{"canonical":"https://sealedbidder.com/opportunities/36c24525q0705","key":"36C24525Q0705","url":"https://sealedbidder.com/opportunities/36c24525q0705","title":"J041--SOURCES SOUGHT NOTICE - POLYTRAUMA HVAC REPAIRS WASHINGTON DC VAMC 688-25-4-478-0163","solicitation_number":"36C24525Q0705","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-08-01T14:00:00Z","first_posted":"2025-07-21","last_posted":"2025-07-21","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"238220","psc":"J041","set_aside":null,"place_state":"DC","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"11001","place_county_name":"District of Columbia","place_city":"1150000","place_city_name":"Washington","winner":null,"award_amount":null,"publications":[{"notice_id":"597c3188f53c4fcd9db8422144c137af","title":"J041--SOURCES SOUGHT NOTICE - POLYTRAUMA HVAC REPAIRS WASHINGTON DC VAMC 688-25-4-478-0163","solicitation_number":"36C24525Q0705","notice_type":"r","base_type":"r","posted":"2025-07-21","posted_at":"2025-07-21T13:10:15.520Z","due_at":"2025-08-01T14:00:00Z","due_date":"2025-08-01","cancelled":false,"archived":true,"archive_date":"2025-09-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/597c3188f53c4fcd9db8422144c137af/view","enriched":true,"history":[{"index":3,"title":"J041--SOURCES SOUGHT NOTICE - POLYTRAUMA HVAC REPAIRS WASHINGTON DC VAMC 688-25-4-478-0163","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T13:10:15.520Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"597c3188f53c4fcd9db8422144c137af","solicitation_number":"36C24525Q0705"}]}],"latest_notice_id":"597c3188f53c4fcd9db8422144c137af","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-07-21","posted_at":"2025-07-21T13:10:15.520Z","created_at":"2025-07-21T13:10:13.283Z","modified_at":"2025-10-01T04:00:10.590Z","response_deadline":{"raw":"2025-08-01T10:00:00-04:00","utc":"2025-08-01T14:00:00Z","date":"2025-08-01","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/597c3188f53c4fcd9db8422144c137af/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"J041--SOURCES SOUGHT NOTICE - POLYTRAUMA HVAC REPAIRS WASHINGTON DC VAMC 688-25-4-478-0163","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_id":"100173468","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-30","archive_type":"auto_custom"},"history":[{"index":3,"title":"J041--SOURCES SOUGHT NOTICE - POLYTRAUMA HVAC REPAIRS WASHINGTON DC VAMC 688-25-4-478-0163","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T13:10:15.520Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"597c3188f53c4fcd9db8422144c137af","solicitation_number":"36C24525Q0705"}],"contacts":[{"name":"Bill Pratt","role":"primary","email":"Billie.Pratt@va.gov","phone":"410-642-2411","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"597c3188f53c4fcd9db8422144c137af","lineage_id":"597c3188f53c4fcd9db8422144c137af","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-09T01:04:16.746492613Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"9b0f3120f195a308878220bd76a958a60bf98c1412766616ea0d6801a4c7226d","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-09T01:04:16.746492613Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"SUMMARY:\nDepartment of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5, is issuing this request for sources sought notice in order to identify vendors that are interested in and capable of providing contractor services. For a contractor to provide HVAC repair services for the Polytrauma Suite. Located at the Washington DC VAMC. \n\nScope of Work:\n\nProject Number: 688-25-4-478-0163\nLocation: Washington DC VAMC, 50 Irving Street NW, Washington, DC 20422\nObjective:\nThis project will retrofit and modify the HVAC system serving the Polytrauma Suite to address system deficiencies and improve thermal performance, while maintaining compliance with VA design guides, federal standards, and relevant codes.\n1. Dual-Duct Terminal Installation\nFurnish and install a 1200 CFM dual-duct terminal box above ceiling as shown on design documents. The new terminal box shall control digitally and capable of modulating the air via of control damper.\nConnect to existing hot and cold deck supply ductwork in the hallway plenum.\nInstallation shall comply with SMACNA duct construction standards.\n2. Ductwork Demolition and Reconfiguration\nDemolish and remove all branch ductwork and diffusers from the existing hallway VAV terminals.\nSeal duct openings upstream of the VAVs to isolate service to individual rooms.\nAll work shall adhere to IMC requirements.\n3. Duct Extension and Diffuser Installation\nExtend duct from new dual-duct terminal into hallway ceiling space.\nInstall six (6) 24\"x24\" lay-in diffusers and four (4) matching intake grilles for plenum air transfer.\nPlacement to conform with ASHRAE 55 thermal comfort criteria and match architectural aesthetics.\n4. Inline Exhaust System Upgrade\nProvide and install a ceiling-mounted inline exhaust fan.\nConnect to existing relief system; design for 1200 CFM capacity, adjustable to 800 CFM.\nInclude vibration isolators and flexible duct connectors.\nFan shall operate at  45 db. Installation must meet IMC and NFPA 90A.\n5. Make-Up Air Damper Deactivation\n The outside air intake to the unit shall be capped off 6 feet up stream from the unit; modify the ductwork to the unit as intake air from the planum to the unit per IMC. \nFurnish and install a 16\"x20\" return grille upstream of filters above hallway ceiling, ensuring unrestricted airflow.\nMaintain code-compliant ventilation through the new terminal box.\n6. VAV Modification   Room GC-228\nAdjust VAV terminal to supply a constant 150 CFM (originally 800 CFM).\nFinal airflow must meet ASHRAE 62.1 minimum ventilation guidelines.