{"canonical":"https://sealedbidder.com/opportunities/36c24426r0113","key":"36C24426R0113","url":"https://sealedbidder.com/opportunities/36c24426r0113","title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","solicitation_number":"36C24426R0113","notice_type":"p","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-07-13T19:00:00Z","first_posted":"2026-05-22","last_posted":"2026-11-16","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"244-NETWORK CONTRACT OFFICE 4 (36C244)","naics":"541330","psc":"C1DZ","set_aside":"SDVOSBC","place_state":"DE","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"10003","place_county_name":"New Castle County","place_city":"1077580","place_city_name":"Wilmington","winner":null,"award_amount":null,"publications":[{"notice_id":"e9e14928f94e4fbbb057f53dc59804f6","title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","solicitation_number":"36C24426R0113","notice_type":"p","base_type":"p","posted":"2026-05-22","posted_at":"2026-05-22T14:17:21.503Z","due_at":"2026-06-22T19:00:00Z","due_date":"2026-06-22","cancelled":false,"archived":true,"archive_date":"2026-08-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e9e14928f94e4fbbb057f53dc59804f6/view","enriched":true,"history":[{"index":4,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T14:37:10.782Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ed553996020841a59530ed90e2b3d18a","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":2,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-18T18:17:52.073Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"432f3fdb94de43ee8ebff0a42c77fa73","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":1,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-22T14:17:21.503Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6","solicitation_number":"36C24426R0113"}]},{"notice_id":"432f3fdb94de43ee8ebff0a42c77fa73","title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","solicitation_number":"36C24426R0113","notice_type":"p","base_type":"p","posted":"2026-06-18","posted_at":"2026-06-18T18:17:52.073Z","due_at":"2026-07-06T19:00:00Z","due_date":"2026-07-06","cancelled":false,"archived":true,"archive_date":"2026-09-04","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/432f3fdb94de43ee8ebff0a42c77fa73/view","enriched":true,"history":[{"index":4,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T14:37:10.782Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ed553996020841a59530ed90e2b3d18a","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":2,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-18T18:17:52.073Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"432f3fdb94de43ee8ebff0a42c77fa73","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":1,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-22T14:17:21.503Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6","solicitation_number":"36C24426R0113"}]},{"notice_id":"ed553996020841a59530ed90e2b3d18a","title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","solicitation_number":"36C24426R0113","notice_type":"p","base_type":"p","posted":"2026-06-26","posted_at":"2026-06-26T14:37:10.782Z","due_at":"2026-07-13T19:00:00Z","due_date":"2026-07-13","cancelled":false,"archived":true,"archive_date":"2026-09-11","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ed553996020841a59530ed90e2b3d18a/view","enriched":true,"history":[{"index":4,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T14:37:10.782Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ed553996020841a59530ed90e2b3d18a","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":2,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-18T18:17:52.073Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"432f3fdb94de43ee8ebff0a42c77fa73","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":1,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-22T14:17:21.503Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6","solicitation_number":"36C24426R0113"}]},{"notice_id":"75bb4079685e43b6b5635aa2fb62863f","title":"C1DZ--460-26-001 | Renovate Exterior of Main Hospital | NCO 4 Construction East - Cancellation Notice","solicitation_number":"36C24426R0113","notice_type":"s","base_type":"p","posted":"2026-11-16","posted_at":"2026-11-16T17:48:34.255Z","due_at":null,"due_date":null,"cancelled":false,"archived":false,"archive_date":"2027-01-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/75bb4079685e43b6b5635aa2fb62863f/view","enriched":true,"history":[{"index":2,"title":"C1DZ--460-26-001 | Renovate Exterior of Main Hospital | NCO 4 Construction East - Cancellation Notice","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T17:48:34.255Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"75bb4079685e43b6b5635aa2fb62863f","solicitation_number":"36C24426R0113","related_opportunity_id":"9e466aa179fd49fbaa4791b067f3f74c"},{"index":1,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T17:17:54.363Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"9e466aa179fd49fbaa4791b067f3f74c","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"}]},{"notice_id":"9e466aa179fd49fbaa4791b067f3f74c","title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","solicitation_number":"36C24426R0113","notice_type":"p","base_type":"p","posted":"2026-11-16","posted_at":"2026-11-16T17:17:54.363Z","due_at":"2026-07-13T19:00:00Z","due_date":"2026-07-13","cancelled":false,"archived":false,"archive_date":"2026-12-11","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9e466aa179fd49fbaa4791b067f3f74c/view","enriched":true,"history":[{"index":6,"title":"C1DZ--460-26-001 | Renovate Exterior of Main Hospital | NCO 4 Construction East - Cancellation Notice","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T17:48:34.255Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"75bb4079685e43b6b5635aa2fb62863f","solicitation_number":"36C24426R0113","related_opportunity_id":"9e466aa179fd49fbaa4791b067f3f74c"},{"index":5,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T17:17:54.363Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"9e466aa179fd49fbaa4791b067f3f74c","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":4,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-06-26T14:37:10.782Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ed553996020841a59530ed90e2b3d18a","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":2,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-06-18T18:17:52.073Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"432f3fdb94de43ee8ebff0a42c77fa73","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":1,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-05-22T14:17:21.503Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6","solicitation_number":"36C24426R0113"}]}],"latest_notice_id":"9e466aa179fd49fbaa4791b067f3f74c","first_type":"p","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-05-22","posted_at":"2026-05-22T14:17:21.503Z","created_at":"2026-05-22T14:17:19.290Z","modified_at":"2026-09-11T05:07:20.493Z","response_deadline":{"raw":"2026-06-22T15:00:00-04:00","utc":"2026-06-22T19:00:00Z","date":"2026-06-22","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e9e14928f94e4fbbb057f53dc59804f6/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","agency":{"office":{"code":"36C244","name":"244-NETWORK CONTRACT OFFICE 4 (36C244)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"15215","city":"PITTSBURGH","state":"PA","country":"USA"},"organization_id":"100163848","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-21","archive_type":"auto_custom"},"history":[{"index":4,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T14:37:10.782Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ed553996020841a59530ed90e2b3d18a","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":2,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-18T18:17:52.073Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"432f3fdb94de43ee8ebff0a42c77fa73","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":1,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-22T14:17:21.503Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6","solicitation_number":"36C24426R0113"}],"contacts":[{"name":"Hanna Karmazyn","role":"primary","email":"Hanna.Karmazyn@va.gov","phone":"302-332-5107","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"e9e14928f94e4fbbb057f53dc59804f6","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"e9e14928f94e4fbbb057f53dc59804f6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-03T03:40:05.833613563Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"9fd74266a43b4f5827c423d0ee15853c90e3f28c2d6a32eacdc0dd1cb94f77d5","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-03T03:40:05.833613563Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Page 13 of 13\nACQUISITION INFORMATION:\nThe Wilmington Department of Veterans Affairs Medical Center located at 1601 Kirkwood Highway, Wilmington DE, 19805 is seeking professional Architect and Engineering (A&E) services for Project No. 460-26-001, Renovate Exterior of Main Hospital Design.  \n\nThis announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send one copy of an SF 330 (7/2021 Edition) and CD from qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS.\nFirms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement.\n\n\nContract Award Procedure:  Interested A&E Firms should e-mail a PDF SF330 document to Hanna Karmazyn at Hanna.Karmazyn@va.gov by 3:00 PM, EST, June 22, 2026. A&E firms shall be registered at www.sam.gov and www.vetbiz.gov. If available, please include your firm's VetBiz.gov SDVOSB status verification. Failure of a proposed SDVOSB A&E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services require may be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement.  A&E Firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $25.5M apply. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY26 funding.   The construction magnitude is between $250,000.00 and $500,000.00.\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nA/E Evaluation Factors \nI. Experience and Past Performance\na. Healthcare Planning Experience \nProvide a brief overview of the firm s history and experience in healthcare planning. Include at least 5 relevant projects.\nAdd emphasis on exterior renovations, ADA accessibility upgrades, and work performed in active medical facilities requiring phasing.\n\nb. Federal Contract Experience \nDemonstrate experience with federal contracts, especially VA projects.\nInclude familiarity with VA TIL, and maintaining facility operations during construction.\nII. Design Team Proposed for This Project\na. Qualifications of Key Personnel \nProvide resumes (max 10) showing experience in healthcare and federal projects.\nInclude experience with ADA compliance, site design (grading/drainage), and life safety.\n\nb. Subconsultants \nProvide qualifications of subcontractors, especially for civil/site work, industrial hygiene, and fire/life safety.\n\nc. Design Approach \nDescribe approach to ADA, NFPA Life Safety Code, infection control, and exterior material selection.\nIII. Technical Approach\nDescribe approach to incorporating ADA, NFPA Life Safety Code, energy conservation, and site improvements.\n\nInclude understanding of renovating an active hospital entrance, maintaining safe access, and minimizing disruption through phasing.\nIV. Proposed Management Plan\na. Project Management Approach \nDescribe approach to schedule, budget, risk management, and communication.\n\nb. Work Plan and Deliverables \nProvide plan to meet design milestones (25%, 75%, 100%, final) and ability to meet submission dates.\n\nc. Compliance Standards \nDemonstrate knowledge of NFPA, NEC, OSHA, and other applicable codes.\n\nd. VA Specific Standards \nDemonstrate familiarity with VA requirements, TIL, and PDT process.\nV. Location and Knowledge of Local Area\na. Firm Location \nProvide office locations and ability to support site visits and response times.\n\nb. Local Knowledge \nDemonstrate knowledge of Wilmington VAMC, local construction conditions, and factors impacting cost and schedule\n\n\n\n\n\n\nWilmington, DE VA Medical Center\nWilmington, DE 19805\n\n\nA/E SCOPE OF WORK\n\nFor\n\n\nRenovate The Exterior Of Main Hospital\nProject No. 460-26-001\n\n\n\nBid Documents/Final Report Ready By:\n180 days after NTP\n\n-- Services --\nProvide:\nProfessional A/E and healthcare planning services to include but not limited to:\nSite investigation   architectural, structural, mechanical, electrical, and environmental services.\nContract drawings and specifications for construction.\n3rd Party Cost Estimates\nConstruction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings; A/E will respond on site within a two-hour period when requested.\nInfection Control Risk Assessment\nMeet all of the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program.  Reference at https://www.cfm.va.gov/cfm/til/index.asp\n \n-- Project Scope --\nGENERAL:\nThis project consists of the renovation of the main exterior entrance of Building 1 at the\nWilmington VA Medical Center. Work includes demolition, redesign, and reconstruction of entrance\nfeatures and installation of a new ADA-compliant handicap ramp. \nSPECIFICS:\nEvaluate and redesign entrance plaza, sidewalks, and approach paths and associated roadways\n\n   Design ADA-compliant ramp including slopes, handrails, landings\n\n   Improve drainage, grading\n\n  Upgrade exterior finishes, railings, entry features and any architectural faÃ§ade as deemed necessary \n\n \n  Maintain facility operations during construction\n\n  Identify and correct life safety deficiencies and provide phasing plan if necessary \n\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.asp  and https://wbdg.org/ffc/federal-facility-criteria. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n. \n\nOther Specifics:\nAutoCAD files of existing design will be provided for use.\nPhase all work in coordination with Hospital staff to minimize down-time to areas affected by the project.\nConstruction Waste Management, s to be included.\nDesign to maintain all infection control/ dust prevention measures.\nList all Permits necessary to complete the project.\nConsolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.aspThe A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n \n\n-- Site Investigations --\nEXPECTATION: A/E will make site visits as necessary to survey existing conditions.\nMake site visits as required to determine existing as-built conditions affecting this project.\nProvide any structural, architectural, electrical, and mechanical investigative work including all interior and exterior, of both existing and designed systems necessary to ensure the accuracy of the design.\nPrepare any measured drawings of existing systems of facility required to ensure the accuracy of the design.\nProvide a CIH to evaluate the impacted building areas for asbestos. Wilmington VA has an asbestos survey which will need to be verified.\nProvide a CIH to evaluate the impacted building areas for lead based paint. Exterior window frames have not been tested for lead based paint, but exterior doors have and several did test positive.\nNOTE:  Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov. AutoCAD background drawings will be provided by the VA upon request.\nThe A/E shall field verify all dimensions.  A/E shall field verify every aspect that relates to the project.  Coordinate site visits with the Project Engineer.\n  -- Environmental/Occupational Safety and Health (EOSH) --\nEXPECTATION: All projects and project designs shall contain language that addresses all applicable EOSH requirements.\nRegulatory Compliance   EOSH requirements for work performed at the above location can be found in:\nVolume 29 of the Code of Federal Regulations, Part 1910   Occupational Safety for General Industry\nVolume 29 of the Code of Federal Regulations, Part 1926   Occupational Safety for The Construction Industry\nVolume 40 of the Code of Federal Regulations   Protection of The Environment\nVolume 49 of the Code of Federal Regulations, Part 397   Transportation of Hazardous Materials\nTitle 7 of the Delaware Code   Conservation\nTitle 16 of the Delaware Code   Health and Safety\n\nSpecifications\nThe VA Master Construction Specifications contain work procedures and material requirements \ndesigned to meet regulatory compliance requirements.Â  Whenever possible, the Master Construction Specifications must be used as the basis for project designs.\nA complete list of these specifications can be viewed at the following website: https://www.cfm.va.gov/cfm/til/index.aspSpecifications which address EOSH requirements include, but are not limited to\n\n-- Design Review Schedule --\nEXPECTATION: Submit review packages so they are received on the noted day.\nSUBMISSIONS:\nSubmit review packages so they are received on the noted day (calendar days after NTP) or earlier:\nNotice to Proceed\nDay 0\n(0 days)\nInitial Meeting with Stakeholders\nDay 14\n(14 days)\nDesign Development Document Submission (25%)\nDay 44\n(30 days)\nPDT Review Meeting (25%)\nDay 58\n(14 days)\nDesign Development Document Submission (75%)\nDay 93\n(35 days)\nPDT Review Meeting (75%)\nDay 107\n(14 days)\nDesign Development Document Submission (100%)\nDay 152\n(45 days)\nPDT Review Meeting (100%)\nDay 166\n(14 days)\nContract Documents Submission (Final)\nDay 180\n(14 days)\nNote:  The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting.\n \n-- Specification Requirements --\n\n-- Design Requirements/Submissions --\nEXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects)\nDELIVER:\nAll design packages directly to the Project Engineer on the established dates to allow the VA to review.  A transmittal letter is required to go to the Contracting Officer on the same day as delivery.  Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006.  The manual is available at the following address: http://www.cfm.va.gov \n25% Design Development Submission:  Attachment  A  25% Submission Requirements\nChecklist of Requirements for the 25% Design Development Submission.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development)\nIdentify Working Drawings scope within construction budget\nIdentify impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\n75% Design Development Submission:  Attachment  B  75% Submission Requirements\nChecklist of Requirements for the 75% Design Development Submission.\nAddress all comments from the 25% review.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development)\nIdentify Working Drawings scope within construction budget.\nFinalize impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nPresent energy modeling and financial impacts using various types of windows for consideration.\nDevelop Infection Control Risk Assessment (VA EC-43)\nA/E shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The A/E shall provide the Project Engineer with a complete copy of the 75% documents for submission to the consulting firm.  The designated firm will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting.\n100% Design Development Submission:  Attachment  C  100% Submission Requirements\nChecklist of Requirements for the 100% Design Development Submission.\nAddress all comments from the 75% review.\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nRevise and update cost estimate\nPreparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission\nFinalize all design calculations\nFinalize all potential bid deduct alternatives\nFinalize all phasing requirements for construction\nFinalize Infection Control Risk Assessment (VA EC-43)\nAddress all comments from the VISN Safety and Fire Protection Review\nContract Documents (CD) Submission:  Attachment  D  Submission Requirements\nSubmit a complete document set of all contract requirements.  The Cover Page shall be submitted for approval signatures.  If necessary, update and submit until approved by the VA.\n \n\nATTACHMENT  A \nDeliver the following (labeled with 25% Design Development Document Submission) and include this attachment as a checklist with your submission:\n25% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F and F1.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment)\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in the newest version of Microsoft Word  (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  B \nDeliver the following (labeled with 75% Design Development Document Submission) and include this attachment as a checklist with your submission:  \n75% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall contain sample catalog cut sheets of new equipment to be installed in the design. Report shall include energy modeling reports with financial impacts of various window types. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025.     software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of Infection Control Risk Assessment.\n1 additional copy each of the custom edited VA Master Specifications and drawings as specified above are to be delivered to a third party fire and life safety firm on the same dates as delivered to the Project Manager. A letter of transmittal signifying delivery will be forwarded to the Project Manager. A/E shall utilize the services of the Network 4 Fire and Safety Engineer, to conduct a fire and life safety peer review of the project throughout the design. Comments resulted from the peer review shall be incorporated into the design at no additional cost.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  C \nDeliver the following (labeled with 100% Design Development Documents Submission) and include this attachment as a checklist with your submission:\n100% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 75% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of the Infection Control Risk Assessment.\n2 copy of drawings in AutoCAD 2025  and .pdf format and specifications in newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  D \nEXPECTATION: Submit complete bid document for final review prior to solicitation. Continue to submit bid documents until all changes are incorporated by the A/E for final signature prior to solicitation.  Upon approval duplicate copies as required.\nDeliver the following (labeled with Contract Documents Submission) and include this attachment as a checklist with your submission:\nContract Document Submission Requirements\n1 copy of the Cover Sheet (AutoCAD) for final VA signatures.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software   for final VA review.  If approved, final sets to be submitted with signed off cover sheet.\n3 copies of final project specification (two bound; one loose) prepared in newest version of Microsoft Word software.  Include a master submittal list in the specifications.\n2 CDs containing \nAll drawings in AutoCAD 2025 (.dwg) and in .pdf file\nAll specifications in newest version of Microsoft Word \nSubmittal Spreadsheet   identifying all the submittals required to be submitted by the contractor for review.  The list shall be organized by division and specification.\nUpon signature approval, provide five sets of final Contract Documents (complete with VA signed Cover Sheet).  Provide two Â½ size sets of final drawings.\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT   E \n\nA/E  SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE\n\nDEPARTMENT OF VETERANS AFFAIRS\nA/E REGULATIONS ASBESTOS ABATEMENT\nThe A/E shall hire a Certified Industrial Hygienist (CIH) Consultant to assist in the assessment and design for asbestos abatement.\nThe CIH shall meet the following minimum qualifications:\nBe certified by the American Board of Industrial Hygienists in Industrial Hygiene-Comprehensive.\nHave asbestos abatement experience in assessment, design, abatement, construction monitoring and decontamination clearance.\nHis office to be as close as possible to the project location, so that he will be available to the COTR during construction on an on-call basis with a response time of one day.\nWill have support staff and back-up capacity to provide adequate level of support to the COTR throughout construction.\nThe scope of work for the A/E with his CIH consultant is as follows:\nPreliminary (25%) Design\nTask 1:  Review building records and interview station personnel for detection of trade name material used for the construction of the buildings, which are known to contain asbestos.  Perform a visual inspection of the areas impacted and develop a sampling strategy that will yield statistically viable conclusions on extent of asbestos present.  Perform this task at the first preliminary submittal and notify VA on results at 100% submission.\nFinal (75 and 100% Reviews) Design\nTask 2:  Collect bulk suspected asbestos samples and utilize the services of a testing lab accredited by the American Industrial Hygienists Association.\nUpon receiving the results determine adequacy for an assessment report.  Any samples requiring further clarification, utilizing scanning electron microscopy (SEM), need to be contracted to a qualified laboratory for sample analysis.  If additional samples are required, take such samples at this stage so that the maximum detection of asbestos can be achieved.  This service (bulk sampling) will be at no cost.\nTask 3:  Prepare an exposure assessment report on only the impacted areas of the modification project.  Include the following information:\nDescribe the impacted areas by sketches, room names or other means.  Show or describe the location of each sample taken, its composition and identification number.\nClassify each impacted space as  Major Abatement   Minor Abatement  or  No Abatement  areas.  A  Major Abatement  area requires full protective measures (sealing off, change room, shower room, etc.), and all asbestos must be removed within the limits of the area.  A  Minor Abatement  area can be decontaminated with one or more applications of the  glove and bag  approach.  A  No Abatement  area requires no abatement work.\nFor each  Major Abatement  area, provide quantity and cost estimates of all asbestos within the limits of the area.  Quantities to be in linear feet of pipe and square feet of ceilings and walls.  The cost to be derived from the quantities multiplied by a unit price.\nFor each  Minor Abatement  area, provide the description, size and location of each element to be decontaminated and a cost estimate.\nProvide summary of the square feet of floor space for all abatement areas, the total linear and square feet of asbestos to be abated, the total cost of abatement and a preliminary schedule of completion.  Include in the cost estimate any cost for decontamination.\nProvide an assessment on the impact of abatement on building sub-systems such as ceilings, lights, walls, carpets, pipes and equipment.  Provide room-by-room description and estimated quantities of impacted items to be placed (number of lighting fixtures, square feet of ceiling, etc.) and a summary of these quantities.  Provide a cost estimate for all impacted items.\nProvide a cover statement signed by both the A/E and the CIH consultant.  The statement shall be in accordance with the  Sample Cover Statement  provided by the VA, as part of the A/E package.\nSubmit the report at the 75% Design Review Submission.\nTask 4:  Prepare drawings and specifications for the asbestos abatement work reflecting the assessment report.  The drawings shall be separately identified from the rest of the drawings, be 1/8  scale plans and shall provide as a minimum the following information.\nFor each  Major Abatement  area show the limits of sealing off, the location and quantities of asbestos material, the arrangements for auxiliary rooms, such as change room, shower room, etc., transportation to the loading platform.\nFor each  Minor Abatement  area show on plans the exact location type and length of pipe element to be abated by the  glove and bag  approach and any other abatement features.\nProvide details, sections, notes and any other information that are necessary for complete bid documents.\nPrepare project specifications by editing and modifying the VA master specifications on asbestos abatement.\nProvide the drawings and specifications for the restoration of the impacted building sub-systems as an integral part of the overall project design.  Provide for replacing of removed asbestos insulation with acceptable non-asbestos insulation, replacing contaminated carpets, replacing old contaminated light fixtures and replacing partially torn down plaster ceilings.\nThe submittals of the working drawings for abatement shall coincide with the submittals for the working drawings of the modification project.\nProvide an integrated phasing showing how the abatement and the general modification work will be executed.  Provide some reasonable cushion between each abatement phase and the following general construction phase to allow for unforeseen delays in abatement completion.\nTask 5:  Assist VA to determine whether the abatement sub-contractor meets qualification requirements.  \nExcluded from the scope of work (to be completed by others):\nProvide onsite continuous monitoring during construction of the performance of the abatement sub-contractor.  Check and approve the set-up for each  Major Abatement  area, check the standard operating procedure of the abatement contractor, continuously monitor air contamination inspections to ensure compliance with specifications and drawings, and monitor access/egress into containment areas. Determine abatement of asbestos discovered during construction and advise the COTR on time and cost for such abatement.\nPerform the final inspection and testing at the end of the abatement work on the area and if the results are satisfactory, release the space to the general contractor for general work.\nAt the end of all abatement work, a compliance certificate signed by both the CIH and the A/E shall be issued.  The compliance certificate shall be in accordance with the  Sample Certificate  provided by the VA in the A/E package.\n \nATTACHMENT  E-1\n\nA/E  SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE 19805\n\nCOVER STATEMENT FOR ASBESTOS ASSESSMENT REPORT\n\n The enclosed Asbestos Assessment Report for                                     has been prepared, as part of Project #                         and covers the following buildings                                               .   I certify that I have surveyed each of the buildings or areas in my contract, have interviewed station personnel and have supervised technicians for the examination of available records related to the buildings.\nBased on the information gathered through the above activities and on the expected extent of the renovation as explained to me by                                               of the A/E firm on this project, I have devised a sampling plan and I have supervised the trained Industrial Hygiene Technicians during the collection of the samples.\nI have selected a qualified analytical laboratory for the analysis of the samples and I have evaluated the sampling results to ensure that statistically viable results on asbestos hazards were available for all buildings involved.\nBases on the above information, I have prepared the attached Asbestos Hazard Assessment Report.  This report reflects the best-known abatement technology, the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects and all applicable regulations.  An abatement design, which will be prepared by a qualified abatement contractor, will achieve the desired decontamination of the impacted areas and minimize exposure of people and the environment.\n\n\n\n\n\n (C. I. H.  NAME, CERTIFICATION  NO. & STATE CERTIFIED IN)","text":"Page 13 of 13\nACQUISITION INFORMATION:\nThe Wilmington Department of Veterans Affairs Medical Center located at 1601 Kirkwood Highway, Wilmington DE, 19805 is seeking professional Architect and Engineering (A&E) services for Project No. 460-26-001, Renovate Exterior of Main Hospital Design.\n\nThis announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send one copy of an SF 330 (7/2021 Edition) and CD from qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS.\nFirms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement.\n\nContract Award Procedure: Interested A&E Firms should e-mail a PDF SF330 document to Hanna Karmazyn at Hanna.Karmazyn@va.gov by 3:00 PM, EST, June 22, 2026. A&E firms shall be registered at www.sam.gov and www.vetbiz.gov. If available, please include your firm's VetBiz.gov SDVOSB status verification. Failure of a proposed SDVOSB A&E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services require may be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement. A&E Firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $25.5M apply. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY26 funding. The construction magnitude is between $250,000.00 and $500,000.00.\n\nA/E Evaluation Factors\nI. Experience and Past Performance\na. Healthcare Planning Experience\nProvide a brief overview of the firm s history and experience in healthcare planning. Include at least 5 relevant projects.