens\nCurrent (eff. 1/1/2022)\nChilled water, condensate systems; coordinate with facility WMP\nVHA Dir. 1028\nFacility Electrical Power Systems   EES, LOTO, arc flash, engineering authority\nCurrent\nElectrical work at VA medical facility; Utility Systems Mgmt Plan compliance\nVHA Dir. 1061(4)\nPrevention & Control of Healthcare-Associated Legionella   water system risk assessment\n2024 Rev.\nCondensate drain systems, humidifiers, chilled water; quarterly Legionella testing\nVA PG-18-10\nHVAC Design Manual   MERV-13 filter requirement, EPA-approved refrigerants, chiller standards\nRev. 3/1/2024\nFilter maintenance standard; refrigerant compliance; chiller O&M guidance\nOSHA 29 CFR 1910.147\nControl of Hazardous Energy (LOTO)\nCurrent\nAll electrical isolation tasks: Contractor LOTO procedures required\nOSHA 29 CFR 1910.134\nRespiratory Protection Standard\nCurrent\nRefrigerant work in confined or enclosed spaces\nEPA 40 CFR Part 82 Subpart F\nSection 608 Refrigerant Management   recovery, recycle, reclaim, reporting\nCurrent\nAll refrigerant additions/removals; Technician certification; leak rate thresholds\nEPA AIM Act / 40 CFR Part 84\nHFC Phasedown & Technology Transitions   new equip. GWP limits; servicing existing systems\n2020/2023 Rules\nR-410A service still permitted on existing equip.; R-22 reclaim only; R-404A/407C advisory\nFAR 52.222-41\nService Contract Labor Standards (SCA)\nCurrent\nWage determination compliance for all technicians under this contract","text":"STATEMENT OF WORK | HVAC / DX PM Services 41 Units | LAJ VAMC | Document No. LAJ-ENG-SOW-HVAC-PM-2026-001 Rev.1 FOR OFFICIAL USE ONLY PRE-AWARD SENSITIVE\nPage 1 Deputy Chief Engineer LAJ VAMC Facilities Management | Rev. March 2026 | v4.0\n\nSTATEMENT OF WORK & IGCE\nPreventive Maintenance & Cleaning 41 DX HVAC Units | IAW Manufacturers' IFU\nMini-Splits Condensing Units Packaged RTUs Precision Cooling / CRAC Air-Cooled Chillers\nRefrigerants: R-410A Â· R-134A Â· R-22 Â· R-407C Â· R-404A | 1.5 Ton ~273 Ton | 41 Units | 14 Locations\nRegulatory Baseline: NFPA 70E-2024 NFPA 70B-2023 NFPA 99-2024 ASHRAE 170-2025 ASHRAE 180-2018 TJC EC.02.05.01/.02 VHA Dir. 1028 / 1061(4) VA PG-18-10 (Rev. 3/1/2024) EPA AIM Act\n\nDocument No.\nLAJ-ENG-SOW-HVAC-PM-2026-001\nSolicitation #\n[TBD at Award]\nPrepared By\nDeputy Chief Engineer, FMS\nRev. Date\nMarch 2026\nTotal Units\n41 DX Units / 14 Locations\nContract Type\nFFP / T&M NTE / Cost (CLINs)\nPeriod of Perf.\nBase Year + 3 Option Years\nNAICS\n238220 Plumbing, Heating & AC\n\nSECTION 1 PURPOSE, SCOPE & REGULATORY FOUNDATION\n1.1 Purpose\nThis Statement of Work (SOW) establishes performance requirements for a qualified mechanical contractor to provide preventive maintenance (PM), cleaning, inspection, and regulatory-compliance services for forty-one (41) direct expansion (DX) HVAC and refrigeration units at the Louis A. Johnson (LAJ) VA Medical Center, Clarksburg, West Virginia (VISN 5 / NCO 5). The equipment inventory spans 14 locations and ranges in capacity from 1.5-ton ductless mini-splits to a 273-ton York YVAA air-cooled chiller. Services shall be performed in strict accordance with each unit's manufacturer Instructions for Use (IFU), the applicable codes and standards cited in Section 1.2, VHA Directives, VA Technical Information Library (TIL) publications, and The Joint Commission (TJC) Environment of Care requirements. This SOW is performance-based: the Contractor is responsible for achieving the outcomes defined herein and shall exercise professional judgment within the boundaries established by the IFU and applicable standards.\n1.2 Regulatory Foundation Current Editions (as of Award Date)\nThe Contractor's program shall be governed by the most current editions of all applicable standards. The following hierarchy of authority applies. In cases of conflict, the more stringent requirement governs.\nVA/VHA Directives and VA CFM Technical Information Library (TIL) publications highest authority for VA medical facilities.\nThe Joint Commission (TJC) Hospital Accreditation Standards EC.02.05.01 (Utility Systems) and EC.02.05.02 (Water Management Program); non-compliance constitutes a TJC finding reportable to facility leadership.\nNFPA codes and standards mandatory reference for healthcare occupancies under NFPA 99-2024, NFPA 101-2021, NFPA 110-2022, NFPA 70E-2024, NFPA 70B-2023, NFPA 90A-2024, NFPA 90B-2024.\nASHRAE standards ASHRAE 170-2025 (ventilation), ASHRAE 180-2018 (HVAC PM), ASHRAE 15-2022 (refrigeration safety), ASHRAE 34-2022 (refrigerant classification), ASHRAE 188-2021 (Legionella risk management).\nEPA regulations 40 CFR Part 82 Subpart F (Section 608), AIM Act / 40 CFR Part 84 (HFC phasedown and Technology Transitions).\nOSHA standards 29 CFR 1910.147 (LOTO), 29 CFR 1910.134 (respiratory protection), 29 CFR 1910 Subpart S (electrical safety).\nManufacturer IFU / O&M manuals minimum PM task baseline; manufacturer requirements shall not be waived without written COR approval.\n1.3 Objectives\nMaintain all 41 DX units in peak operating condition and full regulatory compliance throughout the period of performance (POP).\nSustain TJC EC.02.05.01 compliance: verify and document ventilation pressure relationships, ACH, filtration efficiency, temperature, and humidity per ASHRAE 170-2025 for all units serving patient-care areas.\nSupport the facility's NFPA 70B-2023 Electrical Maintenance Program (EMP) through proper documentation of all electrical PM findings, Equipment Condition Assessments (ECAs), and corrective actions.\nManage all regulated refrigerants (R-410A, R-134A, R-22, R-407C, R-404A) in full compliance with EPA Section 608 and AIM Act provisions; provide written advisory to COR on any legacy refrigerant unit requiring > 1 lb addition per service visit.\nSupport facility compliance with VHA Directive 1061(4) Legionella Prevention: inspect, clean, and treat condensate drain systems and humidifier sections of CRAC/precision cooling units at every PM visit.\nDocument all PM activities in the format required by ASHRAE 180-2018, TJC EC.02.05.01, and the facility's Utility Systems Management Plan (USMP).\n1.4 NFPA 70B-2023 Mandatory Electrical Maintenance Program (EMP) Integration\nNFPA 70B-2023 is now a mandatory Standard (not a recommended practice). The 2023 edition converts all 'should' language to 'shall,' requiring facilities to implement a documented Electrical Maintenance Program (EMP). The Contractor's electrical PM tasks under this contract shall align with and contribute to the facility's EMP per Chapter 4 of NFPA 70B-2023.\nContractor shall perform all electrical PM in accordance with NFPA 70B-2023 Chapter 9, Table 9.2.2, using an Equipment Condition Assessment (ECA) that evaluates: (1) physical condition, (2) criticality, and (3) operating environment.\nInfrared (IR) thermography of electrical components is now mandatory per NFPA 70B-2023. Contractor shall perform IR scanning of all compressor contactors, motor control wiring, and disconnect panels at each PM visit, or at minimum annually. IR findings shall be included in PM Service Reports.\nAll electrical PM findings shall be documented in the facility's EMP records system within 5 business days of service.\nSystem studies (short-circuit, coordination, arc flash) are not within scope of this contract but Contractor shall notify COR if any PM finding suggests a deficiency in existing arc flash label accuracy.\n1.5 AIM Act / EPA Refrigerant Compliance Current Status (as of 2026)\nCRITICAL AIM Act / 40 CFR Part 84: R-410A new equipment manufacture prohibited effective January 1, 2025 (GWP limit 700 for new comfort cooling). EXISTING systems using R-410A, R-22, R-404A, and R-407C may continue to be SERVICED with original refrigerant throughout useful life. Only reclaimed R-22 and R-404A may be used. R-410A service refrigerant supply is constrained and prices are rising. Contractor shall advise COR in writing if any unit's charge loss trajectory suggests end-of-useful-life within the POP.