\n7. Chilled Water Cassette Installation   Room GC-228\nFurnish and install a 1-ton chilled water cassette unit with variable-speed fan.\nRoute insulated condensate drain to the nearest IPC-compliant sanitary drain.\nInclude overflow protection and shutoff sensors.\n8. Chilled Water Piping\nRun new 1  Type L copper piping from the unit to main chilled water riser (no tie-ins to AHU piping).\nRun new 1  type L coper piping from the unit to main hot water supply that suppling to the existing VAV reheat system.\nConfirm riser access and routing in crawlspace with COR.\nAll piping to comply with ASME B31.9 and be hydrostatically tested.\n9. VAV Box Replacement   GC-212 to GC-216\nReplace existing VAVs in Rooms GC-212 through GC-216 with new Siemens-compatible units.\nEach shall modulate between 50 120 CFM and feature digital thermostats.\nControls shall meet BACnet protocol and be installed to SMACNA standards.\n10. Insulation Requirements\nAll ductwork to be insulated with 1.5\" fiberglass insulation, conforming to ASTM C411.\nPipe insulation shall meet ASHRAE 90.1 and local energy codes.\n11. Work Schedule & Logistics\nAll work to be executed during weekends or scheduled downtimes.\nContractors must coordinate access, staging, and delivery with facility personnel.\nPre-work verification of site conditions and material readiness is mandatory.\n12. Testing, Adjusting, and Balancing (TAB)\nEmploy a certified NEBB or AABC TAB contractor for final system balancing.\nSubmit TAB report with airflow measurements, setpoints, and system calibration data to COR.\n13. Controls Integration\nAll HVAC controls work shall be executed by authorized Siemens technicians.\nSiemens to assess and report on control system integrity. Connect the control to the BAS.\nProgramming must align with VA cybersecurity protocols and system specs.\n\n14.  Accessary and option for ne cassette unit.\nUnit will be 4-pipe system\nFreeze protection sensor for HWC\nDisconnect switch, 115 volts\nUnit shall be Lowe blower speed with sound absorbance cabinet insulation \nBack ward centrifugal fan\nInternal fire-resistant foam insulation\nLightweight internal galvanized sheet steel wit integral fan mounted rails.\nIf the ceiling cavity not deep enough, provide a finish look to the cassette.\nMechanical digital thermostat and control shall connect to the BAS.\n\n15. Commissioning and Documentation for Acceptance: Upon project completion, the contractor shall provide all necessary warranties and operational manuals for the new equipment.\n\n15.1 Commissioning\n\n    - Perform commissioning of all repaired or replaced HVAC system components in accordance with VA standards and industry best practices.\n   - Commissioning activities shall include, but are not limited to:\n  - Verification of installation and operation of all HVAC components.\n  - Functional performance testing of system controls, safety devices, and alarms.\n  - Airflow and temperature balancing.\n  - Testing and adjustment of system setpoints for optimal performance.\n  - Training of VA staff on new or modified system components and controls.\n- The Contractor shall coordinate all commissioning activities with the VA Medical Center s designated Commissioning Authority (CxA) and provide access for inspections and testing.\n\n15.2 Documentation for Acceptance\n\n- The Contractor shall submit the following documentation for final acceptance:\n  - **Commissioning Report: Detailing all tests performed, results, and corrective actions taken.\n  - **Certification Documents: Including third-party verification if required.\n  - **Operation and Maintenance Manuals: For all new or modified equipment.\n  - **As-Built Documentation: Updated CAD drawings/diagrams reflecting all changes to the building s HVAC system. Documentation must:\n    - Clearly show modifications to ductwork, equipment, controls, and service connections.\n    - Include updated floor plans, schematics, and system diagrams with revision dates and legends.\n    - Be provided in both electronic (DWG) and PDF formats.\n  - **Warranty Information: For all new equipment and major components.\n- All documentation must be reviewed and approved by the VA Medical Center s Facilities Management and Engineering departments prior to project closeout.\n\n16. Deliverables\n\n- Restored and fully operational HVAC system for the Plumbing Shop.\n- Completed commissioning and certification documentation.\n- Updated as-built CAD drawings/diagrams.\n- Operation and maintenance manuals.\n- Warranty documentation.\n\n17. Acceptance Criteria\n\n- All repairs and modifications completed per approved scope and industry standards.\n- Successful commissioning and functional testing with supporting documentation.\n- Submission and VA approval of all required documentation, including as-built CAD drawings/diagrams.\n- No outstanding deficiencies or punch-list items.\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nInterested & Capable Responses:Â Must respond with the following information. \nMUST ALSO ANSWER THE SUBCONTRACTING QUESTIONS HIGHLIGHTED BELOW. \nNCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for the Washington DC VA Medical Center. \nPlease respond to this RFI/Sources Sought 36C24525Q0705 with your: \n\nBusiness name (including Unique Entity ID (SAM.gov)Â Â \nBusiness type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), andÂ Â \nPerson of contact (including telephone number & email address).Â Â Â \nCapability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities.Â Â \nAvailable contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS)Â \nBrief Summary of categories of services that your company can/cannot provide.Â \nCertification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable)Â \nConfirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response:Â Â Â \nDo you intend to self-perform this effort?