\nAdd emphasis on exterior renovations, ADA accessibility upgrades, and work performed in active medical facilities requiring phasing.\n\nb. Federal Contract Experience\nDemonstrate experience with federal contracts, especially VA projects.\nInclude familiarity with VA TIL, and maintaining facility operations during construction.\nII. Design Team Proposed for This Project\na. Qualifications of Key Personnel\nProvide resumes (max 10) showing experience in healthcare and federal projects.\nInclude experience with ADA compliance, site design (grading/drainage), and life safety.\n\nb. Subconsultants\nProvide qualifications of subcontractors, especially for civil/site work, industrial hygiene, and fire/life safety.\n\nc. Design Approach\nDescribe approach to ADA, NFPA Life Safety Code, infection control, and exterior material selection.\nIII. Technical Approach\nDescribe approach to incorporating ADA, NFPA Life Safety Code, energy conservation, and site improvements.\n\nInclude understanding of renovating an active hospital entrance, maintaining safe access, and minimizing disruption through phasing.\nIV. Proposed Management Plan\na. Project Management Approach\nDescribe approach to schedule, budget, risk management, and communication.\n\nb. Work Plan and Deliverables\nProvide plan to meet design milestones (25%, 75%, 100%, final) and ability to meet submission dates.\n\nc. Compliance Standards\nDemonstrate knowledge of NFPA, NEC, OSHA, and other applicable codes.\n\nd. VA Specific Standards\nDemonstrate familiarity with VA requirements, TIL, and PDT process.\nV. Location and Knowledge of Local Area\na. Firm Location\nProvide office locations and ability to support site visits and response times.\n\nb. Local Knowledge\nDemonstrate knowledge of Wilmington VAMC, local construction conditions, and factors impacting cost and schedule\n\nWilmington, DE VA Medical Center\nWilmington, DE 19805\n\nA/E SCOPE OF WORK\n\nFor\n\nRenovate The Exterior Of Main Hospital\nProject No. 460-26-001\n\nBid Documents/Final Report Ready By:\n180 days after NTP\n\n-- Services --\nProvide:\nProfessional A/E and healthcare planning services to include but not limited to:\nSite investigation architectural, structural, mechanical, electrical, and environmental services.\nContract drawings and specifications for construction.\n3rd Party Cost Estimates\nConstruction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings; A/E will respond on site within a two-hour period when requested.\nInfection Control Risk Assessment\nMeet all of the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program. Reference at https://www.cfm.va.gov/cfm/til/index.asp\n\n-- Project Scope --\nGENERAL:\nThis project consists of the renovation of the main exterior entrance of Building 1 at the\nWilmington VA Medical Center. Work includes demolition, redesign, and reconstruction of entrance\nfeatures and installation of a new ADA-compliant handicap ramp.\nSPECIFICS:\nEvaluate and redesign entrance plaza, sidewalks, and approach paths and associated roadways\n\nDesign ADA-compliant ramp including slopes, handrails, landings\n\nImprove drainage, grading\n\nUpgrade exterior finishes, railings, entry features and any architectural faÃ§ade as deemed necessary\n\nMaintain facility operations during construction\n\nIdentify and correct life safety deficiencies and provide phasing plan if necessary\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.asp and https://wbdg.org/ffc/federal-facility-criteria. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n.\n\nOther Specifics:\nAutoCAD files of existing design will be provided for use.\nPhase all work in coordination with Hospital staff to minimize down-time to areas affected by the project.\nConstruction Waste Management, s to be included.\nDesign to maintain all infection control/ dust prevention measures.\nList all Permits necessary to complete the project.\nConsolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.aspThe A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n\n-- Site Investigations --\nEXPECTATION: A/E will make site visits as necessary to survey existing conditions.\nMake site visits as required to determine existing as-built conditions affecting this project.\nProvide any structural, architectural, electrical, and mechanical investigative work including all interior and exterior, of both existing and designed systems necessary to ensure the accuracy of the design.\nPrepare any measured drawings of existing systems of facility required to ensure the accuracy of the design.\nProvide a CIH to evaluate the impacted building areas for asbestos. Wilmington VA has an asbestos survey which will need to be verified.\nProvide a CIH to evaluate the impacted building areas for lead based paint. Exterior window frames have not been tested for lead based paint, but exterior doors have and several did test positive.\nNOTE: Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov. AutoCAD background drawings will be provided by the VA upon request.\nThe A/E shall field verify all dimensions. A/E shall field verify every aspect that relates to the project. Coordinate site visits with the Project Engineer.\n-- Environmental/Occupational Safety and Health (EOSH) --\nEXPECTATION: All projects and project designs shall contain language that addresses all applicable EOSH requirements.\nRegulatory Compliance EOSH requirements for work performed at the above location can be found in:\nVolume 29 of the Code of Federal Regulations, Part 1910 Occupational Safety for General Industry\nVolume 29 of the Code of Federal Regulations, Part 1926 Occupational Safety for The Construction Industry\nVolume 40 of the Code of Federal Regulations Protection of The Environment\nVolume 49 of the Code of Federal Regulations, Part 397 Transportation of Hazardous Materials\nTitle 7 of the Delaware Code Conservation\nTitle 16 of the Delaware Code Health and Safety\n\nSpecifications\nThe VA Master Construction Specifications contain work procedures and material requirements\ndesigned to meet regulatory compliance requirements.Â Whenever possible, the Master Construction Specifications must be used as the basis for project designs.\nA complete list of these specifications can be viewed at the following website: https://www.cfm.va.gov/cfm/til/index.aspSpecifications which address EOSH requirements include, but are not limited to\n\n-- Design Review Schedule --\nEXPECTATION: Submit review packages so they are received on the noted day.\nSUBMISSIONS:\nSubmit review packages so they are received on the noted day (calendar days after NTP) or earlier:\nNotice to Proceed\nDay 0\n(0 days)\nInitial Meeting with Stakeholders\nDay 14\n(14 days)\nDesign Development Document Submission (25%)\nDay 44\n(30 days)\nPDT Review Meeting (25%)\nDay 58\n(14 days)\nDesign Development Document Submission (75%)\nDay 93\n(35 days)\nPDT Review Meeting (75%)\nDay 107\n(14 days)\nDesign Development Document Submission (100%)\nDay 152\n(45 days)\nPDT Review Meeting (100%)\nDay 166\n(14 days)\nContract Documents Submission (Final)\nDay 180\n(14 days)\nNote: The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting.\n\n-- Specification Requirements --\n\n-- Design Requirements/Submissions --\nEXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects)\nDELIVER:\nAll design packages directly to the Project Engineer on the established dates to allow the VA to review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006. The manual is available at the following address: http://www.cfm.va.gov\n25% Design Development Submission: Attachment A 25% Submission Requirements\nChecklist of Requirements for the 25% Design Development Submission.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development)\nIdentify Working Drawings scope within construction budget\nIdentify impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\n75% Design Development Submission: Attachment B 75% Submission Requirements\nChecklist of Requirements for the 75% Design Development Submission.\nAddress all comments from the 25% review.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development)\nIdentify Working Drawings scope within construction budget.\nFinalize impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nPresent energy modeling and financial impacts using various types of windows for consideration.\nDevelop Infection Control Risk Assessment (VA EC-43)\nA/E shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The A/E shall provide the Project Engineer with a complete copy of the 75% documents for submission to the consulting firm. The designated firm will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting.\n100% Design Development Submission: Attachment C 100% Submission Requirements\nChecklist of Requirements for the 100% Design Development Submission.\nAddress all comments from the 75% review.\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nRevise and update cost estimate\nPreparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission\nFinalize all design calculations\nFinalize all potential bid deduct alternatives\nFinalize all phasing requirements for construction\nFinalize Infection Control Risk Assessment (VA EC-43)\nAddress all comments from the VISN Safety and Fire Protection Review\nContract Documents (CD) Submission: Attachment D Submission Requirements\nSubmit a complete document set of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA.\n\nATTACHMENT A\nDeliver the following (labeled with 25% Design Development Document Submission) and include this attachment as a checklist with your submission:\n25% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F and F1.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment)\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in the newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT B\nDeliver the following (labeled with 75% Design Development Document Submission) and include this attachment as a checklist with your submission:\n75% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall contain sample catalog cut sheets of new equipment to be installed in the design. Report shall include energy modeling reports with financial impacts of various window types. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025. software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of Infection Control Risk Assessment.\n1 additional copy each of the custom edited VA Master Specifications and drawings as specified above are to be delivered to a third party fire and life safety firm on the same dates as delivered to the Project Manager. A letter of transmittal signifying delivery will be forwarded to the Project Manager. A/E shall utilize the services of the Network 4 Fire and Safety Engineer, to conduct a fire and life safety peer review of the project throughout the design. Comments resulted from the peer review shall be incorporated into the design at no additional cost.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT C\nDeliver the following (labeled with 100% Design Development Documents Submission) and include this attachment as a checklist with your submission:\n100% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 75% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of the Infection Control Risk Assessment.\n2 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT D\nEXPECTATION: Submit complete bid document for final review prior to solicitation. Continue to submit bid documents until all changes are incorporated by the A/E for final signature prior to solicitation. Upon approval duplicate copies as required.\nDeliver the following (labeled with Contract Documents Submission) and include this attachment as a checklist with your submission:\nContract Document Submission Requirements\n1 copy of the Cover Sheet (AutoCAD) for final VA signatures.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software for final VA review. If approved, final sets to be submitted with signed off cover sheet.\n3 copies of final project specification (two bound; one loose) prepared in newest version of Microsoft Word software. Include a master submittal list in the specifications.\n2 CDs containing\nAll drawings in AutoCAD 2025 (.dwg) and in .pdf file\nAll specifications in newest version of Microsoft Word\nSubmittal Spreadsheet identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification.\nUpon signature approval, provide five sets of final Contract Documents (complete with VA signed Cover Sheet). Provide two Â½ size sets of final drawings.\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT E\n\nA/E SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE\n\nDEPARTMENT OF VETERANS AFFAIRS\nA/E REGULATIONS ASBESTOS ABATEMENT\nThe A/E shall hire a Certified Industrial Hygienist (CIH) Consultant to assist in the assessment and design for asbestos abatement.\nThe CIH shall meet the following minimum qualifications:\nBe certified by the American Board of Industrial Hygienists in Industrial Hygiene-Comprehensive.\nHave asbestos abatement experience in assessment, design, abatement, construction monitoring and decontamination clearance.\nHis office to be as close as possible to the project location, so that he will be available to the COTR during construction on an on-call basis with a response time of one day.\nWill have support staff and back-up capacity to provide adequate level of support to the COTR throughout construction.\nThe scope of work for the A/E with his CIH consultant is as follows:\nPreliminary (25%) Design\nTask 1: Review building records and interview station personnel for detection of trade name material used for the construction of the buildings, which are known to contain asbestos. Perform a visual inspection of the areas impacted and develop a sampling strategy that will yield statistically viable conclusions on extent of asbestos present. Perform this task at the first preliminary submittal and notify VA on results at 100% submission.\nFinal (75 and 100% Reviews) Design\nTask 2: Collect bulk suspected asbestos samples and utilize the services of a testing lab accredited by the American Industrial Hygienists Association.\nUpon receiving the results determine adequacy for an assessment report. Any samples requiring further clarification, utilizing scanning electron microscopy (SEM), need to be contracted to a qualified laboratory for sample analysis. If additional samples are required, take such samples at this stage so that the maximum detection of asbestos can be achieved. This service (bulk sampling) will be at no cost.\nTask 3: Prepare an exposure assessment report on only the impacted areas of the modification project. Include the following information:\nDescribe the impacted areas by sketches, room names or other means. Show or describe the location of each sample taken, its composition and identification number.\nClassify each impacted space as Major Abatement Minor Abatement or No Abatement areas. A Major Abatement area requires full protective measures (sealing off, change room, shower room, etc.), and all asbestos must be removed within the limits of the area. A Minor Abatement area can be decontaminated with one or more applications of the glove and bag approach. A No Abatement area requires no abatement work.\nFor each Major Abatement area, provide quantity and cost estimates of all asbestos within the limits of the area. Quantities to be in linear feet of pipe and square feet of ceilings and walls. The cost to be derived from the quantities multiplied by a unit price.\nFor each Minor Abatement area, provide the description, size and location of each element to be decontaminated and a cost estimate.\nProvide summary of the square feet of floor space for all abatement areas, the total linear and square feet of asbestos to be abated, the total cost of abatement and a preliminary schedule of completion. Include in the cost estimate any cost for decontamination.\nProvide an assessment on the impact of abatement on building sub-systems such as ceilings, lights, walls, carpets, pipes and equipment. Provide room-by-room description and estimated quantities of impacted items to be placed (number of lighting fixtures, square feet of ceiling, etc.) and a summary of these quantities. Provide a cost estimate for all impacted items.\nProvide a cover statement signed by both the A/E and the CIH consultant. The statement shall be in accordance with the Sample Cover Statement provided by the VA, as part of the A/E package.\nSubmit the report at the 75% Design Review Submission.\nTask 4: Prepare drawings and specifications for the asbestos abatement work reflecting the assessment report. The drawings shall be separately identified from the rest of the drawings, be 1/8 scale plans and shall provide as a minimum the following information.\nFor each Major Abatement area show the limits of sealing off, the location and quantities of asbestos material, the arrangements for auxiliary rooms, such as change room, shower room, etc., transportation to the loading platform.\nFor each Minor Abatement area show on plans the exact location type and length of pipe element to be abated by the glove and bag approach and any other abatement features.\nProvide details, sections, notes and any other information that are necessary for complete bid documents.\nPrepare project specifications by editing and modifying the VA master specifications on asbestos abatement.\nProvide the drawings and specifications for the restoration of the impacted building sub-systems as an integral part of the overall project design. Provide for replacing of removed asbestos insulation with acceptable non-asbestos insulation, replacing contaminated carpets, replacing old contaminated light fixtures and replacing partially torn down plaster ceilings.\nThe submittals of the working drawings for abatement shall coincide with the submittals for the working drawings of the modification project.\nProvide an integrated phasing showing how the abatement and the general modification work will be executed. Provide some reasonable cushion between each abatement phase and the following general construction phase to allow for unforeseen delays in abatement completion.\nTask 5: Assist VA to determine whether the abatement sub-contractor meets qualification requirements.\nExcluded from the scope of work (to be completed by others):\nProvide onsite continuous monitoring during construction of the performance of the abatement sub-contractor. Check and approve the set-up for each Major Abatement area, check the standard operating procedure of the abatement contractor, continuously monitor air contamination inspections to ensure compliance with specifications and drawings, and monitor access/egress into containment areas. Determine abatement of asbestos discovered during construction and advise the COTR on time and cost for such abatement.\nPerform the final inspection and testing at the end of the abatement work on the area and if the results are satisfactory, release the space to the general contractor for general work.\nAt the end of all abatement work, a compliance certificate signed by both the CIH and the A/E shall be issued. The compliance certificate shall be in accordance with the Sample Certificate provided by the VA in the A/E package.\n\nATTACHMENT E-1\n\nA/E SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE 19805\n\nCOVER STATEMENT FOR ASBESTOS ASSESSMENT REPORT\n\nThe enclosed Asbestos Assessment Report for has been prepared, as part of Project # and covers the following buildings . I certify that I have surveyed each of the buildings or areas in my contract, have interviewed station personnel and have supervised technicians for the examination of available records related to the buildings.\nBased on the information gathered through the above activities and on the expected extent of the renovation as explained to me by of the A/E firm on this project, I have devised a sampling plan and I have supervised the trained Industrial Hygiene Technicians during the collection of the samples.\nI have selected a qualified analytical laboratory for the analysis of the samples and I have evaluated the sampling results to ensure that statistically viable results on asbestos hazards were available for all buildings involved.\nBases on the above information, I have prepared the attached Asbestos Hazard Assessment Report. This report reflects the best-known abatement technology, the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects and all applicable regulations. An abatement design, which will be prepared by a qualified abatement contractor, will achieve the desired decontamination of the impacted areas and minimize exposure of people and the environment.\n\n(C. I. H. NAME, CERTIFICATION NO. & STATE CERTIFIED IN)","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C24426R0113","place_of_performance":{"zip":"19805","city":{"code":"77580","name":"Wilmington"},"state":{"code":"DE","name":"Delaware"},"street":"Wilmington DE VAMC","country":{"code":"USA","name":"UNITED STATES"},"street2":"1601 Kirkwood Highway"},"product_service_code":"C1DZ"},{"award":{"awardee":{}},"dates":{"posted":"2026-06-18","posted_at":"2026-06-18T18:17:52.073Z","created_at":"2026-06-18T18:17:47.518Z","modified_at":"2026-09-11T05:07:20.493Z","response_deadline":{"raw":"2026-07-06T15:00:00-04:00","utc":"2026-07-06T19:00:00Z","date":"2026-07-06","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/432f3fdb94de43ee8ebff0a42c77fa73/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","agency":{"office":{"code":"36C244","name":"244-NETWORK CONTRACT OFFICE 4 (36C244)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"15215","city":"PITTSBURGH","state":"PA","country":"USA"},"organization_id":"100163848","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-09-04","archive_type":"auto_custom"},"history":[{"index":4,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T14:37:10.782Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ed553996020841a59530ed90e2b3d18a","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":2,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-18T18:17:52.073Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"432f3fdb94de43ee8ebff0a42c77fa73","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":1,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-22T14:17:21.503Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6","solicitation_number":"36C24426R0113"}],"contacts":[{"name":"Hanna Karmazyn","role":"primary","email":"Hanna.Karmazyn@va.gov","phone":"302-332-5107","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"432f3fdb94de43ee8ebff0a42c77fa73","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"e9e14928f94e4fbbb057f53dc59804f6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-02T01:24:42.991254056Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"25f1c2902a9252877a1f4a01957ccaefb2ee05582a6bbe51354afd3dd0bb52f5","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-02T01:24:42.991254056Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Page 13 of 13\nCorrection made to typo in estimated construction magnitude value in the highlighted statement below. Additional clarifications have also been added and are highlighted at the end of the document. An Extension to the due date has been made to account for the changes. All other details remain as originally posted.\nACQUISITION INFORMATION:\nThe Wilmington Department of Veterans Affairs Medical Center located at 1601 Kirkwood Highway, Wilmington DE, 19805 is seeking professional Architect and Engineering (A&E) services for Project No. 460-26-001, Renovate Exterior of Main Hospital Design.  \n\nThis announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send one copy of an SF 330 (7/2021 Edition) and CD from qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS.\nFirms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement.\n\n\nContract Award Procedure:  Interested A&E Firms should e-mail a PDF SF330 document to Hanna Karmazyn at Hanna.Karmazyn@va.gov by 3:00 PM, EST, July 6, 2026. A&E firms shall be registered at www.sam.gov and www.vetbiz.gov. If available, please include your firm's VetBiz.gov SDVOSB status verification. Failure of a proposed SDVOSB A&E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services require may be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement.  A&E Firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $25.5M apply. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY26 funding.   The construction magnitude is between $2,000,000.00 and $5,000,000.00.\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nA/E Evaluation Factors \nI. Experience and Past Performance\na. Healthcare Planning Experience \nProvide a brief overview of the firm s history and experience in healthcare planning. Include at least 5 relevant projects.\nAdd emphasis on exterior renovations, ADA accessibility upgrades, and work performed in active medical facilities requiring phasing.\n\nb. Federal Contract Experience \nDemonstrate experience with federal contracts, especially VA projects.\nInclude familiarity with VA TIL, and maintaining facility operations during construction.\nII. Design Team Proposed for This Project\na. Qualifications of Key Personnel \nProvide resumes (max 10) showing experience in healthcare and federal projects.\nInclude experience with ADA compliance, site design (grading/drainage), and life safety.\n\nb. Subconsultants \nProvide qualifications of subcontractors, especially for civil/site work, industrial hygiene, and fire/life safety.\n\nc. Design Approach \nDescribe approach to ADA, NFPA Life Safety Code, infection control, and exterior material selection.\nIII. Technical Approach\nDescribe approach to incorporating ADA, NFPA Life Safety Code, energy conservation, and site improvements.\n\nInclude understanding of renovating an active hospital entrance, maintaining safe access, and minimizing disruption through phasing.\nIV. Proposed Management Plan\na. Project Management Approach \nDescribe approach to schedule, budget, risk management, and communication.\n\nb. Work Plan and Deliverables \nProvide plan to meet design milestones (25%, 75%, 100%, final) and ability to meet submission dates.\n\nc. Compliance Standards \nDemonstrate knowledge of NFPA, NEC, OSHA, and other applicable codes.\n\nd. VA Specific Standards \nDemonstrate familiarity with VA requirements, TIL, and PDT process.\nV. Location and Knowledge of Local Area\na. Firm Location \nProvide office locations and ability to support site visits and response times.\n\nb. Local Knowledge \nDemonstrate knowledge of Wilmington VAMC, local construction conditions, and factors impacting cost and schedule\n\n\n\n\n\n\nWilmington, DE VA Medical Center\nWilmington, DE 19805\n\n\nA/E SCOPE OF WORK\n\nFor\n\n\nRenovate The Exterior Of Main Hospital\nProject No. 460-26-001\n\n\n\nBid Documents/Final Report Ready By:\n180 days after NTP\n\n-- Services --\nProvide:\nProfessional A/E and healthcare planning services to include but not limited to:\nSite investigation   architectural, structural, mechanical, electrical, and environmental services.\nContract drawings and specifications for construction.\n3rd Party Cost Estimates\nConstruction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings; A/E will respond on site within a two-hour period when requested.\nInfection Control Risk Assessment\nMeet all of the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program.  Reference at https://www.cfm.va.gov/cfm/til/index.asp\n \n-- Project Scope --\nGENERAL:\nThis project consists of the renovation of the main exterior entrance of Building 1 at the\nWilmington VA Medical Center. Work includes demolition, redesign, and reconstruction of entrance\nfeatures and installation of a new ADA-compliant handicap ramp. \nSPECIFICS:\nEvaluate and redesign entrance plaza, sidewalks, and approach paths and associated roadways\n\n   Design ADA-compliant ramp including slopes, handrails, landings\n\n   Improve drainage, grading\n\n  Upgrade exterior finishes, railings, entry features and any architectural faÃ§ade as deemed necessary \n\n \n  Maintain facility operations during construction\n\n  Identify and correct life safety deficiencies and provide phasing plan if necessary \n\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.asp  and https://wbdg.org/ffc/federal-facility-criteria. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n. \n\nOther Specifics:\nAutoCAD files of existing design will be provided for use.\nPhase all work in coordination with Hospital staff to minimize down-time to areas affected by the project.\nConstruction Waste Management, s to be included.\nDesign to maintain all infection control/ dust prevention measures.\nList all Permits necessary to complete the project.\nConsolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.aspThe A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n \n\n-- Site Investigations --\nEXPECTATION: A/E will make site visits as necessary to survey existing conditions.\nMake site visits as required to determine existing as-built conditions affecting this project.\nProvide any structural, architectural, electrical, and mechanical investigative work including all interior and exterior, of both existing and designed systems necessary to ensure the accuracy of the design.\nPrepare any measured drawings of existing systems of facility required to ensure the accuracy of the design.\nProvide a CIH to evaluate the impacted building areas for asbestos. Wilmington VA has an asbestos survey which will need to be verified.\nProvide a CIH to evaluate the impacted building areas for lead based paint. Exterior window frames have not been tested for lead based paint, but exterior doors have and several did test positive.\nNOTE:  Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov. AutoCAD background drawings will be provided by the VA upon request.\nThe A/E shall field verify all dimensions.  A/E shall field verify every aspect that relates to the project.  Coordinate site visits with the Project Engineer.\n  -- Environmental/Occupational Safety and Health (EOSH) --\nEXPECTATION: All projects and project designs shall contain language that addresses all applicable EOSH requirements.\nRegulatory Compliance   EOSH requirements for work performed at the above location can be found in:\nVolume 29 of the Code of Federal Regulations, Part 1910   Occupational Safety for General Industry\nVolume 29 of the Code of Federal Regulations, Part 1926   Occupational Safety for The Construction Industry\nVolume 40 of the Code of Federal Regulations   Protection of The Environment\nVolume 49 of the Code of Federal Regulations, Part 397   Transportation of Hazardous Materials\nTitle 7 of the Delaware Code   Conservation\nTitle 16 of the Delaware Code   Health and Safety\n\nSpecifications\nThe VA Master Construction Specifications contain work procedures and material requirements \ndesigned to meet regulatory compliance requirements.Â  Whenever possible, the Master Construction Specifications must be used as the basis for project designs.\nA complete list of these specifications can be viewed at the following website: https://www.cfm.va.gov/cfm/til/index.aspSpecifications which address EOSH requirements include, but are not limited to\n\n-- Design Review Schedule --\nEXPECTATION: Submit review packages so they are received on the noted day.\nSUBMISSIONS:\nSubmit review packages so they are received on the noted day (calendar days after NTP) or earlier:\nNotice to Proceed\nDay 0\n(0 days)\nInitial Meeting with Stakeholders\nDay 14\n(14 days)\nDesign Development Document Submission (25%)\nDay 44\n(30 days)\nPDT Review Meeting (25%)\nDay 58\n(14 days)\nDesign Development Document Submission (75%)\nDay 93\n(35 days)\nPDT Review Meeting (75%)\nDay 107\n(14 days)\nDesign Development Document Submission (100%)\nDay 152\n(45 days)\nPDT Review Meeting (100%)\nDay 166\n(14 days)\nContract Documents Submission (Final)\nDay 180\n(14 days)\nNote:  The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting.\n \n-- Specification Requirements --\n\n-- Design Requirements/Submissions --\nEXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects)\nDELIVER:\nAll design packages directly to the Project Engineer on the established dates to allow the VA to review.  A transmittal letter is required to go to the Contracting Officer on the same day as delivery.  Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006.  The manual is available at the following address: http://www.cfm.va.gov \n25% Design Development Submission:  Attachment  A  25% Submission Requirements\nChecklist of Requirements for the 25% Design Development Submission.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development)\nIdentify Working Drawings scope within construction budget\nIdentify impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\n75% Design Development Submission:  Attachment  B  75% Submission Requirements\nChecklist of Requirements for the 75% Design Development Submission.