{"canonical":"https://sealedbidder.com/opportunities/36c24226b0045","key":"36C24226B0045","url":"https://sealedbidder.com/opportunities/36c24226b0045","title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","solicitation_number":"36C24226B0045","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-04-27T16:00:00Z","first_posted":"2026-02-26","last_posted":"2026-04-15","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"236220","psc":"Y1DZ","set_aside":"SDVOSBC","place_state":"NY","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"36081","place_county_name":"Queens County","place_city":null,"place_city_name":null,"winner":"MICHAEL KOST","award_amount":null,"publications":[{"notice_id":"83a27f29357943768e63f8e44bc480fd","title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","solicitation_number":"36C24226B0045","notice_type":"p","base_type":"p","posted":"2026-02-26","posted_at":"2026-02-26T21:15:39.376Z","due_at":"2026-04-14T16:00:00Z","due_date":"2026-04-14","cancelled":false,"archived":true,"archive_date":"2026-07-22","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/83a27f29357943768e63f8e44bc480fd/view","enriched":true,"history":[{"index":4,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-26T21:15:39.376Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"83a27f29357943768e63f8e44bc480fd","solicitation_number":"36C24226B0045"},{"index":2,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-11T18:46:41.060Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"99062a60f1e644dfa3d69c62b3fa2424","solicitation_number":"36C24226B0045","related_opportunity_id":"83a27f29357943768e63f8e44bc480fd"}]},{"notice_id":"99062a60f1e644dfa3d69c62b3fa2424","title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","solicitation_number":"36C24226B0045","notice_type":"o","base_type":"p","posted":"2026-03-11","posted_at":"2026-03-11T18:46:41.060Z","due_at":"2026-04-17T16:00:00Z","due_date":"2026-04-17","cancelled":false,"archived":true,"archive_date":"2026-07-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/99062a60f1e644dfa3d69c62b3fa2424/view","enriched":true,"history":[{"index":5,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-26T21:15:39.376Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"83a27f29357943768e63f8e44bc480fd","solicitation_number":"36C24226B0045"},{"index":3,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-04-15T17:49:08.608Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8942800ac0dd4fb292b37880d96e9f43","solicitation_number":"36C24226B0045","parent_opportunity_id":"99062a60f1e644dfa3d69c62b3fa2424","related_opportunity_id":"83a27f29357943768e63f8e44bc480fd"},{"index":2,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-03-11T18:46:41.060Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"99062a60f1e644dfa3d69c62b3fa2424","solicitation_number":"36C24226B0045","related_opportunity_id":"83a27f29357943768e63f8e44bc480fd"}]},{"notice_id":"8942800ac0dd4fb292b37880d96e9f43","title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","solicitation_number":"36C24226B0045","notice_type":"o","base_type":"o","posted":"2026-04-15","posted_at":"2026-04-15T17:49:08.608Z","due_at":"2026-04-27T16:00:00Z","due_date":"2026-04-27","cancelled":false,"archived":true,"archive_date":"2026-09-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8942800ac0dd4fb292b37880d96e9f43/view","enriched":true,"history":[{"index":5,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-26T21:15:39.376Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"83a27f29357943768e63f8e44bc480fd","solicitation_number":"36C24226B0045"},{"index":3,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-04-15T17:49:08.608Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8942800ac0dd4fb292b37880d96e9f43","solicitation_number":"36C24226B0045","parent_opportunity_id":"99062a60f1e644dfa3d69c62b3fa2424","related_opportunity_id":"83a27f29357943768e63f8e44bc480fd"},{"index":2,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-03-11T18:46:41.060Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"99062a60f1e644dfa3d69c62b3fa2424","solicitation_number":"36C24226B0045","related_opportunity_id":"83a27f29357943768e63f8e44bc480fd"}]}],"latest_notice_id":"8942800ac0dd4fb292b37880d96e9f43","first_type":"p","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-02-26","posted_at":"2026-02-26T21:15:39.376Z","created_at":"2026-02-26T21:15:37.160Z","modified_at":"2026-07-23T03:55:45.027Z","response_deadline":{"raw":"2026-04-14T12:00:00-04:00","utc":"2026-04-14T16:00:00Z","date":"2026-04-14","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/83a27f29357943768e63f8e44bc480fd/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","agency":{"office":{"code":"36C242","name":"242-NETWORK CONTRACT OFFICE 02 (36C242)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"organization_id":"100186522","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-07-22","archive_type":"auto_custom"},"history":[{"index":4,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-26T21:15:39.376Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"83a27f29357943768e63f8e44bc480fd","solicitation_number":"36C24226B0045"},{"index":2,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-11T18:46:41.060Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"99062a60f1e644dfa3d69c62b3fa2424","solicitation_number":"36C24226B0045","related_opportunity_id":"83a27f29357943768e63f8e44bc480fd"}],"contacts":[{"name":"Vladimir Stoyanov","role":"primary","email":"Vladimir.Stoyanov@va.gov","phone":"(718) 836-6600","title":"Contracting Officer"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"83a27f29357943768e63f8e44bc480fd","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"99062a60f1e644dfa3d69c62b3fa2424","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-12T02:57:00.248456420Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"931171f0ff0496948e0c205d42e6ae4334e42bd50a0ebc15b23d0cc8bb2fd6cc","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-12T02:57:00.248456420Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Project Number: 630A4-25-200\nProject Title: Refurbish & upgrade the laundry ventilation system at St. Albans\n\nScope of work Performance Period: 240 CALENDAR DAYS FROM NTP\nDescription of Work:\nProvide refurbish and part equivalent replacement of existing four HV Units and 7 Exhaust fans serve the laundry operation and small capacity AC units for the staff breakrooms to support the laundry building 173 located at the Veterans Affairs Medical Center,179-00 Linden Blvd, Jamaica, NY 11425 in accordance with manufacturer specifications and VA specifications at http://www.cfm.va.gov/til/specs.asp. Work shall meet all VA design guidelines and requirements. This work shall include, but not be limited to, all necessary labor and Materials to perform all Mechanical, electrical, Plumbing, and other related trade work for a complete restoration and functional system.\n\nThe contractor will perform a mandated walkthrough to verify the site condition and notify the Contractor Officer during the bidding process of any observations and comments not included in the following outlined SOW below:\n\n\nHV-1\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, repair, and/or replacement of the interior components and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\n\n\nHV-2\n\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\nHV-3\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\n\nHV-4\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may\n\nProvide new fan array sections consisting of high-efficiency, direct-drive motors and VFDs to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\nFurnish and install new variable frequency drives (VFDs) for exhaust fans E- 1,2; GX-1,2,3,4, and 5. Exhaust fans GX 3,4, and 5 are located on the upper roof; exhaust fans GX 1 and 2 are located on the lower roof. Exhaust fan E-1 is in MER1, and Exhaust fan E-2 is in MER2.\n\nExhaust Fans\n\nRefurbish existing exhaust fans, GX-1, 2, 3, 4, 5, E1 and E2. Replace existing motors with new NEMA premium-efficiency inverter-duty motors and install a new variable-speed drive. Replace bearings and seals. Install new sealant on the ductwork seams. Install new access doors. Install new motorized dampers. Replace filters on roof exhaust fans GX-1, 2, 3, 4, 5, and exhaust fans E1 and E2. Exhaust fans GX 3, 4, and 5 are located on the upper roof; GX 1 and 2 are located on the lower roof. Exhaust Fan E-1 is in MER1, and Exhaust Fan E-2 is in MER2.\nReplace the main electrical breaker for each unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\n\nPiping and devices\nReplace the existing steam PRV station (High to Mid)\nReplace the existing relief valve on the expansion/Flash Tank in MER 1.\nReplace all steam and condensate piping, fittings, valves, F&T traps, and all necessary items to connect to the new Steam coils.\nAC units\n\nRemove and replace AC 2 & ACCU1 with a new equivalent split system, including all necessary installation work, materials, and activation.\nRemove and replace AC 1 with a new equivalent package unit, including all the necessary installation work, materials, and activation\nPainting\nSandblast and paint the structural steel for GX 1,2,3,4 and 5.\nClean and epoxy paint the mechanical room floors.\n\nGeneral Requirement:\nThe Contractor shall furnish all labor, materials, tools, supervision, equipment, and safety necessary to perform the site preparation. At a minimum, the following shall be performed:\nThe Contractor shall take all necessary precautions and safety measures to protect all patients and end users from all related activities.\n\nThe Contractor shall repair all walls and interior damage related to the site preparation. The Contractor shall repair all demolition and openings necessitated to perform the repair.