{"canonical":"https://sealedbidder.com/opportunities/36c24525q0295","key":"36C24525Q0295","url":"https://sealedbidder.com/opportunities/36c24525q0295","title":"J091--SOURCES SOUGHT NOTICE - ENGINEERING SERVICES AST TANK - ICP REGULATORY - TRAINING - TANK CLOSURES SUPPORT 512-25-2-637-0059","solicitation_number":"36C24525Q0295","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-02-25T15:00:00Z","first_posted":"2025-02-07","last_posted":"2025-02-07","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541330","psc":"J091","set_aside":null,"place_state":"MD","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"24510","place_county_name":"City of Baltimore","place_city":"2404000","place_city_name":"Baltimore","winner":null,"award_amount":null,"publications":[{"notice_id":"3f59c586da5a49e0a4657969c0938bd0","title":"J091--SOURCES SOUGHT NOTICE - ENGINEERING SERVICES AST TANK - ICP REGULATORY - TRAINING - TANK CLOSURES SUPPORT 512-25-2-637-0059","solicitation_number":"36C24525Q0295","notice_type":"r","base_type":"r","posted":"2025-02-07","posted_at":"2025-02-07T15:27:06.214Z","due_at":"2025-02-25T15:00:00Z","due_date":"2025-02-25","cancelled":false,"archived":true,"archive_date":"2025-04-26","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3f59c586da5a49e0a4657969c0938bd0/view","enriched":true,"history":[{"index":3,"title":"J091--SOURCES SOUGHT NOTICE - ENGINEERING SERVICES AST TANK - ICP REGULATORY - TRAINING - TANK CLOSURES SUPPORT 512-25-2-637-0059","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T15:27:06.214Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"3f59c586da5a49e0a4657969c0938bd0","solicitation_number":"36C24525Q0295"}]}],"latest_notice_id":"3f59c586da5a49e0a4657969c0938bd0","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-02-07","posted_at":"2025-02-07T15:27:06.214Z","created_at":"2025-02-07T15:27:02.251Z","modified_at":"2025-04-26T04:00:32.244Z","response_deadline":{"raw":"2025-02-25T10:00:00-05:00","utc":"2025-02-25T15:00:00Z","date":"2025-02-25","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3f59c586da5a49e0a4657969c0938bd0/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"J091--SOURCES SOUGHT NOTICE - ENGINEERING SERVICES AST TANK - ICP REGULATORY - TRAINING - TANK CLOSURES SUPPORT 512-25-2-637-0059","agency":{"office":{"code":"36C245","name":"245-NETWORK CONTRACT OFFICE 5 (36C245)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"organization_id":"100173468","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-26","archive_type":"auto_custom"},"history":[{"index":3,"title":"J091--SOURCES SOUGHT NOTICE - ENGINEERING SERVICES AST TANK - ICP REGULATORY - TRAINING - TANK CLOSURES SUPPORT 512-25-2-637-0059","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-07T15:27:06.214Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"3f59c586da5a49e0a4657969c0938bd0","solicitation_number":"36C24525Q0295"}],"contacts":[{"name":"Bill Pratt","role":"primary","email":"Billie.Pratt@va.gov","phone":"410-642-2411","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"3f59c586da5a49e0a4657969c0938bd0","lineage_id":"3f59c586da5a49e0a4657969c0938bd0","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T02:19:23.438486831Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"5ee0b2e68a93d9d6bf82bb093210708ff9a395bde8ee81bdbcf96d30fa914a9f","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T02:19:23.438486831Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"8\nPage 8 of 57\nPage 8 of 57\n\nSUMMARY:\n\nDepartment of Veterans Affairs, Veterans Health Administration, Network Contracting\nOffice 5, is issuing this request for sources sought notice in order to identify vendors\nthat are interested in and capable of providing contractor services. For a contractor that\ncan provide a licensed MD Professional Engineer (P.E.) and STI SP001 Inspector(s). For Tank and ICP Regulatory; Training; and Tank Closure Support. To comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs). There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs. For the Baltimore VA Medical Center, Loch Raven VA Medical Center, and the Perry Point VA Medical Center. \nFor response details see Interested & Capable Responses last two pages. \n\nSCOPE OF WORK: \n\nLocations:\nBaltimore VA Medical Center  Perry Point VA Medical Center  \n10 North Greene Street   361 Boiler House Rd.\nBaltimore, MD 21201   Perry Point, MD 21902\n\nLoch Raven VA Medical Center\n3900 Loch Raven Blvd\nBaltimore, MD 21218\n\nTank and ICP Regulatory; Training; and Tank Closure Support for Baltimore VAMC; Loch Raven VAMC and Perry Point VAMC Integrated Contingency Plans (ICPs) \n512-25-2-637-0059\nI. INTRODUCTION \nTo comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs) Please see Attachment A for a list of VAMHCS ASTs and USTs.  This list will change as tanks are added and removed.\n.  There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs.  ASTs and USTs fall under several environmental regulatory requirements: Section 112.7(e) of the Clean Water Act and Maryland Department of the Environment Oil Operations Permit, Code of Maryland Regulations (COMAR) 26.10.01-.18 and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001; etc; as well as the latest COMAR regulations that pertain to ASTs.  This base plus four-year best value contract will provide AST subject matter expert support to accomplish the following for the Baltimore; Loch Raven; and Perry Point VAMCs:\n\nCLIN 1.0 Update Integrated Contingency Plans (ICPs) \n\nCLIN 2.0 Modify/Update and present ICP training to VAMHCS Personnel\n\nCLIN 3.0 Update VAMHCS AST/UST policies; fuel system SOPs and other tank-related documentation based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as those from NFPA; PEI; STI SP001; etc.\n\nCLIN 4.0 AST Closure support for VAMHCS tanks based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001, etc. as well as with the Resource Conservation and Recovery Act (RCRA)\n\nAll updates, support, and training shall be conducted in accordance with the following regulations:\n40 CFR 112 (Clean Water Act SPCC requirements)\n40 CFR 262.34 and 40 CFR 265.52 (RCRA Contingency Plan)\nCode of Maryland Regulations (COMAR) 26.13.05.04 (Maryland Contingency Plan Requirements)\nCOMAR 26.10.01-.18 (MDE Oil Pollution Control and Storage Tank Management) and all associated standards and references within the regulations such as those from NFPA; PEI; STI; etc.\nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nNational Fire Protection Association sections NFPA 30, Flammable and Combustible Liquids Code; \nPetroleum Equipment Institute (PEI) RP 1700;\nAll applicable state and local regulations, Executive Orders, VA Directives, and Facility Policies.\n\n\nII. DESCRIPTION OF WORK \n\n1.0 CLIN 1.0   ICP UPDATES\n\nThe contractor shall update the Baltimore; Loch Raven; and Perry Point VAMC ICPs as identified below and as needed each year due to technical changes from construction contracts.\n\nVISN\nFacility\nRCRA LQG\nRequired Plan Update\nDate of last update\n5\nBaltimore VAMC\nYes\nICP\n2020\n5\nPerry Point VAMC\nYes\nICP\n2021\n5\nLoch Raven VAMC\nYes\nICP \n2020\n\n  \nAt a minimum the creation, updates and revisions for ICPs shall:\nDescribe the actions facility personnel must take to response to fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water at the facility. \nDescribe arrangements agreed to by local police departments, fire departments, hospitals, contractors, and State and local emergency response teams to coordinate emergency services.\nList names, addresses, and phone numbers (office and home) of all persons qualified to act as emergency coordinator, and this list must be kept up to date. Where more than one person is listed, one must be named as primary emergency coordinator, and others must be listed in the order in which they will assume responsibility as alternates. \nInclude a list of all emergency equipment at the facility (such as fire extinguishing systems, spill control equipment, communications and alarm systems (internal and external), and decontamination equipment), where this equipment is required. This list must be kept up to date. In addition, the plan must include the location and a physical description of each item on the list, and a brief outline of its capabilities. \nInclude an evacuation plan for facility personnel where there is a possibility that evacuation could be necessary. This plan must describe signal(s) to be used to begin evacuation, evacuation routes, and alternate evacuation routes (in cases where the primary routes could be blocked by releases of hazardous waste or fires).\nDescribe the physical layout of the facility and include a facility diagram, which must mark the location and contents of each fixed oil storage container and the storage area where mobile or portable containers are located. Including:\nType of oil in each fixed container and its storage capacity for all containers over 55 gallons. For mobile or portable containers, either provide the type of oil and storage capacity for each container or provide an estimate of the potential number of mobile or portable containers, the types of oil, and anticipated storage capacities;\nDischarge prevention measures including procedures for routine handling of products (loading, unloading, and facility transfers, etc.); \nDischarge or drainage controls such as secondary containment around containers and other structures, equipment, and procedures for the control of a discharge; \nCountermeasures for discharge discovery, response, and cleanup (both the facility's capability and those that might be required of a contractor); \nMethods of disposal of recovered materials in accordance with applicable legal requirements; and \nContact list and phone numbers for the facility response coordinator, National Response Center, cleanup contractors with whom you have an agreement for response, and all appropriate Federal, State, and local agencies who must be contacted in case of a discharge.\nProvide information and procedures to enable a person reporting a discharge to relate information on the exact address or location and phone number of the facility; the date and time of the discharge, the type of material discharged; estimates of the total quantity discharged; the source of the discharge; a description of all affected media; the cause of the discharge; any damages or injuries caused by the discharge; actions being used to stop, remove, and mitigate the effects of the discharge; whether an evacuation may be needed; and, the names of individuals and/or organizations who have also been contacted.  \nInclude a prediction of the direction, rate of flow, and total quantity of oil which could be discharged from the facility as a result of each type of major equipment failure using AutoCAD or approved software. \nRecommend, if needed, appropriate containment and/or diversionary structures or equipment to prevent a discharge. \nBe certified by a Professional Engineer licensed in the state of Maryland\nIdentify written procedures for inspection, tests, and record keeping requirements.\nInclude requirements for personnel, training, and discharge prevention procedures related to:\nOperation and maintenance of equipment to prevent discharges; discharge procedure protocols; applicable pollution control laws, rules, and regulations; general facility operations; and, the contents of the facility ICP.\nKey personnel who are accountable for discharge prevention.\nDescribe how the facility will secure and control access to the oil handling, processing and storage areas; secure master flow and drain valves; prevent unauthorized access to starter controls on oil pumps; secure out-of-service and loading/unloading connections of oil pipelines; and address the appropriateness of security lighting to both prevent acts of vandalism and assist in the discovery of oil discharges. \nDescribe procedures for filling and dispensing oil at the facility and recommend methods for preventing releases. \nInclude a complete discussion of conformance with the applicable requirements and other effective discharge prevention and containment procedures required by federal, state and local guidelines.  \nInclude a Quick Reference Guide (QRG).\n1.1 CLIN 1.0   Milestones, Time Lines and Project Submittals\n\nCLIN 1.0 Milestone\nCLIN 1.0 Time Line\nSite visits and investigations for all sites\nCompleted within 60 days of Notice to Proceed (NTP) and within 60 days of each Option Year start date\nDraft submission of ICPs for all sites\n90 Days after NTP and within 90 days of each Option Year start date\nCOR review period\n3 weeks after receiving drafts\nFinal Submission \n2 weeks after receiving COR comments\nCLIN 1.0 PROJECT SUBMITTALS: \n1. Draft ICP: One electronic copy should be sent to the COR.  The COR will then review and provide comments to both the contractor and the site staff.   Estimate two rounds of comment resolution for each draft.\n2. Final ICP: Six hardcopies (with electronic deliverable) will be delivered to the COR and VAMHCS Point of Contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs).\n3. ICP Documents:  The contractor shall provide electronic access to all ICP documents.\n\n\n2.0 CLIN 2.0 Training\nTo comply with the requirements under the Clean Water Act and the Resource Conservation and Recovery Act, the VAMHCS Facilities of Baltimore, Perry Point, and Loch Raven will also require initial training on all new and updated ICPs. \n\nAfter the first ICP update, he contractor must provide two-hour, facility-specific, initial training to each individually identified VAMHCS facility for up to 50 employees per site (Maximum of 200 total, total 8 hours and can be done virtually, in-person or a combination of both).  Contractor shall provide updates to ICP training each year following the base year. The training should provide detailed requirements related to the entire ICP; not just specific to the most recent revisions. This training will include monthly inspections; spill response and instruction on completion of documentation and recordkeeping requirements of the plan. The training shall include the submission of an electronic copy of the training for future facility training use.   \n\n2.1 CLIN 2.0   Milestones, Time Lines and Project Submittals\n\nCLIN 2.0 Milestone\nCLIN 2.0 Time Line\nDraft submission of ICP Training for each of the three sites\n90 Days after NTP and within 90 days of each Option Year start date\nCOR review period\n2 weeks after receiving draft training slide deck\nFinal Submission \n2 weeks after receiving COR comments\nProvide Annual Training (Can be virtual via platform such as MS Teams)\nWithin 30 days after final submission \n\nCLIN 2.0 PROJECT SUBMITTALS: \n1. Draft ICP Training: One electronic copy should be sent to the COR for each VAMHCS facility.  The COR will then review and provide comments to both the contractor and the site staff.   Estimate two rounds of comment resolution for each draft.\n2. Final ICP Training: Electronic file will be delivered to the COR and point of contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs)\n3. ICP Training:  The contractor shall provide ICP training either in-person or via MS Teams (or other compatible virtual platform) for real-time training to each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs).\n4. All Training Documents:  The contractor shall provide electronic access to all training documents. \n\n\nCLIN 3.0 VAMHCS AST/UST Document Reviews and Updates\nReview all VAMHCS AST/UST policies; fuel system SOPs and other related documentation such as Technical Information Library tank-related specifications and update all documentation based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as those from NFPA; PEI; STI SP001; etc.\n\n3.1 CLIN 3.0   Milestones, Time Lines and Project Submittals\n\nCLIN 3.0 Milestone\nCLIN 3.0 Time Line\nReview of all VAMHCS AST and UST-related Documentation (Including related policies; SOPs; ICPs; Inspection Checklists; reports etc.)  Assume review of 4-6 documents each year of the contract with most extensive review the first year of the contract. \nConcurrently with ICP Updates and within 90 days of each Option Year start date\nTrack Change updates to all documents reviewed with suggestions for improvement, efficiencies, etc. Please note, the latest VAMHCS document templates must be utilized.  Please refer to VAMHCS COR for latest document templates.\n\nWithin 180 days of Base year start date and within 180 days of each Option year start date\nCOR review period\n2 weeks after receiving draft changes\nFinal Submission  - Two versions delivered electronically to COR:  1)Version with all track changes in the document 2)Version with all track changes accepted. \n2 weeks after receiving final COR comments\n\nCLIN 3.0 PROJECT SUBMITTALS: \n1. Track Change Updates: One electronic copy should be sent to the COR for each VAMHCS document reviewed.  The COR will then review and provide comments to the contractor.   Estimate two rounds of comment resolution for each document reviewed.\n2. Final Documentation Updates (Track Change and Clean Versions): Electronic files of Final Track changes version and final clean versions will be delivered to the COR for each document reviewed.  \n\n\nCLIN 4.0 Tank Closure Support: \nThe contractor shall also complete and/or oversee and review tank closure activities at the VAMHCS sites as needed, to include any tank closures as required by the following to ensure all regulatory items are completed.  This will include documentation; sampling; and testing as well as removal and disposal of tank and tank contents.  