\nAddress all comments from the 25% review.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development)\nIdentify Working Drawings scope within construction budget.\nFinalize impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nPresent energy modeling and financial impacts using various types of windows for consideration.\nDevelop Infection Control Risk Assessment (VA EC-43)\nA/E shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The A/E shall provide the Project Engineer with a complete copy of the 75% documents for submission to the consulting firm.  The designated firm will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting.\n100% Design Development Submission:  Attachment  C  100% Submission Requirements\nChecklist of Requirements for the 100% Design Development Submission.\nAddress all comments from the 75% review.\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nRevise and update cost estimate\nPreparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission\nFinalize all design calculations\nFinalize all potential bid deduct alternatives\nFinalize all phasing requirements for construction\nFinalize Infection Control Risk Assessment (VA EC-43)\nAddress all comments from the VISN Safety and Fire Protection Review\nContract Documents (CD) Submission:  Attachment  D  Submission Requirements\nSubmit a complete document set of all contract requirements.  The Cover Page shall be submitted for approval signatures.  If necessary, update and submit until approved by the VA.\n \n\nATTACHMENT  A \nDeliver the following (labeled with 25% Design Development Document Submission) and include this attachment as a checklist with your submission:\n25% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F and F1.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment)\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in the newest version of Microsoft Word  (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  B \nDeliver the following (labeled with 75% Design Development Document Submission) and include this attachment as a checklist with your submission:  \n75% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall contain sample catalog cut sheets of new equipment to be installed in the design. Report shall include energy modeling reports with financial impacts of various window types. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025.     software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of Infection Control Risk Assessment.\n1 additional copy each of the custom edited VA Master Specifications and drawings as specified above are to be delivered to a third party fire and life safety firm on the same dates as delivered to the Project Manager. A letter of transmittal signifying delivery will be forwarded to the Project Manager. A/E shall utilize the services of the Network 4 Fire and Safety Engineer, to conduct a fire and life safety peer review of the project throughout the design. Comments resulted from the peer review shall be incorporated into the design at no additional cost.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  C \nDeliver the following (labeled with 100% Design Development Documents Submission) and include this attachment as a checklist with your submission:\n100% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 75% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of the Infection Control Risk Assessment.\n2 copy of drawings in AutoCAD 2025  and .pdf format and specifications in newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  D \nEXPECTATION: Submit complete bid document for final review prior to solicitation. Continue to submit bid documents until all changes are incorporated by the A/E for final signature prior to solicitation.  Upon approval duplicate copies as required.\nDeliver the following (labeled with Contract Documents Submission) and include this attachment as a checklist with your submission:\nContract Document Submission Requirements\n1 copy of the Cover Sheet (AutoCAD) for final VA signatures.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software   for final VA review.  If approved, final sets to be submitted with signed off cover sheet.\n3 copies of final project specification (two bound; one loose) prepared in newest version of Microsoft Word software.  Include a master submittal list in the specifications.\n2 CDs containing \nAll drawings in AutoCAD 2025 (.dwg) and in .pdf file\nAll specifications in newest version of Microsoft Word \nSubmittal Spreadsheet   identifying all the submittals required to be submitted by the contractor for review.  The list shall be organized by division and specification.\nUpon signature approval, provide five sets of final Contract Documents (complete with VA signed Cover Sheet).  Provide two Â½ size sets of final drawings.\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT   E \n\nA/E  SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE\n\nDEPARTMENT OF VETERANS AFFAIRS\nA/E REGULATIONS ASBESTOS ABATEMENT\nThe A/E shall hire a Certified Industrial Hygienist (CIH) Consultant to assist in the assessment and design for asbestos abatement.\nThe CIH shall meet the following minimum qualifications:\nBe certified by the American Board of Industrial Hygienists in Industrial Hygiene-Comprehensive.\nHave asbestos abatement experience in assessment, design, abatement, construction monitoring and decontamination clearance.\nHis office to be as close as possible to the project location, so that he will be available to the COTR during construction on an on-call basis with a response time of one day.\nWill have support staff and back-up capacity to provide adequate level of support to the COTR throughout construction.\nThe scope of work for the A/E with his CIH consultant is as follows:\nPreliminary (25%) Design\nTask 1:  Review building records and interview station personnel for detection of trade name material used for the construction of the buildings, which are known to contain asbestos.  Perform a visual inspection of the areas impacted and develop a sampling strategy that will yield statistically viable conclusions on extent of asbestos present.  Perform this task at the first preliminary submittal and notify VA on results at 100% submission.\nFinal (75 and 100% Reviews) Design\nTask 2:  Collect bulk suspected asbestos samples and utilize the services of a testing lab accredited by the American Industrial Hygienists Association.\nUpon receiving the results determine adequacy for an assessment report.  Any samples requiring further clarification, utilizing scanning electron microscopy (SEM), need to be contracted to a qualified laboratory for sample analysis.  If additional samples are required, take such samples at this stage so that the maximum detection of asbestos can be achieved.  This service (bulk sampling) will be at no cost.\nTask 3:  Prepare an exposure assessment report on only the impacted areas of the modification project.  Include the following information:\nDescribe the impacted areas by sketches, room names or other means.  Show or describe the location of each sample taken, its composition and identification number.\nClassify each impacted space as  Major Abatement   Minor Abatement  or  No Abatement  areas.  A  Major Abatement  area requires full protective measures (sealing off, change room, shower room, etc.), and all asbestos must be removed within the limits of the area.  A  Minor Abatement  area can be decontaminated with one or more applications of the  glove and bag  approach.  A  No Abatement  area requires no abatement work.\nFor each  Major Abatement  area, provide quantity and cost estimates of all asbestos within the limits of the area.  Quantities to be in linear feet of pipe and square feet of ceilings and walls.  The cost to be derived from the quantities multiplied by a unit price.\nFor each  Minor Abatement  area, provide the description, size and location of each element to be decontaminated and a cost estimate.\nProvide summary of the square feet of floor space for all abatement areas, the total linear and square feet of asbestos to be abated, the total cost of abatement and a preliminary schedule of completion.  Include in the cost estimate any cost for decontamination.\nProvide an assessment on the impact of abatement on building sub-systems such as ceilings, lights, walls, carpets, pipes and equipment.  Provide room-by-room description and estimated quantities of impacted items to be placed (number of lighting fixtures, square feet of ceiling, etc.) and a summary of these quantities.  Provide a cost estimate for all impacted items.\nProvide a cover statement signed by both the A/E and the CIH consultant.  The statement shall be in accordance with the  Sample Cover Statement  provided by the VA, as part of the A/E package.\nSubmit the report at the 75% Design Review Submission.\nTask 4:  Prepare drawings and specifications for the asbestos abatement work reflecting the assessment report.  The drawings shall be separately identified from the rest of the drawings, be 1/8  scale plans and shall provide as a minimum the following information.\nFor each  Major Abatement  area show the limits of sealing off, the location and quantities of asbestos material, the arrangements for auxiliary rooms, such as change room, shower room, etc., transportation to the loading platform.\nFor each  Minor Abatement  area show on plans the exact location type and length of pipe element to be abated by the  glove and bag  approach and any other abatement features.\nProvide details, sections, notes and any other information that are necessary for complete bid documents.\nPrepare project specifications by editing and modifying the VA master specifications on asbestos abatement.\nProvide the drawings and specifications for the restoration of the impacted building sub-systems as an integral part of the overall project design.  Provide for replacing of removed asbestos insulation with acceptable non-asbestos insulation, replacing contaminated carpets, replacing old contaminated light fixtures and replacing partially torn down plaster ceilings.\nThe submittals of the working drawings for abatement shall coincide with the submittals for the working drawings of the modification project.\nProvide an integrated phasing showing how the abatement and the general modification work will be executed.  Provide some reasonable cushion between each abatement phase and the following general construction phase to allow for unforeseen delays in abatement completion.\nTask 5:  Assist VA to determine whether the abatement sub-contractor meets qualification requirements.  \nExcluded from the scope of work (to be completed by others):\nProvide onsite continuous monitoring during construction of the performance of the abatement sub-contractor.  Check and approve the set-up for each  Major Abatement  area, check the standard operating procedure of the abatement contractor, continuously monitor air contamination inspections to ensure compliance with specifications and drawings, and monitor access/egress into containment areas. Determine abatement of asbestos discovered during construction and advise the COTR on time and cost for such abatement.\nPerform the final inspection and testing at the end of the abatement work on the area and if the results are satisfactory, release the space to the general contractor for general work.\nAt the end of all abatement work, a compliance certificate signed by both the CIH and the A/E shall be issued.  The compliance certificate shall be in accordance with the  Sample Certificate  provided by the VA in the A/E package.\n \nATTACHMENT  E-1\n\nA/E  SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE 19805\n\nCOVER STATEMENT FOR ASBESTOS ASSESSMENT REPORT\n\n The enclosed Asbestos Assessment Report for                                     has been prepared, as part of Project #                         and covers the following buildings                                               .   I certify that I have surveyed each of the buildings or areas in my contract, have interviewed station personnel and have supervised technicians for the examination of available records related to the buildings.\nBased on the information gathered through the above activities and on the expected extent of the renovation as explained to me by                                               of the A/E firm on this project, I have devised a sampling plan and I have supervised the trained Industrial Hygiene Technicians during the collection of the samples.\nI have selected a qualified analytical laboratory for the analysis of the samples and I have evaluated the sampling results to ensure that statistically viable results on asbestos hazards were available for all buildings involved.\nBases on the above information, I have prepared the attached Asbestos Hazard Assessment Report.  This report reflects the best-known abatement technology, the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects and all applicable regulations.  An abatement design, which will be prepared by a qualified abatement contractor, will achieve the desired decontamination of the impacted areas and minimize exposure of people and the environment.\n\n\n\n\n\n (C. I. H.  NAME, CERTIFICATION  NO. & STATE CERTIFIED IN)\n\n\n\n\n\n\n\nPhotos of exterior:\n\nIt is the VA s intention to potentially modify or completely replace the main traffic circle canopy due to ADA sidewalk, ramp or vehicle drop off requirements. This requirement is also being requested to update the main entrance with a modernized canopy layout/design.\nDrainage will need to be considered. With the layout of new sidewalks and ramps the ground slope and stormwater runoff will be modified and need to be redesigned. \nDesign was completed in 1994. See current plan as separate attachment.","text":"Page 13 of 13\nCorrection made to typo in estimated construction magnitude value in the highlighted statement below. Additional clarifications have also been added and are highlighted at the end of the document. An Extension to the due date has been made to account for the changes. All other details remain as originally posted.\nACQUISITION INFORMATION:\nThe Wilmington Department of Veterans Affairs Medical Center located at 1601 Kirkwood Highway, Wilmington DE, 19805 is seeking professional Architect and Engineering (A&E) services for Project No. 460-26-001, Renovate Exterior of Main Hospital Design.\n\nThis announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send one copy of an SF 330 (7/2021 Edition) and CD from qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS.\nFirms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement.\n\nContract Award Procedure: Interested A&E Firms should e-mail a PDF SF330 document to Hanna Karmazyn at Hanna.Karmazyn@va.gov by 3:00 PM, EST, July 6, 2026. A&E firms shall be registered at www.sam.gov and www.vetbiz.gov. If available, please include your firm's VetBiz.gov SDVOSB status verification. Failure of a proposed SDVOSB A&E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services require may be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement. A&E Firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $25.5M apply. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY26 funding. The construction magnitude is between $2,000,000.00 and $5,000,000.00.\n\nA/E Evaluation Factors\nI. Experience and Past Performance\na. Healthcare Planning Experience\nProvide a brief overview of the firm s history and experience in healthcare planning. Include at least 5 relevant projects.\nAdd emphasis on exterior renovations, ADA accessibility upgrades, and work performed in active medical facilities requiring phasing.\n\nb. Federal Contract Experience\nDemonstrate experience with federal contracts, especially VA projects.\nInclude familiarity with VA TIL, and maintaining facility operations during construction.\nII. Design Team Proposed for This Project\na. Qualifications of Key Personnel\nProvide resumes (max 10) showing experience in healthcare and federal projects.\nInclude experience with ADA compliance, site design (grading/drainage), and life safety.\n\nb. Subconsultants\nProvide qualifications of subcontractors, especially for civil/site work, industrial hygiene, and fire/life safety.\n\nc. Design Approach\nDescribe approach to ADA, NFPA Life Safety Code, infection control, and exterior material selection.\nIII. Technical Approach\nDescribe approach to incorporating ADA, NFPA Life Safety Code, energy conservation, and site improvements.\n\nInclude understanding of renovating an active hospital entrance, maintaining safe access, and minimizing disruption through phasing.\nIV. Proposed Management Plan\na. Project Management Approach\nDescribe approach to schedule, budget, risk management, and communication.\n\nb. Work Plan and Deliverables\nProvide plan to meet design milestones (25%, 75%, 100%, final) and ability to meet submission dates.\n\nc. Compliance Standards\nDemonstrate knowledge of NFPA, NEC, OSHA, and other applicable codes.\n\nd. VA Specific Standards\nDemonstrate familiarity with VA requirements, TIL, and PDT process.\nV. Location and Knowledge of Local Area\na. Firm Location\nProvide office locations and ability to support site visits and response times.\n\nb. Local Knowledge\nDemonstrate knowledge of Wilmington VAMC, local construction conditions, and factors impacting cost and schedule\n\nWilmington, DE VA Medical Center\nWilmington, DE 19805\n\nA/E SCOPE OF WORK\n\nFor\n\nRenovate The Exterior Of Main Hospital\nProject No. 460-26-001\n\nBid Documents/Final Report Ready By:\n180 days after NTP\n\n-- Services --\nProvide:\nProfessional A/E and healthcare planning services to include but not limited to:\nSite investigation architectural, structural, mechanical, electrical, and environmental services.\nContract drawings and specifications for construction.\n3rd Party Cost Estimates\nConstruction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings; A/E will respond on site within a two-hour period when requested.\nInfection Control Risk Assessment\nMeet all of the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program. Reference at https://www.cfm.va.gov/cfm/til/index.asp\n\n-- Project Scope --\nGENERAL:\nThis project consists of the renovation of the main exterior entrance of Building 1 at the\nWilmington VA Medical Center. Work includes demolition, redesign, and reconstruction of entrance\nfeatures and installation of a new ADA-compliant handicap ramp.\nSPECIFICS:\nEvaluate and redesign entrance plaza, sidewalks, and approach paths and associated roadways\n\nDesign ADA-compliant ramp including slopes, handrails, landings\n\nImprove drainage, grading\n\nUpgrade exterior finishes, railings, entry features and any architectural faÃ§ade as deemed necessary\n\nMaintain facility operations during construction\n\nIdentify and correct life safety deficiencies and provide phasing plan if necessary\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.asp and https://wbdg.org/ffc/federal-facility-criteria. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n.\n\nOther Specifics:\nAutoCAD files of existing design will be provided for use.\nPhase all work in coordination with Hospital staff to minimize down-time to areas affected by the project.\nConstruction Waste Management, s to be included.\nDesign to maintain all infection control/ dust prevention measures.\nList all Permits necessary to complete the project.\nConsolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.aspThe A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n\n-- Site Investigations --\nEXPECTATION: A/E will make site visits as necessary to survey existing conditions.\nMake site visits as required to determine existing as-built conditions affecting this project.\nProvide any structural, architectural, electrical, and mechanical investigative work including all interior and exterior, of both existing and designed systems necessary to ensure the accuracy of the design.\nPrepare any measured drawings of existing systems of facility required to ensure the accuracy of the design.\nProvide a CIH to evaluate the impacted building areas for asbestos. Wilmington VA has an asbestos survey which will need to be verified.\nProvide a CIH to evaluate the impacted building areas for lead based paint. Exterior window frames have not been tested for lead based paint, but exterior doors have and several did test positive.\nNOTE: Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov. AutoCAD background drawings will be provided by the VA upon request.\nThe A/E shall field verify all dimensions. A/E shall field verify every aspect that relates to the project. Coordinate site visits with the Project Engineer.\n-- Environmental/Occupational Safety and Health (EOSH) --\nEXPECTATION: All projects and project designs shall contain language that addresses all applicable EOSH requirements.\nRegulatory Compliance EOSH requirements for work performed at the above location can be found in:\nVolume 29 of the Code of Federal Regulations, Part 1910 Occupational Safety for General Industry\nVolume 29 of the Code of Federal Regulations, Part 1926 Occupational Safety for The Construction Industry\nVolume 40 of the Code of Federal Regulations Protection of The Environment\nVolume 49 of the Code of Federal Regulations, Part 397 Transportation of Hazardous Materials\nTitle 7 of the Delaware Code Conservation\nTitle 16 of the Delaware Code Health and Safety\n\nSpecifications\nThe VA Master Construction Specifications contain work procedures and material requirements\ndesigned to meet regulatory compliance requirements.Â Whenever possible, the Master Construction Specifications must be used as the basis for project designs.\nA complete list of these specifications can be viewed at the following website: https://www.cfm.va.gov/cfm/til/index.aspSpecifications which address EOSH requirements include, but are not limited to\n\n-- Design Review Schedule --\nEXPECTATION: Submit review packages so they are received on the noted day.\nSUBMISSIONS:\nSubmit review packages so they are received on the noted day (calendar days after NTP) or earlier:\nNotice to Proceed\nDay 0\n(0 days)\nInitial Meeting with Stakeholders\nDay 14\n(14 days)\nDesign Development Document Submission (25%)\nDay 44\n(30 days)\nPDT Review Meeting (25%)\nDay 58\n(14 days)\nDesign Development Document Submission (75%)\nDay 93\n(35 days)\nPDT Review Meeting (75%)\nDay 107\n(14 days)\nDesign Development Document Submission (100%)\nDay 152\n(45 days)\nPDT Review Meeting (100%)\nDay 166\n(14 days)\nContract Documents Submission (Final)\nDay 180\n(14 days)\nNote: The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting.\n\n-- Specification Requirements --\n\n-- Design Requirements/Submissions --\nEXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects)\nDELIVER:\nAll design packages directly to the Project Engineer on the established dates to allow the VA to review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006. The manual is available at the following address: http://www.cfm.va.gov\n25% Design Development Submission: Attachment A 25% Submission Requirements\nChecklist of Requirements for the 25% Design Development Submission.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development)\nIdentify Working Drawings scope within construction budget\nIdentify impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\n75% Design Development Submission: Attachment B 75% Submission Requirements\nChecklist of Requirements for the 75% Design Development Submission.\nAddress all comments from the 25% review.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development)\nIdentify Working Drawings scope within construction budget.\nFinalize impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nPresent energy modeling and financial impacts using various types of windows for consideration.\nDevelop Infection Control Risk Assessment (VA EC-43)\nA/E shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The A/E shall provide the Project Engineer with a complete copy of the 75% documents for submission to the consulting firm. The designated firm will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting.\n100% Design Development Submission: Attachment C 100% Submission Requirements\nChecklist of Requirements for the 100% Design Development Submission.\nAddress all comments from the 75% review.\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nRevise and update cost estimate\nPreparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission\nFinalize all design calculations\nFinalize all potential bid deduct alternatives\nFinalize all phasing requirements for construction\nFinalize Infection Control Risk Assessment (VA EC-43)\nAddress all comments from the VISN Safety and Fire Protection Review\nContract Documents (CD) Submission: Attachment D Submission Requirements\nSubmit a complete document set of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA.\n\nATTACHMENT A\nDeliver the following (labeled with 25% Design Development Document Submission) and include this attachment as a checklist with your submission:\n25% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F and F1.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment)\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in the newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT B\nDeliver the following (labeled with 75% Design Development Document Submission) and include this attachment as a checklist with your submission:\n75% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall contain sample catalog cut sheets of new equipment to be installed in the design. Report shall include energy modeling reports with financial impacts of various window types. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025. software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of Infection Control Risk Assessment.\n1 additional copy each of the custom edited VA Master Specifications and drawings as specified above are to be delivered to a third party fire and life safety firm on the same dates as delivered to the Project Manager. A letter of transmittal signifying delivery will be forwarded to the Project Manager. A/E shall utilize the services of the Network 4 Fire and Safety Engineer, to conduct a fire and life safety peer review of the project throughout the design. Comments resulted from the peer review shall be incorporated into the design at no additional cost.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT C\nDeliver the following (labeled with 100% Design Development Documents Submission) and include this attachment as a checklist with your submission:\n100% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 75% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of the Infection Control Risk Assessment.\n2 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT D\nEXPECTATION: Submit complete bid document for final review prior to solicitation. Continue to submit bid documents until all changes are incorporated by the A/E for final signature prior to solicitation. Upon approval duplicate copies as required.\nDeliver the following (labeled with Contract Documents Submission) and include this attachment as a checklist with your submission:\nContract Document Submission Requirements\n1 copy of the Cover Sheet (AutoCAD) for final VA signatures.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software for final VA review. If approved, final sets to be submitted with signed off cover sheet.\n3 copies of final project specification (two bound; one loose) prepared in newest version of Microsoft Word software. Include a master submittal list in the specifications.\n2 CDs containing\nAll drawings in AutoCAD 2025 (.dwg) and in .pdf file\nAll specifications in newest version of Microsoft Word\nSubmittal Spreadsheet identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification.\nUpon signature approval, provide five sets of final Contract Documents (complete with VA signed Cover Sheet). Provide two Â½ size sets of final drawings.\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT E\n\nA/E SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE\n\nDEPARTMENT OF VETERANS AFFAIRS\nA/E REGULATIONS ASBESTOS ABATEMENT\nThe A/E shall hire a Certified Industrial Hygienist (CIH) Consultant to assist in the assessment and design for asbestos abatement.\nThe CIH shall meet the following minimum qualifications:\nBe certified by the American Board of Industrial Hygienists in Industrial Hygiene-Comprehensive.\nHave asbestos abatement experience in assessment, design, abatement, construction monitoring and decontamination clearance.\nHis office to be as close as possible to the project location, so that he will be available to the COTR during construction on an on-call basis with a response time of one day.\nWill have support staff and back-up capacity to provide adequate level of support to the COTR throughout construction.\nThe scope of work for the A/E with his CIH consultant is as follows:\nPreliminary (25%) Design\nTask 1: Review building records and interview station personnel for detection of trade name material used for the construction of the buildings, which are known to contain asbestos. Perform a visual inspection of the areas impacted and develop a sampling strategy that will yield statistically viable conclusions on extent of asbestos present. Perform this task at the first preliminary submittal and notify VA on results at 100% submission.\nFinal (75 and 100% Reviews) Design\nTask 2: Collect bulk suspected asbestos samples and utilize the services of a testing lab accredited by the American Industrial Hygienists Association.\nUpon receiving the results determine adequacy for an assessment report. Any samples requiring further clarification, utilizing scanning electron microscopy (SEM), need to be contracted to a qualified laboratory for sample analysis. If additional samples are required, take such samples at this stage so that the maximum detection of asbestos can be achieved. This service (bulk sampling) will be at no cost.\nTask 3: Prepare an exposure assessment report on only the impacted areas of the modification project. Include the following information:\nDescribe the impacted areas by sketches, room names or other means. Show or describe the location of each sample taken, its composition and identification number.\nClassify each impacted space as Major Abatement Minor Abatement or No Abatement areas. A Major Abatement area requires full protective measures (sealing off, change room, shower room, etc.), and all asbestos must be removed within the limits of the area. A Minor Abatement area can be decontaminated with one or more applications of the glove and bag approach. A No Abatement area requires no abatement work.\nFor each Major Abatement area, provide quantity and cost estimates of all asbestos within the limits of the area. Quantities to be in linear feet of pipe and square feet of ceilings and walls. The cost to be derived from the quantities multiplied by a unit price.\nFor each Minor Abatement area, provide the description, size and location of each element to be decontaminated and a cost estimate.\nProvide summary of the square feet of floor space for all abatement areas, the total linear and square feet of asbestos to be abated, the total cost of abatement and a preliminary schedule of completion. Include in the cost estimate any cost for decontamination.\nProvide an assessment on the impact of abatement on building sub-systems such as ceilings, lights, walls, carpets, pipes and equipment. Provide room-by-room description and estimated quantities of impacted items to be placed (number of lighting fixtures, square feet of ceiling, etc.) and a summary of these quantities. Provide a cost estimate for all impacted items.\nProvide a cover statement signed by both the A/E and the CIH consultant. The statement shall be in accordance with the Sample Cover Statement provided by the VA, as part of the A/E package.\nSubmit the report at the 75% Design Review Submission.\nTask 4: Prepare drawings and specifications for the asbestos abatement work reflecting the assessment report. The drawings shall be separately identified from the rest of the drawings, be 1/8 scale plans and shall provide as a minimum the following information.\nFor each Major Abatement area show the limits of sealing off, the location and quantities of asbestos material, the arrangements for auxiliary rooms, such as change room, shower room, etc., transportation to the loading platform.\nFor each Minor Abatement area show on plans the exact location type and length of pipe element to be abated by the glove and bag approach and any other abatement features.\nProvide details, sections, notes and any other information that are necessary for complete bid documents.\nPrepare project specifications by editing and modifying the VA master specifications on asbestos abatement.