\nR-22 units (Units 13, 14, 19, 20, 38): Only reclaimed R-22 may be used for service. Contractor shall document supplier and source of all R-22 used. Any addition > 1 lb requires COR notification within 24 hours.\nR-404A (Unit 37) and R-407C (Units 33 36): Both are high-GWP refrigerants under phasedown. Only reclaimed product available for service. COR notification required for any addition.\nR-410A (30 units): Still available for service as reclaimed or newly produced product through the phasedown schedule. Monitor supply cost and availability; report supply constraints to COR.\nR-134A (Unit 39, York YVAA ~273-ton chiller): R-134a is subject to HFC phasedown allowance reductions. Coordinate with York authorized service on reclaimed refrigerant procurement for annual chiller service.\nEPA AIM Act Technology Transitions Rule reconsideration was proposed October 3, 2025. Contractor shall monitor EPA regulatory updates and immediately notify COR of any changes affecting service refrigerant availability.\n\nSECTION 2 EQUIPMENT INVENTORY (41 Units)\n2.1 Government Furnished Equipment List (GFEL)\nAll 41 units are listed below. Red refrigerant text denotes legacy / AIM Act phasedown refrigerants requiring special handling. Units marked in Category column require COR notification upon any refrigerant addition. Units marked * in Charge column require verified charge documentation at first PM visit per IFU.\n\n#\nEquipment Name\nModel Number\nSerial Number\nLocation\nRefrig.\nCharge / Capacity\nCategory\n1\nPanasonic\nCU-KE36NKU\n0001351\n7th Floor\nR-410A\n6.5 lbs\nMini-Split / Ductless\n2\nPanasonic\nCU-KE36NKU\n0002251\n7th Floor\nR-410A\n6.5 lbs\nMini-Split / Ductless\n3\nPanasonic\nCU-KE36NKU\n0004851\n7th Floor\nR-410A\n6.5 lbs\nMini-Split / Ductless\n4\nPanasonic\nCU-KE36NKU\n0005551\n7th Floor\nR-410A\n6.5 lbs\nMini-Split / Ductless\n5\nFujitsu\nAOU18RLXFW1\nBPS002868\n6th Floor\nR-410A\n4 lbs 10 oz\nMini-Split / Ductless\n6\nDaikin\nRZR24PVJU\nA002782\n1st Floor\nR-410A\n5.1 lbs\nMini-Split / Ductless\n7\nMitsubishi\nPUZA18NKA7\n82U09519A\nRoof\nR-410A\n4 lbs 14 oz\nMini-Split / Ductless\n8\nMitsubishi\nPUMY-P36NKMU1\n6YU01844A\nRoof\nR-410A\n10 lbs 9 oz\nMini-Split / Ductless\n9\nYork\nYCJD18S41S1HA\nW2F0995365\nBldg 20\nR-410A\n3 lbs 3 oz\nMini-Split / Ductless\n10\nCarrier Puron Unit 1\n38TXA048330\n3203E07364\nBldg 5\nR-410A\n10.13 lbs\nCondensing Unit / Split\n11\nCarrier Puron Unit 2\n38TXA048320\n3202E08320\nBldg 5\nR-410A\n10.13 lbs\nCondensing Unit / Split\n12\nCarrier Puron Unit 3\n38TXA030330\n3203E06515\nBldg 5\nR-410A\n6 lbs\nCondensing Unit / Split\n13\nCarrier\n38ARZ008-501LA\n5004G50052\nAHU 43\nR-22\n2 lbs\nCondensing Unit / Split\n14\nGoodman\nGSC130361DE\n0810203289\n2nd Floor\nR-22\n119 oz (7.4 lbs)\nCondensing Unit / Split\n15\nAir Temp\nVS6BF-036K\nVSF170602498\n2nd Floor\nR-410A\n78 oz (4.9 lbs)\nCondensing Unit / Split\n16\nDuctless Air\nDA27-3Z-0\n340E45337051\nBuilding 7\nR-410A\n98.8 oz (6.2 lbs)\nMini-Split / Ductless\n17\nAir Temp\nVS4BD-042KB\nVSG170522724\nHR Roof\nR-410A\n59 oz (3.7 lbs)\nCondensing Unit / Split\n18\nAir Temp\nVSA1BF4M1SN42K\nVSG190117061\nHR Roof\nR-410A\n97 oz (6.1 lbs)\nCondensing Unit / Split\n19\nAaon\nCA0358\n200508CCCI05164\n2nd Floor\nR-22\nSide 1: 80 oz / Side 2: 80 oz\nPackaged / RTU\n20\nAaon\n68418\n200602-AMCJ02869\n2nd Floor\nR-22\nSide 1: 144 oz / Side 2: 144 oz\nPackaged / RTU\n21\nAHU 35 (J. Controls)\nJ15XPC00R4A2BCA1E1\nN1M8394756\nRoof\nR-410A\nSys 1: 23 lbs / Sys 2: 23 lbs 4 oz\nPackaged / RTU\n22\nMcQuay\nRPS042DLS\nFBOU10040070301\nRoof\nR-410A\nCkt 1: 30 lbs / Ckt 2: 30 lbs\nPackaged / RTU\n23\nJohnson Controls\nJ12YDC00A4GLB4\nN2A0568880\nRoof\nR-410A\nNo Precharge Label *\nPackaged / RTU\n24\nJohnson Controls\nJ40YDC00A4BAA2\nN1E9947000\nRoom 2134\nR-410A\nNo Precharge Label *\nPackaged / RTU\n25\nAddison\nPROH240C4K4DAC20M6\n210405001-001\nRoof\nR-410A\nCkt 1: 47 lbs / Ckt 2: 47 lbs\nPrecision Cooling / CRAC\n26\nVertiv Liebert\nMCS028E1ADR546\nY21DAX0001\nRoof\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n27\nEmerson Liebert\nMCS028E1YDA093\nY16FAX0029\n1st Floor\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n28\nEmerson Liebert\nMCS028E1YDA093\nY16FAX0028\n1st Floor\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n29\nLiebert Vertiv Unit 1\nMCL055E1ADQ192\nY20CAZ0184\nOutside NW Entrance\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n30\nLiebert Vertiv Unit 2\nMCL055E1ADQ192\nY20CAZ0182\nOutside NW Entrance\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n31\nLiebert Vertiv Unit 3\nMCL055E1ADQ192\nY20CAZ0183\nOutside NW Entrance\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n32\nLiebert Vertiv Unit 4\nMCL055E1ADQ192\nY20CAZ0185\nOutside NW Entrance\nR-410A\nNo Precharge Label *\nPrecision Cooling / CRAC\n33\nAirstack\nASP10A\nJI 11 10A\nOutside B241\nR-407C\n30 lbs\nPrecision Cooling / CRAC\n34\nAirstack\nASP10A\nJI 11-138\nOutside B241\nR-407C\n30 lbs\nPrecision Cooling / CRAC\n35\nAirstack\nASP10A\nJI 11-139\nOutside B241\nR-407C\n30 lbs\nPrecision Cooling / CRAC\n36\nAirstack\nMCS028E1ADR546\nJI 11-140\nOutside B241\nR-407C\n30 lbs\nPrecision Cooling / CRAC\n37\nClimate Control\nCCH0015MBACHA0000\nT22G22697\nOutside NW Entrance\nR-404A\n14 lbs 8 oz\nCondensing Unit / Split\n38\nCondensing Unit\nRAUCC20EB203ABD000020\nC09D13669\nOutside NW Entrance\nR-22\n70 lbs\nCondensing Unit / Split\n39\nYork Air-Cooled Chiller\nYVAA0273DGF46BAV...\nSNFM-295810\n4th Floor\nR-134A\nSys 1: 265 lbs / Sys 2: 265 lbs\nAir-Cooled Chiller\n40\nYork Chiller #1\nYCAL0033EE17XEBS...\nSGFM-169510\nBldg 20\nR-410A\n45 lbs\nAir-Cooled Chiller\n41\nYork Chiller #2\nYCAL0033EE17XEBS...\nSEFM-127220\nBldg 20\nR-410A\n45 lbs\nAir-Cooled Chiller\n* No Precharge Label Contractor shall establish verified charge at first PM visit using manufacturer service data; document on EPA refrigerant tracking log and submit to COR within 30 days.\nLegacy / Phasedown Refrigerant R-22, R-407C, and R-404A are subject to EPA AIM Act phasedown. See Section 1.5 and Section 4.4 for handling requirements.\n\nSECTION 3 SPECIFIC TASKS, DELIVERABLES & REGULATORY COMPLIANCE\n3.1 Universal Requirements All 41 Units (Every PM Visit)\nThe following requirements apply to every PM visit on every unit under this contract, regardless of unit type, in addition to the unit-category-specific tasks in Sections 3.2 3.6.\n3.1.1 Pre-Work Safety NFPA 70E-2024 & OSHA 29 CFR 1910.147\nPerform a task-specific arc flash and shock hazard analysis per NFPA 70E-2024 Section 130.5 prior to commencing any electrical work. Document analysis on pre-task planning form submitted to COR.\nObtain facility-issued Energized Electrical Work Permit (EWP) per NFPA 70E-2024 Section 130.2 for any task requiring exposure to energized conductors above 50V. Work on de-energized equipment requires LOTO per OSHA 29 CFR 1910.147 and facility LOTO procedures.\nSelect and verify PPE per NFPA 70E-2024 Table 130.7(C)(15)(a) and (b) based on incident energy analysis or PPE category method. Minimum PPE for HVAC disconnects: Category 1 (arc-rated face shield, gloves, clothing).\nVerify all arc flash labels per IEEE 1584-2018 are present, legible, and current (system study not older than 5 years per NFPA 70B-2023 Chapter 6). Report any missing or outdated labels to COR in writing.\nFor refrigerant work in enclosed mechanical rooms: verify adequate ventilation per ASHRAE 15-2022 Section 8 before proceeding. Use portable oxygen / refrigerant detector where applicable.\n3.1.2 Documentation ASHRAE 180-2018, NFPA 70B-2023, TJC EC.02.05.01\nRecord all measured operating parameters on the standardized PM Service Report (see Section 4.3). Report shall follow the data elements required by ASHRAE 180-2018 Section 4.3 (Implementation) and TJC EC.02.05.01.\nClassify all deficiencies found using the NFPA 70B-2023 Equipment Condition Assessment (ECA) scale and the facility's deficiency classification system: Critical (immediate safety hazard), Urgent ( 125 lbs/yr must be reported.