\n\nThe Contractor shall test and verify all work to ensure proper operation.\n\nThe Contractor must have OSHA training and specialized OSHA training.\n\nIn the performance of all work, the workers must be incompliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.).\nAll work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, VA Policy and requirements, OSHA regulations, and manufacturer specifications.\n\nThe Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. The contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost.\n\nIt is the responsibility of the contractor to verify all quantities, field conditions, and measurements prior to starting work. The contractor shall notify the CO/COR and the VA Engineering Team of any differing site conditions prior to commencing work.\n\nThe Contractor shall always provide an English-Speaking working supervisor on- site when work is being performed and for the duration of this project. A supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this.\n\nThe Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc.\n\nThe Contractor shall post visible required warning signs and barriers prior to beginning any work.\n\nThe Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government.\n\nThe Contractor shall be responsible for the proper and safe removal and disposal of all debris.\n\nThe Contractor shall perform cleanup at any time when the work area becomes cluttered and/or restricts traffic. At a minimum, the Contractor shall clean the work area at the end of each work shift.\n\nThe C&A requirements do not apply, and a Security Accreditation Package is not required.\n\nThe Contractor is responsible for completing the VA Privacy and Information Security Awareness training.\n\nContractor is responsible for providing Professional Engineer-stamped shop drawings.\n\nThe Contractor is responsible for providing infection control and ILSM.\n\nThe Contractor is responsible for providing a phasing plan.\n\nContractor is responsible for advanced hourly coordination that includes overtime, weekend, and holiday work hours. \n\n\nBase Bid (Alternate Bid)\n\nAll controls shall interface and be connected to the existing Infinity (Johnson Controls BMS system) building management system front end located in building no. 89 ground floor. Contractor shall update [system hardware and software to the last version of (Johnson Controls BMS system)]. Contractor shall extend required control wiring in conduits to all required locations. Conduits shall run in the hung ceiling space in all finished spaces. coordinate with cor.\n\nProvide BMS tie-in to the BMS central workstation located in Building #89, Engineering Service. Install a new conduit to the BMS located in Building 89.\nSt Albans uses a Johnson Controls BMS system.\n\n\n\nTESTING, ADJUSTING, AND BALANCING (TAB), COMMISSIONING, TRAINING, AND ACCEPTANCE\n\nGeneral.Â Provide all labor, materials, instruments, and certified personnel required to perform TAB and commissioning of HV-1 through HV-4; exhaust fans GX-1, GX-2, GX-3, GX-4, GX-5, E-1, and E-2; new/replaced VFDs; steam PRV station and associated coils, valves, actuators, and controls. Perform work in accordance with VA Master Specifications (e.g.,Â 23 05 93Â TAB for HVAC andÂ 01 91 00Â Commissioning), applicable NFPA and OSHA requirements, and manufacturer recommendations.\n\nQualifications.Â TAB work shall be performed by anÂ independentÂ NEBB, AABC, or TABB-certified firm not affiliated with the installation mechanical contractor. Commissioning activities shall be led by a qualified provider with a minimum of five (5) similar projects in healthcare or VA facilities within the last five years.\n\nPre-Functional Activities.\n\nSubmit a TAB plan and commissioning plan identifying procedures, calibrated instruments, point lists, and test forms for Government review.\nVerify equipment installation is complete, clean, and safe to operate; confirm correct rotation, belt tension (if any), VFD parameters, damper actuation, valve stroke, sensor placement, and controller addressing.\nConfirm availability of design setpoints/targets; if absent, coordinate with COR to establish interim targets meeting process needs and ventilation/pressurization intent for laundry operations.\n\nFunctional Performance Testing.Â Execute tests to demonstrate sequences of operation and interlocks, including at a minimum:\n\nLead/lag or fan-array staging; start/stop via DDC; alarm and fail-safe conditions.\nExhaust supply interlock to maintain required differential pressure/airflow relationships for laundry spaces.\nCoil control (preheat/reheat) with space-temperature regulation, freeze-start and high-limit safety, filter differential-pressure monitoring, and VFD speed limits.\nPRV station regulation, condensate return function, and trap operation under load.\n\nTAB Measurements and Balancing.\n\nMeasure and record supply/return/exhaust airflows, system total/static pressures, motor amperage, coil  T/ P, and damper positions at design and turndown conditions.\nBalance systems to approved setpoints; document final positions and VFD minimum/maximum speeds.\nWhere field constraints prevent achieving targets, propose corrective actions (e.g., sheave/VFD adjustments, damper/coil modifications) and implement upon written direction.\n\nControls Integration and Trending.\n\nVerify all new digital control points, alarms, and trends are mapped, named, and viewable at the local controller and at any front-end, as applicable.\nProvide a 30-day trend log (5-minute intervals minimum) for key points: space temperature(s), supply/exhaust airflow, duct static, coil valve position, filter  P, and VFD speed. Submit trend analysis with recommendations.\n\nDocumentation.\n\nDeliver a sealed TAB Report (or certified report by TAB supervisor) including methods, calibrated instrument lists, as-found/as-left data, and a punch-list of deficiencies.\nProvide Commissioning Report with test scripts, results, issues log, resolutions, and final sequence narratives and setpoints.\nSubmit O&M manuals and as-built control diagrams reflecting final configurations.\n\nTraining.Â Provide a minimum ofÂ 8 hoursÂ of instructor-led training for VA operations staff covering routine operation, seasonal changeover, alarm response, and maintenance of HV units, exhaust fans, VFDs, PRV station, and DDC. Provide recordings and handouts.\n\nAcceptance Criteria.Â Substantial Completion will not be recommended until:\n\nAll TAB and commissioning deficiencies are resolved.\nTrend data demonstrates stable control at approved setpoints; and\nRequired documentation and training deliverables are accepted by the COR.\n\nWarranty Verification.Â During the warranty period, perform one (1) seasonal re-check to confirm TAB values and control performance remain within tolerance, and correct deviations at no additional cost to the Government.\n\n\nVA Patient Privacy and Network Infrastructure:\nNone of the equipment listed within this procurement package will access the VA Network or store any sensitive patient information. Any contractors who will come on-site for installation will not need access to the VA network. All contractors must comply with VA regulation and complete the following training:  VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access or use of VA Sensitive Information. \nReference the attached Handbook 6500.6 Appendix A - Checklist for Information Security in the initiation phase of acquisitions.\nThe system does not transmit or maintain electronic Protected Health Information. A Manufacturer Disclosure Statement for Medical Device Security (MDS2) form in not applicable.\nA VA Directive 6550 Pre-Procurement Assessment form is not applicable.\nPrivacy Training:\nVA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information\nAll contractor employees and subcontractors participating under this contract are required to complete the VA's Privacy training requirement -  VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information.  Contractors must provide certifications of completion to the COR during each year of the contract. Training expires 365 days after the training is taken. This requirement is in addition to any other training that may be required of the contractor and subcontractor(s). The COR for the contract is responsible for ensuring the contractor takes the training and follows up with the annual requirements.\nSee Attachment A   VA Privacy Training for Personnel without Access to VA Computer\n\nProject Management Platform Requirement\n\nConstruction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize the VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through the project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning, and Retro-Commissioning contracts.Â  There is no user, license, or subscription fee for the contractor to use this cloud-based platform. \nContractor shall accomplish and complete the following tasks upon award of contract:\nRequest access to the ACC platform and Productivity NOW eLearning Site to project VA COR NLT 14 days from contract award. \nOnly staff who shall utilize the platform shall be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.\nThe access request shall be in writing and include a list of staff. The list shall include the following information:\nFull Name\nCompany Name\nEmail Address\nRole/Position on the project (i.e., Project manager, site supervisor)\nUpon granting access, staff shall complete the required ACC training through the Productivity NOW platform within 12 Calendar days.\nUpon successful completion of training, the contractor shall submit certificates of completion to COR NLT 2 business days. \nAccess to Productivity NOW eLearning will expire after 12 Calendar days after online access is granted. Contractor shall complete ACC training within that period.