{"canonical":"https://sealedbidder.com/opportunities/36c24525r0063","key":"36C24525R0063","url":"https://sealedbidder.com/opportunities/36c24525r0063","title":"C1DA--Renovate 4th Floor for CLC","solicitation_number":"36C24525R0063","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-07-15T18:00:00Z","first_posted":"2025-06-12","last_posted":"2025-06-12","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541310","psc":"C1DA","set_aside":"SDVOSBC","place_state":"WV","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"54081","place_county_name":"Raleigh County","place_city":"5405332","place_city_name":"Beckley","winner":"HARRELL DESIGN GROUP PC","award_amount":null,"publications":[{"notice_id":"949cf3e247e7472a80fdd2c46cf7775e","title":"C1DA--Renovate 4th Floor for CLC","solicitation_number":"36C24525R0063","notice_type":"r","base_type":"r","posted":"2025-06-12","posted_at":"2025-06-12T12:41:53.469Z","due_at":"2025-07-15T18:00:00Z","due_date":"2025-07-15","cancelled":false,"archived":true,"archive_date":"2025-09-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/949cf3e247e7472a80fdd2c46cf7775e/view","enriched":true,"history":[{"index":3,"title":"C1DA--Renovate 4th Floor for CLC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-12T12:41:53.469Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"949cf3e247e7472a80fdd2c46cf7775e","solicitation_number":"36C24525R0063"}]}],"latest_notice_id":"949cf3e247e7472a80fdd2c46cf7775e","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-06-12","posted_at":"2025-06-12T12:41:53.469Z","created_at":"2025-06-12T12:41:51.257Z","modified_at":"2025-09-13T04:04:31.128Z","response_deadline":{"raw":"2025-07-15T14:00:00-04:00","utc":"2025-07-15T18:00:00Z","date":"2025-07-15","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/949cf3e247e7472a80fdd2c46cf7775e/view"},"naics":{"codes":["541310"],"primary":"541310"},"title":"C1DA--Renovate 4th Floor for CLC","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_id":"100173468","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-13","archive_type":"auto_custom"},"history":[{"index":3,"title":"C1DA--Renovate 4th Floor for CLC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-12T12:41:53.469Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"949cf3e247e7472a80fdd2c46cf7775e","solicitation_number":"36C24525R0063"}],"contacts":[{"name":"Contracting Officer","role":"primary","email":"millard.adkins@va.gov","phone":"304-255-2121 x4136","title":"Millard Adkins"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"949cf3e247e7472a80fdd2c46cf7775e","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"949cf3e247e7472a80fdd2c46cf7775e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T15:37:55.756114938Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"910b4e1d52acffc55e28c1240c7f623daa7589e11e1939865c6c1745f7fcef58","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-12T15:37:55.756114938Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Sources Sought Notice\n\nSources Sought Notice\n\nPage 21 of 21\nSources Sought Notice\n*= Required Field\nSources Sought Notice\n\nPage 1 of 21\nAll INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT. THERE IS NO SEPARATE RFP PACKAGE TO DOWNLOAD.\nNAICS Code: 541- Professional, Scientific, and Technical Services; 541310- Architectural. PSC C1DA Architect and Engineering   Construction: Hospitals and Infirmaries.\n\nThe Department of Veterans Affairs Medical Center (VAMC); VISN 5 Contracting, 200 Veterans Drive, Beckley, WV 25801 is advertising for Architectural/Engineering Services to provide Schematic Design, LCCA, Design Development, Construction/Bid Documents, Specifications, Construction Cost Estimates, and Construction period services for the Renovate 4th Floor for CLC 36C245-25-R-0063 at the VAMC, 200 Veterans Drive, Beckley, WV 25801.\n\nThis acquisition is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside.  Any subsequent award will require firms to be registered in System for Award Management (SAM) (www.sam.gov)  as well as https://veterans.certify.sba.gov/ VETS 4212 and https://web.sba.gov/pro-net/search/dsp_dsbs.cfm registered/verified Service Disabled Veteran Owned Business.  \n\nTHIS IS NOT A REQUEST FOR PROPOSAL. This is a request for SF 330's Architect/Engineer Qualifications packages only.\n\nSubmission Requirements:  This acquisition is for A/E Services and is procured in accordance with the Brooks Act as implemented in Subpart 36.6 of the Federal Acquisition Regulation. Firms registering for consideration for future Federal AE projects are encouraged to electronically submit SF 330 Part I. Part II, General Qualifications, and to update at least annually. To be considered for this contract, firms shall submit SF330s electronically. SF330s to include Parts I & II are to be emailed to millard.adkins@va.gov, adobe pdf format, single file, no larger than 10MB, and no zipped files. Receipt must be confirmed. SF 330 are due no later than 2:00 pm Eastern Standard Time on July 15, 2025.  YOUR RESPONSE SHALL BE IN ACCORDANCE WITH AND IN THE SAME ORDER OF THE EVALUATION FACTORS LISTED BELOW. FAILURE TO FOLLOW THIS SAME FORMAT IN THE SUBMISSION WILL RESULT IN REJECTION OF SF330. The SF330 can be found on the GSA forms website www.gsa.gov. All questions are to be sent to the attention of Millard.Adkins@va.gov. no later than 2:00 pm Eastern Standard Time on June 19,2025. Potential contractors must be registered in SAM (www.sam.gov) and visible and certified in https://veterans.certify.sba.gov/ and https://web.sba.gov/pro-net/search/dsp_dsbs.cfm (www.va.gov/osdbu) and Vets 4212 at time of submission, and at time of award, of their qualifications in order to be considered for an award.  Additionally, the submission must include an insert detailing the following information:  SAMS UEI, Tax ID Number, the email address and phone number of the primary point of contact, CVE, and a printed copy of the firms  SDVOSB Registry.  Offerors shall provide all documents listed and comply with all proposal instructions for their proposal to be considered responsive to this notice. This review may eliminate offerors that fail to provide all the required information and documents in the format and detail specified. An unverified SDVOSBs will be considered non-responsive as it is deficient and therefore will not be evaluated.\n\n\nThis is a Service-Disabled Veteran Owned Small business set aside.  NAICS Codes: 541310, Size standard is $12.5 million.  This is not a request for proposal, nor will a solicitation package or bidder/plan holder list be issued.  There are no solicitation documents available.  This procurement is subject to the availability of funds. The Government is under no obligation to award a contract because of this announcement.\n\n\nThe selected A/E firm shall be in accordance with FAR Part 2.101 definition of  Architect-engineer services  as defined in 40 U.S.C. 1102 and FAR Part 36.6 to provide professional A/E services for the project as required.  The SDVOSB Architectural firm must employ the principal Architect responsible for design of this project, i.e. and be involved heavily in all aspects of the design, stamping drawings along with the other team disciplines.  A/E(s) signing drawings must be licensed.  The license(s) are required at the time of an award to prospective A/E(s).  The following A/E disciplines are expected to be required for this design effort: architecture, structural, civil, mechanical, plumbing, electrical, fire protection, industrial hygiene, interior design, surveyors, cost estimators, certified physical security specialist or other types of A/E services as defined by FAR Part 36.6 that may be necessary.  Upon award, the scope may include, but is not limited to: \n\nRenovate 4th Floor for CLC\n\nProject # 517-25-215\n\nA/E SCOPE OF WORK\n\nThis project will engage an architectural/engineering (A/E) firm to reimagine the space on the 4th floor to provide a design for a renovation project to reconstruct a compliant CLC facility and park addition into the VA Beckley site. This project will be to provide a compliant design with respect to VA criteria for a CLC on the 4th floor. This project will be an extensive design requiring new full HVAC, new perimeter heating, new floor to ceiling windows to maximize natural lighting, outdoor rooftop recreational area(s), a wraparound enclosure (hallway) on the recreational roof with seating/viewing areas, destination spaces, and a complete asbestos survey (to include sampling and testing) of the scope area.  It also must have the capability to utilize existing floor space in the design, as well as, combining existing common areas.  This project will reimagine the existing 3rd floor rooftop for exterior garden area complete with full garden beds, utilities, and amenities, multiple covered pathways/sidewalks, outdoor grilling, multiple shaded and heated dining and sitting areas, a fully functional nighttime movie area, art area, soda shop, barbershop, and aviary with an enclosed walkway surrounding the space. Due to the rooftop garden area, extensive mechanical equipment relocations, including exhaust and intakes, will be required.\n\nProject description is taken from strategic capital investment planning (SCIP):\n \nThis project will provide a design and phased construction of a full renovation for a portion of the 4th floor to upgrade and modernize the Community Living Center (CLC). A consistent theme will need to be developed for this project that can be used for follow on projects. The construction will renovate approximately 13,800 square feet to improve patient comfort, safety and increase patient privacy. Additionally, the project includes the construction of a 3,590 square foot connecting corridor to improve accessibility and functionality, suicide prevention, and mechanical pathways. To minimize disruption to patient care, construction will be executed in carefully planned phases while maintaining a seamless transition between project stages.\n\n\n      ADDITIONAL PROJECT GOALS:\n\nThe A/E shall provide design services for project 517-25-215.  This project design would move portions of LTC to the 4th floor which is specifically designed for outstanding CLC patient care.  This CLC design will provide veterans with independence and dignity.  It will also allow them the ability to engage in various activities and promote family involvement.  The design should have a strong family feel in order to provide the veteran with the sense that they are at home.  The CLC needs to contain a hub or central gathering area (town center), as well as, common areas and activity areas that can be easily accessed from the patient rooms.  The design will include but is not limited to the following: private bedrooms with connected private bathrooms, a great room, visitor restrooms, living room, dining room, kitchen, pantry, library, hair salon, theater, family room, laundry room, activity room/exercise room, and spa room.  The design should also incorporate outdoor gathering areas that are easily accessible to the patients.   \n\n\nThe architect shall ensure renovation meets criteria in the Small House (SH) Model Design Guide, available on the VA TIL.  There is specific guidance in this design guide focusing on renovations and conversion of existing space.\n\nThe architect shall produce construction drawings for a full design encompassing all disciplines. Such as demolition and new construction, interiors, phasing plans for work, outages and temporary access during construction as well as FF&E.\n\nThe architect will work and collaborate with project groups performing work in the same general area. \n\nThe architect shall verify and detail all utility moves and upgrades to support the new floorplans.\n\nAll Construction drawings, estimates, and specifications shall be provided to execute a turnkey construction project.\n\nThe architect will provide a solution for a portion of the 4th floor area in a design and will be required to provide a construction package.  The A/E is responsible for ensuring all required utilities, etc., are available such that the Phase 1 can be used, in its entirety without relying on future additional phased work.\n\nConstruction period services\n    Submission review and approvals for 100% drawings and specifications. \n    Site visits per VA request.\n   7.2.1  Minimum of 102 visits (defined as 1 person for 1 day) total; 70 for design and 32 for construction. Example: 5 A/E personnel for 3 days doing field investigation would be 15 visits.\n    Update drawings (as-built conditions from contractor red line drawings), and  \n             VA correspondence during construction.\n    A/E will respond on site within a twenty-four (24) hour period when  \n           requested.\n\nAn on-site kickoff meeting, prior to any design, will be needed with VA staff for the start of the project to further outline goals and needs of the project.  It is expected this will coincide with initial site investigation by the A/E. 10 site visits (5 personnel for 2 days).\n\nAt the 10% design review, (3) distinct design options shall be presented. The objective for this is to be collaborative and in line with a dynamic brainstorming session. The presentation by the A/E will provide 3 options or combination of options/designs for VA Management to review. 10 site visits (5 personnel for 2 days).\n\nAt the 25% design review, (3) design options with estimated costs shall be presented based on the previous (10% review) in a design charrette. The presentation will provide 3 options of floorplans and choices for different combinations of materials and color palettes for both interior and exterior features. VA leadership will make a final option selection after the 25 % review. The preferred option or combination will be executed in the remaining design effort and rendered as 3D output provided to the VA. This expected deliverable should be similar to Revit software animation. 10 site visits (5 personnel for 2 days).\n\nAt the 50% design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the 75% review, narrative report addressing bid deduct alternatives, construction phasing, design calculations or analysis, itemized cost estimate and specifications of the selected design shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the 100% design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the final design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The final review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings.  Final design review will be held as a virtual meeting, scheduled by the A/E.\n\nIt is anticipated an additional design site visit may be needed for information gathering or investigation. 10 site visits (5 personnel for 2 days).\n\nIt is anticipated that 32 site visits will be needed during construction, this includes intermediate and final inspections.\n\nAny testing or studies, such as flow, geotechnical, electrical, are the responsibility of the A/E.\n\nDesign shall include AE consultation for 3rd party commissioning of building.\n\nDesign shall comply with all current VA design guidelines and specifications. VA space criteria shall be used as a guide.\n\nDesign manuals and specifications can be found at http://www.cfm.va.gov/TIL/. \n\nWork located at the Beckley VA Medical Center, in Beckley WV. \n\nThe selected A&E will attend pre-bid job showing remotely. Selected A&E shall provide responses to questions asked by potential bidders and issue written responses.\n\nProject shall be designed and constructed to meet all VHA requirements including VA sustainability and green energy initiatives. See VISN 5 Energy and Water Requirements.  \n\nProject shall be designed in coordination with VA staff, veteran patients, and VA Central Office/HEFP.\n\nA/E shall provide an interior designer as one of the core team members for this effort.\n\nPlanning must include a total of 10% deductive bid alternates that will need to be identified and incorporated as part of the bidding documents.    \n\nSpecifics:\n\nThis design should be for a construction budget of $24,629,961. Completed design shall result in a cost that is within the budget limitations. If the base bid cost exceeds budget, the A/E shall re-design or take necessary steps to reduce the cost so that budget limitations are not exceeded. Deducts will need to be coordinated with the VA and noted on specifications and Final Design drawings.\n      \nProvide contract specifications utilizing only the VA Master Specifications edited to remove all impertinent specs for this project.\n\nAttend design review meetings and make all necessary site visits during design to gather information necessary from the existing sites, building plans, utility plans, etc. to provide a complete assessment of the proposed work. A thorough as-built shall be conducted of the existing site conditions to complete a full detailed set of documents.  \n\nAssess the intent and scope of this project and work with the Medical Center staff to develop a final design, specifications and cost estimate to best suit the needs and constraints of the government, while incorporating VAMC Beckley Engineering/Facilities Management Service, Safety, Infection Control, National Offices, and Contracting Officer comments into the final design package.\n\nIncorporate in the preliminary drawings the pre-construction risk assessment evaluations that include noise, vibration and infection control. \n\nProvide bound specifications and 100% construction drawings with all references \nbound. Construction documents will be required to be furnished in hard copy, electronic .dwg & PDF files (AutoCAD 2018 or most current at the time of final design submission) and electronic .pdf files. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its  Project Browser/Navigator .\n\nVA cannot send or receive any emails that contains more than 5mb of data. AE shall bind or combine files to conform to the 5mb limit. \n\nCost estimates will be formulated detailing quantities of materials, labor, profit, overhead, insurance, taxes, etc. in the format found at  \nhttp://www.cfm.va.gov/contract/aedessubreq.asp\n\nFinal drawings will detail measures to be taken by the contractor to assure life safety and infection control. A stated above a preconstruction risk assessment will be completed finalized and included in project submissions.\n\nPlans for phasing construction to minimize impact on the medical center will be incorporated into the construction documents. Plan construction activities to include impacts on the medical center such as relocating patient and staff, equipment, providing temporary barriers, providing temporary utilities, minimizing impact on patient flow, etc.