Â \nIf you are located outside the immediate area, how will you self-perform?Â \nOr do you intend to subcontract work under this contract?Â \nIf you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting?Â \nÂ \nResponse Instructions:Â \nResponses must be submitted by 10:00 AM (ET) Friday 8-1-2025, Responses to the information requested above must be submitted via email to Bill Pratt at Billie.Pratt@va.gov.\nThis request for information/sources sought notice is for planning purposes ONLY and does not constitute a solicitation, responses to this notice are not offers and cannot be accepted by the Government to form a binding contract.Â  The results of this market research will assist in the development of (1) the requirement, and (2) the acquisition strategy (e.g., SDVOSB/SDVOSB set-aside, small business set-aside, full and open competition, etc.).Â  VA assumes no responsibility for any costs incurred as a result of a vendor s attendance to the Site-Visit nor the preparation of responses submitted as a result of this notice.\n\nBill Pratt\nContract Specialist\nVHA, NCO 5","text":"SUMMARY:\nDepartment of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5, is issuing this request for sources sought notice in order to identify vendors that are interested in and capable of providing contractor services. For a contractor to provide HVAC repair services for the Polytrauma Suite. Located at the Washington DC VAMC.\n\nScope of Work:\n\nProject Number: 688-25-4-478-0163\nLocation: Washington DC VAMC, 50 Irving Street NW, Washington, DC 20422\nObjective:\nThis project will retrofit and modify the HVAC system serving the Polytrauma Suite to address system deficiencies and improve thermal performance, while maintaining compliance with VA design guides, federal standards, and relevant codes.\n1. Dual-Duct Terminal Installation\nFurnish and install a 1200 CFM dual-duct terminal box above ceiling as shown on design documents. The new terminal box shall control digitally and capable of modulating the air via of control damper.\nConnect to existing hot and cold deck supply ductwork in the hallway plenum.\nInstallation shall comply with SMACNA duct construction standards.\n2. Ductwork Demolition and Reconfiguration\nDemolish and remove all branch ductwork and diffusers from the existing hallway VAV terminals.\nSeal duct openings upstream of the VAVs to isolate service to individual rooms.\nAll work shall adhere to IMC requirements.\n3. Duct Extension and Diffuser Installation\nExtend duct from new dual-duct terminal into hallway ceiling space.\nInstall six (6) 24\"x24\" lay-in diffusers and four (4) matching intake grilles for plenum air transfer.\nPlacement to conform with ASHRAE 55 thermal comfort criteria and match architectural aesthetics.\n4. Inline Exhaust System Upgrade\nProvide and install a ceiling-mounted inline exhaust fan.\nConnect to existing relief system; design for 1200 CFM capacity, adjustable to 800 CFM.\nInclude vibration isolators and flexible duct connectors.\nFan shall operate at 45 db. Installation must meet IMC and NFPA 90A.\n5. Make-Up Air Damper Deactivation\nThe outside air intake to the unit shall be capped off 6 feet up stream from the unit; modify the ductwork to the unit as intake air from the planum to the unit per IMC.\nFurnish and install a 16\"x20\" return grille upstream of filters above hallway ceiling, ensuring unrestricted airflow.\nMaintain code-compliant ventilation through the new terminal box.\n6. VAV Modification Room GC-228\nAdjust VAV terminal to supply a constant 150 CFM (originally 800 CFM).\nFinal airflow must meet ASHRAE 62.1 minimum ventilation guidelines.\n7. Chilled Water Cassette Installation Room GC-228\nFurnish and install a 1-ton chilled water cassette unit with variable-speed fan.\nRoute insulated condensate drain to the nearest IPC-compliant sanitary drain.\nInclude overflow protection and shutoff sensors.\n8. Chilled Water Piping\nRun new 1 Type L copper piping from the unit to main chilled water riser (no tie-ins to AHU piping).\nRun new 1 type L coper piping from the unit to main hot water supply that suppling to the existing VAV reheat system.\nConfirm riser access and routing in crawlspace with COR.\nAll piping to comply with ASME B31.9 and be hydrostatically tested.\n9. VAV Box Replacement GC-212 to GC-216\nReplace existing VAVs in Rooms GC-212 through GC-216 with new Siemens-compatible units.\nEach shall modulate between 50 120 CFM and feature digital thermostats.\nControls shall meet BACnet protocol and be installed to SMACNA standards.\n10. Insulation Requirements\nAll ductwork to be insulated with 1.5\" fiberglass insulation, conforming to ASTM C411.\nPipe insulation shall meet ASHRAE 90.1 and local energy codes.\n11. Work Schedule & Logistics\nAll work to be executed during weekends or scheduled downtimes.\nContractors must coordinate access, staging, and delivery with facility personnel.\nPre-work verification of site conditions and material readiness is mandatory.\n12. Testing, Adjusting, and Balancing (TAB)\nEmploy a certified NEBB or AABC TAB contractor for final system balancing.\nSubmit TAB report with airflow measurements, setpoints, and system calibration data to COR.\n13. Controls Integration\nAll HVAC controls work shall be executed by authorized Siemens technicians.\nSiemens to assess and report on control system integrity. Connect the control to the BAS.\nProgramming must align with VA cybersecurity protocols and system specs.\n\n14. Accessary and option for ne cassette unit.\nUnit will be 4-pipe system\nFreeze protection sensor for HWC\nDisconnect switch, 115 volts\nUnit shall be Lowe blower speed with sound absorbance cabinet insulation\nBack ward centrifugal fan\nInternal fire-resistant foam insulation\nLightweight internal galvanized sheet steel wit integral fan mounted rails.