{"canonical":"https://sealedbidder.com/opportunities/36c24526q0448","key":"36C24526Q0448","url":"https://sealedbidder.com/opportunities/36c24526q0448","title":"F103--VAMHCS WATER CHEMICAL SUPPLY & SUPPORT CONTRACT 5 Year (Base plus 4 Option Years) PPVAMC, BAVAMC, LRVAMC","solicitation_number":"36C24526Q0448","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-04-24T15:00:00Z","first_posted":"2026-04-14","last_posted":"2026-04-14","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"221310","psc":"F103","set_aside":null,"place_state":"MD","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"24510","place_county_name":"City of Baltimore","place_city":"2404000","place_city_name":"Baltimore","winner":null,"award_amount":null,"publications":[{"notice_id":"1f8986f0ae5d4c439030fed7c5bf643b","title":"F103--VAMHCS WATER CHEMICAL SUPPLY & SUPPORT CONTRACT 5 Year (Base plus 4 Option Years) PPVAMC, BAVAMC, LRVAMC","solicitation_number":"36C24526Q0448","notice_type":"r","base_type":"r","posted":"2026-04-14","posted_at":"2026-04-14T15:55:01.746Z","due_at":"2026-04-24T15:00:00Z","due_date":"2026-04-24","cancelled":false,"archived":true,"archive_date":"2026-06-23","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1f8986f0ae5d4c439030fed7c5bf643b/view","enriched":true,"history":[{"index":3,"title":"F103--VAMHCS WATER CHEMICAL SUPPLY & SUPPORT CONTRACT 5 Year (Base plus 4 Option Years) PPVAMC, BAVAMC, LRVAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T15:55:01.746Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"1f8986f0ae5d4c439030fed7c5bf643b","solicitation_number":"36C24526Q0448"}]}],"latest_notice_id":"1f8986f0ae5d4c439030fed7c5bf643b","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-04-14","posted_at":"2026-04-14T15:55:01.746Z","created_at":"2026-04-14T15:54:59.526Z","modified_at":"2026-06-24T03:55:45.517Z","response_deadline":{"raw":"2026-04-24T11:00:00-04:00","utc":"2026-04-24T15:00:00Z","date":"2026-04-24","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1f8986f0ae5d4c439030fed7c5bf643b/view"},"naics":{"codes":["221310"],"primary":"221310"},"title":"F103--VAMHCS WATER CHEMICAL SUPPLY & SUPPORT CONTRACT 5 Year (Base plus 4 Option Years) PPVAMC, BAVAMC, LRVAMC","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_id":"100173468","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-23","archive_type":"auto_custom"},"history":[{"index":3,"title":"F103--VAMHCS WATER CHEMICAL SUPPLY & SUPPORT CONTRACT 5 Year (Base plus 4 Option Years) PPVAMC, BAVAMC, LRVAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-14T15:55:01.746Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"1f8986f0ae5d4c439030fed7c5bf643b","solicitation_number":"36C24526Q0448"}],"contacts":[{"name":"William Chris Galletta","role":"primary","email":"William.Galletta@va.gov","phone":"410-637-1506","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"1f8986f0ae5d4c439030fed7c5bf643b","lineage_id":"1f8986f0ae5d4c439030fed7c5bf643b","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-07T00:16:09.658141377Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"73c6a8a3fb8fa4ff7be0e894928e6acae0c81397c4351e89b4608aec125cf39a","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-07T00:16:09.658141377Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Department of Veterans Affairs NCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for Loch Raven , Baltimore and Perry Pt VA Medical Centers.\n\nPlease respond to this RFI/Sources Sought 36C24526Q0448 with your:\n1. Business name (including Unique Entity ID (SAM.gov)\n2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, \nDisadvantaged Small Business, 8(a), etc.), and\n3. Person of contact (including telephone number & email address).\n4. Capability statement and summary of previous experience providing these types of \nservices for the Veterans Health Administration or other similar facilities.\n5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include \napplicable NAICS)\n6. Brief Summary of categories of services that your company can/cannot provide.\n7. Certification(s) / Licenses for meeting the local requirements to provide these \nservices at the Huntington VAMC (if applicable)\n8. Confirmation that your organization has the capability & expertise to meet the \nperformance requirements while complying with applicable limitations in \nsubcontracting by responding to the questions below with your response:\na. Do you intend to self-perform this effort?\nb. If you are located outside the immediate area, how will you self-perform?\nc. Or do you intend to subcontract work under this contract?\nd. If you intend to subcontract work under this contract, how will you ensure\ncompliance with the limitations on subcontracting?\nResponse Instructions:\nResponses must be received by Friday 4/24/ 2026 @ 11:00 AM EST. Responses to the information requested above must be submitted via email to William.Galletta@va.gov \n\nSCOPE OF WORK\nVAMC WIDE CHEMICAL SUPPLY & SUPPORT CONTRACT\nPPVAMC, BAVAMC, LRVAMC\n\nBackground Information:\nThis is a New Contract effort to serve all three major VAMHCS Sites which includes Perry Point VAMC, Baltimore VAMC, and Loch Raven VAMC. The purpose of such is to provide Chemicals necessary for the functioning of HVAC Equipment, Legionella prevention, and exclusive to Perry Point Water Treatment Chemicals. The Statement of Work below identifies each sites needs by different CLINs known as Contractor Line-Item Numbers with descriptive information regarding that CLINs purpose for the specific site. Although billed through different 2237 allocations, the contract is wholistic in nature such that the winning bidder serves the different needs of all 3 campuses.\n\nNeeds Specific to Perry Point VAMC\nPERRY POINT BOILER WATER CHEMICAL & COOLING TOWER TREATMENT SERVICES\nA. Chemical Water Treatment\nVendor will provide services and products which are approved for this specific application. This is a need-based service, varied price maintenance, repair, and technical support agreement.\nFor the boiler plant, Vendor will provide a 25-40% alkaline catalyzed sodium bisulfite oxygen scavenger to remove dissolved oxygen from the feed water and boiler water which leads to pitting of system metallurgy. Vendor will also provide advanced polymer treatment, 25% active sodium hydroxide alkalinity treatment to help prevent deposition of minerals on the boiler heat transfer surfaces. Vendor will provide a triple blend of neutralizing amines (DEAE, Cyclohexylamine and morpholine) to neutralize the carbonic acid that naturally forms when steam condenses to a liquid. This is required to protect return line metallurgy from corrosion and premature failure.\nThe vendor will also provide FlexPro advanced polymer treatment with halogen stable technology or approved equal for the condenser water systems to protect the condenser water systems from corrosion and scaling. Vendor will provide an oxidizing biocide stabilized liquid bromine and a non-oxidizing biocide consisting of 4% isothiazoline to control and protect the systems from microbiological organisms in accordance with ASHRAE, OSHA, CDC, and COOLING TECHNOLOGY INSTITUTE standards for Legionella Risk Minimization. They will provide legionella testing on all four cooling tower systems every 90 days. The testing will include three samples per system and shall be taken from the cooling tower sump, inlet to the condenser and outlet from the condenser. A total of (36) legionella tests shall be included in the proposal. Legionella tests must be sent to a third-party independent laboratory that follows CDC Environmental Techniques Evaluation (ELITE) protocol.\nB. General\nThe Contractor shall provide the chemicals, consulting services and the handling of all chemicals (except testing reagents) as required to control corrosion, microbiological growth, scale, algae, and slime in all heat transfer equipment and the associated systems. These systems include potable water, boiler water, and the open loop condenser water systems.\nAll chemicals supplied by the contractor shall be specifically formulated for the system in which they are being used according to the recommendations of a qualified chemist or laboratory.\nAll chemicals, except for solid products, shall be delivered using BULK delivery system for boiler chemistry and NEAT delivery for the cooling tower chemistry using bulk and neat delivery double-walled storage tanks. The specified chemicals shall conform to all existing local, state, and federal regulations regarding water pollution, and have appropriate EPA registration and FDA approval where applicable.\nThe contractor shall also warrant that the chemicals used in the water treatment program shall have no detrimental effect on any surfaces of the systems being treated and will bear the costs of any repairs made necessary by their use. To ensure quality control, the contract company shall be ISO-9000 certified.\nInvoices submitted to the VA need to include a copy of the delivery ticket showing the\nnecessary proof the product was delivered to the Perry Point VA Medical Center. Submit\nsperate invoice for each delivery ticket.\n\n\nC. Contractor Qualifications\nThe contractor shall provide evidence of experience in providing cooling water, boiler water,\nclosed system, and condensate system treatment services of the types and to the extent as outlined in these specifications. Due to the extensive capital costs involved with our equipment, an experienced water treatment company is required. The Contractor shall provide evidence of successfully conducting such operations for a period of not less than twenty (20) years.\nThe contractor shall own and operate laboratory facilities capable of performing a complete range of analytical work to assist with the monitoring, control, and troubleshooting of the facilities water systems. The successful vendor shall have a completely staffed laboratory that has at least two Ph.D. s in chemistry or related sciences. The vendor shall provide the name of the Ph.D.-level laboratory personnel, including educational background.\nAll field personnel for the contractor servicing our facility must have a college or university degree in a technical discipline and have at least 20 years of water treatment experience. Contractors have at least two backup personnel who also have at least 10 years of water treatment experience.\nSince the facility will rely on the contractor for his/her troubleshooting expertise and problem-solving capabilities, the Service Engineer from the contract company must be a degreed engineering professional. The primary representative must currently provide the same size and scope of service required by our facility to at least one other federal government campus customer in Maryland. Customer name, phone number and reference information must be included in bid package. Failure to include will render the bid unresponsive.\nThe Contractor laboratory facility shall be equipped to run the following: water analyses, deposit analyses, corrosion coupon analyses, microbiological analyses, ion exchange resin analyses, and metallurgical analyses.\nContractors  primary service representative for this account shall have the following certification. Within the past year-OSHA 30 Hour Safety Training. The primary representative shall also have OSHA approved HAZWOPER 40 Hour Training Certifications with annual refresher. Proof of certifications shall be submitted with bid package. At least one backup representative must have OSHA 30 Hour Safety Training. Proof of certification for backup representative must be submitted with bid package. The facility uses Walchem microprocessors to properly feed and control the blowdown and chemical feed to the condenser water systems and boiler water systems. Since these microprocessors are critical to our operations, the primary service representative and backup representative must be factory certified by Walchem in their use and operation. Training certificates must be submitted with bid package or bid will be rendered unresponsive.\nD. Technical Support\nThe vendor shall have a fully staffed technical support group, including a licensed professional engineer. These personnel shall be available for consultation during normal business hours of the facility. The vendor shall submit a list of at least three (3) members of this support group, including their qualifications, phone numbers and normal working hours.\nE. Microbiological Testing\nThe facility is concerned with bacterial control in water systems and the potential growth of\nLegionnaire s Disease Bacteria (LDB). The vendor shall provide laboratory data concerning\nbiocidal efficacy in controlling LDB growth. The vendor shall provide chemicals to comply with the COOLING TECHNOLOGY INSTITUTE (CTI)  Legionellosis Guideline: Best Practices for Control of Legionella . Contractor shall assist facility in development of a HACCP plan in Accordance with ASHRAE Standard 188P.\nF. Insurance Requirements\nThe vendor shall supply a certificate of insurance indicating the types and amounts of insurance provided. The contractor shall assume the entire responsibility for and shall indemnify and save harmless the V.A. of and from all liability for injury to person, death or property damage resulting from or in any way related to the performance of the work under contract.\nThe contractor shall also carry Comprehensive General Liability Insurance as respects bodily injuries or death in the amount of $2,000,000, property damage in the amount of $100,000 and Comprehensive Automobile Liability Insurance including all owned, and hired vehicles, with a $1,000,000 combined single limit, unless otherwise required, and shall furnish to the V.A. a certificate thereof containing such indemnification.\nG. Field Service Capabilities\nThe vendor will have the capability of conducting the following on-site field tests:\n*Microbiological studies\n*Corrosion studies using corrosion coupons\n*Fiber-optic equipment inspections\n*Steam purity studies\n*Elution studies\n*Test heat exchanger studies\n*Dissolved oxygen studies\n*Spectrophotometric testing\n\nH. In-House Regulatory Affairs\nTo ensure that all water treatment programs comply with local, state, and federal laws on\nenvironmental protection, the vendor shall have an in-house regulatory affairs group. The\nvendor shall provide the name and phone number of the supervisor of this group as well as\ndocumentation as to this group s capabilities.