For estimating purposes, assume the following (however, may be subject to change):\n\nSix AST closures in the base year of contract:\n1 x 75-300 gal diesel tank (shop-fabricated)\n3x 500-700 gal diesel tanks (shop-fabricated)\n2 x 15,000 gal diesel tanks (shop-fabricated)\nThree AST closures in Year one of contract:\n1 x 75-300 gal diesel tank (shop-fabricated)\n1 x 500-700 gal diesel tank (shop-fabricated)\n1 x 150,000 gal #2 Fuel Oil tank (Field-erected)\nTwo AST closures in Year tow of contract:\n1x 1000-4000gal diesel tank (shop-fabricated) with underground piping and two subsurface sumps\n1 x 75-300 gal diesel tank (shop-fabricated)\n\nMDE does not prescribe a set number of samples per tank type or size.  Assume number of samples based on worst case scenarios.  For example 5-10 soil samples/AST for sizes 55 gallons to 700 gallons; 6-10 soil samples/AST for each of the 15,000-gallon tanks; and 12 shallow soil samples for the 150,000-gallon AST. Sample analyses include VOCs, MTBE, TBA, naphthalene, TPH-GRO, and TPH-DRO.    Please note, this could be increased depending upon MDE requirements.\n\nClosures per COMAR 26.10 (or most recent version of MDE regulations) and \nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nPetroleum Equipment Institute (PEI) RP 1700\nSTI SP001\nResource Conservation and Recovery Act (RCRA)\n\nAll Closure documentation; Sampling and testing; Removal and disposal of tank and tank contents in accordance with all EPA; MDE; and local laws; submittal to MDE and any related onsite support will be required by the Contractor\n\nAST Closure for VAMHCS tanks shall be based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001, etc.  This will include permanent and temporary closure per the following or latest COMAR regulations and MDE fact sheet (this one or latest version):  https://mde.maryland.gov/programs/land/OilControl/Documents/AST_Closure_Fact_Sheet_6.9.23_6pgs.pdf: \n\n(1). At least 30 days before beginning the permanent closure of the AST system:\n(a) Notify MDE Oil AST & Permits Section, Oil Control Program Land and Materials Administration in writing of the planned AST system permanent closure; and\n\n(b) Submit to the Department for approval a proposed sampling plan for a site assessment to determine if there is evidence of a spill, release, or discharge where contamination is most likely to be present, which includes the sampling of, at a minimum, the following areas of the AST site:\n(i) Within and immediately outside of the secondary containment dike, if present;\n(ii) Within the footprint of the removed AST; and\n(iii) Beneath underground piping associated with the removed AST (if applicable);\n(2). Place the AST system out-of-service in accordance with Â§B of this regulation:\nB. Out-of-Service. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall complete each of the following steps to place the AST system out-of-service:\n\n(1) Remove all oil from the AST system;\n\n(2) Isolate all piping connected to the AST;\n\n(3) Remove all waste materials from the AST system, including storage tank- bottom sludge, and dispose of these materials in compliance with applicable federal, State, and local laws;\n\n(4) Purge all petroleum vapors and maintain the AST system vapor free;\n\n(5) Secure the AST system to prevent unauthorized entrance or tampering;\n\n(6) Protect the AST system from flotation;\n\n(7) Continue the operation and maintenance of corrosion protection on the AST system in accordance with Regulation .10 of this chapter;\n\n(8) Lock the fill port;\n\n(9) Label the AST using lettering at least 3 inches high, in a readily visible location on the AST, with the following information:\n(a) Date the AST was placed out-of-service;\n(b) Name of product last stored; and\n(c) The words \"OUT-OF-SERVICE\" or \"EMPTY\"; and\n\n(10) Notify the Department in writing 30 days before placing the AST system out-of-service.\n\n(3) Comply with PEI RP 1700 \"Recommended Practices for the Closure of Underground Storage Tank and Shop-Fabricated Aboveground Storage Tank Systems\";\n(4) Disconnect and remove all aboveground piping associated with the AST system;\n(5) Disconnect and remove all underground piping associated with the AST system:\n(a) Under the continuous on-site presence and direction of a certified UST system technician or remover; and\n(b) In accordance with the UST system permanent closure procedures inÂ COMAR 26.10.10.02D;\n(6) Remove the AST and associated piping from the site; and\n(7) Within 45 days of completing the permanent closure and approved site assessment, submit a closure report to the Department detailing:\n(a) The AST closure activities; and\n(b) The results of the sampling event, including a map identifying sample locations, laboratory results, summary of findings, and conclusions.\n\n4.1 CLIN 4.0   Milestones, Time Lines and Project Submittals\n\nCLIN 4.0 Milestone\nCLIN 4.0 Time Line\nDraft submission of all required items within latest MDE Closure regulations (see paragraphs above) such as sampling plans; drawings; etc.\n10 Days after Notification of tank closure and within 10 days of each required MDE closure item listed in the latest MDE closure regulations.  \nCOR review period\n1 week after receiving draft submission\nFinal Submission \n1 week after receiving COR comments\nSubmittal to MDE\n2-3 Business days after Final Submission of the items above to COR\nProvide tank closure reports, sampling plans, testing and all related closure documentation, photos, etc. into a final report\nWithin 30 days after final submission of last closure item for each tank that is closed. \nProvide all required onsite support required (for tasks such as sampling; tank and tank contents removal and disposal etc.)\n2-4 onsite visits as required per tank closure\n\nCLIN 4.0 PROJECT SUBMITTALS: \n1. Draft Closure items required by latest MDE regulations: One electronic copy should be sent to the COR for each VAMHCS facility.  The COR will then review and provide comments to both the contractor and the site staff.   Estimate two rounds of comment resolution for each draft.\n2. Final Closure items required by latest MDE regulations: Electronic file will be delivered to the COR and point of contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs)\n3. Draft Tank Closure Report with all regulatory elements required:  One electronic copy should be sent to the COR and point of contact for each VAMHCS facility.  The COR will then review and provide comments to both the contractor and the site staff.   Estimate two rounds of comment resolution for each draft.\n4. Final Tank Closure Report with all regulatory elements required:  One electronic copy should be sent to the COR and point of contact for each VAMHCS facility within two weeks of receipt of COR comments.\n5. Onsite Support Schedule for reconnaissance; sampling; and tank removal/disposal:  Contractor to provide at least 30 days prior to each AST closure.\n\n\n5.0 QUALIFICATIONS:\nPrime Contractor personnel must perform the work in this SOW and all work shall be managed by a currently licensed MD Professional Engineer (P.E.) and STI SP001 Inspector(s).\nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance successfully completing SPCC/Integrated Contingency Plans and/or plan updates and associated training. \nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance working with Maryland Oil Pollution Control regulations for ASTs and USTs and industry standards referenced within.    This may include but is not limited to:\nCOMAR 26.10, Chapters 1-18 (or latest edition of MD Oil Pollution Control and Storage Tank Management regulations)\nSteel Tank Institute (STI) SP001\nPetroleum Equipment Institute (PEI) RP 1700.\nNational Fire Protection Association (NFPA) 30\n\nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance successfully completing AST permanent closures per MDE regulations and industry references within the regulations, particularly:\nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nPEI RP 1700.\nNFPA 30\nSTI SP001 \n\nPrime Contractor must have an office within 200 miles of the Perry Point VA Medical Center within the area of Maryland, Delaware, Pennsylvania or Virginia/Washington, D.C.\n\nVAMHCS personnel will provide timely access to all tanks and tank areas, including unlocking of gates and fill ports as needed.\n\nContractor will be able to work onsite each day for 8-hours as needed.\n\nA total of 8 days onsite is assumed for completing Perry Point VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 1 day onsite is assumed for completing Baltimore VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 1 day onsite is assumed for completing Loch Raven VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 2-4 days onsite is assumed for completing each tank closure at the Loch Raven; Baltimore; and Perry Point VAMCs.\n\nContractor will supply appropriate personnel and monitoring during the confined space entries, when needed per OSHA standards (One vaulted tank at Perry Point VAMC is located within a confined space).\n\nThe contractor will supply an 8-foot, A-frame ladder to access tank tops. For tanks taller than that for which a catwalk, access platform, stairs, or other safe means of access are not present, contractor will provide required safety equipment per latest OSHA standards. \n\nContractor will supply an OSHA Health and Safety Plan for review by COR if requested.\n\n6.0 BACKGROUND\nAs required by the Clean Water Act and in accordance with the Code of Federal Regulations 40 CFR Section 112, facilities with an aggregate aboveground oil storage capacity greater than 1,320 gallons or an underground oil storage capacity greater than 42,000 gallons must develop, implement, and maintain an integrated Contingency Plan (ICP), which will meet the requirements for a Spill Prevention Control and Countermeasures Plan (SPCCP) and Resource Conservation and Recovery Act (RCRA) hazardous waste contingency plan.  The ICP is required for facilities to prevent discharges to waters of the United States and respond to spills should they occur.   \n\nPer 40 CFR 112.5, an ICP shall be amended by a 3rd party Professional Engineer (P.E.) when there is a change in facility design, construction, operation, or maintenance that affects its potential for discharge, or every five years.  To do this, a 3rd party Professional Engineer licensed in the state of Maryland must certify the changes and update the associated ICP, including drawings and an update of the Quick Reference Guide (QRG).   The following VA facilities are subject to this requirement: Baltimore VA Medical Center (VAMC), Perry Point VAMC, and Loch Raven VAMC. \n\nAdditionally, as required by the Resource Conservation and Recovery Act (RCRA) and in accordance with 40 CFR 262.34, generators of hazardous waste must develop, implement, and maintain a hazardous waste contingency plan.  Specifically, large quantity generators must maintain a current, written contingency plan which should be updated as needed. The following VA facilities require written hazardous waste contingency plan updates: Baltimore VAMC, Perry Point VAMC, and Loch Raven VAMC.\n\n\n\n\n\n\n\nATTACHMENT A - This list may be updated as tanks are added/removed and will be provided by the VAMHCS COR to the contractor (Tanks highlighted in yellow are planned for closure and removal depending on funding and priorities)\nPERRY POINT VAMC ABOVEGROUND STORAGE TANKS (above 55gal):\nTable A-1. Aboveground Storage Tank Inventory   Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI-LEVEL ALARM\nCONTAINMENT AND SPILL CONTROL FEATURES\nD-17H\nKitchen, Bldg. 17H\n3,000\nDiesel Fuel\nYes\nDouble-walled tank, overfill\nprevention device\nDT-17H\nEmergency Generator, Bldg.\n17H\n100\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD-19H\nMedical Ward, Bldg. 19H\n2,000\nDiesel Fuel\nNo\nDouble-walled tank\nD-20\nRaw Water Pumping\nStation, Bldg. 20\n605\nDiesel Fuel\nNo\nDouble-walled tank,\nSecondary containment\nD-20H/D-333\nGenerator Bldg.333,\nadjacent to Bldg. 20H\n2,000\nDiesel Fuel\nYes\nDouble-walled tank, overfill prevention device, spill bucket\nDT-20H/DT- 333\nGenerator Bldg.\n333\n150\nDiesel Fuel\nNo\nDouble-walled tank\nD-23H/D- 361G\nHospital Clinic, Bldg. 23 (Outside\nBuilding 23H)\n2,500\nDiesel Fuel\nYes\nDouble-walled tank, spill bucket\nDT-23H/DT- 361G\nEmergency Generator, Bldg.361 G\n(Outside Building 23H\n75\nDiesel Fuel\nYes\nDouble-walled tank\nDT  23H/GG106\nRoom GG 106,\nBldg. 23H (Inside\nBuilding 23H)\n75\nDiesel Fuel\nYes\nDouble walled tank\nD 103\nWater Filter\nPlant, Bldg.\n103\n4000\nDiesel Fuel\nNo\nVaulted, double walled tank with double-walled underground piping,\nSecondary containment\nDT 103A\nWater Filter\nPlant, Bldg.\n103\n242\nDiesel Fuel\nNo\nDouble walled tank, Secondary containment\nDT 103B\nWater Filter\nPlant, Bldg. 103\n242\nDiesel Fuel\nNo\nDouble walled tank, Secondary containment\n\n\n\n10\nPage 10 of 57\nPage 10 of 57\n\nTable A-1. Aboveground Storage Tank Inventory   Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI-LEVEL ALARM\nCONTAINMENT AND SPILL\nCONTROL FEATURES\nD 311\nWastewater Pumping\nStation, Bldg. 311\n1,000\nDiesel Fuel\nYes\nDouble walled tank, spill bucket\nDT 311\nEmergency Generator, Bldg.\n311\n75\nDiesel Fuel\nYes\nSingle walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD 315\nBoiler Plant, Bldg.\n315\n150,000\nHeating Oil\nNo\n164,000 gallon engineered berm consisting of soil and concrete with a PVC\nliner\nD 321.A\nChiller Plant, Bldg.\n321\n500\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nDT 321.A\nEmergency Generator, Bldg.\n321\n75\nDiesel Fuel\nYes\nDouble walled tank\nD 321.B\nChiller Plant, Bldg.\n321\n15,000\nDiesel Fuel\nYes\nDouble walled tank\nDT 321.B\nChiller Plant, Bldg.\n321\n700\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD 321.C\nChiller Plant, Bldg.\n321\n15,000\nDiesel Fuel\nYes\nDouble walled tank\nDT 321.C\nChiller Plant, Bldg.\n321\n700\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD 324\nGenerator Bldg.\n324\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 325\nGenerator Bldg.\n325\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 326\nGenerator Bldg.\n326\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 327\nGenerator Bldg.\n327\n500\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\n\n\n\nPage 10 of 57\n\nTable A-1. Aboveground Storage Tank Inventory   Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI- LEVEL ALAR M\nCONTAINMENT AND SPILL CONTROL FEATURES\nD 329\nGenerator Bldg.\n329\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 344\nGenerator Bldg.\n344\n550\nDiesel Fuel\nYes\nDouble walled tank; overfill\nprevention device\nDT 344\nGenerator Bldg.\n344\n25\nDiesel Fuel\nYes\nSingle-walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD 360G\nFilter Plant,\nBldg. 360G\n2,000\nDiesel Fuel\nYes\nDouble walled tank, spill\nbucket\nD-365\nGenerator Bldg.\n365\n1,000\nDiesel Fuel\nYes\nDouble-walled tank, spill bucket\nDT-365\nEmergency Generator, Bldg.\n365\n75\nDiesel Fuel\nNo\nSingle-walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD-507\nSalt Shed, Bldg.\n507\n500\nDiesel\nFuel\nNo\nDouble-walled tank\nD-11.A\nMobile Emergency\nGenerator (200 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-11.B\nMobile Emergency\nGenerator (200 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-11.C\nMobile Emergency\nGenerator (100 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-Mobile\nREMRO\n(Outside) Mobile Refueler\n275\nDiesel Fuel\nN/A\nNone\nD- REMRO\nAutomotive\nRepair Garage\n500\nHeating Oil\nNo\nSec. containment basin\nO-11\nGarage, Bldg.\n11\n275\nUsed Oil\nNo\nSec. containment basin\n\n\nTotal # of\nTanks   Perry Point VAMC\n38\n\nBALTIMORE VAMC ABOVEGROUND STORAGE TANKS:\n\nTable A-2. Baltimore VAMC Aboveground Storage Tank Inventory\nTank No.\nLocation\nCapacity (gallons)\nProduct\nHigh-Level Alarm\nContainment and Spill Control Features\nAST 1\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nAST 2\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nAST 3\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nTotal # of Tanks  \nBaltimore VAMC\n3\n\n\nLOCH RAVEN VAMC ABOVEGROUND STORAGE TANKS:\n\nTable A-3. Loch Raven Aboveground Storage Tank Inventory\nTank No.\nLocation\nCapacity\n(gallons)\nProduct\nHi-Level Alarm\nContainment and Spill\n    Control Features\nAST-1\nBuilding 1\n(exterior)\n2,000\nDiesel fuel\nYes\nDouble-walled steel tank with double-walled underground piping\n\nDT-1\nEmergency generator day tank(exterior)\n\n75\n\nDiesel fuel\n\nNo\n\nDouble-walled\nMobile Generator\nBuilding 1\n(exterior)\n574\nDiesel fuel\nYes\nDouble-walled\nTotal # of Tanks   Loch Raven VAMC\n3\n\nInterested & Capable Responses: Must respond with the following information. MUST ANSWER THE SUBCONTRACTING QUESTIONS HIGHLIGHTED BELOW.\nCONTRACTORS MUST ALSO PROVIDE THE FOLLOWING COPIES:\nMaryland Professional Engineering License / Certificate \nSP001 Inspector Certification - Aboveground Tank System Inspector\nNCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for the Washington DC VA Medical Center.\nPlease respond to this RFI/Sources Sought 36C24525Q0295 with your:\nBusiness name (including Unique Entity ID (SAM.gov)\nBusiness type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and\nPerson of contact (including telephone number & email address).\nCapability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities.\nAvailable contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS)\nBrief Summary of categories of services that your company can/cannot provide.\nCertification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable)\nConfirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response:\nDo you intend to self-perform this effort? \nIf you are located outside the immediate area, how will you self-perform? \nOr do you intend to subcontract work under this contract? \nIf you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting? \n\nResponse Instructions:\nResponses must be received by Tuesday, February 25th, 2025 @ 10:00 AM EST. Responses to the information requested above must be submitted via email to Bill Pratt\nat Billie.Pratt@va.gov. and William.Galletta@va.gov. \n\nSubject line should have: 36C24525Q0295 | Response Sources Sought Notice | Company Name.