\nAdditional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above.\nThe contractor shall only use the ACC platform for contract-required technical submissions, project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor shall an increase in the contract amount be provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence outside the platform shall not be the governing authority's responsibility and will be at the contractor s expense. Official project correspondence and collaboration include, but are not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.\nContractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertain to staff who were granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel, and/or any other action that may affect the contractor's ability to maintain the required utilization of the platform.\n\nJustification:\nThe St. Albans Laundry mechanical room contains four Air Handling Units (HV s) and exhaust fans that provide ventilation and environmental control for laundry operations. Three of these units (AHU-1, AHU-3, AHU-4) are non-operational, along with inaccurate functional exhaust fans, resulting in inadequate airflow and compromised environmental conditions. This project seeks to execute immediate corrective repairs to restore serviceability for the overall ventilation system/units as an interim measure until a long-term design & Construction upgrade project is implemented.","text":"Project Number: 630A4-25-200\nProject Title: Refurbish & upgrade the laundry ventilation system at St. Albans\n\nScope of work Performance Period: 240 CALENDAR DAYS FROM NTP\nDescription of Work:\nProvide refurbish and part equivalent replacement of existing four HV Units and 7 Exhaust fans serve the laundry operation and small capacity AC units for the staff breakrooms to support the laundry building 173 located at the Veterans Affairs Medical Center,179-00 Linden Blvd, Jamaica, NY 11425 in accordance with manufacturer specifications and VA specifications at http://www.cfm.va.gov/til/specs.asp. Work shall meet all VA design guidelines and requirements. This work shall include, but not be limited to, all necessary labor and Materials to perform all Mechanical, electrical, Plumbing, and other related trade work for a complete restoration and functional system.\n\nThe contractor will perform a mandated walkthrough to verify the site condition and notify the Contractor Officer during the bidding process of any observations and comments not included in the following outlined SOW below:\n\nHV-1\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, repair, and/or replacement of the interior components and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\n\nHV-2\n\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\nHV-3\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\n\nHV-4\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may\n\nProvide new fan array sections consisting of high-efficiency, direct-drive motors and VFDs to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\nFurnish and install new variable frequency drives (VFDs) for exhaust fans E- 1,2; GX-1,2,3,4, and 5. Exhaust fans GX 3,4, and 5 are located on the upper roof; exhaust fans GX 1 and 2 are located on the lower roof. Exhaust fan E-1 is in MER1, and Exhaust fan E-2 is in MER2.\n\nExhaust Fans\n\nRefurbish existing exhaust fans, GX-1, 2, 3, 4, 5, E1 and E2. Replace existing motors with new NEMA premium-efficiency inverter-duty motors and install a new variable-speed drive. Replace bearings and seals. Install new sealant on the ductwork seams. Install new access doors. Install new motorized dampers. Replace filters on roof exhaust fans GX-1, 2, 3, 4, 5, and exhaust fans E1 and E2. Exhaust fans GX 3, 4, and 5 are located on the upper roof; GX 1 and 2 are located on the lower roof. Exhaust Fan E-1 is in MER1, and Exhaust Fan E-2 is in MER2.\nReplace the main electrical breaker for each unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\n\nPiping and devices\nReplace the existing steam PRV station (High to Mid)\nReplace the existing relief valve on the expansion/Flash Tank in MER 1.\nReplace all steam and condensate piping, fittings, valves, F&T traps, and all necessary items to connect to the new Steam coils.\nAC units\n\nRemove and replace AC 2 & ACCU1 with a new equivalent split system, including all necessary installation work, materials, and activation.\nRemove and replace AC 1 with a new equivalent package unit, including all the necessary installation work, materials, and activation\nPainting\nSandblast and paint the structural steel for GX 1,2,3,4 and 5.\nClean and epoxy paint the mechanical room floors.\n\nGeneral Requirement:\nThe Contractor shall furnish all labor, materials, tools, supervision, equipment, and safety necessary to perform the site preparation. At a minimum, the following shall be performed:\nThe Contractor shall take all necessary precautions and safety measures to protect all patients and end users from all related activities.\n\nThe Contractor shall repair all walls and interior damage related to the site preparation. The Contractor shall repair all demolition and openings necessitated to perform the repair.\n\nThe Contractor shall test and verify all work to ensure proper operation.\n\nThe Contractor must have OSHA training and specialized OSHA training.\n\nIn the performance of all work, the workers must be incompliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.).\nAll work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, VA Policy and requirements, OSHA regulations, and manufacturer specifications.\n\nThe Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. The contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost.\n\nIt is the responsibility of the contractor to verify all quantities, field conditions, and measurements prior to starting work. The contractor shall notify the CO/COR and the VA Engineering Team of any differing site conditions prior to commencing work.\n\nThe Contractor shall always provide an English-Speaking working supervisor on- site when work is being performed and for the duration of this project. A supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this.\n\nThe Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc.\n\nThe Contractor shall post visible required warning signs and barriers prior to beginning any work.\n\nThe Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government.\n\nThe Contractor shall be responsible for the proper and safe removal and disposal of all debris.\n\nThe Contractor shall perform cleanup at any time when the work area becomes cluttered and/or restricts traffic. At a minimum, the Contractor shall clean the work area at the end of each work shift.\n\nThe C&A requirements do not apply, and a Security Accreditation Package is not required.\n\nThe Contractor is responsible for completing the VA Privacy and Information Security Awareness training.\n\nContractor is responsible for providing Professional Engineer-stamped shop drawings.\n\nThe Contractor is responsible for providing infection control and ILSM.\n\nThe Contractor is responsible for providing a phasing plan.\n\nContractor is responsible for advanced hourly coordination that includes overtime, weekend, and holiday work hours.\n\nBase Bid (Alternate Bid)\n\nAll controls shall interface and be connected to the existing Infinity (Johnson Controls BMS system) building management system front end located in building no. 89 ground floor. Contractor shall update [system hardware and software to the last version of (Johnson Controls BMS system)]. Contractor shall extend required control wiring in conduits to all required locations. Conduits shall run in the hung ceiling space in all finished spaces. coordinate with cor.\n\nProvide BMS tie-in to the BMS central workstation located in Building #89, Engineering Service. Install a new conduit to the BMS located in Building 89.\nSt Albans uses a Johnson Controls BMS system.\n\nTESTING, ADJUSTING, AND BALANCING (TAB), COMMISSIONING, TRAINING, AND ACCEPTANCE\n\nGeneral.Â Provide all labor, materials, instruments, and certified personnel required to perform TAB and commissioning of HV-1 through HV-4; exhaust fans GX-1, GX-2, GX-3, GX-4, GX-5, E-1, and E-2; new/replaced VFDs; steam PRV station and associated coils, valves, actuators, and controls. Perform work in accordance with VA Master Specifications (e.g.,Â 23 05 93Â TAB for HVAC andÂ 01 91 00Â Commissioning), applicable NFPA and OSHA requirements, and manufacturer recommendations.\n\nQualifications.Â TAB work shall be performed by anÂ independentÂ NEBB, AABC, or TABB-certified firm not affiliated with the installation mechanical contractor. Commissioning activities shall be led by a qualified provider with a minimum of five (5) similar projects in healthcare or VA facilities within the last five years.\n\nPre-Functional Activities.\n\nSubmit a TAB plan and commissioning plan identifying procedures, calibrated instruments, point lists, and test forms for Government review.\nVerify equipment installation is complete, clean, and safe to operate; confirm correct rotation, belt tension (if any), VFD parameters, damper actuation, valve stroke, sensor placement, and controller addressing.\nConfirm availability of design setpoints/targets; if absent, coordinate with COR to establish interim targets meeting process needs and ventilation/pressurization intent for laundry operations.\n\nFunctional Performance Testing.Â Execute tests to demonstrate sequences of operation and interlocks, including at a minimum:\n\nLead/lag or fan-array staging; start/stop via DDC; alarm and fail-safe conditions.\nExhaust supply interlock to maintain required differential pressure/airflow relationships for laundry spaces.