\nIf the ceiling cavity not deep enough, provide a finish look to the cassette.\nMechanical digital thermostat and control shall connect to the BAS.\n\n15. Commissioning and Documentation for Acceptance: Upon project completion, the contractor shall provide all necessary warranties and operational manuals for the new equipment.\n\n15.1 Commissioning\n\n- Perform commissioning of all repaired or replaced HVAC system components in accordance with VA standards and industry best practices.\n- Commissioning activities shall include, but are not limited to:\n- Verification of installation and operation of all HVAC components.\n- Functional performance testing of system controls, safety devices, and alarms.\n- Airflow and temperature balancing.\n- Testing and adjustment of system setpoints for optimal performance.\n- Training of VA staff on new or modified system components and controls.\n- The Contractor shall coordinate all commissioning activities with the VA Medical Center s designated Commissioning Authority (CxA) and provide access for inspections and testing.\n\n15.2 Documentation for Acceptance\n\n- The Contractor shall submit the following documentation for final acceptance:\n- **Commissioning Report: Detailing all tests performed, results, and corrective actions taken.\n- **Certification Documents: Including third-party verification if required.\n- **Operation and Maintenance Manuals: For all new or modified equipment.\n- **As-Built Documentation: Updated CAD drawings/diagrams reflecting all changes to the building s HVAC system. Documentation must:\n- Clearly show modifications to ductwork, equipment, controls, and service connections.\n- Include updated floor plans, schematics, and system diagrams with revision dates and legends.\n- Be provided in both electronic (DWG) and PDF formats.\n- **Warranty Information: For all new equipment and major components.\n- All documentation must be reviewed and approved by the VA Medical Center s Facilities Management and Engineering departments prior to project closeout.\n\n16. Deliverables\n\n- Restored and fully operational HVAC system for the Plumbing Shop.\n- Completed commissioning and certification documentation.\n- Updated as-built CAD drawings/diagrams.\n- Operation and maintenance manuals.\n- Warranty documentation.\n\n17. Acceptance Criteria\n\n- All repairs and modifications completed per approved scope and industry standards.\n- Successful commissioning and functional testing with supporting documentation.\n- Submission and VA approval of all required documentation, including as-built CAD drawings/diagrams.\n- No outstanding deficiencies or punch-list items.\n\nInterested & Capable Responses:Â Must respond with the following information.\nMUST ALSO ANSWER THE SUBCONTRACTING QUESTIONS HIGHLIGHTED BELOW.\nNCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for the Washington DC VA Medical Center.\nPlease respond to this RFI/Sources Sought 36C24525Q0705 with your:\n\nBusiness name (including Unique Entity ID (SAM.gov)Â Â\nBusiness type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), andÂ Â\nPerson of contact (including telephone number & email address).Â Â Â\nCapability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities.Â Â\nAvailable contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS)Â\nBrief Summary of categories of services that your company can/cannot provide.Â\nCertification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable)Â\nConfirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response:Â Â Â\nDo you intend to self-perform this effort?Â\nIf you are located outside the immediate area, how will you self-perform?Â\nOr do you intend to subcontract work under this contract?Â\nIf you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting?Â\nÂ\nResponse Instructions:Â\nResponses must be submitted by 10:00 AM (ET) Friday 8-1-2025, Responses to the information requested above must be submitted via email to Bill Pratt at Billie.Pratt@va.gov.\nThis request for information/sources sought notice is for planning purposes ONLY and does not constitute a solicitation, responses to this notice are not offers and cannot be accepted by the Government to form a binding contract.Â The results of this market research will assist in the development of (1) the requirement, and (2) the acquisition strategy (e.g., SDVOSB/SDVOSB set-aside, small business set-aside, full and open competition, etc.).Â VA assumes no responsibility for any costs incurred as a result of a vendor s attendance to the Site-Visit nor the preparation of responses submitted as a result of this notice.\n\nBill Pratt\nContract Specialist\nVHA, NCO 5","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24525Q0705","place_of_performance":{"zip":"20422","city":{"name":"Washington"},"state":{"code":"DC","name":"District of Columbia"},"street":"Department of Veterans Affiars Washington DC VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"50 Irving Street"},"product_service_code":"J041"}],"due_at":"2025-08-01T14:00:00Z","due_date":"2025-08-01","closes_at":"2025-08-01T14:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","state":"DC","county":"11001","county_name":"District of Columbia","city":"1150000","city_name":"Washington","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-09T01:16:48.252395Z","principal_notice_id":"597c3188f53c4fcd9db8422144c137af","description":{"text":"SUMMARY:\nDepartment of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5, is issuing this request for sources sought notice in order to identify vendors that are interested in and capable of providing contractor services. For a contractor to provide HVAC repair services for the Polytrauma Suite. Located at the Washington DC VAMC.