\n\nProvide construction administration to include shop drawings/submittal review, site inspections, and RFI response.\n\n\nSITE INVESTIGATIONS:\n\nA/E shall make site visits as necessary to verify existing conditions and interview VA staff. Note: Information including drawings and other documentation provided to the A/E is used as reference only. All dimensions and existing conditions will be field verified and documented by the AE in the final design package. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov/TIL/. A/E shall field verify every aspect that relates to the project.  Coordinate visits with the Project Manager/Contracting Officer Representative (COR) \n\nassigned after award. The A/E shall arrange for and oversee the performance of such investigations. Auto CAD architectural background drawings will be provided by the VA upon request.  \n\nThe A/E shall independently field verify all existing dimensions, wall layouts, utilities, material types and every other design aspect that relates to the project.\n\nEXPECTATION: Submit review package so they are received on the noted day. \n\n\nReview \n*Due Date \n*Days from last review\n(Calendar Days After NTP)\nKickoff Initial Site Investigation & Design Charrette\n10\n0\nÂ \n45\n35\n10% Design Review & Design Charrette\nÂ \n75\n30\nVA 10% Review - Completed\nÂ \n105\n30\n25% Design Review & Design Charrette\nÂ \n135\n30\nVA 25% Review - Completed\nÂ \n170\n35\n50% Design Review & Presentation\nÂ \n200\n30\nVA 50% Review - Completed\nÂ \n230\n30\n75% Design Review & Presentation\nÂ \n260\n30\nVA 75% Review - Completed\nÂ \n290\n30\n100% Construction Documents\nÂ \n310\n20\nVA 100% Review - Completed\nFinal Construction Documents\n320\n10\n\n*Design and design review time can be faster than indicated in the schedule above and may result in faster completion of the project design (or float in the VA or AE schedule reviews)\n\nNote: Kickoff Meeting will be issued in writing or via teleconference call meeting.  \n\n\nDESIGN REQUIREMENTS:\n\nExpectations: Submit complete review package in accordance with the following requirements and guidelines outlined in \n\nhttps://www.cfm.va.gov/contract/ae.asp. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E and VA team may elect to delete individual submissions which are not required.\n\nDeliver:\nAll design packages will be delivered directly to FMSL (Engineering) on the established dates for VA review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C November 2008. The manual is available at the following address: http://www.cfm.va.gov/contract/aeDesSubReq.asp. Prepare working drawings on AutoCAD MEP/Architecture, 2018 versions or most current at the time of final design submission, utilizing its  smart  capabilities chases. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its  Project Browser/Navigator .\n\nNote: In the interest of time, electronic submittals of design documents are preferred to expedite review time. PDF Email Attachments (5mb limit) or an internet Share Point site for file downloads are acceptable. Final and As Built copies should be supplied in both electronic and Hard Copy formats.\n\nDesign Development 100%:  Attachment  E  100% Submission Requirements\nRequirements for the 100% Design Development. Address all comments from the 100% review and finalize required submittals.\n  \nFINAL Contract Documents (CD):  Attachment  F  Submission Requirements\nSubmit a complete document of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process\n\n\nCONSTRUCTION PERIOD SERVICES:\n\nProvide assistance to the VA to determine whether the contractor or subcontractor meets qualification requirements, support by written recommendations of any problems or litigation encountered in past based on firsthand knowledge.\n\nAE will review all submissions and provide recommendations to the VA within five  \ncalendar days upon request. AE will review and provide replies to contractor / VA generated RFIs when required by the project manager within five calendar days.\n\nA/E will review and work cooperatively with 3rd party VA commissioning agent/firm.\n\n\nAE will review contractor's cost estimates, methods of work, materials and provide recommendations to the VA.\n\nMake site visits on requests of the VA and prepare written reports to include agreed upon changes in design as determined necessary during the construction. Visits made based on errors and omissions in design will be at no cost to the VA.\n\nParticipate in partial/final acceptance inspections as scheduled and generate punch list items for completion. The punch list shall reference the contract documents for specific deficiencies (i.e. specification section, drawing detail, etc.)\n\nPrepare as-built drawings on original set with A/E s stamp, based on record drawings that the contractor kept during construction. Transpose contractor s as-builts to \nAutoCAD (.dwg) and provide a set of updated as-builts on CD within 30 days to the Project Engineer. Final drawing submittal will include hard copies as described for other submissions as well as a CD clearly labeled with the project name, number and submittal date containing: Folder labeled  bid documents . All specifications bound in one (1) word document (make sure spec sections are separated by page breaks). All drawing sheets in one .pdf file.\n\nAll bound or combined files shall be limited to 5mb.\nFolder labeled  DWG s  with subfolders containing engineering disciplines (Architectural, MEP, Structural, Civil, etc.) which includes the .arj file (for every discipline) to launch and organize the drawing file system and make all drawings the current project inside of AutoCAD.\n\nFolder labeled  PDF sheets  containing separate .pdf documents for each discipline.\n\nFolder labeled  cost estimate  containing a copy of the final construction cost estimate documents\n\nFolder labeled  calculations  containing final calculation documents.\nFolder labeled  specifications  with a word document for each spec section\n\nFolder labeled  misc  for IH reports, materials testing, VPDES permit, soils tests, sustainability checklist, etc.\nUpon construction completion, red line drawings will be furnished to the A/E to prepare as built drawings. Final as built drawings will be furnished as master building drawings in a project manager format prescribed by the VA.  \n\nThe A/E shall review and approve all specified equipment and installation submittals and shop drawings. The A/E shall attend the pre-construction conference to review and \nconfirm project scope. During construction, the A/E shall allow for a minimum of 10 site visits as directed and scheduled by the COR.   \nArchitect/Engineer Energy Scope of Work\nEnergy Requirements for the Procurement of all New Construction, Major & Minor Renovation Projects:\n\n1.  New Construction:  \n\nAll new construction shall be designed to achieve an energy consumption level that is at least 30% below the level achieved under ASHRAE Standard 90.1-2004, if life-cycle cost effective. Use Appendix G of ASHRAE Standard 90.1-2004 to document the energy savings.\n\nShould the 30% reduction in energy consumption prove not to be life-cycle cost effective, then the A/E shall evaluate alternative designs at 5% successive decrements to identify the most energy-efficient design that is life-cycle cost effective.\n\nThe following parameters shall be used for performing the analysis:\n\n20-year life-cycle period for system comparisons\nUse Public domain programs such as TRACE, E-CUBE, Carrier E20-II, etc.\n7% Discount Factor\nNeither include taxes, nor insurance while computing cost.\n\n\n2.  Major & Minor Renovations and Major Equipment Replacements:\n\nFor Major Renovations: Shall include any renovation where an entire area is  gutted  and rebuilt. Any replacement of central HVAC equipment or changes in air distribution shall be considered a  Major Renovation. \n\nReduce the energy cost budget by 20% below pre-renovations 2003 baseline. A/E shall estimate 2003 baseline energy consumption before the renovation and compare it to the proposed design after the renovation, and document the 20% savings. The primary unit for energy budget reporting is the British Thermal Unit (BTU) per square foot of the area to be renovated. A/E shall develop the energy budget as required in ASHRAE 90.1-2004, Appendix G, using the same parameters outlined above for new construction. \n\nFor Minor Renovations: Shall be defined as a small portion of a building, where only architectural treatments, or simple equipment replacement is planned. The renovation will have little to no impact on the central HVAC System, or energy use within the renovated area. \n\nAny part of the renovation which impacts energy consumption shall be designed with the mandate to reduce energy consumption. For example, if exterior walls are part of \n\nthe project, then their R-Value shall be increased. If lighting fixtures are to be replaced, then they shall be replaced with the most energy efficient fixture that is cost effective (20-year life).\n\n3.  Renewable Energy Resources: \n\nFor any work, renewable (geothermal, heat recovery, wind, PV solar, solar hot water, etc.) shall be evaluated for life-cycle cost effectiveness.  \n\nATTACHMENT  A \n\n Design Development 10% Submission Requirements\n\nDeliver the following (labeled with 10% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #9.  Three design options shall be presented in a design charrette. The presentation will provide 3 options of floorplan designs for VA Management to review. One of the three design choices shall be a cantilevered top floor which will provide additional square footage. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)  \n\n3 half size sets of all drawings produced on the latest version of AutoCAD software.  \n\n1 copy of itemized total project cost by design option. Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit) \n\n\nATTACHMENT  B \n\n Design Development 25% Submission Requirements\n\nDeliver the following (labeled with 25% submission) and include this attachment as a checklist with your submission:\n\n1 copies of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations.  Complete all items listed in A/E scope of work #10. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)  \n3 half size sets of all drawings required by project, produced on the latest version of AutoCAD software.  \n\n1 copy of itemized cost estimate by specification section or trade (labor, material and equipment). Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit) \n\n\nATTACHMENT  C \n\n Design Development 50% Submission Requirements\n\nDeliver the following (labeled with 50% submission) and include this attachment as a checklist with your submission:\n1 copy of a narrative report forwarding the design develop 50% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #11.   Complete The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n3 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n \n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word.    (.pdf files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\n\n                                                ATTACHMENT  D \n \nDesign Development 75% Submission Requirements\n\nDeliver the following (labeled with 75% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 75% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #12.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n3 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n \n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word.    (.pdf files for email shall not exceed the 5mb limit. AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit. \n\n\nATTACHMENT  E \n\nDesign Development 100% Submission Requirements\n\nDeliver the following (labeled with 100% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 100% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #13.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review.  Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review.  Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n \n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word.    (.pdf files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit. \n                                     ATTACHMENT  F \n\n        Final Contract Document Submission Requirements\n1 copy of the construction drawings Cover Sheet in AutoCAD format for FINAL VA signatures.  Forward copy via email. (.pdf files for email shall not exceed the 5mb email limit)\n1 copy of FINAL design narrative report forwarding the design submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #14. The report shall identify bid deducts, recommended construction phasing and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)    \n2 full size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half scale sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of FINAL itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of FINAL edited VA Master Specifications of sections to be used for the construction project. (Make sure that all proof reading edits marks and lined through text have been removed. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of the FINAL master submittal list identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the FINAL Construction Scope of Work. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n \n1 copy of FINAL drawings in AutoCAD (.dwg files) and FINAL Specifications in Microsoft Word. (word files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit. \n\n\n\nThis acquisition is for Architect/Engineer (A/E) services and is procured in accordance with the Brooks Act as implemented in Subpart 36.6 of the Federal Acquisition Regulation.  All submissions will be evaluated in accordance with the evaluation criteria.  A \"short listing\" of 3-5 (more or less) firms deemed most highly rated after initial source selection (shortlisted) will be chosen for interviews. Interviews will be conducted by teleconference or virtually. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. \n\nPlease note this is not a request for proposal.  Eligible responses received will be evaluated based on the following criteria and the most highly qualified will be compiled on a shortlist of candidates. The evaluation factors for the SF330 Evaluations are listed below in order and will be used to evaluate and select the short-listed firms. The evaluation factors I through III are of equal value and are most important. Evaluation factor IV is less important than the first three but is more important than evaluation factor V. Evaluation V is more important than evaluation factor VI. Evaluation factors VI, VII, and VIII are equal. \n\nI   Professional Qualifications Necessary for Satisfactory Performance of Required Services\nWho will be the designated project manager (PM) for the project?  \nWhat is the PM discipline, how much experience does the individual have with project management and then specific to clinic spaces?  \nWhat is the level of experience of the project manager and other professionals as it relates directly to expanding clinics within the VA?\nWhat is the level of VA experience of the team related to constructing new clinic spaces?\nWhat is their overall knowledge of new construction with respect clinic spaces and VA requirements?\n\nII   Specialized Experience with Healthcare Facility Related Designs, Complex Electrical and Mechanical Experience and Technical Competence in the Type of Work Required\nWho will be the lead mechanical, electrical, plumbing other person/s (specialists) for the project?Â  \nHow much experience does the individual/s have with designing mechanical, electrical, plumbing or other systems (specialties) for clinical spaces?Â  \nWhat is the level of experience directly with VA as it relates to clinic expansion in a health care setting?\nWhat is their overall knowledge of clinic construction and VA requirements?\n What is their overall knowledge of expansion to existing sites?\n\nIII-Past Performance on Contracts with Government Agencies and Private Industry in Terms of Cost Control, Quality of Work, and Compliance with Performance Schedules\nTalk about a 3 previous successful VA CLC spaces.Â (past performance) Please discuss 10 highlights from your firms past CLC jobs that made your work exceptional.\nPlease discuss 3 lessons learned from any project and how you have used them on future projects (learned from past performance). \nTalk about a recent project where a renovation was completed at an existing building, how it was phased, and discuss your process, challenges, and solutions. \nPlease include a cost control chart of your last 10 jobs that includes current performance schedules.   \n\nIV-Past Performance on Contracts with Government Agencies and Private Industry During Construction Period of Services (CPS)\nTalk about previous successful clinic projects CPS (past performance).\nPlease discuss highlights from your firms past clinic jobs during CPS that made your work exceptional.\nPlease discuss lessons learned from any project CPS and how you have used them on future projects (lessons learned from past performance).Â  \nTalk about a successful project where issues arose during CPS and how they were corrected and resolved. Describe past techniques used to minimize RFIs and submittal response time.\nExplain your thoroughness to review RFI and submittal response time. Explain your thoroughness to review RFI and submittals, while adhering to project specifications and deadlines.\n\nV- Organization, Management and Quality Control\nWho is responsible for quality control (QC)?Â  \nHow does the QC relate to the project? \nWho completed (or will complete) QC for the project? \nHow does the prime (management of the sub-consultants) intend to monitor and guarantee their subs performance, cooperation and involvement in the project?  \nWhat is managements plan when something goes wrong with a deliverable from a sub? (1 example)\n\nVI- Capacity\nDiscuss the prime s relationship with the listed sub-consultants and their experience together.Â \nDiscuss the prime's capacity as a company and include specific individuals  capacity\nPlease discuss your subs capacity to accomplish the needed work.\n\nVII- Litigation and Insurance\nDiscuss any significant claims against the firm because of improper or incomplete architectural and engineering services in the last 10 years.\n\nVIII   Distance\nGeographical location from Beckley, West Virginia VA Medical Center\n\nNOTE:  UPON AWARD, THE FOLLOWING WILL APPLY:\nThe A/E disciplines include, but are not limited to, the following:  Architectural, Civil, and Mechanical/Electrical/Plumbing (MEP) which includes the following disciplines: estimating, structural, mechanical (HVAC), electrical, plumbing, geotechnical, design, certified physical security specialist and engineering services related to healthcare facilities.   \nAward is contingent upon the availability of funds.\n\n\n\nContracting Office Address: \nDepartment of Veteran Affairs\nMillard Adkins, CO\n517/90C\nBuilding 2\n200 Veterans Drive,\nBeckley, WV  25801\nPoint of Contact(s): \nMillard M Adkins, Contracting Officer, email address: millard.adkins@va.gov","text":"Sources Sought Notice\n\nSources Sought Notice\n\nPage 21 of 21\nSources Sought Notice\n*= Required Field\nSources Sought Notice\n\nPage 1 of 21\nAll INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT. THERE IS NO SEPARATE RFP PACKAGE TO DOWNLOAD.\nNAICS Code: 541- Professional, Scientific, and Technical Services; 541310- Architectural. PSC C1DA Architect and Engineering Construction: Hospitals and Infirmaries.\n\nThe Department of Veterans Affairs Medical Center (VAMC); VISN 5 Contracting, 200 Veterans Drive, Beckley, WV 25801 is advertising for Architectural/Engineering Services to provide Schematic Design, LCCA, Design Development, Construction/Bid Documents, Specifications, Construction Cost Estimates, and Construction period services for the Renovate 4th Floor for CLC 36C245-25-R-0063 at the VAMC, 200 Veterans Drive, Beckley, WV 25801.\n\nThis acquisition is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. Any subsequent award will require firms to be registered in System for Award Management (SAM) (www.sam.gov) as well as https://veterans.certify.sba.gov/ VETS 4212 and https://web.sba.gov/pro-net/search/dsp_dsbs.cfm registered/verified Service Disabled Veteran Owned Business.\n\nTHIS IS NOT A REQUEST FOR PROPOSAL. This is a request for SF 330's Architect/Engineer Qualifications packages only.\n\nSubmission Requirements: This acquisition is for A/E Services and is procured in accordance with the Brooks Act as implemented in Subpart 36.6 of the Federal Acquisition Regulation. Firms registering for consideration for future Federal AE projects are encouraged to electronically submit SF 330 Part I. Part II, General Qualifications, and to update at least annually. To be considered for this contract, firms shall submit SF330s electronically. SF330s to include Parts I & II are to be emailed to millard.adkins@va.gov, adobe pdf format, single file, no larger than 10MB, and no zipped files. Receipt must be confirmed. SF 330 are due no later than 2:00 pm Eastern Standard Time on July 15, 2025. YOUR RESPONSE SHALL BE IN ACCORDANCE WITH AND IN THE SAME ORDER OF THE EVALUATION FACTORS LISTED BELOW. FAILURE TO FOLLOW THIS SAME FORMAT IN THE SUBMISSION WILL RESULT IN REJECTION OF SF330. The SF330 can be found on the GSA forms website www.gsa.gov. All questions are to be sent to the attention of Millard.Adkins@va.gov. no later than 2:00 pm Eastern Standard Time on June 19,2025. Potential contractors must be registered in SAM (www.sam.gov) and visible and certified in https://veterans.certify.sba.gov/ and https://web.sba.gov/pro-net/search/dsp_dsbs.cfm (www.va.gov/osdbu) and Vets 4212 at time of submission, and at time of award, of their qualifications in order to be considered for an award. Additionally, the submission must include an insert detailing the following information: SAMS UEI, Tax ID Number, the email address and phone number of the primary point of contact, CVE, and a printed copy of the firms SDVOSB Registry. Offerors shall provide all documents listed and comply with all proposal instructions for their proposal to be considered responsive to this notice. This review may eliminate offerors that fail to provide all the required information and documents in the format and detail specified. An unverified SDVOSBs will be considered non-responsive as it is deficient and therefore will not be evaluated.\n\nThis is a Service-Disabled Veteran Owned Small business set aside. NAICS Codes: 541310, Size standard is $12.5 million. This is not a request for proposal, nor will a solicitation package or bidder/plan holder list be issued. There are no solicitation documents available. This procurement is subject to the availability of funds. The Government is under no obligation to award a contract because of this announcement.\n\nThe selected A/E firm shall be in accordance with FAR Part 2.101 definition of Architect-engineer services as defined in 40 U.S.C. 1102 and FAR Part 36.6 to provide professional A/E services for the project as required. The SDVOSB Architectural firm must employ the principal Architect responsible for design of this project, i.e. and be involved heavily in all aspects of the design, stamping drawings along with the other team disciplines. A/E(s) signing drawings must be licensed. The license(s) are required at the time of an award to prospective A/E(s). The following A/E disciplines are expected to be required for this design effort: architecture, structural, civil, mechanical, plumbing, electrical, fire protection, industrial hygiene, interior design, surveyors, cost estimators, certified physical security specialist or other types of A/E services as defined by FAR Part 36.6 that may be necessary. Upon award, the scope may include, but is not limited to:\n\nRenovate 4th Floor for CLC\n\nProject # 517-25-215\n\nA/E SCOPE OF WORK\n\nThis project will engage an architectural/engineering (A/E) firm to reimagine the space on the 4th floor to provide a design for a renovation project to reconstruct a compliant CLC facility and park addition into the VA Beckley site. This project will be to provide a compliant design with respect to VA criteria for a CLC on the 4th floor. This project will be an extensive design requiring new full HVAC, new perimeter heating, new floor to ceiling windows to maximize natural lighting, outdoor rooftop recreational area(s), a wraparound enclosure (hallway) on the recreational roof with seating/viewing areas, destination spaces, and a complete asbestos survey (to include sampling and testing) of the scope area. It also must have the capability to utilize existing floor space in the design, as well as, combining existing common areas. This project will reimagine the existing 3rd floor rooftop for exterior garden area complete with full garden beds, utilities, and amenities, multiple covered pathways/sidewalks, outdoor grilling, multiple shaded and heated dining and sitting areas, a fully functional nighttime movie area, art area, soda shop, barbershop, and aviary with an enclosed walkway surrounding the space. Due to the rooftop garden area, extensive mechanical equipment relocations, including exhaust and intakes, will be required.\n\nProject description is taken from strategic capital investment planning (SCIP):\n\nThis project will provide a design and phased construction of a full renovation for a portion of the 4th floor to upgrade and modernize the Community Living Center (CLC). A consistent theme will need to be developed for this project that can be used for follow on projects. The construction will renovate approximately 13,800 square feet to improve patient comfort, safety and increase patient privacy. Additionally, the project includes the construction of a 3,590 square foot connecting corridor to improve accessibility and functionality, suicide prevention, and mechanical pathways. To minimize disruption to patient care, construction will be executed in carefully planned phases while maintaining a seamless transition between project stages.\n\nADDITIONAL PROJECT GOALS:\n\nThe A/E shall provide design services for project 517-25-215. This project design would move portions of LTC to the 4th floor which is specifically designed for outstanding CLC patient care. This CLC design will provide veterans with independence and dignity. It will also allow them the ability to engage in various activities and promote family involvement. The design should have a strong family feel in order to provide the veteran with the sense that they are at home. The CLC needs to contain a hub or central gathering area (town center), as well as, common areas and activity areas that can be easily accessed from the patient rooms. The design will include but is not limited to the following: private bedrooms with connected private bathrooms, a great room, visitor restrooms, living room, dining room, kitchen, pantry, library, hair salon, theater, family room, laundry room, activity room/exercise room, and spa room. The design should also incorporate outdoor gathering areas that are easily accessible to the patients.\n\nThe architect shall ensure renovation meets criteria in the Small House (SH) Model Design Guide, available on the VA TIL. There is specific guidance in this design guide focusing on renovations and conversion of existing space.\n\nThe architect shall produce construction drawings for a full design encompassing all disciplines. Such as demolition and new construction, interiors, phasing plans for work, outages and temporary access during construction as well as FF&E.\n\nThe architect will work and collaborate with project groups performing work in the same general area.\n\nThe architect shall verify and detail all utility moves and upgrades to support the new floorplans.\n\nAll Construction drawings, estimates, and specifications shall be provided to execute a turnkey construction project.\n\nThe architect will provide a solution for a portion of the 4th floor area in a design and will be required to provide a construction package. The A/E is responsible for ensuring all required utilities, etc., are available such that the Phase 1 can be used, in its entirety without relying on future additional phased work.\n\nConstruction period services\nSubmission review and approvals for 100% drawings and specifications.\nSite visits per VA request.\n7.2.1 Minimum of 102 visits (defined as 1 person for 1 day) total; 70 for design and 32 for construction. Example: 5 A/E personnel for 3 days doing field investigation would be 15 visits.\nUpdate drawings (as-built conditions from contractor red line drawings), and\nVA correspondence during construction.\nA/E will respond on site within a twenty-four (24) hour period when\nrequested.\n\nAn on-site kickoff meeting, prior to any design, will be needed with VA staff for the start of the project to further outline goals and needs of the project. It is expected this will coincide with initial site investigation by the A/E. 10 site visits (5 personnel for 2 days).\n\nAt the 10% design review, (3) distinct design options shall be presented. The objective for this is to be collaborative and in line with a dynamic brainstorming session. The presentation by the A/E will provide 3 options or combination of options/designs for VA Management to review. 10 site visits (5 personnel for 2 days).\n\nAt the 25% design review, (3) design options with estimated costs shall be presented based on the previous (10% review) in a design charrette. The presentation will provide 3 options of floorplans and choices for different combinations of materials and color palettes for both interior and exterior features. VA leadership will make a final option selection after the 25 % review. The preferred option or combination will be executed in the remaining design effort and rendered as 3D output provided to the VA. This expected deliverable should be similar to Revit software animation. 10 site visits (5 personnel for 2 days).\n\nAt the 50% design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the 75% review, narrative report addressing bid deduct alternatives, construction phasing, design calculations or analysis, itemized cost estimate and specifications of the selected design shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the 100% design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the final design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The final review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. Final design review will be held as a virtual meeting, scheduled by the A/E.\n\nIt is anticipated an additional design site visit may be needed for information gathering or investigation. 10 site visits (5 personnel for 2 days).\n\nIt is anticipated that 32 site visits will be needed during construction, this includes intermediate and final inspections.\n\nAny testing or studies, such as flow, geotechnical, electrical, are the responsibility of the A/E.\n\nDesign shall include AE consultation for 3rd party commissioning of building.\n\nDesign shall comply with all current VA design guidelines and specifications. VA space criteria shall be used as a guide.\n\nDesign manuals and specifications can be found at http://www.cfm.va.gov/TIL/.\n\nWork located at the Beckley VA Medical Center, in Beckley WV.\n\nThe selected A&E will attend pre-bid job showing remotely. Selected A&E shall provide responses to questions asked by potential bidders and issue written responses.\n\nProject shall be designed and constructed to meet all VHA requirements including VA sustainability and green energy initiatives. See VISN 5 Energy and Water Requirements.\n\nProject shall be designed in coordination with VA staff, veteran patients, and VA Central Office/HEFP.\n\nA/E shall provide an interior designer as one of the core team members for this effort.\n\nPlanning must include a total of 10% deductive bid alternates that will need to be identified and incorporated as part of the bidding documents.\n\nSpecifics:\n\nThis design should be for a construction budget of $24,629,961. Completed design shall result in a cost that is within the budget limitations. If the base bid cost exceeds budget, the A/E shall re-design or take necessary steps to reduce the cost so that budget limitations are not exceeded. Deducts will need to be coordinated with the VA and noted on specifications and Final Design drawings.\n\nProvide contract specifications utilizing only the VA Master Specifications edited to remove all impertinent specs for this project.\n\nAttend design review meetings and make all necessary site visits during design to gather information necessary from the existing sites, building plans, utility plans, etc. to provide a complete assessment of the proposed work. A thorough as-built shall be conducted of the existing site conditions to complete a full detailed set of documents.\n\nAssess the intent and scope of this project and work with the Medical Center staff to develop a final design, specifications and cost estimate to best suit the needs and constraints of the government, while incorporating VAMC Beckley Engineering/Facilities Management Service, Safety, Infection Control, National Offices, and Contracting Officer comments into the final design package.\n\nIncorporate in the preliminary drawings the pre-construction risk assessment evaluations that include noise, vibration and infection control.\n\nProvide bound specifications and 100% construction drawings with all references\nbound. Construction documents will be required to be furnished in hard copy, electronic .dwg & PDF files (AutoCAD 2018 or most current at the time of final design submission) and electronic .pdf files. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its Project Browser/Navigator .\n\nVA cannot send or receive any emails that contains more than 5mb of data. AE shall bind or combine files to conform to the 5mb limit.\n\nCost estimates will be formulated detailing quantities of materials, labor, profit, overhead, insurance, taxes, etc. in the format found at\nhttp://www.cfm.va.gov/contract/aedessubreq.asp\n\nFinal drawings will detail measures to be taken by the contractor to assure life safety and infection control. A stated above a preconstruction risk assessment will be completed finalized and included in project submissions.\n\nPlans for phasing construction to minimize impact on the medical center will be incorporated into the construction documents. Plan construction activities to include impacts on the medical center such as relocating patient and staff, equipment, providing temporary barriers, providing temporary utilities, minimizing impact on patient flow, etc.\n\nProvide construction administration to include shop drawings/submittal review, site inspections, and RFI response.\n\nSITE INVESTIGATIONS:\n\nA/E shall make site visits as necessary to verify existing conditions and interview VA staff. Note: Information including drawings and other documentation provided to the A/E is used as reference only. All dimensions and existing conditions will be field verified and documented by the AE in the final design package. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov/TIL/. A/E shall field verify every aspect that relates to the project. Coordinate visits with the Project Manager/Contracting Officer Representative (COR)\n\nassigned after award. The A/E shall arrange for and oversee the performance of such investigations. Auto CAD architectural background drawings will be provided by the VA upon request.\n\nThe A/E shall independently field verify all existing dimensions, wall layouts, utilities, material types and every other design aspect that relates to the project.\n\nEXPECTATION: Submit review package so they are received on the noted day.\n\nReview\n*Due Date\n*Days from last review\n(Calendar Days After NTP)\nKickoff Initial Site Investigation & Design Charrette\n10\n0\nÂ\n45\n35\n10% Design Review & Design Charrette\nÂ\n75\n30\nVA 10% Review - Completed\nÂ\n105\n30\n25% Design Review & Design Charrette\nÂ\n135\n30\nVA 25% Review - Completed\nÂ\n170\n35\n50% Design Review & Presentation\nÂ\n200\n30\nVA 50% Review - Completed\nÂ\n230\n30\n75% Design Review & Presentation\nÂ\n260\n30\nVA 75% Review - Completed\nÂ\n290\n30\n100% Construction Documents\nÂ\n310\n20\nVA 100% Review - Completed\nFinal Construction Documents\n320\n10\n\n*Design and design review time can be faster than indicated in the schedule above and may result in faster completion of the project design (or float in the VA or AE schedule reviews)\n\nNote: Kickoff Meeting will be issued in writing or via teleconference call meeting.\n\nDESIGN REQUIREMENTS:\n\nExpectations: Submit complete review package in accordance with the following requirements and guidelines outlined in\n\nhttps://www.cfm.va.gov/contract/ae.asp. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E and VA team may elect to delete individual submissions which are not required.\n\nDeliver:\nAll design packages will be delivered directly to FMSL (Engineering) on the established dates for VA review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C November 2008. The manual is available at the following address: http://www.cfm.va.gov/contract/aeDesSubReq.asp. Prepare working drawings on AutoCAD MEP/Architecture, 2018 versions or most current at the time of final design submission, utilizing its smart capabilities chases. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its Project Browser/Navigator .\n\nNote: In the interest of time, electronic submittals of design documents are preferred to expedite review time. PDF Email Attachments (5mb limit) or an internet Share Point site for file downloads are acceptable. Final and As Built copies should be supplied in both electronic and Hard Copy formats.\n\nDesign Development 100%: Attachment E 100% Submission Requirements\nRequirements for the 100% Design Development. Address all comments from the 100% review and finalize required submittals.\n\nFINAL Contract Documents (CD): Attachment F Submission Requirements\nSubmit a complete document of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process\n\nCONSTRUCTION PERIOD SERVICES:\n\nProvide assistance to the VA to determine whether the contractor or subcontractor meets qualification requirements, support by written recommendations of any problems or litigation encountered in past based on firsthand knowledge.\n\nAE will review all submissions and provide recommendations to the VA within five\ncalendar days upon request. AE will review and provide replies to contractor / VA generated RFIs when required by the project manager within five calendar days.\n\nA/E will review and work cooperatively with 3rd party VA commissioning agent/firm.\n\nAE will review contractor's cost estimates, methods of work, materials and provide recommendations to the VA.\n\nMake site visits on requests of the VA and prepare written reports to include agreed upon changes in design as determined necessary during the construction. Visits made based on errors and omissions in design will be at no cost to the VA.\n\nParticipate in partial/final acceptance inspections as scheduled and generate punch list items for completion. The punch list shall reference the contract documents for specific deficiencies (i.e. specification section, drawing detail, etc.)\n\nPrepare as-built drawings on original set with A/E s stamp, based on record drawings that the contractor kept during construction. Transpose contractor s as-builts to\nAutoCAD (.dwg) and provide a set of updated as-builts on CD within 30 days to the Project Engineer. Final drawing submittal will include hard copies as described for other submissions as well as a CD clearly labeled with the project name, number and submittal date containing: Folder labeled bid documents . All specifications bound in one (1) word document (make sure spec sections are separated by page breaks). All drawing sheets in one .pdf file.\n\nAll bound or combined files shall be limited to 5mb.\nFolder labeled DWG s with subfolders containing engineering disciplines (Architectural, MEP, Structural, Civil, etc.) which includes the .arj file (for every discipline) to launch and organize the drawing file system and make all drawings the current project inside of AutoCAD.\n\nFolder labeled PDF sheets containing separate .pdf documents for each discipline.\n\nFolder labeled cost estimate containing a copy of the final construction cost estimate documents\n\nFolder labeled calculations containing final calculation documents.\nFolder labeled specifications with a word document for each spec section\n\nFolder labeled misc for IH reports, materials testing, VPDES permit, soils tests, sustainability checklist, etc.\nUpon construction completion, red line drawings will be furnished to the A/E to prepare as built drawings. Final as built drawings will be furnished as master building drawings in a project manager format prescribed by the VA.\n\nThe A/E shall review and approve all specified equipment and installation submittals and shop drawings. The A/E shall attend the pre-construction conference to review and\nconfirm project scope. During construction, the A/E shall allow for a minimum of 10 site visits as directed and scheduled by the COR.\nArchitect/Engineer Energy Scope of Work\nEnergy Requirements for the Procurement of all New Construction, Major & Minor Renovation Projects:\n\n1. New Construction:\n\nAll new construction shall be designed to achieve an energy consumption level that is at least 30% below the level achieved under ASHRAE Standard 90.1-2004, if life-cycle cost effective. Use Appendix G of ASHRAE Standard 90.1-2004 to document the energy savings.\n\nShould the 30% reduction in energy consumption prove not to be life-cycle cost effective, then the A/E shall evaluate alternative designs at 5% successive decrements to identify the most energy-efficient design that is life-cycle cost effective.\n\nThe following parameters shall be used for performing the analysis:\n\n20-year life-cycle period for system comparisons\nUse Public domain programs such as TRACE, E-CUBE, Carrier E20-II, etc.\n7% Discount Factor\nNeither include taxes, nor insurance while computing cost.\n\n2. Major & Minor Renovations and Major Equipment Replacements:\n\nFor Major Renovations: Shall include any renovation where an entire area is gutted and rebuilt. Any replacement of central HVAC equipment or changes in air distribution shall be considered a Major Renovation.\n\nReduce the energy cost budget by 20% below pre-renovations 2003 baseline. A/E shall estimate 2003 baseline energy consumption before the renovation and compare it to the proposed design after the renovation, and document the 20% savings. The primary unit for energy budget reporting is the British Thermal Unit (BTU) per square foot of the area to be renovated. A/E shall develop the energy budget as required in ASHRAE 90.1-2004, Appendix G, using the same parameters outlined above for new construction.\n\nFor Minor Renovations: Shall be defined as a small portion of a building, where only architectural treatments, or simple equipment replacement is planned. The renovation will have little to no impact on the central HVAC System, or energy use within the renovated area.\n\nAny part of the renovation which impacts energy consumption shall be designed with the mandate to reduce energy consumption. For example, if exterior walls are part of\n\nthe project, then their R-Value shall be increased. If lighting fixtures are to be replaced, then they shall be replaced with the most energy efficient fixture that is cost effective (20-year life).\n\n3. Renewable Energy Resources:\n\nFor any work, renewable (geothermal, heat recovery, wind, PV solar, solar hot water, etc.) shall be evaluated for life-cycle cost effectiveness.\n\nATTACHMENT A\n\nDesign Development 10% Submission Requirements\n\nDeliver the following (labeled with 10% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #9. Three design options shall be presented in a design charrette. The presentation will provide 3 options of floorplan designs for VA Management to review. One of the three design choices shall be a cantilevered top floor which will provide additional square footage. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n\n3 half size sets of all drawings produced on the latest version of AutoCAD software.\n\n1 copy of itemized total project cost by design option. Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit)\n\nATTACHMENT B\n\nDesign Development 25% Submission Requirements\n\nDeliver the following (labeled with 25% submission) and include this attachment as a checklist with your submission:\n\n1 copies of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in A/E scope of work #10. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n3 half size sets of all drawings required by project, produced on the latest version of AutoCAD software.\n\n1 copy of itemized cost estimate by specification section or trade (labor, material and equipment). Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit)\n\nATTACHMENT C\n\nDesign Development 50% Submission Requirements\n\nDeliver the following (labeled with 50% submission) and include this attachment as a checklist with your submission:\n1 copy of a narrative report forwarding the design develop 50% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #11. Complete The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n3 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word. (.pdf files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\n\nATTACHMENT D\n\nDesign Development 75% Submission Requirements\n\nDeliver the following (labeled with 75% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 75% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #12. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n3 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word. (.pdf files for email shall not exceed the 5mb limit. AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\n\nATTACHMENT E\n\nDesign Development 100% Submission Requirements\n\nDeliver the following (labeled with 100% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 100% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #13. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word. (.pdf files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\nATTACHMENT F\n\nFinal Contract Document Submission Requirements\n1 copy of the construction drawings Cover Sheet in AutoCAD format for FINAL VA signatures. Forward copy via email. (.pdf files for email shall not exceed the 5mb email limit)\n1 copy of FINAL design narrative report forwarding the design submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #14. The report shall identify bid deducts, recommended construction phasing and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half scale sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of FINAL itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of FINAL edited VA Master Specifications of sections to be used for the construction project. (Make sure that all proof reading edits marks and lined through text have been removed. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of the FINAL master submittal list identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the FINAL Construction Scope of Work. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of FINAL drawings in AutoCAD (.dwg files) and FINAL Specifications in Microsoft Word. (word files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\n\nThis acquisition is for Architect/Engineer (A/E) services and is procured in accordance with the Brooks Act as implemented in Subpart 36.6 of the Federal Acquisition Regulation. All submissions will be evaluated in accordance with the evaluation criteria. A \"short listing\" of 3-5 (more or less) firms deemed most highly rated after initial source selection (shortlisted) will be chosen for interviews. Interviews will be conducted by teleconference or virtually. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement.\n\nPlease note this is not a request for proposal. Eligible responses received will be evaluated based on the following criteria and the most highly qualified will be compiled on a shortlist of candidates. The evaluation factors for the SF330 Evaluations are listed below in order and will be used to evaluate and select the short-listed firms. The evaluation factors I through III are of equal value and are most important. Evaluation factor IV is less important than the first three but is more important than evaluation factor V. Evaluation V is more important than evaluation factor VI. Evaluation factors VI, VII, and VIII are equal.\n\nI Professional Qualifications Necessary for Satisfactory Performance of Required Services\nWho will be the designated project manager (PM) for the project?\nWhat is the PM discipline, how much experience does the individual have with project management and then specific to clinic spaces?\nWhat is the level of experience of the project manager and other professionals as it relates directly to expanding clinics within the VA?\nWhat is the level of VA experience of the team related to constructing new clinic spaces?\nWhat is their overall knowledge of new construction with respect clinic spaces and VA requirements?\n\nII Specialized Experience with Healthcare Facility Related Designs, Complex Electrical and Mechanical Experience and Technical Competence in the Type of Work Required\nWho will be the lead mechanical, electrical, plumbing other person/s (specialists) for the project?Â\nHow much experience does the individual/s have with designing mechanical, electrical, plumbing or other systems (specialties) for clinical spaces?Â\nWhat is the level of experience directly with VA as it relates to clinic expansion in a health care setting?\nWhat is their overall knowledge of clinic construction and VA requirements?\nWhat is their overall knowledge of expansion to existing sites?\n\nIII-Past Performance on Contracts with Government Agencies and Private Industry in Terms of Cost Control, Quality of Work, and Compliance with Performance Schedules\nTalk about a 3 previous successful VA CLC spaces.Â (past performance) Please discuss 10 highlights from your firms past CLC jobs that made your work exceptional.\nPlease discuss 3 lessons learned from any project and how you have used them on future projects (learned from past performance).\nTalk about a recent project where a renovation was completed at an existing building, how it was phased, and discuss your process, challenges, and solutions.\nPlease include a cost control chart of your last 10 jobs that includes current performance schedules.\n\nIV-Past Performance on Contracts with Government Agencies and Private Industry During Construction Period of Services (CPS)\nTalk about previous successful clinic projects CPS (past performance).\nPlease discuss highlights from your firms past clinic jobs during CPS that made your work exceptional.\nPlease discuss lessons learned from any project CPS and how you have used them on future projects (lessons learned from past performance).Â\nTalk about a successful project where issues arose during CPS and how they were corrected and resolved. Describe past techniques used to minimize RFIs and submittal response time.\nExplain your thoroughness to review RFI and submittal response time. Explain your thoroughness to review RFI and submittals, while adhering to project specifications and deadlines.\n\nV- Organization, Management and Quality Control\nWho is responsible for quality control (QC)?Â\nHow does the QC relate to the project?\nWho completed (or will complete) QC for the project?\nHow does the prime (management of the sub-consultants) intend to monitor and guarantee their subs performance, cooperation and involvement in the project?\nWhat is managements plan when something goes wrong with a deliverable from a sub? (1 example)\n\nVI- Capacity\nDiscuss the prime s relationship with the listed sub-consultants and their experience together.Â\nDiscuss the prime's capacity as a company and include specific individuals capacity\nPlease discuss your subs capacity to accomplish the needed work.\n\nVII- Litigation and Insurance\nDiscuss any significant claims against the firm because of improper or incomplete architectural and engineering services in the last 10 years.\n\nVIII Distance\nGeographical location from Beckley, West Virginia VA Medical Center\n\nNOTE: UPON AWARD, THE FOLLOWING WILL APPLY:\nThe A/E disciplines include, but are not limited to, the following: Architectural, Civil, and Mechanical/Electrical/Plumbing (MEP) which includes the following disciplines: estimating, structural, mechanical (HVAC), electrical, plumbing, geotechnical, design, certified physical security specialist and engineering services related to healthcare facilities.\nAward is contingent upon the availability of funds.\n\nContracting Office Address:\nDepartment of Veteran Affairs\nMillard Adkins, CO\n517/90C\nBuilding 2\n200 Veterans Drive,\nBeckley, WV 25801\nPoint of Contact(s):\nMillard M Adkins, Contracting Officer, email address: millard.adkins@va.gov","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24525R0063","place_of_performance":{"zip":"25801","city":{"code":"5332","name":"Beckley"},"state":{"code":"WV","name":"West Virginia"},"street":"Beckley VAMC 200 Vetreans Ave","country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"C1DA"}],"due_at":"2025-07-15T18:00:00Z","due_date":"2025-07-15","closes_at":"2025-07-15T18:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","state":"WV","county":"54081","county_name":"Raleigh County","city":"5405332","city_name":"Beckley","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"FDMWG5FJLRQ3","amount":null,"linked_awards":1,"cancelled":false,"archived":true,"updated_at":"2026-11-12T16:05:29.692974Z","principal_notice_id":"949cf3e247e7472a80fdd2c46cf7775e","description":{"text":"Sources Sought Notice\n\nSources Sought Notice\n\nPage 21 of 21\nSources Sought Notice\n*= Required Field\nSources Sought Notice\n\nPage 1 of 21\nAll INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT. THERE IS NO SEPARATE RFP PACKAGE TO DOWNLOAD.\nNAICS Code: 541- Professional, Scientific, and Technical Services; 541310- Architectural. PSC C1DA Architect and Engineering Construction: Hospitals and Infirmaries.\n\nThe Department of Veterans Affairs Medical Center (VAMC); VISN 5 Contracting, 200 Veterans Drive, Beckley, WV 25801 is advertising for Architectural/Engineering Services to provide Schematic Design, LCCA, Design Development, Construction/Bid Documents, Specifications, Construction Cost Estimates, and Construction period services for the Renovate 4th Floor for CLC 36C245-25-R-0063 at the VAMC, 200 Veterans Drive, Beckley, WV 25801.\n\nThis acquisition is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. Any subsequent award will require firms to be registered in System for Award Management (SAM) (www.sam.gov) as well as https://veterans.certify.sba.gov/ VETS 4212 and https://web.sba.gov/pro-net/search/dsp_dsbs.cfm registered/verified Service Disabled Veteran Owned Business.\n\nTHIS IS NOT A REQUEST FOR PROPOSAL. This is a request for SF 330's Architect/Engineer Qualifications packages only.