\nCoil control (preheat/reheat) with space-temperature regulation, freeze-start and high-limit safety, filter differential-pressure monitoring, and VFD speed limits.\nPRV station regulation, condensate return function, and trap operation under load.\n\nTAB Measurements and Balancing.\n\nMeasure and record supply/return/exhaust airflows, system total/static pressures, motor amperage, coil T/ P, and damper positions at design and turndown conditions.\nBalance systems to approved setpoints; document final positions and VFD minimum/maximum speeds.\nWhere field constraints prevent achieving targets, propose corrective actions (e.g., sheave/VFD adjustments, damper/coil modifications) and implement upon written direction.\n\nControls Integration and Trending.\n\nVerify all new digital control points, alarms, and trends are mapped, named, and viewable at the local controller and at any front-end, as applicable.\nProvide a 30-day trend log (5-minute intervals minimum) for key points: space temperature(s), supply/exhaust airflow, duct static, coil valve position, filter P, and VFD speed. Submit trend analysis with recommendations.\n\nDocumentation.\n\nDeliver a sealed TAB Report (or certified report by TAB supervisor) including methods, calibrated instrument lists, as-found/as-left data, and a punch-list of deficiencies.\nProvide Commissioning Report with test scripts, results, issues log, resolutions, and final sequence narratives and setpoints.\nSubmit O&M manuals and as-built control diagrams reflecting final configurations.\n\nTraining.Â Provide a minimum ofÂ 8 hoursÂ of instructor-led training for VA operations staff covering routine operation, seasonal changeover, alarm response, and maintenance of HV units, exhaust fans, VFDs, PRV station, and DDC. Provide recordings and handouts.\n\nAcceptance Criteria.Â Substantial Completion will not be recommended until:\n\nAll TAB and commissioning deficiencies are resolved.\nTrend data demonstrates stable control at approved setpoints; and\nRequired documentation and training deliverables are accepted by the COR.\n\nWarranty Verification.Â During the warranty period, perform one (1) seasonal re-check to confirm TAB values and control performance remain within tolerance, and correct deviations at no additional cost to the Government.\n\nVA Patient Privacy and Network Infrastructure:\nNone of the equipment listed within this procurement package will access the VA Network or store any sensitive patient information. Any contractors who will come on-site for installation will not need access to the VA network. All contractors must comply with VA regulation and complete the following training: VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access or use of VA Sensitive Information.\nReference the attached Handbook 6500.6 Appendix A - Checklist for Information Security in the initiation phase of acquisitions.\nThe system does not transmit or maintain electronic Protected Health Information. A Manufacturer Disclosure Statement for Medical Device Security (MDS2) form in not applicable.\nA VA Directive 6550 Pre-Procurement Assessment form is not applicable.\nPrivacy Training:\nVA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information\nAll contractor employees and subcontractors participating under this contract are required to complete the VA's Privacy training requirement - VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information. Contractors must provide certifications of completion to the COR during each year of the contract. Training expires 365 days after the training is taken. This requirement is in addition to any other training that may be required of the contractor and subcontractor(s). The COR for the contract is responsible for ensuring the contractor takes the training and follows up with the annual requirements.\nSee Attachment A VA Privacy Training for Personnel without Access to VA Computer\n\nProject Management Platform Requirement\n\nConstruction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize the VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through the project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning, and Retro-Commissioning contracts.Â There is no user, license, or subscription fee for the contractor to use this cloud-based platform.\nContractor shall accomplish and complete the following tasks upon award of contract:\nRequest access to the ACC platform and Productivity NOW eLearning Site to project VA COR NLT 14 days from contract award.\nOnly staff who shall utilize the platform shall be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.\nThe access request shall be in writing and include a list of staff. The list shall include the following information:\nFull Name\nCompany Name\nEmail Address\nRole/Position on the project (i.e., Project manager, site supervisor)\nUpon granting access, staff shall complete the required ACC training through the Productivity NOW platform within 12 Calendar days.\nUpon successful completion of training, the contractor shall submit certificates of completion to COR NLT 2 business days.\nAccess to Productivity NOW eLearning will expire after 12 Calendar days after online access is granted. Contractor shall complete ACC training within that period.\nAdditional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above.\nThe contractor shall only use the ACC platform for contract-required technical submissions, project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor shall an increase in the contract amount be provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence outside the platform shall not be the governing authority's responsibility and will be at the contractor s expense. Official project correspondence and collaboration include, but are not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.\nContractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertain to staff who were granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel, and/or any other action that may affect the contractor's ability to maintain the required utilization of the platform.\n\nJustification:\nThe St. Albans Laundry mechanical room contains four Air Handling Units (HV s) and exhaust fans that provide ventilation and environmental control for laundry operations. Three of these units (AHU-1, AHU-3, AHU-4) are non-operational, along with inaccurate functional exhaust fans, resulting in inadequate airflow and compromised environmental conditions. This project seeks to execute immediate corrective repairs to restore serviceability for the overall ventilation system/units as an interim measure until a long-term design & Construction upgrade project is implemented.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C24226B0045","place_of_performance":{"zip":"11424","city":{"name":"Queens"},"state":{"code":"NY","name":"New York"},"street":"Department of Veterans Affairs NYHHCS","country":{"code":"USA","name":"UNITED STATES"},"street2":"St. Albans VA Medical Center 179-00 Linden Boulevard"},"product_service_code":"Y1DZ"},{"award":{"awardee":{}},"dates":{"posted":"2026-03-11","posted_at":"2026-03-11T18:46:41.060Z","created_at":"2026-03-11T18:45:54.239Z","modified_at":"2026-04-15T17:49:08.608Z","response_deadline":{"raw":"2026-04-17T12:00:00-04:00","utc":"2026-04-17T16:00:00Z","date":"2026-04-17","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/99062a60f1e644dfa3d69c62b3fa2424/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","agency":{"office":{"code":"36C242","name":"242-NETWORK CONTRACT OFFICE 02 (36C242)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"organization_id":"100186522","organization_type":"OFFICE"},"status":{"active":true,"latest":false,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-07-25","archive_type":"auto_custom"},"history":[{"index":5,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-26T21:15:39.376Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"83a27f29357943768e63f8e44bc480fd","solicitation_number":"36C24226B0045"},{"index":3,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-04-15T17:49:08.608Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8942800ac0dd4fb292b37880d96e9f43","solicitation_number":"36C24226B0045","parent_opportunity_id":"99062a60f1e644dfa3d69c62b3fa2424","related_opportunity_id":"83a27f29357943768e63f8e44bc480fd"},{"index":2,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-03-11T18:46:41.060Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"99062a60f1e644dfa3d69c62b3fa2424","solicitation_number":"36C24226B0045","related_opportunity_id":"83a27f29357943768e63f8e44bc480fd"}],"contacts":[{"name":"Vladimir S Stoyanov","role":"primary","email":"vladimir.stoyanov@va.gov","title":"Contracting Officer"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"99062a60f1e644dfa3d69c62b3fa2424","lineage_id":"99062a60f1e644dfa3d69c62b3fa2424","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-21T09:28:41.147093415Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T16:22:40.277975Z","row_sha256":"bc98d624fff71d695af0711ec96fd122226e0f4e918c2306ee738ac8eeb215ed","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-21T09:28:41.147093415Z","first_seen_at":"2026-09-16T16:22:40.277975Z"},"description":{"html":"Scope of work\nPerformance Period: 240 CALENDAR DAYS FROM NTP\nDescription of Work:\nProvide refurbish and part equivalent replacement of existing four HV Units and 7 Exhaust fans serve the laundry operation and small capacity AC units for the staff breakrooms to support the laundry building 173 located at the Veterans Affairs Medical Center,179-00 Linden Blvd, Jamaica, NY 11425 in accordance with manufacturer specifications and VA specifications at http://www.cfm.va.gov/til/specs.asp. Work shall meet all VA design guidelines and requirements. This work shall include, but not be limited to, all necessary labor and Materials to perform all Mechanical, electrical, Plumbing, and other related trade work for a complete restoration and functional system.