\nProvide the drawings and specifications for the restoration of the impacted building sub-systems as an integral part of the overall project design. Provide for replacing of removed asbestos insulation with acceptable non-asbestos insulation, replacing contaminated carpets, replacing old contaminated light fixtures and replacing partially torn down plaster ceilings.\nThe submittals of the working drawings for abatement shall coincide with the submittals for the working drawings of the modification project.\nProvide an integrated phasing showing how the abatement and the general modification work will be executed. Provide some reasonable cushion between each abatement phase and the following general construction phase to allow for unforeseen delays in abatement completion.\nTask 5: Assist VA to determine whether the abatement sub-contractor meets qualification requirements.\nExcluded from the scope of work (to be completed by others):\nProvide onsite continuous monitoring during construction of the performance of the abatement sub-contractor. Check and approve the set-up for each Major Abatement area, check the standard operating procedure of the abatement contractor, continuously monitor air contamination inspections to ensure compliance with specifications and drawings, and monitor access/egress into containment areas. Determine abatement of asbestos discovered during construction and advise the COTR on time and cost for such abatement.\nPerform the final inspection and testing at the end of the abatement work on the area and if the results are satisfactory, release the space to the general contractor for general work.\nAt the end of all abatement work, a compliance certificate signed by both the CIH and the A/E shall be issued. The compliance certificate shall be in accordance with the Sample Certificate provided by the VA in the A/E package.\n\nATTACHMENT E-1\n\nA/E SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE 19805\n\nCOVER STATEMENT FOR ASBESTOS ASSESSMENT REPORT\n\nThe enclosed Asbestos Assessment Report for has been prepared, as part of Project # and covers the following buildings . I certify that I have surveyed each of the buildings or areas in my contract, have interviewed station personnel and have supervised technicians for the examination of available records related to the buildings.\nBased on the information gathered through the above activities and on the expected extent of the renovation as explained to me by of the A/E firm on this project, I have devised a sampling plan and I have supervised the trained Industrial Hygiene Technicians during the collection of the samples.\nI have selected a qualified analytical laboratory for the analysis of the samples and I have evaluated the sampling results to ensure that statistically viable results on asbestos hazards were available for all buildings involved.\nBases on the above information, I have prepared the attached Asbestos Hazard Assessment Report. This report reflects the best-known abatement technology, the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects and all applicable regulations. An abatement design, which will be prepared by a qualified abatement contractor, will achieve the desired decontamination of the impacted areas and minimize exposure of people and the environment.\n\n(C. I. H. NAME, CERTIFICATION NO. & STATE CERTIFIED IN)\n\nPhotos of exterior:\n\nIt is the VA s intention to potentially modify or completely replace the main traffic circle canopy due to ADA sidewalk, ramp or vehicle drop off requirements. This requirement is also being requested to update the main entrance with a modernized canopy layout/design.\nDrainage will need to be considered. With the layout of new sidewalks and ramps the ground slope and stormwater runoff will be modified and need to be redesigned.\nDesign was completed in 1994. See current plan as separate attachment.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C24426R0113","place_of_performance":{"zip":"19805","city":{"code":"77580","name":"Wilmington"},"state":{"code":"DE","name":"Delaware"},"street":"Wilmington DE VAMC","country":{"code":"USA","name":"UNITED STATES"},"street2":"1601 Kirkwood Highway"},"product_service_code":"C1DZ"},{"award":{"awardee":{}},"dates":{"posted":"2026-06-26","posted_at":"2026-06-26T14:37:10.782Z","created_at":"2026-06-26T14:37:06.223Z","modified_at":"2026-09-11T05:07:20.493Z","response_deadline":{"raw":"2026-07-13T15:00:00-04:00","utc":"2026-07-13T19:00:00Z","date":"2026-07-13","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ed553996020841a59530ed90e2b3d18a/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","agency":{"office":{"code":"36C244","name":"244-NETWORK CONTRACT OFFICE 4 (36C244)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"15215","city":"PITTSBURGH","state":"PA","country":"USA"},"organization_id":"100163848","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-09-11","archive_type":"auto_custom"},"history":[{"index":4,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-26T14:37:10.782Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ed553996020841a59530ed90e2b3d18a","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":2,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-18T18:17:52.073Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"432f3fdb94de43ee8ebff0a42c77fa73","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":1,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-22T14:17:21.503Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6","solicitation_number":"36C24426R0113"}],"contacts":[{"name":"Hanna Karmazyn","role":"primary","email":"Hanna.Karmazyn@va.gov","phone":"302-332-5107","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"ed553996020841a59530ed90e2b3d18a","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"e9e14928f94e4fbbb057f53dc59804f6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-01T00:59:06.344215988Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"5a24360a6aab0d67ead70cee916ab20d476bcb59c42da878a746aa8d06f0a36e","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-01T00:59:06.344215988Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"Page 13 of 13\nAdditional clarifying details added though this revision posting. Changes in this revision can be seen highlighted in green. Yellow highlighted text reflects the previous corrections made from the original posting. An Extension to the due date has been made accordingly. Further extension requests are not feasible to the timeframe for this intended FY26 contract award. All other details remain as originally posted. \nACQUISITION INFORMATION:\nThe Wilmington Department of Veterans Affairs Medical Center located at 1601 Kirkwood Highway, Wilmington DE, 19805 is seeking professional Architect and Engineering (A&E) services for Project No. 460-26-001, Renovate Exterior of Main Hospital Design.  \n\nThis announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send one copy of an SF 330 (7/2021 Edition) via email with qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS.\nFirms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement.\n\n\nContract Award Procedure:  Interested A&E Firms should e-mail a PDF SF330 document to Hanna Karmazyn at Hanna.Karmazyn@va.gov by 3:00 PM, EST, July 13, 2026. A&E firms shall be registered at www.sam.gov and www.vetbiz.gov. If available, please include your firm's VetBiz.gov SDVOSB status verification. Failure of a proposed SDVOSB A&E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services require may be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement.  A&E Firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $25.5M apply. NAICS 541330 covers engineering design, development and utilization of structures and systems and remains the appropriate code for this procurement. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY26 funding.   The construction magnitude is between $2,000,000.00 and $5,000,000.00. \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nA/E Evaluation Factors \nI. Experience and Past Performance\na. Healthcare Planning Experience \nProvide a brief overview of the firm s history and experience in healthcare planning. Include at least 5 relevant projects.\nAdd emphasis on exterior renovations, ADA accessibility upgrades, and work performed in active medical facilities requiring phasing.\n\nb. Federal Contract Experience \nDemonstrate experience with federal contracts, especially VA projects.\nInclude familiarity with VA TIL, and maintaining facility operations during construction.\nII. Design Team Proposed for This Project\na. Qualifications of Key Personnel \nProvide resumes (max 10) showing experience in healthcare and federal projects.\nInclude experience with ADA compliance, site design (grading/drainage), and life safety.\n\nb. Subconsultants \nProvide qualifications of subcontractors, especially for civil/site work, industrial hygiene, and fire/life safety.\n\nc. Design Approach \nDescribe approach to ADA, NFPA Life Safety Code, infection control, and exterior material selection.\nIII. Technical Approach\nDescribe approach to incorporating ADA, NFPA Life Safety Code, energy conservation, and site improvements.\n\nInclude understanding of renovating an active hospital entrance, maintaining safe access, and minimizing disruption through phasing.\nIV. Proposed Management Plan\na. Project Management Approach \nDescribe approach to schedule, budget, risk management, and communication.\n\nb. Work Plan and Deliverables \nProvide plan to meet design milestones (25%, 75%, 100%, final) and ability to meet submission dates.\n\nc. Compliance Standards \nDemonstrate knowledge of NFPA, NEC, OSHA, and other applicable codes.\n\nd. VA Specific Standards \nDemonstrate familiarity with VA requirements, TIL, and PDT process.\nV. Location and Knowledge of Local Area\na. Firm Location \nProvide office locations and ability to support site visits and response times.\n\nb. Local Knowledge \nDemonstrate knowledge of Wilmington VAMC, local construction conditions, and factors impacting cost and schedule\n\n\n\n\n\n\nWilmington, DE VA Medical Center\nWilmington, DE 19805\n\n\nA/E SCOPE OF WORK\n\nFor\n\n\nRenovate The Exterior Of Main Hospital\nProject No. 460-26-001\n\n\n\nBid Documents/Final Report Ready By:\n180 days after NTP\n\n-- Services --\nProvide:\nProfessional A/E and healthcare planning services to include but not limited to:\nSite investigation   architectural, structural, mechanical, electrical, and environmental services.\nContract drawings and specifications for construction.\n3rd Party Cost Estimates\nConstruction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings; A/E will respond on site within a two-hour period when requested.\nInfection Control Risk Assessment\nMeet all of the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program.  Reference at https://www.cfm.va.gov/cfm/til/index.asp\n \n-- Project Scope --\nGENERAL:\nThis project consists of the renovation of the main exterior entrance of Building 1 at the\nWilmington VA Medical Center. Work includes demolition, redesign, and reconstruction of entrance\nfeatures and installation of a new ADA-compliant handicap ramp. \nSPECIFICS:\nEvaluate and redesign entrance plaza, sidewalks, and approach paths and associated roadways\n\n   Design ADA-compliant ramp including slopes, handrails, landings\n\n   Improve drainage, grading\n\n  Upgrade exterior finishes, railings, entry features and any architectural faÃ§ade as deemed necessary \n\n \n  Maintain facility operations during construction\n\n  Identify and correct life safety deficiencies and provide phasing plan if necessary \n\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.asp  and https://wbdg.org/ffc/federal-facility-criteria. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n. \n\nOther Specifics:\nAutoCAD files of existing design will be provided for use.\nPhase all work in coordination with Hospital staff to minimize down-time to areas affected by the project.\nConstruction Waste Management, s to be included.\nDesign to maintain all infection control/ dust prevention measures.\nList all Permits necessary to complete the project.\nConsolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.aspThe A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n \n\n-- Site Investigations --\nEXPECTATION: A/E will make site visits as necessary to survey existing conditions.\nMake site visits as required to determine existing as-built conditions affecting this project.\nProvide any structural, architectural, electrical, and mechanical investigative work including all interior and exterior, of both existing and designed systems necessary to ensure the accuracy of the design.\nPrepare any measured drawings of existing systems of facility required to ensure the accuracy of the design.\nProvide a CIH to evaluate the impacted building areas for asbestos. Wilmington VA has an asbestos survey which will need to be verified.\nProvide a CIH to evaluate the impacted building areas for lead based paint. Exterior window frames have not been tested for lead based paint, but exterior doors have and several did test positive.\nNOTE:  Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov. AutoCAD background drawings will be provided by the VA upon request.\nThe A/E shall field verify all dimensions.  A/E shall field verify every aspect that relates to the project.  Coordinate site visits with the Project Engineer.\n  -- Environmental/Occupational Safety and Health (EOSH) --\nEXPECTATION: All projects and project designs shall contain language that addresses all applicable EOSH requirements.\nRegulatory Compliance   EOSH requirements for work performed at the above location can be found in:\nVolume 29 of the Code of Federal Regulations, Part 1910   Occupational Safety for General Industry\nVolume 29 of the Code of Federal Regulations, Part 1926   Occupational Safety for The Construction Industry\nVolume 40 of the Code of Federal Regulations   Protection of The Environment\nVolume 49 of the Code of Federal Regulations, Part 397   Transportation of Hazardous Materials\nTitle 7 of the Delaware Code   Conservation\nTitle 16 of the Delaware Code   Health and Safety\n\nSpecifications\nThe VA Master Construction Specifications contain work procedures and material requirements \ndesigned to meet regulatory compliance requirements.Â  Whenever possible, the Master Construction Specifications must be used as the basis for project designs.\nA complete list of these specifications can be viewed at the following website: https://www.cfm.va.gov/cfm/til/index.aspSpecifications which address EOSH requirements include, but are not limited to\n\n-- Design Review Schedule --\nEXPECTATION: Submit review packages so they are received on the noted day.\nSUBMISSIONS:\nSubmit review packages so they are received on the noted day (calendar days after NTP) or earlier:\nNotice to Proceed\nDay 0\n(0 days)\nInitial Meeting with Stakeholders\nDay 14\n(14 days)\nDesign Development Document Submission (25%)\nDay 44\n(30 days)\nPDT Review Meeting (25%)\nDay 58\n(14 days)\nDesign Development Document Submission (75%)\nDay 93\n(35 days)\nPDT Review Meeting (75%)\nDay 107\n(14 days)\nDesign Development Document Submission (100%)\nDay 152\n(45 days)\nPDT Review Meeting (100%)\nDay 166\n(14 days)\nContract Documents Submission (Final)\nDay 180\n(14 days)\nNote:  The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting.\n \n-- Specification Requirements --\n\n-- Design Requirements/Submissions --\nEXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects)\nDELIVER:\nAll design packages directly to the Project Engineer on the established dates to allow the VA to review.  A transmittal letter is required to go to the Contracting Officer on the same day as delivery.  Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006.  The manual is available at the following address: http://www.cfm.va.gov \n25% Design Development Submission:  Attachment  A  25% Submission Requirements\nChecklist of Requirements for the 25% Design Development Submission.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development)\nIdentify Working Drawings scope within construction budget\nIdentify impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\n75% Design Development Submission:  Attachment  B  75% Submission Requirements\nChecklist of Requirements for the 75% Design Development Submission.\nAddress all comments from the 25% review.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development)\nIdentify Working Drawings scope within construction budget.\nFinalize impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nPresent energy modeling and financial impacts using various types of windows for consideration.\nDevelop Infection Control Risk Assessment (VA EC-43)\nA/E shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The A/E shall provide the Project Engineer with a complete copy of the 75% documents for submission to the consulting firm.  The designated firm will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting.\n100% Design Development Submission:  Attachment  C  100% Submission Requirements\nChecklist of Requirements for the 100% Design Development Submission.\nAddress all comments from the 75% review.\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nRevise and update cost estimate\nPreparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission\nFinalize all design calculations\nFinalize all potential bid deduct alternatives\nFinalize all phasing requirements for construction\nFinalize Infection Control Risk Assessment (VA EC-43)\nAddress all comments from the VISN Safety and Fire Protection Review\nContract Documents (CD) Submission:  Attachment  D  Submission Requirements\nSubmit a complete document set of all contract requirements.  The Cover Page shall be submitted for approval signatures.  If necessary, update and submit until approved by the VA.\n \n\nATTACHMENT  A \nDeliver the following (labeled with 25% Design Development Document Submission) and include this attachment as a checklist with your submission:\n25% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F and F1.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment)\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in the newest version of Microsoft Word  (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  B \nDeliver the following (labeled with 75% Design Development Document Submission) and include this attachment as a checklist with your submission:  \n75% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall contain sample catalog cut sheets of new equipment to be installed in the design. Report shall include energy modeling reports with financial impacts of various window types. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025.     software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of Infection Control Risk Assessment.\n1 additional copy each of the custom edited VA Master Specifications and drawings as specified above are to be delivered to a third party fire and life safety firm on the same dates as delivered to the Project Manager. A letter of transmittal signifying delivery will be forwarded to the Project Manager. A/E shall utilize the services of the Network 4 Fire and Safety Engineer, to conduct a fire and life safety peer review of the project throughout the design. Comments resulted from the peer review shall be incorporated into the design at no additional cost.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  C \nDeliver the following (labeled with 100% Design Development Documents Submission) and include this attachment as a checklist with your submission:\n100% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 75% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of the Infection Control Risk Assessment.\n2 copy of drawings in AutoCAD 2025  and .pdf format and specifications in newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  D \nEXPECTATION: Submit complete bid document for final review prior to solicitation. Continue to submit bid documents until all changes are incorporated by the A/E for final signature prior to solicitation.  Upon approval duplicate copies as required.\nDeliver the following (labeled with Contract Documents Submission) and include this attachment as a checklist with your submission:\nContract Document Submission Requirements\n1 copy of the Cover Sheet (AutoCAD) for final VA signatures.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software   for final VA review.  If approved, final sets to be submitted with signed off cover sheet.\n3 copies of final project specification (two bound; one loose) prepared in newest version of Microsoft Word software.  Include a master submittal list in the specifications.\n2 CDs containing \nAll drawings in AutoCAD 2025 (.dwg) and in .pdf file\nAll specifications in newest version of Microsoft Word \nSubmittal Spreadsheet   identifying all the submittals required to be submitted by the contractor for review.  The list shall be organized by division and specification.\nUpon signature approval, provide five sets of final Contract Documents (complete with VA signed Cover Sheet).  Provide two Â½ size sets of final drawings.\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT   E \n\nA/E  SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE\n\nDEPARTMENT OF VETERANS AFFAIRS\nA/E REGULATIONS ASBESTOS ABATEMENT\nThe A/E shall hire a Certified Industrial Hygienist (CIH) Consultant to assist in the assessment and design for asbestos abatement.\nThe CIH shall meet the following minimum qualifications:\nBe certified by the American Board of Industrial Hygienists in Industrial Hygiene-Comprehensive.\nHave asbestos abatement experience in assessment, design, abatement, construction monitoring and decontamination clearance.\nHis office to be as close as possible to the project location, so that he will be available to the COTR during construction on an on-call basis with a response time of one day.\nWill have support staff and back-up capacity to provide adequate level of support to the COTR throughout construction.\nThe scope of work for the A/E with his CIH consultant is as follows:\nPreliminary (25%) Design\nTask 1:  Review building records and interview station personnel for detection of trade name material used for the construction of the buildings, which are known to contain asbestos.  Perform a visual inspection of the areas impacted and develop a sampling strategy that will yield statistically viable conclusions on extent of asbestos present.  Perform this task at the first preliminary submittal and notify VA on results at 100% submission.\nFinal (75 and 100% Reviews) Design\nTask 2:  Collect bulk suspected asbestos samples and utilize the services of a testing lab accredited by the American Industrial Hygienists Association.\nUpon receiving the results determine adequacy for an assessment report.  Any samples requiring further clarification, utilizing scanning electron microscopy (SEM), need to be contracted to a qualified laboratory for sample analysis.  If additional samples are required, take such samples at this stage so that the maximum detection of asbestos can be achieved.  This service (bulk sampling) will be at no cost.\nTask 3:  Prepare an exposure assessment report on only the impacted areas of the modification project.  Include the following information:\nDescribe the impacted areas by sketches, room names or other means.  Show or describe the location of each sample taken, its composition and identification number.\nClassify each impacted space as  Major Abatement   Minor Abatement  or  No Abatement  areas.  A  Major Abatement  area requires full protective measures (sealing off, change room, shower room, etc.), and all asbestos must be removed within the limits of the area.  A  Minor Abatement  area can be decontaminated with one or more applications of the  glove and bag  approach.  A  No Abatement  area requires no abatement work.\nFor each  Major Abatement  area, provide quantity and cost estimates of all asbestos within the limits of the area.  Quantities to be in linear feet of pipe and square feet of ceilings and walls.  The cost to be derived from the quantities multiplied by a unit price.\nFor each  Minor Abatement  area, provide the description, size and location of each element to be decontaminated and a cost estimate.\nProvide summary of the square feet of floor space for all abatement areas, the total linear and square feet of asbestos to be abated, the total cost of abatement and a preliminary schedule of completion.  Include in the cost estimate any cost for decontamination.\nProvide an assessment on the impact of abatement on building sub-systems such as ceilings, lights, walls, carpets, pipes and equipment.  Provide room-by-room description and estimated quantities of impacted items to be placed (number of lighting fixtures, square feet of ceiling, etc.) and a summary of these quantities.  Provide a cost estimate for all impacted items.\nProvide a cover statement signed by both the A/E and the CIH consultant.  The statement shall be in accordance with the  Sample Cover Statement  provided by the VA, as part of the A/E package.\nSubmit the report at the 75% Design Review Submission.\nTask 4:  Prepare drawings and specifications for the asbestos abatement work reflecting the assessment report.  The drawings shall be separately identified from the rest of the drawings, be 1/8  scale plans and shall provide as a minimum the following information.\nFor each  Major Abatement  area show the limits of sealing off, the location and quantities of asbestos material, the arrangements for auxiliary rooms, such as change room, shower room, etc., transportation to the loading platform.\nFor each  Minor Abatement  area show on plans the exact location type and length of pipe element to be abated by the  glove and bag  approach and any other abatement features.\nProvide details, sections, notes and any other information that are necessary for complete bid documents.\nPrepare project specifications by editing and modifying the VA master specifications on asbestos abatement.\nProvide the drawings and specifications for the restoration of the impacted building sub-systems as an integral part of the overall project design.  Provide for replacing of removed asbestos insulation with acceptable non-asbestos insulation, replacing contaminated carpets, replacing old contaminated light fixtures and replacing partially torn down plaster ceilings.\nThe submittals of the working drawings for abatement shall coincide with the submittals for the working drawings of the modification project.\nProvide an integrated phasing showing how the abatement and the general modification work will be executed.  Provide some reasonable cushion between each abatement phase and the following general construction phase to allow for unforeseen delays in abatement completion.\nTask 5:  Assist VA to determine whether the abatement sub-contractor meets qualification requirements.  \nExcluded from the scope of work (to be completed by others):\nProvide onsite continuous monitoring during construction of the performance of the abatement sub-contractor.  Check and approve the set-up for each  Major Abatement  area, check the standard operating procedure of the abatement contractor, continuously monitor air contamination inspections to ensure compliance with specifications and drawings, and monitor access/egress into containment areas. Determine abatement of asbestos discovered during construction and advise the COTR on time and cost for such abatement.\nPerform the final inspection and testing at the end of the abatement work on the area and if the results are satisfactory, release the space to the general contractor for general work.\nAt the end of all abatement work, a compliance certificate signed by both the CIH and the A/E shall be issued.  The compliance certificate shall be in accordance with the  Sample Certificate  provided by the VA in the A/E package.\n \nATTACHMENT  E-1\n\nA/E  SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE 19805\n\nCOVER STATEMENT FOR ASBESTOS ASSESSMENT REPORT\n\n The enclosed Asbestos Assessment Report for                                     has been prepared, as part of Project #                         and covers the following buildings                                               .   I certify that I have surveyed each of the buildings or areas in my contract, have interviewed station personnel and have supervised technicians for the examination of available records related to the buildings.\nBased on the information gathered through the above activities and on the expected extent of the renovation as explained to me by                                               of the A/E firm on this project, I have devised a sampling plan and I have supervised the trained Industrial Hygiene Technicians during the collection of the samples.\nI have selected a qualified analytical laboratory for the analysis of the samples and I have evaluated the sampling results to ensure that statistically viable results on asbestos hazards were available for all buildings involved.\nBases on the above information, I have prepared the attached Asbestos Hazard Assessment Report.  This report reflects the best-known abatement technology, the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects and all applicable regulations.  An abatement design, which will be prepared by a qualified abatement contractor, will achieve the desired decontamination of the impacted areas and minimize exposure of people and the environment.\n\n\n\n\n\n (C. I. H.  NAME, CERTIFICATION  NO. & STATE CERTIFIED IN)\n\n\n\n\n\n\n\nPhotos of exterior:\n\nIt is the VA s intention to potentially modify or completely replace the main traffic circle canopy due to ADA sidewalk, ramp or vehicle drop off requirements. This requirement is also being requested to update the main entrance with a modernized canopy layout/design.\nDrainage will need to be considered. With the layout of new sidewalks and ramps the ground slope and stormwater runoff will be modified and need to be redesigned. \nDesign was completed in 1994. See current plan as separate attachment.\nReplacing of the existing entrance canopy is a required element of the project.\nThe VA did not complete an ADA assessment.\nThere will be some modifications that will need to be done as it relates to roadway modifications, traffic circle improvements, adjacent parking areas, utilities, and landscape areas included within the project boundary.","text":"Page 13 of 13\nAdditional clarifying details added though this revision posting. Changes in this revision can be seen highlighted in green. Yellow highlighted text reflects the previous corrections made from the original posting. An Extension to the due date has been made accordingly. Further extension requests are not feasible to the timeframe for this intended FY26 contract award. All other details remain as originally posted.\nACQUISITION INFORMATION:\nThe Wilmington Department of Veterans Affairs Medical Center located at 1601 Kirkwood Highway, Wilmington DE, 19805 is seeking professional Architect and Engineering (A&E) services for Project No. 460-26-001, Renovate Exterior of Main Hospital Design.\n\nThis announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send one copy of an SF 330 (7/2021 Edition) via email with qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS.\nFirms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement.\n\nContract Award Procedure: Interested A&E Firms should e-mail a PDF SF330 document to Hanna Karmazyn at Hanna.Karmazyn@va.gov by 3:00 PM, EST, July 13, 2026. A&E firms shall be registered at www.sam.gov and www.vetbiz.gov. If available, please include your firm's VetBiz.gov SDVOSB status verification. Failure of a proposed SDVOSB A&E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services require may be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement. A&E Firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $25.5M apply. NAICS 541330 covers engineering design, development and utilization of structures and systems and remains the appropriate code for this procurement. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY26 funding. The construction magnitude is between $2,000,000.00 and $5,000,000.00.\n\nA/E Evaluation Factors\nI. Experience and Past Performance\na. Healthcare Planning Experience\nProvide a brief overview of the firm s history and experience in healthcare planning. Include at least 5 relevant projects.\nAdd emphasis on exterior renovations, ADA accessibility upgrades, and work performed in active medical facilities requiring phasing.\n\nb. Federal Contract Experience\nDemonstrate experience with federal contracts, especially VA projects.\nInclude familiarity with VA TIL, and maintaining facility operations during construction.\nII. Design Team Proposed for This Project\na. Qualifications of Key Personnel\nProvide resumes (max 10) showing experience in healthcare and federal projects.\nInclude experience with ADA compliance, site design (grading/drainage), and life safety.