\n\nI. Equipment Repair and Replacement\nAll pumps, controllers, water meters, piping, controls, solenoid valves, timers, and interlocks required to meet these specifications and not presently installed, shall be furnished, and installed by the veteran s administration.\nIf the COR and the contractor agree that a conductivity controller, component, or pump is irreparable, the COR shall have a purchase order issued to the contractor for a replacement. The treatment contractor shall recommend new controllers and pumps. The water treatment contractor shall coordinate replacement of special application equipment.\nReplacement of defective auxiliary equipment such as water meters, solenoid valves, motorized valves, timers, and interlocks, shall be directed by the COR. The Veteran s Administration shall bear the cost of the equipment and installation if not installed in house.\n\nJ. Chemical Identification, Handling and Storage\nThe contractor shall post complete and updated Safety Data Sheets (SDS) that meet OSHA\nhazardous communications standards adjacent to each chemical feed station. A second set shall be provided to the COR.\nThe vendor must supply a 24-hour, 7 day per week emergency response group who can be called for emergency information regarding chemical spills and/or accidents involving his products. The vendor shall submit the emergency phone number and a sample of documentation outlining instructions for reporting accidents and chemical spills.\n\nK. Training\nThe vendor shall provide operator training that includes chemical testing, reporting, and\nunderstanding the chemical program s test results. Training Program to include reference\nmanuals and audiovisual training of at least 4 hours of cooling operator training.\n\nL. Testing Requirements\nThe contractor shall draw samples from each system as necessary, up to 24 but not less than once monthly, and shall test for:\nSystems \nControl Range \nCondenser Water Systems \npH \n9.0 maximum \nCycles \n4-6 \nConductivity \n1500 maximum (mmhos) \nCu \nless than 0.20 ppm \nFe \nless than 0.50 ppm \nHalogen (chlorine./bromine) \n0.5-1.0 ppm Free residual or per label guidelines. \nTTA \n>1.0 ppm \nORP \n300-500 mV \nTotal Hardness \nRecord \nMicrobiological \n<10,000 colony forming units per ml (bulk water) \nBoiler Water Systems \nSoftener \nTotal Hardness \n0-1 ppm \nConductivity \nRecord \nDealkalizer \nTotal Hardness \n0-1 ppm \nConductivity \nRecord \nM-Alkalinity \n0-30 ppm \nFeedwater\n\nTotal Hardness \n0-1 ppm \nConductivity \nRecord \nBoilers \nConductivity \n3500 mmhos max. \np-alkalinity \n200-600 ppm \nQuadraSperse \n200-400 ppm \nSulfite \n40-60 ppm \nCondensate \nTotal Hardness \n0-1 ppm \nConductivity \nRecord \npH \n8.0-9.0 \n\nWhile on site, the contractor shall review the building s daily water treatment logs with the\nengineers. The contractor shall furnish a monthly report, to be completed on site that shall\ncontain the following information:\nM. Contractor Tests Results\nResults of inspection of water treatment equipment to insure proper operation.\nResults of inspection of cooling tower for leakage and overflow.\nResults of cooling tower bleed solenoid for proper operation, record makeup and blow down water meter readings.\nNotation that the engineer is or is not keeping an in-house test log and biocide test strip record and recommended corrective action for any deficiencies determined from the engineer s test log and discussions with the engineer.\nNote and recommend any corrective action for any deficiencies determined by the contractor s test. Notation of any changes made to the controllers or pumps. Previous and present closed system and boiler make-up water meter readings. Water balance information to show systems are not scaling. One copy of the report is to be emailed, and duplicate copies are to be submitted to VA Shop Supervisor.\nN. Equipment Settings and Adjustments\nThe contractor shall perform or supervise all adjustments to conductivity controllers, timers, and pumps. Independent Testing: on a random basis, at VA s discretion, the V.A. may require the contractor to draw a duplicate sample from each system and leave it at the property to be sent for analysis by an independent laboratory. The VA shall bear the cost of the independent test.\nThe following information must be supplied with each sample requested by the V.A.:\nComplete address and building system identification.\nName of person to contact for information about the sample.\nIdentification of the chemical treatment used to include company name and chemical treatment identifications.\nO. Contractor Response\nThe contractor shall arrive on site for all emergency calls within four (4) hours of notification.\nP. Corrosion Coupons\nThe contractor shall run corrosion coupon tests on the open recirculating systems for mild steel and copper, continuously on 60 90-day intervals. The contractor shall furnish a written report documenting corrosion rates in mils/year on 60 90-day intervals. Corrosion rates shall be maintained below 1.0 mils/year for mild steel (average corrosion) and below 0.1 mils per year for copper coupons (average corrosion). Failure to maintain specified corrosion levels can result in the termination of contract for cause.\nComplete Water Analyses The contractor shall perform a complete water analysis on all systems quarterly. These samples should be sent to the contractor s laboratory for analysis.\nQ. Project list\nTo provide this location with optimum efficiency and effectiveness from the water treatment program, the contractor will establish a project list for each system treated. The project list contains special items that are to be accomplished by plant personnel, the contractor, or both.\nItems on the list are mutually agreed upon as being important / necessary. Each project on the list is given a priority, estimated starting and completion dates. The project list is reviewed and updated during regular review meetings.\nR. Treatment Chemicals, Cooling Tower Treatment\nThe cooling tower shall be treated with a liquid scale and corrosion inhibitor, containing FlexPro technology or technically approved equal, Halogen stable yellow metal corrosion inhibitors, mild steel corrosion inhibitors, and scale inhibitors. The products must effectively control corrosion and scale of ferrous metals, copper, bronze, brass and galvanized. For water conservation purposes, tower cycles must be maintained at 4-6 cycles of concentration at a pH of 9.0 max. The VA doesn t want pH control using acid or related compounds.\nProgram must keep corrosion rates below 1 mil per year for mild steel (average corrosion) and below 0.1 mils per year for copper (average corrosion). Program must keep heat transfer surfaces free of mineral scale or other deposits. If mineral scale or other deposits are found, the contractor shall chemically and mechanically clean the equipment using his own manpower at his own cost. There are (4) cooling towers at the Perry Point VA Medical Center. The cooling towers are operational April, May, June, July, August, September, October, November.\nSampling of each cooling tower for Legionella by culture methodology must be performed within 7 days of startup and every 90 days during periods when the cooling tower is operational or operational-ready (i.e., cleaned, disinfected, full of water and ready for operation). At a minimum, samples must be collected from each basin/sump, and the supply to and return from the chillers. The facility is concerned with bacterial control in water systems and the potential growth of Legionnaire s Disease Bacteria (LDB). The vendor shall provide laboratory data concerning biocidal efficacy in controlling LDB growth. Total of 36 Legionella tests per year.\nThe vendor shall provide chemicals to comply with the Cooling Technology Institute (CTI),\n Legionellosis Guideline: Best Practices for Control of Legionella  and VA Directive 1061 (2021)\nAppendix D,  Prevention of Legionella Disease from cooling towers at Department of Veterans\nAffairs Medical Facilities . Contractor shall assist facility in development of a Hazard Analysis and Critical Control Point (HACCP) plan in Accordance with ASHRAE Standard 188P.\nS. Biocides\nAll biocides must be registered with the US Environmental Protection Agency. The contractor shall provide a stabilized solid oxidizing biocide as the primary biocide. The contractor shall add the oxidizing biocide or alternative product in accordance with label instructions or manufacturer s guidelines, and sufficient to maintain the desired free halogen residual.\nThe contractor shall also provide a non-oxidizing biocide that has proven effective in the control of aerobic slime forming bacteria, algae, fungi, yeasts and molds and other organisms. The nonoxidizing biocide shall be either 4% Isothiazolin or 50% Gluteraldehyde.\nThe contractor shall provide necessary potable water treatment that must be NSF approved and recognized and approved by MDE for use in potable water treatment facilities. The potable water treatment plant coagulant shall be USALCO DELPAC 2020 or approved equal. Jar testing shall be conducted on any approved equal at the contractor s expense. Coagulant deliveries shall also be delivered via bulk tanker trucks in 1,000--1,500-gallon loads using a 2  camlock type hose.\nT. Operating Data\nSteam production-=156,510,000 pounds per year 2021\nCondensate Return-0% for calculation purposes\nGallons per year makeup 14-18 million gallons per year\nDomestic Water Production =approximately 140 million gallons per year\nAssume Feedwater dissolved oxygen content is 2 ppm\nNatural gas use for boilers is 169,798,000 CCF per year in 2021\nBoiler Pressure is 100psi\nMonthly service required and as needed at no extra cost\nMonthly legionella tests per year on all tower systems\n\nNeeds Specific to Baltimore VAMC\nTHREE AIR-COOLED TOWERS (OPEN LOOP) AND TWO (CLOSED LOOP) SYSTEMS (HEATING AND CHILLED WATER)\nThe Contractor shall provide all personnel, management, material, parts, equipment, supplies, labor and transportation in performing routine water treatment and testing services for three (3) Baltimore Air-Cooled Towers (open loop) and two (2) closed loop system (heating and chilled water). This will include the recommended once a year for systems operated seasonally and twice a year for system operated twice a year for system operated year-round located at the Baltimore VA Medical Center.\nPreventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions. To clean, lubricate, calibrate, test and replace faulty or worn parts and/or parts which are likely to become faulty, fail or become worn, repair or adjust components, or assemblies of components as necessitated by wear, tear, damage, or failure of parts, returning the equipment and/or instrument to the operating condition defined in the manufacturer s specifications.\nESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract.\n\n\nPREVENTIVE MAINTENNANCE REQUIREMENTS\nA. Unless otherwise scheduled, monthly, provide routine water treatment and testing services to include at a minimum, complete water treatment services rendered by trained personnel under professional engineering supervision. Such services are designed to control and inhibit corrosion, pitting, scale formation and biological growth. This will include the following:\n1. Open systems shall be serviced twice per month from May through October and monthly from November through April.\n2. Closed systems will be serviced monthly year-round.\n3. Vendor will furnish and apply all chemicals.\n4. Inspect and adjust the water treatment equipment. Water treatment equipment is defined as, but not limited to, chemical feed tanks, bypass feeders, chemical and biocide injection pumps, solenoid valves, control panels, time clocks, agitators, and water meters as applicable.\n5. The vendor shall maintain proper chemical concentrations based on normal system operation while optimizing water consumption.\n6. The vendor will collect and analyze water samples and submit water analysis reports as required.\n7. The vendor will perform a water sample test on each cooling tower for the presence of Legionella. This test will be performed twice each year, once at the beginning of the cooling season and once at the end of the cooling season. A written report will be provided outlining the results and any recommended corrective actions. This report must be provided within 14 calendar days of performing the test.\n8. The vendor will perform unscheduled service calls at no additional charge during normal business hours as required to fulfill the requirements of this contract provided the calls are not a result of tampering or abuse by unauthorized personnel or damage caused by others.\n9. Should deposits or significant biological growth occur as a result of negligence or error on the part of the water treatment service provider, the vendor will conduct chemical cleaning of all condenser tubes at no additional cost.\n10. Include in the scope of work are the following:\n  Provide for each cooling tower:\no Necessary controller, timers and sensors including spill containment, and tubing to operate the various devices\no Inhibitor dispenser\no 2 biocide feeders+\no 4 Legionella test year\n  Provide access real time to the data of the water chemistry of each cooling tower from a data base. The data must be in a format compatible with a Microsoft Office product\n  Provide necessary chemicals to maintain the water chemistry of the cooling towers, chiller water and heating water systems in a manner to minimize biological growth as well as corrosion and the buildup of minerals on the surfaces of the cooling towers as well as the surfaces of the chillers and heat exchangers.\nReporting\nB. In order to assure the successful implementation of a water chemistry program there needs to be goals and treatment level metrics. These measurements shall be taken and calculated using both  real time  system measurements and periodic lab testing. The metrics shall include but not limited to.\n  Total chlorine\n  Inhibitor level\n  Nitrite level (closed loop)\n  Periodic Legionella testing based on VA Directive 1061\n  Weekly dip slides   interpretations\n  Mild steel Corrosion rate   quarterly\n  Copper corrosion rate   quarterly\n  Aerobic and anaerobic microbial level\n  System Turbidity\nThe contractor shall provide a monthly report on the water chemistry, chemical usage, water usage as well as an analysis of the cycles of concentration.