\n\nScope of Work:\n\nProject Number: 688-25-4-478-0163\nLocation: Washington DC VAMC, 50 Irving Street NW, Washington, DC 20422\nObjective:\nThis project will retrofit and modify the HVAC system serving the Polytrauma Suite to address system deficiencies and improve thermal performance, while maintaining compliance with VA design guides, federal standards, and relevant codes.\n1. Dual-Duct Terminal Installation\nFurnish and install a 1200 CFM dual-duct terminal box above ceiling as shown on design documents. The new terminal box shall control digitally and capable of modulating the air via of control damper.\nConnect to existing hot and cold deck supply ductwork in the hallway plenum.\nInstallation shall comply with SMACNA duct construction standards.\n2. Ductwork Demolition and Reconfiguration\nDemolish and remove all branch ductwork and diffusers from the existing hallway VAV terminals.\nSeal duct openings upstream of the VAVs to isolate service to individual rooms.\nAll work shall adhere to IMC requirements.\n3. Duct Extension and Diffuser Installation\nExtend duct from new dual-duct terminal into hallway ceiling space.\nInstall six (6) 24\"x24\" lay-in diffusers and four (4) matching intake grilles for plenum air transfer.\nPlacement to conform with ASHRAE 55 thermal comfort criteria and match architectural aesthetics.\n4. Inline Exhaust System Upgrade\nProvide and install a ceiling-mounted inline exhaust fan.\nConnect to existing relief system; design for 1200 CFM capacity, adjustable to 800 CFM.\nInclude vibration isolators and flexible duct connectors.\nFan shall operate at 45 db. Installation must meet IMC and NFPA 90A.\n5. Make-Up Air Damper Deactivation\nThe outside air intake to the unit shall be capped off 6 feet up stream from the unit; modify the ductwork to the unit as intake air from the planum to the unit per IMC.\nFurnish and install a 16\"x20\" return grille upstream of filters above hallway ceiling, ensuring unrestricted airflow.\nMaintain code-compliant ventilation through the new terminal box.\n6. VAV Modification Room GC-228\nAdjust VAV terminal to supply a constant 150 CFM (originally 800 CFM).\nFinal airflow must meet ASHRAE 62.1 minimum ventilation guidelines.\n7. Chilled Water Cassette Installation Room GC-228\nFurnish and install a 1-ton chilled water cassette unit with variable-speed fan.\nRoute insulated condensate drain to the nearest IPC-compliant sanitary drain.\nInclude overflow protection and shutoff sensors.\n8. Chilled Water Piping\nRun new 1 Type L copper piping from the unit to main chilled water riser (no tie-ins to AHU piping).\nRun new 1 type L coper piping from the unit to main hot water supply that suppling to the existing VAV reheat system.\nConfirm riser access and routing in crawlspace with COR.\nAll piping to comply with ASME B31.9 and be hydrostatically tested.\n9. VAV Box Replacement GC-212 to GC-216\nReplace existing VAVs in Rooms GC-212 through GC-216 with new Siemens-compatible units.\nEach shall modulate between 50 120 CFM and feature digital thermostats.\nControls shall meet BACnet protocol and be installed to SMACNA standards.\n10. Insulation Requirements\nAll ductwork to be insulated with 1.5\" fiberglass insulation, conforming to ASTM C411.\nPipe insulation shall meet ASHRAE 90.1 and local energy codes.\n11. Work Schedule & Logistics\nAll work to be executed during weekends or scheduled downtimes.\nContractors must coordinate access, staging, and delivery with facility personnel.\nPre-work verification of site conditions and material readiness is mandatory.\n12. Testing, Adjusting, and Balancing (TAB)\nEmploy a certified NEBB or AABC TAB contractor for final system balancing.\nSubmit TAB report with airflow measurements, setpoints, and system calibration data to COR.\n13. Controls Integration\nAll HVAC controls work shall be executed by authorized Siemens technicians.\nSiemens to assess and report on control system integrity. Connect the control to the BAS.\nProgramming must align with VA cybersecurity protocols and system specs.\n\n14. Accessary and option for ne cassette unit.\nUnit will be 4-pipe system\nFreeze protection sensor for HWC\nDisconnect switch, 115 volts\nUnit shall be Lowe blower speed with sound absorbance cabinet insulation\nBack ward centrifugal fan\nInternal fire-resistant foam insulation\nLightweight internal galvanized sheet steel wit integral fan mounted rails.\nIf the ceiling cavity not deep enough, provide a finish look to the cassette.\nMechanical digital thermostat and control shall connect to the BAS.\n\n15. Commissioning and Documentation for Acceptance: Upon project completion, the contractor shall provide all necessary warranties and operational manuals for the new equipment.\n\n15.1 Commissioning\n\n- Perform commissioning of all repaired or replaced HVAC system components in accordance with VA standards and industry best practices.\n- Commissioning activities shall include, but are not limited to:\n- Verification of installation and operation of all HVAC components.\n- Functional performance testing of system controls, safety devices, and alarms.\n- Airflow and temperature balancing.\n- Testing and adjustment of system setpoints for optimal performance.\n- Training of VA staff on new or modified system components and controls.\n- The Contractor shall coordinate all commissioning activities with the VA Medical Center s designated Commissioning Authority (CxA) and provide access for inspections and testing.\n\n15.2 Documentation for Acceptance\n\n- The Contractor shall submit the following documentation for final acceptance:\n- **Commissioning Report: Detailing all tests performed, results, and corrective actions taken.\n- **Certification Documents: Including third-party verification if required.