Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,430 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation, total small business set-aside, first published as presolicitation

NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC

36C24227R0008

Department of Veterans Affairs, 242-Network Contract Office 02. Plumbing, Heating, and Air-Conditioning Contractors.

Offers due

December 2, 2026 at 10:00 AM EST

6 days from now. Posted November 20, 2026, first published October 14, 2026.

Get an email when this is amended, when the deadline moves and when it is awarded.Watch it

Next from this buyer

Similar, open now

All 56 open in plumbing, heating, and air-conditioning contractors

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. To compete, read the solicitation and its attachments, send questions to the contact named on the notice in writing, and submit the offer the way the solicitation says before the deadline. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
Time to respond
Bidders have 30 days from the day the solicitation was posted, November 2, 2026, to the deadline. The deadline moved 2 times: it was first October 28, 2026 and is now December 2, 2026.
Before the solicitation
The agency published a presolicitation on October 14, 2026, 19 days before the solicitation.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

CONTINUATION OF SF 30 BLOCK 14 AMENDMENT DESCRIPTION 0002 AGAINST SOLICITATION NO. 36C24227R0008 1. This amendment answers the following vendor questions: Number of boiler vents: On M-101 (Boiler and Generator Exhaust Plan, Phase II), the new wall penetration/chase is labeled with two 14" I.D. pipes and one 12" I.D. pipe. Keynote 2 calls for a single "new 14" boiler double walled insulated vent stack," and the cutover notes describe that one vent connecting to Boiler #1 and continuing to within two feet of Boiler #2's vent, so one common 14" vent appears to serve both boilers. The solicitation description, however, refers to "two new steel boiler exhaust stacks." Please confirm whether the work is: (a) one 14" double-wall vent common to Boiler #1 and Boiler #2, plus the 12" generator exhaust, or (b) two separate 14" double-wall vents (one per boiler), plus the 12" generator exhaust. If (a), please confirm what the second 14" pipe shown at the penetration represents. Answer: Confirming: it is (b) two separate 14" double-wall vents (one per boiler), plus the 12" generator exhaust. b) Draft control or stack fan: No stack fan, draft inducer, or boiler-outlet draft control appears on the drawings. Section 23 51 00 (paragraph 2.2, Boiler Outlet Dampers and Accessories) refers to automatic draft control specified in Section 23 09 11, but Section 23 09 11 is not included in the solicitation. Please confirm whether: (a) the new boiler vent is intended to operate on natural draft (no fan or draft control required), or (b) a mechanical draft fan and/or barometric or motorized draft control is expected. If so, please issue Section 23 09 11 or identify the required equipment and control sequence. Answer: Confirming: it is (a) the new boiler vent is intended to operate on natural draft (no fan or draft control required). c) Design heating load and operating water temperatures: Please provide the building design heating load (or recent gas and oil usage or meter data), and the normal heating-water supply and return temperatures for the two existing Fulton Vantage boilers. Return-water temperature sets the flue-gas temperature, which governs the vent sizing and draft calculation. Please also confirm whether the two boilers operate as lead/standby (N+1) or are both required at design load. Answer: Replacing the boiler is not part of the contract. Boilers have inducer fans. There is no stack fan or boiler draft controls to be installed. d) Facility designation: Please confirm whether the Rome CBOC is designated mission-critical under VA Physical Security and Resiliency Design requirements, or otherwise required to keep heating on during a utility outage, as this affects the vent design for both fuels. Answer: Rome CBOC is NOT designated as a Critical/Mission Critical facility. CBOCs are generally outpatient facilities rather than hospitals with inpatient, emergency, surgical, or continuity-of-government functions. Therefore, absent a specific VA risk assessment or designation, the Rome CBOC would not ordinarily be assumed to be mission critical. e) Fuel oil and emergency power: Boiler #2 fires #2 fuel oil as a backup fuel. Please confirm (a) whether the vent must be designed for oil firing on Boiler #2 (and on Boiler #1, if applicable), (b) the size and required reserve of the existing #2 oil tank, and (c) whether the boilers and their associated vent or draft equipment are served by emergency power through an automatic transfer switch. Answer: The specified vent material (AL-29-4C) is compatible for operating the boilers on natural gas or #2 oil. This contract does not include altering the existing fuel oil tank, day tank, the boilers, or the generator. We are eliminating the existing exhaust stack and installing a new exhaust stack in a different location to serve the two existing boilers and existing emergency generator. All other terms and conditions remain unchanged.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. October 14, 2026

    Presolicitation

    Due October 28, 2026 at 10:00 AM EDT. SAM.gov, notice 06939110ebcd47b99c26a373f7fe23e3

    1 revision on SAM
    • October 14, 2026: publish, presolicitation
  2. November 2, 2026

    Solicitation, originally presolicitation

    Due November 30, 2026 at 10:00 AM EST. SAM.gov, notice 0951519546bb4150bfa1786f85010086

    3 revisions on SAM
    • November 2, 2026: publish, solicitation
    • November 2, 2026: publish, solicitation
    • October 14, 2026: publish, presolicitation
  3. November 2, 2026

    Solicitation

    Due December 2, 2026 at 10:00 AM EST. SAM.gov, notice a15493834fb74a78a930005cb6294732

    3 revisions on SAM
    • November 2, 2026: publish, solicitation
    • November 2, 2026: publish, solicitation
    • October 14, 2026: publish, presolicitation
  4. November 16, 2026

    Solicitation

    Due December 2, 2026 at 10:00 AM EST. SAM.gov, notice 4beb9b7ae8b74e838faa440c94427489

    4 revisions on SAM
    • November 16, 2026: publish, solicitation
    • November 16, 2026: publish, solicitation
    • November 2, 2026: publish, solicitation
    • November 2, 2026: publish, solicitation
  5. November 16, 2026

    Solicitation

    Due December 2, 2026 at 10:00 AM EST. SAM.gov, notice a6091dd5d30e493ebcfcd1c7b94cc798

    4 revisions on SAM
    • November 16, 2026: publish, solicitation
    • November 16, 2026: publish, solicitation
    • November 2, 2026: publish, solicitation
    • November 2, 2026: publish, solicitation
  6. November 20, 2026

    Solicitation

    Due December 2, 2026 at 10:00 AM EST. SAM.gov, notice a4209158195e4eaaa69a73f455b90ed4

    5 revisions on SAM
    • November 20, 2026: publish, solicitation
    • November 16, 2026: publish, solicitation
    • November 16, 2026: publish, solicitation
    • November 2, 2026: publish, solicitation
    • November 2, 2026: publish, solicitation

Points of contact