\n\nThis request for information/sources sought notice is for planning purposes ONLY and\ndoes not constitute a solicitation, responses to this notice are not offers and cannot be\naccepted by the Government to form a binding contract. The results of this market\nresearch will assist in the development of (1) the requirement, and (2) the acquisition\nstrategy (e.g., SDVOSB/SDVOSB set-aside, small business set-aside, full and open\ncompetition, etc.). VA assumes no responsibility for any costs incurred as a result of a\nvendor s attendance to the Site-Visit nor the preparation of responses submitted as a\nresult of this notice.\n\n\nBill Pratt\nContract Officer \nVHA, NCO 5","text":"8\nPage 8 of 57\nPage 8 of 57\n\nSUMMARY:\n\nDepartment of Veterans Affairs, Veterans Health Administration, Network Contracting\nOffice 5, is issuing this request for sources sought notice in order to identify vendors\nthat are interested in and capable of providing contractor services. For a contractor that\ncan provide a licensed MD Professional Engineer (P.E.) and STI SP001 Inspector(s). For Tank and ICP Regulatory; Training; and Tank Closure Support. To comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs). There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs. For the Baltimore VA Medical Center, Loch Raven VA Medical Center, and the Perry Point VA Medical Center.\nFor response details see Interested & Capable Responses last two pages.\n\nSCOPE OF WORK:\n\nLocations:\nBaltimore VA Medical Center Perry Point VA Medical Center\n10 North Greene Street 361 Boiler House Rd.\nBaltimore, MD 21201 Perry Point, MD 21902\n\nLoch Raven VA Medical Center\n3900 Loch Raven Blvd\nBaltimore, MD 21218\n\nTank and ICP Regulatory; Training; and Tank Closure Support for Baltimore VAMC; Loch Raven VAMC and Perry Point VAMC Integrated Contingency Plans (ICPs)\n512-25-2-637-0059\nI. INTRODUCTION\nTo comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs) Please see Attachment A for a list of VAMHCS ASTs and USTs. This list will change as tanks are added and removed.\n. There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs. ASTs and USTs fall under several environmental regulatory requirements: Section 112.7(e) of the Clean Water Act and Maryland Department of the Environment Oil Operations Permit, Code of Maryland Regulations (COMAR) 26.10.01-.18 and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001; etc; as well as the latest COMAR regulations that pertain to ASTs. This base plus four-year best value contract will provide AST subject matter expert support to accomplish the following for the Baltimore; Loch Raven; and Perry Point VAMCs:\n\nCLIN 1.0 Update Integrated Contingency Plans (ICPs)\n\nCLIN 2.0 Modify/Update and present ICP training to VAMHCS Personnel\n\nCLIN 3.0 Update VAMHCS AST/UST policies; fuel system SOPs and other tank-related documentation based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as those from NFPA; PEI; STI SP001; etc.\n\nCLIN 4.0 AST Closure support for VAMHCS tanks based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001, etc. as well as with the Resource Conservation and Recovery Act (RCRA)\n\nAll updates, support, and training shall be conducted in accordance with the following regulations:\n40 CFR 112 (Clean Water Act SPCC requirements)\n40 CFR 262.34 and 40 CFR 265.52 (RCRA Contingency Plan)\nCode of Maryland Regulations (COMAR) 26.13.05.04 (Maryland Contingency Plan Requirements)\nCOMAR 26.10.01-.18 (MDE Oil Pollution Control and Storage Tank Management) and all associated standards and references within the regulations such as those from NFPA; PEI; STI; etc.\nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nNational Fire Protection Association sections NFPA 30, Flammable and Combustible Liquids Code;\nPetroleum Equipment Institute (PEI) RP 1700;\nAll applicable state and local regulations, Executive Orders, VA Directives, and Facility Policies.\n\nII. DESCRIPTION OF WORK\n\n1.0 CLIN 1.0 ICP UPDATES\n\nThe contractor shall update the Baltimore; Loch Raven; and Perry Point VAMC ICPs as identified below and as needed each year due to technical changes from construction contracts.\n\nVISN\nFacility\nRCRA LQG\nRequired Plan Update\nDate of last update\n5\nBaltimore VAMC\nYes\nICP\n2020\n5\nPerry Point VAMC\nYes\nICP\n2021\n5\nLoch Raven VAMC\nYes\nICP\n2020\n\nAt a minimum the creation, updates and revisions for ICPs shall:\nDescribe the actions facility personnel must take to response to fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water at the facility.\nDescribe arrangements agreed to by local police departments, fire departments, hospitals, contractors, and State and local emergency response teams to coordinate emergency services.\nList names, addresses, and phone numbers (office and home) of all persons qualified to act as emergency coordinator, and this list must be kept up to date. Where more than one person is listed, one must be named as primary emergency coordinator, and others must be listed in the order in which they will assume responsibility as alternates.\nInclude a list of all emergency equipment at the facility (such as fire extinguishing systems, spill control equipment, communications and alarm systems (internal and external), and decontamination equipment), where this equipment is required. This list must be kept up to date. In addition, the plan must include the location and a physical description of each item on the list, and a brief outline of its capabilities.\nInclude an evacuation plan for facility personnel where there is a possibility that evacuation could be necessary. This plan must describe signal(s) to be used to begin evacuation, evacuation routes, and alternate evacuation routes (in cases where the primary routes could be blocked by releases of hazardous waste or fires).\nDescribe the physical layout of the facility and include a facility diagram, which must mark the location and contents of each fixed oil storage container and the storage area where mobile or portable containers are located. Including:\nType of oil in each fixed container and its storage capacity for all containers over 55 gallons. For mobile or portable containers, either provide the type of oil and storage capacity for each container or provide an estimate of the potential number of mobile or portable containers, the types of oil, and anticipated storage capacities;\nDischarge prevention measures including procedures for routine handling of products (loading, unloading, and facility transfers, etc.);\nDischarge or drainage controls such as secondary containment around containers and other structures, equipment, and procedures for the control of a discharge;\nCountermeasures for discharge discovery, response, and cleanup (both the facility's capability and those that might be required of a contractor);\nMethods of disposal of recovered materials in accordance with applicable legal requirements; and\nContact list and phone numbers for the facility response coordinator, National Response Center, cleanup contractors with whom you have an agreement for response, and all appropriate Federal, State, and local agencies who must be contacted in case of a discharge.\nProvide information and procedures to enable a person reporting a discharge to relate information on the exact address or location and phone number of the facility; the date and time of the discharge, the type of material discharged; estimates of the total quantity discharged; the source of the discharge; a description of all affected media; the cause of the discharge; any damages or injuries caused by the discharge; actions being used to stop, remove, and mitigate the effects of the discharge; whether an evacuation may be needed; and, the names of individuals and/or organizations who have also been contacted.\nInclude a prediction of the direction, rate of flow, and total quantity of oil which could be discharged from the facility as a result of each type of major equipment failure using AutoCAD or approved software.\nRecommend, if needed, appropriate containment and/or diversionary structures or equipment to prevent a discharge.\nBe certified by a Professional Engineer licensed in the state of Maryland\nIdentify written procedures for inspection, tests, and record keeping requirements.\nInclude requirements for personnel, training, and discharge prevention procedures related to:\nOperation and maintenance of equipment to prevent discharges; discharge procedure protocols; applicable pollution control laws, rules, and regulations; general facility operations; and, the contents of the facility ICP.\nKey personnel who are accountable for discharge prevention.\nDescribe how the facility will secure and control access to the oil handling, processing and storage areas; secure master flow and drain valves; prevent unauthorized access to starter controls on oil pumps; secure out-of-service and loading/unloading connections of oil pipelines; and address the appropriateness of security lighting to both prevent acts of vandalism and assist in the discovery of oil discharges.\nDescribe procedures for filling and dispensing oil at the facility and recommend methods for preventing releases.\nInclude a complete discussion of conformance with the applicable requirements and other effective discharge prevention and containment procedures required by federal, state and local guidelines.\nInclude a Quick Reference Guide (QRG).\n1.1 CLIN 1.0 Milestones, Time Lines and Project Submittals\n\nCLIN 1.0 Milestone\nCLIN 1.0 Time Line\nSite visits and investigations for all sites\nCompleted within 60 days of Notice to Proceed (NTP) and within 60 days of each Option Year start date\nDraft submission of ICPs for all sites\n90 Days after NTP and within 90 days of each Option Year start date\nCOR review period\n3 weeks after receiving drafts\nFinal Submission\n2 weeks after receiving COR comments\nCLIN 1.0 PROJECT SUBMITTALS:\n1. Draft ICP: One electronic copy should be sent to the COR. The COR will then review and provide comments to both the contractor and the site staff. Estimate two rounds of comment resolution for each draft.\n2. Final ICP: Six hardcopies (with electronic deliverable) will be delivered to the COR and VAMHCS Point of Contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs).\n3. ICP Documents: The contractor shall provide electronic access to all ICP documents.\n\n2.0 CLIN 2.0 Training\nTo comply with the requirements under the Clean Water Act and the Resource Conservation and Recovery Act, the VAMHCS Facilities of Baltimore, Perry Point, and Loch Raven will also require initial training on all new and updated ICPs.\n\nAfter the first ICP update, he contractor must provide two-hour, facility-specific, initial training to each individually identified VAMHCS facility for up to 50 employees per site (Maximum of 200 total, total 8 hours and can be done virtually, in-person or a combination of both). Contractor shall provide updates to ICP training each year following the base year. The training should provide detailed requirements related to the entire ICP; not just specific to the most recent revisions. This training will include monthly inspections; spill response and instruction on completion of documentation and recordkeeping requirements of the plan. The training shall include the submission of an electronic copy of the training for future facility training use.\n\n2.1 CLIN 2.0 Milestones, Time Lines and Project Submittals\n\nCLIN 2.0 Milestone\nCLIN 2.0 Time Line\nDraft submission of ICP Training for each of the three sites\n90 Days after NTP and within 90 days of each Option Year start date\nCOR review period\n2 weeks after receiving draft training slide deck\nFinal Submission\n2 weeks after receiving COR comments\nProvide Annual Training (Can be virtual via platform such as MS Teams)\nWithin 30 days after final submission\n\nCLIN 2.0 PROJECT SUBMITTALS:\n1. Draft ICP Training: One electronic copy should be sent to the COR for each VAMHCS facility. The COR will then review and provide comments to both the contractor and the site staff. Estimate two rounds of comment resolution for each draft.\n2. Final ICP Training: Electronic file will be delivered to the COR and point of contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs)\n3. ICP Training: The contractor shall provide ICP training either in-person or via MS Teams (or other compatible virtual platform) for real-time training to each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs).\n4. All Training Documents: The contractor shall provide electronic access to all training documents.\n\nCLIN 3.0 VAMHCS AST/UST Document Reviews and Updates\nReview all VAMHCS AST/UST policies; fuel system SOPs and other related documentation such as Technical Information Library tank-related specifications and update all documentation based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as those from NFPA; PEI; STI SP001; etc.\n\n3.1 CLIN 3.0 Milestones, Time Lines and Project Submittals\n\nCLIN 3.0 Milestone\nCLIN 3.0 Time Line\nReview of all VAMHCS AST and UST-related Documentation (Including related policies; SOPs; ICPs; Inspection Checklists; reports etc.) Assume review of 4-6 documents each year of the contract with most extensive review the first year of the contract.\nConcurrently with ICP Updates and within 90 days of each Option Year start date\nTrack Change updates to all documents reviewed with suggestions for improvement, efficiencies, etc. Please note, the latest VAMHCS document templates must be utilized. Please refer to VAMHCS COR for latest document templates.\n\nWithin 180 days of Base year start date and within 180 days of each Option year start date\nCOR review period\n2 weeks after receiving draft changes\nFinal Submission - Two versions delivered electronically to COR: 1)Version with all track changes in the document 2)Version with all track changes accepted.\n2 weeks after receiving final COR comments\n\nCLIN 3.0 PROJECT SUBMITTALS:\n1. Track Change Updates: One electronic copy should be sent to the COR for each VAMHCS document reviewed. The COR will then review and provide comments to the contractor. Estimate two rounds of comment resolution for each document reviewed.\n2. Final Documentation Updates (Track Change and Clean Versions): Electronic files of Final Track changes version and final clean versions will be delivered to the COR for each document reviewed.\n\nCLIN 4.0 Tank Closure Support:\nThe contractor shall also complete and/or oversee and review tank closure activities at the VAMHCS sites as needed, to include any tank closures as required by the following to ensure all regulatory items are completed. This will include documentation; sampling; and testing as well as removal and disposal of tank and tank contents. For estimating purposes, assume the following (however, may be subject to change):\n\nSix AST closures in the base year of contract:\n1 x 75-300 gal diesel tank (shop-fabricated)\n3x 500-700 gal diesel tanks (shop-fabricated)\n2 x 15,000 gal diesel tanks (shop-fabricated)\nThree AST closures in Year one of contract:\n1 x 75-300 gal diesel tank (shop-fabricated)\n1 x 500-700 gal diesel tank (shop-fabricated)\n1 x 150,000 gal #2 Fuel Oil tank (Field-erected)\nTwo AST closures in Year tow of contract:\n1x 1000-4000gal diesel tank (shop-fabricated) with underground piping and two subsurface sumps\n1 x 75-300 gal diesel tank (shop-fabricated)\n\nMDE does not prescribe a set number of samples per tank type or size. Assume number of samples based on worst case scenarios. For example 5-10 soil samples/AST for sizes 55 gallons to 700 gallons; 6-10 soil samples/AST for each of the 15,000-gallon tanks; and 12 shallow soil samples for the 150,000-gallon AST. Sample analyses include VOCs, MTBE, TBA, naphthalene, TPH-GRO, and TPH-DRO. Please note, this could be increased depending upon MDE requirements.\n\nClosures per COMAR 26.10 (or most recent version of MDE regulations) and\nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nPetroleum Equipment Institute (PEI) RP 1700\nSTI SP001\nResource Conservation and Recovery Act (RCRA)\n\nAll Closure documentation; Sampling and testing; Removal and disposal of tank and tank contents in accordance with all EPA; MDE; and local laws; submittal to MDE and any related onsite support will be required by the Contractor\n\nAST Closure for VAMHCS tanks shall be based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001, etc. This will include permanent and temporary closure per the following or latest COMAR regulations and MDE fact sheet (this one or latest version): https://mde.maryland.gov/programs/land/OilControl/Documents/AST_Closure_Fact_Sheet_6.9.23_6pgs.pdf:\n\n(1). At least 30 days before beginning the permanent closure of the AST system:\n(a) Notify MDE Oil AST & Permits Section, Oil Control Program Land and Materials Administration in writing of the planned AST system permanent closure; and\n\n(b) Submit to the Department for approval a proposed sampling plan for a site assessment to determine if there is evidence of a spill, release, or discharge where contamination is most likely to be present, which includes the sampling of, at a minimum, the following areas of the AST site:\n(i) Within and immediately outside of the secondary containment dike, if present;\n(ii) Within the footprint of the removed AST; and\n(iii) Beneath underground piping associated with the removed AST (if applicable);\n(2). Place the AST system out-of-service in accordance with Â§B of this regulation:\nB. Out-of-Service. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall complete each of the following steps to place the AST system out-of-service:\n\n(1) Remove all oil from the AST system;\n\n(2) Isolate all piping connected to the AST;\n\n(3) Remove all waste materials from the AST system, including storage tank- bottom sludge, and dispose of these materials in compliance with applicable federal, State, and local laws;\n\n(4) Purge all petroleum vapors and maintain the AST system vapor free;\n\n(5) Secure the AST system to prevent unauthorized entrance or tampering;\n\n(6) Protect the AST system from flotation;\n\n(7) Continue the operation and maintenance of corrosion protection on the AST system in accordance with Regulation .10 of this chapter;\n\n(8) Lock the fill port;\n\n(9) Label the AST using lettering at least 3 inches high, in a readily visible location on the AST, with the following information:\n(a) Date the AST was placed out-of-service;\n(b) Name of product last stored; and\n(c) The words \"OUT-OF-SERVICE\" or \"EMPTY\"; and\n\n(10) Notify the Department in writing 30 days before placing the AST system out-of-service.\n\n(3) Comply with PEI RP 1700 \"Recommended Practices for the Closure of Underground Storage Tank and Shop-Fabricated Aboveground Storage Tank Systems\";\n(4) Disconnect and remove all aboveground piping associated with the AST system;\n(5) Disconnect and remove all underground piping associated with the AST system:\n(a) Under the continuous on-site presence and direction of a certified UST system technician or remover; and\n(b) In accordance with the UST system permanent closure procedures inÂ COMAR 26.10.10.02D;\n(6) Remove the AST and associated piping from the site; and\n(7) Within 45 days of completing the permanent closure and approved site assessment, submit a closure report to the Department detailing:\n(a) The AST closure activities; and\n(b) The results of the sampling event, including a map identifying sample locations, laboratory results, summary of findings, and conclusions.\n\n4.1 CLIN 4.0 Milestones, Time Lines and Project Submittals\n\nCLIN 4.0 Milestone\nCLIN 4.0 Time Line\nDraft submission of all required items within latest MDE Closure regulations (see paragraphs above) such as sampling plans; drawings; etc.\n10 Days after Notification of tank closure and within 10 days of each required MDE closure item listed in the latest MDE closure regulations.\nCOR review period\n1 week after receiving draft submission\nFinal Submission\n1 week after receiving COR comments\nSubmittal to MDE\n2-3 Business days after Final Submission of the items above to COR\nProvide tank closure reports, sampling plans, testing and all related closure documentation, photos, etc. into a final report\nWithin 30 days after final submission of last closure item for each tank that is closed.\nProvide all required onsite support required (for tasks such as sampling; tank and tank contents removal and disposal etc.)\n2-4 onsite visits as required per tank closure\n\nCLIN 4.0 PROJECT SUBMITTALS:\n1. Draft Closure items required by latest MDE regulations: One electronic copy should be sent to the COR for each VAMHCS facility. The COR will then review and provide comments to both the contractor and the site staff. Estimate two rounds of comment resolution for each draft.\n2. Final Closure items required by latest MDE regulations: Electronic file will be delivered to the COR and point of contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs)\n3. Draft Tank Closure Report with all regulatory elements required: One electronic copy should be sent to the COR and point of contact for each VAMHCS facility. The COR will then review and provide comments to both the contractor and the site staff. Estimate two rounds of comment resolution for each draft.\n4. Final Tank Closure Report with all regulatory elements required: One electronic copy should be sent to the COR and point of contact for each VAMHCS facility within two weeks of receipt of COR comments.\n5. Onsite Support Schedule for reconnaissance; sampling; and tank removal/disposal: Contractor to provide at least 30 days prior to each AST closure.\n\n5.0 QUALIFICATIONS:\nPrime Contractor personnel must perform the work in this SOW and all work shall be managed by a currently licensed MD Professional Engineer (P.E.) and STI SP001 Inspector(s).\nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance successfully completing SPCC/Integrated Contingency Plans and/or plan updates and associated training.\nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance working with Maryland Oil Pollution Control regulations for ASTs and USTs and industry standards referenced within. This may include but is not limited to:\nCOMAR 26.10, Chapters 1-18 (or latest edition of MD Oil Pollution Control and Storage Tank Management regulations)\nSteel Tank Institute (STI) SP001\nPetroleum Equipment Institute (PEI) RP 1700.\nNational Fire Protection Association (NFPA) 30\n\nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance successfully completing AST permanent closures per MDE regulations and industry references within the regulations, particularly:\nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nPEI RP 1700.\nNFPA 30\nSTI SP001\n\nPrime Contractor must have an office within 200 miles of the Perry Point VA Medical Center within the area of Maryland, Delaware, Pennsylvania or Virginia/Washington, D.C.\n\nVAMHCS personnel will provide timely access to all tanks and tank areas, including unlocking of gates and fill ports as needed.\n\nContractor will be able to work onsite each day for 8-hours as needed.\n\nA total of 8 days onsite is assumed for completing Perry Point VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 1 day onsite is assumed for completing Baltimore VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 1 day onsite is assumed for completing Loch Raven VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 2-4 days onsite is assumed for completing each tank closure at the Loch Raven; Baltimore; and Perry Point VAMCs.\n\nContractor will supply appropriate personnel and monitoring during the confined space entries, when needed per OSHA standards (One vaulted tank at Perry Point VAMC is located within a confined space).\n\nThe contractor will supply an 8-foot, A-frame ladder to access tank tops. For tanks taller than that for which a catwalk, access platform, stairs, or other safe means of access are not present, contractor will provide required safety equipment per latest OSHA standards.\n\nContractor will supply an OSHA Health and Safety Plan for review by COR if requested.\n\n6.0 BACKGROUND\nAs required by the Clean Water Act and in accordance with the Code of Federal Regulations 40 CFR Section 112, facilities with an aggregate aboveground oil storage capacity greater than 1,320 gallons or an underground oil storage capacity greater than 42,000 gallons must develop, implement, and maintain an integrated Contingency Plan (ICP), which will meet the requirements for a Spill Prevention Control and Countermeasures Plan (SPCCP) and Resource Conservation and Recovery Act (RCRA) hazardous waste contingency plan. The ICP is required for facilities to prevent discharges to waters of the United States and respond to spills should they occur.\n\nPer 40 CFR 112.5, an ICP shall be amended by a 3rd party Professional Engineer (P.E.) when there is a change in facility design, construction, operation, or maintenance that affects its potential for discharge, or every five years. To do this, a 3rd party Professional Engineer licensed in the state of Maryland must certify the changes and update the associated ICP, including drawings and an update of the Quick Reference Guide (QRG). The following VA facilities are subject to this requirement: Baltimore VA Medical Center (VAMC), Perry Point VAMC, and Loch Raven VAMC.\n\nAdditionally, as required by the Resource Conservation and Recovery Act (RCRA) and in accordance with 40 CFR 262.34, generators of hazardous waste must develop, implement, and maintain a hazardous waste contingency plan. Specifically, large quantity generators must maintain a current, written contingency plan which should be updated as needed. The following VA facilities require written hazardous waste contingency plan updates: Baltimore VAMC, Perry Point VAMC, and Loch Raven VAMC.\n\nATTACHMENT A - This list may be updated as tanks are added/removed and will be provided by the VAMHCS COR to the contractor (Tanks highlighted in yellow are planned for closure and removal depending on funding and priorities)\nPERRY POINT VAMC ABOVEGROUND STORAGE TANKS (above 55gal):\nTable A-1. Aboveground Storage Tank Inventory Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI-LEVEL ALARM\nCONTAINMENT AND SPILL CONTROL FEATURES\nD-17H\nKitchen, Bldg. 17H\n3,000\nDiesel Fuel\nYes\nDouble-walled tank, overfill\nprevention device\nDT-17H\nEmergency Generator, Bldg.\n17H\n100\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD-19H\nMedical Ward, Bldg. 19H\n2,000\nDiesel Fuel\nNo\nDouble-walled tank\nD-20\nRaw Water Pumping\nStation, Bldg. 20\n605\nDiesel Fuel\nNo\nDouble-walled tank,\nSecondary containment\nD-20H/D-333\nGenerator Bldg.333,\nadjacent to Bldg. 20H\n2,000\nDiesel Fuel\nYes\nDouble-walled tank, overfill prevention device, spill bucket\nDT-20H/DT- 333\nGenerator Bldg.\n333\n150\nDiesel Fuel\nNo\nDouble-walled tank\nD-23H/D- 361G\nHospital Clinic, Bldg. 23 (Outside\nBuilding 23H)\n2,500\nDiesel Fuel\nYes\nDouble-walled tank, spill bucket\nDT-23H/DT- 361G\nEmergency Generator, Bldg.361 G\n(Outside Building 23H\n75\nDiesel Fuel\nYes\nDouble-walled tank\nDT 23H/GG106\nRoom GG 106,\nBldg. 23H (Inside\nBuilding 23H)\n75\nDiesel Fuel\nYes\nDouble walled tank\nD 103\nWater Filter\nPlant, Bldg.\n103\n4000\nDiesel Fuel\nNo\nVaulted, double walled tank with double-walled underground piping,\nSecondary containment\nDT 103A\nWater Filter\nPlant, Bldg.\n103\n242\nDiesel Fuel\nNo\nDouble walled tank, Secondary containment\nDT 103B\nWater Filter\nPlant, Bldg. 103\n242\nDiesel Fuel\nNo\nDouble walled tank, Secondary containment\n\n10\nPage 10 of 57\nPage 10 of 57\n\nTable A-1. Aboveground Storage Tank Inventory Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI-LEVEL ALARM\nCONTAINMENT AND SPILL\nCONTROL FEATURES\nD 311\nWastewater Pumping\nStation, Bldg. 311\n1,000\nDiesel Fuel\nYes\nDouble walled tank, spill bucket\nDT 311\nEmergency Generator, Bldg.\n311\n75\nDiesel Fuel\nYes\nSingle walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD 315\nBoiler Plant, Bldg.\n315\n150,000\nHeating Oil\nNo\n164,000 gallon engineered berm consisting of soil and concrete with a PVC\nliner\nD 321.A\nChiller Plant, Bldg.\n321\n500\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nDT 321.A\nEmergency Generator, Bldg.\n321\n75\nDiesel Fuel\nYes\nDouble walled tank\nD 321.B\nChiller Plant, Bldg.\n321\n15,000\nDiesel Fuel\nYes\nDouble walled tank\nDT 321.B\nChiller Plant, Bldg.\n321\n700\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD 321.C\nChiller Plant, Bldg.\n321\n15,000\nDiesel Fuel\nYes\nDouble walled tank\nDT 321.C\nChiller Plant, Bldg.\n321\n700\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD 324\nGenerator Bldg.\n324\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 325\nGenerator Bldg.\n325\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 326\nGenerator Bldg.\n326\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 327\nGenerator Bldg.\n327\n500\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\n\nPage 10 of 57\n\nTable A-1. Aboveground Storage Tank Inventory Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI- LEVEL ALAR M\nCONTAINMENT AND SPILL CONTROL FEATURES\nD 329\nGenerator Bldg.\n329\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 344\nGenerator Bldg.\n344\n550\nDiesel Fuel\nYes\nDouble walled tank; overfill\nprevention device\nDT 344\nGenerator Bldg.\n344\n25\nDiesel Fuel\nYes\nSingle-walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD 360G\nFilter Plant,\nBldg. 360G\n2,000\nDiesel Fuel\nYes\nDouble walled tank, spill\nbucket\nD-365\nGenerator Bldg.\n365\n1,000\nDiesel Fuel\nYes\nDouble-walled tank, spill bucket\nDT-365\nEmergency Generator, Bldg.\n365\n75\nDiesel Fuel\nNo\nSingle-walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD-507\nSalt Shed, Bldg.\n507\n500\nDiesel\nFuel\nNo\nDouble-walled tank\nD-11.A\nMobile Emergency\nGenerator (200 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-11.B\nMobile Emergency\nGenerator (200 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-11.C\nMobile Emergency\nGenerator (100 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-Mobile\nREMRO\n(Outside) Mobile Refueler\n275\nDiesel Fuel\nN/A\nNone\nD- REMRO\nAutomotive\nRepair Garage\n500\nHeating Oil\nNo\nSec. containment basin\nO-11\nGarage, Bldg.\n11\n275\nUsed Oil\nNo\nSec. containment basin\n\nTotal # of\nTanks Perry Point VAMC\n38\n\nBALTIMORE VAMC ABOVEGROUND STORAGE TANKS:\n\nTable A-2. Baltimore VAMC Aboveground Storage Tank Inventory\nTank No.\nLocation\nCapacity (gallons)\nProduct\nHigh-Level Alarm\nContainment and Spill Control Features\nAST 1\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nAST 2\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nAST 3\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nTotal # of Tanks\nBaltimore VAMC\n3\n\nLOCH RAVEN VAMC ABOVEGROUND STORAGE TANKS:\n\nTable A-3. Loch Raven Aboveground Storage Tank Inventory\nTank No.\nLocation\nCapacity\n(gallons)\nProduct\nHi-Level Alarm\nContainment and Spill\nControl Features\nAST-1\nBuilding 1\n(exterior)\n2,000\nDiesel fuel\nYes\nDouble-walled steel tank with double-walled underground piping\n\nDT-1\nEmergency generator day tank(exterior)\n\n75\n\nDiesel fuel\n\nNo\n\nDouble-walled\nMobile Generator\nBuilding 1\n(exterior)\n574\nDiesel fuel\nYes\nDouble-walled\nTotal # of Tanks Loch Raven VAMC\n3\n\nInterested & Capable Responses: Must respond with the following information. MUST ANSWER THE SUBCONTRACTING QUESTIONS HIGHLIGHTED BELOW.\nCONTRACTORS MUST ALSO PROVIDE THE FOLLOWING COPIES:\nMaryland Professional Engineering License / Certificate\nSP001 Inspector Certification - Aboveground Tank System Inspector\nNCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for the Washington DC VA Medical Center.\nPlease respond to this RFI/Sources Sought 36C24525Q0295 with your:\nBusiness name (including Unique Entity ID (SAM.gov)\nBusiness type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and\nPerson of contact (including telephone number & email address).\nCapability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities.\nAvailable contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS)\nBrief Summary of categories of services that your company can/cannot provide.\nCertification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable)\nConfirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response:\nDo you intend to self-perform this effort?\nIf you are located outside the immediate area, how will you self-perform?\nOr do you intend to subcontract work under this contract?\nIf you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting?\n\nResponse Instructions:\nResponses must be received by Tuesday, February 25th, 2025 @ 10:00 AM EST. Responses to the information requested above must be submitted via email to Bill Pratt\nat Billie.Pratt@va.gov. and William.Galletta@va.gov.\n\nSubject line should have: 36C24525Q0295 | Response Sources Sought Notice | Company Name.\n\nThis request for information/sources sought notice is for planning purposes ONLY and\ndoes not constitute a solicitation, responses to this notice are not offers and cannot be\naccepted by the Government to form a binding contract. The results of this market\nresearch will assist in the development of (1) the requirement, and (2) the acquisition\nstrategy (e.g., SDVOSB/SDVOSB set-aside, small business set-aside, full and open\ncompetition, etc.). VA assumes no responsibility for any costs incurred as a result of a\nvendor s attendance to the Site-Visit nor the preparation of responses submitted as a\nresult of this notice.\n\nBill Pratt\nContract Officer\nVHA, NCO 5","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24525Q0295","place_of_performance":{"zip":"21201","city":{"code":"4000","name":"Baltimore"},"state":{"code":"MD","name":"Maryland"},"street":"Department of Veterans Affairs Maryland VA Health Care System","country":{"code":"USA","name":"UNITED STATES"},"street2":"10 North Greene Street"},"product_service_code":"J091"}],"due_at":"2025-02-25T15:00:00Z","due_date":"2025-02-25","closes_at":"2025-02-25T15:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-23T02:25:26.440577Z","principal_notice_id":"3f59c586da5a49e0a4657969c0938bd0","description":{"text":"8\nPage 8 of 57\nPage 8 of 57\n\nSUMMARY:\n\nDepartment of Veterans Affairs, Veterans Health Administration, Network Contracting\nOffice 5, is issuing this request for sources sought notice in order to identify vendors\nthat are interested in and capable of providing contractor services. For a contractor that\ncan provide a licensed MD Professional Engineer (P.E.) and STI SP001 Inspector(s). For Tank and ICP Regulatory; Training; and Tank Closure Support. To comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs). There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs. For the Baltimore VA Medical Center, Loch Raven VA Medical Center, and the Perry Point VA Medical Center.\nFor response details see Interested & Capable Responses last two pages.\n\nSCOPE OF WORK:\n\nLocations:\nBaltimore VA Medical Center Perry Point VA Medical Center\n10 North Greene Street 361 Boiler House Rd.\nBaltimore, MD 21201 Perry Point, MD 21902\n\nLoch Raven VA Medical Center\n3900 Loch Raven Blvd\nBaltimore, MD 21218\n\nTank and ICP Regulatory; Training; and Tank Closure Support for Baltimore VAMC; Loch Raven VAMC and Perry Point VAMC Integrated Contingency Plans (ICPs)\n512-25-2-637-0059\nI. INTRODUCTION\nTo comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs) Please see Attachment A for a list of VAMHCS ASTs and USTs. This list will change as tanks are added and removed.