\n- **Operation and Maintenance Manuals: For all new or modified equipment.\n- **As-Built Documentation: Updated CAD drawings/diagrams reflecting all changes to the building s HVAC system. Documentation must:\n- Clearly show modifications to ductwork, equipment, controls, and service connections.\n- Include updated floor plans, schematics, and system diagrams with revision dates and legends.\n- Be provided in both electronic (DWG) and PDF formats.\n- **Warranty Information: For all new equipment and major components.\n- All documentation must be reviewed and approved by the VA Medical Center s Facilities Management and Engineering departments prior to project closeout.\n\n16. Deliverables\n\n- Restored and fully operational HVAC system for the Plumbing Shop.\n- Completed commissioning and certification documentation.\n- Updated as-built CAD drawings/diagrams.\n- Operation and maintenance manuals.\n- Warranty documentation.\n\n17. Acceptance Criteria\n\n- All repairs and modifications completed per approved scope and industry standards.\n- Successful commissioning and functional testing with supporting documentation.\n- Submission and VA approval of all required documentation, including as-built CAD drawings/diagrams.\n- No outstanding deficiencies or punch-list items.\n\nInterested & Capable Responses:Â Must respond with the following information.\nMUST ALSO ANSWER THE SUBCONTRACTING QUESTIONS HIGHLIGHTED BELOW.\nNCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for the Washington DC VA Medical Center.\nPlease respond to this RFI/Sources Sought 36C24525Q0705 with your:\n\nBusiness name (including Unique Entity ID (SAM.gov)Â Â\nBusiness type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), andÂ Â\nPerson of contact (including telephone number & email address).Â Â Â\nCapability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities.Â Â\nAvailable contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS)Â\nBrief Summary of categories of services that your company can/cannot provide.Â\nCertification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable)Â\nConfirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response:Â Â Â\nDo you intend to self-perform this effort?Â\nIf you are located outside the immediate area, how will you self-perform?Â\nOr do you intend to subcontract work under this contract?Â\nIf you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting?Â\nÂ\nResponse Instructions:Â\nResponses must be submitted by 10:00 AM (ET) Friday 8-1-2025, Responses to the information requested above must be submitted via email to Bill Pratt at Billie.Pratt@va.gov.\nThis request for information/sources sought notice is for planning purposes ONLY and does not constitute a solicitation, responses to this notice are not offers and cannot be accepted by the Government to form a binding contract.Â The results of this market research will assist in the development of (1) the requirement, and (2) the acquisition strategy (e.g., SDVOSB/SDVOSB set-aside, small business set-aside, full and open competition, etc.).Â VA assumes no responsibility for any costs incurred as a result of a vendor s attendance to the Site-Visit nor the preparation of responses submitted as a result of this notice.\n\nBill Pratt\nContract Specialist\nVHA, NCO 5","html":"SUMMARY:\nDepartment of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5, is issuing this request for sources sought notice in order to identify vendors that are interested in and capable of providing contractor services. For a contractor to provide HVAC repair services for the Polytrauma Suite. Located at the Washington DC VAMC. \n\nScope of Work:\n\nProject Number: 688-25-4-478-0163\nLocation: Washington DC VAMC, 50 Irving Street NW, Washington, DC 20422\nObjective:\nThis project will retrofit and modify the HVAC system serving the Polytrauma Suite to address system deficiencies and improve thermal performance, while maintaining compliance with VA design guides, federal standards, and relevant codes.\n1. Dual-Duct Terminal Installation\nFurnish and install a 1200 CFM dual-duct terminal box above ceiling as shown on design documents. The new terminal box shall control digitally and capable of modulating the air via of control damper.\nConnect to existing hot and cold deck supply ductwork in the hallway plenum.\nInstallation shall comply with SMACNA duct construction standards.\n2. Ductwork Demolition and Reconfiguration\nDemolish and remove all branch ductwork and diffusers from the existing hallway VAV terminals.\nSeal duct openings upstream of the VAVs to isolate service to individual rooms.\nAll work shall adhere to IMC requirements.\n3. Duct Extension and Diffuser Installation\nExtend duct from new dual-duct terminal into hallway ceiling space.\nInstall six (6) 24\"x24\" lay-in diffusers and four (4) matching intake grilles for plenum air transfer.\nPlacement to conform with ASHRAE 55 thermal comfort criteria and match architectural aesthetics.\n4. Inline Exhaust System Upgrade\nProvide and install a ceiling-mounted inline exhaust fan.\nConnect to existing relief system; design for 1200 CFM capacity, adjustable to 800 CFM.\nInclude vibration isolators and flexible duct connectors.\nFan shall operate at  45 db. Installation must meet IMC and NFPA 90A.\n5. Make-Up Air Damper Deactivation\n The outside air intake to the unit shall be capped off 6 feet up stream from the unit; modify the ductwork to the unit as intake air from the planum to the unit per IMC. \nFurnish and install a 16\"x20\" return grille upstream of filters above hallway ceiling, ensuring unrestricted airflow.\nMaintain code-compliant ventilation through the new terminal box.\n6. VAV Modification   Room GC-228\nAdjust VAV terminal to supply a constant 150 CFM (originally 800 CFM).