\nDocument refrigerant type, any quantity added or removed, and source (virgin vs. reclaimed) on EPA tracking log. For R-22, reclaimed only. Submit log to COR within 30 days.\nCheck reversing valve in both heating and cooling modes (heat pump units); document mode-switching response time and pressure differentials.\nInspect metering device (TXV/EEV/orifice); verify superheat per IFU.\n3.2.3 Electrical & Controls NFPA 70E-2024, NFPA 70B-2023\nInspect, clean, and torque all electrical terminations. Perform IR thermography scan of all contactors, capacitors, and disconnect per NFPA 70B-2023 Â§7.9.\nTest capacitors (start and run) with digital capacitance meter; replace if outside Â±6% of nameplate. Record pre- and post-replacement values.\nMeasure and record compressor RLA, FLA, and supply voltage; flag any amperage within 10% of nameplate max.\nTest all safety controls: high-pressure cutout, low-pressure cutout, freeze protection, high-discharge-temperature thermostat, and loss-of-charge protection. Document setpoints and trip test values.\nVerify controller/thermostat calibration against NIST-traceable reference thermometer; document offset if found.\n3.2.4 Mechanical\nLubricate motors and bearings per IFU (type, quantity, frequency as specified by manufacturer).\nInspect and tighten all mounting hardware and vibration isolators.\nClean unit interior cabinet and exterior surfaces.\n3.3 Condensing Units & DX Splits (Units 10 15, 17 18, 37 38) Semi-Annual PM\n9 units; R-410A, R-22, R-404A; 2 4 ton. Manufacturers: Carrier, Goodman, Air Temp, Climate Control, RAUCC. All tasks in Section 3.2 apply plus the following.\nInspect liquid line filter-drier and sight glass; replace drier if moisture indicator shows wet or color change. Document replacement with refrigerant log entry.\nInspect and test crankcase heater (scroll/recip compressor units); measure current draw; verify energized 24 hours before startup following seasonal shutdown.\nInspect service valve cores and caps; verify valve position and packing condition.\nFor R-22 Units (13, 14, 38): Use only EPA-certified reclaimed R-22. Any addition requires COR notification within 24 hours. Document recovery cylinder ID per 40 CFR Part 82 Subpart F. Evaluate end-of-life trajectory and report to COR if unit is projected to require > 2 lbs per year.\nFor R-404A Unit (37): Only reclaimed R-404A may be used for service. COR notification required for any addition. Evaluate retrofit/replacement options and provide written assessment to COR at first PM visit.\n3.4 Packaged Units / RTUs (Units 19 24) Semi-Annual PM\n6 units; R-22 and R-410A; multi-circuit units (Aaon CA0358, Aaon 68418, AHU 35, McQuay RPS042 have dual circuits). Manufacturers: Aaon, Johnson Controls, McQuay. All tasks in Sections 3.2 3.3 apply per circuit plus the following.\nTreat each refrigerant circuit independently: perform separate leak check, refrigerant measurement, and EPA documentation per circuit.\nInspect, clean, and lubricate economizer dampers and actuators where equipped; verify economizer control sequence through BAS/DDC per COR direction. Document damper % opening at test completion.\nInspect supply and return air plenums; clean accessible surfaces; verify flex connection integrity.\nGas heat section (where applicable): inspect burner assembly; inspect heat exchanger for cracks, pinholes, or deterioration using inspection mirror, camera, or pressurization test per manufacturer IFU; inspect flue connections and combustion air provisions. Perform combustion analysis using a calibrated combustion analyzer: measure CO (ppm), CO2 (%), O2 (%), stack temperature, and combustion efficiency. Flag any flue gas CO reading > 100 ppm (air-free) as Critical; notify COR immediately. Flag combustion efficiency below 75% as Urgent. Document all findings. Any cracked or perforated heat exchanger shall be classified Critical, unit shall be immediately shut down and tagged out, and COR notified by phone within 1 hour.\nVerify outdoor air (OA) damper operation. Measure and document OA volumetric flow rate (CFM) using a balometer, pitot tube traverse, or equivalent calibrated instrument at each semi-annual visit. Compare measured OA CFM to design minimum OA requirement per ASHRAE 62.1-2022 Table 6.2.2. Any unit delivering less than 90% of design minimum OA shall be classified Urgent and reported to the COR within 24 hours.\nVerify unit sequence of operations through BAS/DDC integration point; document setpoints and mode confirmation.\nFor R-22 units (19, 20): Same legacy refrigerant requirements as Section 3.3.\nNFPA 90A-2024 Â§6.1: Inspect accessible ductwork connections, flex connectors, and smoke dampers associated with each RTU. Verify smoke damper blade and actuator condition; document accessibility for required testing. Report any obstructed or non-functional smoke damper to COR as Urgent deficiency. Smoke damper full-open/full-close testing remains the responsibility of the facility Fire Protection PM program; Contractor shall coordinate visibility of damper condition during HVAC PM.\n3.5 Precision Cooling / CRAC Units (Units 25 36) Semi-Annual PM\n13 units: Addison (1), Vertiv Liebert (1), Emerson Liebert (2), Liebert Vertiv (4), Airstack (4), Johnson Controls (1); R-410A and R-407C. 8 of these units carry 'No Precharge Label' mandatory charge verification at first PM visit. Critical healthcare HVAC assets supporting data/server rooms and clinical spaces.\n3.5.1 Legionella Prevention VHA Directive 1061(4) & TJC EC.02.05.02\nVHA Directive 1061(4) 2024 Revision: The 2024 revision expands Legionella prevention requirements to include condensate systems and non-potable aerosol-generating systems. CRAC unit condensate pans and humidifier sections are within scope. Biocide treatment and documentation are mandatory at every PM visit.\nInspect, clean, and treat condensate drain pans and drain lines at every PM visit. Apply EPA-registered biocide; document product name, EPA registration number, concentration, and application date.\nHumidifier sections (where equipped): clean distributor pans and canister, inspect electrode condition, flush stagnant water, test fill/drain cycle, verify conductivity setpoints. Per ASHRAE Guideline 12-2020, ultrasonic humidifiers are prohibited in VA healthcare facilities (VA PG-18-10). Report any non-compliant humidifier type to COR.\nDocument findings in the format required by the facility's Water Management Program (WMP) under TJC EC.02.05.02. Provide signed copy to COR for WMP file within 5 business days.\n3.5.2 Refrigeration & Electrical All CRAC Units\nAll refrigerant circuit tasks in Section 3.2.2 apply. For R-407C units (33 36, Airstack): verify charge using subcooling method at condenser outlet per Airstack IFU (R-407C is a zeotropic blend use subcooling, not superheat alone, for charge verification). COR notification required for any addition.\nInspect, clean, and test EC/direct-drive plenum fans; check bearing condition via sound and vibration.\nInspect and test reheat coils and electric heat elements; measure current draw per element; verify thermal cutout trip temperature.\nInspect Variable Speed Drives (VSDs) if equipped; clean cooling fans and heatsinks; verify drive parameters.\nVerify thermal management controller: setpoints, alarm thresholds, remote notification paths. Confirm integration with BAS/DCIM where present.\n3.5.3 Initial Visit No Precharge Label Units (Units 23, 24, 26 32, 37)\nAt the first PM visit on each unit marked 'No Precharge Label' (Units 23, 24, 26 32, and 37 9 units total): obtain the manufacturer IFU or service manual and determine the factory-specified refrigerant charge. Recover the existing charge using EPA-certified recovery equipment, weigh it, and recharge to the verified specification. Record pre- and post-recovery charge weights on EPA Form 608 refrigerant tracking log. Document the verified design charge for each unit in the facility CMMS and submit a completed Charge Verification Record to the COR within 30 calendar days of the visit.