{"canonical":"https://sealedbidder.com/opportunities/36c24526q0175","key":"36C24526Q0175","url":"https://sealedbidder.com/opportunities/36c24526q0175","title":"J045--TAB DEFICIENCY REPORT AND REPAIRS DC VAMC SITE VISIT 1/27/26 @9AM DC VAMC. SDVOSB SET-ASIDE","solicitation_number":"36C24526Q0175","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-01-30T15:00:00Z","first_posted":"2026-01-22","last_posted":"2026-01-22","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561210","psc":"J045","set_aside":"SDVOSBC","place_state":"DC","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"11001","place_county_name":"District of Columbia","place_city":"1150000","place_city_name":"Washington","winner":"VENERGY GROUP LLC","award_amount":null,"publications":[{"notice_id":"5e13cba1097747e8844d6f7dd2617cc8","title":"J045--TAB DEFICIENCY REPORT AND REPAIRS DC VAMC SITE VISIT 1/27/26 @9AM DC VAMC. SDVOSB SET-ASIDE","solicitation_number":"36C24526Q0175","notice_type":"k","base_type":"k","posted":"2026-01-22","posted_at":"2026-01-22T16:09:25.774Z","due_at":"2026-01-30T15:00:00Z","due_date":"2026-01-30","cancelled":false,"archived":true,"archive_date":"2026-03-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5e13cba1097747e8844d6f7dd2617cc8/view","enriched":true,"history":[{"index":3,"title":"J045--TAB DEFICIENCY REPORT AND REPAIRS DC VAMC SITE VISIT 1/27/26 @9AM DC VAMC. SDVOSB SET-ASIDE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-22T16:09:25.774Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"5e13cba1097747e8844d6f7dd2617cc8","solicitation_number":"36C24526Q0175"}]}],"latest_notice_id":"5e13cba1097747e8844d6f7dd2617cc8","first_type":"k","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-01-22","posted_at":"2026-01-22T16:09:25.774Z","created_at":"2026-01-22T16:09:15.782Z","modified_at":"2026-04-01T04:00:08.055Z","response_deadline":{"raw":"2026-01-30T10:00:00-05:00","utc":"2026-01-30T15:00:00Z","date":"2026-01-30","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5e13cba1097747e8844d6f7dd2617cc8/view"},"naics":{"codes":["561210"],"primary":"561210"},"title":"J045--TAB DEFICIENCY REPORT AND REPAIRS DC VAMC SITE VISIT 1/27/26 @9AM DC VAMC. SDVOSB SET-ASIDE","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_id":"100173468","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-31","archive_type":"auto_custom"},"history":[{"index":3,"title":"J045--TAB DEFICIENCY REPORT AND REPAIRS DC VAMC SITE VISIT 1/27/26 @9AM DC VAMC. SDVOSB SET-ASIDE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-22T16:09:25.774Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"5e13cba1097747e8844d6f7dd2617cc8","solicitation_number":"36C24526Q0175"}],"contacts":[{"fax":"NA","name":"JOHN RITTER","role":"primary","email":"JOHN.RITTER2@VA.GOV","phone":"EMAIL ONLY","title":"CONTRACTING OFFICER"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"5e13cba1097747e8844d6f7dd2617cc8","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"5e13cba1097747e8844d6f7dd2617cc8","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-15T01:51:47.312791463Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"f03c42f89a39e000a6f087978a950413f88473a9f59c14e1608644f1cea13ee8","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-15T01:51:47.312791463Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"SOURCE SOUGHT\n\nTHIS IS A SOURCES SOUGHT ANNOUNCEMENT IS FOR INFORMATION & PLANNING PURPOSES ONLY; IT IS NEITHER A SOLICITATION ANNOUNCEMENT NOR A REQUEST FOR PROPOSALS OR QUOTES AND DOES NOT OBLIGATE THE GOVERNMENT TO AWARD A CONTRACT. A CONTRACT MAY NOT BE AWARDED AS A RESULT OF THIS SOURCES SOUGHT ANNOUNCEMENT. REQUESTS FOR A SOLICITATION WILL NOT RECEIVE A RESPONSE. RESPONSES TO THIS SOURCES SOUGHT MUST BE IN WRITING. THE PURPOSE OF THIS SOURCES SOUGHT ANNOUNCEMENT IS FOR MARKET RESEARCH TO MAKE APPROPRIATE ACQUISITION DECISIONS AND TO GAIN KNOWLEDGE OF POTENTIAL QUALIFIED SERVICE DISABLED VETERAN OWNED SMALL BUSINESSES, VETERAN OWNED SMALL BUSINESSES, 8(A), HUBZONE AND OTHER SMALL BUSINESSES INTERESTED AND CAPABLE OF PERFORMING THE WORK. DOCUMENTATION OF TECHNICAL EXPERTISE MUST BE PRESENTED IN SUFFICIENT DETAIL FOR THE GOVERNMENT TO DETERMINE THAT YOUR COMPANY POSSESSES THE NECESSARY FUNCTIONAL AREA EXPERTISE AND EXPERIENCE TO COMPETE FOR THIS ACQUISITION.  RESPONSES TO THIS NOTICE SHALL INCLUDE THE FOLLOWING: (A) COMPANY NAME (B) ADDRESS (C) POINT OF CONTACT (D) PHONE, FAX, AND EMAIL (E) DUNS NUMBER (F) CAGE CODE (G)TAX ID NUMBER (H) TYPE OF SMALL BUSINESS, E.G. SERVICES DISABLED VETERAN OWNED SMALL BUSINESS, VETERAN-OWNED SMALL BUSINESS, 8(A), HUBZONE, WOMEN OWNED SMALL BUSINESS, SMALL DISADVANTAGED BUSINESS, OR SMALL BUSINESS HUBZONE BUSINESS AND (I) MUST PROVIDE A CAPABILITY STATEMENT THAT ADDRESSES THE ORGANIZATIONS QUALIFICATIONS AND ABILITY TO PERFORM AS A CONTRACTOR FOR THE WORK DESCRIBED BELOW.\n\nInspection, Safety Device Testing and Calibration\nBoiler Plant Burners, Controls, Instruments, Data Management and Inspections\nPerry Point VAMC\nPerry Point, MD 21902\n\nNACIS: 811310\nPSC: J044\n\n\n1.  Introduction:\n\nMost Department of Veterans Affairs Medical Centers (VAMC) have a central boiler plant to provide steam for heating and air conditioning, domestic hot water, kitchens and sterilization.  Some medical centers have laundries that utilize steam.\n\nBoiler plant safety, reliability, efficiency and equipment longevity are paramount concerns of VAMC management.  Malfunctioning burners or controls can cause catastrophic events resulting in injuries and death and massive property damage.  Inaccurate or inadequate data management and monitoring systems can fail to warn of unsafe or inefficient performance.  Regular inspections, testing and calibration by expert technicians are an essential part of a program to address these concerns. \n\nThis  Statement of Work  describes the requirements for the inspection, testing and calibration of the boiler plant burners, controls and instruments by qualified technicians.  \n\n \nA separate  Statement of Work  document covers the inspections of the boilers and boiler plant equipment by Qualified Professional Inspectors.\n\n2.  Technician Qualifications:\n\nTechnicians shall have completed at least a one-year trade school and have five years successful experience in this field.  The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plant.  The VAMC facility manager/engineer may define and accept equivalent qualifications.