\nC. The Contractor will contact the COTR to schedule a PM at least seven (7) calendar days prior to the proposed date. Schedule changes required by the Government after approval shall be made at no additional cost if notice is provided to the Contractor five (5) calendar days or more prior to the scheduled date of accomplishment.\nTraining\nD. The contractor shall provide training of the VA staff on:\n  The basics of cooling tower operation\no Their function\no How they operate\no Water related issued that the water treatments are designed to prevent\n  Safety   how to handle and dispose of chemicals in a safe manner\n  Testing and troubleshooting including:\no Basic testing of water parameters\no Interpretation of periodic testing results and reports\no Necessary information to make adjustments necessary to maintain an efficient program\nD. The goals of the program are the following:\no Suspended solids < 25 for film fill\no Total Dissolved Solids (TDS) <5,000ppm\no pH balance 6.5 - 9\no Chlorides <1,500 ppm\no CaCO3 < 800 ppm\no Sulfates if calcium over 800 < 800 ppm if calcium is under 800 < 5,000ppm\no Silica SiO2< 150 ppm\no Iron <3 ppm\no Manganese < 0.1 ppm\no Ammonia if copper is present < 50 ppm\no Cycles of Concentration 10\n\nNeeds Specific to Loch Raven VAMC: TBD","text":"Department of Veterans Affairs NCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for Loch Raven , Baltimore and Perry Pt VA Medical Centers.\n\nPlease respond to this RFI/Sources Sought 36C24526Q0448 with your:\n1. Business name (including Unique Entity ID (SAM.gov)\n2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned,\nDisadvantaged Small Business, 8(a), etc.), and\n3. Person of contact (including telephone number & email address).\n4. Capability statement and summary of previous experience providing these types of\nservices for the Veterans Health Administration or other similar facilities.\n5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include\napplicable NAICS)\n6. Brief Summary of categories of services that your company can/cannot provide.\n7. Certification(s) / Licenses for meeting the local requirements to provide these\nservices at the Huntington VAMC (if applicable)\n8. Confirmation that your organization has the capability & expertise to meet the\nperformance requirements while complying with applicable limitations in\nsubcontracting by responding to the questions below with your response:\na. Do you intend to self-perform this effort?\nb. If you are located outside the immediate area, how will you self-perform?\nc. Or do you intend to subcontract work under this contract?\nd. If you intend to subcontract work under this contract, how will you ensure\ncompliance with the limitations on subcontracting?\nResponse Instructions:\nResponses must be received by Friday 4/24/ 2026 @ 11:00 AM EST. Responses to the information requested above must be submitted via email to William.Galletta@va.gov\n\nSCOPE OF WORK\nVAMC WIDE CHEMICAL SUPPLY & SUPPORT CONTRACT\nPPVAMC, BAVAMC, LRVAMC\n\nBackground Information:\nThis is a New Contract effort to serve all three major VAMHCS Sites which includes Perry Point VAMC, Baltimore VAMC, and Loch Raven VAMC. The purpose of such is to provide Chemicals necessary for the functioning of HVAC Equipment, Legionella prevention, and exclusive to Perry Point Water Treatment Chemicals. The Statement of Work below identifies each sites needs by different CLINs known as Contractor Line-Item Numbers with descriptive information regarding that CLINs purpose for the specific site. Although billed through different 2237 allocations, the contract is wholistic in nature such that the winning bidder serves the different needs of all 3 campuses.\n\nNeeds Specific to Perry Point VAMC\nPERRY POINT BOILER WATER CHEMICAL & COOLING TOWER TREATMENT SERVICES\nA. Chemical Water Treatment\nVendor will provide services and products which are approved for this specific application. This is a need-based service, varied price maintenance, repair, and technical support agreement.\nFor the boiler plant, Vendor will provide a 25-40% alkaline catalyzed sodium bisulfite oxygen scavenger to remove dissolved oxygen from the feed water and boiler water which leads to pitting of system metallurgy. Vendor will also provide advanced polymer treatment, 25% active sodium hydroxide alkalinity treatment to help prevent deposition of minerals on the boiler heat transfer surfaces. Vendor will provide a triple blend of neutralizing amines (DEAE, Cyclohexylamine and morpholine) to neutralize the carbonic acid that naturally forms when steam condenses to a liquid. This is required to protect return line metallurgy from corrosion and premature failure.\nThe vendor will also provide FlexPro advanced polymer treatment with halogen stable technology or approved equal for the condenser water systems to protect the condenser water systems from corrosion and scaling. Vendor will provide an oxidizing biocide stabilized liquid bromine and a non-oxidizing biocide consisting of 4% isothiazoline to control and protect the systems from microbiological organisms in accordance with ASHRAE, OSHA, CDC, and COOLING TECHNOLOGY INSTITUTE standards for Legionella Risk Minimization. They will provide legionella testing on all four cooling tower systems every 90 days. The testing will include three samples per system and shall be taken from the cooling tower sump, inlet to the condenser and outlet from the condenser. A total of (36) legionella tests shall be included in the proposal. Legionella tests must be sent to a third-party independent laboratory that follows CDC Environmental Techniques Evaluation (ELITE) protocol.\nB. General\nThe Contractor shall provide the chemicals, consulting services and the handling of all chemicals (except testing reagents) as required to control corrosion, microbiological growth, scale, algae, and slime in all heat transfer equipment and the associated systems. These systems include potable water, boiler water, and the open loop condenser water systems.\nAll chemicals supplied by the contractor shall be specifically formulated for the system in which they are being used according to the recommendations of a qualified chemist or laboratory.\nAll chemicals, except for solid products, shall be delivered using BULK delivery system for boiler chemistry and NEAT delivery for the cooling tower chemistry using bulk and neat delivery double-walled storage tanks. The specified chemicals shall conform to all existing local, state, and federal regulations regarding water pollution, and have appropriate EPA registration and FDA approval where applicable.\nThe contractor shall also warrant that the chemicals used in the water treatment program shall have no detrimental effect on any surfaces of the systems being treated and will bear the costs of any repairs made necessary by their use. To ensure quality control, the contract company shall be ISO-9000 certified.\nInvoices submitted to the VA need to include a copy of the delivery ticket showing the\nnecessary proof the product was delivered to the Perry Point VA Medical Center. Submit\nsperate invoice for each delivery ticket.\n\nC. Contractor Qualifications\nThe contractor shall provide evidence of experience in providing cooling water, boiler water,\nclosed system, and condensate system treatment services of the types and to the extent as outlined in these specifications. Due to the extensive capital costs involved with our equipment, an experienced water treatment company is required. The Contractor shall provide evidence of successfully conducting such operations for a period of not less than twenty (20) years.\nThe contractor shall own and operate laboratory facilities capable of performing a complete range of analytical work to assist with the monitoring, control, and troubleshooting of the facilities water systems. The successful vendor shall have a completely staffed laboratory that has at least two Ph.D. s in chemistry or related sciences. The vendor shall provide the name of the Ph.D.-level laboratory personnel, including educational background.\nAll field personnel for the contractor servicing our facility must have a college or university degree in a technical discipline and have at least 20 years of water treatment experience. Contractors have at least two backup personnel who also have at least 10 years of water treatment experience.\nSince the facility will rely on the contractor for his/her troubleshooting expertise and problem-solving capabilities, the Service Engineer from the contract company must be a degreed engineering professional. The primary representative must currently provide the same size and scope of service required by our facility to at least one other federal government campus customer in Maryland. Customer name, phone number and reference information must be included in bid package. Failure to include will render the bid unresponsive.\nThe Contractor laboratory facility shall be equipped to run the following: water analyses, deposit analyses, corrosion coupon analyses, microbiological analyses, ion exchange resin analyses, and metallurgical analyses.\nContractors primary service representative for this account shall have the following certification. Within the past year-OSHA 30 Hour Safety Training. The primary representative shall also have OSHA approved HAZWOPER 40 Hour Training Certifications with annual refresher. Proof of certifications shall be submitted with bid package. At least one backup representative must have OSHA 30 Hour Safety Training. Proof of certification for backup representative must be submitted with bid package. The facility uses Walchem microprocessors to properly feed and control the blowdown and chemical feed to the condenser water systems and boiler water systems. Since these microprocessors are critical to our operations, the primary service representative and backup representative must be factory certified by Walchem in their use and operation. Training certificates must be submitted with bid package or bid will be rendered unresponsive.\nD. Technical Support\nThe vendor shall have a fully staffed technical support group, including a licensed professional engineer. These personnel shall be available for consultation during normal business hours of the facility. The vendor shall submit a list of at least three (3) members of this support group, including their qualifications, phone numbers and normal working hours.\nE. Microbiological Testing\nThe facility is concerned with bacterial control in water systems and the potential growth of\nLegionnaire s Disease Bacteria (LDB). The vendor shall provide laboratory data concerning\nbiocidal efficacy in controlling LDB growth. The vendor shall provide chemicals to comply with the COOLING TECHNOLOGY INSTITUTE (CTI) Legionellosis Guideline: Best Practices for Control of Legionella . Contractor shall assist facility in development of a HACCP plan in Accordance with ASHRAE Standard 188P.\nF. Insurance Requirements\nThe vendor shall supply a certificate of insurance indicating the types and amounts of insurance provided. The contractor shall assume the entire responsibility for and shall indemnify and save harmless the V.A. of and from all liability for injury to person, death or property damage resulting from or in any way related to the performance of the work under contract.\nThe contractor shall also carry Comprehensive General Liability Insurance as respects bodily injuries or death in the amount of $2,000,000, property damage in the amount of $100,000 and Comprehensive Automobile Liability Insurance including all owned, and hired vehicles, with a $1,000,000 combined single limit, unless otherwise required, and shall furnish to the V.A. a certificate thereof containing such indemnification.\nG. Field Service Capabilities\nThe vendor will have the capability of conducting the following on-site field tests:\n*Microbiological studies\n*Corrosion studies using corrosion coupons\n*Fiber-optic equipment inspections\n*Steam purity studies\n*Elution studies\n*Test heat exchanger studies\n*Dissolved oxygen studies\n*Spectrophotometric testing\n\nH. In-House Regulatory Affairs\nTo ensure that all water treatment programs comply with local, state, and federal laws on\nenvironmental protection, the vendor shall have an in-house regulatory affairs group. The\nvendor shall provide the name and phone number of the supervisor of this group as well as\ndocumentation as to this group s capabilities.\n\nI. Equipment Repair and Replacement\nAll pumps, controllers, water meters, piping, controls, solenoid valves, timers, and interlocks required to meet these specifications and not presently installed, shall be furnished, and installed by the veteran s administration.\nIf the COR and the contractor agree that a conductivity controller, component, or pump is irreparable, the COR shall have a purchase order issued to the contractor for a replacement. The treatment contractor shall recommend new controllers and pumps. The water treatment contractor shall coordinate replacement of special application equipment.\nReplacement of defective auxiliary equipment such as water meters, solenoid valves, motorized valves, timers, and interlocks, shall be directed by the COR. The Veteran s Administration shall bear the cost of the equipment and installation if not installed in house.\n\nJ. Chemical Identification, Handling and Storage\nThe contractor shall post complete and updated Safety Data Sheets (SDS) that meet OSHA\nhazardous communications standards adjacent to each chemical feed station. A second set shall be provided to the COR.\nThe vendor must supply a 24-hour, 7 day per week emergency response group who can be called for emergency information regarding chemical spills and/or accidents involving his products. The vendor shall submit the emergency phone number and a sample of documentation outlining instructions for reporting accidents and chemical spills.\n\nK. Training\nThe vendor shall provide operator training that includes chemical testing, reporting, and\nunderstanding the chemical program s test results. Training Program to include reference\nmanuals and audiovisual training of at least 4 hours of cooling operator training.\n\nL. Testing Requirements\nThe contractor shall draw samples from each system as necessary, up to 24 but not less than once monthly, and shall test for:\nSystems\nControl Range\nCondenser Water Systems\npH\n9.0 maximum\nCycles\n4-6\nConductivity\n1500 maximum (mmhos)\nCu\nless than 0.20 ppm\nFe\nless than 0.50 ppm\nHalogen (chlorine./bromine)\n0.5-1.0 ppm Free residual or per label guidelines.