\n3.6 Air-Cooled Chillers (Units 39 41) Quarterly PM\n3 chillers: York YVAA0273 (~273 ton, R-134A, 4th Floor mechanical room) and York YCAL0033 #1 and #2 (33 ton each, R-410A, Bldg 20). These are high-criticality healthcare utility assets. TJC EC.02.05.01 compliance documentation is mandatory.\nTJC EC.02.05.01 Chiller Compliance: Standard EC.02.05.01 EP 15 requires ventilation systems in critical care areas to maintain appropriate pressure relationships, ACH, temperature (68 75Â°F in ORs), and humidity (20 60% RH) per NFPA 99-2024 and ASHRAE 170-2025. Chiller performance directly affects these parameters. Chiller degradation or failure must be reported to COR within 2 hours when it results in critical-area parameter excursions.\n3.6.1 Refrigeration System ASHRAE 15-2022, EPA 40 CFR Part 82\nRecord all operating parameters at each quarterly visit: suction/discharge pressures and temperatures, approach temperatures, leaving chilled water temperature (LCHWT) and return, condenser entering/leaving temperatures, compressor oil pressure differential, and all active alarms/faults.\nCompare measured performance to design operating envelope; flag any parameter > 10% from design and classify as Urgent deficiency.\nLeak-check all refrigerant circuits, service valves, oil fittings, and Schrader ports using electronic leak detector (sensitivity 0.1 oz/yr). For R-134A (Unit 39): EPA Section 608 institutional owner leak rate threshold is 20% of charge 265-lb charge yields 53-lb trigger. Report any leak exceeding 10 lbs/yr to COR immediately.\nClean condenser coils by pressure washing or pH-neutral foam cleaner per York IFU; document pre-wash and post-wash ambient Delta-T to verify cleaning effectiveness.\nInspect, clean, and test oil separator (where equipped). Pull and submit compressor oil sample for spectrographic analysis annually; provide oil analysis report to COR.\nInspect and test expansion devices, suction line filter-driers, and sight glass/moisture indicators.\nPurge non-condensable gases from refrigerant circuit per IFU procedure when indicated by elevated head pressure at known ambient conditions.\n3.6.2 Compressor System\nRecord per-compressor: suction/discharge pressure, oil pressure differential, suction/discharge temperature, amperage (all three phases), supply voltage (balance check).\nVerify crankcase heater operation; measure current draw. Heater must be energized minimum 24 hours before startup after any power interruption.\nReview on-board controller fault/alarm log; download if capable; clear only with COR written approval. Provide fault history report at each quarterly visit.\nInspect compressor vibration isolators and mounting hardware. Measure and record vibration levels (velocity, in/sec peak) at each accessible compressor bearing location using a calibrated vibration meter or analyzer. Compare readings to the baseline established at contract start (per Section 4B.1) and to manufacturer alarm limits. Flag any reading exceeding the manufacturer alert level, or any reading that has increased > 50% from the established baseline, as Urgent. Flag any reading at or above the manufacturer danger/shutdown level as Critical.\n3.6.3 Electrical & Controls NFPA 70E-2024, NFPA 70B-2023\nInspect, clean, and torque all electrical connections in chiller control panel and power section. Perform IR thermography per NFPA 70B-2023 Â§7.9.\nVerify all safety cutouts: high-pressure, low-pressure, high-discharge temperature, low-oil-pressure, motor overload, freeze protection, and flow switch test each safety per IFU; document setpoints and verified trip values.\nCalibrate LCHWT sensor against NIST-traceable reference (accuracy Â±0.5Â°F); document calibration date, as-found, and as-left values.\nTest VFDs (where equipped): inspect drive panel, clean cooling fans, verify parameters, check drive efficiency mode operation.\nPerform motor winding megohm test annually at the beginning of each cooling season, using a 500V or 1000V insulation resistance tester per IEEE 43-2013. Document: test voltage, ambient temperature and humidity, measured resistance in M , and polarization index (PI) if multi-minute test is performed. Compare to prior year baseline. Flag any reading $500. For components > $1,000, the Contractor shall obtain three competitive price quotes and provide them to the COR with the approval request; this shall be completed within 5 business days of identifying the need for replacement. Where a single OEM source exists and competition is not practicable, the Contractor shall document the sole-source justification in writing for COR review.\nRefrigerant: all types (R-410A, R-134A, R-22, R-407C, R-404A) supplied by Contractor under Cost CLIN, invoiced at actual cost with source documentation. Virgin refrigerant is prohibited for R-22 and R-404A reclaimed product only.\nConsumables (standard filters, capacitors, contactors, belts, standard lubricants, coil cleaner, biocide) are included in the FFP CLIN pricing. Non-standard or unusual consumables require COR approval.\nContractor shall maintain a minimum 2-week spare parts inventory for high-failure-rate components (capacitors, contactors, filters) to support emergency response timelines.\n4.5 Safety & Regulatory Compliance\nNFPA 70E-2024: All electrical PM performed by Qualified Electrical Workers as defined in NFPA 70E Chapter 1. Energized Electrical Work Permits required per Section 130.2. Contractor's electrical safety program shall be submitted to COR within 15 days of contract award.\nOSHA 29 CFR 1910.147: Contractor LOTO procedure submitted to COR within 15 days of contract award. Facility-specific LOTO procedures shall be obtained from the COR for each identified energy source prior to first PM.\nNFPA 70B-2023 Â§4.5: Contractor shall designate a qualified person responsible for implementing the contractor's EMP contribution under this contract. Name and qualifications submitted to COR within 15 days of award.\nASHRAE 15-2022: Verify refrigerant concentration levels via portable detector prior to entering any enclosed mechanical room containing refrigerant systems. OSHA 29 CFR 1910.134 respiratory protection: Contractor shall provide and require the use of NIOSH-approved respirators for: (1) refrigerant recovery or transfer operations in enclosed spaces; (2) any work in spaces where refrigerant concentration may exceed ASHRAE 15-2022 Section 7.4 concentration limits; and (3) coil cleaning with chemical cleaners in confined or poorly-ventilated areas. Contractor's respiratory protection program shall be maintained in accordance with 29 CFR 1910.134.\nEPA 40 CFR Part 82, Subpart F: All refrigerant recovery, recycling, and reclaim activities shall comply with Section 608. Recovery equipment shall be certified by an EPA-recognized laboratory. Technicians shall use approved recovery cylinders; no venting under any circumstances.\nAIM Act compliance: Contractor shall maintain documentation of refrigerant sources (virgin vs. reclaimed) and shall not purchase or use refrigerants in violation of AIM Act Technology Transitions restrictions. Any regulatory change during the POP shall be brought to COR's attention within 10 business days.\nVHA Directive 1028: All work on electrical systems at LAJ VAMC shall comply with VHA Directive 1028, including requirements for the Utility Systems Management Plan. Contractor electrical safety incidents shall be reported per VHA incident reporting requirements.\n\nSECTION 4A CONTRACTOR DELIVERABLES MATRIX\nThe following table consolidates all contractor deliverables required under this SOW. This matrix serves as the authoritative reference for both parties. Additional detail on each deliverable is found in the referenced section.\nDeliverable\nSOW Ref.