\n\nSubmission Requirements: This acquisition is for A/E Services and is procured in accordance with the Brooks Act as implemented in Subpart 36.6 of the Federal Acquisition Regulation. Firms registering for consideration for future Federal AE projects are encouraged to electronically submit SF 330 Part I. Part II, General Qualifications, and to update at least annually. To be considered for this contract, firms shall submit SF330s electronically. SF330s to include Parts I & II are to be emailed to millard.adkins@va.gov, adobe pdf format, single file, no larger than 10MB, and no zipped files. Receipt must be confirmed. SF 330 are due no later than 2:00 pm Eastern Standard Time on July 15, 2025. YOUR RESPONSE SHALL BE IN ACCORDANCE WITH AND IN THE SAME ORDER OF THE EVALUATION FACTORS LISTED BELOW. FAILURE TO FOLLOW THIS SAME FORMAT IN THE SUBMISSION WILL RESULT IN REJECTION OF SF330. The SF330 can be found on the GSA forms website www.gsa.gov. All questions are to be sent to the attention of Millard.Adkins@va.gov. no later than 2:00 pm Eastern Standard Time on June 19,2025. Potential contractors must be registered in SAM (www.sam.gov) and visible and certified in https://veterans.certify.sba.gov/ and https://web.sba.gov/pro-net/search/dsp_dsbs.cfm (www.va.gov/osdbu) and Vets 4212 at time of submission, and at time of award, of their qualifications in order to be considered for an award. Additionally, the submission must include an insert detailing the following information: SAMS UEI, Tax ID Number, the email address and phone number of the primary point of contact, CVE, and a printed copy of the firms SDVOSB Registry. Offerors shall provide all documents listed and comply with all proposal instructions for their proposal to be considered responsive to this notice. This review may eliminate offerors that fail to provide all the required information and documents in the format and detail specified. An unverified SDVOSBs will be considered non-responsive as it is deficient and therefore will not be evaluated.\n\nThis is a Service-Disabled Veteran Owned Small business set aside. NAICS Codes: 541310, Size standard is $12.5 million. This is not a request for proposal, nor will a solicitation package or bidder/plan holder list be issued. There are no solicitation documents available. This procurement is subject to the availability of funds. The Government is under no obligation to award a contract because of this announcement.\n\nThe selected A/E firm shall be in accordance with FAR Part 2.101 definition of Architect-engineer services as defined in 40 U.S.C. 1102 and FAR Part 36.6 to provide professional A/E services for the project as required. The SDVOSB Architectural firm must employ the principal Architect responsible for design of this project, i.e. and be involved heavily in all aspects of the design, stamping drawings along with the other team disciplines. A/E(s) signing drawings must be licensed. The license(s) are required at the time of an award to prospective A/E(s). The following A/E disciplines are expected to be required for this design effort: architecture, structural, civil, mechanical, plumbing, electrical, fire protection, industrial hygiene, interior design, surveyors, cost estimators, certified physical security specialist or other types of A/E services as defined by FAR Part 36.6 that may be necessary. Upon award, the scope may include, but is not limited to:\n\nRenovate 4th Floor for CLC\n\nProject # 517-25-215\n\nA/E SCOPE OF WORK\n\nThis project will engage an architectural/engineering (A/E) firm to reimagine the space on the 4th floor to provide a design for a renovation project to reconstruct a compliant CLC facility and park addition into the VA Beckley site. This project will be to provide a compliant design with respect to VA criteria for a CLC on the 4th floor. This project will be an extensive design requiring new full HVAC, new perimeter heating, new floor to ceiling windows to maximize natural lighting, outdoor rooftop recreational area(s), a wraparound enclosure (hallway) on the recreational roof with seating/viewing areas, destination spaces, and a complete asbestos survey (to include sampling and testing) of the scope area. It also must have the capability to utilize existing floor space in the design, as well as, combining existing common areas. This project will reimagine the existing 3rd floor rooftop for exterior garden area complete with full garden beds, utilities, and amenities, multiple covered pathways/sidewalks, outdoor grilling, multiple shaded and heated dining and sitting areas, a fully functional nighttime movie area, art area, soda shop, barbershop, and aviary with an enclosed walkway surrounding the space. Due to the rooftop garden area, extensive mechanical equipment relocations, including exhaust and intakes, will be required.\n\nProject description is taken from strategic capital investment planning (SCIP):\n\nThis project will provide a design and phased construction of a full renovation for a portion of the 4th floor to upgrade and modernize the Community Living Center (CLC). A consistent theme will need to be developed for this project that can be used for follow on projects. The construction will renovate approximately 13,800 square feet to improve patient comfort, safety and increase patient privacy. Additionally, the project includes the construction of a 3,590 square foot connecting corridor to improve accessibility and functionality, suicide prevention, and mechanical pathways. To minimize disruption to patient care, construction will be executed in carefully planned phases while maintaining a seamless transition between project stages.\n\nADDITIONAL PROJECT GOALS:\n\nThe A/E shall provide design services for project 517-25-215. This project design would move portions of LTC to the 4th floor which is specifically designed for outstanding CLC patient care. This CLC design will provide veterans with independence and dignity. It will also allow them the ability to engage in various activities and promote family involvement. The design should have a strong family feel in order to provide the veteran with the sense that they are at home. The CLC needs to contain a hub or central gathering area (town center), as well as, common areas and activity areas that can be easily accessed from the patient rooms. The design will include but is not limited to the following: private bedrooms with connected private bathrooms, a great room, visitor restrooms, living room, dining room, kitchen, pantry, library, hair salon, theater, family room, laundry room, activity room/exercise room, and spa room. The design should also incorporate outdoor gathering areas that are easily accessible to the patients.\n\nThe architect shall ensure renovation meets criteria in the Small House (SH) Model Design Guide, available on the VA TIL. There is specific guidance in this design guide focusing on renovations and conversion of existing space.\n\nThe architect shall produce construction drawings for a full design encompassing all disciplines. Such as demolition and new construction, interiors, phasing plans for work, outages and temporary access during construction as well as FF&E.\n\nThe architect will work and collaborate with project groups performing work in the same general area.\n\nThe architect shall verify and detail all utility moves and upgrades to support the new floorplans.\n\nAll Construction drawings, estimates, and specifications shall be provided to execute a turnkey construction project.\n\nThe architect will provide a solution for a portion of the 4th floor area in a design and will be required to provide a construction package. The A/E is responsible for ensuring all required utilities, etc., are available such that the Phase 1 can be used, in its entirety without relying on future additional phased work.\n\nConstruction period services\nSubmission review and approvals for 100% drawings and specifications.\nSite visits per VA request.\n7.2.1 Minimum of 102 visits (defined as 1 person for 1 day) total; 70 for design and 32 for construction. Example: 5 A/E personnel for 3 days doing field investigation would be 15 visits.\nUpdate drawings (as-built conditions from contractor red line drawings), and\nVA correspondence during construction.\nA/E will respond on site within a twenty-four (24) hour period when\nrequested.\n\nAn on-site kickoff meeting, prior to any design, will be needed with VA staff for the start of the project to further outline goals and needs of the project. It is expected this will coincide with initial site investigation by the A/E. 10 site visits (5 personnel for 2 days).\n\nAt the 10% design review, (3) distinct design options shall be presented. The objective for this is to be collaborative and in line with a dynamic brainstorming session. The presentation by the A/E will provide 3 options or combination of options/designs for VA Management to review. 10 site visits (5 personnel for 2 days).\n\nAt the 25% design review, (3) design options with estimated costs shall be presented based on the previous (10% review) in a design charrette. The presentation will provide 3 options of floorplans and choices for different combinations of materials and color palettes for both interior and exterior features. VA leadership will make a final option selection after the 25 % review. The preferred option or combination will be executed in the remaining design effort and rendered as 3D output provided to the VA. This expected deliverable should be similar to Revit software animation. 10 site visits (5 personnel for 2 days).\n\nAt the 50% design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the 75% review, narrative report addressing bid deduct alternatives, construction phasing, design calculations or analysis, itemized cost estimate and specifications of the selected design shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the 100% design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the final design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The final review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. Final design review will be held as a virtual meeting, scheduled by the A/E.\n\nIt is anticipated an additional design site visit may be needed for information gathering or investigation. 10 site visits (5 personnel for 2 days).\n\nIt is anticipated that 32 site visits will be needed during construction, this includes intermediate and final inspections.\n\nAny testing or studies, such as flow, geotechnical, electrical, are the responsibility of the A/E.\n\nDesign shall include AE consultation for 3rd party commissioning of building.\n\nDesign shall comply with all current VA design guidelines and specifications. VA space criteria shall be used as a guide.\n\nDesign manuals and specifications can be found at http://www.cfm.va.gov/TIL/.\n\nWork located at the Beckley VA Medical Center, in Beckley WV.\n\nThe selected A&E will attend pre-bid job showing remotely. Selected A&E shall provide responses to questions asked by potential bidders and issue written responses.\n\nProject shall be designed and constructed to meet all VHA requirements including VA sustainability and green energy initiatives. See VISN 5 Energy and Water Requirements.\n\nProject shall be designed in coordination with VA staff, veteran patients, and VA Central Office/HEFP.\n\nA/E shall provide an interior designer as one of the core team members for this effort.\n\nPlanning must include a total of 10% deductive bid alternates that will need to be identified and incorporated as part of the bidding documents.\n\nSpecifics:\n\nThis design should be for a construction budget of $24,629,961. Completed design shall result in a cost that is within the budget limitations. If the base bid cost exceeds budget, the A/E shall re-design or take necessary steps to reduce the cost so that budget limitations are not exceeded. Deducts will need to be coordinated with the VA and noted on specifications and Final Design drawings.\n\nProvide contract specifications utilizing only the VA Master Specifications edited to remove all impertinent specs for this project.\n\nAttend design review meetings and make all necessary site visits during design to gather information necessary from the existing sites, building plans, utility plans, etc. to provide a complete assessment of the proposed work. A thorough as-built shall be conducted of the existing site conditions to complete a full detailed set of documents.\n\nAssess the intent and scope of this project and work with the Medical Center staff to develop a final design, specifications and cost estimate to best suit the needs and constraints of the government, while incorporating VAMC Beckley Engineering/Facilities Management Service, Safety, Infection Control, National Offices, and Contracting Officer comments into the final design package.\n\nIncorporate in the preliminary drawings the pre-construction risk assessment evaluations that include noise, vibration and infection control.\n\nProvide bound specifications and 100% construction drawings with all references\nbound. Construction documents will be required to be furnished in hard copy, electronic .dwg & PDF files (AutoCAD 2018 or most current at the time of final design submission) and electronic .pdf files. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its Project Browser/Navigator .\n\nVA cannot send or receive any emails that contains more than 5mb of data. AE shall bind or combine files to conform to the 5mb limit.\n\nCost estimates will be formulated detailing quantities of materials, labor, profit, overhead, insurance, taxes, etc. in the format found at\nhttp://www.cfm.va.gov/contract/aedessubreq.asp\n\nFinal drawings will detail measures to be taken by the contractor to assure life safety and infection control. A stated above a preconstruction risk assessment will be completed finalized and included in project submissions.\n\nPlans for phasing construction to minimize impact on the medical center will be incorporated into the construction documents. Plan construction activities to include impacts on the medical center such as relocating patient and staff, equipment, providing temporary barriers, providing temporary utilities, minimizing impact on patient flow, etc.\n\nProvide construction administration to include shop drawings/submittal review, site inspections, and RFI response.\n\nSITE INVESTIGATIONS:\n\nA/E shall make site visits as necessary to verify existing conditions and interview VA staff. Note: Information including drawings and other documentation provided to the A/E is used as reference only. All dimensions and existing conditions will be field verified and documented by the AE in the final design package. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov/TIL/. A/E shall field verify every aspect that relates to the project. Coordinate visits with the Project Manager/Contracting Officer Representative (COR)\n\nassigned after award. The A/E shall arrange for and oversee the performance of such investigations. Auto CAD architectural background drawings will be provided by the VA upon request.\n\nThe A/E shall independently field verify all existing dimensions, wall layouts, utilities, material types and every other design aspect that relates to the project.\n\nEXPECTATION: Submit review package so they are received on the noted day.\n\nReview\n*Due Date\n*Days from last review\n(Calendar Days After NTP)\nKickoff Initial Site Investigation & Design Charrette\n10\n0\nÂ\n45\n35\n10% Design Review & Design Charrette\nÂ\n75\n30\nVA 10% Review - Completed\nÂ\n105\n30\n25% Design Review & Design Charrette\nÂ\n135\n30\nVA 25% Review - Completed\nÂ\n170\n35\n50% Design Review & Presentation\nÂ\n200\n30\nVA 50% Review - Completed\nÂ\n230\n30\n75% Design Review & Presentation\nÂ\n260\n30\nVA 75% Review - Completed\nÂ\n290\n30\n100% Construction Documents\nÂ\n310\n20\nVA 100% Review - Completed\nFinal Construction Documents\n320\n10\n\n*Design and design review time can be faster than indicated in the schedule above and may result in faster completion of the project design (or float in the VA or AE schedule reviews)\n\nNote: Kickoff Meeting will be issued in writing or via teleconference call meeting.\n\nDESIGN REQUIREMENTS:\n\nExpectations: Submit complete review package in accordance with the following requirements and guidelines outlined in\n\nhttps://www.cfm.va.gov/contract/ae.asp. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E and VA team may elect to delete individual submissions which are not required.\n\nDeliver:\nAll design packages will be delivered directly to FMSL (Engineering) on the established dates for VA review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C November 2008. The manual is available at the following address: http://www.cfm.va.gov/contract/aeDesSubReq.asp. Prepare working drawings on AutoCAD MEP/Architecture, 2018 versions or most current at the time of final design submission, utilizing its smart capabilities chases. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its Project Browser/Navigator .\n\nNote: In the interest of time, electronic submittals of design documents are preferred to expedite review time. PDF Email Attachments (5mb limit) or an internet Share Point site for file downloads are acceptable. Final and As Built copies should be supplied in both electronic and Hard Copy formats.\n\nDesign Development 100%: Attachment E 100% Submission Requirements\nRequirements for the 100% Design Development. Address all comments from the 100% review and finalize required submittals.\n\nFINAL Contract Documents (CD): Attachment F Submission Requirements\nSubmit a complete document of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process\n\nCONSTRUCTION PERIOD SERVICES:\n\nProvide assistance to the VA to determine whether the contractor or subcontractor meets qualification requirements, support by written recommendations of any problems or litigation encountered in past based on firsthand knowledge.\n\nAE will review all submissions and provide recommendations to the VA within five\ncalendar days upon request. AE will review and provide replies to contractor / VA generated RFIs when required by the project manager within five calendar days.\n\nA/E will review and work cooperatively with 3rd party VA commissioning agent/firm.\n\nAE will review contractor's cost estimates, methods of work, materials and provide recommendations to the VA.\n\nMake site visits on requests of the VA and prepare written reports to include agreed upon changes in design as determined necessary during the construction. Visits made based on errors and omissions in design will be at no cost to the VA.\n\nParticipate in partial/final acceptance inspections as scheduled and generate punch list items for completion. The punch list shall reference the contract documents for specific deficiencies (i.e. specification section, drawing detail, etc.)\n\nPrepare as-built drawings on original set with A/E s stamp, based on record drawings that the contractor kept during construction. Transpose contractor s as-builts to\nAutoCAD (.dwg) and provide a set of updated as-builts on CD within 30 days to the Project Engineer. Final drawing submittal will include hard copies as described for other submissions as well as a CD clearly labeled with the project name, number and submittal date containing: Folder labeled bid documents . All specifications bound in one (1) word document (make sure spec sections are separated by page breaks). All drawing sheets in one .pdf file.