\n\nTechnicians shall demonstrate familiarity with and ready access to the current versions of the following references:  \n\nNFPA 85, Boiler and Combustion Systems Hazards Code.  \n\nVHA Boiler Plant Safety Device Testing Manual, 3rd Edition.\n\nTechnicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, all calibrated within one month of the site visits.  At facilities with programmable digital controls, the technicians must be capable of programming the controls and have the appropriate hardware and software for this.\n\n3.  Inspection, Testing and Calibration Requirements:\n\nTechnicians shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler and boiler plant controls as specified below. This shall be done every six months in accordance with a schedule provided by VAMC.  VAMC may extend the schedule for burners in limited service. \n\nInstrumentation, monitoring and data management systems as listed below shall be calibrated every six months.\n\nProvide at least two weeks notice to the Contracting Officer s Representative (COR) prior to performing the work. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her designate is available on site to monitor the work.\n\n\nVAMC will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival.  This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating.\n\nVAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled testing.\n\nThe inspections, testing and calibrations shall comply with: \n\nThe recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual, 5th Edition.\n \nThe written recommendations of the equipment manufacturers.\n\nThe requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazards Code including applicable appendices.  \n\nBurner performance requirements in this document.\n\nA summary of the work is as follows:\n\nReview boiler plant log sheets and alarm and trouble reports.\n\nReview records that show combustion performance (flue gas oxygen and carbon monoxide).\n\nPerform overall visual inspection of systems.  Verify that systems comply with referenced codes and VAMC requirements stated in this contract.\n\nTest and record the operation and set points of all burner/boiler safety interlock devices.  Refer to list below.  Verify that the set points and operating points are within approximately 20% of normal operating parameters.  Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation.  \n\nOperate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output. \n\nCompare the combustion performance data with VAMC requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. \n\nVerify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy.\n\nImmediately inform COR of any recommended repairs or modifications.\n\nAll of interlocks and safety devices to be inspected and tested on each boiler/burner/equipment, are contained in the VHA Boiler Plant Safety Devices Testing Manual, 5th Edition, along with testing procedures.\n\nRequired burner performance (natural gas and fuel oil):\n\nTurndown (ratio of maximum and minimum firing rates):  10/1    8/1    5/1    4/1  (Refer to original burner specification).\n\nAchieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates.\n\nMaximum carbon monoxide:  200 parts per million (ppm)\n\nMaximum NOx:  _____ (Refer to original burner specification).\n\nFlue gas oxygen:  2.5   4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single-point positioning systems).\n\nFlue gas oxygen (low excess air burners):  1.0   2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single point positioning systems).\n\nNo visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations.\n\n*Copies of the applicable emissions regulations must be available in the boiler plant office.\n\nFlames shall be stable with no pulsations, shall be retained near burner, no blowoff or flashbacks, no constant flame impingement on refractory or waterwalls.\n\nList of instrumentation and controls to be inspected and calibrated:\n\nSteam flow transmitters (all).\n\nSteam flow recorders/computer readout.\n\nFlue gas oxygen sampling, analyzing and recorder/computer readout.\n\nBoiler and economizer stack temperature transmitters and recorder/computer readout.\n\nMaster steam pressure and combustion controllers.\n\nBoiler outlet draft controllers.\n\nBoiler water level controllers.\n\nFeedwater deaerator and condensate storage tank water level controllers including overflow.\n\nAll pressure and temperature sensors and transmitters.\n\nAll signal processing and readout devices.\n\n4.  Report Requirements:\n\nProvide complete written report of the inspection fully describing all tests performed, all findings, and recommendations. The report shall have two sections the first section will be in a table form that with four columns: \nThe first column labeled  FUNCTION  did the device pass or fail. \nThe second column labeled  Device  list the device number and description in accordance with the VHA Boiler Plant Safety Devices Testing Manual,5thd Edition.\nThe third labeled  Deficiencies-Recommendations  \nThe fourth column labeled  corrective actions  list any corrective actions taken during the inspection.\nThe next section shall be in paragraph/bulleted form and list each device individual in accordance to the VHA Boiler Plant Safety Devices Testing Manual, 5th Edition. Plus the section must reference the correct Master Specification and Standard Detail for that device. See sample below.\n\n5.1. Condensate Storage Tank High Water Alarm\nPurpose: High water level may be an indication of condensate transfer pump\nfailure that could lead to low water condition in the feedwater deaerator and in the boilers. There may be a failure of make-up water controls.\nRecommended set point: 4 inches below overflow level and 2/3 of tank height.\nPotential hazards due to failure of high water alarm: Feedwater deaerator\nrunning dry and, consequently, boiler feed pumps running dry will cause\noverheating and damage to pumps and potential for plant shut down. Failure of\nmake-up water controls (in open position) could lead to significant cost from\nwaste of water and condensate from the tank overflow if this occurs over a long\ntime period.\n\nRecommended type of device: Conductivity probe type switch. Float type\nswitches have high failure rate in this application where they are exposed to flash\nsteam that causes seals to harden and prevent float movement.\nVA Master Specification section: 23 50 11 (old 15625).\nwww.va.gov/facmgt/standard/\nVA Standard Detail: SD232111-05.pdf www.va.gov/facmgt/standard/\nFailure rate of float types: 48% (BEI study of VA boiler plants).