\nTTA\n>1.0 ppm\nORP\n300-500 mV\nTotal Hardness\nRecord\nMicrobiological\n<10,000 colony forming units per ml (bulk water)\nBoiler Water Systems\nSoftener\nTotal Hardness\n0-1 ppm\nConductivity\nRecord\nDealkalizer\nTotal Hardness\n0-1 ppm\nConductivity\nRecord\nM-Alkalinity\n0-30 ppm\nFeedwater\n\nTotal Hardness\n0-1 ppm\nConductivity\nRecord\nBoilers\nConductivity\n3500 mmhos max.\np-alkalinity\n200-600 ppm\nQuadraSperse\n200-400 ppm\nSulfite\n40-60 ppm\nCondensate\nTotal Hardness\n0-1 ppm\nConductivity\nRecord\npH\n8.0-9.0\n\nWhile on site, the contractor shall review the building s daily water treatment logs with the\nengineers. The contractor shall furnish a monthly report, to be completed on site that shall\ncontain the following information:\nM. Contractor Tests Results\nResults of inspection of water treatment equipment to insure proper operation.\nResults of inspection of cooling tower for leakage and overflow.\nResults of cooling tower bleed solenoid for proper operation, record makeup and blow down water meter readings.\nNotation that the engineer is or is not keeping an in-house test log and biocide test strip record and recommended corrective action for any deficiencies determined from the engineer s test log and discussions with the engineer.\nNote and recommend any corrective action for any deficiencies determined by the contractor s test. Notation of any changes made to the controllers or pumps. Previous and present closed system and boiler make-up water meter readings. Water balance information to show systems are not scaling. One copy of the report is to be emailed, and duplicate copies are to be submitted to VA Shop Supervisor.\nN. Equipment Settings and Adjustments\nThe contractor shall perform or supervise all adjustments to conductivity controllers, timers, and pumps. Independent Testing: on a random basis, at VA s discretion, the V.A. may require the contractor to draw a duplicate sample from each system and leave it at the property to be sent for analysis by an independent laboratory. The VA shall bear the cost of the independent test.\nThe following information must be supplied with each sample requested by the V.A.:\nComplete address and building system identification.\nName of person to contact for information about the sample.\nIdentification of the chemical treatment used to include company name and chemical treatment identifications.\nO. Contractor Response\nThe contractor shall arrive on site for all emergency calls within four (4) hours of notification.\nP. Corrosion Coupons\nThe contractor shall run corrosion coupon tests on the open recirculating systems for mild steel and copper, continuously on 60 90-day intervals. The contractor shall furnish a written report documenting corrosion rates in mils/year on 60 90-day intervals. Corrosion rates shall be maintained below 1.0 mils/year for mild steel (average corrosion) and below 0.1 mils per year for copper coupons (average corrosion). Failure to maintain specified corrosion levels can result in the termination of contract for cause.\nComplete Water Analyses The contractor shall perform a complete water analysis on all systems quarterly. These samples should be sent to the contractor s laboratory for analysis.\nQ. Project list\nTo provide this location with optimum efficiency and effectiveness from the water treatment program, the contractor will establish a project list for each system treated. The project list contains special items that are to be accomplished by plant personnel, the contractor, or both.\nItems on the list are mutually agreed upon as being important / necessary. Each project on the list is given a priority, estimated starting and completion dates. The project list is reviewed and updated during regular review meetings.\nR. Treatment Chemicals, Cooling Tower Treatment\nThe cooling tower shall be treated with a liquid scale and corrosion inhibitor, containing FlexPro technology or technically approved equal, Halogen stable yellow metal corrosion inhibitors, mild steel corrosion inhibitors, and scale inhibitors. The products must effectively control corrosion and scale of ferrous metals, copper, bronze, brass and galvanized. For water conservation purposes, tower cycles must be maintained at 4-6 cycles of concentration at a pH of 9.0 max. The VA doesn t want pH control using acid or related compounds.\nProgram must keep corrosion rates below 1 mil per year for mild steel (average corrosion) and below 0.1 mils per year for copper (average corrosion). Program must keep heat transfer surfaces free of mineral scale or other deposits. If mineral scale or other deposits are found, the contractor shall chemically and mechanically clean the equipment using his own manpower at his own cost. There are (4) cooling towers at the Perry Point VA Medical Center. The cooling towers are operational April, May, June, July, August, September, October, November.\nSampling of each cooling tower for Legionella by culture methodology must be performed within 7 days of startup and every 90 days during periods when the cooling tower is operational or operational-ready (i.e., cleaned, disinfected, full of water and ready for operation). At a minimum, samples must be collected from each basin/sump, and the supply to and return from the chillers. The facility is concerned with bacterial control in water systems and the potential growth of Legionnaire s Disease Bacteria (LDB). The vendor shall provide laboratory data concerning biocidal efficacy in controlling LDB growth. Total of 36 Legionella tests per year.\nThe vendor shall provide chemicals to comply with the Cooling Technology Institute (CTI),\nLegionellosis Guideline: Best Practices for Control of Legionella and VA Directive 1061 (2021)\nAppendix D, Prevention of Legionella Disease from cooling towers at Department of Veterans\nAffairs Medical Facilities . Contractor shall assist facility in development of a Hazard Analysis and Critical Control Point (HACCP) plan in Accordance with ASHRAE Standard 188P.\nS. Biocides\nAll biocides must be registered with the US Environmental Protection Agency. The contractor shall provide a stabilized solid oxidizing biocide as the primary biocide. The contractor shall add the oxidizing biocide or alternative product in accordance with label instructions or manufacturer s guidelines, and sufficient to maintain the desired free halogen residual.\nThe contractor shall also provide a non-oxidizing biocide that has proven effective in the control of aerobic slime forming bacteria, algae, fungi, yeasts and molds and other organisms. The nonoxidizing biocide shall be either 4% Isothiazolin or 50% Gluteraldehyde.\nThe contractor shall provide necessary potable water treatment that must be NSF approved and recognized and approved by MDE for use in potable water treatment facilities. The potable water treatment plant coagulant shall be USALCO DELPAC 2020 or approved equal. Jar testing shall be conducted on any approved equal at the contractor s expense. Coagulant deliveries shall also be delivered via bulk tanker trucks in 1,000--1,500-gallon loads using a 2 camlock type hose.\nT. Operating Data\nSteam production-=156,510,000 pounds per year 2021\nCondensate Return-0% for calculation purposes\nGallons per year makeup 14-18 million gallons per year\nDomestic Water Production =approximately 140 million gallons per year\nAssume Feedwater dissolved oxygen content is 2 ppm\nNatural gas use for boilers is 169,798,000 CCF per year in 2021\nBoiler Pressure is 100psi\nMonthly service required and as needed at no extra cost\nMonthly legionella tests per year on all tower systems\n\nNeeds Specific to Baltimore VAMC\nTHREE AIR-COOLED TOWERS (OPEN LOOP) AND TWO (CLOSED LOOP) SYSTEMS (HEATING AND CHILLED WATER)\nThe Contractor shall provide all personnel, management, material, parts, equipment, supplies, labor and transportation in performing routine water treatment and testing services for three (3) Baltimore Air-Cooled Towers (open loop) and two (2) closed loop system (heating and chilled water). This will include the recommended once a year for systems operated seasonally and twice a year for system operated twice a year for system operated year-round located at the Baltimore VA Medical Center.\nPreventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions. To clean, lubricate, calibrate, test and replace faulty or worn parts and/or parts which are likely to become faulty, fail or become worn, repair or adjust components, or assemblies of components as necessitated by wear, tear, damage, or failure of parts, returning the equipment and/or instrument to the operating condition defined in the manufacturer s specifications.\nESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract.\n\nPREVENTIVE MAINTENNANCE REQUIREMENTS\nA. Unless otherwise scheduled, monthly, provide routine water treatment and testing services to include at a minimum, complete water treatment services rendered by trained personnel under professional engineering supervision. Such services are designed to control and inhibit corrosion, pitting, scale formation and biological growth. This will include the following:\n1. Open systems shall be serviced twice per month from May through October and monthly from November through April.\n2. Closed systems will be serviced monthly year-round.\n3. Vendor will furnish and apply all chemicals.\n4. Inspect and adjust the water treatment equipment. Water treatment equipment is defined as, but not limited to, chemical feed tanks, bypass feeders, chemical and biocide injection pumps, solenoid valves, control panels, time clocks, agitators, and water meters as applicable.\n5. The vendor shall maintain proper chemical concentrations based on normal system operation while optimizing water consumption.\n6. The vendor will collect and analyze water samples and submit water analysis reports as required.\n7. The vendor will perform a water sample test on each cooling tower for the presence of Legionella. This test will be performed twice each year, once at the beginning of the cooling season and once at the end of the cooling season. A written report will be provided outlining the results and any recommended corrective actions. This report must be provided within 14 calendar days of performing the test.\n8. The vendor will perform unscheduled service calls at no additional charge during normal business hours as required to fulfill the requirements of this contract provided the calls are not a result of tampering or abuse by unauthorized personnel or damage caused by others.\n9. Should deposits or significant biological growth occur as a result of negligence or error on the part of the water treatment service provider, the vendor will conduct chemical cleaning of all condenser tubes at no additional cost.\n10. Include in the scope of work are the following:\nProvide for each cooling tower:\no Necessary controller, timers and sensors including spill containment, and tubing to operate the various devices\no Inhibitor dispenser\no 2 biocide feeders+\no 4 Legionella test year\nProvide access real time to the data of the water chemistry of each cooling tower from a data base. The data must be in a format compatible with a Microsoft Office product\nProvide necessary chemicals to maintain the water chemistry of the cooling towers, chiller water and heating water systems in a manner to minimize biological growth as well as corrosion and the buildup of minerals on the surfaces of the cooling towers as well as the surfaces of the chillers and heat exchangers.\nReporting\nB. In order to assure the successful implementation of a water chemistry program there needs to be goals and treatment level metrics. These measurements shall be taken and calculated using both real time system measurements and periodic lab testing. The metrics shall include but not limited to.\nTotal chlorine\nInhibitor level\nNitrite level (closed loop)\nPeriodic Legionella testing based on VA Directive 1061\nWeekly dip slides interpretations\nMild steel Corrosion rate quarterly\nCopper corrosion rate quarterly\nAerobic and anaerobic microbial level\nSystem Turbidity\nThe contractor shall provide a monthly report on the water chemistry, chemical usage, water usage as well as an analysis of the cycles of concentration.\nC. The Contractor will contact the COTR to schedule a PM at least seven (7) calendar days prior to the proposed date. Schedule changes required by the Government after approval shall be made at no additional cost if notice is provided to the Contractor five (5) calendar days or more prior to the scheduled date of accomplishment.\nTraining\nD. The contractor shall provide training of the VA staff on:\nThe basics of cooling tower operation\no Their function\no How they operate\no Water related issued that the water treatments are designed to prevent\nSafety how to handle and dispose of chemicals in a safe manner\nTesting and troubleshooting including:\no Basic testing of water parameters\no Interpretation of periodic testing results and reports\no Necessary information to make adjustments necessary to maintain an efficient program\nD. The goals of the program are the following:\no Suspended solids < 25 for film fill\no Total Dissolved Solids (TDS) <5,000ppm\no pH balance 6.5 - 9\no Chlorides <1,500 ppm\no CaCO3 < 800 ppm\no Sulfates if calcium over 800 < 800 ppm if calcium is under 800 < 5,000ppm\no Silica SiO2< 150 ppm\no Iron <3 ppm\no Manganese < 0.1 ppm\no Ammonia if copper is present < 50 ppm\no Cycles of Concentration 10\n\nNeeds Specific to Loch Raven VAMC: TBD","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24526Q0448","place_of_performance":{"zip":"21201","city":{"code":"4000","name":"Baltimore"},"state":{"code":"MD","name":"Maryland"},"street":"Department of Veterans Affairs LR-Baltimore-Perry Pt VAMCs","country":{"code":"USA","name":"UNITED STATES"},"street2":"10 N Greene St"},"product_service_code":"F103"}],"due_at":"2026-04-24T15:00:00Z","due_date":"2026-04-24","closes_at":"2026-04-24T15:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-07T01:07:54.444994Z","principal_notice_id":"1f8986f0ae5d4c439030fed7c5bf643b","description":{"text":"Department of Veterans Affairs NCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for Loch Raven , Baltimore and Perry Pt VA Medical Centers.\n\nPlease respond to this RFI/Sources Sought 36C24526Q0448 with your:\n1. Business name (including Unique Entity ID (SAM.gov)\n2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned,\nDisadvantaged Small Business, 8(a), etc.), and\n3. Person of contact (including telephone number & email address).\n4. Capability statement and summary of previous experience providing these types of\nservices for the Veterans Health Administration or other similar facilities.