\n\nAll bound or combined files shall be limited to 5mb.\nFolder labeled DWG s with subfolders containing engineering disciplines (Architectural, MEP, Structural, Civil, etc.) which includes the .arj file (for every discipline) to launch and organize the drawing file system and make all drawings the current project inside of AutoCAD.\n\nFolder labeled PDF sheets containing separate .pdf documents for each discipline.\n\nFolder labeled cost estimate containing a copy of the final construction cost estimate documents\n\nFolder labeled calculations containing final calculation documents.\nFolder labeled specifications with a word document for each spec section\n\nFolder labeled misc for IH reports, materials testing, VPDES permit, soils tests, sustainability checklist, etc.\nUpon construction completion, red line drawings will be furnished to the A/E to prepare as built drawings. Final as built drawings will be furnished as master building drawings in a project manager format prescribed by the VA.\n\nThe A/E shall review and approve all specified equipment and installation submittals and shop drawings. The A/E shall attend the pre-construction conference to review and\nconfirm project scope. During construction, the A/E shall allow for a minimum of 10 site visits as directed and scheduled by the COR.\nArchitect/Engineer Energy Scope of Work\nEnergy Requirements for the Procurement of all New Construction, Major & Minor Renovation Projects:\n\n1. New Construction:\n\nAll new construction shall be designed to achieve an energy consumption level that is at least 30% below the level achieved under ASHRAE Standard 90.1-2004, if life-cycle cost effective. Use Appendix G of ASHRAE Standard 90.1-2004 to document the energy savings.\n\nShould the 30% reduction in energy consumption prove not to be life-cycle cost effective, then the A/E shall evaluate alternative designs at 5% successive decrements to identify the most energy-efficient design that is life-cycle cost effective.\n\nThe following parameters shall be used for performing the analysis:\n\n20-year life-cycle period for system comparisons\nUse Public domain programs such as TRACE, E-CUBE, Carrier E20-II, etc.\n7% Discount Factor\nNeither include taxes, nor insurance while computing cost.\n\n2. Major & Minor Renovations and Major Equipment Replacements:\n\nFor Major Renovations: Shall include any renovation where an entire area is gutted and rebuilt. Any replacement of central HVAC equipment or changes in air distribution shall be considered a Major Renovation.\n\nReduce the energy cost budget by 20% below pre-renovations 2003 baseline. A/E shall estimate 2003 baseline energy consumption before the renovation and compare it to the proposed design after the renovation, and document the 20% savings. The primary unit for energy budget reporting is the British Thermal Unit (BTU) per square foot of the area to be renovated. A/E shall develop the energy budget as required in ASHRAE 90.1-2004, Appendix G, using the same parameters outlined above for new construction.\n\nFor Minor Renovations: Shall be defined as a small portion of a building, where only architectural treatments, or simple equipment replacement is planned. The renovation will have little to no impact on the central HVAC System, or energy use within the renovated area.\n\nAny part of the renovation which impacts energy consumption shall be designed with the mandate to reduce energy consumption. For example, if exterior walls are part of\n\nthe project, then their R-Value shall be increased. If lighting fixtures are to be replaced, then they shall be replaced with the most energy efficient fixture that is cost effective (20-year life).\n\n3. Renewable Energy Resources:\n\nFor any work, renewable (geothermal, heat recovery, wind, PV solar, solar hot water, etc.) shall be evaluated for life-cycle cost effectiveness.\n\nATTACHMENT A\n\nDesign Development 10% Submission Requirements\n\nDeliver the following (labeled with 10% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #9. Three design options shall be presented in a design charrette. The presentation will provide 3 options of floorplan designs for VA Management to review. One of the three design choices shall be a cantilevered top floor which will provide additional square footage. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n\n3 half size sets of all drawings produced on the latest version of AutoCAD software.\n\n1 copy of itemized total project cost by design option. Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit)\n\nATTACHMENT B\n\nDesign Development 25% Submission Requirements\n\nDeliver the following (labeled with 25% submission) and include this attachment as a checklist with your submission:\n\n1 copies of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in A/E scope of work #10. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n3 half size sets of all drawings required by project, produced on the latest version of AutoCAD software.\n\n1 copy of itemized cost estimate by specification section or trade (labor, material and equipment). Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit)\n\nATTACHMENT C\n\nDesign Development 50% Submission Requirements\n\nDeliver the following (labeled with 50% submission) and include this attachment as a checklist with your submission:\n1 copy of a narrative report forwarding the design develop 50% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #11. Complete The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n3 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word. (.pdf files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\n\nATTACHMENT D\n\nDesign Development 75% Submission Requirements\n\nDeliver the following (labeled with 75% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 75% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #12. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n3 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word. (.pdf files for email shall not exceed the 5mb limit. AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\n\nATTACHMENT E\n\nDesign Development 100% Submission Requirements\n\nDeliver the following (labeled with 100% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 100% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #13. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word. (.pdf files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\nATTACHMENT F\n\nFinal Contract Document Submission Requirements\n1 copy of the construction drawings Cover Sheet in AutoCAD format for FINAL VA signatures. Forward copy via email. (.pdf files for email shall not exceed the 5mb email limit)\n1 copy of FINAL design narrative report forwarding the design submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #14. The report shall identify bid deducts, recommended construction phasing and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half scale sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of FINAL itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of FINAL edited VA Master Specifications of sections to be used for the construction project. (Make sure that all proof reading edits marks and lined through text have been removed. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of the FINAL master submittal list identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the FINAL Construction Scope of Work. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of FINAL drawings in AutoCAD (.dwg files) and FINAL Specifications in Microsoft Word. (word files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\n\nThis acquisition is for Architect/Engineer (A/E) services and is procured in accordance with the Brooks Act as implemented in Subpart 36.6 of the Federal Acquisition Regulation. All submissions will be evaluated in accordance with the evaluation criteria. A \"short listing\" of 3-5 (more or less) firms deemed most highly rated after initial source selection (shortlisted) will be chosen for interviews. Interviews will be conducted by teleconference or virtually. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement.\n\nPlease note this is not a request for proposal. Eligible responses received will be evaluated based on the following criteria and the most highly qualified will be compiled on a shortlist of candidates. The evaluation factors for the SF330 Evaluations are listed below in order and will be used to evaluate and select the short-listed firms. The evaluation factors I through III are of equal value and are most important. Evaluation factor IV is less important than the first three but is more important than evaluation factor V. Evaluation V is more important than evaluation factor VI. Evaluation factors VI, VII, and VIII are equal.\n\nI Professional Qualifications Necessary for Satisfactory Performance of Required Services\nWho will be the designated project manager (PM) for the project?\nWhat is the PM discipline, how much experience does the individual have with project management and then specific to clinic spaces?\nWhat is the level of experience of the project manager and other professionals as it relates directly to expanding clinics within the VA?\nWhat is the level of VA experience of the team related to constructing new clinic spaces?\nWhat is their overall knowledge of new construction with respect clinic spaces and VA requirements?\n\nII Specialized Experience with Healthcare Facility Related Designs, Complex Electrical and Mechanical Experience and Technical Competence in the Type of Work Required\nWho will be the lead mechanical, electrical, plumbing other person/s (specialists) for the project?Â\nHow much experience does the individual/s have with designing mechanical, electrical, plumbing or other systems (specialties) for clinical spaces?Â\nWhat is the level of experience directly with VA as it relates to clinic expansion in a health care setting?\nWhat is their overall knowledge of clinic construction and VA requirements?\nWhat is their overall knowledge of expansion to existing sites?\n\nIII-Past Performance on Contracts with Government Agencies and Private Industry in Terms of Cost Control, Quality of Work, and Compliance with Performance Schedules\nTalk about a 3 previous successful VA CLC spaces.Â (past performance) Please discuss 10 highlights from your firms past CLC jobs that made your work exceptional.\nPlease discuss 3 lessons learned from any project and how you have used them on future projects (learned from past performance).\nTalk about a recent project where a renovation was completed at an existing building, how it was phased, and discuss your process, challenges, and solutions.\nPlease include a cost control chart of your last 10 jobs that includes current performance schedules.\n\nIV-Past Performance on Contracts with Government Agencies and Private Industry During Construction Period of Services (CPS)\nTalk about previous successful clinic projects CPS (past performance).\nPlease discuss highlights from your firms past clinic jobs during CPS that made your work exceptional.\nPlease discuss lessons learned from any project CPS and how you have used them on future projects (lessons learned from past performance).Â\nTalk about a successful project where issues arose during CPS and how they were corrected and resolved. Describe past techniques used to minimize RFIs and submittal response time.\nExplain your thoroughness to review RFI and submittal response time. Explain your thoroughness to review RFI and submittals, while adhering to project specifications and deadlines.\n\nV- Organization, Management and Quality Control\nWho is responsible for quality control (QC)?Â\nHow does the QC relate to the project?\nWho completed (or will complete) QC for the project?\nHow does the prime (management of the sub-consultants) intend to monitor and guarantee their subs performance, cooperation and involvement in the project?\nWhat is managements plan when something goes wrong with a deliverable from a sub? (1 example)\n\nVI- Capacity\nDiscuss the prime s relationship with the listed sub-consultants and their experience together.Â\nDiscuss the prime's capacity as a company and include specific individuals capacity\nPlease discuss your subs capacity to accomplish the needed work.\n\nVII- Litigation and Insurance\nDiscuss any significant claims against the firm because of improper or incomplete architectural and engineering services in the last 10 years.\n\nVIII Distance\nGeographical location from Beckley, West Virginia VA Medical Center\n\nNOTE: UPON AWARD, THE FOLLOWING WILL APPLY:\nThe A/E disciplines include, but are not limited to, the following: Architectural, Civil, and Mechanical/Electrical/Plumbing (MEP) which includes the following disciplines: estimating, structural, mechanical (HVAC), electrical, plumbing, geotechnical, design, certified physical security specialist and engineering services related to healthcare facilities.\nAward is contingent upon the availability of funds.\n\nContracting Office Address:\nDepartment of Veteran Affairs\nMillard Adkins, CO\n517/90C\nBuilding 2\n200 Veterans Drive,\nBeckley, WV 25801\nPoint of Contact(s):\nMillard M Adkins, Contracting Officer, email address: millard.adkins@va.gov","html":"Sources Sought Notice\n\nSources Sought Notice\n\nPage 21 of 21\nSources Sought Notice\n*= Required Field\nSources Sought Notice\n\nPage 1 of 21\nAll INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT. THERE IS NO SEPARATE RFP PACKAGE TO DOWNLOAD.\nNAICS Code: 541- Professional, Scientific, and Technical Services; 541310- Architectural. PSC C1DA Architect and Engineering   Construction: Hospitals and Infirmaries.\n\nThe Department of Veterans Affairs Medical Center (VAMC); VISN 5 Contracting, 200 Veterans Drive, Beckley, WV 25801 is advertising for Architectural/Engineering Services to provide Schematic Design, LCCA, Design Development, Construction/Bid Documents, Specifications, Construction Cost Estimates, and Construction period services for the Renovate 4th Floor for CLC 36C245-25-R-0063 at the VAMC, 200 Veterans Drive, Beckley, WV 25801.\n\nThis acquisition is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside.  Any subsequent award will require firms to be registered in System for Award Management (SAM) (www.sam.gov)  as well as https://veterans.certify.sba.gov/ VETS 4212 and https://web.sba.gov/pro-net/search/dsp_dsbs.cfm registered/verified Service Disabled Veteran Owned Business.  \n\nTHIS IS NOT A REQUEST FOR PROPOSAL. This is a request for SF 330's Architect/Engineer Qualifications packages only.\n\nSubmission Requirements:  This acquisition is for A/E Services and is procured in accordance with the Brooks Act as implemented in Subpart 36.6 of the Federal Acquisition Regulation. Firms registering for consideration for future Federal AE projects are encouraged to electronically submit SF 330 Part I. Part II, General Qualifications, and to update at least annually. To be considered for this contract, firms shall submit SF330s electronically. SF330s to include Parts I & II are to be emailed to millard.adkins@va.gov, adobe pdf format, single file, no larger than 10MB, and no zipped files. Receipt must be confirmed. SF 330 are due no later than 2:00 pm Eastern Standard Time on July 15, 2025.  YOUR RESPONSE SHALL BE IN ACCORDANCE WITH AND IN THE SAME ORDER OF THE EVALUATION FACTORS LISTED BELOW. FAILURE TO FOLLOW THIS SAME FORMAT IN THE SUBMISSION WILL RESULT IN REJECTION OF SF330. The SF330 can be found on the GSA forms website www.gsa.gov. All questions are to be sent to the attention of Millard.Adkins@va.gov. no later than 2:00 pm Eastern Standard Time on June 19,2025. Potential contractors must be registered in SAM (www.sam.gov) and visible and certified in https://veterans.certify.sba.gov/ and https://web.sba.gov/pro-net/search/dsp_dsbs.cfm (www.va.gov/osdbu) and Vets 4212 at time of submission, and at time of award, of their qualifications in order to be considered for an award.  Additionally, the submission must include an insert detailing the following information:  SAMS UEI, Tax ID Number, the email address and phone number of the primary point of contact, CVE, and a printed copy of the firms  SDVOSB Registry.  Offerors shall provide all documents listed and comply with all proposal instructions for their proposal to be considered responsive to this notice. This review may eliminate offerors that fail to provide all the required information and documents in the format and detail specified. An unverified SDVOSBs will be considered non-responsive as it is deficient and therefore will not be evaluated.\n\n\nThis is a Service-Disabled Veteran Owned Small business set aside.  NAICS Codes: 541310, Size standard is $12.5 million.  This is not a request for proposal, nor will a solicitation package or bidder/plan holder list be issued.  There are no solicitation documents available.  This procurement is subject to the availability of funds. The Government is under no obligation to award a contract because of this announcement.\n\n\nThe selected A/E firm shall be in accordance with FAR Part 2.101 definition of  Architect-engineer services  as defined in 40 U.S.C. 1102 and FAR Part 36.6 to provide professional A/E services for the project as required.  The SDVOSB Architectural firm must employ the principal Architect responsible for design of this project, i.e. and be involved heavily in all aspects of the design, stamping drawings along with the other team disciplines.  A/E(s) signing drawings must be licensed.  The license(s) are required at the time of an award to prospective A/E(s).  The following A/E disciplines are expected to be required for this design effort: architecture, structural, civil, mechanical, plumbing, electrical, fire protection, industrial hygiene, interior design, surveyors, cost estimators, certified physical security specialist or other types of A/E services as defined by FAR Part 36.6 that may be necessary.  Upon award, the scope may include, but is not limited to: \n\nRenovate 4th Floor for CLC\n\nProject # 517-25-215\n\nA/E SCOPE OF WORK\n\nThis project will engage an architectural/engineering (A/E) firm to reimagine the space on the 4th floor to provide a design for a renovation project to reconstruct a compliant CLC facility and park addition into the VA Beckley site. This project will be to provide a compliant design with respect to VA criteria for a CLC on the 4th floor. This project will be an extensive design requiring new full HVAC, new perimeter heating, new floor to ceiling windows to maximize natural lighting, outdoor rooftop recreational area(s), a wraparound enclosure (hallway) on the recreational roof with seating/viewing areas, destination spaces, and a complete asbestos survey (to include sampling and testing) of the scope area.  