\nMake and Model: Mercoid Float\nDid it function properly: No\nCategory & Action Time Limit: Upon Failure or Within 5 Years\nComments: Float type switches are not allowed for high water alarms. The VA\nrecommended switch type is a conductivity probe type switch. Install the VA\nrecommended switch and set to alarm at 2/3 of the tank height. There are valves\nthat can isolate this alarm. These valves must be made lockable only in the\noperating position.\n\nFurnish report within one week of each facility inspection in  Microsoft Word  format by email to the COTR and to the VA Headquarters office designated. Provide hard copies of data sheets and flue gas analyzer  strip  printouts to the COTR within one week of visit.\n\nAll safety-related deficiencies shall be immediately reported to the COTR, Boiler Plant Supervisor and/or Chief Engineer during the inspection visit.\n\n\nAddendum","text":"SOURCE SOUGHT\n\nTHIS IS A SOURCES SOUGHT ANNOUNCEMENT IS FOR INFORMATION & PLANNING PURPOSES ONLY; IT IS NEITHER A SOLICITATION ANNOUNCEMENT NOR A REQUEST FOR PROPOSALS OR QUOTES AND DOES NOT OBLIGATE THE GOVERNMENT TO AWARD A CONTRACT. A CONTRACT MAY NOT BE AWARDED AS A RESULT OF THIS SOURCES SOUGHT ANNOUNCEMENT. REQUESTS FOR A SOLICITATION WILL NOT RECEIVE A RESPONSE. RESPONSES TO THIS SOURCES SOUGHT MUST BE IN WRITING. THE PURPOSE OF THIS SOURCES SOUGHT ANNOUNCEMENT IS FOR MARKET RESEARCH TO MAKE APPROPRIATE ACQUISITION DECISIONS AND TO GAIN KNOWLEDGE OF POTENTIAL QUALIFIED SERVICE DISABLED VETERAN OWNED SMALL BUSINESSES, VETERAN OWNED SMALL BUSINESSES, 8(A), HUBZONE AND OTHER SMALL BUSINESSES INTERESTED AND CAPABLE OF PERFORMING THE WORK. DOCUMENTATION OF TECHNICAL EXPERTISE MUST BE PRESENTED IN SUFFICIENT DETAIL FOR THE GOVERNMENT TO DETERMINE THAT YOUR COMPANY POSSESSES THE NECESSARY FUNCTIONAL AREA EXPERTISE AND EXPERIENCE TO COMPETE FOR THIS ACQUISITION. RESPONSES TO THIS NOTICE SHALL INCLUDE THE FOLLOWING: (A) COMPANY NAME (B) ADDRESS (C) POINT OF CONTACT (D) PHONE, FAX, AND EMAIL (E) DUNS NUMBER (F) CAGE CODE (G)TAX ID NUMBER (H) TYPE OF SMALL BUSINESS, E.G. SERVICES DISABLED VETERAN OWNED SMALL BUSINESS, VETERAN-OWNED SMALL BUSINESS, 8(A), HUBZONE, WOMEN OWNED SMALL BUSINESS, SMALL DISADVANTAGED BUSINESS, OR SMALL BUSINESS HUBZONE BUSINESS AND (I) MUST PROVIDE A CAPABILITY STATEMENT THAT ADDRESSES THE ORGANIZATIONS QUALIFICATIONS AND ABILITY TO PERFORM AS A CONTRACTOR FOR THE WORK DESCRIBED BELOW.\n\nInspection, Safety Device Testing and Calibration\nBoiler Plant Burners, Controls, Instruments, Data Management and Inspections\nPerry Point VAMC\nPerry Point, MD 21902\n\nNACIS: 811310\nPSC: J044\n\n1. Introduction:\n\nMost Department of Veterans Affairs Medical Centers (VAMC) have a central boiler plant to provide steam for heating and air conditioning, domestic hot water, kitchens and sterilization. Some medical centers have laundries that utilize steam.\n\nBoiler plant safety, reliability, efficiency and equipment longevity are paramount concerns of VAMC management. Malfunctioning burners or controls can cause catastrophic events resulting in injuries and death and massive property damage. Inaccurate or inadequate data management and monitoring systems can fail to warn of unsafe or inefficient performance. Regular inspections, testing and calibration by expert technicians are an essential part of a program to address these concerns.\n\nThis Statement of Work describes the requirements for the inspection, testing and calibration of the boiler plant burners, controls and instruments by qualified technicians.\n\nA separate Statement of Work document covers the inspections of the boilers and boiler plant equipment by Qualified Professional Inspectors.\n\n2. Technician Qualifications:\n\nTechnicians shall have completed at least a one-year trade school and have five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plant. The VAMC facility manager/engineer may define and accept equivalent qualifications.\n\nTechnicians shall demonstrate familiarity with and ready access to the current versions of the following references:\n\nNFPA 85, Boiler and Combustion Systems Hazards Code.\n\nVHA Boiler Plant Safety Device Testing Manual, 3rd Edition.\n\nTechnicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, all calibrated within one month of the site visits. At facilities with programmable digital controls, the technicians must be capable of programming the controls and have the appropriate hardware and software for this.\n\n3. Inspection, Testing and Calibration Requirements:\n\nTechnicians shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler and boiler plant controls as specified below. This shall be done every six months in accordance with a schedule provided by VAMC. VAMC may extend the schedule for burners in limited service.\n\nInstrumentation, monitoring and data management systems as listed below shall be calibrated every six months.\n\nProvide at least two weeks notice to the Contracting Officer s Representative (COR) prior to performing the work. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her designate is available on site to monitor the work.\n\nVAMC will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating.\n\nVAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled testing.\n\nThe inspections, testing and calibrations shall comply with:\n\nThe recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual, 5th Edition.\n\nThe written recommendations of the equipment manufacturers.\n\nThe requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazards Code including applicable appendices.\n\nBurner performance requirements in this document.\n\nA summary of the work is as follows:\n\nReview boiler plant log sheets and alarm and trouble reports.\n\nReview records that show combustion performance (flue gas oxygen and carbon monoxide).\n\nPerform overall visual inspection of systems. Verify that systems comply with referenced codes and VAMC requirements stated in this contract.\n\nTest and record the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Verify that the set points and operating points are within approximately 20% of normal operating parameters. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation.\n\nOperate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output.\n\nCompare the combustion performance data with VAMC requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data.\n\nVerify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy.\n\nImmediately inform COR of any recommended repairs or modifications.\n\nAll of interlocks and safety devices to be inspected and tested on each boiler/burner/equipment, are contained in the VHA Boiler Plant Safety Devices Testing Manual, 5th Edition, along with testing procedures.\n\nRequired burner performance (natural gas and fuel oil):\n\nTurndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification).\n\nAchieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates.\n\nMaximum carbon monoxide: 200 parts per million (ppm)\n\nMaximum NOx: _____ (Refer to original burner specification).\n\nFlue gas oxygen: 2.5 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single-point positioning systems).\n\nFlue gas oxygen (low excess air burners): 1.0 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single point positioning systems).\n\nNo visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations.\n\n*Copies of the applicable emissions regulations must be available in the boiler plant office.\n\nFlames shall be stable with no pulsations, shall be retained near burner, no blowoff or flashbacks, no constant flame impingement on refractory or waterwalls.\n\nList of instrumentation and controls to be inspected and calibrated:\n\nSteam flow transmitters (all).\n\nSteam flow recorders/computer readout.\n\nFlue gas oxygen sampling, analyzing and recorder/computer readout.\n\nBoiler and economizer stack temperature transmitters and recorder/computer readout.\n\nMaster steam pressure and combustion controllers.\n\nBoiler outlet draft controllers.\n\nBoiler water level controllers.\n\nFeedwater deaerator and condensate storage tank water level controllers including overflow.\n\nAll pressure and temperature sensors and transmitters.\n\nAll signal processing and readout devices.\n\n4. Report Requirements:\n\nProvide complete written report of the inspection fully describing all tests performed, all findings, and recommendations. The report shall have two sections the first section will be in a table form that with four columns:\nThe first column labeled FUNCTION did the device pass or fail.\nThe second column labeled Device list the device number and description in accordance with the VHA Boiler Plant Safety Devices Testing Manual,5thd Edition.\nThe third labeled Deficiencies-Recommendations\nThe fourth column labeled corrective actions list any corrective actions taken during the inspection.\nThe next section shall be in paragraph/bulleted form and list each device individual in accordance to the VHA Boiler Plant Safety Devices Testing Manual, 5th Edition. Plus the section must reference the correct Master Specification and Standard Detail for that device. See sample below.\n\n5.1. Condensate Storage Tank High Water Alarm\nPurpose: High water level may be an indication of condensate transfer pump\nfailure that could lead to low water condition in the feedwater deaerator and in the boilers. There may be a failure of make-up water controls.\nRecommended set point: 4 inches below overflow level and 2/3 of tank height.\nPotential hazards due to failure of high water alarm: Feedwater deaerator\nrunning dry and, consequently, boiler feed pumps running dry will cause\noverheating and damage to pumps and potential for plant shut down. Failure of\nmake-up water controls (in open position) could lead to significant cost from\nwaste of water and condensate from the tank overflow if this occurs over a long\ntime period.\n\nRecommended type of device: Conductivity probe type switch. Float type\nswitches have high failure rate in this application where they are exposed to flash\nsteam that causes seals to harden and prevent float movement.\nVA Master Specification section: 23 50 11 (old 15625).\nwww.va.gov/facmgt/standard/\nVA Standard Detail: SD232111-05.pdf www.va.gov/facmgt/standard/\nFailure rate of float types: 48% (BEI study of VA boiler plants).\nMake and Model: Mercoid Float\nDid it function properly: No\nCategory & Action Time Limit: Upon Failure or Within 5 Years\nComments: Float type switches are not allowed for high water alarms. The VA\nrecommended switch type is a conductivity probe type switch. Install the VA\nrecommended switch and set to alarm at 2/3 of the tank height. There are valves\nthat can isolate this alarm. These valves must be made lockable only in the\noperating position.\n\nFurnish report within one week of each facility inspection in Microsoft Word format by email to the COTR and to the VA Headquarters office designated. Provide hard copies of data sheets and flue gas analyzer strip printouts to the COTR within one week of visit.\n\nAll safety-related deficiencies shall be immediately reported to the COTR, Boiler Plant Supervisor and/or Chief Engineer during the inspection visit.\n\nAddendum","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C24526Q0175","place_of_performance":{"zip":"20422","city":{"name":"WASHINGTON"},"state":{"code":"DC","name":"District of Columbia"},"street":"WASHINGTON DC VAMC 688","country":{"code":"USA","name":"UNITED STATES"},"street2":"FMS 50 IRVING ST NW"},"product_service_code":"J045"}],"due_at":"2026-01-30T15:00:00Z","due_date":"2026-01-30","closes_at":"2026-01-30T15:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","state":"DC","county":"11001","county_name":"District of Columbia","city":"1150000","city_name":"Washington","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"NWJ1Z3M5EAE5","amount":null,"linked_awards":1,"cancelled":false,"archived":true,"updated_at":"2026-10-15T02:32:28.018113Z","principal_notice_id":"5e13cba1097747e8844d6f7dd2617cc8","description":{"text":"SOURCE SOUGHT\n\nTHIS IS A SOURCES SOUGHT ANNOUNCEMENT IS FOR INFORMATION & PLANNING PURPOSES ONLY; IT IS NEITHER A SOLICITATION ANNOUNCEMENT NOR A REQUEST FOR PROPOSALS OR QUOTES AND DOES NOT OBLIGATE THE GOVERNMENT TO AWARD A CONTRACT. A CONTRACT MAY NOT BE AWARDED AS A RESULT OF THIS SOURCES SOUGHT ANNOUNCEMENT. REQUESTS FOR A SOLICITATION WILL NOT RECEIVE A RESPONSE. RESPONSES TO THIS SOURCES SOUGHT MUST BE IN WRITING. THE PURPOSE OF THIS SOURCES SOUGHT ANNOUNCEMENT IS FOR MARKET RESEARCH TO MAKE APPROPRIATE ACQUISITION DECISIONS AND TO GAIN KNOWLEDGE OF POTENTIAL QUALIFIED SERVICE DISABLED VETERAN OWNED SMALL BUSINESSES, VETERAN OWNED SMALL BUSINESSES, 8(A), HUBZONE AND OTHER SMALL BUSINESSES INTERESTED AND CAPABLE OF PERFORMING THE WORK. DOCUMENTATION OF TECHNICAL EXPERTISE MUST BE PRESENTED IN SUFFICIENT DETAIL FOR THE GOVERNMENT TO DETERMINE THAT YOUR COMPANY POSSESSES THE NECESSARY FUNCTIONAL AREA EXPERTISE AND EXPERIENCE TO COMPETE FOR THIS ACQUISITION. RESPONSES TO THIS NOTICE SHALL INCLUDE THE FOLLOWING: (A) COMPANY NAME (B) ADDRESS (C) POINT OF CONTACT (D) PHONE, FAX, AND EMAIL (E) DUNS NUMBER (F) CAGE CODE (G)TAX ID NUMBER (H) TYPE OF SMALL BUSINESS, E.G. SERVICES DISABLED VETERAN OWNED SMALL BUSINESS, VETERAN-OWNED SMALL BUSINESS, 8(A), HUBZONE, WOMEN OWNED SMALL BUSINESS, SMALL DISADVANTAGED BUSINESS, OR SMALL BUSINESS HUBZONE BUSINESS AND (I) MUST PROVIDE A CAPABILITY STATEMENT THAT ADDRESSES THE ORGANIZATIONS QUALIFICATIONS AND ABILITY TO PERFORM AS A CONTRACTOR FOR THE WORK DESCRIBED BELOW.