\nDue Date\nSubmit To\nFormat\nQuality Control Plan (QCP)\n4B.2\nWithin 15 cal. days of award\nKO (for approval)\nElectronic PDF\nProposed Key Personnel Resumes & Credentials\n4B.3\nWithin 15 cal. days of award\nCOR\nElectronic PDF\nContractor LOTO Program\n4.5\nWithin 15 cal. days of award\nCOR\nElectronic PDF\nContractor Electrical Safety Program (NFPA 70E)\n4.5\nWithin 15 cal. days of award\nCOR\nElectronic PDF\nPersonnel Badging Information (background investigation)\n4B.5\nWithin 10 cal. days of award\nCOR / VA Police\nVA-specified forms\nMaster PM Schedule\n4.1\nWithin 15 cal. days of award\nCOR (for approval)\nElectronic / CMMS\nBaseline Condition Assessment (BCA) Report\n4B.1\nWithin 10 cal. days of completing BCA ( 30 days after award)\nCOR\nElectronic PDF\nBaseline Vibration Readings Chillers (Units 39 41)\n4B.1\nWith BCA Report\nCOR\nElectronic, tabular format\nBaseline Megohm Test Values Chiller Compressors\n4B.1\nWith BCA Report\nCOR\nElectronic, tabular format\nPM Service Report (PMSR) Per Visit\n4.3\nWithin 3 business days of each visit\nCOR\nElectronic / CMMS-compatible\nCritical Deficiency Notification (phone)\n4.3\nWithin 1 hour of discovery\nCOR\nPhone; written follow-up within 24 hrs\nUrgent Deficiency Written Notification\n4.3\nWithin 24 hours of discovery\nCOR\nElectronic email + PMSR\nRefrigerant EPA Tracking Log\n4.3\nWithin 30 cal. days of any add/remove\nCOR\nElectronic; per refrigerant type\nCharge Verification Record No Precharge Label Units\n3.5.3\nWithin 30 cal. days of first visit to each unit\nCOR\nEPA Form 608 basis; electronic\nWMP-Related Findings (Condensate / Humidifier)\n3.5.1\nWithin 5 business days of each visit\nCOR / WMP Administrator\nElectronic PDF\nQuarterly Summary Report (QSR)\n4.3\nBy 10th of month following each quarter\nCOR\nElectronic PDF\nAnnual Chiller Performance Report (Units 39 41)\n4.3\nWithin 30 cal. days of final quarterly PM of year\nCOR\nElectronic PDF\nYork Chiller Compressor Oil Analysis Report\n3.6.1\nAnnually; with Annual Chiller Report\nCOR\nLab report + Contractor summary\nPMSR Combustion Analysis Results (gas heat units)\n3.4\nWith each semi-annual PMSR for gas units\nCOR\nIncluded in PMSR\nOA CFM Measurement Results (RTU units)\n3.4\nWith each semi-annual PMSR for RTU units\nCOR\nIncluded in PMSR\nIR Thermography Report with Anomaly Images\n3.2.3\nWith PMSR for any IR anomaly found\nCOR\nElectronic; thermal images attached\nQCP Internal Inspection Records (10% sample)\n4B.2\nAvailable upon COR request; referenced in QSR\nCOR (on request)\nElectronic\nFinal Summary Report (Close-Out)\n4B.7\nWithin 30 cal. days of contract expiration\nCOR + KO\nElectronic PDF\nAll Service Records Electronic Transfer to CMMS\n4B.7\nWithin 30 cal. days of contract expiration\nCOR\nCMMS-compatible format\nReturn of GFP (badges, keys, documents)\n4B.7\nWithin 5 business days of contract expiration\nCOR / VA Police\nPhysical return + written confirmation\n\nSECTION 4B ADDITIONAL CONTRACT REQUIREMENTS\n4B.1 Mobilization & Baseline Condition Assessment\nWithin 30 calendar days of contract award, and prior to commencing routine scheduled PM, the Contractor shall perform a one-time Baseline Condition Assessment (BCA) on all 41 units. The BCA protects both parties by establishing the as-found condition of all equipment at contract inception.\nInspect every unit in the GFEL and complete a Baseline Condition Assessment Form documenting: unit ID, date inspected, operating status, visible deficiencies, existing damage or non-standard modifications, refrigerant charge status (including verified charge for all No Precharge Label units), filter condition and MERV rating, and technician name and EPA cert number.\nRecord baseline vibration signature readings on all three York chillers (Units 39 41) using a calibrated vibration meter; document at each bearing location. These readings establish the baseline for quarterly trending throughout the POP.\nRecord baseline motor winding megohm test values for all chiller compressors. Document test voltage, measured insulation resistance (M ), and ambient temperature/humidity conditions.\nSubmit the completed BCA Report to the COR within 10 calendar days of completing all inspections. The COR will review and either accept or formally dispute any pre-existing conditions within 10 calendar days of receipt. Undisputed pre-existing conditions shall be documented as Government-accepted prior conditions, not attributable to Contractor negligence.\nContractor shall coordinate the BCA schedule with the COR; individual unit access may be scheduled across the 30-day window to minimize operational disruption.\n4B.2 Quality Control Plan (QCP) FAR 46.401\nThis contract exceeds the FAR 46.401 threshold requiring a Quality Control Plan. The Contractor's QCP establishes how it will ensure the quality of services delivered and is a contract deliverable, not optional.\nThe Contractor shall submit a QCP for COR review and KO approval within 15 calendar days of contract award. The KO must approve the QCP before the Contractor may begin scheduled PM visits.\nThe QCP shall address, at minimum: (1) organizational chart and personnel qualifications verification process; (2) inspection procedures for each equipment category; (3) self-inspection checklist format; (4) corrective action process for internal quality findings; (5) records management and PMSR submission process; (6) subcontractor oversight if applicable; and (7) customer complaint resolution process.\nThe Contractor shall conduct internal quality inspections on a minimum of 10% of all PM visits per quarter, documenting results and corrective actions. Internal inspection records shall be available to the COR upon request.\nThe Government reserves the right to perform Quality Assurance (QA) surveillance of contractor performance at any time. Surveillance methods may include: direct observation, PMSR review, re-inspection of recently serviced equipment, and review of refrigerant tracking logs.\n4B.3 Key Personnel\nThe following positions are designated as Key Personnel for this contract. Key Personnel are critical to successful contract performance. The Government's approval is required before any Key Personnel substitution takes effect.\nKey Personnel Position\nMinimum Qualifications\nSubstitution Lead Time\nContract Manager / Lead Technician\nEPA 608 Universal; OSHA 30-hour; minimum 5 years commercial HVAC PM experience; designated single point of contact for COR\n30 calendar days written notice to KO; COR concurrence required\nYork Chiller Specialist (Units 39 41)\nEPA 608 Universal; York factory-authorized chiller service certification for YVAA and YCAL platforms; minimum 3 years documented chiller experience\n30 calendar days written notice to KO; KO approval required\nPrecision Cooling Specialist (Units 25 36)\nEPA 608 Universal; Vertiv/Emerson Authorized Service Provider (ASP) certification or documented factory training equivalent\n21 calendar days written notice to KO; COR concurrence required\nContractor shall submit resumes and supporting credentials for all proposed Key Personnel with the QCP submittal (within 15 calendar days of award). The Government reserves the right to reject proposed Key Personnel who do not meet stated qualifications.\n4B.4 Infection Control Risk Assessment (ICRA) Requirements\nLAJ VAMC is an acute-care healthcare facility with active patient care on all floors and in multiple buildings. Any maintenance activity that may generate dust, disturb ceiling tiles, open wall cavities, or affect air pressure relationships in patient care areas requires ICRA coordination prior to commencement of work.\nBefore each PM visit in patient care areas (7th Floor, 6th Floor, 4th Floor, 1st Floor, 2nd Floor, Room 2134, and any clinical space), the Contractor shall notify the COR and Infection Control Officer (ICO) a minimum of 5 business days in advance to allow ICRA evaluation.