\n. There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs. ASTs and USTs fall under several environmental regulatory requirements: Section 112.7(e) of the Clean Water Act and Maryland Department of the Environment Oil Operations Permit, Code of Maryland Regulations (COMAR) 26.10.01-.18 and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001; etc; as well as the latest COMAR regulations that pertain to ASTs. This base plus four-year best value contract will provide AST subject matter expert support to accomplish the following for the Baltimore; Loch Raven; and Perry Point VAMCs:\n\nCLIN 1.0 Update Integrated Contingency Plans (ICPs)\n\nCLIN 2.0 Modify/Update and present ICP training to VAMHCS Personnel\n\nCLIN 3.0 Update VAMHCS AST/UST policies; fuel system SOPs and other tank-related documentation based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as those from NFPA; PEI; STI SP001; etc.\n\nCLIN 4.0 AST Closure support for VAMHCS tanks based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001, etc. as well as with the Resource Conservation and Recovery Act (RCRA)\n\nAll updates, support, and training shall be conducted in accordance with the following regulations:\n40 CFR 112 (Clean Water Act SPCC requirements)\n40 CFR 262.34 and 40 CFR 265.52 (RCRA Contingency Plan)\nCode of Maryland Regulations (COMAR) 26.13.05.04 (Maryland Contingency Plan Requirements)\nCOMAR 26.10.01-.18 (MDE Oil Pollution Control and Storage Tank Management) and all associated standards and references within the regulations such as those from NFPA; PEI; STI; etc.\nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nNational Fire Protection Association sections NFPA 30, Flammable and Combustible Liquids Code;\nPetroleum Equipment Institute (PEI) RP 1700;\nAll applicable state and local regulations, Executive Orders, VA Directives, and Facility Policies.\n\nII. DESCRIPTION OF WORK\n\n1.0 CLIN 1.0 ICP UPDATES\n\nThe contractor shall update the Baltimore; Loch Raven; and Perry Point VAMC ICPs as identified below and as needed each year due to technical changes from construction contracts.\n\nVISN\nFacility\nRCRA LQG\nRequired Plan Update\nDate of last update\n5\nBaltimore VAMC\nYes\nICP\n2020\n5\nPerry Point VAMC\nYes\nICP\n2021\n5\nLoch Raven VAMC\nYes\nICP\n2020\n\nAt a minimum the creation, updates and revisions for ICPs shall:\nDescribe the actions facility personnel must take to response to fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water at the facility.\nDescribe arrangements agreed to by local police departments, fire departments, hospitals, contractors, and State and local emergency response teams to coordinate emergency services.\nList names, addresses, and phone numbers (office and home) of all persons qualified to act as emergency coordinator, and this list must be kept up to date. Where more than one person is listed, one must be named as primary emergency coordinator, and others must be listed in the order in which they will assume responsibility as alternates.\nInclude a list of all emergency equipment at the facility (such as fire extinguishing systems, spill control equipment, communications and alarm systems (internal and external), and decontamination equipment), where this equipment is required. This list must be kept up to date. In addition, the plan must include the location and a physical description of each item on the list, and a brief outline of its capabilities.\nInclude an evacuation plan for facility personnel where there is a possibility that evacuation could be necessary. This plan must describe signal(s) to be used to begin evacuation, evacuation routes, and alternate evacuation routes (in cases where the primary routes could be blocked by releases of hazardous waste or fires).\nDescribe the physical layout of the facility and include a facility diagram, which must mark the location and contents of each fixed oil storage container and the storage area where mobile or portable containers are located. Including:\nType of oil in each fixed container and its storage capacity for all containers over 55 gallons. For mobile or portable containers, either provide the type of oil and storage capacity for each container or provide an estimate of the potential number of mobile or portable containers, the types of oil, and anticipated storage capacities;\nDischarge prevention measures including procedures for routine handling of products (loading, unloading, and facility transfers, etc.);\nDischarge or drainage controls such as secondary containment around containers and other structures, equipment, and procedures for the control of a discharge;\nCountermeasures for discharge discovery, response, and cleanup (both the facility's capability and those that might be required of a contractor);\nMethods of disposal of recovered materials in accordance with applicable legal requirements; and\nContact list and phone numbers for the facility response coordinator, National Response Center, cleanup contractors with whom you have an agreement for response, and all appropriate Federal, State, and local agencies who must be contacted in case of a discharge.\nProvide information and procedures to enable a person reporting a discharge to relate information on the exact address or location and phone number of the facility; the date and time of the discharge, the type of material discharged; estimates of the total quantity discharged; the source of the discharge; a description of all affected media; the cause of the discharge; any damages or injuries caused by the discharge; actions being used to stop, remove, and mitigate the effects of the discharge; whether an evacuation may be needed; and, the names of individuals and/or organizations who have also been contacted.\nInclude a prediction of the direction, rate of flow, and total quantity of oil which could be discharged from the facility as a result of each type of major equipment failure using AutoCAD or approved software.\nRecommend, if needed, appropriate containment and/or diversionary structures or equipment to prevent a discharge.\nBe certified by a Professional Engineer licensed in the state of Maryland\nIdentify written procedures for inspection, tests, and record keeping requirements.\nInclude requirements for personnel, training, and discharge prevention procedures related to:\nOperation and maintenance of equipment to prevent discharges; discharge procedure protocols; applicable pollution control laws, rules, and regulations; general facility operations; and, the contents of the facility ICP.\nKey personnel who are accountable for discharge prevention.\nDescribe how the facility will secure and control access to the oil handling, processing and storage areas; secure master flow and drain valves; prevent unauthorized access to starter controls on oil pumps; secure out-of-service and loading/unloading connections of oil pipelines; and address the appropriateness of security lighting to both prevent acts of vandalism and assist in the discovery of oil discharges.\nDescribe procedures for filling and dispensing oil at the facility and recommend methods for preventing releases.\nInclude a complete discussion of conformance with the applicable requirements and other effective discharge prevention and containment procedures required by federal, state and local guidelines.\nInclude a Quick Reference Guide (QRG).\n1.1 CLIN 1.0 Milestones, Time Lines and Project Submittals\n\nCLIN 1.0 Milestone\nCLIN 1.0 Time Line\nSite visits and investigations for all sites\nCompleted within 60 days of Notice to Proceed (NTP) and within 60 days of each Option Year start date\nDraft submission of ICPs for all sites\n90 Days after NTP and within 90 days of each Option Year start date\nCOR review period\n3 weeks after receiving drafts\nFinal Submission\n2 weeks after receiving COR comments\nCLIN 1.0 PROJECT SUBMITTALS:\n1. Draft ICP: One electronic copy should be sent to the COR. The COR will then review and provide comments to both the contractor and the site staff. Estimate two rounds of comment resolution for each draft.\n2. Final ICP: Six hardcopies (with electronic deliverable) will be delivered to the COR and VAMHCS Point of Contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs).\n3. ICP Documents: The contractor shall provide electronic access to all ICP documents.\n\n2.0 CLIN 2.0 Training\nTo comply with the requirements under the Clean Water Act and the Resource Conservation and Recovery Act, the VAMHCS Facilities of Baltimore, Perry Point, and Loch Raven will also require initial training on all new and updated ICPs.\n\nAfter the first ICP update, he contractor must provide two-hour, facility-specific, initial training to each individually identified VAMHCS facility for up to 50 employees per site (Maximum of 200 total, total 8 hours and can be done virtually, in-person or a combination of both). Contractor shall provide updates to ICP training each year following the base year. The training should provide detailed requirements related to the entire ICP; not just specific to the most recent revisions. This training will include monthly inspections; spill response and instruction on completion of documentation and recordkeeping requirements of the plan. The training shall include the submission of an electronic copy of the training for future facility training use.\n\n2.1 CLIN 2.0 Milestones, Time Lines and Project Submittals\n\nCLIN 2.0 Milestone\nCLIN 2.0 Time Line\nDraft submission of ICP Training for each of the three sites\n90 Days after NTP and within 90 days of each Option Year start date\nCOR review period\n2 weeks after receiving draft training slide deck\nFinal Submission\n2 weeks after receiving COR comments\nProvide Annual Training (Can be virtual via platform such as MS Teams)\nWithin 30 days after final submission\n\nCLIN 2.0 PROJECT SUBMITTALS:\n1. Draft ICP Training: One electronic copy should be sent to the COR for each VAMHCS facility. The COR will then review and provide comments to both the contractor and the site staff. Estimate two rounds of comment resolution for each draft.\n2. Final ICP Training: Electronic file will be delivered to the COR and point of contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs)\n3. ICP Training: The contractor shall provide ICP training either in-person or via MS Teams (or other compatible virtual platform) for real-time training to each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs).\n4. All Training Documents: The contractor shall provide electronic access to all training documents.\n\nCLIN 3.0 VAMHCS AST/UST Document Reviews and Updates\nReview all VAMHCS AST/UST policies; fuel system SOPs and other related documentation such as Technical Information Library tank-related specifications and update all documentation based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as those from NFPA; PEI; STI SP001; etc.\n\n3.1 CLIN 3.0 Milestones, Time Lines and Project Submittals\n\nCLIN 3.0 Milestone\nCLIN 3.0 Time Line\nReview of all VAMHCS AST and UST-related Documentation (Including related policies; SOPs; ICPs; Inspection Checklists; reports etc.) Assume review of 4-6 documents each year of the contract with most extensive review the first year of the contract.\nConcurrently with ICP Updates and within 90 days of each Option Year start date\nTrack Change updates to all documents reviewed with suggestions for improvement, efficiencies, etc. Please note, the latest VAMHCS document templates must be utilized. Please refer to VAMHCS COR for latest document templates.\n\nWithin 180 days of Base year start date and within 180 days of each Option year start date\nCOR review period\n2 weeks after receiving draft changes\nFinal Submission - Two versions delivered electronically to COR: 1)Version with all track changes in the document 2)Version with all track changes accepted.\n2 weeks after receiving final COR comments\n\nCLIN 3.0 PROJECT SUBMITTALS:\n1. Track Change Updates: One electronic copy should be sent to the COR for each VAMHCS document reviewed. The COR will then review and provide comments to the contractor. Estimate two rounds of comment resolution for each document reviewed.\n2. Final Documentation Updates (Track Change and Clean Versions): Electronic files of Final Track changes version and final clean versions will be delivered to the COR for each document reviewed.\n\nCLIN 4.0 Tank Closure Support:\nThe contractor shall also complete and/or oversee and review tank closure activities at the VAMHCS sites as needed, to include any tank closures as required by the following to ensure all regulatory items are completed. This will include documentation; sampling; and testing as well as removal and disposal of tank and tank contents. For estimating purposes, assume the following (however, may be subject to change):\n\nSix AST closures in the base year of contract:\n1 x 75-300 gal diesel tank (shop-fabricated)\n3x 500-700 gal diesel tanks (shop-fabricated)\n2 x 15,000 gal diesel tanks (shop-fabricated)\nThree AST closures in Year one of contract:\n1 x 75-300 gal diesel tank (shop-fabricated)\n1 x 500-700 gal diesel tank (shop-fabricated)\n1 x 150,000 gal #2 Fuel Oil tank (Field-erected)\nTwo AST closures in Year tow of contract:\n1x 1000-4000gal diesel tank (shop-fabricated) with underground piping and two subsurface sumps\n1 x 75-300 gal diesel tank (shop-fabricated)\n\nMDE does not prescribe a set number of samples per tank type or size. Assume number of samples based on worst case scenarios. For example 5-10 soil samples/AST for sizes 55 gallons to 700 gallons; 6-10 soil samples/AST for each of the 15,000-gallon tanks; and 12 shallow soil samples for the 150,000-gallon AST. Sample analyses include VOCs, MTBE, TBA, naphthalene, TPH-GRO, and TPH-DRO. Please note, this could be increased depending upon MDE requirements.\n\nClosures per COMAR 26.10 (or most recent version of MDE regulations) and\nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nPetroleum Equipment Institute (PEI) RP 1700\nSTI SP001\nResource Conservation and Recovery Act (RCRA)\n\nAll Closure documentation; Sampling and testing; Removal and disposal of tank and tank contents in accordance with all EPA; MDE; and local laws; submittal to MDE and any related onsite support will be required by the Contractor\n\nAST Closure for VAMHCS tanks shall be based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001, etc. This will include permanent and temporary closure per the following or latest COMAR regulations and MDE fact sheet (this one or latest version): https://mde.maryland.gov/programs/land/OilControl/Documents/AST_Closure_Fact_Sheet_6.9.23_6pgs.pdf:\n\n(1). At least 30 days before beginning the permanent closure of the AST system:\n(a) Notify MDE Oil AST & Permits Section, Oil Control Program Land and Materials Administration in writing of the planned AST system permanent closure; and\n\n(b) Submit to the Department for approval a proposed sampling plan for a site assessment to determine if there is evidence of a spill, release, or discharge where contamination is most likely to be present, which includes the sampling of, at a minimum, the following areas of the AST site:\n(i) Within and immediately outside of the secondary containment dike, if present;\n(ii) Within the footprint of the removed AST; and\n(iii) Beneath underground piping associated with the removed AST (if applicable);\n(2). Place the AST system out-of-service in accordance with Â§B of this regulation:\nB. Out-of-Service. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall complete each of the following steps to place the AST system out-of-service:\n\n(1) Remove all oil from the AST system;\n\n(2) Isolate all piping connected to the AST;\n\n(3) Remove all waste materials from the AST system, including storage tank- bottom sludge, and dispose of these materials in compliance with applicable federal, State, and local laws;\n\n(4) Purge all petroleum vapors and maintain the AST system vapor free;\n\n(5) Secure the AST system to prevent unauthorized entrance or tampering;\n\n(6) Protect the AST system from flotation;\n\n(7) Continue the operation and maintenance of corrosion protection on the AST system in accordance with Regulation .10 of this chapter;\n\n(8) Lock the fill port;\n\n(9) Label the AST using lettering at least 3 inches high, in a readily visible location on the AST, with the following information:\n(a) Date the AST was placed out-of-service;\n(b) Name of product last stored; and\n(c) The words \"OUT-OF-SERVICE\" or \"EMPTY\"; and\n\n(10) Notify the Department in writing 30 days before placing the AST system out-of-service.\n\n(3) Comply with PEI RP 1700 \"Recommended Practices for the Closure of Underground Storage Tank and Shop-Fabricated Aboveground Storage Tank Systems\";\n(4) Disconnect and remove all aboveground piping associated with the AST system;\n(5) Disconnect and remove all underground piping associated with the AST system:\n(a) Under the continuous on-site presence and direction of a certified UST system technician or remover; and\n(b) In accordance with the UST system permanent closure procedures inÂ COMAR 26.10.10.02D;\n(6) Remove the AST and associated piping from the site; and\n(7) Within 45 days of completing the permanent closure and approved site assessment, submit a closure report to the Department detailing:\n(a) The AST closure activities; and\n(b) The results of the sampling event, including a map identifying sample locations, laboratory results, summary of findings, and conclusions.