\n\nb. Subconsultants\nProvide qualifications of subcontractors, especially for civil/site work, industrial hygiene, and fire/life safety.\n\nc. Design Approach\nDescribe approach to ADA, NFPA Life Safety Code, infection control, and exterior material selection.\nIII. Technical Approach\nDescribe approach to incorporating ADA, NFPA Life Safety Code, energy conservation, and site improvements.\n\nInclude understanding of renovating an active hospital entrance, maintaining safe access, and minimizing disruption through phasing.\nIV. Proposed Management Plan\na. Project Management Approach\nDescribe approach to schedule, budget, risk management, and communication.\n\nb. Work Plan and Deliverables\nProvide plan to meet design milestones (25%, 75%, 100%, final) and ability to meet submission dates.\n\nc. Compliance Standards\nDemonstrate knowledge of NFPA, NEC, OSHA, and other applicable codes.\n\nd. VA Specific Standards\nDemonstrate familiarity with VA requirements, TIL, and PDT process.\nV. Location and Knowledge of Local Area\na. Firm Location\nProvide office locations and ability to support site visits and response times.\n\nb. Local Knowledge\nDemonstrate knowledge of Wilmington VAMC, local construction conditions, and factors impacting cost and schedule\n\nWilmington, DE VA Medical Center\nWilmington, DE 19805\n\nA/E SCOPE OF WORK\n\nFor\n\nRenovate The Exterior Of Main Hospital\nProject No. 460-26-001\n\nBid Documents/Final Report Ready By:\n180 days after NTP\n\n-- Services --\nProvide:\nProfessional A/E and healthcare planning services to include but not limited to:\nSite investigation architectural, structural, mechanical, electrical, and environmental services.\nContract drawings and specifications for construction.\n3rd Party Cost Estimates\nConstruction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings; A/E will respond on site within a two-hour period when requested.\nInfection Control Risk Assessment\nMeet all of the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program. Reference at https://www.cfm.va.gov/cfm/til/index.asp\n\n-- Project Scope --\nGENERAL:\nThis project consists of the renovation of the main exterior entrance of Building 1 at the\nWilmington VA Medical Center. Work includes demolition, redesign, and reconstruction of entrance\nfeatures and installation of a new ADA-compliant handicap ramp.\nSPECIFICS:\nEvaluate and redesign entrance plaza, sidewalks, and approach paths and associated roadways\n\nDesign ADA-compliant ramp including slopes, handrails, landings\n\nImprove drainage, grading\n\nUpgrade exterior finishes, railings, entry features and any architectural faÃ§ade as deemed necessary\n\nMaintain facility operations during construction\n\nIdentify and correct life safety deficiencies and provide phasing plan if necessary\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.asp and https://wbdg.org/ffc/federal-facility-criteria. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n.\n\nOther Specifics:\nAutoCAD files of existing design will be provided for use.\nPhase all work in coordination with Hospital staff to minimize down-time to areas affected by the project.\nConstruction Waste Management, s to be included.\nDesign to maintain all infection control/ dust prevention measures.\nList all Permits necessary to complete the project.\nConsolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.aspThe A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n\n-- Site Investigations --\nEXPECTATION: A/E will make site visits as necessary to survey existing conditions.\nMake site visits as required to determine existing as-built conditions affecting this project.\nProvide any structural, architectural, electrical, and mechanical investigative work including all interior and exterior, of both existing and designed systems necessary to ensure the accuracy of the design.\nPrepare any measured drawings of existing systems of facility required to ensure the accuracy of the design.\nProvide a CIH to evaluate the impacted building areas for asbestos. Wilmington VA has an asbestos survey which will need to be verified.\nProvide a CIH to evaluate the impacted building areas for lead based paint. Exterior window frames have not been tested for lead based paint, but exterior doors have and several did test positive.\nNOTE: Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov. AutoCAD background drawings will be provided by the VA upon request.\nThe A/E shall field verify all dimensions. A/E shall field verify every aspect that relates to the project. Coordinate site visits with the Project Engineer.\n-- Environmental/Occupational Safety and Health (EOSH) --\nEXPECTATION: All projects and project designs shall contain language that addresses all applicable EOSH requirements.\nRegulatory Compliance EOSH requirements for work performed at the above location can be found in:\nVolume 29 of the Code of Federal Regulations, Part 1910 Occupational Safety for General Industry\nVolume 29 of the Code of Federal Regulations, Part 1926 Occupational Safety for The Construction Industry\nVolume 40 of the Code of Federal Regulations Protection of The Environment\nVolume 49 of the Code of Federal Regulations, Part 397 Transportation of Hazardous Materials\nTitle 7 of the Delaware Code Conservation\nTitle 16 of the Delaware Code Health and Safety\n\nSpecifications\nThe VA Master Construction Specifications contain work procedures and material requirements\ndesigned to meet regulatory compliance requirements.Â Whenever possible, the Master Construction Specifications must be used as the basis for project designs.\nA complete list of these specifications can be viewed at the following website: https://www.cfm.va.gov/cfm/til/index.aspSpecifications which address EOSH requirements include, but are not limited to\n\n-- Design Review Schedule --\nEXPECTATION: Submit review packages so they are received on the noted day.\nSUBMISSIONS:\nSubmit review packages so they are received on the noted day (calendar days after NTP) or earlier:\nNotice to Proceed\nDay 0\n(0 days)\nInitial Meeting with Stakeholders\nDay 14\n(14 days)\nDesign Development Document Submission (25%)\nDay 44\n(30 days)\nPDT Review Meeting (25%)\nDay 58\n(14 days)\nDesign Development Document Submission (75%)\nDay 93\n(35 days)\nPDT Review Meeting (75%)\nDay 107\n(14 days)\nDesign Development Document Submission (100%)\nDay 152\n(45 days)\nPDT Review Meeting (100%)\nDay 166\n(14 days)\nContract Documents Submission (Final)\nDay 180\n(14 days)\nNote: The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting.\n\n-- Specification Requirements --\n\n-- Design Requirements/Submissions --\nEXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects)\nDELIVER:\nAll design packages directly to the Project Engineer on the established dates to allow the VA to review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006. The manual is available at the following address: http://www.cfm.va.gov\n25% Design Development Submission: Attachment A 25% Submission Requirements\nChecklist of Requirements for the 25% Design Development Submission.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development)\nIdentify Working Drawings scope within construction budget\nIdentify impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\n75% Design Development Submission: Attachment B 75% Submission Requirements\nChecklist of Requirements for the 75% Design Development Submission.\nAddress all comments from the 25% review.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development)\nIdentify Working Drawings scope within construction budget.\nFinalize impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nPresent energy modeling and financial impacts using various types of windows for consideration.\nDevelop Infection Control Risk Assessment (VA EC-43)\nA/E shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The A/E shall provide the Project Engineer with a complete copy of the 75% documents for submission to the consulting firm. The designated firm will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting.\n100% Design Development Submission: Attachment C 100% Submission Requirements\nChecklist of Requirements for the 100% Design Development Submission.\nAddress all comments from the 75% review.\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nRevise and update cost estimate\nPreparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission\nFinalize all design calculations\nFinalize all potential bid deduct alternatives\nFinalize all phasing requirements for construction\nFinalize Infection Control Risk Assessment (VA EC-43)\nAddress all comments from the VISN Safety and Fire Protection Review\nContract Documents (CD) Submission: Attachment D Submission Requirements\nSubmit a complete document set of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA.\n\nATTACHMENT A\nDeliver the following (labeled with 25% Design Development Document Submission) and include this attachment as a checklist with your submission:\n25% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F and F1.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment)\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in the newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT B\nDeliver the following (labeled with 75% Design Development Document Submission) and include this attachment as a checklist with your submission:\n75% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall contain sample catalog cut sheets of new equipment to be installed in the design. Report shall include energy modeling reports with financial impacts of various window types. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025. software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of Infection Control Risk Assessment.\n1 additional copy each of the custom edited VA Master Specifications and drawings as specified above are to be delivered to a third party fire and life safety firm on the same dates as delivered to the Project Manager. A letter of transmittal signifying delivery will be forwarded to the Project Manager. A/E shall utilize the services of the Network 4 Fire and Safety Engineer, to conduct a fire and life safety peer review of the project throughout the design. Comments resulted from the peer review shall be incorporated into the design at no additional cost.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT C\nDeliver the following (labeled with 100% Design Development Documents Submission) and include this attachment as a checklist with your submission:\n100% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 75% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of the Infection Control Risk Assessment.\n2 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT D\nEXPECTATION: Submit complete bid document for final review prior to solicitation. Continue to submit bid documents until all changes are incorporated by the A/E for final signature prior to solicitation. Upon approval duplicate copies as required.\nDeliver the following (labeled with Contract Documents Submission) and include this attachment as a checklist with your submission:\nContract Document Submission Requirements\n1 copy of the Cover Sheet (AutoCAD) for final VA signatures.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software for final VA review. If approved, final sets to be submitted with signed off cover sheet.\n3 copies of final project specification (two bound; one loose) prepared in newest version of Microsoft Word software. Include a master submittal list in the specifications.\n2 CDs containing\nAll drawings in AutoCAD 2025 (.dwg) and in .pdf file\nAll specifications in newest version of Microsoft Word\nSubmittal Spreadsheet identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification.\nUpon signature approval, provide five sets of final Contract Documents (complete with VA signed Cover Sheet). Provide two Â½ size sets of final drawings.\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT E\n\nA/E SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE\n\nDEPARTMENT OF VETERANS AFFAIRS\nA/E REGULATIONS ASBESTOS ABATEMENT\nThe A/E shall hire a Certified Industrial Hygienist (CIH) Consultant to assist in the assessment and design for asbestos abatement.\nThe CIH shall meet the following minimum qualifications:\nBe certified by the American Board of Industrial Hygienists in Industrial Hygiene-Comprehensive.\nHave asbestos abatement experience in assessment, design, abatement, construction monitoring and decontamination clearance.\nHis office to be as close as possible to the project location, so that he will be available to the COTR during construction on an on-call basis with a response time of one day.\nWill have support staff and back-up capacity to provide adequate level of support to the COTR throughout construction.\nThe scope of work for the A/E with his CIH consultant is as follows:\nPreliminary (25%) Design\nTask 1: Review building records and interview station personnel for detection of trade name material used for the construction of the buildings, which are known to contain asbestos. Perform a visual inspection of the areas impacted and develop a sampling strategy that will yield statistically viable conclusions on extent of asbestos present. Perform this task at the first preliminary submittal and notify VA on results at 100% submission.\nFinal (75 and 100% Reviews) Design\nTask 2: Collect bulk suspected asbestos samples and utilize the services of a testing lab accredited by the American Industrial Hygienists Association.\nUpon receiving the results determine adequacy for an assessment report. Any samples requiring further clarification, utilizing scanning electron microscopy (SEM), need to be contracted to a qualified laboratory for sample analysis. If additional samples are required, take such samples at this stage so that the maximum detection of asbestos can be achieved. This service (bulk sampling) will be at no cost.\nTask 3: Prepare an exposure assessment report on only the impacted areas of the modification project. Include the following information:\nDescribe the impacted areas by sketches, room names or other means. Show or describe the location of each sample taken, its composition and identification number.\nClassify each impacted space as Major Abatement Minor Abatement or No Abatement areas. A Major Abatement area requires full protective measures (sealing off, change room, shower room, etc.), and all asbestos must be removed within the limits of the area. A Minor Abatement area can be decontaminated with one or more applications of the glove and bag approach. A No Abatement area requires no abatement work.\nFor each Major Abatement area, provide quantity and cost estimates of all asbestos within the limits of the area. Quantities to be in linear feet of pipe and square feet of ceilings and walls. The cost to be derived from the quantities multiplied by a unit price.\nFor each Minor Abatement area, provide the description, size and location of each element to be decontaminated and a cost estimate.\nProvide summary of the square feet of floor space for all abatement areas, the total linear and square feet of asbestos to be abated, the total cost of abatement and a preliminary schedule of completion. Include in the cost estimate any cost for decontamination.\nProvide an assessment on the impact of abatement on building sub-systems such as ceilings, lights, walls, carpets, pipes and equipment. Provide room-by-room description and estimated quantities of impacted items to be placed (number of lighting fixtures, square feet of ceiling, etc.) and a summary of these quantities. Provide a cost estimate for all impacted items.\nProvide a cover statement signed by both the A/E and the CIH consultant. The statement shall be in accordance with the Sample Cover Statement provided by the VA, as part of the A/E package.\nSubmit the report at the 75% Design Review Submission.\nTask 4: Prepare drawings and specifications for the asbestos abatement work reflecting the assessment report. The drawings shall be separately identified from the rest of the drawings, be 1/8 scale plans and shall provide as a minimum the following information.\nFor each Major Abatement area show the limits of sealing off, the location and quantities of asbestos material, the arrangements for auxiliary rooms, such as change room, shower room, etc., transportation to the loading platform.\nFor each Minor Abatement area show on plans the exact location type and length of pipe element to be abated by the glove and bag approach and any other abatement features.\nProvide details, sections, notes and any other information that are necessary for complete bid documents.\nPrepare project specifications by editing and modifying the VA master specifications on asbestos abatement.\nProvide the drawings and specifications for the restoration of the impacted building sub-systems as an integral part of the overall project design. Provide for replacing of removed asbestos insulation with acceptable non-asbestos insulation, replacing contaminated carpets, replacing old contaminated light fixtures and replacing partially torn down plaster ceilings.\nThe submittals of the working drawings for abatement shall coincide with the submittals for the working drawings of the modification project.\nProvide an integrated phasing showing how the abatement and the general modification work will be executed. Provide some reasonable cushion between each abatement phase and the following general construction phase to allow for unforeseen delays in abatement completion.\nTask 5: Assist VA to determine whether the abatement sub-contractor meets qualification requirements.\nExcluded from the scope of work (to be completed by others):\nProvide onsite continuous monitoring during construction of the performance of the abatement sub-contractor. Check and approve the set-up for each Major Abatement area, check the standard operating procedure of the abatement contractor, continuously monitor air contamination inspections to ensure compliance with specifications and drawings, and monitor access/egress into containment areas. Determine abatement of asbestos discovered during construction and advise the COTR on time and cost for such abatement.\nPerform the final inspection and testing at the end of the abatement work on the area and if the results are satisfactory, release the space to the general contractor for general work.\nAt the end of all abatement work, a compliance certificate signed by both the CIH and the A/E shall be issued. The compliance certificate shall be in accordance with the Sample Certificate provided by the VA in the A/E package.\n\nATTACHMENT E-1\n\nA/E SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE 19805\n\nCOVER STATEMENT FOR ASBESTOS ASSESSMENT REPORT\n\nThe enclosed Asbestos Assessment Report for has been prepared, as part of Project # and covers the following buildings . I certify that I have surveyed each of the buildings or areas in my contract, have interviewed station personnel and have supervised technicians for the examination of available records related to the buildings.\nBased on the information gathered through the above activities and on the expected extent of the renovation as explained to me by of the A/E firm on this project, I have devised a sampling plan and I have supervised the trained Industrial Hygiene Technicians during the collection of the samples.\nI have selected a qualified analytical laboratory for the analysis of the samples and I have evaluated the sampling results to ensure that statistically viable results on asbestos hazards were available for all buildings involved.\nBases on the above information, I have prepared the attached Asbestos Hazard Assessment Report. This report reflects the best-known abatement technology, the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects and all applicable regulations. An abatement design, which will be prepared by a qualified abatement contractor, will achieve the desired decontamination of the impacted areas and minimize exposure of people and the environment.\n\n(C. I. H. NAME, CERTIFICATION NO. & STATE CERTIFIED IN)\n\nPhotos of exterior:\n\nIt is the VA s intention to potentially modify or completely replace the main traffic circle canopy due to ADA sidewalk, ramp or vehicle drop off requirements. This requirement is also being requested to update the main entrance with a modernized canopy layout/design.\nDrainage will need to be considered. With the layout of new sidewalks and ramps the ground slope and stormwater runoff will be modified and need to be redesigned.\nDesign was completed in 1994. See current plan as separate attachment.\nReplacing of the existing entrance canopy is a required element of the project.\nThe VA did not complete an ADA assessment.\nThere will be some modifications that will need to be done as it relates to roadway modifications, traffic circle improvements, adjacent parking areas, utilities, and landscape areas included within the project boundary.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C24426R0113","place_of_performance":{"zip":"19805","city":{"code":"77580","name":"Wilmington"},"state":{"code":"DE","name":"Delaware"},"street":"Wilmington DE VAMC","country":{"code":"USA","name":"UNITED STATES"},"street2":"1601 Kirkwood Highway"},"product_service_code":"C1DZ"},{"award":{"awardee":{}},"dates":{"posted":"2026-11-16","posted_at":"2026-11-16T17:48:34.255Z","created_at":"2026-11-16T17:48:31.963Z","modified_at":"2026-11-16T17:48:34.255Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/75bb4079685e43b6b5635aa2fb62863f/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"C1DZ--460-26-001 | Renovate Exterior of Main Hospital | NCO 4 Construction East - Cancellation Notice","agency":{"office":{"code":"36C244","name":"244-NETWORK CONTRACT OFFICE 4 (36C244)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"15215","city":"PITTSBURGH","state":"PA","country":"USA"},"organization_id":"100163848","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-01-15","archive_type":"auto_custom"},"history":[{"index":2,"title":"C1DZ--460-26-001 | Renovate Exterior of Main Hospital | NCO 4 Construction East - Cancellation Notice","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T17:48:34.255Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"75bb4079685e43b6b5635aa2fb62863f","solicitation_number":"36C24426R0113","related_opportunity_id":"9e466aa179fd49fbaa4791b067f3f74c"},{"index":1,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T17:17:54.363Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"9e466aa179fd49fbaa4791b067f3f74c","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"}],"contacts":[{"name":"Cheryl A. Roberts","role":"primary","email":"cheryl.roberts2@va.gov","phone":"302-570-0324","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"75bb4079685e43b6b5635aa2fb62863f","lineage_id":"e9e14928f94e4fbbb057f53dc59804f6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T07:44:53.266182202Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"85e14329eca27c595e9baeb82aefb456-27\"","fetched_at":"2026-11-17T04:39:38.100364673Z","row_sha256":"76e42dc8279a2b3d1eb00944a9ebd9ebc46421b61290782f943e61b7539ab96a","last_modified":"2026-11-17T04:30:19Z"},"updated_at":"2026-11-17T07:44:53.266182202Z","first_seen_at":"2026-11-17T04:39:38.100364673Z"},"description":{"html":"The purpose of this amendment is to cancel solicitation 36C24426R0113.  See attached document.","text":"The purpose of this amendment is to cancel solicitation 36C24426R0113. See attached document.","origin":"detail"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"36C24426R0113","product_service_code":"C1DZ"},{"award":{"awardee":{}},"dates":{"posted":"2026-11-16","posted_at":"2026-11-16T17:17:54.363Z","created_at":"2026-11-16T17:17:54.363Z","modified_at":"2026-11-16T17:17:54.363Z","response_deadline":{"raw":"2026-07-13T15:00:00-04:00","utc":"2026-07-13T19:00:00Z","date":"2026-07-13","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9e466aa179fd49fbaa4791b067f3f74c/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","agency":{"office":{"code":"36C244","name":"244-NETWORK CONTRACT OFFICE 4 (36C244)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"15215","city":"PITTSBURGH","state":"PA","country":"USA"},"organization_id":"100163848","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-12-11","archive_type":"auto_custom"},"history":[{"index":6,"title":"C1DZ--460-26-001 | Renovate Exterior of Main Hospital | NCO 4 Construction East - Cancellation Notice","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T17:48:34.255Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"75bb4079685e43b6b5635aa2fb62863f","solicitation_number":"36C24426R0113","related_opportunity_id":"9e466aa179fd49fbaa4791b067f3f74c"},{"index":5,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-16T17:17:54.363Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"9e466aa179fd49fbaa4791b067f3f74c","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":4,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-06-26T14:37:10.782Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ed553996020841a59530ed90e2b3d18a","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":2,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-06-18T18:17:52.073Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"modify","opportunity_id":"432f3fdb94de43ee8ebff0a42c77fa73","solicitation_number":"36C24426R0113","parent_opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6"},{"index":1,"title":"C1DZ--460-26-001 Renovate Exterior of Main Hospital","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-05-22T14:17:21.503Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"e9e14928f94e4fbbb057f53dc59804f6","solicitation_number":"36C24426R0113"}],"contacts":[{"name":"Hanna Karmazyn","role":"primary","email":"Hanna.Karmazyn@va.gov","phone":"302-332-5107","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"9e466aa179fd49fbaa4791b067f3f74c","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"e9e14928f94e4fbbb057f53dc59804f6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T07:11:12.739168425Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"85e14329eca27c595e9baeb82aefb456-27\"","fetched_at":"2026-11-17T04:39:38.100364673Z","row_sha256":"a9484a048792f7d5b078342e2d2ca758889e6117f1bad3086eb63516b5614a59","last_modified":"2026-11-17T04:30:19Z"},"updated_at":"2026-11-17T07:11:12.739168425Z","first_seen_at":"2026-11-17T04:39:38.100364673Z"},"description":{"html":"Page 13 of 13\nAdditional clarifying details added though this revision posting. Changes in this revision can be seen highlighted in green. Yellow highlighted text reflects the previous corrections made from the original posting. An Extension to the due date has been made accordingly. Further extension requests are not feasible to the timeframe for this intended FY26 contract award. All other details remain as originally posted. \nACQUISITION INFORMATION:\nThe Wilmington Department of Veterans Affairs Medical Center located at 1601 Kirkwood Highway, Wilmington DE, 19805 is seeking professional Architect and Engineering (A&E) services for Project No. 460-26-001, Renovate Exterior of Main Hospital Design.  \n\nThis announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send one copy of an SF 330 (7/2021 Edition) via email with qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS.\nFirms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement.\n\n\nContract Award Procedure:  Interested A&E Firms should e-mail a PDF SF330 document to Hanna Karmazyn at Hanna.Karmazyn@va.gov by 3:00 PM, EST, July 13, 2026. A&E firms shall be registered at www.sam.gov and www.vetbiz.gov. If available, please include your firm's VetBiz.gov SDVOSB status verification. Failure of a proposed SDVOSB A&E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services require may be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement.  A&E Firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $25.5M apply. NAICS 541330 covers engineering design, development and utilization of structures and systems and remains the appropriate code for this procurement. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY26 funding.   The construction magnitude is between $2,000,000.00 and $5,000,000.00. \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nA/E Evaluation Factors \nI. Experience and Past Performance\na. Healthcare Planning Experience \nProvide a brief overview of the firm s history and experience in healthcare planning. Include at least 5 relevant projects.\nAdd emphasis on exterior renovations, ADA accessibility upgrades, and work performed in active medical facilities requiring phasing.\n\nb. Federal Contract Experience \nDemonstrate experience with federal contracts, especially VA projects.\nInclude familiarity with VA TIL, and maintaining facility operations during construction.\nII. Design Team Proposed for This Project\na. Qualifications of Key Personnel \nProvide resumes (max 10) showing experience in healthcare and federal projects.\nInclude experience with ADA compliance, site design (grading/drainage), and life safety.\n\nb. Subconsultants \nProvide qualifications of subcontractors, especially for civil/site work, industrial hygiene, and fire/life safety.\n\nc. Design Approach \nDescribe approach to ADA, NFPA Life Safety Code, infection control, and exterior material selection.\nIII. Technical Approach\nDescribe approach to incorporating ADA, NFPA Life Safety Code, energy conservation, and site improvements.\n\nInclude understanding of renovating an active hospital entrance, maintaining safe access, and minimizing disruption through phasing.\nIV. Proposed Management Plan\na. Project Management Approach \nDescribe approach to schedule, budget, risk management, and communication.\n\nb. Work Plan and Deliverables \nProvide plan to meet design milestones (25%, 75%, 100%, final) and ability to meet submission dates.\n\nc. Compliance Standards \nDemonstrate knowledge of NFPA, NEC, OSHA, and other applicable codes.\n\nd. VA Specific Standards \nDemonstrate familiarity with VA requirements, TIL, and PDT process.\nV. Location and Knowledge of Local Area\na. Firm Location \nProvide office locations and ability to support site visits and response times.\n\nb. Local Knowledge \nDemonstrate knowledge of Wilmington VAMC, local construction conditions, and factors impacting cost and schedule\n\n\n\n\n\n\nWilmington, DE VA Medical Center\nWilmington, DE 19805\n\n\nA/E SCOPE OF WORK\n\nFor\n\n\nRenovate The Exterior Of Main Hospital\nProject No. 460-26-001\n\n\n\nBid Documents/Final Report Ready By:\n180 days after NTP\n\n-- Services --\nProvide:\nProfessional A/E and healthcare planning services to include but not limited to:\nSite investigation   architectural, structural, mechanical, electrical, and environmental services.\nContract drawings and specifications for construction.\n3rd Party Cost Estimates\nConstruction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings; A/E will respond on site within a two-hour period when requested.\nInfection Control Risk Assessment\nMeet all of the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program.  Reference at https://www.cfm.va.gov/cfm/til/index.asp\n \n-- Project Scope --\nGENERAL:\nThis project consists of the renovation of the main exterior entrance of Building 1 at the\nWilmington VA Medical Center. Work includes demolition, redesign, and reconstruction of entrance\nfeatures and installation of a new ADA-compliant handicap ramp. \nSPECIFICS:\nEvaluate and redesign entrance plaza, sidewalks, and approach paths and associated roadways\n\n   Design ADA-compliant ramp including slopes, handrails, landings\n\n   Improve drainage, grading\n\n  Upgrade exterior finishes, railings, entry features and any architectural faÃ§ade as deemed necessary \n\n \n  Maintain facility operations during construction\n\n  Identify and correct life safety deficiencies and provide phasing plan if necessary \n\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.asp  and https://wbdg.org/ffc/federal-facility-criteria. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n. \n\nOther Specifics:\nAutoCAD files of existing design will be provided for use.\nPhase all work in coordination with Hospital staff to minimize down-time to areas affected by the project.\nConstruction Waste Management, s to be included.\nDesign to maintain all infection control/ dust prevention measures.\nList all Permits necessary to complete the project.\nConsolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.aspThe A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n \n\n-- Site Investigations --\nEXPECTATION: A/E will make site visits as necessary to survey existing conditions.\nMake site visits as required to determine existing as-built conditions affecting this project.\nProvide any structural, architectural, electrical, and mechanical investigative work including all interior and exterior, of both existing and designed systems necessary to ensure the accuracy of the design.