\n5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include\napplicable NAICS)\n6. Brief Summary of categories of services that your company can/cannot provide.\n7. Certification(s) / Licenses for meeting the local requirements to provide these\nservices at the Huntington VAMC (if applicable)\n8. Confirmation that your organization has the capability & expertise to meet the\nperformance requirements while complying with applicable limitations in\nsubcontracting by responding to the questions below with your response:\na. Do you intend to self-perform this effort?\nb. If you are located outside the immediate area, how will you self-perform?\nc. Or do you intend to subcontract work under this contract?\nd. If you intend to subcontract work under this contract, how will you ensure\ncompliance with the limitations on subcontracting?\nResponse Instructions:\nResponses must be received by Friday 4/24/ 2026 @ 11:00 AM EST. Responses to the information requested above must be submitted via email to William.Galletta@va.gov\n\nSCOPE OF WORK\nVAMC WIDE CHEMICAL SUPPLY & SUPPORT CONTRACT\nPPVAMC, BAVAMC, LRVAMC\n\nBackground Information:\nThis is a New Contract effort to serve all three major VAMHCS Sites which includes Perry Point VAMC, Baltimore VAMC, and Loch Raven VAMC. The purpose of such is to provide Chemicals necessary for the functioning of HVAC Equipment, Legionella prevention, and exclusive to Perry Point Water Treatment Chemicals. The Statement of Work below identifies each sites needs by different CLINs known as Contractor Line-Item Numbers with descriptive information regarding that CLINs purpose for the specific site. Although billed through different 2237 allocations, the contract is wholistic in nature such that the winning bidder serves the different needs of all 3 campuses.\n\nNeeds Specific to Perry Point VAMC\nPERRY POINT BOILER WATER CHEMICAL & COOLING TOWER TREATMENT SERVICES\nA. Chemical Water Treatment\nVendor will provide services and products which are approved for this specific application. This is a need-based service, varied price maintenance, repair, and technical support agreement.\nFor the boiler plant, Vendor will provide a 25-40% alkaline catalyzed sodium bisulfite oxygen scavenger to remove dissolved oxygen from the feed water and boiler water which leads to pitting of system metallurgy. Vendor will also provide advanced polymer treatment, 25% active sodium hydroxide alkalinity treatment to help prevent deposition of minerals on the boiler heat transfer surfaces. Vendor will provide a triple blend of neutralizing amines (DEAE, Cyclohexylamine and morpholine) to neutralize the carbonic acid that naturally forms when steam condenses to a liquid. This is required to protect return line metallurgy from corrosion and premature failure.\nThe vendor will also provide FlexPro advanced polymer treatment with halogen stable technology or approved equal for the condenser water systems to protect the condenser water systems from corrosion and scaling. Vendor will provide an oxidizing biocide stabilized liquid bromine and a non-oxidizing biocide consisting of 4% isothiazoline to control and protect the systems from microbiological organisms in accordance with ASHRAE, OSHA, CDC, and COOLING TECHNOLOGY INSTITUTE standards for Legionella Risk Minimization. They will provide legionella testing on all four cooling tower systems every 90 days. The testing will include three samples per system and shall be taken from the cooling tower sump, inlet to the condenser and outlet from the condenser. A total of (36) legionella tests shall be included in the proposal. Legionella tests must be sent to a third-party independent laboratory that follows CDC Environmental Techniques Evaluation (ELITE) protocol.\nB. General\nThe Contractor shall provide the chemicals, consulting services and the handling of all chemicals (except testing reagents) as required to control corrosion, microbiological growth, scale, algae, and slime in all heat transfer equipment and the associated systems. These systems include potable water, boiler water, and the open loop condenser water systems.\nAll chemicals supplied by the contractor shall be specifically formulated for the system in which they are being used according to the recommendations of a qualified chemist or laboratory.\nAll chemicals, except for solid products, shall be delivered using BULK delivery system for boiler chemistry and NEAT delivery for the cooling tower chemistry using bulk and neat delivery double-walled storage tanks. The specified chemicals shall conform to all existing local, state, and federal regulations regarding water pollution, and have appropriate EPA registration and FDA approval where applicable.\nThe contractor shall also warrant that the chemicals used in the water treatment program shall have no detrimental effect on any surfaces of the systems being treated and will bear the costs of any repairs made necessary by their use. To ensure quality control, the contract company shall be ISO-9000 certified.\nInvoices submitted to the VA need to include a copy of the delivery ticket showing the\nnecessary proof the product was delivered to the Perry Point VA Medical Center. Submit\nsperate invoice for each delivery ticket.\n\nC. Contractor Qualifications\nThe contractor shall provide evidence of experience in providing cooling water, boiler water,\nclosed system, and condensate system treatment services of the types and to the extent as outlined in these specifications. Due to the extensive capital costs involved with our equipment, an experienced water treatment company is required. The Contractor shall provide evidence of successfully conducting such operations for a period of not less than twenty (20) years.\nThe contractor shall own and operate laboratory facilities capable of performing a complete range of analytical work to assist with the monitoring, control, and troubleshooting of the facilities water systems. The successful vendor shall have a completely staffed laboratory that has at least two Ph.D. s in chemistry or related sciences. The vendor shall provide the name of the Ph.D.-level laboratory personnel, including educational background.\nAll field personnel for the contractor servicing our facility must have a college or university degree in a technical discipline and have at least 20 years of water treatment experience. Contractors have at least two backup personnel who also have at least 10 years of water treatment experience.\nSince the facility will rely on the contractor for his/her troubleshooting expertise and problem-solving capabilities, the Service Engineer from the contract company must be a degreed engineering professional. The primary representative must currently provide the same size and scope of service required by our facility to at least one other federal government campus customer in Maryland. Customer name, phone number and reference information must be included in bid package. Failure to include will render the bid unresponsive.\nThe Contractor laboratory facility shall be equipped to run the following: water analyses, deposit analyses, corrosion coupon analyses, microbiological analyses, ion exchange resin analyses, and metallurgical analyses.\nContractors primary service representative for this account shall have the following certification. Within the past year-OSHA 30 Hour Safety Training. The primary representative shall also have OSHA approved HAZWOPER 40 Hour Training Certifications with annual refresher. Proof of certifications shall be submitted with bid package. At least one backup representative must have OSHA 30 Hour Safety Training. Proof of certification for backup representative must be submitted with bid package. The facility uses Walchem microprocessors to properly feed and control the blowdown and chemical feed to the condenser water systems and boiler water systems. Since these microprocessors are critical to our operations, the primary service representative and backup representative must be factory certified by Walchem in their use and operation. Training certificates must be submitted with bid package or bid will be rendered unresponsive.\nD. Technical Support\nThe vendor shall have a fully staffed technical support group, including a licensed professional engineer. These personnel shall be available for consultation during normal business hours of the facility. The vendor shall submit a list of at least three (3) members of this support group, including their qualifications, phone numbers and normal working hours.\nE. Microbiological Testing\nThe facility is concerned with bacterial control in water systems and the potential growth of\nLegionnaire s Disease Bacteria (LDB). The vendor shall provide laboratory data concerning\nbiocidal efficacy in controlling LDB growth. The vendor shall provide chemicals to comply with the COOLING TECHNOLOGY INSTITUTE (CTI) Legionellosis Guideline: Best Practices for Control of Legionella . Contractor shall assist facility in development of a HACCP plan in Accordance with ASHRAE Standard 188P.\nF. Insurance Requirements\nThe vendor shall supply a certificate of insurance indicating the types and amounts of insurance provided. The contractor shall assume the entire responsibility for and shall indemnify and save harmless the V.A. of and from all liability for injury to person, death or property damage resulting from or in any way related to the performance of the work under contract.\nThe contractor shall also carry Comprehensive General Liability Insurance as respects bodily injuries or death in the amount of $2,000,000, property damage in the amount of $100,000 and Comprehensive Automobile Liability Insurance including all owned, and hired vehicles, with a $1,000,000 combined single limit, unless otherwise required, and shall furnish to the V.A. a certificate thereof containing such indemnification.\nG. Field Service Capabilities\nThe vendor will have the capability of conducting the following on-site field tests:\n*Microbiological studies\n*Corrosion studies using corrosion coupons\n*Fiber-optic equipment inspections\n*Steam purity studies\n*Elution studies\n*Test heat exchanger studies\n*Dissolved oxygen studies\n*Spectrophotometric testing\n\nH. In-House Regulatory Affairs\nTo ensure that all water treatment programs comply with local, state, and federal laws on\nenvironmental protection, the vendor shall have an in-house regulatory affairs group. The\nvendor shall provide the name and phone number of the supervisor of this group as well as\ndocumentation as to this group s capabilities.\n\nI. Equipment Repair and Replacement\nAll pumps, controllers, water meters, piping, controls, solenoid valves, timers, and interlocks required to meet these specifications and not presently installed, shall be furnished, and installed by the veteran s administration.\nIf the COR and the contractor agree that a conductivity controller, component, or pump is irreparable, the COR shall have a purchase order issued to the contractor for a replacement. The treatment contractor shall recommend new controllers and pumps. The water treatment contractor shall coordinate replacement of special application equipment.\nReplacement of defective auxiliary equipment such as water meters, solenoid valves, motorized valves, timers, and interlocks, shall be directed by the COR. The Veteran s Administration shall bear the cost of the equipment and installation if not installed in house.\n\nJ. Chemical Identification, Handling and Storage\nThe contractor shall post complete and updated Safety Data Sheets (SDS) that meet OSHA\nhazardous communications standards adjacent to each chemical feed station. A second set shall be provided to the COR.\nThe vendor must supply a 24-hour, 7 day per week emergency response group who can be called for emergency information regarding chemical spills and/or accidents involving his products. The vendor shall submit the emergency phone number and a sample of documentation outlining instructions for reporting accidents and chemical spills.\n\nK. Training\nThe vendor shall provide operator training that includes chemical testing, reporting, and\nunderstanding the chemical program s test results. Training Program to include reference\nmanuals and audiovisual training of at least 4 hours of cooling operator training.\n\nL. Testing Requirements\nThe contractor shall draw samples from each system as necessary, up to 24 but not less than once monthly, and shall test for:\nSystems\nControl Range\nCondenser Water Systems\npH\n9.0 maximum\nCycles\n4-6\nConductivity\n1500 maximum (mmhos)\nCu\nless than 0.20 ppm\nFe\nless than 0.50 ppm\nHalogen (chlorine./bromine)\n0.5-1.0 ppm Free residual or per label guidelines.\nTTA\n>1.0 ppm\nORP\n300-500 mV\nTotal Hardness\nRecord\nMicrobiological\n<10,000 colony forming units per ml (bulk water)\nBoiler Water Systems\nSoftener\nTotal Hardness\n0-1 ppm\nConductivity\nRecord\nDealkalizer\nTotal Hardness\n0-1 ppm\nConductivity\nRecord\nM-Alkalinity\n0-30 ppm\nFeedwater\n\nTotal Hardness\n0-1 ppm\nConductivity\nRecord\nBoilers\nConductivity\n3500 mmhos max.\np-alkalinity\n200-600 ppm\nQuadraSperse\n200-400 ppm\nSulfite\n40-60 ppm\nCondensate\nTotal Hardness\n0-1 ppm\nConductivity\nRecord\npH\n8.0-9.0\n\nWhile on site, the contractor shall review the building s daily water treatment logs with the\nengineers. The contractor shall furnish a monthly report, to be completed on site that shall\ncontain the following information:\nM. Contractor Tests Results\nResults of inspection of water treatment equipment to insure proper operation.\nResults of inspection of cooling tower for leakage and overflow.\nResults of cooling tower bleed solenoid for proper operation, record makeup and blow down water meter readings.\nNotation that the engineer is or is not keeping an in-house test log and biocide test strip record and recommended corrective action for any deficiencies determined from the engineer s test log and discussions with the engineer.\nNote and recommend any corrective action for any deficiencies determined by the contractor s test. Notation of any changes made to the controllers or pumps. Previous and present closed system and boiler make-up water meter readings. Water balance information to show systems are not scaling. One copy of the report is to be emailed, and duplicate copies are to be submitted to VA Shop Supervisor.