It also must have the capability to utilize existing floor space in the design, as well as, combining existing common areas.  This project will reimagine the existing 3rd floor rooftop for exterior garden area complete with full garden beds, utilities, and amenities, multiple covered pathways/sidewalks, outdoor grilling, multiple shaded and heated dining and sitting areas, a fully functional nighttime movie area, art area, soda shop, barbershop, and aviary with an enclosed walkway surrounding the space. Due to the rooftop garden area, extensive mechanical equipment relocations, including exhaust and intakes, will be required.\n\nProject description is taken from strategic capital investment planning (SCIP):\n \nThis project will provide a design and phased construction of a full renovation for a portion of the 4th floor to upgrade and modernize the Community Living Center (CLC). A consistent theme will need to be developed for this project that can be used for follow on projects. The construction will renovate approximately 13,800 square feet to improve patient comfort, safety and increase patient privacy. Additionally, the project includes the construction of a 3,590 square foot connecting corridor to improve accessibility and functionality, suicide prevention, and mechanical pathways. To minimize disruption to patient care, construction will be executed in carefully planned phases while maintaining a seamless transition between project stages.\n\n\n      ADDITIONAL PROJECT GOALS:\n\nThe A/E shall provide design services for project 517-25-215.  This project design would move portions of LTC to the 4th floor which is specifically designed for outstanding CLC patient care.  This CLC design will provide veterans with independence and dignity.  It will also allow them the ability to engage in various activities and promote family involvement.  The design should have a strong family feel in order to provide the veteran with the sense that they are at home.  The CLC needs to contain a hub or central gathering area (town center), as well as, common areas and activity areas that can be easily accessed from the patient rooms.  The design will include but is not limited to the following: private bedrooms with connected private bathrooms, a great room, visitor restrooms, living room, dining room, kitchen, pantry, library, hair salon, theater, family room, laundry room, activity room/exercise room, and spa room.  The design should also incorporate outdoor gathering areas that are easily accessible to the patients.   \n\n\nThe architect shall ensure renovation meets criteria in the Small House (SH) Model Design Guide, available on the VA TIL.  There is specific guidance in this design guide focusing on renovations and conversion of existing space.\n\nThe architect shall produce construction drawings for a full design encompassing all disciplines. Such as demolition and new construction, interiors, phasing plans for work, outages and temporary access during construction as well as FF&E.\n\nThe architect will work and collaborate with project groups performing work in the same general area. \n\nThe architect shall verify and detail all utility moves and upgrades to support the new floorplans.\n\nAll Construction drawings, estimates, and specifications shall be provided to execute a turnkey construction project.\n\nThe architect will provide a solution for a portion of the 4th floor area in a design and will be required to provide a construction package.  The A/E is responsible for ensuring all required utilities, etc., are available such that the Phase 1 can be used, in its entirety without relying on future additional phased work.\n\nConstruction period services\n    Submission review and approvals for 100% drawings and specifications. \n    Site visits per VA request.\n   7.2.1  Minimum of 102 visits (defined as 1 person for 1 day) total; 70 for design and 32 for construction. Example: 5 A/E personnel for 3 days doing field investigation would be 15 visits.\n    Update drawings (as-built conditions from contractor red line drawings), and  \n             VA correspondence during construction.\n    A/E will respond on site within a twenty-four (24) hour period when  \n           requested.\n\nAn on-site kickoff meeting, prior to any design, will be needed with VA staff for the start of the project to further outline goals and needs of the project.  It is expected this will coincide with initial site investigation by the A/E. 10 site visits (5 personnel for 2 days).\n\nAt the 10% design review, (3) distinct design options shall be presented. The objective for this is to be collaborative and in line with a dynamic brainstorming session. The presentation by the A/E will provide 3 options or combination of options/designs for VA Management to review. 10 site visits (5 personnel for 2 days).\n\nAt the 25% design review, (3) design options with estimated costs shall be presented based on the previous (10% review) in a design charrette. The presentation will provide 3 options of floorplans and choices for different combinations of materials and color palettes for both interior and exterior features. VA leadership will make a final option selection after the 25 % review. The preferred option or combination will be executed in the remaining design effort and rendered as 3D output provided to the VA. This expected deliverable should be similar to Revit software animation. 10 site visits (5 personnel for 2 days).\n\nAt the 50% design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the 75% review, narrative report addressing bid deduct alternatives, construction phasing, design calculations or analysis, itemized cost estimate and specifications of the selected design shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the 100% design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings. 10 site visits (5 personnel for 2 days).\n\nAt the final design review, narrative report addressing bid deduct alternatives, design calculations or analysis of the selected design, itemized cost estimate and specifications shall be presented. The final review will also include the architectural, structural, electrical, plumbing, HVAC, site, fire protection and phasing drawings.  Final design review will be held as a virtual meeting, scheduled by the A/E.\n\nIt is anticipated an additional design site visit may be needed for information gathering or investigation. 10 site visits (5 personnel for 2 days).\n\nIt is anticipated that 32 site visits will be needed during construction, this includes intermediate and final inspections.\n\nAny testing or studies, such as flow, geotechnical, electrical, are the responsibility of the A/E.\n\nDesign shall include AE consultation for 3rd party commissioning of building.\n\nDesign shall comply with all current VA design guidelines and specifications. VA space criteria shall be used as a guide.\n\nDesign manuals and specifications can be found at http://www.cfm.va.gov/TIL/. \n\nWork located at the Beckley VA Medical Center, in Beckley WV. \n\nThe selected A&E will attend pre-bid job showing remotely. Selected A&E shall provide responses to questions asked by potential bidders and issue written responses.\n\nProject shall be designed and constructed to meet all VHA requirements including VA sustainability and green energy initiatives. See VISN 5 Energy and Water Requirements.  \n\nProject shall be designed in coordination with VA staff, veteran patients, and VA Central Office/HEFP.\n\nA/E shall provide an interior designer as one of the core team members for this effort.\n\nPlanning must include a total of 10% deductive bid alternates that will need to be identified and incorporated as part of the bidding documents.    \n\nSpecifics:\n\nThis design should be for a construction budget of $24,629,961. Completed design shall result in a cost that is within the budget limitations. If the base bid cost exceeds budget, the A/E shall re-design or take necessary steps to reduce the cost so that budget limitations are not exceeded. Deducts will need to be coordinated with the VA and noted on specifications and Final Design drawings.\n      \nProvide contract specifications utilizing only the VA Master Specifications edited to remove all impertinent specs for this project.\n\nAttend design review meetings and make all necessary site visits during design to gather information necessary from the existing sites, building plans, utility plans, etc. to provide a complete assessment of the proposed work. A thorough as-built shall be conducted of the existing site conditions to complete a full detailed set of documents.  \n\nAssess the intent and scope of this project and work with the Medical Center staff to develop a final design, specifications and cost estimate to best suit the needs and constraints of the government, while incorporating VAMC Beckley Engineering/Facilities Management Service, Safety, Infection Control, National Offices, and Contracting Officer comments into the final design package.\n\nIncorporate in the preliminary drawings the pre-construction risk assessment evaluations that include noise, vibration and infection control. \n\nProvide bound specifications and 100% construction drawings with all references \nbound. Construction documents will be required to be furnished in hard copy, electronic .dwg & PDF files (AutoCAD 2018 or most current at the time of final design submission) and electronic .pdf files. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its  Project Browser/Navigator .\n\nVA cannot send or receive any emails that contains more than 5mb of data. AE shall bind or combine files to conform to the 5mb limit. \n\nCost estimates will be formulated detailing quantities of materials, labor, profit, overhead, insurance, taxes, etc. in the format found at  \nhttp://www.cfm.va.gov/contract/aedessubreq.asp\n\nFinal drawings will detail measures to be taken by the contractor to assure life safety and infection control. A stated above a preconstruction risk assessment will be completed finalized and included in project submissions.\n\nPlans for phasing construction to minimize impact on the medical center will be incorporated into the construction documents. Plan construction activities to include impacts on the medical center such as relocating patient and staff, equipment, providing temporary barriers, providing temporary utilities, minimizing impact on patient flow, etc.\n\nProvide construction administration to include shop drawings/submittal review, site inspections, and RFI response.\n\n\nSITE INVESTIGATIONS:\n\nA/E shall make site visits as necessary to verify existing conditions and interview VA staff. Note: Information including drawings and other documentation provided to the A/E is used as reference only. All dimensions and existing conditions will be field verified and documented by the AE in the final design package. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov/TIL/. A/E shall field verify every aspect that relates to the project.  Coordinate visits with the Project Manager/Contracting Officer Representative (COR) \n\nassigned after award. The A/E shall arrange for and oversee the performance of such investigations. Auto CAD architectural background drawings will be provided by the VA upon request.  \n\nThe A/E shall independently field verify all existing dimensions, wall layouts, utilities, material types and every other design aspect that relates to the project.\n\nEXPECTATION: Submit review package so they are received on the noted day. \n\n\nReview \n*Due Date \n*Days from last review\n(Calendar Days After NTP)\nKickoff Initial Site Investigation & Design Charrette\n10\n0\nÂ \n45\n35\n10% Design Review & Design Charrette\nÂ \n75\n30\nVA 10% Review - Completed\nÂ \n105\n30\n25% Design Review & Design Charrette\nÂ \n135\n30\nVA 25% Review - Completed\nÂ \n170\n35\n50% Design Review & Presentation\nÂ \n200\n30\nVA 50% Review - Completed\nÂ \n230\n30\n75% Design Review & Presentation\nÂ \n260\n30\nVA 75% Review - Completed\nÂ \n290\n30\n100% Construction Documents\nÂ \n310\n20\nVA 100% Review - Completed\nFinal Construction Documents\n320\n10\n\n*Design and design review time can be faster than indicated in the schedule above and may result in faster completion of the project design (or float in the VA or AE schedule reviews)\n\nNote: Kickoff Meeting will be issued in writing or via teleconference call meeting.  \n\n\nDESIGN REQUIREMENTS:\n\nExpectations: Submit complete review package in accordance with the following requirements and guidelines outlined in \n\nhttps://www.cfm.va.gov/contract/ae.asp. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E and VA team may elect to delete individual submissions which are not required.\n\nDeliver:\nAll design packages will be delivered directly to FMSL (Engineering) on the established dates for VA review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C November 2008. The manual is available at the following address: http://www.cfm.va.gov/contract/aeDesSubReq.asp. Prepare working drawings on AutoCAD MEP/Architecture, 2018 versions or most current at the time of final design submission, utilizing its  smart  capabilities chases. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its  Project Browser/Navigator .\n\nNote: In the interest of time, electronic submittals of design documents are preferred to expedite review time. PDF Email Attachments (5mb limit) or an internet Share Point site for file downloads are acceptable. Final and As Built copies should be supplied in both electronic and Hard Copy formats.\n\nDesign Development 100%:  Attachment  E  100% Submission Requirements\nRequirements for the 100% Design Development. Address all comments from the 100% review and finalize required submittals.\n  \nFINAL Contract Documents (CD):  Attachment  F  Submission Requirements\nSubmit a complete document of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process\n\n\nCONSTRUCTION PERIOD SERVICES:\n\nProvide assistance to the VA to determine whether the contractor or subcontractor meets qualification requirements, support by written recommendations of any problems or litigation encountered in past based on firsthand knowledge.\n\nAE will review all submissions and provide recommendations to the VA within five  \ncalendar days upon request. AE will review and provide replies to contractor / VA generated RFIs when required by the project manager within five calendar days.\n\nA/E will review and work cooperatively with 3rd party VA commissioning agent/firm.\n\n\nAE will review contractor's cost estimates, methods of work, materials and provide recommendations to the VA.\n\nMake site visits on requests of the VA and prepare written reports to include agreed upon changes in design as determined necessary during the construction. Visits made based on errors and omissions in design will be at no cost to the VA.\n\nParticipate in partial/final acceptance inspections as scheduled and generate punch list items for completion. The punch list shall reference the contract documents for specific deficiencies (i.e. specification section, drawing detail, etc.)\n\nPrepare as-built drawings on original set with A/E s stamp, based on record drawings that the contractor kept during construction. Transpose contractor s as-builts to \nAutoCAD (.dwg) and provide a set of updated as-builts on CD within 30 days to the Project Engineer. Final drawing submittal will include hard copies as described for other submissions as well as a CD clearly labeled with the project name, number and submittal date containing: Folder labeled  bid documents . All specifications bound in one (1) word document (make sure spec sections are separated by page breaks). All drawing sheets in one .pdf file.\n\nAll bound or combined files shall be limited to 5mb.\nFolder labeled  DWG s  with subfolders containing engineering disciplines (Architectural, MEP, Structural, Civil, etc.) which includes the .arj file (for every discipline) to launch and organize the drawing file system and make all drawings the current project inside of AutoCAD.\n\nFolder labeled  PDF sheets  containing separate .pdf documents for each discipline.\n\nFolder labeled  cost estimate  containing a copy of the final construction cost estimate documents\n\nFolder labeled  calculations  containing final calculation documents.\nFolder labeled  specifications  with a word document for each spec section\n\nFolder labeled  misc  for IH reports, materials testing, VPDES permit, soils tests, sustainability checklist, etc.\nUpon construction completion, red line drawings will be furnished to the A/E to prepare as built drawings. Final as built drawings will be furnished as master building drawings in a project manager format prescribed by the VA.  \n\nThe A/E shall review and approve all specified equipment and installation submittals and shop drawings. The A/E shall attend the pre-construction conference to review and \nconfirm project scope. During construction, the A/E shall allow for a minimum of 10 site visits as directed and scheduled by the COR.   \nArchitect/Engineer Energy Scope of Work\nEnergy Requirements for the Procurement of all New Construction, Major & Minor Renovation Projects:\n\n1.  New Construction:  \n\nAll new construction shall be designed to achieve an energy consumption level that is at least 30% below the level achieved under ASHRAE Standard 90.1-2004, if life-cycle cost effective. Use Appendix G of ASHRAE Standard 90.1-2004 to document the energy savings.\n\nShould the 30% reduction in energy consumption prove not to be life-cycle cost effective, then the A/E shall evaluate alternative designs at 5% successive decrements to identify the most energy-efficient design that is life-cycle cost effective.\n\nThe following parameters shall be used for performing the analysis:\n\n20-year life-cycle period for system comparisons\nUse Public domain programs such as TRACE, E-CUBE, Carrier E20-II, etc.\n7% Discount Factor\nNeither include taxes, nor insurance while computing cost.\n\n\n2.  