\nPrepare any measured drawings of existing systems of facility required to ensure the accuracy of the design.\nProvide a CIH to evaluate the impacted building areas for asbestos. Wilmington VA has an asbestos survey which will need to be verified.\nProvide a CIH to evaluate the impacted building areas for lead based paint. Exterior window frames have not been tested for lead based paint, but exterior doors have and several did test positive.\nNOTE:  Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov. AutoCAD background drawings will be provided by the VA upon request.\nThe A/E shall field verify all dimensions.  A/E shall field verify every aspect that relates to the project.  Coordinate site visits with the Project Engineer.\n  -- Environmental/Occupational Safety and Health (EOSH) --\nEXPECTATION: All projects and project designs shall contain language that addresses all applicable EOSH requirements.\nRegulatory Compliance   EOSH requirements for work performed at the above location can be found in:\nVolume 29 of the Code of Federal Regulations, Part 1910   Occupational Safety for General Industry\nVolume 29 of the Code of Federal Regulations, Part 1926   Occupational Safety for The Construction Industry\nVolume 40 of the Code of Federal Regulations   Protection of The Environment\nVolume 49 of the Code of Federal Regulations, Part 397   Transportation of Hazardous Materials\nTitle 7 of the Delaware Code   Conservation\nTitle 16 of the Delaware Code   Health and Safety\n\nSpecifications\nThe VA Master Construction Specifications contain work procedures and material requirements \ndesigned to meet regulatory compliance requirements.Â  Whenever possible, the Master Construction Specifications must be used as the basis for project designs.\nA complete list of these specifications can be viewed at the following website: https://www.cfm.va.gov/cfm/til/index.aspSpecifications which address EOSH requirements include, but are not limited to\n\n-- Design Review Schedule --\nEXPECTATION: Submit review packages so they are received on the noted day.\nSUBMISSIONS:\nSubmit review packages so they are received on the noted day (calendar days after NTP) or earlier:\nNotice to Proceed\nDay 0\n(0 days)\nInitial Meeting with Stakeholders\nDay 14\n(14 days)\nDesign Development Document Submission (25%)\nDay 44\n(30 days)\nPDT Review Meeting (25%)\nDay 58\n(14 days)\nDesign Development Document Submission (75%)\nDay 93\n(35 days)\nPDT Review Meeting (75%)\nDay 107\n(14 days)\nDesign Development Document Submission (100%)\nDay 152\n(45 days)\nPDT Review Meeting (100%)\nDay 166\n(14 days)\nContract Documents Submission (Final)\nDay 180\n(14 days)\nNote:  The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting.\n \n-- Specification Requirements --\n\n-- Design Requirements/Submissions --\nEXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects)\nDELIVER:\nAll design packages directly to the Project Engineer on the established dates to allow the VA to review.  A transmittal letter is required to go to the Contracting Officer on the same day as delivery.  Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006.  The manual is available at the following address: http://www.cfm.va.gov \n25% Design Development Submission:  Attachment  A  25% Submission Requirements\nChecklist of Requirements for the 25% Design Development Submission.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development)\nIdentify Working Drawings scope within construction budget\nIdentify impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\n75% Design Development Submission:  Attachment  B  75% Submission Requirements\nChecklist of Requirements for the 75% Design Development Submission.\nAddress all comments from the 25% review.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development)\nIdentify Working Drawings scope within construction budget.\nFinalize impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nPresent energy modeling and financial impacts using various types of windows for consideration.\nDevelop Infection Control Risk Assessment (VA EC-43)\nA/E shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The A/E shall provide the Project Engineer with a complete copy of the 75% documents for submission to the consulting firm.  The designated firm will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting.\n100% Design Development Submission:  Attachment  C  100% Submission Requirements\nChecklist of Requirements for the 100% Design Development Submission.\nAddress all comments from the 75% review.\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nRevise and update cost estimate\nPreparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission\nFinalize all design calculations\nFinalize all potential bid deduct alternatives\nFinalize all phasing requirements for construction\nFinalize Infection Control Risk Assessment (VA EC-43)\nAddress all comments from the VISN Safety and Fire Protection Review\nContract Documents (CD) Submission:  Attachment  D  Submission Requirements\nSubmit a complete document set of all contract requirements.  The Cover Page shall be submitted for approval signatures.  If necessary, update and submit until approved by the VA.\n \n\nATTACHMENT  A \nDeliver the following (labeled with 25% Design Development Document Submission) and include this attachment as a checklist with your submission:\n25% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F and F1.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment)\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in the newest version of Microsoft Word  (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  B \nDeliver the following (labeled with 75% Design Development Document Submission) and include this attachment as a checklist with your submission:  \n75% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall contain sample catalog cut sheets of new equipment to be installed in the design. Report shall include energy modeling reports with financial impacts of various window types. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025.     software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of Infection Control Risk Assessment.\n1 additional copy each of the custom edited VA Master Specifications and drawings as specified above are to be delivered to a third party fire and life safety firm on the same dates as delivered to the Project Manager. A letter of transmittal signifying delivery will be forwarded to the Project Manager. A/E shall utilize the services of the Network 4 Fire and Safety Engineer, to conduct a fire and life safety peer review of the project throughout the design. Comments resulted from the peer review shall be incorporated into the design at no additional cost.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  C \nDeliver the following (labeled with 100% Design Development Documents Submission) and include this attachment as a checklist with your submission:\n100% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 75% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of the Infection Control Risk Assessment.\n2 copy of drawings in AutoCAD 2025  and .pdf format and specifications in newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  D \nEXPECTATION: Submit complete bid document for final review prior to solicitation. Continue to submit bid documents until all changes are incorporated by the A/E for final signature prior to solicitation.  Upon approval duplicate copies as required.\nDeliver the following (labeled with Contract Documents Submission) and include this attachment as a checklist with your submission:\nContract Document Submission Requirements\n1 copy of the Cover Sheet (AutoCAD) for final VA signatures.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software   for final VA review.  If approved, final sets to be submitted with signed off cover sheet.\n3 copies of final project specification (two bound; one loose) prepared in newest version of Microsoft Word software.  Include a master submittal list in the specifications.\n2 CDs containing \nAll drawings in AutoCAD 2025 (.dwg) and in .pdf file\nAll specifications in newest version of Microsoft Word \nSubmittal Spreadsheet   identifying all the submittals required to be submitted by the contractor for review.  The list shall be organized by division and specification.\nUpon signature approval, provide five sets of final Contract Documents (complete with VA signed Cover Sheet).  Provide two Â½ size sets of final drawings.\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT   E \n\nA/E  SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE\n\nDEPARTMENT OF VETERANS AFFAIRS\nA/E REGULATIONS ASBESTOS ABATEMENT\nThe A/E shall hire a Certified Industrial Hygienist (CIH) Consultant to assist in the assessment and design for asbestos abatement.\nThe CIH shall meet the following minimum qualifications:\nBe certified by the American Board of Industrial Hygienists in Industrial Hygiene-Comprehensive.\nHave asbestos abatement experience in assessment, design, abatement, construction monitoring and decontamination clearance.\nHis office to be as close as possible to the project location, so that he will be available to the COTR during construction on an on-call basis with a response time of one day.\nWill have support staff and back-up capacity to provide adequate level of support to the COTR throughout construction.\nThe scope of work for the A/E with his CIH consultant is as follows:\nPreliminary (25%) Design\nTask 1:  Review building records and interview station personnel for detection of trade name material used for the construction of the buildings, which are known to contain asbestos.  Perform a visual inspection of the areas impacted and develop a sampling strategy that will yield statistically viable conclusions on extent of asbestos present.  Perform this task at the first preliminary submittal and notify VA on results at 100% submission.\nFinal (75 and 100% Reviews) Design\nTask 2:  Collect bulk suspected asbestos samples and utilize the services of a testing lab accredited by the American Industrial Hygienists Association.\nUpon receiving the results determine adequacy for an assessment report.  Any samples requiring further clarification, utilizing scanning electron microscopy (SEM), need to be contracted to a qualified laboratory for sample analysis.  If additional samples are required, take such samples at this stage so that the maximum detection of asbestos can be achieved.  This service (bulk sampling) will be at no cost.\nTask 3:  Prepare an exposure assessment report on only the impacted areas of the modification project.  Include the following information:\nDescribe the impacted areas by sketches, room names or other means.  Show or describe the location of each sample taken, its composition and identification number.\nClassify each impacted space as  Major Abatement   Minor Abatement  or  No Abatement  areas.  A  Major Abatement  area requires full protective measures (sealing off, change room, shower room, etc.), and all asbestos must be removed within the limits of the area.  A  Minor Abatement  area can be decontaminated with one or more applications of the  glove and bag  approach.  A  No Abatement  area requires no abatement work.\nFor each  Major Abatement  area, provide quantity and cost estimates of all asbestos within the limits of the area.  Quantities to be in linear feet of pipe and square feet of ceilings and walls.  The cost to be derived from the quantities multiplied by a unit price.\nFor each  Minor Abatement  area, provide the description, size and location of each element to be decontaminated and a cost estimate.\nProvide summary of the square feet of floor space for all abatement areas, the total linear and square feet of asbestos to be abated, the total cost of abatement and a preliminary schedule of completion.  Include in the cost estimate any cost for decontamination.\nProvide an assessment on the impact of abatement on building sub-systems such as ceilings, lights, walls, carpets, pipes and equipment.  Provide room-by-room description and estimated quantities of impacted items to be placed (number of lighting fixtures, square feet of ceiling, etc.) and a summary of these quantities.  Provide a cost estimate for all impacted items.\nProvide a cover statement signed by both the A/E and the CIH consultant.  The statement shall be in accordance with the  Sample Cover Statement  provided by the VA, as part of the A/E package.\nSubmit the report at the 75% Design Review Submission.\nTask 4:  Prepare drawings and specifications for the asbestos abatement work reflecting the assessment report.  The drawings shall be separately identified from the rest of the drawings, be 1/8  scale plans and shall provide as a minimum the following information.\nFor each  Major Abatement  area show the limits of sealing off, the location and quantities of asbestos material, the arrangements for auxiliary rooms, such as change room, shower room, etc., transportation to the loading platform.\nFor each  Minor Abatement  area show on plans the exact location type and length of pipe element to be abated by the  glove and bag  approach and any other abatement features.\nProvide details, sections, notes and any other information that are necessary for complete bid documents.\nPrepare project specifications by editing and modifying the VA master specifications on asbestos abatement.\nProvide the drawings and specifications for the restoration of the impacted building sub-systems as an integral part of the overall project design.  Provide for replacing of removed asbestos insulation with acceptable non-asbestos insulation, replacing contaminated carpets, replacing old contaminated light fixtures and replacing partially torn down plaster ceilings.\nThe submittals of the working drawings for abatement shall coincide with the submittals for the working drawings of the modification project.\nProvide an integrated phasing showing how the abatement and the general modification work will be executed.  Provide some reasonable cushion between each abatement phase and the following general construction phase to allow for unforeseen delays in abatement completion.\nTask 5:  Assist VA to determine whether the abatement sub-contractor meets qualification requirements.  \nExcluded from the scope of work (to be completed by others):\nProvide onsite continuous monitoring during construction of the performance of the abatement sub-contractor.  Check and approve the set-up for each  Major Abatement  area, check the standard operating procedure of the abatement contractor, continuously monitor air contamination inspections to ensure compliance with specifications and drawings, and monitor access/egress into containment areas. Determine abatement of asbestos discovered during construction and advise the COTR on time and cost for such abatement.\nPerform the final inspection and testing at the end of the abatement work on the area and if the results are satisfactory, release the space to the general contractor for general work.\nAt the end of all abatement work, a compliance certificate signed by both the CIH and the A/E shall be issued.  The compliance certificate shall be in accordance with the  Sample Certificate  provided by the VA in the A/E package.\n \nATTACHMENT  E-1\n\nA/E  SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE 19805\n\nCOVER STATEMENT FOR ASBESTOS ASSESSMENT REPORT\n\n The enclosed Asbestos Assessment Report for                                     has been prepared, as part of Project #                         and covers the following buildings                                               .   I certify that I have surveyed each of the buildings or areas in my contract, have interviewed station personnel and have supervised technicians for the examination of available records related to the buildings.\nBased on the information gathered through the above activities and on the expected extent of the renovation as explained to me by                                               of the A/E firm on this project, I have devised a sampling plan and I have supervised the trained Industrial Hygiene Technicians during the collection of the samples.\nI have selected a qualified analytical laboratory for the analysis of the samples and I have evaluated the sampling results to ensure that statistically viable results on asbestos hazards were available for all buildings involved.\nBases on the above information, I have prepared the attached Asbestos Hazard Assessment Report.  This report reflects the best-known abatement technology, the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects and all applicable regulations.  An abatement design, which will be prepared by a qualified abatement contractor, will achieve the desired decontamination of the impacted areas and minimize exposure of people and the environment.\n\n\n\n\n\n (C. I. H.  NAME, CERTIFICATION  NO. & STATE CERTIFIED IN)\n\n\n\n\n\n\n\nPhotos of exterior:\n\nIt is the VA s intention to potentially modify or completely replace the main traffic circle canopy due to ADA sidewalk, ramp or vehicle drop off requirements. This requirement is also being requested to update the main entrance with a modernized canopy layout/design.\nDrainage will need to be considered. With the layout of new sidewalks and ramps the ground slope and stormwater runoff will be modified and need to be redesigned. \nDesign was completed in 1994. See current plan as separate attachment.\nReplacing of the existing entrance canopy is a required element of the project.\nThe VA did not complete an ADA assessment.\nThere will be some modifications that will need to be done as it relates to roadway modifications, traffic circle improvements, adjacent parking areas, utilities, and landscape areas included within the project boundary.","text":"Page 13 of 13\nAdditional clarifying details added though this revision posting. Changes in this revision can be seen highlighted in green. Yellow highlighted text reflects the previous corrections made from the original posting. An Extension to the due date has been made accordingly. Further extension requests are not feasible to the timeframe for this intended FY26 contract award. All other details remain as originally posted.\nACQUISITION INFORMATION:\nThe Wilmington Department of Veterans Affairs Medical Center located at 1601 Kirkwood Highway, Wilmington DE, 19805 is seeking professional Architect and Engineering (A&E) services for Project No. 460-26-001, Renovate Exterior of Main Hospital Design.\n\nThis announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send one copy of an SF 330 (7/2021 Edition) via email with qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS.\nFirms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement.\n\nContract Award Procedure: Interested A&E Firms should e-mail a PDF SF330 document to Hanna Karmazyn at Hanna.Karmazyn@va.gov by 3:00 PM, EST, July 13, 2026. A&E firms shall be registered at www.sam.gov and www.vetbiz.gov. If available, please include your firm's VetBiz.gov SDVOSB status verification. Failure of a proposed SDVOSB A&E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services require may be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement. A&E Firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $25.5M apply. NAICS 541330 covers engineering design, development and utilization of structures and systems and remains the appropriate code for this procurement. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY26 funding. The construction magnitude is between $2,000,000.00 and $5,000,000.00.\n\nA/E Evaluation Factors\nI. Experience and Past Performance\na. Healthcare Planning Experience\nProvide a brief overview of the firm s history and experience in healthcare planning. Include at least 5 relevant projects.\nAdd emphasis on exterior renovations, ADA accessibility upgrades, and work performed in active medical facilities requiring phasing.\n\nb. Federal Contract Experience\nDemonstrate experience with federal contracts, especially VA projects.\nInclude familiarity with VA TIL, and maintaining facility operations during construction.\nII. Design Team Proposed for This Project\na. Qualifications of Key Personnel\nProvide resumes (max 10) showing experience in healthcare and federal projects.\nInclude experience with ADA compliance, site design (grading/drainage), and life safety.\n\nb. Subconsultants\nProvide qualifications of subcontractors, especially for civil/site work, industrial hygiene, and fire/life safety.\n\nc. Design Approach\nDescribe approach to ADA, NFPA Life Safety Code, infection control, and exterior material selection.\nIII. Technical Approach\nDescribe approach to incorporating ADA, NFPA Life Safety Code, energy conservation, and site improvements.\n\nInclude understanding of renovating an active hospital entrance, maintaining safe access, and minimizing disruption through phasing.\nIV. Proposed Management Plan\na. Project Management Approach\nDescribe approach to schedule, budget, risk management, and communication.\n\nb. Work Plan and Deliverables\nProvide plan to meet design milestones (25%, 75%, 100%, final) and ability to meet submission dates.\n\nc. Compliance Standards\nDemonstrate knowledge of NFPA, NEC, OSHA, and other applicable codes.\n\nd. VA Specific Standards\nDemonstrate familiarity with VA requirements, TIL, and PDT process.\nV. Location and Knowledge of Local Area\na. Firm Location\nProvide office locations and ability to support site visits and response times.\n\nb. Local Knowledge\nDemonstrate knowledge of Wilmington VAMC, local construction conditions, and factors impacting cost and schedule\n\nWilmington, DE VA Medical Center\nWilmington, DE 19805\n\nA/E SCOPE OF WORK\n\nFor\n\nRenovate The Exterior Of Main Hospital\nProject No. 460-26-001\n\nBid Documents/Final Report Ready By:\n180 days after NTP\n\n-- Services --\nProvide:\nProfessional A/E and healthcare planning services to include but not limited to:\nSite investigation architectural, structural, mechanical, electrical, and environmental services.\nContract drawings and specifications for construction.\n3rd Party Cost Estimates\nConstruction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings; A/E will respond on site within a two-hour period when requested.\nInfection Control Risk Assessment\nMeet all of the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program. Reference at https://www.cfm.va.gov/cfm/til/index.asp\n\n-- Project Scope --\nGENERAL:\nThis project consists of the renovation of the main exterior entrance of Building 1 at the\nWilmington VA Medical Center. Work includes demolition, redesign, and reconstruction of entrance\nfeatures and installation of a new ADA-compliant handicap ramp.\nSPECIFICS:\nEvaluate and redesign entrance plaza, sidewalks, and approach paths and associated roadways\n\nDesign ADA-compliant ramp including slopes, handrails, landings\n\nImprove drainage, grading\n\nUpgrade exterior finishes, railings, entry features and any architectural faÃ§ade as deemed necessary\n\nMaintain facility operations during construction\n\nIdentify and correct life safety deficiencies and provide phasing plan if necessary\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.asp and https://wbdg.org/ffc/federal-facility-criteria. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n.\n\nOther Specifics:\nAutoCAD files of existing design will be provided for use.\nPhase all work in coordination with Hospital staff to minimize down-time to areas affected by the project.\nConstruction Waste Management, s to be included.\nDesign to maintain all infection control/ dust prevention measures.\nList all Permits necessary to complete the project.\nConsolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.aspThe A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n\n-- Site Investigations --\nEXPECTATION: A/E will make site visits as necessary to survey existing conditions.\nMake site visits as required to determine existing as-built conditions affecting this project.\nProvide any structural, architectural, electrical, and mechanical investigative work including all interior and exterior, of both existing and designed systems necessary to ensure the accuracy of the design.\nPrepare any measured drawings of existing systems of facility required to ensure the accuracy of the design.\nProvide a CIH to evaluate the impacted building areas for asbestos. Wilmington VA has an asbestos survey which will need to be verified.\nProvide a CIH to evaluate the impacted building areas for lead based paint. Exterior window frames have not been tested for lead based paint, but exterior doors have and several did test positive.\nNOTE: Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov. AutoCAD background drawings will be provided by the VA upon request.\nThe A/E shall field verify all dimensions. A/E shall field verify every aspect that relates to the project. Coordinate site visits with the Project Engineer.\n-- Environmental/Occupational Safety and Health (EOSH) --\nEXPECTATION: All projects and project designs shall contain language that addresses all applicable EOSH requirements.\nRegulatory Compliance EOSH requirements for work performed at the above location can be found in:\nVolume 29 of the Code of Federal Regulations, Part 1910 Occupational Safety for General Industry\nVolume 29 of the Code of Federal Regulations, Part 1926 Occupational Safety for The Construction Industry\nVolume 40 of the Code of Federal Regulations Protection of The Environment\nVolume 49 of the Code of Federal Regulations, Part 397 Transportation of Hazardous Materials\nTitle 7 of the Delaware Code Conservation\nTitle 16 of the Delaware Code Health and Safety\n\nSpecifications\nThe VA Master Construction Specifications contain work procedures and material requirements\ndesigned to meet regulatory compliance requirements.Â Whenever possible, the Master Construction Specifications must be used as the basis for project designs.\nA complete list of these specifications can be viewed at the following website: https://www.cfm.va.gov/cfm/til/index.aspSpecifications which address EOSH requirements include, but are not limited to\n\n-- Design Review Schedule --\nEXPECTATION: Submit review packages so they are received on the noted day.\nSUBMISSIONS:\nSubmit review packages so they are received on the noted day (calendar days after NTP) or earlier:\nNotice to Proceed\nDay 0\n(0 days)\nInitial Meeting with Stakeholders\nDay 14\n(14 days)\nDesign Development Document Submission (25%)\nDay 44\n(30 days)\nPDT Review Meeting (25%)\nDay 58\n(14 days)\nDesign Development Document Submission (75%)\nDay 93\n(35 days)\nPDT Review Meeting (75%)\nDay 107\n(14 days)\nDesign Development Document Submission (100%)\nDay 152\n(45 days)\nPDT Review Meeting (100%)\nDay 166\n(14 days)\nContract Documents Submission (Final)\nDay 180\n(14 days)\nNote: The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting.\n\n-- Specification Requirements --\n\n-- Design Requirements/Submissions --\nEXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects)\nDELIVER:\nAll design packages directly to the Project Engineer on the established dates to allow the VA to review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006. The manual is available at the following address: http://www.cfm.va.gov\n25% Design Development Submission: Attachment A 25% Submission Requirements\nChecklist of Requirements for the 25% Design Development Submission.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development)\nIdentify Working Drawings scope within construction budget\nIdentify impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\n75% Design Development Submission: Attachment B 75% Submission Requirements\nChecklist of Requirements for the 75% Design Development Submission.\nAddress all comments from the 25% review.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development)\nIdentify Working Drawings scope within construction budget.\nFinalize impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nPresent energy modeling and financial impacts using various types of windows for consideration.\nDevelop Infection Control Risk Assessment (VA EC-43)\nA/E shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The A/E shall provide the Project Engineer with a complete copy of the 75% documents for submission to the consulting firm. The designated firm will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting.\n100% Design Development Submission: Attachment C 100% Submission Requirements\nChecklist of Requirements for the 100% Design Development Submission.\nAddress all comments from the 75% review.\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nRevise and update cost estimate\nPreparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission\nFinalize all design calculations\nFinalize all potential bid deduct alternatives\nFinalize all phasing requirements for construction\nFinalize Infection Control Risk Assessment (VA EC-43)\nAddress all comments from the VISN Safety and Fire Protection Review\nContract Documents (CD) Submission: Attachment D Submission Requirements\nSubmit a complete document set of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA.\n\nATTACHMENT A\nDeliver the following (labeled with 25% Design Development Document Submission) and include this attachment as a checklist with your submission:\n25% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F and F1.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment)\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in the newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT B\nDeliver the following (labeled with 75% Design Development Document Submission) and include this attachment as a checklist with your submission:\n75% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall contain sample catalog cut sheets of new equipment to be installed in the design. Report shall include energy modeling reports with financial impacts of various window types. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025. software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of Infection Control Risk Assessment.\n1 additional copy each of the custom edited VA Master Specifications and drawings as specified above are to be delivered to a third party fire and life safety firm on the same dates as delivered to the Project Manager. A letter of transmittal signifying delivery will be forwarded to the Project Manager. A/E shall utilize the services of the Network 4 Fire and Safety Engineer, to conduct a fire and life safety peer review of the project throughout the design. Comments resulted from the peer review shall be incorporated into the design at no additional cost.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT C\nDeliver the following (labeled with 100% Design Development Documents Submission) and include this attachment as a checklist with your submission:\n100% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 75% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of the Infection Control Risk Assessment.\n2 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT D\nEXPECTATION: Submit complete bid document for final review prior to solicitation. Continue to submit bid documents until all changes are incorporated by the A/E for final signature prior to solicitation. Upon approval duplicate copies as required.\nDeliver the following (labeled with Contract Documents Submission) and include this attachment as a checklist with your submission:\nContract Document Submission Requirements\n1 copy of the Cover Sheet (AutoCAD) for final VA signatures.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software for final VA review. If approved, final sets to be submitted with signed off cover sheet.\n3 copies of final project specification (two bound; one loose) prepared in newest version of Microsoft Word software. Include a master submittal list in the specifications.\n2 CDs containing\nAll drawings in AutoCAD 2025 (.dwg) and in .pdf file\nAll specifications in newest version of Microsoft Word\nSubmittal Spreadsheet identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification.\nUpon signature approval, provide five sets of final Contract Documents (complete with VA signed Cover Sheet). Provide two Â½ size sets of final drawings.\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT E\n\nA/E SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE\n\nDEPARTMENT OF VETERANS AFFAIRS\nA/E REGULATIONS ASBESTOS ABATEMENT\nThe A/E shall hire a Certified Industrial Hygienist (CIH) Consultant to assist in the assessment and design for asbestos abatement.\nThe CIH shall meet the following minimum qualifications:\nBe certified by the American Board of Industrial Hygienists in Industrial Hygiene-Comprehensive.\nHave asbestos abatement experience in assessment, design, abatement, construction monitoring and decontamination clearance.