\n\nThe contractor will perform a mandated walkthrough to verify the site condition and notify the Contractor Officer during the bidding process of any observations and comments not included in the following outlined SOW below:\n\n\nHV-1\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, repair, and/or replacement of the interior components and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\n\n\nHV-2\n\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\nHV-3\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\n\nHV-4\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may\n\nProvide new fan array sections consisting of high-efficiency, direct-drive motors and VFDs to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\nFurnish and install new variable frequency drives (VFDs) for exhaust fans E- 1,2; GX-1,2,3,4, and 5. Exhaust fans GX 3,4, and 5 are located on the upper roof; exhaust fans GX 1 and 2 are located on the lower roof. Exhaust fan E-1 is in MER1, and Exhaust fan E-2 is in MER2.\n\nExhaust Fans\n\nRefurbish existing exhaust fans, GX-1, 2, 3, 4, 5, E1 and E2. Replace existing motors with new NEMA premium-efficiency inverter-duty motors and install a new variable-speed drive. Replace bearings and seals. Install new sealant on the ductwork seams. Install new access doors. Install new motorized dampers. Replace filters on roof exhaust fans GX-1, 2, 3, 4, 5, and exhaust fans E1 and E2. Exhaust fans GX 3, 4, and 5 are located on the upper roof; GX 1 and 2 are located on the lower roof. Exhaust Fan E-1 is in MER1, and Exhaust Fan E-2 is in MER2.\nReplace the main electrical breaker for each unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\n\nPiping and devices\nReplace the existing steam PRV station (High to Mid)\nReplace the existing relief valve on the expansion/Flash Tank in MER 1.\nReplace all steam and condensate piping, fittings, valves, F&T traps, and all necessary items to connect to the new Steam coils.\nAC units\n\nRemove and replace AC 2 & ACCU1 with a new equivalent split system, including all necessary installation work, materials, and activation.\nRemove and replace AC 1 with a new equivalent package unit, including all the necessary installation work, materials, and activation\nPainting\nSandblast and paint the structural steel for GX 1,2,3,4 and 5.\nClean and epoxy paint the mechanical room floors.\n\nGeneral Requirement:\nThe Contractor shall furnish all labor, materials, tools, supervision, equipment, and safety necessary to perform the site preparation. At a minimum, the following shall be performed:\nThe Contractor shall take all necessary precautions and safety measures to protect all patients and end users from all related activities.\n\nThe Contractor shall repair all walls and interior damage related to the site preparation. The Contractor shall repair all demolition and openings necessitated to perform the repair.\n\nThe Contractor shall test and verify all work to ensure proper operation.\n\nThe Contractor must have OSHA training and specialized OSHA training.\n\nIn the performance of all work, the workers must be incompliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.).\nAll work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, VA Policy and requirements, OSHA regulations, and manufacturer specifications.\n\nThe Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. The contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost.\n\nIt is the responsibility of the contractor to verify all quantities, field conditions, and measurements prior to starting work. The contractor shall notify the CO/COR and the VA Engineering Team of any differing site conditions prior to commencing work.\n\nThe Contractor shall always provide an English-Speaking working supervisor on- site when work is being performed and for the duration of this project. A supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this.\n\nThe Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc.\n\nThe Contractor shall post visible required warning signs and barriers prior to beginning any work.\n\nThe Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government.\n\nThe Contractor shall be responsible for the proper and safe removal and disposal of all debris.\n\nThe Contractor shall perform cleanup at any time when the work area becomes cluttered and/or restricts traffic. At a minimum, the Contractor shall clean the work area at the end of each work shift.\n\nThe C&A requirements do not apply, and a Security Accreditation Package is not required.\n\nThe Contractor is responsible for completing the VA Privacy and Information Security Awareness training.\n\nContractor is responsible for providing Professional Engineer-stamped shop drawings.\n\nThe Contractor is responsible for providing infection control and ILSM.\n\nThe Contractor is responsible for providing a phasing plan.\n\nContractor is responsible for advanced hourly coordination that includes overtime, weekend, and holiday work hours. \n\n\nBase Bid (Alternate Bid)\n\nAll controls shall interface and be connected to the existing Infinity (Johnson Controls BMS system) building management system front end located in building no. 89 ground floor. Contractor shall update [system hardware and software to the last version of (Johnson Controls BMS system)]. Contractor shall extend required control wiring in conduits to all required locations. Conduits shall run in the hung ceiling space in all finished spaces. coordinate with cor.\n\nProvide BMS tie-in to the BMS central workstation located in Building #89, Engineering Service. Install a new conduit to the BMS located in Building 89.\nSt Albans uses a Johnson Controls BMS system.\n\nTESTING, ADJUSTING, AND BALANCING (TAB), COMMISSIONING, TRAINING, AND ACCEPTANCE\n\nGeneral.Â Provide all labor, materials, instruments, and certified personnel required to perform TAB and commissioning of HV-1 through HV-4; exhaust fans GX-1, GX-2, GX-3, GX-4, GX-5, E-1, and E-2; new/replaced VFDs; steam PRV station and associated coils, valves, actuators, and controls. Perform work in accordance with VA Master Specifications (e.g.,Â 23 05 93Â TAB for HVAC andÂ 01 91 00Â Commissioning), applicable NFPA and OSHA requirements, and manufacturer recommendations.\n\nQualifications.Â TAB work shall be performed by anÂ independentÂ NEBB, AABC, or TABB-certified firm not affiliated with the installation mechanical contractor. Commissioning activities shall be led by a qualified provider with a minimum of five (5) similar projects in healthcare or VA facilities within the last five years.\n\nPre-Functional Activities.\n\nSubmit a TAB plan and commissioning plan identifying procedures, calibrated instruments, point lists, and test forms for Government review.\nVerify equipment installation is complete, clean, and safe to operate; confirm correct rotation, belt tension (if any), VFD parameters, damper actuation, valve stroke, sensor placement, and controller addressing.\nConfirm availability of design setpoints/targets; if absent, coordinate with COR to establish interim targets meeting process needs and ventilation/pressurization intent for laundry operations.\n\nFunctional Performance Testing.Â Execute tests to demonstrate sequences of operation and interlocks, including at a minimum:\n\nLead/lag or fan-array staging; start/stop via DDC; alarm and fail-safe conditions.\nExhaust supply interlock to maintain required differential pressure/airflow relationships for laundry spaces.\nCoil control (preheat/reheat) with space-temperature regulation, freeze-start and high-limit safety, filter differential-pressure monitoring, and VFD speed limits.\nPRV station regulation, condensate return function, and trap operation under load.\n\nTAB Measurements and Balancing.\n\nMeasure and record supply/return/exhaust airflows, system total/static pressures, motor amperage, coil  T/ P, and damper positions at design and turndown conditions.\nBalance systems to approved setpoints; document final positions and VFD minimum/maximum speeds.\nWhere field constraints prevent achieving targets, propose corrective actions (e.g., sheave/VFD adjustments, damper/coil modifications) and implement upon written direction.\n\nControls Integration and Trending.\n\nVerify all new digital control points, alarms, and trends are mapped, named, and viewable at the local controller and at any front-end, as applicable.\nProvide a 30-day trend log (5-minute intervals minimum) for key points: space temperature(s), supply/exhaust airflow, duct static, coil valve position, filter  P, and VFD speed. Submit trend analysis with recommendations.\n\nDocumentation.\n\nDeliver a sealed TAB Report (or certified report by TAB supervisor) including methods, calibrated instrument lists, as-found/as-left data, and a punch-list of deficiencies.\nProvide Commissioning Report with test scripts, results, issues log, resolutions, and final sequence narratives and setpoints.\nSubmit O&M manuals and as-built control diagrams reflecting final configurations.\n\nTraining.Â Provide a minimum ofÂ 8 hoursÂ of instructor-led training for VA operations staff covering routine operation, seasonal changeover, alarm response, and maintenance of HV units, exhaust fans, VFDs, PRV station, and DDC. Provide recordings and handouts.\n\nAcceptance Criteria.Â Substantial Completion will not be recommended until:\n\nAll TAB and commissioning deficiencies are resolved.\nTrend data demonstrates stable control at approved setpoints; and\nRequired documentation and training deliverables are accepted by the COR.\n\nWarranty Verification.Â During the warranty period, perform one (1) seasonal re-check to confirm TAB values and control performance remain within tolerance, and correct deviations at no additional cost to the Government.