\nN. Equipment Settings and Adjustments\nThe contractor shall perform or supervise all adjustments to conductivity controllers, timers, and pumps. Independent Testing: on a random basis, at VA s discretion, the V.A. may require the contractor to draw a duplicate sample from each system and leave it at the property to be sent for analysis by an independent laboratory. The VA shall bear the cost of the independent test.\nThe following information must be supplied with each sample requested by the V.A.:\nComplete address and building system identification.\nName of person to contact for information about the sample.\nIdentification of the chemical treatment used to include company name and chemical treatment identifications.\nO. Contractor Response\nThe contractor shall arrive on site for all emergency calls within four (4) hours of notification.\nP. Corrosion Coupons\nThe contractor shall run corrosion coupon tests on the open recirculating systems for mild steel and copper, continuously on 60 90-day intervals. The contractor shall furnish a written report documenting corrosion rates in mils/year on 60 90-day intervals. Corrosion rates shall be maintained below 1.0 mils/year for mild steel (average corrosion) and below 0.1 mils per year for copper coupons (average corrosion). Failure to maintain specified corrosion levels can result in the termination of contract for cause.\nComplete Water Analyses The contractor shall perform a complete water analysis on all systems quarterly. These samples should be sent to the contractor s laboratory for analysis.\nQ. Project list\nTo provide this location with optimum efficiency and effectiveness from the water treatment program, the contractor will establish a project list for each system treated. The project list contains special items that are to be accomplished by plant personnel, the contractor, or both.\nItems on the list are mutually agreed upon as being important / necessary. Each project on the list is given a priority, estimated starting and completion dates. The project list is reviewed and updated during regular review meetings.\nR. Treatment Chemicals, Cooling Tower Treatment\nThe cooling tower shall be treated with a liquid scale and corrosion inhibitor, containing FlexPro technology or technically approved equal, Halogen stable yellow metal corrosion inhibitors, mild steel corrosion inhibitors, and scale inhibitors. The products must effectively control corrosion and scale of ferrous metals, copper, bronze, brass and galvanized. For water conservation purposes, tower cycles must be maintained at 4-6 cycles of concentration at a pH of 9.0 max. The VA doesn t want pH control using acid or related compounds.\nProgram must keep corrosion rates below 1 mil per year for mild steel (average corrosion) and below 0.1 mils per year for copper (average corrosion). Program must keep heat transfer surfaces free of mineral scale or other deposits. If mineral scale or other deposits are found, the contractor shall chemically and mechanically clean the equipment using his own manpower at his own cost. There are (4) cooling towers at the Perry Point VA Medical Center. The cooling towers are operational April, May, June, July, August, September, October, November.\nSampling of each cooling tower for Legionella by culture methodology must be performed within 7 days of startup and every 90 days during periods when the cooling tower is operational or operational-ready (i.e., cleaned, disinfected, full of water and ready for operation). At a minimum, samples must be collected from each basin/sump, and the supply to and return from the chillers. The facility is concerned with bacterial control in water systems and the potential growth of Legionnaire s Disease Bacteria (LDB). The vendor shall provide laboratory data concerning biocidal efficacy in controlling LDB growth. Total of 36 Legionella tests per year.\nThe vendor shall provide chemicals to comply with the Cooling Technology Institute (CTI),\nLegionellosis Guideline: Best Practices for Control of Legionella and VA Directive 1061 (2021)\nAppendix D, Prevention of Legionella Disease from cooling towers at Department of Veterans\nAffairs Medical Facilities . Contractor shall assist facility in development of a Hazard Analysis and Critical Control Point (HACCP) plan in Accordance with ASHRAE Standard 188P.\nS. Biocides\nAll biocides must be registered with the US Environmental Protection Agency. The contractor shall provide a stabilized solid oxidizing biocide as the primary biocide. The contractor shall add the oxidizing biocide or alternative product in accordance with label instructions or manufacturer s guidelines, and sufficient to maintain the desired free halogen residual.\nThe contractor shall also provide a non-oxidizing biocide that has proven effective in the control of aerobic slime forming bacteria, algae, fungi, yeasts and molds and other organisms. The nonoxidizing biocide shall be either 4% Isothiazolin or 50% Gluteraldehyde.\nThe contractor shall provide necessary potable water treatment that must be NSF approved and recognized and approved by MDE for use in potable water treatment facilities. The potable water treatment plant coagulant shall be USALCO DELPAC 2020 or approved equal. Jar testing shall be conducted on any approved equal at the contractor s expense. Coagulant deliveries shall also be delivered via bulk tanker trucks in 1,000--1,500-gallon loads using a 2 camlock type hose.\nT. Operating Data\nSteam production-=156,510,000 pounds per year 2021\nCondensate Return-0% for calculation purposes\nGallons per year makeup 14-18 million gallons per year\nDomestic Water Production =approximately 140 million gallons per year\nAssume Feedwater dissolved oxygen content is 2 ppm\nNatural gas use for boilers is 169,798,000 CCF per year in 2021\nBoiler Pressure is 100psi\nMonthly service required and as needed at no extra cost\nMonthly legionella tests per year on all tower systems\n\nNeeds Specific to Baltimore VAMC\nTHREE AIR-COOLED TOWERS (OPEN LOOP) AND TWO (CLOSED LOOP) SYSTEMS (HEATING AND CHILLED WATER)\nThe Contractor shall provide all personnel, management, material, parts, equipment, supplies, labor and transportation in performing routine water treatment and testing services for three (3) Baltimore Air-Cooled Towers (open loop) and two (2) closed loop system (heating and chilled water). This will include the recommended once a year for systems operated seasonally and twice a year for system operated twice a year for system operated year-round located at the Baltimore VA Medical Center.\nPreventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions. To clean, lubricate, calibrate, test and replace faulty or worn parts and/or parts which are likely to become faulty, fail or become worn, repair or adjust components, or assemblies of components as necessitated by wear, tear, damage, or failure of parts, returning the equipment and/or instrument to the operating condition defined in the manufacturer s specifications.\nESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract.\n\nPREVENTIVE MAINTENNANCE REQUIREMENTS\nA. Unless otherwise scheduled, monthly, provide routine water treatment and testing services to include at a minimum, complete water treatment services rendered by trained personnel under professional engineering supervision. Such services are designed to control and inhibit corrosion, pitting, scale formation and biological growth. This will include the following:\n1. Open systems shall be serviced twice per month from May through October and monthly from November through April.\n2. Closed systems will be serviced monthly year-round.\n3. Vendor will furnish and apply all chemicals.\n4. Inspect and adjust the water treatment equipment. Water treatment equipment is defined as, but not limited to, chemical feed tanks, bypass feeders, chemical and biocide injection pumps, solenoid valves, control panels, time clocks, agitators, and water meters as applicable.\n5. The vendor shall maintain proper chemical concentrations based on normal system operation while optimizing water consumption.\n6. The vendor will collect and analyze water samples and submit water analysis reports as required.\n7. The vendor will perform a water sample test on each cooling tower for the presence of Legionella. This test will be performed twice each year, once at the beginning of the cooling season and once at the end of the cooling season. A written report will be provided outlining the results and any recommended corrective actions. This report must be provided within 14 calendar days of performing the test.\n8. The vendor will perform unscheduled service calls at no additional charge during normal business hours as required to fulfill the requirements of this contract provided the calls are not a result of tampering or abuse by unauthorized personnel or damage caused by others.\n9. Should deposits or significant biological growth occur as a result of negligence or error on the part of the water treatment service provider, the vendor will conduct chemical cleaning of all condenser tubes at no additional cost.\n10. Include in the scope of work are the following:\nProvide for each cooling tower:\no Necessary controller, timers and sensors including spill containment, and tubing to operate the various devices\no Inhibitor dispenser\no 2 biocide feeders+\no 4 Legionella test year\nProvide access real time to the data of the water chemistry of each cooling tower from a data base. The data must be in a format compatible with a Microsoft Office product\nProvide necessary chemicals to maintain the water chemistry of the cooling towers, chiller water and heating water systems in a manner to minimize biological growth as well as corrosion and the buildup of minerals on the surfaces of the cooling towers as well as the surfaces of the chillers and heat exchangers.\nReporting\nB. In order to assure the successful implementation of a water chemistry program there needs to be goals and treatment level metrics. These measurements shall be taken and calculated using both real time system measurements and periodic lab testing. The metrics shall include but not limited to.\nTotal chlorine\nInhibitor level\nNitrite level (closed loop)\nPeriodic Legionella testing based on VA Directive 1061\nWeekly dip slides interpretations\nMild steel Corrosion rate quarterly\nCopper corrosion rate quarterly\nAerobic and anaerobic microbial level\nSystem Turbidity\nThe contractor shall provide a monthly report on the water chemistry, chemical usage, water usage as well as an analysis of the cycles of concentration.\nC. The Contractor will contact the COTR to schedule a PM at least seven (7) calendar days prior to the proposed date. Schedule changes required by the Government after approval shall be made at no additional cost if notice is provided to the Contractor five (5) calendar days or more prior to the scheduled date of accomplishment.\nTraining\nD. The contractor shall provide training of the VA staff on:\nThe basics of cooling tower operation\no Their function\no How they operate\no Water related issued that the water treatments are designed to prevent\nSafety how to handle and dispose of chemicals in a safe manner\nTesting and troubleshooting including:\no Basic testing of water parameters\no Interpretation of periodic testing results and reports\no Necessary information to make adjustments necessary to maintain an efficient program\nD. The goals of the program are the following:\no Suspended solids < 25 for film fill\no Total Dissolved Solids (TDS) <5,000ppm\no pH balance 6.5 - 9\no Chlorides <1,500 ppm\no CaCO3 < 800 ppm\no Sulfates if calcium over 800 < 800 ppm if calcium is under 800 < 5,000ppm\no Silica SiO2< 150 ppm\no Iron <3 ppm\no Manganese < 0.1 ppm\no Ammonia if copper is present < 50 ppm\no Cycles of Concentration 10\n\nNeeds Specific to Loch Raven VAMC: TBD","html":"Department of Veterans Affairs NCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for Loch Raven , Baltimore and Perry Pt VA Medical Centers.\n\nPlease respond to this RFI/Sources Sought 36C24526Q0448 with your:\n1. Business name (including Unique Entity ID (SAM.gov)\n2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, \nDisadvantaged Small Business, 8(a), etc.), and\n3. Person of contact (including telephone number & email address).\n4. Capability statement and summary of previous experience providing these types of \nservices for the Veterans Health Administration or other similar facilities.\n5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include \napplicable NAICS)\n6. Brief Summary of categories of services that your company can/cannot provide.\n7. Certification(s) / Licenses for meeting the local requirements to provide these \nservices at the Huntington VAMC (if applicable)\n8. Confirmation that your organization has the capability & expertise to meet the \nperformance requirements while complying with applicable limitations in \nsubcontracting by responding to the questions below with your response:\na. Do you intend to self-perform this effort?\nb. If you are located outside the immediate area, how will you self-perform?\nc. Or do you intend to subcontract work under this contract?\nd. If you intend to subcontract work under this contract, how will you ensure\ncompliance with the limitations on subcontracting?\nResponse Instructions:\nResponses must be received by Friday 4/24/ 2026 @ 11:00 AM EST. Responses to the information requested above must be submitted via email to William.Galletta@va.gov \n\nSCOPE OF WORK\nVAMC WIDE CHEMICAL SUPPLY & SUPPORT CONTRACT\nPPVAMC, BAVAMC, LRVAMC\n\nBackground Information:\nThis is a New Contract effort to serve all three major VAMHCS Sites which includes Perry Point VAMC, Baltimore VAMC, and Loch Raven VAMC. The purpose of such is to provide Chemicals necessary for the functioning of HVAC Equipment, Legionella prevention, and exclusive to Perry Point Water Treatment Chemicals. The Statement of Work below identifies each sites needs by different CLINs known as Contractor Line-Item Numbers with descriptive information regarding that CLINs purpose for the specific site. Although billed through different 2237 allocations, the contract is wholistic in nature such that the winning bidder serves the different needs of all 3 campuses.\n\nNeeds Specific to Perry Point VAMC\nPERRY POINT BOILER WATER CHEMICAL & COOLING TOWER TREATMENT SERVICES\nA. Chemical Water Treatment\nVendor will provide services and products which are approved for this specific application. This is a need-based service, varied price maintenance, repair, and technical support agreement.