\nThe Contractor shall comply with all ICRA conditions established by the ICO, which may include use of dust containment barriers, HEPA vacuuming of disturbed areas, pre-dampening of surfaces before cleaning, use of N95 respirators, isolation of air handling systems from patient areas during coil cleaning, and post-maintenance inspection by infection control staff before restoring normal airflow.\nCoil washing activities on units serving patient care spaces shall use only EPA-registered no-rinse or low-vapor-pressure coil cleaners. Application shall be performed with the AHU in shutdown and supply/return grilles isolated. Allow full drying before restart per IFU and ICRA conditions.\nThe Contractor shall immediately notify the COR and ICO of any activity that inadvertently disturbs ceiling tiles, generates visible airborne dust in a patient care area, or causes an unexpected pressure relationship change. The COR and ICO will direct the required response, which may include immediate shutdown of the affected AHU.\nThe Contractor is responsible for providing its own ICRA-required PPE (dust masks, booties, gloves, barriers). The Government will provide access to ICRA carts and supplies for barrier installation upon advance request to the COR.\nSECTION 6 REGULATORY REFERENCES & STANDARDS MATRIX\n5.1 Applicable Standards Current Editions\nAll standards listed below shall be applied in their most current edition at time of contract award and as updated during the period of performance. The Contractor shall monitor applicable standards for updates and notify the COR of any code change affecting contract scope within 30 calendar days of publication.\n\nStandard / Authority\nTitle / Scope\nEdition\nApplicability\nNFPA 90A\nStandard for the Installation of Air-Conditioning and Ventilating Systems fire/smoke hazard provisions in forced-air systems; duct construction, filter requirements\n2024\nFire-smoke protection in all HVAC ductwork; smoke damper compliance during PM\nNFPA 90B\nStandard for the Installation of Warm Air Heating and Air-Conditioning Systems residential/light commercial (buildings < 25,000 cu ft)\n2024\nApplicable to mini-split and light commercial condensing units (Units 1 18)\nNFPA 70E\nStandard for Electrical Safety in the Workplace LOTO, PPE, arc flash, energized work permits\n2024\nAll electrical PM tasks; Section 130.3 energized work; Table 130.7(C)(15)\nNFPA 70B\nStandard for Electrical Equipment Maintenance Mandatory EMP, maintenance intervals (Ch. 9), IR thermography\n2023\nElectrical PM frequency & documentation; Equipment Condition Assessment (ECA)\nNFPA 99\nHealth Care Facilities Code HVAC, medical gas, essential electrical systems\n2024\nAll HVAC work in healthcare occupancies; Chapter 6 (HVAC), Chapter 4 (electrical)\nNFPA 101\nLife Safety Code Means of egress, fire protection maintenance\n2021\nHVAC work affecting compartmentation, smoke control, egress\nNFPA 110\nStandard for Emergency & Standby Power Systems\n2022\nEES/generator HVAC impacts; load bank requirements Â§8.4.9\nASHRAE 15\nSafety Standard for Refrigeration Systems machinery room requirements, leak detection\n2022\nAll refrigerant handling, machinery room classification\nASHRAE 34\nDesignation & Safety Classification of Refrigerants A2L classification\n2022\nContractor awareness of A2L flammability (R-32 on future equip.)\nASHRAE 52.2\nMethod of Testing Air-Cleaning Devices MERV filter ratings\n2022\nFilter verification; MERV-13 requirement per VA PG-18-10 rev. 3/1/2024\nASHRAE 55\nThermal Environmental Conditions for Human Occupancy\n2023\nSpace temp/humidity verification during PM\nASHRAE 62.1\nVentilation for Acceptable Indoor Air Quality\n2022\nOA verification on packaged units and AHUs\nASHRAE 170\nVentilation of Health Care Facilities pressure, ACH, filtration per space type\n2025\nAll patient-care area HVAC; operating rooms 68 75Â°F / 20 60% RH\nASHRAE 180\nStandard Practice for Inspection and Maintenance of Commercial Building HVAC Systems\n2018\nBaseline PM task framework; program initiation and documentation\nASHRAE 188\nLegionellosis: Risk Management for Building Water Systems\n2021\nCondensate and chilled water systems; tie to TJC EC.02.05.02\nASHRAE Guideline 12\nMinimizing the Risk of Legionellosis humidifier guidance\n2020\nHumidifier sections of CRAC units; resonates with VHA Dir. 1061(4)\nTJC EC.02.05.01\nUtility Systems Management ventilation compliance in critical care areas, documentation\nCurrent\nHVAC PM documentation, pressure relationships, ACH, humidity tracking\nTJC EC.02.05.02\nWater Management Program Legionella and waterborne pathogens\nCurrent (eff. 1/1/2022)\nChilled water, condensate systems; coordinate with facility WMP\nVHA Dir. 1028\nFacility Electrical Power Systems EES, LOTO, arc flash, engineering authority\nCurrent\nElectrical work at VA medical facility; Utility Systems Mgmt Plan compliance\nVHA Dir. 1061(4)\nPrevention & Control of Healthcare-Associated Legionella water system risk assessment\n2024 Rev.\nCondensate drain systems, humidifiers, chilled water; quarterly Legionella testing\nVA PG-18-10\nHVAC Design Manual MERV-13 filter requirement, EPA-approved refrigerants, chiller standards\nRev. 3/1/2024\nFilter maintenance standard; refrigerant compliance; chiller O&M guidance\nOSHA 29 CFR 1910.147\nControl of Hazardous Energy (LOTO)\nCurrent\nAll electrical isolation tasks: Contractor LOTO procedures required\nOSHA 29 CFR 1910.134\nRespiratory Protection Standard\nCurrent\nRefrigerant work in confined or enclosed spaces\nEPA 40 CFR Part 82 Subpart F\nSection 608 Refrigerant Management recovery, recycle, reclaim, reporting\nCurrent\nAll refrigerant additions/removals; Technician certification; leak rate thresholds\nEPA AIM Act / 40 CFR Part 84\nHFC Phasedown & Technology Transitions new equip. GWP limits; servicing existing systems\n2020/2023 Rules\nR-410A service still permitted on existing equip.; R-22 reclaim only; R-404A/407C advisory\nFAR 52.222-41\nService Contract Labor Standards (SCA)\nCurrent\nWage determination compliance for all technicians under this contract","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24526Q0514","product_service_code":"J045"},{"award":{"awardee":{}},"dates":{"posted":"2026-05-11","posted_at":"2026-05-11T18:24:47.307Z","created_at":"2026-05-11T18:24:45.088Z","modified_at":"2026-06-18T03:55:44.622Z","response_deadline":{"raw":"2026-05-18T08:00:00-04:00","utc":"2026-05-18T12:00:00Z","date":"2026-05-18","time":"08:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/830083b55e284b2e9050b675ad6efa04/view"},"naics":{"codes":["561210"],"primary":"561210"},"title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_id":"100173468","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-17","archive_type":"auto_custom"},"history":[{"index":6,"title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-11T18:33:08.744Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"37fc7d8438a64e59884f8e96b3a47cab","solicitation_number":"36C24526Q0514","related_opportunity_id":"830083b55e284b2e9050b675ad6efa04"},{"index":4,"title":"J045--PREVENTIVE MAINTENANCE & CLEANING- 41 DX HVAC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-11T18:24:47.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"830083b55e284b2e9050b675ad6efa04","solicitation_number":"36C24526Q0514"}],"contacts":[{"name":"Keysha Gorman","role":"primary","email":"Keysha.Gorman74@va.gov","phone":"410-637-1509","title":"Contract Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"830083b55e284b2e9050b675ad6efa04","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"830083b55e284b2e9050b675ad6efa04","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-05T00:05:57.226851632Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"3f0baa11b2211bc3fe8cf5fd1c75ac41749b48cdaa124313370e9840212427b4","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-05T00:05:57.226851632Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"DISCLAIMER\n  This RFI is issued solely for information and planning purposes only and does not constitute a solicitation.  