\n\n\nVA Patient Privacy and Network Infrastructure\nNone of the equipment listed within this procurement package will access the VA Network or store any sensitive patient information. Any contractors who will come on-site for installation will not need access to the VA network. All contractors must comply with VA regulation and complete the following training:  VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access or use of VA Sensitive Information. \nReference the attached Handbook 6500.6 Appendix A - Checklist for Information Security in the initiation phase of acquisitions.\nThe system does not transmit or maintain electronic Protected Health Information. A Manufacturer Disclosure Statement for Medical Device Security (MDS2) form in not applicable.\nA VA Directive 6550 Pre-Procurement Assessment form is not applicable.\nPrivacy Training:\nVA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information\nAll contractor employees and subcontractors participating under this contract are required to complete the VA's Privacy training requirement -  VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information.  Contractors must provide certifications of completion to the COR during each year of the contract. Training expires 365 days after the training is taken. This requirement is in addition to any other training that may be required of the contractor and subcontractor(s). The COR for the contract is responsible for ensuring the contractor takes the training and to follow up with the annual requirements.\nSee Attachment A   VA Privacy Training for Personnel without Access to VA Computer\n\nProject Management Platform Requirement\n\nConstruction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize the VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through the project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning, and Retro-Commissioning contracts.Â  There is no user, license, or subscription fee for the contractor to use this cloud-based platform. \nContractor shall accomplish and complete the following tasks upon award of contract:\nRequest access to the ACC platform and Productivity NOW eLearning Site to project VA COR NLT 14 days from contract award. \nOnly staff who shall utilize the platform shall be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.\nThe access request shall be in writing and include a list of staff. The list shall include the following information:\nFull Name\nCompany Name\nEmail Address\nRole/Position on the project (i.e., Project manager, site supervisor)\nUpon granting access, staff shall complete the required ACC training through the Productivity NOW platform within 12 Calendar days.\nUpon successful completion of training, the contractor shall submit certificates of completion to COR NLT 2 business days. \nAccess to Productivity NOW eLearning will expire after 12 Calendar days after online access is granted. Contractor shall complete ACC training within that period.\nAdditional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above.\nThe contractor shall only use the ACC platform for contract-required technical submissions, project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor shall an increase in the contract amount be provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence outside the platform shall not be the governing authority's responsibility and will be at the contractor s expense. Official project correspondence and collaboration include, but are not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.\nContractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertain to staff who were granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel, and/or any other action that may affect the contractor's ability to maintain the required utilization of the platform.\n\nJustification:\nThe St. Albans Laundry mechanical room contains four Air Handling Units (HV s) and exhaust fans that provide ventilation and environmental control for laundry operations. Three of these units (AHU-1, AHU-3, AHU-4) are non-operational, along with inaccurate functional exhaust fans, resulting in inadequate airflow and compromised environmental conditions. This project seeks to execute immediate corrective repairs to restore serviceability for the overall ventilation system/units as an interim measure until a long-term design & Construction upgrade project is implemented.","text":"Scope of work\nPerformance Period: 240 CALENDAR DAYS FROM NTP\nDescription of Work:\nProvide refurbish and part equivalent replacement of existing four HV Units and 7 Exhaust fans serve the laundry operation and small capacity AC units for the staff breakrooms to support the laundry building 173 located at the Veterans Affairs Medical Center,179-00 Linden Blvd, Jamaica, NY 11425 in accordance with manufacturer specifications and VA specifications at http://www.cfm.va.gov/til/specs.asp. Work shall meet all VA design guidelines and requirements. This work shall include, but not be limited to, all necessary labor and Materials to perform all Mechanical, electrical, Plumbing, and other related trade work for a complete restoration and functional system.\n\nThe contractor will perform a mandated walkthrough to verify the site condition and notify the Contractor Officer during the bidding process of any observations and comments not included in the following outlined SOW below:\n\nHV-1\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, repair, and/or replacement of the interior components and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\n\nHV-2\n\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\nHV-3\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\n\nHV-4\nProvide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may\n\nProvide new fan array sections consisting of high-efficiency, direct-drive motors and VFDs to reduce operating power while providing system redundancy and reduced maintenance requirements.\nProvide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication.\nProvide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper.\nProvide all necessary labor and materials to install new filters\nProvide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control.\nProvide all necessary labor and materials to install the new fire damper/automatic damper as required.\nReplace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\nProvide and install a new digital local control system interlocked with the exhaust system and the space temperature.\nFurnish and install new variable frequency drives (VFDs) for exhaust fans E- 1,2; GX-1,2,3,4, and 5. Exhaust fans GX 3,4, and 5 are located on the upper roof; exhaust fans GX 1 and 2 are located on the lower roof. Exhaust fan E-1 is in MER1, and Exhaust fan E-2 is in MER2.\n\nExhaust Fans\n\nRefurbish existing exhaust fans, GX-1, 2, 3, 4, 5, E1 and E2. Replace existing motors with new NEMA premium-efficiency inverter-duty motors and install a new variable-speed drive. Replace bearings and seals. Install new sealant on the ductwork seams. Install new access doors. Install new motorized dampers. Replace filters on roof exhaust fans GX-1, 2, 3, 4, 5, and exhaust fans E1 and E2. Exhaust fans GX 3, 4, and 5 are located on the upper roof; GX 1 and 2 are located on the lower roof. Exhaust Fan E-1 is in MER1, and Exhaust Fan E-2 is in MER2.\nReplace the main electrical breaker for each unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD\n\nPiping and devices\nReplace the existing steam PRV station (High to Mid)\nReplace the existing relief valve on the expansion/Flash Tank in MER 1.\nReplace all steam and condensate piping, fittings, valves, F&T traps, and all necessary items to connect to the new Steam coils.\nAC units\n\nRemove and replace AC 2 & ACCU1 with a new equivalent split system, including all necessary installation work, materials, and activation.\nRemove and replace AC 1 with a new equivalent package unit, including all the necessary installation work, materials, and activation\nPainting\nSandblast and paint the structural steel for GX 1,2,3,4 and 5.\nClean and epoxy paint the mechanical room floors.\n\nGeneral Requirement:\nThe Contractor shall furnish all labor, materials, tools, supervision, equipment, and safety necessary to perform the site preparation. At a minimum, the following shall be performed:\nThe Contractor shall take all necessary precautions and safety measures to protect all patients and end users from all related activities.\n\nThe Contractor shall repair all walls and interior damage related to the site preparation. The Contractor shall repair all demolition and openings necessitated to perform the repair.\n\nThe Contractor shall test and verify all work to ensure proper operation.\n\nThe Contractor must have OSHA training and specialized OSHA training.\n\nIn the performance of all work, the workers must be incompliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.).\nAll work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, VA Policy and requirements, OSHA regulations, and manufacturer specifications.\n\nThe Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. The contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost.\n\nIt is the responsibility of the contractor to verify all quantities, field conditions, and measurements prior to starting work. The contractor shall notify the CO/COR and the VA Engineering Team of any differing site conditions prior to commencing work.\n\nThe Contractor shall always provide an English-Speaking working supervisor on- site when work is being performed and for the duration of this project. A supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this.\n\nThe Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc.\n\nThe Contractor shall post visible required warning signs and barriers prior to beginning any work.