\nFor the boiler plant, Vendor will provide a 25-40% alkaline catalyzed sodium bisulfite oxygen scavenger to remove dissolved oxygen from the feed water and boiler water which leads to pitting of system metallurgy. Vendor will also provide advanced polymer treatment, 25% active sodium hydroxide alkalinity treatment to help prevent deposition of minerals on the boiler heat transfer surfaces. Vendor will provide a triple blend of neutralizing amines (DEAE, Cyclohexylamine and morpholine) to neutralize the carbonic acid that naturally forms when steam condenses to a liquid. This is required to protect return line metallurgy from corrosion and premature failure.\nThe vendor will also provide FlexPro advanced polymer treatment with halogen stable technology or approved equal for the condenser water systems to protect the condenser water systems from corrosion and scaling. Vendor will provide an oxidizing biocide stabilized liquid bromine and a non-oxidizing biocide consisting of 4% isothiazoline to control and protect the systems from microbiological organisms in accordance with ASHRAE, OSHA, CDC, and COOLING TECHNOLOGY INSTITUTE standards for Legionella Risk Minimization. They will provide legionella testing on all four cooling tower systems every 90 days. The testing will include three samples per system and shall be taken from the cooling tower sump, inlet to the condenser and outlet from the condenser. A total of (36) legionella tests shall be included in the proposal. Legionella tests must be sent to a third-party independent laboratory that follows CDC Environmental Techniques Evaluation (ELITE) protocol.\nB. General\nThe Contractor shall provide the chemicals, consulting services and the handling of all chemicals (except testing reagents) as required to control corrosion, microbiological growth, scale, algae, and slime in all heat transfer equipment and the associated systems. These systems include potable water, boiler water, and the open loop condenser water systems.\nAll chemicals supplied by the contractor shall be specifically formulated for the system in which they are being used according to the recommendations of a qualified chemist or laboratory.\nAll chemicals, except for solid products, shall be delivered using BULK delivery system for boiler chemistry and NEAT delivery for the cooling tower chemistry using bulk and neat delivery double-walled storage tanks. The specified chemicals shall conform to all existing local, state, and federal regulations regarding water pollution, and have appropriate EPA registration and FDA approval where applicable.\nThe contractor shall also warrant that the chemicals used in the water treatment program shall have no detrimental effect on any surfaces of the systems being treated and will bear the costs of any repairs made necessary by their use. To ensure quality control, the contract company shall be ISO-9000 certified.\nInvoices submitted to the VA need to include a copy of the delivery ticket showing the\nnecessary proof the product was delivered to the Perry Point VA Medical Center. Submit\nsperate invoice for each delivery ticket.\n\n\nC. Contractor Qualifications\nThe contractor shall provide evidence of experience in providing cooling water, boiler water,\nclosed system, and condensate system treatment services of the types and to the extent as outlined in these specifications. Due to the extensive capital costs involved with our equipment, an experienced water treatment company is required. The Contractor shall provide evidence of successfully conducting such operations for a period of not less than twenty (20) years.\nThe contractor shall own and operate laboratory facilities capable of performing a complete range of analytical work to assist with the monitoring, control, and troubleshooting of the facilities water systems. The successful vendor shall have a completely staffed laboratory that has at least two Ph.D. s in chemistry or related sciences. The vendor shall provide the name of the Ph.D.-level laboratory personnel, including educational background.\nAll field personnel for the contractor servicing our facility must have a college or university degree in a technical discipline and have at least 20 years of water treatment experience. Contractors have at least two backup personnel who also have at least 10 years of water treatment experience.\nSince the facility will rely on the contractor for his/her troubleshooting expertise and problem-solving capabilities, the Service Engineer from the contract company must be a degreed engineering professional. The primary representative must currently provide the same size and scope of service required by our facility to at least one other federal government campus customer in Maryland. Customer name, phone number and reference information must be included in bid package. Failure to include will render the bid unresponsive.\nThe Contractor laboratory facility shall be equipped to run the following: water analyses, deposit analyses, corrosion coupon analyses, microbiological analyses, ion exchange resin analyses, and metallurgical analyses.\nContractors  primary service representative for this account shall have the following certification. Within the past year-OSHA 30 Hour Safety Training. The primary representative shall also have OSHA approved HAZWOPER 40 Hour Training Certifications with annual refresher. Proof of certifications shall be submitted with bid package. At least one backup representative must have OSHA 30 Hour Safety Training. Proof of certification for backup representative must be submitted with bid package. The facility uses Walchem microprocessors to properly feed and control the blowdown and chemical feed to the condenser water systems and boiler water systems. Since these microprocessors are critical to our operations, the primary service representative and backup representative must be factory certified by Walchem in their use and operation. Training certificates must be submitted with bid package or bid will be rendered unresponsive.\nD. Technical Support\nThe vendor shall have a fully staffed technical support group, including a licensed professional engineer. These personnel shall be available for consultation during normal business hours of the facility. The vendor shall submit a list of at least three (3) members of this support group, including their qualifications, phone numbers and normal working hours.\nE. Microbiological Testing\nThe facility is concerned with bacterial control in water systems and the potential growth of\nLegionnaire s Disease Bacteria (LDB). The vendor shall provide laboratory data concerning\nbiocidal efficacy in controlling LDB growth. The vendor shall provide chemicals to comply with the COOLING TECHNOLOGY INSTITUTE (CTI)  Legionellosis Guideline: Best Practices for Control of Legionella . Contractor shall assist facility in development of a HACCP plan in Accordance with ASHRAE Standard 188P.\nF. Insurance Requirements\nThe vendor shall supply a certificate of insurance indicating the types and amounts of insurance provided. The contractor shall assume the entire responsibility for and shall indemnify and save harmless the V.A. of and from all liability for injury to person, death or property damage resulting from or in any way related to the performance of the work under contract.\nThe contractor shall also carry Comprehensive General Liability Insurance as respects bodily injuries or death in the amount of $2,000,000, property damage in the amount of $100,000 and Comprehensive Automobile Liability Insurance including all owned, and hired vehicles, with a $1,000,000 combined single limit, unless otherwise required, and shall furnish to the V.A. a certificate thereof containing such indemnification.\nG. Field Service Capabilities\nThe vendor will have the capability of conducting the following on-site field tests:\n*Microbiological studies\n*Corrosion studies using corrosion coupons\n*Fiber-optic equipment inspections\n*Steam purity studies\n*Elution studies\n*Test heat exchanger studies\n*Dissolved oxygen studies\n*Spectrophotometric testing\n\nH. In-House Regulatory Affairs\nTo ensure that all water treatment programs comply with local, state, and federal laws on\nenvironmental protection, the vendor shall have an in-house regulatory affairs group. The\nvendor shall provide the name and phone number of the supervisor of this group as well as\ndocumentation as to this group s capabilities.\n\nI. Equipment Repair and Replacement\nAll pumps, controllers, water meters, piping, controls, solenoid valves, timers, and interlocks required to meet these specifications and not presently installed, shall be furnished, and installed by the veteran s administration.\nIf the COR and the contractor agree that a conductivity controller, component, or pump is irreparable, the COR shall have a purchase order issued to the contractor for a replacement. The treatment contractor shall recommend new controllers and pumps. The water treatment contractor shall coordinate replacement of special application equipment.\nReplacement of defective auxiliary equipment such as water meters, solenoid valves, motorized valves, timers, and interlocks, shall be directed by the COR. The Veteran s Administration shall bear the cost of the equipment and installation if not installed in house.\n\nJ. Chemical Identification, Handling and Storage\nThe contractor shall post complete and updated Safety Data Sheets (SDS) that meet OSHA\nhazardous communications standards adjacent to each chemical feed station. A second set shall be provided to the COR.\nThe vendor must supply a 24-hour, 7 day per week emergency response group who can be called for emergency information regarding chemical spills and/or accidents involving his products. The vendor shall submit the emergency phone number and a sample of documentation outlining instructions for reporting accidents and chemical spills.\n\nK. Training\nThe vendor shall provide operator training that includes chemical testing, reporting, and\nunderstanding the chemical program s test results. Training Program to include reference\nmanuals and audiovisual training of at least 4 hours of cooling operator training.\n\nL. Testing Requirements\nThe contractor shall draw samples from each system as necessary, up to 24 but not less than once monthly, and shall test for:\nSystems \nControl Range \nCondenser Water Systems \npH \n9.0 maximum \nCycles \n4-6 \nConductivity \n1500 maximum (mmhos) \nCu \nless than 0.20 ppm \nFe \nless than 0.50 ppm \nHalogen (chlorine./bromine) \n0.5-1.0 ppm Free residual or per label guidelines. \nTTA \n>1.0 ppm \nORP \n300-500 mV \nTotal Hardness \nRecord \nMicrobiological \n<10,000 colony forming units per ml (bulk water) \nBoiler Water Systems \nSoftener \nTotal Hardness \n0-1 ppm \nConductivity \nRecord \nDealkalizer \nTotal Hardness \n0-1 ppm \nConductivity \nRecord \nM-Alkalinity \n0-30 ppm \nFeedwater\n\nTotal Hardness \n0-1 ppm \nConductivity \nRecord \nBoilers \nConductivity \n3500 mmhos max. \np-alkalinity \n200-600 ppm \nQuadraSperse \n200-400 ppm \nSulfite \n40-60 ppm \nCondensate \nTotal Hardness \n0-1 ppm \nConductivity \nRecord \npH \n8.0-9.0 \n\nWhile on site, the contractor shall review the building s daily water treatment logs with the\nengineers. The contractor shall furnish a monthly report, to be completed on site that shall\ncontain the following information:\nM. Contractor Tests Results\nResults of inspection of water treatment equipment to insure proper operation.\nResults of inspection of cooling tower for leakage and overflow.\nResults of cooling tower bleed solenoid for proper operation, record makeup and blow down water meter readings.\nNotation that the engineer is or is not keeping an in-house test log and biocide test strip record and recommended corrective action for any deficiencies determined from the engineer s test log and discussions with the engineer.\nNote and recommend any corrective action for any deficiencies determined by the contractor s test. Notation of any changes made to the controllers or pumps. Previous and present closed system and boiler make-up water meter readings. Water balance information to show systems are not scaling. One copy of the report is to be emailed, and duplicate copies are to be submitted to VA Shop Supervisor.\nN. Equipment Settings and Adjustments\nThe contractor shall perform or supervise all adjustments to conductivity controllers, timers, and pumps. Independent Testing: on a random basis, at VA s discretion, the V.A. may require the contractor to draw a duplicate sample from each system and leave it at the property to be sent for analysis by an independent laboratory. The VA shall bear the cost of the independent test.\nThe following information must be supplied with each sample requested by the V.A.:\nComplete address and building system identification.\nName of person to contact for information about the sample.\nIdentification of the chemical treatment used to include company name and chemical treatment identifications.\nO. Contractor Response\nThe contractor shall arrive on site for all emergency calls within four (4) hours of notification.\nP. Corrosion Coupons\nThe contractor shall run corrosion coupon tests on the open recirculating systems for mild steel and copper, continuously on 60 90-day intervals. The contractor shall furnish a written report documenting corrosion rates in mils/year on 60 90-day intervals. Corrosion rates shall be maintained below 1.0 mils/year for mild steel (average corrosion) and below 0.1 mils per year for copper coupons (average corrosion). Failure to maintain specified corrosion levels can result in the termination of contract for cause.\nComplete Water Analyses The contractor shall perform a complete water analysis on all systems quarterly. These samples should be sent to the contractor s laboratory for analysis.\nQ. Project list\nTo provide this location with optimum efficiency and effectiveness from the water treatment program, the contractor will establish a project list for each system treated. The project list contains special items that are to be accomplished by plant personnel, the contractor, or both.\nItems on the list are mutually agreed upon as being important / necessary. Each project on the list is given a priority, estimated starting and completion dates. The project list is reviewed and updated during regular review meetings.