Major & Minor Renovations and Major Equipment Replacements:\n\nFor Major Renovations: Shall include any renovation where an entire area is  gutted  and rebuilt. Any replacement of central HVAC equipment or changes in air distribution shall be considered a  Major Renovation. \n\nReduce the energy cost budget by 20% below pre-renovations 2003 baseline. A/E shall estimate 2003 baseline energy consumption before the renovation and compare it to the proposed design after the renovation, and document the 20% savings. The primary unit for energy budget reporting is the British Thermal Unit (BTU) per square foot of the area to be renovated. A/E shall develop the energy budget as required in ASHRAE 90.1-2004, Appendix G, using the same parameters outlined above for new construction. \n\nFor Minor Renovations: Shall be defined as a small portion of a building, where only architectural treatments, or simple equipment replacement is planned. The renovation will have little to no impact on the central HVAC System, or energy use within the renovated area. \n\nAny part of the renovation which impacts energy consumption shall be designed with the mandate to reduce energy consumption. For example, if exterior walls are part of \n\nthe project, then their R-Value shall be increased. If lighting fixtures are to be replaced, then they shall be replaced with the most energy efficient fixture that is cost effective (20-year life).\n\n3.  Renewable Energy Resources: \n\nFor any work, renewable (geothermal, heat recovery, wind, PV solar, solar hot water, etc.) shall be evaluated for life-cycle cost effectiveness.  \n\nATTACHMENT  A \n\n Design Development 10% Submission Requirements\n\nDeliver the following (labeled with 10% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #9.  Three design options shall be presented in a design charrette. The presentation will provide 3 options of floorplan designs for VA Management to review. One of the three design choices shall be a cantilevered top floor which will provide additional square footage. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)  \n\n3 half size sets of all drawings produced on the latest version of AutoCAD software.  \n\n1 copy of itemized total project cost by design option. Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit) \n\n\nATTACHMENT  B \n\n Design Development 25% Submission Requirements\n\nDeliver the following (labeled with 25% submission) and include this attachment as a checklist with your submission:\n\n1 copies of a narrative report forwarding the design develop SD submission addressing items listed in the design requirements and any additional A/E recommendations.  Complete all items listed in A/E scope of work #10. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)  \n3 half size sets of all drawings required by project, produced on the latest version of AutoCAD software.  \n\n1 copy of itemized cost estimate by specification section or trade (labor, material and equipment). Forward copy via email in .pdf format. (email size shall not exceed the 5mb limit) \n\n\nATTACHMENT  C \n\n Design Development 50% Submission Requirements\n\nDeliver the following (labeled with 50% submission) and include this attachment as a checklist with your submission:\n1 copy of a narrative report forwarding the design develop 50% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items listed in the A/E scope of work #11.   Complete The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n3 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n \n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word.    (.pdf files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit.\n\n                                                ATTACHMENT  D \n \nDesign Development 75% Submission Requirements\n\nDeliver the following (labeled with 75% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 75% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #12.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n3 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n \n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word.    (.pdf files for email shall not exceed the 5mb limit. AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit. \n\n\nATTACHMENT  E \n\nDesign Development 100% Submission Requirements\n\nDeliver the following (labeled with 100% submission) and include this attachment as a checklist with your submission:\n\n1 copy of a narrative report forwarding the design develop 100% submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #13.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)\n2 full size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half size sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half scale sets of all drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of updated itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of custom edited VA Master Specifications of sections to be used for the construction project. The individual specification sections shall be submitted with all proof reading edits marks highlighted and /or lined through text visibly shown. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of a master submittal list identifying all the submittals required to be submitted by the contractor for review.  Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the Construction Scope of Work for review.  Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n \n1 copy of drawings in AutoCAD (.dwg files) and specifications in Microsoft Word.    (.pdf files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit. \n                                     ATTACHMENT  F \n\n        Final Contract Document Submission Requirements\n1 copy of the construction drawings Cover Sheet in AutoCAD format for FINAL VA signatures.  Forward copy via email. (.pdf files for email shall not exceed the 5mb email limit)\n1 copy of FINAL design narrative report forwarding the design submission addressing items listed in the design requirements and any additional A/E recommendations. Complete all items in the A/E scope of work #14. The report shall identify bid deducts, recommended construction phasing and any design calculations or analysis. Forward copy via email in .pdf format. (.pdf files for email shall not exceed the 5mb limit)    \n2 full size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half size sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n2 half scale sets of all FINAL drawings updating all previous comments required by project, produced on the latest version of AutoCAD software.\n1 copy of FINAL itemized cost estimate by specification section or trade (labor, material and equipment). Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of FINAL edited VA Master Specifications of sections to be used for the construction project. (Make sure that all proof reading edits marks and lined through text have been removed. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n\n1 copy of the FINAL master submittal list identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n1 copy of the FINAL Construction Scope of Work. Include electronically (.pdf file) (.pdf files for email shall not exceed the 5mb limit)\n \n1 copy of FINAL drawings in AutoCAD (.dwg files) and FINAL Specifications in Microsoft Word. (word files for email shall not exceed the 5mb limit). AE shall submit on CD or DVD or establish an internet Share Point site for file transfer. Any combined files shall not exceed the 5mb limit. \n\n\n\nThis acquisition is for Architect/Engineer (A/E) services and is procured in accordance with the Brooks Act as implemented in Subpart 36.6 of the Federal Acquisition Regulation.  All submissions will be evaluated in accordance with the evaluation criteria.  A \"short listing\" of 3-5 (more or less) firms deemed most highly rated after initial source selection (shortlisted) will be chosen for interviews. Interviews will be conducted by teleconference or virtually. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. \n\nPlease note this is not a request for proposal.  Eligible responses received will be evaluated based on the following criteria and the most highly qualified will be compiled on a shortlist of candidates. The evaluation factors for the SF330 Evaluations are listed below in order and will be used to evaluate and select the short-listed firms. The evaluation factors I through III are of equal value and are most important. Evaluation factor IV is less important than the first three but is more important than evaluation factor V. Evaluation V is more important than evaluation factor VI. Evaluation factors VI, VII, and VIII are equal. \n\nI   Professional Qualifications Necessary for Satisfactory Performance of Required Services\nWho will be the designated project manager (PM) for the project?  \nWhat is the PM discipline, how much experience does the individual have with project management and then specific to clinic spaces?  \nWhat is the level of experience of the project manager and other professionals as it relates directly to expanding clinics within the VA?\nWhat is the level of VA experience of the team related to constructing new clinic spaces?\nWhat is their overall knowledge of new construction with respect clinic spaces and VA requirements?\n\nII   Specialized Experience with Healthcare Facility Related Designs, Complex Electrical and Mechanical Experience and Technical Competence in the Type of Work Required\nWho will be the lead mechanical, electrical, plumbing other person/s (specialists) for the project?Â  \nHow much experience does the individual/s have with designing mechanical, electrical, plumbing or other systems (specialties) for clinical spaces?Â  \nWhat is the level of experience directly with VA as it relates to clinic expansion in a health care setting?\nWhat is their overall knowledge of clinic construction and VA requirements?\n What is their overall knowledge of expansion to existing sites?\n\nIII-Past Performance on Contracts with Government Agencies and Private Industry in Terms of Cost Control, Quality of Work, and Compliance with Performance Schedules\nTalk about a 3 previous successful VA CLC spaces.Â (past performance) Please discuss 10 highlights from your firms past CLC jobs that made your work exceptional.\nPlease discuss 3 lessons learned from any project and how you have used them on future projects (learned from past performance). \nTalk about a recent project where a renovation was completed at an existing building, how it was phased, and discuss your process, challenges, and solutions. \nPlease include a cost control chart of your last 10 jobs that includes current performance schedules.   \n\nIV-Past Performance on Contracts with Government Agencies and Private Industry During Construction Period of Services (CPS)\nTalk about previous successful clinic projects CPS (past performance).\nPlease discuss highlights from your firms past clinic jobs during CPS that made your work exceptional.\nPlease discuss lessons learned from any project CPS and how you have used them on future projects (lessons learned from past performance).Â  \nTalk about a successful project where issues arose during CPS and how they were corrected and resolved. Describe past techniques used to minimize RFIs and submittal response time.\nExplain your thoroughness to review RFI and submittal response time. Explain your thoroughness to review RFI and submittals, while adhering to project specifications and deadlines.\n\nV- Organization, Management and Quality Control\nWho is responsible for quality control (QC)?Â  \nHow does the QC relate to the project? \nWho completed (or will complete) QC for the project? \nHow does the prime (management of the sub-consultants) intend to monitor and guarantee their subs performance, cooperation and involvement in the project?  \nWhat is managements plan when something goes wrong with a deliverable from a sub? (1 example)\n\nVI- Capacity\nDiscuss the prime s relationship with the listed sub-consultants and their experience together.Â \nDiscuss the prime's capacity as a company and include specific individuals  capacity\nPlease discuss your subs capacity to accomplish the needed work.\n\nVII- Litigation and Insurance\nDiscuss any significant claims against the firm because of improper or incomplete architectural and engineering services in the last 10 years.\n\nVIII   Distance\nGeographical location from Beckley, West Virginia VA Medical Center\n\nNOTE:  UPON AWARD, THE FOLLOWING WILL APPLY:\nThe A/E disciplines include, but are not limited to, the following:  Architectural, Civil, and Mechanical/Electrical/Plumbing (MEP) which includes the following disciplines: estimating, structural, mechanical (HVAC), electrical, plumbing, geotechnical, design, certified physical security specialist and engineering services related to healthcare facilities.   \nAward is contingent upon the availability of funds.\n\n\n\nContracting Office Address: \nDepartment of Veteran Affairs\nMillard Adkins, CO\n517/90C\nBuilding 2\n200 Veterans Drive,\nBeckley, WV  25801\nPoint of Contact(s): \nMillard M Adkins, Contracting Officer, email address: millard.adkins@va.gov","origin":"detail"},"contacts":[{"name":"Contracting Officer","role":"primary","email":"millard.adkins@va.gov","phone":"304-255-2121 x4136","title":"Millard Adkins"}],"place_of_performance":{"zip":"25801","city":{"code":"5332","name":"Beckley"},"state":{"code":"WV","name":"West Virginia"},"street":"Beckley VAMC 200 Vetreans Ave","country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"naics_codes":["541310"],"award":{"awardee":{}},"attachments":[{"resource_id":"3aa67c0252d74de2878803791e524327","name":"36C24525R0063.docx","kind":"file","mime_type":".docx","size_bytes":45130,"posted_at":"2025-06-12T12:41:53.469Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3aa67c0252d74de2878803791e524327/download","mirrored":false},{"resource_id":"5c047a04490c43d7b59596dffd8506bb","name":"Beckley VAMC","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-06-12T12:41:53.469Z","export_controlled":false,"sha256":null,"url":"http://VAWW.Beckley.VA.gov","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C24525C0130_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C24525C0130_3600_-NONE-_-NONE-/","piid":"36C24525C0130","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"FDMWG5FJLRQ3","recipient_name":"HARRELL DESIGN GROUP PC","recipient_uei":"FDMWG5FJLRQ3","recipient_cage":"3U8F0","recipient_city":"CHARLOTTE","recipient_state":"NC","sub_name":"Department of Veterans Affairs","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","office_key":"o-36C245","first_action_date":"2025-09-11","last_action_date":"2026-08-13","actions":3,"obligated":"3161639.00","current_total_value":"3161639.00","potential_total_value":"3161639.00","naics":"541310","psc":"C1DA","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":16,"description":"A/E NRM DESIGN RENOVATE 4TH FLOOR FOR CLC","method":"solicitation","confidence":"high","evidence":["solicitation number 36C24525R0063 equals the FPDS solicitation identifier","same awarding office 36C245"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C24526R0101","latest_notice_id":"e84156527a944ee3bd5001d28af5d713","title":"C1DA-- Renovate Specialty Clinics on 2nd","solicitation_number":"36C24526R0101","notice_type":"r","first_type":"r","first_posted":"2026-09-24","last_posted":"2026-11-18","notices":4,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541310","psc":"C1DA","set_aside":"SDVOSBC","state":"WV","county":"54081","county_name":"Raleigh County","city":"5405332","city_name":"Beckley","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24527Q0070","latest_notice_id":"b0b1581a6a1441b9a46d407375bc44d0","title":"6550--FLOW CYTOMETERY REAGENTS AND SUPPLIES (VA-27-00016081) |","solicitation_number":"36C24527Q0070","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"325413","psc":"6550","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T00:57:17.217280Z"},{"key":"36C24527Q0061","latest_notice_id":"0db5662de5914b458655bed9898980cf","title":"J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT","solicitation_number":"36C24527Q0061","notice_type":"o","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-18","notices":3,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561210","psc":"J065","set_aside":"SBA","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24527Q0081","latest_notice_id":"77e2cd670c3040a6ad2a1fc44daa2bc5","title":"DJ10--Alertus Enhanced Notification Licensing & Premier Support","solicitation_number":"36C24527Q0081","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541519","psc":"DJ10","set_aside":null,"state":"WV","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"SOFTWARE LICENSING AND SUPPORT MARTINSBURG VA MEDICAL CENTER","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C24527Q0073","latest_notice_id":"6ce8b040a9be44d0972b338bc7b6cf88","title":"Arc Flash Hazard Analysis Services","solicitation_number":"36C24527Q0073","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"334515","psc":"6625","set_aside":null,"state":"WV","county":"54033","county_name":"Harrison County","city":"5415628","city_name":"Clarksburg","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open":[{"key":"36C24526R0101","latest_notice_id":"e84156527a944ee3bd5001d28af5d713","title":"C1DA-- Renovate Specialty Clinics on 2nd","solicitation_number":"36C24526R0101","notice_type":"r","first_type":"r","first_posted":"2026-09-24","last_posted":"2026-11-18","notices":4,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541310","psc":"C1DA","set_aside":"SDVOSBC","state":"WV","county":"54081","county_name":"Raleigh County","city":"5405332","city_name":"Beckley","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"AEASSERVICES2027","latest_notice_id":"a11b054dddee4d1c8ba20ff7d12e4d8c","title":"Sources Sought Advisory and Assistance Services contract.","solicitation_number":"A-E_A-SServices2027","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-12-03T17:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA2521","office_name":"FA2521 45 CONS PK","naics":"541310","psc":"C219","set_aside":"8A","state":"FL","county":"12009","county_name":"Brevard County","city":"1255375","city_name":"Patrick AFB","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T07:05:05.540398Z"},{"key":"N6247026R0022","latest_notice_id":"e9f785e4103446a2af5d74da35cccc31","title":"INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) CONTRACT FOR ARCHITECT-ENGINEER (A-E) SERVICES FOR FACILITIES WITH SECURED SPACES LOCATED THROUGHOUT NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND AREA OF RESPONSIBILITY, WORLDWIDE","solicitation_number":"N6247026R0022","notice_type":"k","first_type":"r","first_posted":"2026-04-01","last_posted":"2026-11-19","notices":7,"due_at":"2026-12-10T19:00:00Z","due_date":"2026-12-10","closes_at":"2026-12-10T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62470","office_name":"NAVFACSYSCOM ATLANTIC","naics":"541310","psc":"C211","set_aside":null,"state":"VA","county":"51710","county_name":"City of Norfolk","city":"5157000","city_name":"Norfolk","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open_total":5,"indexable":false}