All information received in response to this RFI that is marked as proprietary will be handled accordingly.  In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract.  Responders are solely responsible for all expenses associated with responding to this RFI.\n\nSubmit your capability statement by May 18, 2026, to Keysha.Gorman74@va.gov. For your information to be accepted, include in your information business size and SAM s UEI Number. \nThis action is for a base plus three option year contract. \n \n\nSTATEMENT OF WORK  |  HVAC / DX PM Services   41 Units  |  LAJ VAMC  |  Document No. LAJ-ENG-SOW-HVAC-PM-2026-001 Rev.1 FOR OFFICIAL USE ONLY   PRE-AWARD SENSITIVE\nPage 32 Deputy Chief Engineer   LAJ VAMC Facilities Management  |  Rev. March 2026  |  v4.0\nPage 32 of 32\n\nSTATEMENT OF WORK  &  IGCE\nPreventive Maintenance & Cleaning   41 DX HVAC Units  |  IAW Manufacturers' IFU\nMini-Splits     Condensing Units     Packaged RTUs     Precision Cooling / CRAC     Air-Cooled Chillers\nRefrigerants: R-410A Â· R-134A Â· R-22 Â· R-407C Â· R-404A  |  1.5 Ton   ~273 Ton  |  41 Units  |  14 Locations\nRegulatory Baseline: NFPA 70E-2024     NFPA 70B-2023     NFPA 99-2024     ASHRAE 170-2025     ASHRAE 180-2018     TJC EC.02.05.01/.02     VHA Dir. 1028 / 1061(4)     VA PG-18-10 (Rev. 3/1/2024)     EPA AIM Act\n\nDocument No.\nLAJ-ENG-SOW-HVAC-PM-2026-001\nSolicitation #\n[TBD at Award]\nPrepared By\nDeputy Chief Engineer, FMS\nRev. Date\nMarch 2026\nTotal Units\n41 DX Units / 14 Locations\nContract Type\nFFP / T&M NTE / Cost (CLINs)\nPeriod of Perf.\nBase Year + 3 Option Years\nNAICS\n238220   Plumbing, Heating & AC\n \nSECTION 1   PURPOSE, SCOPE & REGULATORY FOUNDATION\n1.1  Purpose\nThis Statement of Work (SOW) establishes performance requirements for a qualified mechanical contractor to provide preventive maintenance (PM), cleaning, inspection, and regulatory-compliance services for forty-one (41) direct expansion (DX) HVAC and refrigeration units at the Louis A. Johnson (LAJ) VA Medical Center, Clarksburg, West Virginia (VISN 5 / NCO 5). The equipment inventory spans 14 locations and ranges in capacity from 1.5-ton ductless mini-splits to a 273-ton York YVAA air-cooled chiller. Services shall be performed in strict accordance with each unit's manufacturer Instructions for Use (IFU), the applicable codes and standards cited in Section 1.2, VHA Directives, VA Technical Information Library (TIL) publications, and The Joint Commission (TJC) Environment of Care requirements. This SOW is performance-based: the Contractor is responsible for achieving the outcomes defined herein and shall exercise professional judgment within the boundaries established by the IFU and applicable standards.","text":"DISCLAIMER\nThis RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI.\n\nSubmit your capability statement by May 18, 2026, to Keysha.Gorman74@va.gov. For your information to be accepted, include in your information business size and SAM s UEI Number.\nThis action is for a base plus three option year contract.\n\nSTATEMENT OF WORK | HVAC / DX PM Services 41 Units | LAJ VAMC | Document No. LAJ-ENG-SOW-HVAC-PM-2026-001 Rev.1 FOR OFFICIAL USE ONLY PRE-AWARD SENSITIVE\nPage 32 Deputy Chief Engineer LAJ VAMC Facilities Management | Rev. March 2026 | v4.0\nPage 32 of 32\n\nSTATEMENT OF WORK & IGCE\nPreventive Maintenance & Cleaning 41 DX HVAC Units | IAW Manufacturers' IFU\nMini-Splits Condensing Units Packaged RTUs Precision Cooling / CRAC Air-Cooled Chillers\nRefrigerants: R-410A Â· R-134A Â· R-22 Â· R-407C Â· R-404A | 1.5 Ton ~273 Ton | 41 Units | 14 Locations\nRegulatory Baseline: NFPA 70E-2024 NFPA 70B-2023 NFPA 99-2024 ASHRAE 170-2025 ASHRAE 180-2018 TJC EC.02.05.01/.02 VHA Dir. 1028 / 1061(4) VA PG-18-10 (Rev. 3/1/2024) EPA AIM Act\n\nDocument No.\nLAJ-ENG-SOW-HVAC-PM-2026-001\nSolicitation #\n[TBD at Award]\nPrepared By\nDeputy Chief Engineer, FMS\nRev. Date\nMarch 2026\nTotal Units\n41 DX Units / 14 Locations\nContract Type\nFFP / T&M NTE / Cost (CLINs)\nPeriod of Perf.\nBase Year + 3 Option Years\nNAICS\n238220 Plumbing, Heating & AC\n\nSECTION 1 PURPOSE, SCOPE & REGULATORY FOUNDATION\n1.1 Purpose\nThis Statement of Work (SOW) establishes performance requirements for a qualified mechanical contractor to provide preventive maintenance (PM), cleaning, inspection, and regulatory-compliance services for forty-one (41) direct expansion (DX) HVAC and refrigeration units at the Louis A. Johnson (LAJ) VA Medical Center, Clarksburg, West Virginia (VISN 5 / NCO 5). The equipment inventory spans 14 locations and ranges in capacity from 1.5-ton ductless mini-splits to a 273-ton York YVAA air-cooled chiller. Services shall be performed in strict accordance with each unit's manufacturer Instructions for Use (IFU), the applicable codes and standards cited in Section 1.2, VHA Directives, VA Technical Information Library (TIL) publications, and The Joint Commission (TJC) Environment of Care requirements. This SOW is performance-based: the Contractor is responsible for achieving the outcomes defined herein and shall exercise professional judgment within the boundaries established by the IFU and applicable standards.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24526Q0514","place_of_performance":{"zip":"21201","city":{"code":"4000","name":"Baltimore"},"state":{"code":"MD","name":"Maryland"},"street":"Department of Veterans Affairs VAMC","country":{"code":"USA","name":"UNITED STATES"},"street2":"10 N Greene St"},"product_service_code":"J045"}],"due_at":"2026-05-18T12:00:00Z","due_date":"2026-05-18","closes_at":"2026-05-18T12:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-05T00:16:33.325935Z","principal_notice_id":"830083b55e284b2e9050b675ad6efa04","description":{"text":"DISCLAIMER\nThis RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI.\n\nSubmit your capability statement by May 18, 2026, to Keysha.Gorman74@va.gov. For your information to be accepted, include in your information business size and SAM s UEI Number.\nThis action is for a base plus three option year contract.\n\nSTATEMENT OF WORK | HVAC / DX PM Services 41 Units | LAJ VAMC | Document No. LAJ-ENG-SOW-HVAC-PM-2026-001 Rev.1 FOR OFFICIAL USE ONLY PRE-AWARD SENSITIVE\nPage 32 Deputy Chief Engineer LAJ VAMC Facilities Management | Rev. March 2026 | v4.0\nPage 32 of 32\n\nSTATEMENT OF WORK & IGCE\nPreventive Maintenance & Cleaning 41 DX HVAC Units | IAW Manufacturers' IFU\nMini-Splits Condensing Units Packaged RTUs Precision Cooling / CRAC Air-Cooled Chillers\nRefrigerants: R-410A Â· R-134A Â· R-22 Â· R-407C Â· R-404A | 1.5 Ton ~273 Ton | 41 Units | 14 Locations\nRegulatory Baseline: NFPA 70E-2024 NFPA 70B-2023 NFPA 99-2024 ASHRAE 170-2025 ASHRAE 180-2018 TJC EC.02.05.01/.02 VHA Dir. 1028 / 1061(4) VA PG-18-10 (Rev. 3/1/2024) EPA AIM Act\n\nDocument No.\nLAJ-ENG-SOW-HVAC-PM-2026-001\nSolicitation #\n[TBD at Award]\nPrepared By\nDeputy Chief Engineer, FMS\nRev. Date\nMarch 2026\nTotal Units\n41 DX Units / 14 Locations\nContract Type\nFFP / T&M NTE / Cost (CLINs)\nPeriod of Perf.\nBase Year + 3 Option Years\nNAICS\n238220 Plumbing, Heating & AC\n\nSECTION 1 PURPOSE, SCOPE & REGULATORY FOUNDATION\n1.1 Purpose\nThis Statement of Work (SOW) establishes performance requirements for a qualified mechanical contractor to provide preventive maintenance (PM), cleaning, inspection, and regulatory-compliance services for forty-one (41) direct expansion (DX) HVAC and refrigeration units at the Louis A. Johnson (LAJ) VA Medical Center, Clarksburg, West Virginia (VISN 5 / NCO 5). The equipment inventory spans 14 locations and ranges in capacity from 1.5-ton ductless mini-splits to a 273-ton York YVAA air-cooled chiller. Services shall be performed in strict accordance with each unit's manufacturer Instructions for Use (IFU), the applicable codes and standards cited in Section 1.2, VHA Directives, VA Technical Information Library (TIL) publications, and The Joint Commission (TJC) Environment of Care requirements. This SOW is performance-based: the Contractor is responsible for achieving the outcomes defined herein and shall exercise professional judgment within the boundaries established by the IFU and applicable standards.","html":"DISCLAIMER\n  This RFI is issued solely for information and planning purposes only and does not constitute a solicitation.  