\nHis office to be as close as possible to the project location, so that he will be available to the COTR during construction on an on-call basis with a response time of one day.\nWill have support staff and back-up capacity to provide adequate level of support to the COTR throughout construction.\nThe scope of work for the A/E with his CIH consultant is as follows:\nPreliminary (25%) Design\nTask 1: Review building records and interview station personnel for detection of trade name material used for the construction of the buildings, which are known to contain asbestos. Perform a visual inspection of the areas impacted and develop a sampling strategy that will yield statistically viable conclusions on extent of asbestos present. Perform this task at the first preliminary submittal and notify VA on results at 100% submission.\nFinal (75 and 100% Reviews) Design\nTask 2: Collect bulk suspected asbestos samples and utilize the services of a testing lab accredited by the American Industrial Hygienists Association.\nUpon receiving the results determine adequacy for an assessment report. Any samples requiring further clarification, utilizing scanning electron microscopy (SEM), need to be contracted to a qualified laboratory for sample analysis. If additional samples are required, take such samples at this stage so that the maximum detection of asbestos can be achieved. This service (bulk sampling) will be at no cost.\nTask 3: Prepare an exposure assessment report on only the impacted areas of the modification project. Include the following information:\nDescribe the impacted areas by sketches, room names or other means. Show or describe the location of each sample taken, its composition and identification number.\nClassify each impacted space as Major Abatement Minor Abatement or No Abatement areas. A Major Abatement area requires full protective measures (sealing off, change room, shower room, etc.), and all asbestos must be removed within the limits of the area. A Minor Abatement area can be decontaminated with one or more applications of the glove and bag approach. A No Abatement area requires no abatement work.\nFor each Major Abatement area, provide quantity and cost estimates of all asbestos within the limits of the area. Quantities to be in linear feet of pipe and square feet of ceilings and walls. The cost to be derived from the quantities multiplied by a unit price.\nFor each Minor Abatement area, provide the description, size and location of each element to be decontaminated and a cost estimate.\nProvide summary of the square feet of floor space for all abatement areas, the total linear and square feet of asbestos to be abated, the total cost of abatement and a preliminary schedule of completion. Include in the cost estimate any cost for decontamination.\nProvide an assessment on the impact of abatement on building sub-systems such as ceilings, lights, walls, carpets, pipes and equipment. Provide room-by-room description and estimated quantities of impacted items to be placed (number of lighting fixtures, square feet of ceiling, etc.) and a summary of these quantities. Provide a cost estimate for all impacted items.\nProvide a cover statement signed by both the A/E and the CIH consultant. The statement shall be in accordance with the Sample Cover Statement provided by the VA, as part of the A/E package.\nSubmit the report at the 75% Design Review Submission.\nTask 4: Prepare drawings and specifications for the asbestos abatement work reflecting the assessment report. The drawings shall be separately identified from the rest of the drawings, be 1/8 scale plans and shall provide as a minimum the following information.\nFor each Major Abatement area show the limits of sealing off, the location and quantities of asbestos material, the arrangements for auxiliary rooms, such as change room, shower room, etc., transportation to the loading platform.\nFor each Minor Abatement area show on plans the exact location type and length of pipe element to be abated by the glove and bag approach and any other abatement features.\nProvide details, sections, notes and any other information that are necessary for complete bid documents.\nPrepare project specifications by editing and modifying the VA master specifications on asbestos abatement.\nProvide the drawings and specifications for the restoration of the impacted building sub-systems as an integral part of the overall project design. Provide for replacing of removed asbestos insulation with acceptable non-asbestos insulation, replacing contaminated carpets, replacing old contaminated light fixtures and replacing partially torn down plaster ceilings.\nThe submittals of the working drawings for abatement shall coincide with the submittals for the working drawings of the modification project.\nProvide an integrated phasing showing how the abatement and the general modification work will be executed. Provide some reasonable cushion between each abatement phase and the following general construction phase to allow for unforeseen delays in abatement completion.\nTask 5: Assist VA to determine whether the abatement sub-contractor meets qualification requirements.\nExcluded from the scope of work (to be completed by others):\nProvide onsite continuous monitoring during construction of the performance of the abatement sub-contractor. Check and approve the set-up for each Major Abatement area, check the standard operating procedure of the abatement contractor, continuously monitor air contamination inspections to ensure compliance with specifications and drawings, and monitor access/egress into containment areas. Determine abatement of asbestos discovered during construction and advise the COTR on time and cost for such abatement.\nPerform the final inspection and testing at the end of the abatement work on the area and if the results are satisfactory, release the space to the general contractor for general work.\nAt the end of all abatement work, a compliance certificate signed by both the CIH and the A/E shall be issued. The compliance certificate shall be in accordance with the Sample Certificate provided by the VA in the A/E package.\n\nATTACHMENT E-1\n\nA/E SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE 19805\n\nCOVER STATEMENT FOR ASBESTOS ASSESSMENT REPORT\n\nThe enclosed Asbestos Assessment Report for has been prepared, as part of Project # and covers the following buildings . I certify that I have surveyed each of the buildings or areas in my contract, have interviewed station personnel and have supervised technicians for the examination of available records related to the buildings.\nBased on the information gathered through the above activities and on the expected extent of the renovation as explained to me by of the A/E firm on this project, I have devised a sampling plan and I have supervised the trained Industrial Hygiene Technicians during the collection of the samples.\nI have selected a qualified analytical laboratory for the analysis of the samples and I have evaluated the sampling results to ensure that statistically viable results on asbestos hazards were available for all buildings involved.\nBases on the above information, I have prepared the attached Asbestos Hazard Assessment Report. This report reflects the best-known abatement technology, the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects and all applicable regulations. An abatement design, which will be prepared by a qualified abatement contractor, will achieve the desired decontamination of the impacted areas and minimize exposure of people and the environment.\n\n(C. I. H. NAME, CERTIFICATION NO. & STATE CERTIFIED IN)\n\nPhotos of exterior:\n\nIt is the VA s intention to potentially modify or completely replace the main traffic circle canopy due to ADA sidewalk, ramp or vehicle drop off requirements. This requirement is also being requested to update the main entrance with a modernized canopy layout/design.\nDrainage will need to be considered. With the layout of new sidewalks and ramps the ground slope and stormwater runoff will be modified and need to be redesigned.\nDesign was completed in 1994. See current plan as separate attachment.\nReplacing of the existing entrance canopy is a required element of the project.\nThe VA did not complete an ADA assessment.\nThere will be some modifications that will need to be done as it relates to roadway modifications, traffic circle improvements, adjacent parking areas, utilities, and landscape areas included within the project boundary.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C24426R0113","place_of_performance":{"zip":"19805","city":{"code":"77580","name":"Wilmington"},"state":{"code":"DE","name":"Delaware"},"street":"Wilmington DE VAMC","country":{"code":"USA","name":"UNITED STATES"},"street2":"1601 Kirkwood Highway"},"product_service_code":"C1DZ"}],"due_at":"2026-07-13T19:00:00Z","due_date":"2026-07-13","closes_at":"2026-07-13T19:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C244","office_name":"244-NETWORK CONTRACT OFFICE 4 (36C244)","state":"DE","county":"10003","county_name":"New Castle County","city":"1077580","city_name":"Wilmington","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-11-17T04:42:47.571825Z","principal_notice_id":"9e466aa179fd49fbaa4791b067f3f74c","description":{"text":"Page 13 of 13\nAdditional clarifying details added though this revision posting. Changes in this revision can be seen highlighted in green. Yellow highlighted text reflects the previous corrections made from the original posting. An Extension to the due date has been made accordingly. Further extension requests are not feasible to the timeframe for this intended FY26 contract award. All other details remain as originally posted.\nACQUISITION INFORMATION:\nThe Wilmington Department of Veterans Affairs Medical Center located at 1601 Kirkwood Highway, Wilmington DE, 19805 is seeking professional Architect and Engineering (A&E) services for Project No. 460-26-001, Renovate Exterior of Main Hospital Design.\n\nThis announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send one copy of an SF 330 (7/2021 Edition) via email with qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS.\nFirms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement.\n\nContract Award Procedure: Interested A&E Firms should e-mail a PDF SF330 document to Hanna Karmazyn at Hanna.Karmazyn@va.gov by 3:00 PM, EST, July 13, 2026. A&E firms shall be registered at www.sam.gov and www.vetbiz.gov. If available, please include your firm's VetBiz.gov SDVOSB status verification. Failure of a proposed SDVOSB A&E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services require may be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement. A&E Firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $25.5M apply. NAICS 541330 covers engineering design, development and utilization of structures and systems and remains the appropriate code for this procurement. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY26 funding. The construction magnitude is between $2,000,000.00 and $5,000,000.00.\n\nA/E Evaluation Factors\nI. Experience and Past Performance\na. Healthcare Planning Experience\nProvide a brief overview of the firm s history and experience in healthcare planning. Include at least 5 relevant projects.\nAdd emphasis on exterior renovations, ADA accessibility upgrades, and work performed in active medical facilities requiring phasing.\n\nb. Federal Contract Experience\nDemonstrate experience with federal contracts, especially VA projects.\nInclude familiarity with VA TIL, and maintaining facility operations during construction.\nII. Design Team Proposed for This Project\na. Qualifications of Key Personnel\nProvide resumes (max 10) showing experience in healthcare and federal projects.\nInclude experience with ADA compliance, site design (grading/drainage), and life safety.\n\nb. Subconsultants\nProvide qualifications of subcontractors, especially for civil/site work, industrial hygiene, and fire/life safety.\n\nc. Design Approach\nDescribe approach to ADA, NFPA Life Safety Code, infection control, and exterior material selection.\nIII. Technical Approach\nDescribe approach to incorporating ADA, NFPA Life Safety Code, energy conservation, and site improvements.\n\nInclude understanding of renovating an active hospital entrance, maintaining safe access, and minimizing disruption through phasing.\nIV. Proposed Management Plan\na. Project Management Approach\nDescribe approach to schedule, budget, risk management, and communication.\n\nb. Work Plan and Deliverables\nProvide plan to meet design milestones (25%, 75%, 100%, final) and ability to meet submission dates.\n\nc. Compliance Standards\nDemonstrate knowledge of NFPA, NEC, OSHA, and other applicable codes.\n\nd. VA Specific Standards\nDemonstrate familiarity with VA requirements, TIL, and PDT process.\nV. Location and Knowledge of Local Area\na. Firm Location\nProvide office locations and ability to support site visits and response times.\n\nb. Local Knowledge\nDemonstrate knowledge of Wilmington VAMC, local construction conditions, and factors impacting cost and schedule\n\nWilmington, DE VA Medical Center\nWilmington, DE 19805\n\nA/E SCOPE OF WORK\n\nFor\n\nRenovate The Exterior Of Main Hospital\nProject No. 460-26-001\n\nBid Documents/Final Report Ready By:\n180 days after NTP\n\n-- Services --\nProvide:\nProfessional A/E and healthcare planning services to include but not limited to:\nSite investigation architectural, structural, mechanical, electrical, and environmental services.\nContract drawings and specifications for construction.\n3rd Party Cost Estimates\nConstruction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings; A/E will respond on site within a two-hour period when requested.\nInfection Control Risk Assessment\nMeet all of the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program. Reference at https://www.cfm.va.gov/cfm/til/index.asp\n\n-- Project Scope --\nGENERAL:\nThis project consists of the renovation of the main exterior entrance of Building 1 at the\nWilmington VA Medical Center. Work includes demolition, redesign, and reconstruction of entrance\nfeatures and installation of a new ADA-compliant handicap ramp.\nSPECIFICS:\nEvaluate and redesign entrance plaza, sidewalks, and approach paths and associated roadways\n\nDesign ADA-compliant ramp including slopes, handrails, landings\n\nImprove drainage, grading\n\nUpgrade exterior finishes, railings, entry features and any architectural faÃ§ade as deemed necessary\n\nMaintain facility operations during construction\n\nIdentify and correct life safety deficiencies and provide phasing plan if necessary\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.asp and https://wbdg.org/ffc/federal-facility-criteria. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n.\n\nOther Specifics:\nAutoCAD files of existing design will be provided for use.\nPhase all work in coordination with Hospital staff to minimize down-time to areas affected by the project.\nConstruction Waste Management, s to be included.\nDesign to maintain all infection control/ dust prevention measures.\nList all Permits necessary to complete the project.\nConsolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.aspThe A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n\n-- Site Investigations --\nEXPECTATION: A/E will make site visits as necessary to survey existing conditions.\nMake site visits as required to determine existing as-built conditions affecting this project.\nProvide any structural, architectural, electrical, and mechanical investigative work including all interior and exterior, of both existing and designed systems necessary to ensure the accuracy of the design.\nPrepare any measured drawings of existing systems of facility required to ensure the accuracy of the design.\nProvide a CIH to evaluate the impacted building areas for asbestos. Wilmington VA has an asbestos survey which will need to be verified.\nProvide a CIH to evaluate the impacted building areas for lead based paint. Exterior window frames have not been tested for lead based paint, but exterior doors have and several did test positive.\nNOTE: Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov. AutoCAD background drawings will be provided by the VA upon request.\nThe A/E shall field verify all dimensions. A/E shall field verify every aspect that relates to the project. Coordinate site visits with the Project Engineer.\n-- Environmental/Occupational Safety and Health (EOSH) --\nEXPECTATION: All projects and project designs shall contain language that addresses all applicable EOSH requirements.\nRegulatory Compliance EOSH requirements for work performed at the above location can be found in:\nVolume 29 of the Code of Federal Regulations, Part 1910 Occupational Safety for General Industry\nVolume 29 of the Code of Federal Regulations, Part 1926 Occupational Safety for The Construction Industry\nVolume 40 of the Code of Federal Regulations Protection of The Environment\nVolume 49 of the Code of Federal Regulations, Part 397 Transportation of Hazardous Materials\nTitle 7 of the Delaware Code Conservation\nTitle 16 of the Delaware Code Health and Safety\n\nSpecifications\nThe VA Master Construction Specifications contain work procedures and material requirements\ndesigned to meet regulatory compliance requirements.Â Whenever possible, the Master Construction Specifications must be used as the basis for project designs.\nA complete list of these specifications can be viewed at the following website: https://www.cfm.va.gov/cfm/til/index.aspSpecifications which address EOSH requirements include, but are not limited to\n\n-- Design Review Schedule --\nEXPECTATION: Submit review packages so they are received on the noted day.\nSUBMISSIONS:\nSubmit review packages so they are received on the noted day (calendar days after NTP) or earlier:\nNotice to Proceed\nDay 0\n(0 days)\nInitial Meeting with Stakeholders\nDay 14\n(14 days)\nDesign Development Document Submission (25%)\nDay 44\n(30 days)\nPDT Review Meeting (25%)\nDay 58\n(14 days)\nDesign Development Document Submission (75%)\nDay 93\n(35 days)\nPDT Review Meeting (75%)\nDay 107\n(14 days)\nDesign Development Document Submission (100%)\nDay 152\n(45 days)\nPDT Review Meeting (100%)\nDay 166\n(14 days)\nContract Documents Submission (Final)\nDay 180\n(14 days)\nNote: The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting.\n\n-- Specification Requirements --\n\n-- Design Requirements/Submissions --\nEXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects)\nDELIVER:\nAll design packages directly to the Project Engineer on the established dates to allow the VA to review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006. The manual is available at the following address: http://www.cfm.va.gov\n25% Design Development Submission: Attachment A 25% Submission Requirements\nChecklist of Requirements for the 25% Design Development Submission.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development)\nIdentify Working Drawings scope within construction budget\nIdentify impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\n75% Design Development Submission: Attachment B 75% Submission Requirements\nChecklist of Requirements for the 75% Design Development Submission.\nAddress all comments from the 25% review.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development)\nIdentify Working Drawings scope within construction budget.\nFinalize impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nPresent energy modeling and financial impacts using various types of windows for consideration.\nDevelop Infection Control Risk Assessment (VA EC-43)\nA/E shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The A/E shall provide the Project Engineer with a complete copy of the 75% documents for submission to the consulting firm. The designated firm will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting.\n100% Design Development Submission: Attachment C 100% Submission Requirements\nChecklist of Requirements for the 100% Design Development Submission.\nAddress all comments from the 75% review.\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nRevise and update cost estimate\nPreparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission\nFinalize all design calculations\nFinalize all potential bid deduct alternatives\nFinalize all phasing requirements for construction\nFinalize Infection Control Risk Assessment (VA EC-43)\nAddress all comments from the VISN Safety and Fire Protection Review\nContract Documents (CD) Submission: Attachment D Submission Requirements\nSubmit a complete document set of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA.\n\nATTACHMENT A\nDeliver the following (labeled with 25% Design Development Document Submission) and include this attachment as a checklist with your submission:\n25% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F and F1.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment)\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in the newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT B\nDeliver the following (labeled with 75% Design Development Document Submission) and include this attachment as a checklist with your submission:\n75% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall contain sample catalog cut sheets of new equipment to be installed in the design. Report shall include energy modeling reports with financial impacts of various window types. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025. software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of Infection Control Risk Assessment.\n1 additional copy each of the custom edited VA Master Specifications and drawings as specified above are to be delivered to a third party fire and life safety firm on the same dates as delivered to the Project Manager. A letter of transmittal signifying delivery will be forwarded to the Project Manager. A/E shall utilize the services of the Network 4 Fire and Safety Engineer, to conduct a fire and life safety peer review of the project throughout the design. Comments resulted from the peer review shall be incorporated into the design at no additional cost.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT C\nDeliver the following (labeled with 100% Design Development Documents Submission) and include this attachment as a checklist with your submission:\n100% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 75% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of the Infection Control Risk Assessment.\n2 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT D\nEXPECTATION: Submit complete bid document for final review prior to solicitation. Continue to submit bid documents until all changes are incorporated by the A/E for final signature prior to solicitation. Upon approval duplicate copies as required.\nDeliver the following (labeled with Contract Documents Submission) and include this attachment as a checklist with your submission:\nContract Document Submission Requirements\n1 copy of the Cover Sheet (AutoCAD) for final VA signatures.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software for final VA review. If approved, final sets to be submitted with signed off cover sheet.\n3 copies of final project specification (two bound; one loose) prepared in newest version of Microsoft Word software. Include a master submittal list in the specifications.\n2 CDs containing\nAll drawings in AutoCAD 2025 (.dwg) and in .pdf file\nAll specifications in newest version of Microsoft Word\nSubmittal Spreadsheet identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification.\nUpon signature approval, provide five sets of final Contract Documents (complete with VA signed Cover Sheet). Provide two Â½ size sets of final drawings.\nInclude one copy of full view of 3d model renderings of all aspects of the project\n\nATTACHMENT E\n\nA/E SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE\n\nDEPARTMENT OF VETERANS AFFAIRS\nA/E REGULATIONS ASBESTOS ABATEMENT\nThe A/E shall hire a Certified Industrial Hygienist (CIH) Consultant to assist in the assessment and design for asbestos abatement.\nThe CIH shall meet the following minimum qualifications:\nBe certified by the American Board of Industrial Hygienists in Industrial Hygiene-Comprehensive.\nHave asbestos abatement experience in assessment, design, abatement, construction monitoring and decontamination clearance.\nHis office to be as close as possible to the project location, so that he will be available to the COTR during construction on an on-call basis with a response time of one day.\nWill have support staff and back-up capacity to provide adequate level of support to the COTR throughout construction.\nThe scope of work for the A/E with his CIH consultant is as follows:\nPreliminary (25%) Design\nTask 1: Review building records and interview station personnel for detection of trade name material used for the construction of the buildings, which are known to contain asbestos. Perform a visual inspection of the areas impacted and develop a sampling strategy that will yield statistically viable conclusions on extent of asbestos present. Perform this task at the first preliminary submittal and notify VA on results at 100% submission.\nFinal (75 and 100% Reviews) Design\nTask 2: Collect bulk suspected asbestos samples and utilize the services of a testing lab accredited by the American Industrial Hygienists Association.\nUpon receiving the results determine adequacy for an assessment report. Any samples requiring further clarification, utilizing scanning electron microscopy (SEM), need to be contracted to a qualified laboratory for sample analysis. If additional samples are required, take such samples at this stage so that the maximum detection of asbestos can be achieved. This service (bulk sampling) will be at no cost.\nTask 3: Prepare an exposure assessment report on only the impacted areas of the modification project. Include the following information:\nDescribe the impacted areas by sketches, room names or other means. Show or describe the location of each sample taken, its composition and identification number.\nClassify each impacted space as Major Abatement Minor Abatement or No Abatement areas. A Major Abatement area requires full protective measures (sealing off, change room, shower room, etc.), and all asbestos must be removed within the limits of the area. A Minor Abatement area can be decontaminated with one or more applications of the glove and bag approach. A No Abatement area requires no abatement work.\nFor each Major Abatement area, provide quantity and cost estimates of all asbestos within the limits of the area. Quantities to be in linear feet of pipe and square feet of ceilings and walls. The cost to be derived from the quantities multiplied by a unit price.\nFor each Minor Abatement area, provide the description, size and location of each element to be decontaminated and a cost estimate.\nProvide summary of the square feet of floor space for all abatement areas, the total linear and square feet of asbestos to be abated, the total cost of abatement and a preliminary schedule of completion. Include in the cost estimate any cost for decontamination.\nProvide an assessment on the impact of abatement on building sub-systems such as ceilings, lights, walls, carpets, pipes and equipment. Provide room-by-room description and estimated quantities of impacted items to be placed (number of lighting fixtures, square feet of ceiling, etc.) and a summary of these quantities. Provide a cost estimate for all impacted items.\nProvide a cover statement signed by both the A/E and the CIH consultant. The statement shall be in accordance with the Sample Cover Statement provided by the VA, as part of the A/E package.\nSubmit the report at the 75% Design Review Submission.\nTask 4: Prepare drawings and specifications for the asbestos abatement work reflecting the assessment report. The drawings shall be separately identified from the rest of the drawings, be 1/8 scale plans and shall provide as a minimum the following information.\nFor each Major Abatement area show the limits of sealing off, the location and quantities of asbestos material, the arrangements for auxiliary rooms, such as change room, shower room, etc., transportation to the loading platform.\nFor each Minor Abatement area show on plans the exact location type and length of pipe element to be abated by the glove and bag approach and any other abatement features.\nProvide details, sections, notes and any other information that are necessary for complete bid documents.\nPrepare project specifications by editing and modifying the VA master specifications on asbestos abatement.\nProvide the drawings and specifications for the restoration of the impacted building sub-systems as an integral part of the overall project design. Provide for replacing of removed asbestos insulation with acceptable non-asbestos insulation, replacing contaminated carpets, replacing old contaminated light fixtures and replacing partially torn down plaster ceilings.\nThe submittals of the working drawings for abatement shall coincide with the submittals for the working drawings of the modification project.\nProvide an integrated phasing showing how the abatement and the general modification work will be executed. Provide some reasonable cushion between each abatement phase and the following general construction phase to allow for unforeseen delays in abatement completion.\nTask 5: Assist VA to determine whether the abatement sub-contractor meets qualification requirements.\nExcluded from the scope of work (to be completed by others):\nProvide onsite continuous monitoring during construction of the performance of the abatement sub-contractor. Check and approve the set-up for each Major Abatement area, check the standard operating procedure of the abatement contractor, continuously monitor air contamination inspections to ensure compliance with specifications and drawings, and monitor access/egress into containment areas. Determine abatement of asbestos discovered during construction and advise the COTR on time and cost for such abatement.\nPerform the final inspection and testing at the end of the abatement work on the area and if the results are satisfactory, release the space to the general contractor for general work.\nAt the end of all abatement work, a compliance certificate signed by both the CIH and the A/E shall be issued. The compliance certificate shall be in accordance with the Sample Certificate provided by the VA in the A/E package.\n\nATTACHMENT E-1\n\nA/E SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE 19805\n\nCOVER STATEMENT FOR ASBESTOS ASSESSMENT REPORT\n\nThe enclosed Asbestos Assessment Report for has been prepared, as part of Project # and covers the following buildings . I certify that I have surveyed each of the buildings or areas in my contract, have interviewed station personnel and have supervised technicians for the examination of available records related to the buildings.\nBased on the information gathered through the above activities and on the expected extent of the renovation as explained to me by of the A/E firm on this project, I have devised a sampling plan and I have supervised the trained Industrial Hygiene Technicians during the collection of the samples.\nI have selected a qualified analytical laboratory for the analysis of the samples and I have evaluated the sampling results to ensure that statistically viable results on asbestos hazards were available for all buildings involved.\nBases on the above information, I have prepared the attached Asbestos Hazard Assessment Report. This report reflects the best-known abatement technology, the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects and all applicable regulations. An abatement design, which will be prepared by a qualified abatement contractor, will achieve the desired decontamination of the impacted areas and minimize exposure of people and the environment.\n\n(C. I. H. NAME, CERTIFICATION NO. & STATE CERTIFIED IN)\n\nPhotos of exterior:\n\nIt is the VA s intention to potentially modify or completely replace the main traffic circle canopy due to ADA sidewalk, ramp or vehicle drop off requirements. This requirement is also being requested to update the main entrance with a modernized canopy layout/design.\nDrainage will need to be considered. With the layout of new sidewalks and ramps the ground slope and stormwater runoff will be modified and need to be redesigned.\nDesign was completed in 1994. See current plan as separate attachment.\nReplacing of the existing entrance canopy is a required element of the project.\nThe VA did not complete an ADA assessment.