\n\nThe Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government.\n\nThe Contractor shall be responsible for the proper and safe removal and disposal of all debris.\n\nThe Contractor shall perform cleanup at any time when the work area becomes cluttered and/or restricts traffic. At a minimum, the Contractor shall clean the work area at the end of each work shift.\n\nThe C&A requirements do not apply, and a Security Accreditation Package is not required.\n\nThe Contractor is responsible for completing the VA Privacy and Information Security Awareness training.\n\nContractor is responsible for providing Professional Engineer-stamped shop drawings.\n\nThe Contractor is responsible for providing infection control and ILSM.\n\nThe Contractor is responsible for providing a phasing plan.\n\nContractor is responsible for advanced hourly coordination that includes overtime, weekend, and holiday work hours.\n\nBase Bid (Alternate Bid)\n\nAll controls shall interface and be connected to the existing Infinity (Johnson Controls BMS system) building management system front end located in building no. 89 ground floor. Contractor shall update [system hardware and software to the last version of (Johnson Controls BMS system)]. Contractor shall extend required control wiring in conduits to all required locations. Conduits shall run in the hung ceiling space in all finished spaces. coordinate with cor.\n\nProvide BMS tie-in to the BMS central workstation located in Building #89, Engineering Service. Install a new conduit to the BMS located in Building 89.\nSt Albans uses a Johnson Controls BMS system.\n\nTESTING, ADJUSTING, AND BALANCING (TAB), COMMISSIONING, TRAINING, AND ACCEPTANCE\n\nGeneral.Â Provide all labor, materials, instruments, and certified personnel required to perform TAB and commissioning of HV-1 through HV-4; exhaust fans GX-1, GX-2, GX-3, GX-4, GX-5, E-1, and E-2; new/replaced VFDs; steam PRV station and associated coils, valves, actuators, and controls. Perform work in accordance with VA Master Specifications (e.g.,Â 23 05 93Â TAB for HVAC andÂ 01 91 00Â Commissioning), applicable NFPA and OSHA requirements, and manufacturer recommendations.\n\nQualifications.Â TAB work shall be performed by anÂ independentÂ NEBB, AABC, or TABB-certified firm not affiliated with the installation mechanical contractor. Commissioning activities shall be led by a qualified provider with a minimum of five (5) similar projects in healthcare or VA facilities within the last five years.\n\nPre-Functional Activities.\n\nSubmit a TAB plan and commissioning plan identifying procedures, calibrated instruments, point lists, and test forms for Government review.\nVerify equipment installation is complete, clean, and safe to operate; confirm correct rotation, belt tension (if any), VFD parameters, damper actuation, valve stroke, sensor placement, and controller addressing.\nConfirm availability of design setpoints/targets; if absent, coordinate with COR to establish interim targets meeting process needs and ventilation/pressurization intent for laundry operations.\n\nFunctional Performance Testing.Â Execute tests to demonstrate sequences of operation and interlocks, including at a minimum:\n\nLead/lag or fan-array staging; start/stop via DDC; alarm and fail-safe conditions.\nExhaust supply interlock to maintain required differential pressure/airflow relationships for laundry spaces.\nCoil control (preheat/reheat) with space-temperature regulation, freeze-start and high-limit safety, filter differential-pressure monitoring, and VFD speed limits.\nPRV station regulation, condensate return function, and trap operation under load.\n\nTAB Measurements and Balancing.\n\nMeasure and record supply/return/exhaust airflows, system total/static pressures, motor amperage, coil T/ P, and damper positions at design and turndown conditions.\nBalance systems to approved setpoints; document final positions and VFD minimum/maximum speeds.\nWhere field constraints prevent achieving targets, propose corrective actions (e.g., sheave/VFD adjustments, damper/coil modifications) and implement upon written direction.\n\nControls Integration and Trending.\n\nVerify all new digital control points, alarms, and trends are mapped, named, and viewable at the local controller and at any front-end, as applicable.\nProvide a 30-day trend log (5-minute intervals minimum) for key points: space temperature(s), supply/exhaust airflow, duct static, coil valve position, filter P, and VFD speed. Submit trend analysis with recommendations.\n\nDocumentation.\n\nDeliver a sealed TAB Report (or certified report by TAB supervisor) including methods, calibrated instrument lists, as-found/as-left data, and a punch-list of deficiencies.\nProvide Commissioning Report with test scripts, results, issues log, resolutions, and final sequence narratives and setpoints.\nSubmit O&M manuals and as-built control diagrams reflecting final configurations.\n\nTraining.Â Provide a minimum ofÂ 8 hoursÂ of instructor-led training for VA operations staff covering routine operation, seasonal changeover, alarm response, and maintenance of HV units, exhaust fans, VFDs, PRV station, and DDC. Provide recordings and handouts.\n\nAcceptance Criteria.Â Substantial Completion will not be recommended until:\n\nAll TAB and commissioning deficiencies are resolved.\nTrend data demonstrates stable control at approved setpoints; and\nRequired documentation and training deliverables are accepted by the COR.\n\nWarranty Verification.Â During the warranty period, perform one (1) seasonal re-check to confirm TAB values and control performance remain within tolerance, and correct deviations at no additional cost to the Government.\n\nVA Patient Privacy and Network Infrastructure\nNone of the equipment listed within this procurement package will access the VA Network or store any sensitive patient information. Any contractors who will come on-site for installation will not need access to the VA network. All contractors must comply with VA regulation and complete the following training: VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access or use of VA Sensitive Information.\nReference the attached Handbook 6500.6 Appendix A - Checklist for Information Security in the initiation phase of acquisitions.\nThe system does not transmit or maintain electronic Protected Health Information. A Manufacturer Disclosure Statement for Medical Device Security (MDS2) form in not applicable.\nA VA Directive 6550 Pre-Procurement Assessment form is not applicable.\nPrivacy Training:\nVA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information\nAll contractor employees and subcontractors participating under this contract are required to complete the VA's Privacy training requirement - VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information. Contractors must provide certifications of completion to the COR during each year of the contract. Training expires 365 days after the training is taken. This requirement is in addition to any other training that may be required of the contractor and subcontractor(s). The COR for the contract is responsible for ensuring the contractor takes the training and to follow up with the annual requirements.\nSee Attachment A VA Privacy Training for Personnel without Access to VA Computer\n\nProject Management Platform Requirement\n\nConstruction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize the VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through the project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning, and Retro-Commissioning contracts.Â There is no user, license, or subscription fee for the contractor to use this cloud-based platform.\nContractor shall accomplish and complete the following tasks upon award of contract:\nRequest access to the ACC platform and Productivity NOW eLearning Site to project VA COR NLT 14 days from contract award.\nOnly staff who shall utilize the platform shall be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.\nThe access request shall be in writing and include a list of staff. The list shall include the following information:\nFull Name\nCompany Name\nEmail Address\nRole/Position on the project (i.e., Project manager, site supervisor)\nUpon granting access, staff shall complete the required ACC training through the Productivity NOW platform within 12 Calendar days.\nUpon successful completion of training, the contractor shall submit certificates of completion to COR NLT 2 business days.\nAccess to Productivity NOW eLearning will expire after 12 Calendar days after online access is granted. Contractor shall complete ACC training within that period.\nAdditional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above.\nThe contractor shall only use the ACC platform for contract-required technical submissions, project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor shall an increase in the contract amount be provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence outside the platform shall not be the governing authority's responsibility and will be at the contractor s expense. Official project correspondence and collaboration include, but are not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.\nContractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertain to staff who were granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel, and/or any other action that may affect the contractor's ability to maintain the required utilization of the platform.\n\nJustification:\nThe St. Albans Laundry mechanical room contains four Air Handling Units (HV s) and exhaust fans that provide ventilation and environmental control for laundry operations. Three of these units (AHU-1, AHU-3, AHU-4) are non-operational, along with inaccurate functional exhaust fans, resulting in inadequate airflow and compromised environmental conditions. This project seeks to execute immediate corrective repairs to restore serviceability for the overall ventilation system/units as an interim measure until a long-term design & Construction upgrade project is implemented.