\nR. Treatment Chemicals, Cooling Tower Treatment\nThe cooling tower shall be treated with a liquid scale and corrosion inhibitor, containing FlexPro technology or technically approved equal, Halogen stable yellow metal corrosion inhibitors, mild steel corrosion inhibitors, and scale inhibitors. The products must effectively control corrosion and scale of ferrous metals, copper, bronze, brass and galvanized. For water conservation purposes, tower cycles must be maintained at 4-6 cycles of concentration at a pH of 9.0 max. The VA doesn t want pH control using acid or related compounds.\nProgram must keep corrosion rates below 1 mil per year for mild steel (average corrosion) and below 0.1 mils per year for copper (average corrosion). Program must keep heat transfer surfaces free of mineral scale or other deposits. If mineral scale or other deposits are found, the contractor shall chemically and mechanically clean the equipment using his own manpower at his own cost. There are (4) cooling towers at the Perry Point VA Medical Center. The cooling towers are operational April, May, June, July, August, September, October, November.\nSampling of each cooling tower for Legionella by culture methodology must be performed within 7 days of startup and every 90 days during periods when the cooling tower is operational or operational-ready (i.e., cleaned, disinfected, full of water and ready for operation). At a minimum, samples must be collected from each basin/sump, and the supply to and return from the chillers. The facility is concerned with bacterial control in water systems and the potential growth of Legionnaire s Disease Bacteria (LDB). The vendor shall provide laboratory data concerning biocidal efficacy in controlling LDB growth. Total of 36 Legionella tests per year.\nThe vendor shall provide chemicals to comply with the Cooling Technology Institute (CTI),\n Legionellosis Guideline: Best Practices for Control of Legionella  and VA Directive 1061 (2021)\nAppendix D,  Prevention of Legionella Disease from cooling towers at Department of Veterans\nAffairs Medical Facilities . Contractor shall assist facility in development of a Hazard Analysis and Critical Control Point (HACCP) plan in Accordance with ASHRAE Standard 188P.\nS. Biocides\nAll biocides must be registered with the US Environmental Protection Agency. The contractor shall provide a stabilized solid oxidizing biocide as the primary biocide. The contractor shall add the oxidizing biocide or alternative product in accordance with label instructions or manufacturer s guidelines, and sufficient to maintain the desired free halogen residual.\nThe contractor shall also provide a non-oxidizing biocide that has proven effective in the control of aerobic slime forming bacteria, algae, fungi, yeasts and molds and other organisms. The nonoxidizing biocide shall be either 4% Isothiazolin or 50% Gluteraldehyde.\nThe contractor shall provide necessary potable water treatment that must be NSF approved and recognized and approved by MDE for use in potable water treatment facilities. The potable water treatment plant coagulant shall be USALCO DELPAC 2020 or approved equal. Jar testing shall be conducted on any approved equal at the contractor s expense. Coagulant deliveries shall also be delivered via bulk tanker trucks in 1,000--1,500-gallon loads using a 2  camlock type hose.\nT. Operating Data\nSteam production-=156,510,000 pounds per year 2021\nCondensate Return-0% for calculation purposes\nGallons per year makeup 14-18 million gallons per year\nDomestic Water Production =approximately 140 million gallons per year\nAssume Feedwater dissolved oxygen content is 2 ppm\nNatural gas use for boilers is 169,798,000 CCF per year in 2021\nBoiler Pressure is 100psi\nMonthly service required and as needed at no extra cost\nMonthly legionella tests per year on all tower systems\n\nNeeds Specific to Baltimore VAMC\nTHREE AIR-COOLED TOWERS (OPEN LOOP) AND TWO (CLOSED LOOP) SYSTEMS (HEATING AND CHILLED WATER)\nThe Contractor shall provide all personnel, management, material, parts, equipment, supplies, labor and transportation in performing routine water treatment and testing services for three (3) Baltimore Air-Cooled Towers (open loop) and two (2) closed loop system (heating and chilled water). This will include the recommended once a year for systems operated seasonally and twice a year for system operated twice a year for system operated year-round located at the Baltimore VA Medical Center.\nPreventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions. To clean, lubricate, calibrate, test and replace faulty or worn parts and/or parts which are likely to become faulty, fail or become worn, repair or adjust components, or assemblies of components as necessitated by wear, tear, damage, or failure of parts, returning the equipment and/or instrument to the operating condition defined in the manufacturer s specifications.\nESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract.\n\n\nPREVENTIVE MAINTENNANCE REQUIREMENTS\nA. Unless otherwise scheduled, monthly, provide routine water treatment and testing services to include at a minimum, complete water treatment services rendered by trained personnel under professional engineering supervision. Such services are designed to control and inhibit corrosion, pitting, scale formation and biological growth. This will include the following:\n1. Open systems shall be serviced twice per month from May through October and monthly from November through April.\n2. Closed systems will be serviced monthly year-round.\n3. Vendor will furnish and apply all chemicals.\n4. Inspect and adjust the water treatment equipment. Water treatment equipment is defined as, but not limited to, chemical feed tanks, bypass feeders, chemical and biocide injection pumps, solenoid valves, control panels, time clocks, agitators, and water meters as applicable.\n5. The vendor shall maintain proper chemical concentrations based on normal system operation while optimizing water consumption.\n6. The vendor will collect and analyze water samples and submit water analysis reports as required.\n7. The vendor will perform a water sample test on each cooling tower for the presence of Legionella. This test will be performed twice each year, once at the beginning of the cooling season and once at the end of the cooling season. A written report will be provided outlining the results and any recommended corrective actions. This report must be provided within 14 calendar days of performing the test.\n8. The vendor will perform unscheduled service calls at no additional charge during normal business hours as required to fulfill the requirements of this contract provided the calls are not a result of tampering or abuse by unauthorized personnel or damage caused by others.\n9. Should deposits or significant biological growth occur as a result of negligence or error on the part of the water treatment service provider, the vendor will conduct chemical cleaning of all condenser tubes at no additional cost.\n10. Include in the scope of work are the following:\n  Provide for each cooling tower:\no Necessary controller, timers and sensors including spill containment, and tubing to operate the various devices\no Inhibitor dispenser\no 2 biocide feeders+\no 4 Legionella test year\n  Provide access real time to the data of the water chemistry of each cooling tower from a data base. The data must be in a format compatible with a Microsoft Office product\n  Provide necessary chemicals to maintain the water chemistry of the cooling towers, chiller water and heating water systems in a manner to minimize biological growth as well as corrosion and the buildup of minerals on the surfaces of the cooling towers as well as the surfaces of the chillers and heat exchangers.\nReporting\nB. In order to assure the successful implementation of a water chemistry program there needs to be goals and treatment level metrics. These measurements shall be taken and calculated using both  real time  system measurements and periodic lab testing. The metrics shall include but not limited to.\n  Total chlorine\n  Inhibitor level\n  Nitrite level (closed loop)\n  Periodic Legionella testing based on VA Directive 1061\n  Weekly dip slides   interpretations\n  Mild steel Corrosion rate   quarterly\n  Copper corrosion rate   quarterly\n  Aerobic and anaerobic microbial level\n  System Turbidity\nThe contractor shall provide a monthly report on the water chemistry, chemical usage, water usage as well as an analysis of the cycles of concentration.\nC. The Contractor will contact the COTR to schedule a PM at least seven (7) calendar days prior to the proposed date. Schedule changes required by the Government after approval shall be made at no additional cost if notice is provided to the Contractor five (5) calendar days or more prior to the scheduled date of accomplishment.\nTraining\nD. The contractor shall provide training of the VA staff on:\n  The basics of cooling tower operation\no Their function\no How they operate\no Water related issued that the water treatments are designed to prevent\n  Safety   how to handle and dispose of chemicals in a safe manner\n  Testing and troubleshooting including:\no Basic testing of water parameters\no Interpretation of periodic testing results and reports\no Necessary information to make adjustments necessary to maintain an efficient program\nD. The goals of the program are the following:\no Suspended solids < 25 for film fill\no Total Dissolved Solids (TDS) <5,000ppm\no pH balance 6.5 - 9\no Chlorides <1,500 ppm\no CaCO3 < 800 ppm\no Sulfates if calcium over 800 < 800 ppm if calcium is under 800 < 5,000ppm\no Silica SiO2< 150 ppm\no Iron <3 ppm\no Manganese < 0.1 ppm\no Ammonia if copper is present < 50 ppm\no Cycles of Concentration 10\n\nNeeds Specific to Loch Raven VAMC: TBD","origin":"detail"},"contacts":[{"name":"William Chris Galletta","role":"primary","email":"William.Galletta@va.gov","phone":"410-637-1506","title":"Contracting Officer"}],"place_of_performance":{"zip":"21201","city":{"code":"4000","name":"Baltimore"},"state":{"code":"MD","name":"Maryland"},"street":"Department of Veterans Affairs LR-Baltimore-Perry Pt VAMCs","country":{"code":"USA","name":"UNITED STATES"},"street2":"10 N Greene St"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"naics_codes":["221310"],"award":{"awardee":{}},"attachments":[{"resource_id":"06860faf16794724910da3ca186ebf4f","name":"36C24526Q0448.docx","kind":"file","mime_type":".docx","size_bytes":38761,"posted_at":"2026-04-14T15:55:01.746Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/06860faf16794724910da3ca186ebf4f/download","mirrored":false}],"awards":[],"related":[{"key":"36C24527Q0070","latest_notice_id":"b0b1581a6a1441b9a46d407375bc44d0","title":"6550--FLOW CYTOMETERY REAGENTS AND SUPPLIES (VA-27-00016081) |","solicitation_number":"36C24527Q0070","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"325413","psc":"6550","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T00:57:17.217280Z"},{"key":"36C24527Q0061","latest_notice_id":"0db5662de5914b458655bed9898980cf","title":"J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT","solicitation_number":"36C24527Q0061","notice_type":"o","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-18","notices":3,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561210","psc":"J065","set_aside":"SBA","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24527Q0081","latest_notice_id":"77e2cd670c3040a6ad2a1fc44daa2bc5","title":"DJ10--Alertus Enhanced Notification Licensing & Premier Support","solicitation_number":"36C24527Q0081","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541519","psc":"DJ10","set_aside":null,"state":"WV","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"SOFTWARE LICENSING AND SUPPORT MARTINSBURG VA MEDICAL CENTER","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C24527Q0073","latest_notice_id":"6ce8b040a9be44d0972b338bc7b6cf88","title":"Arc Flash Hazard Analysis Services","solicitation_number":"36C24527Q0073","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"334515","psc":"6625","set_aside":null,"state":"WV","county":"54033","county_name":"Harrison County","city":"5415628","city_name":"Clarksburg","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24527Q0076","latest_notice_id":"9c0733493507403293e3d1367a3d19b5","title":"6530--MILITARY LITTERS, STANDS AND CARTS","solicitation_number":"36C24527Q0076","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":2,"due_at":"2026-12-02T17:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"337127","psc":"6530","set_aside":null,"state":"WV","county":"54037","county_name":"Jefferson County","city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":"sam_zip","state_evidence":"25430","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"}],"similar_open":[{"key":"FA489727Q0004","latest_notice_id":"1be2f54051d749f3b3104d953c98156d","title":"Re-Activation of Snake River Water Pump","solicitation_number":"FA489727Q0004","notice_type":"k","first_type":"k","first_posted":"2026-11-09","last_posted":"2026-11-09","notices":1,"due_at":"2026-11-30T17:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4897","office_name":"FA4897 366 CONS PKP","naics":"221310","psc":"S114","set_aside":"SBA","state":"ID","county":"16039","county_name":"Elmore County","city":"1654820","city_name":"Mountain Home AFB","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-10T04:49:28.155858Z"},{"key":"15B70027PR000089","latest_notice_id":"c912d189d7364c8b890f9ca51c716824","title":"Water Treatment Chemicals, Testing, Monitoring, and Reporting- Sources Sought Notice / Request for Information","solicitation_number":"15B70027PR000089","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-12-03T16:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1540","sub_name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office_key":"o-15BNAS","office_name":"NATIONAL ACQUISITIONS - CO","naics":"221310","psc":"J046","set_aside":null,"state":"DC","county":"11001","county_name":"District of Columbia","city":"1150000","city_name":"Washington","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"36C26227Q0106","latest_notice_id":"8a66540d3bab41f083edb813277fdeae","title":"H246--Reverse Osmosis, Deionization Equipment and PE Water Softene 2026-2027","solicitation_number":"36C26227Q0106","notice_type":"o","first_type":"r","first_posted":"2026-11-06","last_posted":"2026-11-23","notices":2,"due_at":"2026-12-04T19:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"221310","psc":"H246","set_aside":null,"state":"CA","county":"06037","county_name":"Los Angeles County","city":"0643000","city_name":"Long Beach","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"}],"similar_open_total":6,"indexable":false}