\n\n4.1 CLIN 4.0 Milestones, Time Lines and Project Submittals\n\nCLIN 4.0 Milestone\nCLIN 4.0 Time Line\nDraft submission of all required items within latest MDE Closure regulations (see paragraphs above) such as sampling plans; drawings; etc.\n10 Days after Notification of tank closure and within 10 days of each required MDE closure item listed in the latest MDE closure regulations.\nCOR review period\n1 week after receiving draft submission\nFinal Submission\n1 week after receiving COR comments\nSubmittal to MDE\n2-3 Business days after Final Submission of the items above to COR\nProvide tank closure reports, sampling plans, testing and all related closure documentation, photos, etc. into a final report\nWithin 30 days after final submission of last closure item for each tank that is closed.\nProvide all required onsite support required (for tasks such as sampling; tank and tank contents removal and disposal etc.)\n2-4 onsite visits as required per tank closure\n\nCLIN 4.0 PROJECT SUBMITTALS:\n1. Draft Closure items required by latest MDE regulations: One electronic copy should be sent to the COR for each VAMHCS facility. The COR will then review and provide comments to both the contractor and the site staff. Estimate two rounds of comment resolution for each draft.\n2. Final Closure items required by latest MDE regulations: Electronic file will be delivered to the COR and point of contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs)\n3. Draft Tank Closure Report with all regulatory elements required: One electronic copy should be sent to the COR and point of contact for each VAMHCS facility. The COR will then review and provide comments to both the contractor and the site staff. Estimate two rounds of comment resolution for each draft.\n4. Final Tank Closure Report with all regulatory elements required: One electronic copy should be sent to the COR and point of contact for each VAMHCS facility within two weeks of receipt of COR comments.\n5. Onsite Support Schedule for reconnaissance; sampling; and tank removal/disposal: Contractor to provide at least 30 days prior to each AST closure.\n\n5.0 QUALIFICATIONS:\nPrime Contractor personnel must perform the work in this SOW and all work shall be managed by a currently licensed MD Professional Engineer (P.E.) and STI SP001 Inspector(s).\nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance successfully completing SPCC/Integrated Contingency Plans and/or plan updates and associated training.\nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance working with Maryland Oil Pollution Control regulations for ASTs and USTs and industry standards referenced within. This may include but is not limited to:\nCOMAR 26.10, Chapters 1-18 (or latest edition of MD Oil Pollution Control and Storage Tank Management regulations)\nSteel Tank Institute (STI) SP001\nPetroleum Equipment Institute (PEI) RP 1700.\nNational Fire Protection Association (NFPA) 30\n\nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance successfully completing AST permanent closures per MDE regulations and industry references within the regulations, particularly:\nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nPEI RP 1700.\nNFPA 30\nSTI SP001\n\nPrime Contractor must have an office within 200 miles of the Perry Point VA Medical Center within the area of Maryland, Delaware, Pennsylvania or Virginia/Washington, D.C.\n\nVAMHCS personnel will provide timely access to all tanks and tank areas, including unlocking of gates and fill ports as needed.\n\nContractor will be able to work onsite each day for 8-hours as needed.\n\nA total of 8 days onsite is assumed for completing Perry Point VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 1 day onsite is assumed for completing Baltimore VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 1 day onsite is assumed for completing Loch Raven VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 2-4 days onsite is assumed for completing each tank closure at the Loch Raven; Baltimore; and Perry Point VAMCs.\n\nContractor will supply appropriate personnel and monitoring during the confined space entries, when needed per OSHA standards (One vaulted tank at Perry Point VAMC is located within a confined space).\n\nThe contractor will supply an 8-foot, A-frame ladder to access tank tops. For tanks taller than that for which a catwalk, access platform, stairs, or other safe means of access are not present, contractor will provide required safety equipment per latest OSHA standards.\n\nContractor will supply an OSHA Health and Safety Plan for review by COR if requested.\n\n6.0 BACKGROUND\nAs required by the Clean Water Act and in accordance with the Code of Federal Regulations 40 CFR Section 112, facilities with an aggregate aboveground oil storage capacity greater than 1,320 gallons or an underground oil storage capacity greater than 42,000 gallons must develop, implement, and maintain an integrated Contingency Plan (ICP), which will meet the requirements for a Spill Prevention Control and Countermeasures Plan (SPCCP) and Resource Conservation and Recovery Act (RCRA) hazardous waste contingency plan. The ICP is required for facilities to prevent discharges to waters of the United States and respond to spills should they occur.\n\nPer 40 CFR 112.5, an ICP shall be amended by a 3rd party Professional Engineer (P.E.) when there is a change in facility design, construction, operation, or maintenance that affects its potential for discharge, or every five years. To do this, a 3rd party Professional Engineer licensed in the state of Maryland must certify the changes and update the associated ICP, including drawings and an update of the Quick Reference Guide (QRG). The following VA facilities are subject to this requirement: Baltimore VA Medical Center (VAMC), Perry Point VAMC, and Loch Raven VAMC.\n\nAdditionally, as required by the Resource Conservation and Recovery Act (RCRA) and in accordance with 40 CFR 262.34, generators of hazardous waste must develop, implement, and maintain a hazardous waste contingency plan. Specifically, large quantity generators must maintain a current, written contingency plan which should be updated as needed. The following VA facilities require written hazardous waste contingency plan updates: Baltimore VAMC, Perry Point VAMC, and Loch Raven VAMC.\n\nATTACHMENT A - This list may be updated as tanks are added/removed and will be provided by the VAMHCS COR to the contractor (Tanks highlighted in yellow are planned for closure and removal depending on funding and priorities)\nPERRY POINT VAMC ABOVEGROUND STORAGE TANKS (above 55gal):\nTable A-1. Aboveground Storage Tank Inventory Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI-LEVEL ALARM\nCONTAINMENT AND SPILL CONTROL FEATURES\nD-17H\nKitchen, Bldg. 17H\n3,000\nDiesel Fuel\nYes\nDouble-walled tank, overfill\nprevention device\nDT-17H\nEmergency Generator, Bldg.\n17H\n100\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD-19H\nMedical Ward, Bldg. 19H\n2,000\nDiesel Fuel\nNo\nDouble-walled tank\nD-20\nRaw Water Pumping\nStation, Bldg. 20\n605\nDiesel Fuel\nNo\nDouble-walled tank,\nSecondary containment\nD-20H/D-333\nGenerator Bldg.333,\nadjacent to Bldg. 20H\n2,000\nDiesel Fuel\nYes\nDouble-walled tank, overfill prevention device, spill bucket\nDT-20H/DT- 333\nGenerator Bldg.\n333\n150\nDiesel Fuel\nNo\nDouble-walled tank\nD-23H/D- 361G\nHospital Clinic, Bldg. 23 (Outside\nBuilding 23H)\n2,500\nDiesel Fuel\nYes\nDouble-walled tank, spill bucket\nDT-23H/DT- 361G\nEmergency Generator, Bldg.361 G\n(Outside Building 23H\n75\nDiesel Fuel\nYes\nDouble-walled tank\nDT 23H/GG106\nRoom GG 106,\nBldg. 23H (Inside\nBuilding 23H)\n75\nDiesel Fuel\nYes\nDouble walled tank\nD 103\nWater Filter\nPlant, Bldg.\n103\n4000\nDiesel Fuel\nNo\nVaulted, double walled tank with double-walled underground piping,\nSecondary containment\nDT 103A\nWater Filter\nPlant, Bldg.\n103\n242\nDiesel Fuel\nNo\nDouble walled tank, Secondary containment\nDT 103B\nWater Filter\nPlant, Bldg. 103\n242\nDiesel Fuel\nNo\nDouble walled tank, Secondary containment\n\n10\nPage 10 of 57\nPage 10 of 57\n\nTable A-1. Aboveground Storage Tank Inventory Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI-LEVEL ALARM\nCONTAINMENT AND SPILL\nCONTROL FEATURES\nD 311\nWastewater Pumping\nStation, Bldg. 311\n1,000\nDiesel Fuel\nYes\nDouble walled tank, spill bucket\nDT 311\nEmergency Generator, Bldg.\n311\n75\nDiesel Fuel\nYes\nSingle walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD 315\nBoiler Plant, Bldg.\n315\n150,000\nHeating Oil\nNo\n164,000 gallon engineered berm consisting of soil and concrete with a PVC\nliner\nD 321.A\nChiller Plant, Bldg.\n321\n500\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nDT 321.A\nEmergency Generator, Bldg.\n321\n75\nDiesel Fuel\nYes\nDouble walled tank\nD 321.B\nChiller Plant, Bldg.\n321\n15,000\nDiesel Fuel\nYes\nDouble walled tank\nDT 321.B\nChiller Plant, Bldg.\n321\n700\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD 321.C\nChiller Plant, Bldg.\n321\n15,000\nDiesel Fuel\nYes\nDouble walled tank\nDT 321.C\nChiller Plant, Bldg.\n321\n700\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD 324\nGenerator Bldg.\n324\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 325\nGenerator Bldg.\n325\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 326\nGenerator Bldg.\n326\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 327\nGenerator Bldg.\n327\n500\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\n\nPage 10 of 57\n\nTable A-1. Aboveground Storage Tank Inventory Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI- LEVEL ALAR M\nCONTAINMENT AND SPILL CONTROL FEATURES\nD 329\nGenerator Bldg.\n329\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 344\nGenerator Bldg.\n344\n550\nDiesel Fuel\nYes\nDouble walled tank; overfill\nprevention device\nDT 344\nGenerator Bldg.\n344\n25\nDiesel Fuel\nYes\nSingle-walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD 360G\nFilter Plant,\nBldg. 360G\n2,000\nDiesel Fuel\nYes\nDouble walled tank, spill\nbucket\nD-365\nGenerator Bldg.\n365\n1,000\nDiesel Fuel\nYes\nDouble-walled tank, spill bucket\nDT-365\nEmergency Generator, Bldg.\n365\n75\nDiesel Fuel\nNo\nSingle-walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD-507\nSalt Shed, Bldg.\n507\n500\nDiesel\nFuel\nNo\nDouble-walled tank\nD-11.A\nMobile Emergency\nGenerator (200 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-11.B\nMobile Emergency\nGenerator (200 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-11.C\nMobile Emergency\nGenerator (100 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-Mobile\nREMRO\n(Outside) Mobile Refueler\n275\nDiesel Fuel\nN/A\nNone\nD- REMRO\nAutomotive\nRepair Garage\n500\nHeating Oil\nNo\nSec. containment basin\nO-11\nGarage, Bldg.\n11\n275\nUsed Oil\nNo\nSec. containment basin\n\nTotal # of\nTanks Perry Point VAMC\n38\n\nBALTIMORE VAMC ABOVEGROUND STORAGE TANKS:\n\nTable A-2. Baltimore VAMC Aboveground Storage Tank Inventory\nTank No.\nLocation\nCapacity (gallons)\nProduct\nHigh-Level Alarm\nContainment and Spill Control Features\nAST 1\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nAST 2\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nAST 3\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nTotal # of Tanks\nBaltimore VAMC\n3\n\nLOCH RAVEN VAMC ABOVEGROUND STORAGE TANKS:\n\nTable A-3. Loch Raven Aboveground Storage Tank Inventory\nTank No.\nLocation\nCapacity\n(gallons)\nProduct\nHi-Level Alarm\nContainment and Spill\nControl Features\nAST-1\nBuilding 1\n(exterior)\n2,000\nDiesel fuel\nYes\nDouble-walled steel tank with double-walled underground piping\n\nDT-1\nEmergency generator day tank(exterior)\n\n75\n\nDiesel fuel\n\nNo\n\nDouble-walled\nMobile Generator\nBuilding 1\n(exterior)\n574\nDiesel fuel\nYes\nDouble-walled\nTotal # of Tanks Loch Raven VAMC\n3\n\nInterested & Capable Responses: Must respond with the following information. MUST ANSWER THE SUBCONTRACTING QUESTIONS HIGHLIGHTED BELOW.\nCONTRACTORS MUST ALSO PROVIDE THE FOLLOWING COPIES:\nMaryland Professional Engineering License / Certificate\nSP001 Inspector Certification - Aboveground Tank System Inspector\nNCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for the Washington DC VA Medical Center.\nPlease respond to this RFI/Sources Sought 36C24525Q0295 with your:\nBusiness name (including Unique Entity ID (SAM.gov)\nBusiness type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and\nPerson of contact (including telephone number & email address).\nCapability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities.\nAvailable contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS)\nBrief Summary of categories of services that your company can/cannot provide.\nCertification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable)\nConfirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response:\nDo you intend to self-perform this effort?\nIf you are located outside the immediate area, how will you self-perform?\nOr do you intend to subcontract work under this contract?\nIf you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting?\n\nResponse Instructions:\nResponses must be received by Tuesday, February 25th, 2025 @ 10:00 AM EST. Responses to the information requested above must be submitted via email to Bill Pratt\nat Billie.Pratt@va.gov. and William.Galletta@va.gov.\n\nSubject line should have: 36C24525Q0295 | Response Sources Sought Notice | Company Name.\n\nThis request for information/sources sought notice is for planning purposes ONLY and\ndoes not constitute a solicitation, responses to this notice are not offers and cannot be\naccepted by the Government to form a binding contract. The results of this market\nresearch will assist in the development of (1) the requirement, and (2) the acquisition\nstrategy (e.g., SDVOSB/SDVOSB set-aside, small business set-aside, full and open\ncompetition, etc.). VA assumes no responsibility for any costs incurred as a result of a\nvendor s attendance to the Site-Visit nor the preparation of responses submitted as a\nresult of this notice.\n\nBill Pratt\nContract Officer\nVHA, NCO 5","html":"8\nPage 8 of 57\nPage 8 of 57\n\nSUMMARY:\n\nDepartment of Veterans Affairs, Veterans Health Administration, Network Contracting\nOffice 5, is issuing this request for sources sought notice in order to identify vendors\nthat are interested in and capable of providing contractor services. For a contractor that\ncan provide a licensed MD Professional Engineer (P.E.) and STI SP001 Inspector(s). For Tank and ICP Regulatory; Training; and Tank Closure Support. To comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs). There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs. For the Baltimore VA Medical Center, Loch Raven VA Medical Center, and the Perry Point VA Medical Center. \nFor response details see Interested & Capable Responses last two pages. \n\nSCOPE OF WORK: \n\nLocations:\nBaltimore VA Medical Center  Perry Point VA Medical Center  \n10 North Greene Street   361 Boiler House Rd.\nBaltimore, MD 21201   Perry Point, MD 21902\n\nLoch Raven VA Medical Center\n3900 Loch Raven Blvd\nBaltimore, MD 21218\n\nTank and ICP Regulatory; Training; and Tank Closure Support for Baltimore VAMC; Loch Raven VAMC and Perry Point VAMC Integrated Contingency Plans (ICPs) \n512-25-2-637-0059\nI. INTRODUCTION \nTo comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs) Please see Attachment A for a list of VAMHCS ASTs and USTs.  This list will change as tanks are added and removed.\n.  There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs.  ASTs and USTs fall under several environmental regulatory requirements: Section 112.7(e) of the Clean Water Act and Maryland Department of the Environment Oil Operations Permit, Code of Maryland Regulations (COMAR) 26.10.01-.18 and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001; etc; as well as the latest COMAR regulations that pertain to ASTs.  This base plus four-year best value contract will provide AST subject matter expert support to accomplish the following for the Baltimore; Loch Raven; and Perry Point VAMCs:\n\nCLIN 1.0 Update Integrated Contingency Plans (ICPs) \n\nCLIN 2.0 Modify/Update and present ICP training to VAMHCS Personnel\n\nCLIN 3.0 Update VAMHCS AST/UST policies; fuel system SOPs and other tank-related documentation based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as those from NFPA; PEI; STI SP001; etc.\n\nCLIN 4.0 AST Closure support for VAMHCS tanks based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001, etc. as well as with the Resource Conservation and Recovery Act (RCRA)\n\nAll updates, support, and training shall be conducted in accordance with the following regulations:\n40 CFR 112 (Clean Water Act SPCC requirements)\n40 CFR 262.34 and 40 CFR 265.52 (RCRA Contingency Plan)\nCode of Maryland Regulations (COMAR) 26.13.05.04 (Maryland Contingency Plan Requirements)\nCOMAR 26.10.01-.18 (MDE Oil Pollution Control and Storage Tank Management) and all associated standards and references within the regulations such as those from NFPA; PEI; STI; etc.\nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nNational Fire Protection Association sections NFPA 30, Flammable and Combustible Liquids Code; \nPetroleum Equipment Institute (PEI) RP 1700;\nAll applicable state and local regulations, Executive Orders, VA Directives, and Facility Policies.\n\n\nII. DESCRIPTION OF WORK \n\n1.0 CLIN 1.0   ICP UPDATES\n\nThe contractor shall update the Baltimore; Loch Raven; and Perry Point VAMC ICPs as identified below and as needed each year due to technical changes from construction contracts.\n\nVISN\nFacility\nRCRA LQG\nRequired Plan Update\nDate of last update\n5\nBaltimore VAMC\nYes\nICP\n2020\n5\nPerry Point VAMC\nYes\nICP\n2021\n5\nLoch Raven VAMC\nYes\nICP \n2020\n\n  \nAt a minimum the creation, updates and revisions for ICPs shall:\nDescribe the actions facility personnel must take to response to fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water at the facility. \nDescribe arrangements agreed to by local police departments, fire departments, hospitals, contractors, and State and local emergency response teams to coordinate emergency services.