\n\nInspection, Safety Device Testing and Calibration\nBoiler Plant Burners, Controls, Instruments, Data Management and Inspections\nPerry Point VAMC\nPerry Point, MD 21902\n\nNACIS: 811310\nPSC: J044\n\n1. Introduction:\n\nMost Department of Veterans Affairs Medical Centers (VAMC) have a central boiler plant to provide steam for heating and air conditioning, domestic hot water, kitchens and sterilization. Some medical centers have laundries that utilize steam.\n\nBoiler plant safety, reliability, efficiency and equipment longevity are paramount concerns of VAMC management. Malfunctioning burners or controls can cause catastrophic events resulting in injuries and death and massive property damage. Inaccurate or inadequate data management and monitoring systems can fail to warn of unsafe or inefficient performance. Regular inspections, testing and calibration by expert technicians are an essential part of a program to address these concerns.\n\nThis Statement of Work describes the requirements for the inspection, testing and calibration of the boiler plant burners, controls and instruments by qualified technicians.\n\nA separate Statement of Work document covers the inspections of the boilers and boiler plant equipment by Qualified Professional Inspectors.\n\n2. Technician Qualifications:\n\nTechnicians shall have completed at least a one-year trade school and have five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plant. The VAMC facility manager/engineer may define and accept equivalent qualifications.\n\nTechnicians shall demonstrate familiarity with and ready access to the current versions of the following references:\n\nNFPA 85, Boiler and Combustion Systems Hazards Code.\n\nVHA Boiler Plant Safety Device Testing Manual, 3rd Edition.\n\nTechnicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, all calibrated within one month of the site visits. At facilities with programmable digital controls, the technicians must be capable of programming the controls and have the appropriate hardware and software for this.\n\n3. Inspection, Testing and Calibration Requirements:\n\nTechnicians shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler and boiler plant controls as specified below. This shall be done every six months in accordance with a schedule provided by VAMC. VAMC may extend the schedule for burners in limited service.\n\nInstrumentation, monitoring and data management systems as listed below shall be calibrated every six months.\n\nProvide at least two weeks notice to the Contracting Officer s Representative (COR) prior to performing the work. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her designate is available on site to monitor the work.\n\nVAMC will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating.\n\nVAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled testing.\n\nThe inspections, testing and calibrations shall comply with:\n\nThe recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual, 5th Edition.\n\nThe written recommendations of the equipment manufacturers.\n\nThe requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazards Code including applicable appendices.\n\nBurner performance requirements in this document.\n\nA summary of the work is as follows:\n\nReview boiler plant log sheets and alarm and trouble reports.\n\nReview records that show combustion performance (flue gas oxygen and carbon monoxide).\n\nPerform overall visual inspection of systems. Verify that systems comply with referenced codes and VAMC requirements stated in this contract.\n\nTest and record the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Verify that the set points and operating points are within approximately 20% of normal operating parameters. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation.\n\nOperate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output.\n\nCompare the combustion performance data with VAMC requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data.\n\nVerify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy.\n\nImmediately inform COR of any recommended repairs or modifications.\n\nAll of interlocks and safety devices to be inspected and tested on each boiler/burner/equipment, are contained in the VHA Boiler Plant Safety Devices Testing Manual, 5th Edition, along with testing procedures.\n\nRequired burner performance (natural gas and fuel oil):\n\nTurndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification).\n\nAchieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates.\n\nMaximum carbon monoxide: 200 parts per million (ppm)\n\nMaximum NOx: _____ (Refer to original burner specification).\n\nFlue gas oxygen: 2.5 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single-point positioning systems).\n\nFlue gas oxygen (low excess air burners): 1.0 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single point positioning systems).\n\nNo visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations.\n\n*Copies of the applicable emissions regulations must be available in the boiler plant office.\n\nFlames shall be stable with no pulsations, shall be retained near burner, no blowoff or flashbacks, no constant flame impingement on refractory or waterwalls.\n\nList of instrumentation and controls to be inspected and calibrated:\n\nSteam flow transmitters (all).\n\nSteam flow recorders/computer readout.\n\nFlue gas oxygen sampling, analyzing and recorder/computer readout.\n\nBoiler and economizer stack temperature transmitters and recorder/computer readout.\n\nMaster steam pressure and combustion controllers.\n\nBoiler outlet draft controllers.\n\nBoiler water level controllers.\n\nFeedwater deaerator and condensate storage tank water level controllers including overflow.\n\nAll pressure and temperature sensors and transmitters.\n\nAll signal processing and readout devices.