\nThere will be some modifications that will need to be done as it relates to roadway modifications, traffic circle improvements, adjacent parking areas, utilities, and landscape areas included within the project boundary.","html":"Page 13 of 13\nAdditional clarifying details added though this revision posting. Changes in this revision can be seen highlighted in green. Yellow highlighted text reflects the previous corrections made from the original posting. An Extension to the due date has been made accordingly. Further extension requests are not feasible to the timeframe for this intended FY26 contract award. All other details remain as originally posted. \nACQUISITION INFORMATION:\nThe Wilmington Department of Veterans Affairs Medical Center located at 1601 Kirkwood Highway, Wilmington DE, 19805 is seeking professional Architect and Engineering (A&E) services for Project No. 460-26-001, Renovate Exterior of Main Hospital Design.  \n\nThis announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send one copy of an SF 330 (7/2021 Edition) via email with qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS.\nFirms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement.\n\n\nContract Award Procedure:  Interested A&E Firms should e-mail a PDF SF330 document to Hanna Karmazyn at Hanna.Karmazyn@va.gov by 3:00 PM, EST, July 13, 2026. A&E firms shall be registered at www.sam.gov and www.vetbiz.gov. If available, please include your firm's VetBiz.gov SDVOSB status verification. Failure of a proposed SDVOSB A&E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services require may be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement.  A&E Firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $25.5M apply. NAICS 541330 covers engineering design, development and utilization of structures and systems and remains the appropriate code for this procurement. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY26 funding.   The construction magnitude is between $2,000,000.00 and $5,000,000.00. \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nA/E Evaluation Factors \nI. Experience and Past Performance\na. Healthcare Planning Experience \nProvide a brief overview of the firm s history and experience in healthcare planning. Include at least 5 relevant projects.\nAdd emphasis on exterior renovations, ADA accessibility upgrades, and work performed in active medical facilities requiring phasing.\n\nb. Federal Contract Experience \nDemonstrate experience with federal contracts, especially VA projects.\nInclude familiarity with VA TIL, and maintaining facility operations during construction.\nII. Design Team Proposed for This Project\na. Qualifications of Key Personnel \nProvide resumes (max 10) showing experience in healthcare and federal projects.\nInclude experience with ADA compliance, site design (grading/drainage), and life safety.\n\nb. Subconsultants \nProvide qualifications of subcontractors, especially for civil/site work, industrial hygiene, and fire/life safety.\n\nc. Design Approach \nDescribe approach to ADA, NFPA Life Safety Code, infection control, and exterior material selection.\nIII. Technical Approach\nDescribe approach to incorporating ADA, NFPA Life Safety Code, energy conservation, and site improvements.\n\nInclude understanding of renovating an active hospital entrance, maintaining safe access, and minimizing disruption through phasing.\nIV. Proposed Management Plan\na. Project Management Approach \nDescribe approach to schedule, budget, risk management, and communication.\n\nb. Work Plan and Deliverables \nProvide plan to meet design milestones (25%, 75%, 100%, final) and ability to meet submission dates.\n\nc. Compliance Standards \nDemonstrate knowledge of NFPA, NEC, OSHA, and other applicable codes.\n\nd. VA Specific Standards \nDemonstrate familiarity with VA requirements, TIL, and PDT process.\nV. Location and Knowledge of Local Area\na. Firm Location \nProvide office locations and ability to support site visits and response times.\n\nb. Local Knowledge \nDemonstrate knowledge of Wilmington VAMC, local construction conditions, and factors impacting cost and schedule\n\n\n\n\n\n\nWilmington, DE VA Medical Center\nWilmington, DE 19805\n\n\nA/E SCOPE OF WORK\n\nFor\n\n\nRenovate The Exterior Of Main Hospital\nProject No. 460-26-001\n\n\n\nBid Documents/Final Report Ready By:\n180 days after NTP\n\n-- Services --\nProvide:\nProfessional A/E and healthcare planning services to include but not limited to:\nSite investigation   architectural, structural, mechanical, electrical, and environmental services.\nContract drawings and specifications for construction.\n3rd Party Cost Estimates\nConstruction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings; A/E will respond on site within a two-hour period when requested.\nInfection Control Risk Assessment\nMeet all of the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program.  Reference at https://www.cfm.va.gov/cfm/til/index.asp\n \n-- Project Scope --\nGENERAL:\nThis project consists of the renovation of the main exterior entrance of Building 1 at the\nWilmington VA Medical Center. Work includes demolition, redesign, and reconstruction of entrance\nfeatures and installation of a new ADA-compliant handicap ramp. \nSPECIFICS:\nEvaluate and redesign entrance plaza, sidewalks, and approach paths and associated roadways\n\n   Design ADA-compliant ramp including slopes, handrails, landings\n\n   Improve drainage, grading\n\n  Upgrade exterior finishes, railings, entry features and any architectural faÃ§ade as deemed necessary \n\n \n  Maintain facility operations during construction\n\n  Identify and correct life safety deficiencies and provide phasing plan if necessary \n\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.asp  and https://wbdg.org/ffc/federal-facility-criteria. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n. \n\nOther Specifics:\nAutoCAD files of existing design will be provided for use.\nPhase all work in coordination with Hospital staff to minimize down-time to areas affected by the project.\nConstruction Waste Management, s to be included.\nDesign to maintain all infection control/ dust prevention measures.\nList all Permits necessary to complete the project.\nConsolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.\n\nAll designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at https://www.cfm.va.gov/cfm/til/index.aspThe A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications.\n \n\n-- Site Investigations --\nEXPECTATION: A/E will make site visits as necessary to survey existing conditions.\nMake site visits as required to determine existing as-built conditions affecting this project.\nProvide any structural, architectural, electrical, and mechanical investigative work including all interior and exterior, of both existing and designed systems necessary to ensure the accuracy of the design.\nPrepare any measured drawings of existing systems of facility required to ensure the accuracy of the design.\nProvide a CIH to evaluate the impacted building areas for asbestos. Wilmington VA has an asbestos survey which will need to be verified.\nProvide a CIH to evaluate the impacted building areas for lead based paint. Exterior window frames have not been tested for lead based paint, but exterior doors have and several did test positive.\nNOTE:  Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov. AutoCAD background drawings will be provided by the VA upon request.\nThe A/E shall field verify all dimensions.  A/E shall field verify every aspect that relates to the project.  Coordinate site visits with the Project Engineer.\n  -- Environmental/Occupational Safety and Health (EOSH) --\nEXPECTATION: All projects and project designs shall contain language that addresses all applicable EOSH requirements.\nRegulatory Compliance   EOSH requirements for work performed at the above location can be found in:\nVolume 29 of the Code of Federal Regulations, Part 1910   Occupational Safety for General Industry\nVolume 29 of the Code of Federal Regulations, Part 1926   Occupational Safety for The Construction Industry\nVolume 40 of the Code of Federal Regulations   Protection of The Environment\nVolume 49 of the Code of Federal Regulations, Part 397   Transportation of Hazardous Materials\nTitle 7 of the Delaware Code   Conservation\nTitle 16 of the Delaware Code   Health and Safety\n\nSpecifications\nThe VA Master Construction Specifications contain work procedures and material requirements \ndesigned to meet regulatory compliance requirements.Â  Whenever possible, the Master Construction Specifications must be used as the basis for project designs.\nA complete list of these specifications can be viewed at the following website: https://www.cfm.va.gov/cfm/til/index.aspSpecifications which address EOSH requirements include, but are not limited to\n\n-- Design Review Schedule --\nEXPECTATION: Submit review packages so they are received on the noted day.\nSUBMISSIONS:\nSubmit review packages so they are received on the noted day (calendar days after NTP) or earlier:\nNotice to Proceed\nDay 0\n(0 days)\nInitial Meeting with Stakeholders\nDay 14\n(14 days)\nDesign Development Document Submission (25%)\nDay 44\n(30 days)\nPDT Review Meeting (25%)\nDay 58\n(14 days)\nDesign Development Document Submission (75%)\nDay 93\n(35 days)\nPDT Review Meeting (75%)\nDay 107\n(14 days)\nDesign Development Document Submission (100%)\nDay 152\n(45 days)\nPDT Review Meeting (100%)\nDay 166\n(14 days)\nContract Documents Submission (Final)\nDay 180\n(14 days)\nNote:  The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting.\n \n-- Specification Requirements --\n\n-- Design Requirements/Submissions --\nEXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects)\nDELIVER:\nAll design packages directly to the Project Engineer on the established dates to allow the VA to review.  A transmittal letter is required to go to the Contracting Officer on the same day as delivery.  Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006.  The manual is available at the following address: http://www.cfm.va.gov \n25% Design Development Submission:  Attachment  A  25% Submission Requirements\nChecklist of Requirements for the 25% Design Development Submission.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development)\nIdentify Working Drawings scope within construction budget\nIdentify impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\n75% Design Development Submission:  Attachment  B  75% Submission Requirements\nChecklist of Requirements for the 75% Design Development Submission.\nAddress all comments from the 25% review.\nDefine the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development)\nIdentify Working Drawings scope within construction budget.\nFinalize impact of existing asbestos\nDevelop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code.\nIdentify all design calculations\nIdentify all existing utilities and utility requirements\nIdentify all potential bid deduct alternatives\nIdentify all phasing requirements for construction to minimize impact on medical center operations\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nPresent energy modeling and financial impacts using various types of windows for consideration.\nDevelop Infection Control Risk Assessment (VA EC-43)\nA/E shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The A/E shall provide the Project Engineer with a complete copy of the 75% documents for submission to the consulting firm.  The designated firm will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting.\n100% Design Development Submission:  Attachment  C  100% Submission Requirements\nChecklist of Requirements for the 100% Design Development Submission.\nAddress all comments from the 75% review.\nDesign all finishes, required submittals\nConsolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process.\nRevise and update cost estimate\nPreparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission\nFinalize all design calculations\nFinalize all potential bid deduct alternatives\nFinalize all phasing requirements for construction\nFinalize Infection Control Risk Assessment (VA EC-43)\nAddress all comments from the VISN Safety and Fire Protection Review\nContract Documents (CD) Submission:  Attachment  D  Submission Requirements\nSubmit a complete document set of all contract requirements.  The Cover Page shall be submitted for approval signatures.  If necessary, update and submit until approved by the VA.\n \n\nATTACHMENT  A \nDeliver the following (labeled with 25% Design Development Document Submission) and include this attachment as a checklist with your submission:\n25% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F and F1.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment)\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in the newest version of Microsoft Word  (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  B \nDeliver the following (labeled with 75% Design Development Document Submission) and include this attachment as a checklist with your submission:  \n75% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall contain sample catalog cut sheets of new equipment to be installed in the design. Report shall include energy modeling reports with financial impacts of various window types. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025.     software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of Infection Control Risk Assessment.\n1 additional copy each of the custom edited VA Master Specifications and drawings as specified above are to be delivered to a third party fire and life safety firm on the same dates as delivered to the Project Manager. A letter of transmittal signifying delivery will be forwarded to the Project Manager. A/E shall utilize the services of the Network 4 Fire and Safety Engineer, to conduct a fire and life safety peer review of the project throughout the design. Comments resulted from the peer review shall be incorporated into the design at no additional cost.\n1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in newest version Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  C \nDeliver the following (labeled with 100% Design Development Documents Submission) and include this attachment as a checklist with your submission:\n100% Design Development Submission Requirements\n3 copies of a narrative report forwarding the design development 75% submission addressing items listed in the design requirements and any additional A/E recommendations.  The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F.\n3 sets of all drawings updating all previous comments required by project produced on AutoCAD 2025 software.\n2 copies of updated itemized cost estimate by spec section and trade (labor, material and equipment).\n2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.\n3 copies of the Infection Control Risk Assessment.\n2 copy of drawings in AutoCAD 2025  and .pdf format and specifications in newest version of Microsoft Word (CD)\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT  D \nEXPECTATION: Submit complete bid document for final review prior to solicitation. Continue to submit bid documents until all changes are incorporated by the A/E for final signature prior to solicitation.  Upon approval duplicate copies as required.\nDeliver the following (labeled with Contract Documents Submission) and include this attachment as a checklist with your submission:\nContract Document Submission Requirements\n1 copy of the Cover Sheet (AutoCAD) for final VA signatures.\n3 sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software   for final VA review.  If approved, final sets to be submitted with signed off cover sheet.\n3 copies of final project specification (two bound; one loose) prepared in newest version of Microsoft Word software.  Include a master submittal list in the specifications.\n2 CDs containing \nAll drawings in AutoCAD 2025 (.dwg) and in .pdf file\nAll specifications in newest version of Microsoft Word \nSubmittal Spreadsheet   identifying all the submittals required to be submitted by the contractor for review.  The list shall be organized by division and specification.\nUpon signature approval, provide five sets of final Contract Documents (complete with VA signed Cover Sheet).  Provide two Â½ size sets of final drawings.\nInclude one copy of full view of 3d model renderings of all aspects of the project\n \nATTACHMENT   E \n\nA/E  SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE\n\nDEPARTMENT OF VETERANS AFFAIRS\nA/E REGULATIONS ASBESTOS ABATEMENT\nThe A/E shall hire a Certified Industrial Hygienist (CIH) Consultant to assist in the assessment and design for asbestos abatement.\nThe CIH shall meet the following minimum qualifications:\nBe certified by the American Board of Industrial Hygienists in Industrial Hygiene-Comprehensive.\nHave asbestos abatement experience in assessment, design, abatement, construction monitoring and decontamination clearance.\nHis office to be as close as possible to the project location, so that he will be available to the COTR during construction on an on-call basis with a response time of one day.\nWill have support staff and back-up capacity to provide adequate level of support to the COTR throughout construction.\nThe scope of work for the A/E with his CIH consultant is as follows:\nPreliminary (25%) Design\nTask 1:  Review building records and interview station personnel for detection of trade name material used for the construction of the buildings, which are known to contain asbestos.  Perform a visual inspection of the areas impacted and develop a sampling strategy that will yield statistically viable conclusions on extent of asbestos present.  Perform this task at the first preliminary submittal and notify VA on results at 100% submission.\nFinal (75 and 100% Reviews) Design\nTask 2:  Collect bulk suspected asbestos samples and utilize the services of a testing lab accredited by the American Industrial Hygienists Association.\nUpon receiving the results determine adequacy for an assessment report.  Any samples requiring further clarification, utilizing scanning electron microscopy (SEM), need to be contracted to a qualified laboratory for sample analysis.  If additional samples are required, take such samples at this stage so that the maximum detection of asbestos can be achieved.  This service (bulk sampling) will be at no cost.\nTask 3:  Prepare an exposure assessment report on only the impacted areas of the modification project.  Include the following information:\nDescribe the impacted areas by sketches, room names or other means.  Show or describe the location of each sample taken, its composition and identification number.\nClassify each impacted space as  Major Abatement   Minor Abatement  or  No Abatement  areas.  A  Major Abatement  area requires full protective measures (sealing off, change room, shower room, etc.), and all asbestos must be removed within the limits of the area.  A  Minor Abatement  area can be decontaminated with one or more applications of the  glove and bag  approach.  A  No Abatement  area requires no abatement work.\nFor each  Major Abatement  area, provide quantity and cost estimates of all asbestos within the limits of the area.  Quantities to be in linear feet of pipe and square feet of ceilings and walls.  The cost to be derived from the quantities multiplied by a unit price.\nFor each  Minor Abatement  area, provide the description, size and location of each element to be decontaminated and a cost estimate.\nProvide summary of the square feet of floor space for all abatement areas, the total linear and square feet of asbestos to be abated, the total cost of abatement and a preliminary schedule of completion.  Include in the cost estimate any cost for decontamination.\nProvide an assessment on the impact of abatement on building sub-systems such as ceilings, lights, walls, carpets, pipes and equipment.  Provide room-by-room description and estimated quantities of impacted items to be placed (number of lighting fixtures, square feet of ceiling, etc.) and a summary of these quantities.  Provide a cost estimate for all impacted items.\nProvide a cover statement signed by both the A/E and the CIH consultant.  The statement shall be in accordance with the  Sample Cover Statement  provided by the VA, as part of the A/E package.\nSubmit the report at the 75% Design Review Submission.\nTask 4:  Prepare drawings and specifications for the asbestos abatement work reflecting the assessment report.  The drawings shall be separately identified from the rest of the drawings, be 1/8  scale plans and shall provide as a minimum the following information.\nFor each  Major Abatement  area show the limits of sealing off, the location and quantities of asbestos material, the arrangements for auxiliary rooms, such as change room, shower room, etc., transportation to the loading platform.\nFor each  Minor Abatement  area show on plans the exact location type and length of pipe element to be abated by the  glove and bag  approach and any other abatement features.\nProvide details, sections, notes and any other information that are necessary for complete bid documents.\nPrepare project specifications by editing and modifying the VA master specifications on asbestos abatement.\nProvide the drawings and specifications for the restoration of the impacted building sub-systems as an integral part of the overall project design.  Provide for replacing of removed asbestos insulation with acceptable non-asbestos insulation, replacing contaminated carpets, replacing old contaminated light fixtures and replacing partially torn down plaster ceilings.\nThe submittals of the working drawings for abatement shall coincide with the submittals for the working drawings of the modification project.\nProvide an integrated phasing showing how the abatement and the general modification work will be executed.  Provide some reasonable cushion between each abatement phase and the following general construction phase to allow for unforeseen delays in abatement completion.\nTask 5:  Assist VA to determine whether the abatement sub-contractor meets qualification requirements.  \nExcluded from the scope of work (to be completed by others):\nProvide onsite continuous monitoring during construction of the performance of the abatement sub-contractor.  Check and approve the set-up for each  Major Abatement  area, check the standard operating procedure of the abatement contractor, continuously monitor air contamination inspections to ensure compliance with specifications and drawings, and monitor access/egress into containment areas. Determine abatement of asbestos discovered during construction and advise the COTR on time and cost for such abatement.\nPerform the final inspection and testing at the end of the abatement work on the area and if the results are satisfactory, release the space to the general contractor for general work.\nAt the end of all abatement work, a compliance certificate signed by both the CIH and the A/E shall be issued.  The compliance certificate shall be in accordance with the  Sample Certificate  provided by the VA in the A/E package.\n \nATTACHMENT  E-1\n\nA/E  SPECIFICATIONS\nVA MEDICAL CENTER\nWILMINGTON, DE 19805\n\nCOVER STATEMENT FOR ASBESTOS ASSESSMENT REPORT\n\n The enclosed Asbestos Assessment Report for                                     has been prepared, as part of Project #                         and covers the following buildings                                               .   I certify that I have surveyed each of the buildings or areas in my contract, have interviewed station personnel and have supervised technicians for the examination of available records related to the buildings.\nBased on the information gathered through the above activities and on the expected extent of the renovation as explained to me by                                               of the A/E firm on this project, I have devised a sampling plan and I have supervised the trained Industrial Hygiene Technicians during the collection of the samples.\nI have selected a qualified analytical laboratory for the analysis of the samples and I have evaluated the sampling results to ensure that statistically viable results on asbestos hazards were available for all buildings involved.\nBases on the above information, I have prepared the attached Asbestos Hazard Assessment Report.  This report reflects the best-known abatement technology, the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects and all applicable regulations.  An abatement design, which will be prepared by a qualified abatement contractor, will achieve the desired decontamination of the impacted areas and minimize exposure of people and the environment.\n\n\n\n\n\n (C. I. H.  NAME, CERTIFICATION  NO. & STATE CERTIFIED IN)\n\n\n\n\n\n\n\nPhotos of exterior:\n\nIt is the VA s intention to potentially modify or completely replace the main traffic circle canopy due to ADA sidewalk, ramp or vehicle drop off requirements. This requirement is also being requested to update the main entrance with a modernized canopy layout/design.\nDrainage will need to be considered. With the layout of new sidewalks and ramps the ground slope and stormwater runoff will be modified and need to be redesigned. \nDesign was completed in 1994. See current plan as separate attachment.\nReplacing of the existing entrance canopy is a required element of the project.\nThe VA did not complete an ADA assessment.\nThere will be some modifications that will need to be done as it relates to roadway modifications, traffic circle improvements, adjacent parking areas, utilities, and landscape areas included within the project boundary.","origin":"detail"},"contacts":[{"name":"Hanna Karmazyn","role":"primary","email":"Hanna.Karmazyn@va.gov","phone":"302-332-5107","title":"Contract Specialist"}],"place_of_performance":{"zip":"19805","city":{"code":"77580","name":"Wilmington"},"state":{"code":"DE","name":"Delaware"},"street":"Wilmington DE VAMC","country":{"code":"USA","name":"UNITED STATES"},"street2":"1601 Kirkwood Highway"},"office_address":{"zip":"15215","city":"PITTSBURGH","state":"PA","country":"USA"},"naics_codes":["541330"],"award":{"awardee":{}},"attachments":[{"resource_id":"046e7449960c4b4eb7ee19c746a75ef0","name":"36C24426R0113 0001_1.docx","kind":"file","mime_type":".docx","size_bytes":14228,"posted_at":"2026-11-16T17:48:34.255Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/046e7449960c4b4eb7ee19c746a75ef0/download","mirrored":false},{"resource_id":"1ef316cf2ea44da3bb81ff7d3d9b78b3","name":"36C24426R0113.docx","kind":"file","mime_type":".docx","size_bytes":38634,"posted_at":"2026-05-22T14:17:21.503Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1ef316cf2ea44da3bb81ff7d3d9b78b3/download","mirrored":false},{"resource_id":"a3b16c36209e4826859f7d0fcc727ca3","name":"VA Homepage","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-05-22T14:17:21.503Z","export_controlled":false,"sha256":null,"url":"https://www.va.gov/","mirrored":false},{"resource_id":"a168d6fe5eb74e029e6a137377d787ef","name":"36C24426R0113 0001 02.docx","kind":"file","mime_type":".docx","size_bytes":26079,"posted_at":"2026-11-16T17:48:34.255Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a168d6fe5eb74e029e6a137377d787ef/download","mirrored":false},{"resource_id":"3ac5af3705a847edac9a2710346a68c0","name":"36C24426R0113_1.docx","kind":"file","mime_type":".docx","size_bytes":761159,"posted_at":"2026-06-18T18:17:52.073Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3ac5af3705a847edac9a2710346a68c0/download","mirrored":false},{"resource_id":"d57ac0db630846cda0b9939372ab9ab1","name":"Wilmington VAMC","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-06-18T18:17:52.073Z","export_controlled":false,"sha256":null,"url":"https://www.va.gov/wilmington-health-care/","mirrored":false},{"resource_id":"4782b7acec4b4ad198c36a18b438b238","name":"Wilmington VA Site Plan_Current.pdf","kind":"file","mime_type":".pdf","size_bytes":272168,"posted_at":"2026-06-18T18:17:52.073Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4782b7acec4b4ad198c36a18b438b238/download","mirrored":false},{"resource_id":"2b86af101742447298e12eb3f8065f18","name":"36C24426R0113_2.docx","kind":"file","mime_type":".docx","size_bytes":762115,"posted_at":"2026-06-26T14:37:10.782Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2b86af101742447298e12eb3f8065f18/download","mirrored":false}],"awards":[],"related":[{"key":"36C24427Q0072","latest_notice_id":"525908b124d04d13ac7905ddca2dc6d2","title":"Micro-Sized Scissor Lift","solicitation_number":"36C24427Q0072","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-25T15:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C244","office_name":"244-NETWORK CONTRACT OFFICE 4 (36C244)","naics":"333924","psc":"3990","set_aside":null,"state":"PA","county":"42019","county_name":"Butler County","city":"4210464","city_name":"Butler","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24427Q0050","latest_notice_id":"39a56ccb22e04e4e9193e8010bd8673f","title":"Burlodge Steam Table","solicitation_number":"36C24427Q0050","notice_type":"o","first_type":"o","first_posted":"2026-11-05","last_posted":"2026-11-06","notices":2,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C244","office_name":"244-NETWORK CONTRACT OFFICE 4 (36C244)","naics":"333241","psc":"7310","set_aside":"SBA","state":"PA","county":"42019","county_name":"Butler County","city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"removed_at":null,"updated_at":"2026-11-18T06:18:24.437223Z"},{"key":"36C24427Q0079","latest_notice_id":"1aeaf708a3be40edb708dd1ab609c1ef","title":"6515--Phototherapy","solicitation_number":"36C24427Q0079","notice_type":"k","first_type":"k","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-12-02T11:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T11:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C244","office_name":"244-NETWORK CONTRACT OFFICE 4 (36C244)","naics":"339112","psc":"6515","set_aside":null,"state":"DE","county":"10003","county_name":"New Castle County","city":"1077580","city_name":"Wilmington","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C24426R0088","latest_notice_id":"3dad80776d7f4e15b9869fedfbaa4bbe","title":"Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC","solicitation_number":"36C24426R0088","notice_type":"o","first_type":"p","first_posted":"2026-05-21","last_posted":"2026-11-20","notices":12,"due_at":"2026-12-07T21:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C244","office_name":"244-NETWORK CONTRACT OFFICE 4 (36C244)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":"PA","county":"42101","county_name":"Philadelphia County","city":"4260000","city_name":"Philadelphia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Philadelphia VA Medical Center","site_key":"philadelphia-va-medical-center-pa","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C24427Q0076","latest_notice_id":"b3bcac1db3434456afc02f514f52e327","title":"6515--Smart HemoSphere","solicitation_number":"36C24427Q0076","notice_type":"r","first_type":"r","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-12-08T21:30:00Z","due_date":"2026-12-08","closes_at":"2026-12-08T21:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C244","office_name":"244-NETWORK CONTRACT OFFICE 4 (36C244)","naics":"339112","psc":"6515","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6515)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"80NSSC27949205Q","latest_notice_id":"23182628fc84473aa336c4cd21585a65","title":"Universal Robotics e-Series Arm","solicitation_number":"80NSSC27949205Q","notice_type":"k","first_type":"k","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-080","dept_name":"NATIONAL AERONAUTICS AND SPACE ADMINISTRATION","sub_key":"s-8000","sub_name":"NATIONAL AERONAUTICS AND SPACE ADMINISTRATION","office_key":"o-80NSSC","office_name":"NASA SHARED SERVICES CENTER","naics":"541330","psc":"7E21","set_aside":"SBA","state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"N6449826RFPREQPD440191","latest_notice_id":"a20a21bbce524b5f9d9f3b3a4a4e1a77","title":"Steam Turbine Generator Governor System Replacement","solicitation_number":"N64498-26-RFPREQ-PD-44-0191","notice_type":"k","first_type":"k","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-25T20:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N64498","office_name":"NSWC PHILADELPHIA DIV","naics":"541330","psc":"R425","set_aside":null,"state":"PA","county":"42101","county_name":"Philadelphia County","city":"4260000","city_name":"Philadelphia","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"N6247027R0009","latest_notice_id":"676b5909f116428098423e63e57e16c8","title":"IDIQ Contract for Architect-Engineer (A-E) Services for Ship Homeporting and Related Operational Issues for Various Locations Throughout the Naval Facilities Engineering Systems Command Atlantic Area of Responsibility and Worldwide","solicitation_number":"N62470-27-R-0009","notice_type":"r","first_type":"r","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-27T16:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N62470","office_name":"NAVFACSYSCOM ATLANTIC","naics":"541330","psc":"C219","set_aside":null,"state":"VA","county":"51710","county_name":"City of Norfolk","city":"5157000","city_name":"Norfolk","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"}],"similar_open_total":100,"indexable":true}