\nList names, addresses, and phone numbers (office and home) of all persons qualified to act as emergency coordinator, and this list must be kept up to date. Where more than one person is listed, one must be named as primary emergency coordinator, and others must be listed in the order in which they will assume responsibility as alternates. \nInclude a list of all emergency equipment at the facility (such as fire extinguishing systems, spill control equipment, communications and alarm systems (internal and external), and decontamination equipment), where this equipment is required. This list must be kept up to date. In addition, the plan must include the location and a physical description of each item on the list, and a brief outline of its capabilities. \nInclude an evacuation plan for facility personnel where there is a possibility that evacuation could be necessary. This plan must describe signal(s) to be used to begin evacuation, evacuation routes, and alternate evacuation routes (in cases where the primary routes could be blocked by releases of hazardous waste or fires).\nDescribe the physical layout of the facility and include a facility diagram, which must mark the location and contents of each fixed oil storage container and the storage area where mobile or portable containers are located. Including:\nType of oil in each fixed container and its storage capacity for all containers over 55 gallons. For mobile or portable containers, either provide the type of oil and storage capacity for each container or provide an estimate of the potential number of mobile or portable containers, the types of oil, and anticipated storage capacities;\nDischarge prevention measures including procedures for routine handling of products (loading, unloading, and facility transfers, etc.); \nDischarge or drainage controls such as secondary containment around containers and other structures, equipment, and procedures for the control of a discharge; \nCountermeasures for discharge discovery, response, and cleanup (both the facility's capability and those that might be required of a contractor); \nMethods of disposal of recovered materials in accordance with applicable legal requirements; and \nContact list and phone numbers for the facility response coordinator, National Response Center, cleanup contractors with whom you have an agreement for response, and all appropriate Federal, State, and local agencies who must be contacted in case of a discharge.\nProvide information and procedures to enable a person reporting a discharge to relate information on the exact address or location and phone number of the facility; the date and time of the discharge, the type of material discharged; estimates of the total quantity discharged; the source of the discharge; a description of all affected media; the cause of the discharge; any damages or injuries caused by the discharge; actions being used to stop, remove, and mitigate the effects of the discharge; whether an evacuation may be needed; and, the names of individuals and/or organizations who have also been contacted.  \nInclude a prediction of the direction, rate of flow, and total quantity of oil which could be discharged from the facility as a result of each type of major equipment failure using AutoCAD or approved software. \nRecommend, if needed, appropriate containment and/or diversionary structures or equipment to prevent a discharge. \nBe certified by a Professional Engineer licensed in the state of Maryland\nIdentify written procedures for inspection, tests, and record keeping requirements.\nInclude requirements for personnel, training, and discharge prevention procedures related to:\nOperation and maintenance of equipment to prevent discharges; discharge procedure protocols; applicable pollution control laws, rules, and regulations; general facility operations; and, the contents of the facility ICP.\nKey personnel who are accountable for discharge prevention.\nDescribe how the facility will secure and control access to the oil handling, processing and storage areas; secure master flow and drain valves; prevent unauthorized access to starter controls on oil pumps; secure out-of-service and loading/unloading connections of oil pipelines; and address the appropriateness of security lighting to both prevent acts of vandalism and assist in the discovery of oil discharges. \nDescribe procedures for filling and dispensing oil at the facility and recommend methods for preventing releases. \nInclude a complete discussion of conformance with the applicable requirements and other effective discharge prevention and containment procedures required by federal, state and local guidelines.  \nInclude a Quick Reference Guide (QRG).\n1.1 CLIN 1.0   Milestones, Time Lines and Project Submittals\n\nCLIN 1.0 Milestone\nCLIN 1.0 Time Line\nSite visits and investigations for all sites\nCompleted within 60 days of Notice to Proceed (NTP) and within 60 days of each Option Year start date\nDraft submission of ICPs for all sites\n90 Days after NTP and within 90 days of each Option Year start date\nCOR review period\n3 weeks after receiving drafts\nFinal Submission \n2 weeks after receiving COR comments\nCLIN 1.0 PROJECT SUBMITTALS: \n1. Draft ICP: One electronic copy should be sent to the COR.  The COR will then review and provide comments to both the contractor and the site staff.   Estimate two rounds of comment resolution for each draft.\n2. Final ICP: Six hardcopies (with electronic deliverable) will be delivered to the COR and VAMHCS Point of Contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs).\n3. ICP Documents:  The contractor shall provide electronic access to all ICP documents.\n\n\n2.0 CLIN 2.0 Training\nTo comply with the requirements under the Clean Water Act and the Resource Conservation and Recovery Act, the VAMHCS Facilities of Baltimore, Perry Point, and Loch Raven will also require initial training on all new and updated ICPs. \n\nAfter the first ICP update, he contractor must provide two-hour, facility-specific, initial training to each individually identified VAMHCS facility for up to 50 employees per site (Maximum of 200 total, total 8 hours and can be done virtually, in-person or a combination of both).  Contractor shall provide updates to ICP training each year following the base year. The training should provide detailed requirements related to the entire ICP; not just specific to the most recent revisions. This training will include monthly inspections; spill response and instruction on completion of documentation and recordkeeping requirements of the plan. The training shall include the submission of an electronic copy of the training for future facility training use.   \n\n2.1 CLIN 2.0   Milestones, Time Lines and Project Submittals\n\nCLIN 2.0 Milestone\nCLIN 2.0 Time Line\nDraft submission of ICP Training for each of the three sites\n90 Days after NTP and within 90 days of each Option Year start date\nCOR review period\n2 weeks after receiving draft training slide deck\nFinal Submission \n2 weeks after receiving COR comments\nProvide Annual Training (Can be virtual via platform such as MS Teams)\nWithin 30 days after final submission \n\nCLIN 2.0 PROJECT SUBMITTALS: \n1. Draft ICP Training: One electronic copy should be sent to the COR for each VAMHCS facility.  The COR will then review and provide comments to both the contractor and the site staff.   Estimate two rounds of comment resolution for each draft.\n2. Final ICP Training: Electronic file will be delivered to the COR and point of contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs)\n3. ICP Training:  The contractor shall provide ICP training either in-person or via MS Teams (or other compatible virtual platform) for real-time training to each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs).\n4. All Training Documents:  The contractor shall provide electronic access to all training documents. \n\n\nCLIN 3.0 VAMHCS AST/UST Document Reviews and Updates\nReview all VAMHCS AST/UST policies; fuel system SOPs and other related documentation such as Technical Information Library tank-related specifications and update all documentation based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as those from NFPA; PEI; STI SP001; etc.\n\n3.1 CLIN 3.0   Milestones, Time Lines and Project Submittals\n\nCLIN 3.0 Milestone\nCLIN 3.0 Time Line\nReview of all VAMHCS AST and UST-related Documentation (Including related policies; SOPs; ICPs; Inspection Checklists; reports etc.)  Assume review of 4-6 documents each year of the contract with most extensive review the first year of the contract. \nConcurrently with ICP Updates and within 90 days of each Option Year start date\nTrack Change updates to all documents reviewed with suggestions for improvement, efficiencies, etc. Please note, the latest VAMHCS document templates must be utilized.  Please refer to VAMHCS COR for latest document templates.\n\nWithin 180 days of Base year start date and within 180 days of each Option year start date\nCOR review period\n2 weeks after receiving draft changes\nFinal Submission  - Two versions delivered electronically to COR:  1)Version with all track changes in the document 2)Version with all track changes accepted. \n2 weeks after receiving final COR comments\n\nCLIN 3.0 PROJECT SUBMITTALS: \n1. Track Change Updates: One electronic copy should be sent to the COR for each VAMHCS document reviewed.  The COR will then review and provide comments to the contractor.   Estimate two rounds of comment resolution for each document reviewed.\n2. Final Documentation Updates (Track Change and Clean Versions): Electronic files of Final Track changes version and final clean versions will be delivered to the COR for each document reviewed.  \n\n\nCLIN 4.0 Tank Closure Support: \nThe contractor shall also complete and/or oversee and review tank closure activities at the VAMHCS sites as needed, to include any tank closures as required by the following to ensure all regulatory items are completed.  This will include documentation; sampling; and testing as well as removal and disposal of tank and tank contents.  For estimating purposes, assume the following (however, may be subject to change):\n\nSix AST closures in the base year of contract:\n1 x 75-300 gal diesel tank (shop-fabricated)\n3x 500-700 gal diesel tanks (shop-fabricated)\n2 x 15,000 gal diesel tanks (shop-fabricated)\nThree AST closures in Year one of contract:\n1 x 75-300 gal diesel tank (shop-fabricated)\n1 x 500-700 gal diesel tank (shop-fabricated)\n1 x 150,000 gal #2 Fuel Oil tank (Field-erected)\nTwo AST closures in Year tow of contract:\n1x 1000-4000gal diesel tank (shop-fabricated) with underground piping and two subsurface sumps\n1 x 75-300 gal diesel tank (shop-fabricated)\n\nMDE does not prescribe a set number of samples per tank type or size.  Assume number of samples based on worst case scenarios.  For example 5-10 soil samples/AST for sizes 55 gallons to 700 gallons; 6-10 soil samples/AST for each of the 15,000-gallon tanks; and 12 shallow soil samples for the 150,000-gallon AST. Sample analyses include VOCs, MTBE, TBA, naphthalene, TPH-GRO, and TPH-DRO.    Please note, this could be increased depending upon MDE requirements.\n\nClosures per COMAR 26.10 (or most recent version of MDE regulations) and \nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nPetroleum Equipment Institute (PEI) RP 1700\nSTI SP001\nResource Conservation and Recovery Act (RCRA)\n\nAll Closure documentation; Sampling and testing; Removal and disposal of tank and tank contents in accordance with all EPA; MDE; and local laws; submittal to MDE and any related onsite support will be required by the Contractor\n\nAST Closure for VAMHCS tanks shall be based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001, etc.  This will include permanent and temporary closure per the following or latest COMAR regulations and MDE fact sheet (this one or latest version):  https://mde.maryland.gov/programs/land/OilControl/Documents/AST_Closure_Fact_Sheet_6.9.23_6pgs.pdf: \n\n(1). At least 30 days before beginning the permanent closure of the AST system:\n(a) Notify MDE Oil AST & Permits Section, Oil Control Program Land and Materials Administration in writing of the planned AST system permanent closure; and\n\n(b) Submit to the Department for approval a proposed sampling plan for a site assessment to determine if there is evidence of a spill, release, or discharge where contamination is most likely to be present, which includes the sampling of, at a minimum, the following areas of the AST site:\n(i) Within and immediately outside of the secondary containment dike, if present;\n(ii) Within the footprint of the removed AST; and\n(iii) Beneath underground piping associated with the removed AST (if applicable);\n(2). Place the AST system out-of-service in accordance with Â§B of this regulation:\nB. Out-of-Service. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall complete each of the following steps to place the AST system out-of-service:\n\n(1) Remove all oil from the AST system;\n\n(2) Isolate all piping connected to the AST;\n\n(3) Remove all waste materials from the AST system, including storage tank- bottom sludge, and dispose of these materials in compliance with applicable federal, State, and local laws;\n\n(4) Purge all petroleum vapors and maintain the AST system vapor free;\n\n(5) Secure the AST system to prevent unauthorized entrance or tampering;\n\n(6) Protect the AST system from flotation;\n\n(7) Continue the operation and maintenance of corrosion protection on the AST system in accordance with Regulation .10 of this chapter;\n\n(8) Lock the fill port;\n\n(9) Label the AST using lettering at least 3 inches high, in a readily visible location on the AST, with the following information:\n(a) Date the AST was placed out-of-service;\n(b) Name of product last stored; and\n(c) The words \"OUT-OF-SERVICE\" or \"EMPTY\"; and\n\n(10) Notify the Department in writing 30 days before placing the AST system out-of-service.\n\n(3) Comply with PEI RP 1700 \"Recommended Practices for the Closure of Underground Storage Tank and Shop-Fabricated Aboveground Storage Tank Systems\";\n(4) Disconnect and remove all aboveground piping associated with the AST system;\n(5) Disconnect and remove all underground piping associated with the AST system:\n(a) Under the continuous on-site presence and direction of a certified UST system technician or remover; and\n(b) In accordance with the UST system permanent closure procedures inÂ COMAR 26.10.10.02D;\n(6) Remove the AST and associated piping from the site; and\n(7) Within 45 days of completing the permanent closure and approved site assessment, submit a closure report to the Department detailing:\n(a) The AST closure activities; and\n(b) The results of the sampling event, including a map identifying sample locations, laboratory results, summary of findings, and conclusions.\n\n4.1 CLIN 4.0   Milestones, Time Lines and Project Submittals\n\nCLIN 4.0 Milestone\nCLIN 4.0 Time Line\nDraft submission of all required items within latest MDE Closure regulations (see paragraphs above) such as sampling plans; drawings; etc.\n10 Days after Notification of tank closure and within 10 days of each required MDE closure item listed in the latest MDE closure regulations.  \nCOR review period\n1 week after receiving draft submission\nFinal Submission \n1 week after receiving COR comments\nSubmittal to MDE\n2-3 Business days after Final Submission of the items above to COR\nProvide tank closure reports, sampling plans, testing and all related closure documentation, photos, etc. into a final report\nWithin 30 days after final submission of last closure item for each tank that is closed. \nProvide all required onsite support required (for tasks such as sampling; tank and tank contents removal and disposal etc.)\n2-4 onsite visits as required per tank closure\n\nCLIN 4.0 PROJECT SUBMITTALS: \n1. Draft Closure items required by latest MDE regulations: One electronic copy should be sent to the COR for each VAMHCS facility.  The COR will then review and provide comments to both the contractor and the site staff.   Estimate two rounds of comment resolution for each draft.\n2. Final Closure items required by latest MDE regulations: Electronic file will be delivered to the COR and point of contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs)\n3. Draft Tank Closure Report with all regulatory elements required:  One electronic copy should be sent to the COR and point of contact for each VAMHCS facility.  The COR will then review and provide comments to both the contractor and the site staff.   Estimate two rounds of comment resolution for each draft.\n4. Final Tank Closure Report with all regulatory elements required:  One electronic copy should be sent to the COR and point of contact for each VAMHCS facility within two weeks of receipt of COR comments.\n5. Onsite Support Schedule for reconnaissance; sampling; and tank removal/disposal:  Contractor to provide at least 30 days prior to each AST closure.\n\n\n5.0 QUALIFICATIONS:\nPrime Contractor personnel must perform the work in this SOW and all work shall be managed by a currently licensed MD Professional Engineer (P.E.) and STI SP001 Inspector(s).\nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance successfully completing SPCC/Integrated Contingency Plans and/or plan updates and associated training. \nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance working with Maryland Oil Pollution Control regulations for ASTs and USTs and industry standards referenced within.    