\n\n4. Report Requirements:\n\nProvide complete written report of the inspection fully describing all tests performed, all findings, and recommendations. The report shall have two sections the first section will be in a table form that with four columns:\nThe first column labeled FUNCTION did the device pass or fail.\nThe second column labeled Device list the device number and description in accordance with the VHA Boiler Plant Safety Devices Testing Manual,5thd Edition.\nThe third labeled Deficiencies-Recommendations\nThe fourth column labeled corrective actions list any corrective actions taken during the inspection.\nThe next section shall be in paragraph/bulleted form and list each device individual in accordance to the VHA Boiler Plant Safety Devices Testing Manual, 5th Edition. Plus the section must reference the correct Master Specification and Standard Detail for that device. See sample below.\n\n5.1. Condensate Storage Tank High Water Alarm\nPurpose: High water level may be an indication of condensate transfer pump\nfailure that could lead to low water condition in the feedwater deaerator and in the boilers. There may be a failure of make-up water controls.\nRecommended set point: 4 inches below overflow level and 2/3 of tank height.\nPotential hazards due to failure of high water alarm: Feedwater deaerator\nrunning dry and, consequently, boiler feed pumps running dry will cause\noverheating and damage to pumps and potential for plant shut down. Failure of\nmake-up water controls (in open position) could lead to significant cost from\nwaste of water and condensate from the tank overflow if this occurs over a long\ntime period.\n\nRecommended type of device: Conductivity probe type switch. Float type\nswitches have high failure rate in this application where they are exposed to flash\nsteam that causes seals to harden and prevent float movement.\nVA Master Specification section: 23 50 11 (old 15625).\nwww.va.gov/facmgt/standard/\nVA Standard Detail: SD232111-05.pdf www.va.gov/facmgt/standard/\nFailure rate of float types: 48% (BEI study of VA boiler plants).\nMake and Model: Mercoid Float\nDid it function properly: No\nCategory & Action Time Limit: Upon Failure or Within 5 Years\nComments: Float type switches are not allowed for high water alarms. The VA\nrecommended switch type is a conductivity probe type switch. Install the VA\nrecommended switch and set to alarm at 2/3 of the tank height. There are valves\nthat can isolate this alarm. These valves must be made lockable only in the\noperating position.\n\nFurnish report within one week of each facility inspection in Microsoft Word format by email to the COTR and to the VA Headquarters office designated. Provide hard copies of data sheets and flue gas analyzer strip printouts to the COTR within one week of visit.\n\nAll safety-related deficiencies shall be immediately reported to the COTR, Boiler Plant Supervisor and/or Chief Engineer during the inspection visit.\n\nAddendum","html":"SOURCE SOUGHT\n\nTHIS IS A SOURCES SOUGHT ANNOUNCEMENT IS FOR INFORMATION & PLANNING PURPOSES ONLY; IT IS NEITHER A SOLICITATION ANNOUNCEMENT NOR A REQUEST FOR PROPOSALS OR QUOTES AND DOES NOT OBLIGATE THE GOVERNMENT TO AWARD A CONTRACT. A CONTRACT MAY NOT BE AWARDED AS A RESULT OF THIS SOURCES SOUGHT ANNOUNCEMENT. REQUESTS FOR A SOLICITATION WILL NOT RECEIVE A RESPONSE. RESPONSES TO THIS SOURCES SOUGHT MUST BE IN WRITING. THE PURPOSE OF THIS SOURCES SOUGHT ANNOUNCEMENT IS FOR MARKET RESEARCH TO MAKE APPROPRIATE ACQUISITION DECISIONS AND TO GAIN KNOWLEDGE OF POTENTIAL QUALIFIED SERVICE DISABLED VETERAN OWNED SMALL BUSINESSES, VETERAN OWNED SMALL BUSINESSES, 8(A), HUBZONE AND OTHER SMALL BUSINESSES INTERESTED AND CAPABLE OF PERFORMING THE WORK. DOCUMENTATION OF TECHNICAL EXPERTISE MUST BE PRESENTED IN SUFFICIENT DETAIL FOR THE GOVERNMENT TO DETERMINE THAT YOUR COMPANY POSSESSES THE NECESSARY FUNCTIONAL AREA EXPERTISE AND EXPERIENCE TO COMPETE FOR THIS ACQUISITION.  RESPONSES TO THIS NOTICE SHALL INCLUDE THE FOLLOWING: (A) COMPANY NAME (B) ADDRESS (C) POINT OF CONTACT (D) PHONE, FAX, AND EMAIL (E) DUNS NUMBER (F) CAGE CODE (G)TAX ID NUMBER (H) TYPE OF SMALL BUSINESS, E.G. SERVICES DISABLED VETERAN OWNED SMALL BUSINESS, VETERAN-OWNED SMALL BUSINESS, 8(A), HUBZONE, WOMEN OWNED SMALL BUSINESS, SMALL DISADVANTAGED BUSINESS, OR SMALL BUSINESS HUBZONE BUSINESS AND (I) MUST PROVIDE A CAPABILITY STATEMENT THAT ADDRESSES THE ORGANIZATIONS QUALIFICATIONS AND ABILITY TO PERFORM AS A CONTRACTOR FOR THE WORK DESCRIBED BELOW.\n\nInspection, Safety Device Testing and Calibration\nBoiler Plant Burners, Controls, Instruments, Data Management and Inspections\nPerry Point VAMC\nPerry Point, MD 21902\n\nNACIS: 811310\nPSC: J044\n\n\n1.  Introduction:\n\nMost Department of Veterans Affairs Medical Centers (VAMC) have a central boiler plant to provide steam for heating and air conditioning, domestic hot water, kitchens and sterilization.  Some medical centers have laundries that utilize steam.\n\nBoiler plant safety, reliability, efficiency and equipment longevity are paramount concerns of VAMC management.  Malfunctioning burners or controls can cause catastrophic events resulting in injuries and death and massive property damage.  Inaccurate or inadequate data management and monitoring systems can fail to warn of unsafe or inefficient performance.  Regular inspections, testing and calibration by expert technicians are an essential part of a program to address these concerns. \n\nThis  Statement of Work  describes the requirements for the inspection, testing and calibration of the boiler plant burners, controls and instruments by qualified technicians.  \n\n \nA separate  Statement of Work  document covers the inspections of the boilers and boiler plant equipment by Qualified Professional Inspectors.\n\n2.  Technician Qualifications:\n\nTechnicians shall have completed at least a one-year trade school and have five years successful experience in this field.  The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plant.  The VAMC facility manager/engineer may define and accept equivalent qualifications.\n\nTechnicians shall demonstrate familiarity with and ready access to the current versions of the following references:  \n\nNFPA 85, Boiler and Combustion Systems Hazards Code.  \n\nVHA Boiler Plant Safety Device Testing Manual, 3rd Edition.\n\nTechnicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, all calibrated within one month of the site visits.  