\nFinal airflow must meet ASHRAE 62.1 minimum ventilation guidelines.\n7. Chilled Water Cassette Installation   Room GC-228\nFurnish and install a 1-ton chilled water cassette unit with variable-speed fan.\nRoute insulated condensate drain to the nearest IPC-compliant sanitary drain.\nInclude overflow protection and shutoff sensors.\n8. Chilled Water Piping\nRun new 1  Type L copper piping from the unit to main chilled water riser (no tie-ins to AHU piping).\nRun new 1  type L coper piping from the unit to main hot water supply that suppling to the existing VAV reheat system.\nConfirm riser access and routing in crawlspace with COR.\nAll piping to comply with ASME B31.9 and be hydrostatically tested.\n9. VAV Box Replacement   GC-212 to GC-216\nReplace existing VAVs in Rooms GC-212 through GC-216 with new Siemens-compatible units.\nEach shall modulate between 50 120 CFM and feature digital thermostats.\nControls shall meet BACnet protocol and be installed to SMACNA standards.\n10. Insulation Requirements\nAll ductwork to be insulated with 1.5\" fiberglass insulation, conforming to ASTM C411.\nPipe insulation shall meet ASHRAE 90.1 and local energy codes.\n11. Work Schedule & Logistics\nAll work to be executed during weekends or scheduled downtimes.\nContractors must coordinate access, staging, and delivery with facility personnel.\nPre-work verification of site conditions and material readiness is mandatory.\n12. Testing, Adjusting, and Balancing (TAB)\nEmploy a certified NEBB or AABC TAB contractor for final system balancing.\nSubmit TAB report with airflow measurements, setpoints, and system calibration data to COR.\n13. Controls Integration\nAll HVAC controls work shall be executed by authorized Siemens technicians.\nSiemens to assess and report on control system integrity. Connect the control to the BAS.\nProgramming must align with VA cybersecurity protocols and system specs.\n\n14.  Accessary and option for ne cassette unit.\nUnit will be 4-pipe system\nFreeze protection sensor for HWC\nDisconnect switch, 115 volts\nUnit shall be Lowe blower speed with sound absorbance cabinet insulation \nBack ward centrifugal fan\nInternal fire-resistant foam insulation\nLightweight internal galvanized sheet steel wit integral fan mounted rails.\nIf the ceiling cavity not deep enough, provide a finish look to the cassette.\nMechanical digital thermostat and control shall connect to the BAS.\n\n15. Commissioning and Documentation for Acceptance: Upon project completion, the contractor shall provide all necessary warranties and operational manuals for the new equipment.\n\n15.1 Commissioning\n\n    - Perform commissioning of all repaired or replaced HVAC system components in accordance with VA standards and industry best practices.\n   - Commissioning activities shall include, but are not limited to:\n  - Verification of installation and operation of all HVAC components.\n  - Functional performance testing of system controls, safety devices, and alarms.\n  - Airflow and temperature balancing.\n  - Testing and adjustment of system setpoints for optimal performance.\n  - Training of VA staff on new or modified system components and controls.\n- The Contractor shall coordinate all commissioning activities with the VA Medical Center s designated Commissioning Authority (CxA) and provide access for inspections and testing.\n\n15.2 Documentation for Acceptance\n\n- The Contractor shall submit the following documentation for final acceptance:\n  - **Commissioning Report: Detailing all tests performed, results, and corrective actions taken.\n  - **Certification Documents: Including third-party verification if required.\n  - **Operation and Maintenance Manuals: For all new or modified equipment.\n  - **As-Built Documentation: Updated CAD drawings/diagrams reflecting all changes to the building s HVAC system. Documentation must:\n    - Clearly show modifications to ductwork, equipment, controls, and service connections.\n    - Include updated floor plans, schematics, and system diagrams with revision dates and legends.\n    - Be provided in both electronic (DWG) and PDF formats.\n  - **Warranty Information: For all new equipment and major components.\n- All documentation must be reviewed and approved by the VA Medical Center s Facilities Management and Engineering departments prior to project closeout.\n\n16. Deliverables\n\n- Restored and fully operational HVAC system for the Plumbing Shop.\n- Completed commissioning and certification documentation.\n- Updated as-built CAD drawings/diagrams.\n- Operation and maintenance manuals.\n- Warranty documentation.\n\n17. Acceptance Criteria\n\n- All repairs and modifications completed per approved scope and industry standards.\n- Successful commissioning and functional testing with supporting documentation.\n- Submission and VA approval of all required documentation, including as-built CAD drawings/diagrams.\n- No outstanding deficiencies or punch-list items.\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nInterested & Capable Responses:Â Must respond with the following information. \nMUST ALSO ANSWER THE SUBCONTRACTING QUESTIONS HIGHLIGHTED BELOW. \nNCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for the Washington DC VA Medical Center. \nPlease respond to this RFI/Sources Sought 36C24525Q0705 with your: \n\nBusiness name (including Unique Entity ID (SAM.gov)Â Â \nBusiness type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), andÂ Â \nPerson of contact (including telephone number & email address).Â Â Â \nCapability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities.Â Â \nAvailable contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS)Â \nBrief Summary of categories of services that your company can/cannot provide.