This may include but is not limited to:\nCOMAR 26.10, Chapters 1-18 (or latest edition of MD Oil Pollution Control and Storage Tank Management regulations)\nSteel Tank Institute (STI) SP001\nPetroleum Equipment Institute (PEI) RP 1700.\nNational Fire Protection Association (NFPA) 30\n\nPrime Contractor personnel who will be performing the work on this contract must show recent (within the past three years) past performance successfully completing AST permanent closures per MDE regulations and industry references within the regulations, particularly:\nCOMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems\nCOMAR 26.10.18.12 (Closure of field-erected AST systems)\nPEI RP 1700.\nNFPA 30\nSTI SP001 \n\nPrime Contractor must have an office within 200 miles of the Perry Point VA Medical Center within the area of Maryland, Delaware, Pennsylvania or Virginia/Washington, D.C.\n\nVAMHCS personnel will provide timely access to all tanks and tank areas, including unlocking of gates and fill ports as needed.\n\nContractor will be able to work onsite each day for 8-hours as needed.\n\nA total of 8 days onsite is assumed for completing Perry Point VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 1 day onsite is assumed for completing Baltimore VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 1 day onsite is assumed for completing Loch Raven VAMC ICP updates and review of tanks for all CLINS in this SOW.\n\nA total of 2-4 days onsite is assumed for completing each tank closure at the Loch Raven; Baltimore; and Perry Point VAMCs.\n\nContractor will supply appropriate personnel and monitoring during the confined space entries, when needed per OSHA standards (One vaulted tank at Perry Point VAMC is located within a confined space).\n\nThe contractor will supply an 8-foot, A-frame ladder to access tank tops. For tanks taller than that for which a catwalk, access platform, stairs, or other safe means of access are not present, contractor will provide required safety equipment per latest OSHA standards. \n\nContractor will supply an OSHA Health and Safety Plan for review by COR if requested.\n\n6.0 BACKGROUND\nAs required by the Clean Water Act and in accordance with the Code of Federal Regulations 40 CFR Section 112, facilities with an aggregate aboveground oil storage capacity greater than 1,320 gallons or an underground oil storage capacity greater than 42,000 gallons must develop, implement, and maintain an integrated Contingency Plan (ICP), which will meet the requirements for a Spill Prevention Control and Countermeasures Plan (SPCCP) and Resource Conservation and Recovery Act (RCRA) hazardous waste contingency plan.  The ICP is required for facilities to prevent discharges to waters of the United States and respond to spills should they occur.   \n\nPer 40 CFR 112.5, an ICP shall be amended by a 3rd party Professional Engineer (P.E.) when there is a change in facility design, construction, operation, or maintenance that affects its potential for discharge, or every five years.  To do this, a 3rd party Professional Engineer licensed in the state of Maryland must certify the changes and update the associated ICP, including drawings and an update of the Quick Reference Guide (QRG).   The following VA facilities are subject to this requirement: Baltimore VA Medical Center (VAMC), Perry Point VAMC, and Loch Raven VAMC. \n\nAdditionally, as required by the Resource Conservation and Recovery Act (RCRA) and in accordance with 40 CFR 262.34, generators of hazardous waste must develop, implement, and maintain a hazardous waste contingency plan.  Specifically, large quantity generators must maintain a current, written contingency plan which should be updated as needed. The following VA facilities require written hazardous waste contingency plan updates: Baltimore VAMC, Perry Point VAMC, and Loch Raven VAMC.\n\n\n\n\n\n\n\nATTACHMENT A - This list may be updated as tanks are added/removed and will be provided by the VAMHCS COR to the contractor (Tanks highlighted in yellow are planned for closure and removal depending on funding and priorities)\nPERRY POINT VAMC ABOVEGROUND STORAGE TANKS (above 55gal):\nTable A-1. Aboveground Storage Tank Inventory   Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI-LEVEL ALARM\nCONTAINMENT AND SPILL CONTROL FEATURES\nD-17H\nKitchen, Bldg. 17H\n3,000\nDiesel Fuel\nYes\nDouble-walled tank, overfill\nprevention device\nDT-17H\nEmergency Generator, Bldg.\n17H\n100\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD-19H\nMedical Ward, Bldg. 19H\n2,000\nDiesel Fuel\nNo\nDouble-walled tank\nD-20\nRaw Water Pumping\nStation, Bldg. 20\n605\nDiesel Fuel\nNo\nDouble-walled tank,\nSecondary containment\nD-20H/D-333\nGenerator Bldg.333,\nadjacent to Bldg. 20H\n2,000\nDiesel Fuel\nYes\nDouble-walled tank, overfill prevention device, spill bucket\nDT-20H/DT- 333\nGenerator Bldg.\n333\n150\nDiesel Fuel\nNo\nDouble-walled tank\nD-23H/D- 361G\nHospital Clinic, Bldg. 23 (Outside\nBuilding 23H)\n2,500\nDiesel Fuel\nYes\nDouble-walled tank, spill bucket\nDT-23H/DT- 361G\nEmergency Generator, Bldg.361 G\n(Outside Building 23H\n75\nDiesel Fuel\nYes\nDouble-walled tank\nDT  23H/GG106\nRoom GG 106,\nBldg. 23H (Inside\nBuilding 23H)\n75\nDiesel Fuel\nYes\nDouble walled tank\nD 103\nWater Filter\nPlant, Bldg.\n103\n4000\nDiesel Fuel\nNo\nVaulted, double walled tank with double-walled underground piping,\nSecondary containment\nDT 103A\nWater Filter\nPlant, Bldg.\n103\n242\nDiesel Fuel\nNo\nDouble walled tank, Secondary containment\nDT 103B\nWater Filter\nPlant, Bldg. 103\n242\nDiesel Fuel\nNo\nDouble walled tank, Secondary containment\n\n\n\n10\nPage 10 of 57\nPage 10 of 57\n\nTable A-1. Aboveground Storage Tank Inventory   Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI-LEVEL ALARM\nCONTAINMENT AND SPILL\nCONTROL FEATURES\nD 311\nWastewater Pumping\nStation, Bldg. 311\n1,000\nDiesel Fuel\nYes\nDouble walled tank, spill bucket\nDT 311\nEmergency Generator, Bldg.\n311\n75\nDiesel Fuel\nYes\nSingle walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD 315\nBoiler Plant, Bldg.\n315\n150,000\nHeating Oil\nNo\n164,000 gallon engineered berm consisting of soil and concrete with a PVC\nliner\nD 321.A\nChiller Plant, Bldg.\n321\n500\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nDT 321.A\nEmergency Generator, Bldg.\n321\n75\nDiesel Fuel\nYes\nDouble walled tank\nD 321.B\nChiller Plant, Bldg.\n321\n15,000\nDiesel Fuel\nYes\nDouble walled tank\nDT 321.B\nChiller Plant, Bldg.\n321\n700\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD 321.C\nChiller Plant, Bldg.\n321\n15,000\nDiesel Fuel\nYes\nDouble walled tank\nDT 321.C\nChiller Plant, Bldg.\n321\n700\nDiesel Fuel\nYes\nIntegral Secondary Containment\nD 324\nGenerator Bldg.\n324\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 325\nGenerator Bldg.\n325\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 326\nGenerator Bldg.\n326\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 327\nGenerator Bldg.\n327\n500\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\n\n\n\nPage 10 of 57\n\nTable A-1. Aboveground Storage Tank Inventory   Perry Point VAMC\nTANK NO.\nLOCATION\nCAPACITY\n(gallons)\nPRODUCT\nHI- LEVEL ALAR M\nCONTAINMENT AND SPILL CONTROL FEATURES\nD 329\nGenerator Bldg.\n329\n550\nDiesel Fuel\nNo\nDouble walled tank, spill bucket\nD 344\nGenerator Bldg.\n344\n550\nDiesel Fuel\nYes\nDouble walled tank; overfill\nprevention device\nDT 344\nGenerator Bldg.\n344\n25\nDiesel Fuel\nYes\nSingle-walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD 360G\nFilter Plant,\nBldg. 360G\n2,000\nDiesel Fuel\nYes\nDouble walled tank, spill\nbucket\nD-365\nGenerator Bldg.\n365\n1,000\nDiesel Fuel\nYes\nDouble-walled tank, spill bucket\nDT-365\nEmergency Generator, Bldg.\n365\n75\nDiesel Fuel\nNo\nSingle-walled tank; secondary containment partially provided by building in conjunction with\nactive measures\nD-507\nSalt Shed, Bldg.\n507\n500\nDiesel\nFuel\nNo\nDouble-walled tank\nD-11.A\nMobile Emergency\nGenerator (200 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-11.B\nMobile Emergency\nGenerator (200 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-11.C\nMobile Emergency\nGenerator (100 kw)\n100\nDiesel Fuel\nNo\nDouble-walled tank\nD-Mobile\nREMRO\n(Outside) Mobile Refueler\n275\nDiesel Fuel\nN/A\nNone\nD- REMRO\nAutomotive\nRepair Garage\n500\nHeating Oil\nNo\nSec. containment basin\nO-11\nGarage, Bldg.\n11\n275\nUsed Oil\nNo\nSec. containment basin\n\n\nTotal # of\nTanks   Perry Point VAMC\n38\n\nBALTIMORE VAMC ABOVEGROUND STORAGE TANKS:\n\nTable A-2. Baltimore VAMC Aboveground Storage Tank Inventory\nTank No.\nLocation\nCapacity (gallons)\nProduct\nHigh-Level Alarm\nContainment and Spill Control Features\nAST 1\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nAST 2\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nAST 3\n8th floor, Room 8A-101\n300\nDiesel Fuel\nNo\nNone\nTotal # of Tanks  \nBaltimore VAMC\n3\n\n\nLOCH RAVEN VAMC ABOVEGROUND STORAGE TANKS:\n\nTable A-3. Loch Raven Aboveground Storage Tank Inventory\nTank No.\nLocation\nCapacity\n(gallons)\nProduct\nHi-Level Alarm\nContainment and Spill\n    Control Features\nAST-1\nBuilding 1\n(exterior)\n2,000\nDiesel fuel\nYes\nDouble-walled steel tank with double-walled underground piping\n\nDT-1\nEmergency generator day tank(exterior)\n\n75\n\nDiesel fuel\n\nNo\n\nDouble-walled\nMobile Generator\nBuilding 1\n(exterior)\n574\nDiesel fuel\nYes\nDouble-walled\nTotal # of Tanks   Loch Raven VAMC\n3\n\nInterested & Capable Responses: Must respond with the following information. MUST ANSWER THE SUBCONTRACTING QUESTIONS HIGHLIGHTED BELOW.\nCONTRACTORS MUST ALSO PROVIDE THE FOLLOWING COPIES:\nMaryland Professional Engineering License / Certificate \nSP001 Inspector Certification - Aboveground Tank System Inspector\nNCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for the Washington DC VA Medical Center.\nPlease respond to this RFI/Sources Sought 36C24525Q0295 with your:\nBusiness name (including Unique Entity ID (SAM.gov)\nBusiness type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and\nPerson of contact (including telephone number & email address).\nCapability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities.\nAvailable contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS)\nBrief Summary of categories of services that your company can/cannot provide.\nCertification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable)\nConfirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response:\nDo you intend to self-perform this effort? \nIf you are located outside the immediate area, how will you self-perform? \nOr do you intend to subcontract work under this contract? \nIf you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting? \n\nResponse Instructions:\nResponses must be received by Tuesday, February 25th, 2025 @ 10:00 AM EST. Responses to the information requested above must be submitted via email to Bill Pratt\nat Billie.Pratt@va.gov. and William.Galletta@va.gov. \n\nSubject line should have: 36C24525Q0295 | Response Sources Sought Notice | Company Name.\n\nThis request for information/sources sought notice is for planning purposes ONLY and\ndoes not constitute a solicitation, responses to this notice are not offers and cannot be\naccepted by the Government to form a binding contract. The results of this market\nresearch will assist in the development of (1) the requirement, and (2) the acquisition\nstrategy (e.g., SDVOSB/SDVOSB set-aside, small business set-aside, full and open\ncompetition, etc.). VA assumes no responsibility for any costs incurred as a result of a\nvendor s attendance to the Site-Visit nor the preparation of responses submitted as a\nresult of this notice.\n\n\nBill Pratt\nContract Officer \nVHA, NCO 5","origin":"detail"},"contacts":[{"name":"Bill Pratt","role":"primary","email":"Billie.Pratt@va.gov","phone":"410-642-2411","title":"Contracting Officer"}],"place_of_performance":{"zip":"21201","city":{"code":"4000","name":"Baltimore"},"state":{"code":"MD","name":"Maryland"},"street":"Department of Veterans Affairs Maryland VA Health Care System","country":{"code":"USA","name":"UNITED STATES"},"street2":"10 North Greene Street"},"office_address":{"zip":"21090","city":"LINTHICUM","state":"MD","country":"USA"},"naics_codes":["541330"],"award":{"awardee":{}},"attachments":[{"resource_id":"afe3c5a30e0b42fc95827697341c8bac","name":"36C24525Q0295.docx","kind":"file","mime_type":".docx","size_bytes":61379,"posted_at":"2025-02-07T15:27:06.214Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/afe3c5a30e0b42fc95827697341c8bac/download","mirrored":false},{"resource_id":"43a021f8616b4741bbd9af84b8fa6459","name":"VA","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-02-07T15:27:06.214Z","export_controlled":false,"sha256":null,"url":"https://www.va.gov","mirrored":false},{"resource_id":"280b741a7f00416dbb8cf41fb7561a32","name":"Sources Sought Notice - AST Support.pdf","kind":"file","mime_type":".pdf","size_bytes":330558,"posted_at":"2025-02-07T15:27:06.214Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/280b741a7f00416dbb8cf41fb7561a32/download","mirrored":false},{"resource_id":"027d4e062eac4cd9a55c02d9f73410c4","name":"WAGE DETERMINATION 2015-4215_PP.pdf","kind":"file","mime_type":".pdf","size_bytes":461261,"posted_at":"2025-02-07T15:27:06.214Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/027d4e062eac4cd9a55c02d9f73410c4/download","mirrored":false},{"resource_id":"c331e493ec3b41508fc205391909b203","name":"WAGE DETERMINATION 2015-4265_BT.pdf","kind":"file","mime_type":".pdf","size_bytes":462300,"posted_at":"2025-02-07T15:27:06.214Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c331e493ec3b41508fc205391909b203/download","mirrored":false}],"awards":[],"related":[{"key":"36C24527Q0070","latest_notice_id":"b0b1581a6a1441b9a46d407375bc44d0","title":"6550--FLOW CYTOMETERY REAGENTS AND SUPPLIES (VA-27-00016081) |","solicitation_number":"36C24527Q0070","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"325413","psc":"6550","set_aside":null,"state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T00:57:17.217280Z"},{"key":"36C24527Q0061","latest_notice_id":"0db5662de5914b458655bed9898980cf","title":"J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT","solicitation_number":"36C24527Q0061","notice_type":"o","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-18","notices":3,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"561210","psc":"J065","set_aside":"SBA","state":"MD","county":"24510","county_name":"City of Baltimore","city":"2404000","city_name":"Baltimore","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24527Q0081","latest_notice_id":"77e2cd670c3040a6ad2a1fc44daa2bc5","title":"DJ10--Alertus Enhanced Notification Licensing & Premier Support","solicitation_number":"36C24527Q0081","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"541519","psc":"DJ10","set_aside":null,"state":"WV","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"SOFTWARE LICENSING AND SUPPORT MARTINSBURG VA MEDICAL CENTER","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C24527Q0073","latest_notice_id":"6ce8b040a9be44d0972b338bc7b6cf88","title":"Arc Flash Hazard Analysis Services","solicitation_number":"36C24527Q0073","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"334515","psc":"6625","set_aside":null,"state":"WV","county":"54033","county_name":"Harrison County","city":"5415628","city_name":"Clarksburg","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24527Q0076","latest_notice_id":"9c0733493507403293e3d1367a3d19b5","title":"6530--MILITARY LITTERS, STANDS AND CARTS","solicitation_number":"36C24527Q0076","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":2,"due_at":"2026-12-02T17:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C245","office_name":"245-NETWORK CONTRACT OFFICE 5 (36C245)","naics":"337127","psc":"6530","set_aside":null,"state":"WV","county":"54037","county_name":"Jefferson County","city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":"sam_zip","state_evidence":"25430","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"}],"similar_open":[{"key":"W911QX27RA003","latest_notice_id":"dbc75676aaca427db5d9cbe46ca897e0","title":"**Amendment 0002** RFI / SOURCES SOUGHT SYNOPSIS - EXPERIMENTAL FACILITIES TECHNICIAN SUPPORT SERVICES","solicitation_number":"W911QX27RA003","notice_type":"r","first_type":"r","first_posted":"2026-11-09","last_posted":"2026-11-20","notices":3,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911QX","office_name":"W6QK ACC-APG ADELPHI","naics":"541330","psc":"AJ12","set_aside":null,"state":"MD","county":"24025","county_name":"Harford County","city":"2400175","city_name":"Aberdeen Proving Ground","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"N0016727R3103","latest_notice_id":"ecff67db7fec4d359f3d9cd4d1a87b14","title":"Weapons Effect Solicitation","solicitation_number":"N0016727R3103","notice_type":"o","first_type":"o","first_posted":"2026-10-16","last_posted":"2026-11-12","notices":4,"due_at":"2026-12-01T15:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00167","office_name":"NSWC CARDEROCK","naics":"541330","psc":"R425","set_aside":null,"state":"MD","county":"24031","county_name":"Montgomery County","city":"2407125","city_name":"Bethesda","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"N0018927SSN181126","latest_notice_id":"d0b44874405840e0bab42276608fdf75","title":"Spectrum Engineering Technical Support Services","solicitation_number":"N0018927SSN181126","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-12-02T22:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00189","office_name":"NAVSUP FLT LOG CTR NORFOLK","naics":"541330","psc":"R425","set_aside":null,"state":"MD","county":"24003","county_name":"Anne Arundel County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"}],"similar_open_total":98,"indexable":false}