At facilities with programmable digital controls, the technicians must be capable of programming the controls and have the appropriate hardware and software for this.\n\n3.  Inspection, Testing and Calibration Requirements:\n\nTechnicians shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler and boiler plant controls as specified below. This shall be done every six months in accordance with a schedule provided by VAMC.  VAMC may extend the schedule for burners in limited service. \n\nInstrumentation, monitoring and data management systems as listed below shall be calibrated every six months.\n\nProvide at least two weeks notice to the Contracting Officer s Representative (COR) prior to performing the work. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her designate is available on site to monitor the work.\n\n\nVAMC will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival.  This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating.\n\nVAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled testing.\n\nThe inspections, testing and calibrations shall comply with: \n\nThe recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual, 5th Edition.\n \nThe written recommendations of the equipment manufacturers.\n\nThe requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazards Code including applicable appendices.  \n\nBurner performance requirements in this document.\n\nA summary of the work is as follows:\n\nReview boiler plant log sheets and alarm and trouble reports.\n\nReview records that show combustion performance (flue gas oxygen and carbon monoxide).\n\nPerform overall visual inspection of systems.  Verify that systems comply with referenced codes and VAMC requirements stated in this contract.\n\nTest and record the operation and set points of all burner/boiler safety interlock devices.  Refer to list below.  Verify that the set points and operating points are within approximately 20% of normal operating parameters.  Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation.  \n\nOperate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output. \n\nCompare the combustion performance data with VAMC requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. \n\nVerify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy.\n\nImmediately inform COR of any recommended repairs or modifications.\n\nAll of interlocks and safety devices to be inspected and tested on each boiler/burner/equipment, are contained in the VHA Boiler Plant Safety Devices Testing Manual, 5th Edition, along with testing procedures.\n\nRequired burner performance (natural gas and fuel oil):\n\nTurndown (ratio of maximum and minimum firing rates):  10/1    8/1    5/1    4/1  (Refer to original burner specification).\n\nAchieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates.\n\nMaximum carbon monoxide:  200 parts per million (ppm)\n\nMaximum NOx:  _____ (Refer to original burner specification).\n\nFlue gas oxygen:  2.5   4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single-point positioning systems).\n\nFlue gas oxygen (low excess air burners):  1.0   2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single point positioning systems).\n\nNo visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations.\n\n*Copies of the applicable emissions regulations must be available in the boiler plant office.\n\nFlames shall be stable with no pulsations, shall be retained near burner, no blowoff or flashbacks, no constant flame impingement on refractory or waterwalls.\n\nList of instrumentation and controls to be inspected and calibrated:\n\nSteam flow transmitters (all).\n\nSteam flow recorders/computer readout.\n\nFlue gas oxygen sampling, analyzing and recorder/computer readout.\n\nBoiler and economizer stack temperature transmitters and recorder/computer readout.\n\nMaster steam pressure and combustion controllers.\n\nBoiler outlet draft controllers.\n\nBoiler water level controllers.\n\nFeedwater deaerator and condensate storage tank water level controllers including overflow.\n\nAll pressure and temperature sensors and transmitters.\n\nAll signal processing and readout devices.\n\n4.  Report Requirements:\n\nProvide complete written report of the inspection fully describing all tests performed, all findings, and recommendations. The report shall have two sections the first section will be in a table form that with four columns: \nThe first column labeled  FUNCTION  did the device pass or fail. \nThe second column labeled  Device  list the device number and description in accordance with the VHA Boiler Plant Safety Devices Testing Manual,5thd Edition.\nThe third labeled  Deficiencies-Recommendations  \nThe fourth column labeled  corrective actions  list any corrective actions taken during the inspection.\nThe next section shall be in paragraph/bulleted form and list each device individual in accordance to the VHA Boiler Plant Safety Devices Testing Manual, 5th Edition. Plus the section must reference the correct Master Specification and Standard Detail for that device. See sample below.\n\n5.1. Condensate Storage Tank High Water Alarm\nPurpose: High water level may be an indication of condensate transfer pump\nfailure that could lead to low water condition in the feedwater deaerator and in the boilers. There may be a failure of make-up water controls.\nRecommended set point: 4 inches below overflow level and 2/3 of tank height.\nPotential hazards due to failure of high water alarm: Feedwater deaerator\nrunning dry and, consequently, boiler feed pumps running dry will cause\noverheating and damage to pumps and potential for plant shut down. Failure of\nmake-up water controls (in open position) could lead to significant cost from\nwaste of water and condensate from the tank overflow if this occurs over a long\ntime period.\n\nRecommended type of device: Conductivity probe type switch. Float type\nswitches have high failure rate in this application where they are exposed to flash\nsteam that causes seals to harden and prevent float movement.\nVA Master Specification section: 23 50 11 (old 15625).\nwww.va.gov/facmgt/standard/\nVA Standard Detail: SD232111-05.pdf www.va.gov/facmgt/standard/\nFailure rate of float types: 48% (BEI study of VA boiler plants).\nMake and Model: Mercoid Float\nDid it function properly: No\nCategory & Action Time Limit: Upon Failure or Within 5 Years\nComments: Float type switches are not allowed for high water alarms. The VA\nrecommended switch type is a conductivity probe type switch. Install the VA\nrecommended switch and set to alarm at 2/3 of the tank height. There are valves\nthat can isolate this alarm. These valves must be made lockable only in the\noperating position.