All information received in response to this RFI that is marked as proprietary will be handled accordingly.  In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract.  Responders are solely responsible for all expenses associated with responding to this RFI.\n\nSubmit your capability statement by May 18, 2026, to Keysha.Gorman74@va.gov. For your information to be accepted, include in your information business size and SAM s UEI Number. \nThis action is for a base plus three option year contract. \n \n\nSTATEMENT OF WORK  |  HVAC / DX PM Services   41 Units  |  LAJ VAMC  |  Document No. LAJ-ENG-SOW-HVAC-PM-2026-001 Rev.1 FOR OFFICIAL USE ONLY   PRE-AWARD SENSITIVE\nPage 32 Deputy Chief Engineer   LAJ VAMC Facilities Management  |  Rev. March 2026  |  v4.0\nPage 32 of 32\n\nSTATEMENT OF WORK  &  IGCE\nPreventive Maintenance & Cleaning   41 DX HVAC Units  |  IAW Manufacturers' IFU\nMini-Splits     Condensing Units     Packaged RTUs     Precision Cooling / CRAC     Air-Cooled Chillers\nRefrigerants: R-410A Â· R-134A Â· R-22 Â· R-407C Â· R-404A  |  1.5 Ton   ~273 Ton  |  41 Units  |  14 Locations\nRegulatory Baseline: NFPA 70E-2024     NFPA 70B-2023     NFPA 99-2024     ASHRAE 170-2025     ASHRAE 180-2018     TJC EC.02.05.01/.02     VHA Dir. 1028 / 1061(4)     VA PG-18-10 (Rev. 3/1/2024)     EPA AIM Act\n\nDocument No.\nLAJ-ENG-SOW-HVAC-PM-2026-001\nSolicitation #\n[TBD at Award]\nPrepared By\nDeputy Chief Engineer, FMS\nRev. Date\nMarch 2026\nTotal Units\n41 DX Units / 14 Locations\nContract Type\nFFP / T&M NTE / Cost (CLINs)\nPeriod of Perf.\nBase Year + 3 Option Years\nNAICS\n238220   Plumbing, Heating & AC\n \nSECTION 1   PURPOSE, SCOPE & REGULATORY FOUNDATION\n1.1  Purpose\nThis Statement of Work (SOW) establishes performance requirements for a qualified mechanical contractor to provide preventive maintenance (PM), cleaning, inspection, and regulatory-compliance services for forty-one (41) direct expansion (DX) HVAC and refrigeration units at the Louis A. Johnson (LAJ) VA Medical Center, Clarksburg, West Virginia (VISN 5 / NCO 5). The equipment inventory spans 14 locations and ranges in capacity from 1.5-ton ductless mini-splits to a 273-ton York YVAA air-cooled chiller. Services shall be performed in strict accordance with each unit's manufacturer Instructions for Use (IFU), the applicable codes and standards cited in Section 1.2, VHA Directives, VA Technical Information Library (TIL) publications, and The Joint Commission (TJC) Environment of Care requirements. This SOW is performance-based: the Contractor is responsible for achieving the outcomes defined herein and shall exercise professional judgment within the boundaries established by the IFU and applicable standards.","origin":"detail"},"contacts":[{"name":"Keysha Gorman","role":"primary","email":"Keysha.Gorman74@va.gov","phone":"410-637-1509","title":"Contract Officer"}],"place_of_performance":{"zip":"21201","city":{"code":"4000","name":"Baltimore"},"state":{"code":"MD","name":"Maryland"},"street":"Department of Veterans Affairs VAMC","country":{"code":"USA","name":"UNITED STATES"},"street2":"10 N Greene St"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"naics_codes":["561210"],"award":{"awardee":{}},"attachments":[{"resource_id":"874a2e80b1274d60808d86f32147fc9c","name":"36C24526Q0514.docx","kind":"file","mime_type":".docx","size_bytes":44455,"posted_at":"2026-05-11T18:33:08.744Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/874a2e80b1274d60808d86f32147fc9c/download","mirrored":false},{"resource_id":"b062dac116d74b5697a7dc2a0df3c648","name":"36C24526Q0514_1.docx","kind":"file","mime_type":".docx","size_bytes":33647,"posted_at":"2026-05-11T18:24:47.307Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b062dac116d74b5697a7dc2a0df3c648/download","mirrored":false}],"awards":[],"related":[{"key":"36C24527Q0070","latest_notice_id":"b0b1581a6a1441b9a46d407375bc44d0","title":"6550--FLOW CYTOMETERY REAGENTS AND SUPPLIES (VA-27-00016081) |","solicitation_number":"36C24527Q0070","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"325413","psc":"6550","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T00:57:17.217280Z"},{"key":"36C24527Q0061","latest_notice_id":"0db5662de5914b458655bed9898980cf","title":"J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT","solicitation_number":"36C24527Q0061","notice_type":"o","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-18","notices":3,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561210","psc":"J065","set_aside":"SBA","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24527Q0081","latest_notice_id":"77e2cd670c3040a6ad2a1fc44daa2bc5","title":"DJ10--Alertus Enhanced Notification Licensing & Premier Support","solicitation_number":"36C24527Q0081","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541519","psc":"DJ10","set_aside":null,"state":"WV","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"SOFTWARE LICENSING AND SUPPORT MARTINSBURG VA MEDICAL CENTER","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C24527Q0073","latest_notice_id":"6ce8b040a9be44d0972b338bc7b6cf88","title":"Arc Flash Hazard Analysis Services","solicitation_number":"36C24527Q0073","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"334515","psc":"6625","set_aside":null,"state":"WV","county":"54033","county_name":"Harrison County","city":"5415628","city_name":"Clarksburg","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24527Q0076","latest_notice_id":"9c0733493507403293e3d1367a3d19b5","title":"6530--MILITARY LITTERS, STANDS AND CARTS","solicitation_number":"36C24527Q0076","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":2,"due_at":"2026-12-02T17:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"337127","psc":"6530","set_aside":null,"state":"WV","county":"54037","county_name":"Jefferson County","city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":"sam_zip","state_evidence":"25430","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"}],"similar_open":[{"key":"36C24527Q0061","latest_notice_id":"0db5662de5914b458655bed9898980cf","title":"J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT","solicitation_number":"36C24527Q0061","notice_type":"o","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-18","notices":3,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561210","psc":"J065","set_aside":"SBA","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"FA462026QA303","latest_notice_id":"da68e1a3e39e41e0ae6b6adac38e3984","title":"FA27 Fall Arrest Inspection Services","solicitation_number":"FA462026QA303","notice_type":"r","first_type":"r","first_posted":"2026-11-04","last_posted":"2026-11-04","notices":1,"due_at":"2026-11-26T18:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4620","office_name":"FA4620 92 CONS LGC","naics":"561210","psc":"H342","set_aside":"SBA","state":"WA","county":"53063","county_name":"Spokane County","city":"5322955","city_name":"Fairchild AFB","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-05T04:36:35.392694Z"},{"key":"M0068127R0002","latest_notice_id":"309bf2fd5f174025a6c27c4c74c1461a","title":"Parachute Rigger Sources Sought","solicitation_number":"M0068127R0002","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-11-27T08:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T08:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-M00681","office_name":"COMMANDING GENERAL","naics":"561210","psc":"H281","set_aside":null,"state":"AZ","county":"04027","county_name":"Yuma County","city":"0485680","city_name":"Yuma Proving Ground","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"}],"similar_open_total":40,"indexable":false}