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24226B0045","product_service_code":"Y1DZ"},{"award":{"awardee":{}},"dates":{"posted":"2026-04-15","posted_at":"2026-04-15T17:49:08.608Z","created_at":"2026-04-15T17:40:52.266Z","modified_at":"2026-04-15T17:49:08.612Z","response_deadline":{"raw":"2026-04-27T12:00:00-04:00","utc":"2026-04-27T16:00:00Z","date":"2026-04-27","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8942800ac0dd4fb292b37880d96e9f43/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","agency":{"office":{"code":"36C242","name":"242-NETWORK CONTRACT OFFICE 02 (36C242)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"organization_id":"100186522","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-09-30","archive_type":"auto_custom"},"history":[{"index":5,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-26T21:15:39.376Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"83a27f29357943768e63f8e44bc480fd","solicitation_number":"36C24226B0045"},{"index":3,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-04-15T17:49:08.608Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8942800ac0dd4fb292b37880d96e9f43","solicitation_number":"36C24226B0045","parent_opportunity_id":"99062a60f1e644dfa3d69c62b3fa2424","related_opportunity_id":"83a27f29357943768e63f8e44bc480fd"},{"index":2,"title":"Y1DZ--NRM CONST 630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-03-11T18:46:41.060Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"99062a60f1e644dfa3d69c62b3fa2424","solicitation_number":"36C24226B0045","related_opportunity_id":"83a27f29357943768e63f8e44bc480fd"}],"contacts":[{"name":"Vladimir S Stoyanov","role":"primary","email":"vladimir.stoyanov@va.gov","title":"Contracting Officer"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8942800ac0dd4fb292b37880d96e9f43","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"99062a60f1e644dfa3d69c62b3fa2424","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-21T04:42:27.080091768Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T16:22:40.277975Z","row_sha256":"fa7b368c319d49c3fcb242330c04a9aa174dd582dbbff8271d622b9da370de4b","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-21T04:42:27.080091768Z","first_seen_at":"2026-09-16T16:22:40.277975Z"},"description":{"html":"<p>NEW BID DUE DATE: 04/27/2026 @ 12:00 PM, NEW BID OPENING: 04/28/2026 @ 3:00 PM</p>","text":"NEW BID DUE DATE: 04/27/2026 @ 12:00 PM, NEW BID OPENING: 04/28/2026 @ 3:00 PM","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24226B0045","place_of_performance":{"zip":"11425","city":{"code":"38231","name":"Jamaica"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1DZ"}],"due_at":"2026-04-27T16:00:00Z","due_date":"2026-04-27","closes_at":"2026-04-27T16:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","state":"NY","county":"36081","county_name":"Queens County","city":null,"city_name":null,"country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"QANEBJCXY9B3","amount":null,"linked_awards":3,"cancelled":false,"archived":true,"updated_at":"2026-10-01T04:59:35.906392Z","principal_notice_id":"8942800ac0dd4fb292b37880d96e9f43","description":{"text":"NEW BID DUE DATE: 04/27/2026 @ 12:00 PM, NEW BID OPENING: 04/28/2026 @ 3:00 PM","html":"<p>NEW BID DUE DATE: 04/27/2026 @ 12:00 PM, NEW BID OPENING: 04/28/2026 @ 3:00 PM</p>","origin":"detail"},"contacts":[{"name":"Vladimir S Stoyanov","role":"primary","email":"vladimir.stoyanov@va.gov","title":"Contracting Officer"}],"place_of_performance":{"zip":"11425","city":{"code":"38231","name":"Jamaica"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"naics_codes":["236220"],"award":{"awardee":{}},"attachments":[{"resource_id":"c4902550698d497d9475b2d0a726f0c0","name":"36C24226B0045.docx","kind":"file","mime_type":".docx","size_bytes":40851,"posted_at":"2026-02-26T21:15:39.376Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c4902550698d497d9475b2d0a726f0c0/download","mirrored":false},{"resource_id":"75562b2f7e8c4b8bab8e6ef7f6d1d11a","name":"36C24226B0045_1.docx","kind":"file","mime_type":".docx","size_bytes":161728,"posted_at":"2026-03-11T18:46:41.060Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/75562b2f7e8c4b8bab8e6ef7f6d1d11a/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C24226C0079_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C24226C0079_3600_-NONE-_-NONE-/","piid":"36C24226C0079","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"QANEBJCXY9B3","recipient_name":"MICHAEL KOST","recipient_uei":"QANEBJCXY9B3","recipient_cage":"71FB1","recipient_city":"BRONX","recipient_state":"NY","sub_name":"Department of Veterans Affairs","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","office_key":"o-36C242","first_action_date":"2026-05-21","last_action_date":"2026-10-16","actions":2,"obligated":"1239777.00","current_total_value":"1239777.00","potential_total_value":"1239777.00","naics":"236220","psc":"Y1DZ","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":3,"description":"630A4-25-200 (REFURBISH & UPGRADE LAUNDRY VENTILATION)","method":"solicitation","confidence":"high","evidence":["solicitation number 36C24226B0045 equals the FPDS solicitation identifier","same awarding office 36C242"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C24226R0115","latest_notice_id":"90161704ac554dd8b698d6922b32b544","title":"X1DB--Valley Stream CBOC - New Replacing Lease (VA-28-00000026)","solicitation_number":"36C24226R0115","notice_type":"r","first_type":"r","first_posted":"2026-11-06","last_posted":"2026-11-06","notices":1,"due_at":"2026-11-27T09:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T09:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"531120","psc":"X1DB","set_aside":null,"state":"NY","county":"36059","county_name":"Nassau County","city":"3676705","city_name":"Valley Stream","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-07T04:54:53.607561Z"},{"key":"36C24227R0010","latest_notice_id":"c95dcd81879b4a90b11678c8a80b3462","title":"F108--620-26-206 Asbestos Abatement","solicitation_number":"36C24227R0010","notice_type":"o","first_type":"p","first_posted":"2026-10-23","last_posted":"2026-11-19","notices":8,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"562910","psc":"F108","set_aside":"SDVOSBC","state":"NY","county":"36119","county_name":"Westchester County","city":"3648208","city_name":"Montrose","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24227Q0135","latest_notice_id":"878a17ea716349ce875349b4308f3e10","title":"Y1DA--STATION-CONST TBD OIG RENOVATION","solicitation_number":"36C24227Q0135","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":2,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"236220","psc":"Y1DA","set_aside":"SDVOSBC","state":"NY","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"description","state_evidence":"ANTEEN OPERATIONS. LOCATION: MARGARET COCHRAN CORBIN VA CAMPUS 423 EAST, 23RD STREET NEW YORK, NY 10010","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C24227Q0122","latest_notice_id":"ab2010ecef12446face409c44090d58a","title":"8910--East Orange Milk and Dairy","solicitation_number":"36C24227Q0122","notice_type":"o","first_type":"p","first_posted":"2026-11-09","last_posted":"2026-11-24","notices":2,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"311511","psc":"8910","set_aside":"SBA","state":"NJ","county":"34013","county_name":"Essex County","city":"3419390","city_name":"East Orange","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 8910)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C24227Q0091","latest_notice_id":"5d73616203d447e888c36d0c3fdea423","title":"R425--FY 27 Service (Base+4) | NYH Energy Control Procedures/LOTO Services | 630","solicitation_number":"36C24227Q0091","notice_type":"k","first_type":"k","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"541330","psc":"R425","set_aside":"SDVOSBC","state":"NY","county":"36061","county_name":"New York County","city":"3651000","city_name":"New York","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"}],"similar_open":[{"key":"36C24227Q0135","latest_notice_id":"878a17ea716349ce875349b4308f3e10","title":"Y1DA--STATION-CONST TBD OIG RENOVATION","solicitation_number":"36C24227Q0135","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":2,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"236220","psc":"Y1DA","set_aside":"SDVOSBC","state":"NY","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"description","state_evidence":"ANTEEN OPERATIONS. LOCATION: MARGARET COCHRAN CORBIN VA CAMPUS 423 EAST, 23RD STREET NEW YORK, NY 10010","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C24227B00050001","latest_notice_id":"684f30abb8934f0393559f87438724b3","title":"Z1DA--528A5-27-504 Seal and Stripe Parking Lots","solicitation_number":"36C24227B0005-0001","notice_type":"o","first_type":"o","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-12-03T16:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":"NY","county":"36069","county_name":"Ontario County","city":"3612144","city_name":"Canandaigua","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C24227B0005","latest_notice_id":"d91ec8aa1ebf44dfab4a2168f6e4a162","title":"Z1DA--528A5-27-504 Seal and Stripe Parking Lots","solicitation_number":"36C24227B0005","notice_type":"o","first_type":"p","first_posted":"2026-10-13","last_posted":"2026-10-29","notices":3,"due_at":"2026-12-03T16:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":"NY","county":"36069","county_name":"Ontario County","city":"3612144","city_name":"Canandaigua","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-30T03:41:17.879115Z"}],"similar_open_total":188,"indexable":false}