\n\nFurnish report within one week of each facility inspection in  Microsoft Word  format by email to the COTR and to the VA Headquarters office designated. Provide hard copies of data sheets and flue gas analyzer  strip  printouts to the COTR within one week of visit.\n\nAll safety-related deficiencies shall be immediately reported to the COTR, Boiler Plant Supervisor and/or Chief Engineer during the inspection visit.\n\n\nAddendum","origin":"detail"},"contacts":[{"fax":"NA","name":"JOHN RITTER","role":"primary","email":"JOHN.RITTER2@VA.GOV","phone":"EMAIL ONLY","title":"CONTRACTING OFFICER"}],"place_of_performance":{"zip":"20422","city":{"name":"WASHINGTON"},"state":{"code":"DC","name":"District of Columbia"},"street":"WASHINGTON DC VAMC 688","country":{"code":"USA","name":"UNITED STATES"},"street2":"FMS 50 IRVING ST NW"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"naics_codes":["561210"],"award":{"awardee":{}},"attachments":[{"resource_id":"88ec347406604f619e82c4455fc79f60","name":"36C24526Q0175_1.docx","kind":"file","mime_type":".docx","size_bytes":14579,"posted_at":"2026-01-22T16:09:25.774Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/88ec347406604f619e82c4455fc79f60/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C24526P0248_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C24526P0248_3600_-NONE-_-NONE-/","piid":"36C24526P0248","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"NWJ1Z3M5EAE5","recipient_name":"VENERGY GROUP LLC","recipient_uei":"NWJ1Z3M5EAE5","recipient_cage":"5T9Q4","recipient_city":"FORT PIERCE","recipient_state":"FL","sub_name":"Department of Veterans Affairs","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","office_key":"o-36C245","first_action_date":"2026-02-20","last_action_date":"2026-06-25","actions":2,"obligated":"95500.00","current_total_value":"95500.00","potential_total_value":"95500.00","naics":"561210","psc":"J045","extent_competed":"COMPETED UNDER SAP","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":2,"description":"TABS REPORT","method":"solicitation","confidence":"high","evidence":["solicitation number 36C24526Q0175 equals the FPDS solicitation identifier","same awarding office 36C245"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C24527Q0070","latest_notice_id":"b0b1581a6a1441b9a46d407375bc44d0","title":"6550--FLOW CYTOMETERY REAGENTS AND SUPPLIES (VA-27-00016081) |","solicitation_number":"36C24527Q0070","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"325413","psc":"6550","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T00:57:17.217280Z"},{"key":"36C24527Q0061","latest_notice_id":"0db5662de5914b458655bed9898980cf","title":"J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT","solicitation_number":"36C24527Q0061","notice_type":"o","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-18","notices":3,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561210","psc":"J065","set_aside":"SBA","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24527Q0081","latest_notice_id":"77e2cd670c3040a6ad2a1fc44daa2bc5","title":"DJ10--Alertus Enhanced Notification Licensing & Premier Support","solicitation_number":"36C24527Q0081","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541519","psc":"DJ10","set_aside":null,"state":"WV","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"SOFTWARE LICENSING AND SUPPORT MARTINSBURG VA MEDICAL CENTER","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C24527Q0073","latest_notice_id":"6ce8b040a9be44d0972b338bc7b6cf88","title":"Arc Flash Hazard Analysis Services","solicitation_number":"36C24527Q0073","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"334515","psc":"6625","set_aside":null,"state":"WV","county":"54033","county_name":"Harrison County","city":"5415628","city_name":"Clarksburg","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24527Q0076","latest_notice_id":"9c0733493507403293e3d1367a3d19b5","title":"6530--MILITARY LITTERS, STANDS AND CARTS","solicitation_number":"36C24527Q0076","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":2,"due_at":"2026-12-02T17:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"337127","psc":"6530","set_aside":null,"state":"WV","county":"54037","county_name":"Jefferson County","city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":"sam_zip","state_evidence":"25430","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"}],"similar_open":[{"key":"N4008027R1001","latest_notice_id":"59b185b0657a4df8a7e84a0402fa8af2","title":"NAVAL RESEARCH LABORATORY (NRL) FACILITY SUPPORT SERVICES (FSS)","solicitation_number":"N4008027R1001","notice_type":"o","first_type":"p","first_posted":"2026-09-21","last_posted":"2026-11-19","notices":2,"due_at":"2027-01-06T19:00:00Z","due_date":"2027-01-06","closes_at":"2027-01-06T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N40080","office_name":"NAVFACSYSCOM WASHINGTON","naics":"561210","psc":"S216","set_aside":"SBA","state":"DC","county":"11001","county_name":"District of Columbia","city":"1150000","city_name":"Washington","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"FA462026QA303","latest_notice_id":"da68e1a3e39e41e0ae6b6adac38e3984","title":"FA27 Fall Arrest Inspection Services","solicitation_number":"FA462026QA303","notice_type":"r","first_type":"r","first_posted":"2026-11-04","last_posted":"2026-11-04","notices":1,"due_at":"2026-11-26T18:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4620","office_name":"FA4620 92 CONS LGC","naics":"561210","psc":"H342","set_aside":"SBA","state":"WA","county":"53063","county_name":"Spokane County","city":"5322955","city_name":"Fairchild AFB","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-05T04:36:35.392694Z"},{"key":"M0068127R0002","latest_notice_id":"309bf2fd5f174025a6c27c4c74c1461a","title":"Parachute Rigger Sources Sought","solicitation_number":"M0068127R0002","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-11-27T08:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T08:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-M00681","office_name":"COMMANDING GENERAL","naics":"561210","psc":"H281","set_aside":null,"state":"AZ","county":"04027","county_name":"Yuma County","city":"0485680","city_name":"Yuma Proving Ground","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"}],"similar_open_total":37,"indexable":false}