Â \nCertification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable)Â \nConfirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response:Â Â Â \nDo you intend to self-perform this effort?Â \nIf you are located outside the immediate area, how will you self-perform?Â \nOr do you intend to subcontract work under this contract?Â \nIf you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting?Â \nÂ \nResponse Instructions:Â \nResponses must be submitted by 10:00 AM (ET) Friday 8-1-2025, Responses to the information requested above must be submitted via email to Bill Pratt at Billie.Pratt@va.gov.\nThis request for information/sources sought notice is for planning purposes ONLY and does not constitute a solicitation, responses to this notice are not offers and cannot be accepted by the Government to form a binding contract.Â  The results of this market research will assist in the development of (1) the requirement, and (2) the acquisition strategy (e.g., SDVOSB/SDVOSB set-aside, small business set-aside, full and open competition, etc.).Â  VA assumes no responsibility for any costs incurred as a result of a vendor s attendance to the Site-Visit nor the preparation of responses submitted as a result of this notice.\n\nBill Pratt\nContract Specialist\nVHA, NCO 5","origin":"detail"},"contacts":[{"name":"Bill Pratt","role":"primary","email":"Billie.Pratt@va.gov","phone":"410-642-2411","title":"Contracting Officer"}],"place_of_performance":{"zip":"20422","city":{"name":"Washington"},"state":{"code":"DC","name":"District of Columbia"},"street":"Department of Veterans Affiars Washington DC VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"50 Irving Street"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"naics_codes":["238220"],"award":{"awardee":{}},"attachments":[{"resource_id":"0f5788345c344cd2815e434b33ce0533","name":"va.gov","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-07-21T13:10:15.520Z","export_controlled":false,"sha256":null,"url":"https://www.va.gov","mirrored":false}],"awards":[],"related":[{"key":"36C24527Q0070","latest_notice_id":"b0b1581a6a1441b9a46d407375bc44d0","title":"6550--FLOW CYTOMETERY REAGENTS AND SUPPLIES (VA-27-00016081) |","solicitation_number":"36C24527Q0070","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"325413","psc":"6550","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T00:57:17.217280Z"},{"key":"36C24527Q0061","latest_notice_id":"0db5662de5914b458655bed9898980cf","title":"J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT","solicitation_number":"36C24527Q0061","notice_type":"o","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-18","notices":3,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561210","psc":"J065","set_aside":"SBA","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24527Q0081","latest_notice_id":"77e2cd670c3040a6ad2a1fc44daa2bc5","title":"DJ10--Alertus Enhanced Notification Licensing & Premier Support","solicitation_number":"36C24527Q0081","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541519","psc":"DJ10","set_aside":null,"state":"WV","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"SOFTWARE LICENSING AND SUPPORT MARTINSBURG VA MEDICAL CENTER","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C24527Q0073","latest_notice_id":"6ce8b040a9be44d0972b338bc7b6cf88","title":"Arc Flash Hazard Analysis Services","solicitation_number":"36C24527Q0073","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"334515","psc":"6625","set_aside":null,"state":"WV","county":"54033","county_name":"Harrison County","city":"5415628","city_name":"Clarksburg","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24527Q0076","latest_notice_id":"9c0733493507403293e3d1367a3d19b5","title":"6530--MILITARY LITTERS, STANDS AND CARTS","solicitation_number":"36C24527Q0076","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":2,"due_at":"2026-12-02T17:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"337127","psc":"6530","set_aside":null,"state":"WV","county":"54037","county_name":"Jefferson County","city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":"sam_zip","state_evidence":"25430","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"}],"similar_open":[{"key":"140PP027B0004","latest_notice_id":"53398cb59b8f4b0687efd4e3fa6241dc","title":"Z--13976 PUHO FIRE PROTECTION AT DORM","solicitation_number":"140PP027B0004","notice_type":"r","first_type":"s","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":2,"due_at":"2026-11-26T03:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T03:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140PP0","office_name":"NATIONAL PARK SERVICE CONTRACTING ACTIVITY","naics":"238220","psc":"Z2AA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"140FF027Q0080","latest_notice_id":"c706d18cc5e846508a63090d29caa934","title":"AK-AK MARITIME NWR-LEAK REPAIR","solicitation_number":"140FF027Q0080","notice_type":"o","first_type":"o","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-26T17:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140FF0","office_name":"FWS CONTRACTING ACTIVITY","naics":"238220","psc":"J045","set_aside":"SBA","state":"AK","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"title","state_evidence":"AK-A","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"36C26227Q0149","latest_notice_id":"99fd06e3089e4005bf945b21581e7d70","title":"J065--BRINE MAINTENANCE SVC - Base +4 OY ($0.00) [605] | POP: 01/01/2027 - 12/31/2031","solicitation_number":"36C26227Q0149","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"238220","psc":"J065","set_aside":"SDVOSBC","state":"CA","county":"06071","county_name":"San Bernardino County","city":"0642370","city_name":"Loma Linda","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T07:05:05.540398Z"}],"similar_open_total":57,"indexable":false}