{"canonical":"https://sealedbidder.com/opportunities/36c24225r0040","key":"36C24225R0040","url":"https://sealedbidder.com/opportunities/36c24225r0040","title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","solicitation_number":"36C24225R0040","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-03-10T15:00:00Z","first_posted":"2025-01-31","last_posted":"2025-09-29","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"541330","psc":"C1DA","set_aside":"SDVOSBC","place_state":"NY","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"36061","place_county_name":"New York County","place_city":"3651000","place_city_name":"New York","winner":"WEST POINT ENGINEERS LLC","award_amount":"903566.73","publications":[{"notice_id":"d418af84a21c465fb548357bd957cb91","title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","solicitation_number":"36C24225R0040","notice_type":"r","base_type":"r","posted":"2025-01-31","posted_at":"2025-01-31T18:33:47.161Z","due_at":"2025-03-06T15:00:00Z","due_date":"2025-03-06","cancelled":false,"archived":true,"archive_date":"2025-06-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d418af84a21c465fb548357bd957cb91/view","enriched":true,"history":[{"index":3,"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-03T15:49:56.425Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"5285a1ceef644e8391fcc43dcf2865e7","solicitation_number":"36C24225R0040","parent_opportunity_id":"d418af84a21c465fb548357bd957cb91"},{"index":1,"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-31T18:33:47.161Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"d418af84a21c465fb548357bd957cb91","solicitation_number":"36C24225R0040"}]},{"notice_id":"5285a1ceef644e8391fcc43dcf2865e7","title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","solicitation_number":"36C24225R0040","notice_type":"r","base_type":"r","posted":"2025-03-03","posted_at":"2025-03-03T15:49:56.425Z","due_at":"2025-03-10T15:00:00Z","due_date":"2025-03-10","cancelled":false,"archived":true,"archive_date":"2025-05-09","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5285a1ceef644e8391fcc43dcf2865e7/view","enriched":true,"history":[{"index":3,"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-03T15:49:56.425Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"5285a1ceef644e8391fcc43dcf2865e7","solicitation_number":"36C24225R0040","parent_opportunity_id":"d418af84a21c465fb548357bd957cb91"},{"index":1,"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-31T18:33:47.161Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"d418af84a21c465fb548357bd957cb91","solicitation_number":"36C24225R0040"}]},{"notice_id":"d52ea37167234112a05de9cb64d8e2a1","title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","solicitation_number":"36C24225R0040","notice_type":"a","base_type":"a","posted":"2025-09-29","posted_at":"2025-09-29T15:16:22.209Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2026-01-06","removed_at":null,"award_number":"36C24225C0105","awardee_name":"WEST POINT ENGINEERS LLC","amount":"903566.73","link_sam":"https://sam.gov/workspace/contract/opp/d52ea37167234112a05de9cb64d8e2a1/view","enriched":true,"history":[{"index":3,"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-29T15:16:22.209Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"d52ea37167234112a05de9cb64d8e2a1","solicitation_number":"36C24225R0040"}]}],"latest_notice_id":"d52ea37167234112a05de9cb64d8e2a1","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-01-31","posted_at":"2025-01-31T18:33:47.161Z","created_at":"2025-01-31T18:33:44.966Z","modified_at":"2025-05-09T04:04:30.403Z","response_deadline":{"raw":"2025-03-06T10:00:00-05:00","utc":"2025-03-06T15:00:00Z","date":"2025-03-06","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d418af84a21c465fb548357bd957cb91/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","agency":{"office":{"code":"36C242","name":"242-NETWORK CONTRACT OFFICE 02 (36C242)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"organization_id":"100186522","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-06-13","archive_type":"auto_custom"},"history":[{"index":3,"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-03T15:49:56.425Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"5285a1ceef644e8391fcc43dcf2865e7","solicitation_number":"36C24225R0040","parent_opportunity_id":"d418af84a21c465fb548357bd957cb91"},{"index":1,"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-31T18:33:47.161Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"d418af84a21c465fb548357bd957cb91","solicitation_number":"36C24225R0040"}],"contacts":[{"name":"Samantha Chavanga","role":"primary","email":"Samantha.Chavanga@va.gov","phone":"917-868-2471","title":"Contract Specialist"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"d418af84a21c465fb548357bd957cb91","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"d418af84a21c465fb548357bd957cb91","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-24T02:30:40.772904935Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a14ef3f46a7d874d618e34c18b34ee99d0510bfeee0163a9c5a6b80d24d455a0","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-24T02:30:40.772904935Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Sources Sought Notice\n\nSources Sought Notice\n\nPage 23 of 23\nSources Sought Notice\n*= Required Field\nSources Sought Notice\n\nPage 1 of 23\nDESCRIPTIONS\nTHIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT\nThe Department of Veterans Affairs is seeking a qualified Architect-Engineering (AE) firm to provide Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, Shop Drawing Review, and all other related information for Project No. 630-23-110, Replace Roofs Building #1 located at New York Harbor Healthcare System   Margaret Cochran-Corbin Medical Center 423 East 23rd Street., New York, NY 10010. \nThis requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330   Engineering Services and small business size standard of $25.5 Million. Magnitude of Construction is between $500,000.00 and $1,000,000.00. Potential contractors must be registered in SAM (www.sam.gov) at time of submission of their qualifications to be considered for an award. The design will be completed in a manner such that the estimated construction cost is within the VA budget. It is not expected that any new space will be added to the existing building footprint.  The anticipated award date of the proposed A-E Contract is on or before August 14, 2025. Prospective Contractors must be visible/verified/certified as SDVOSB in VetCert (https://veterans.certify.sba.gov) and registered in SAM (www.sam.gov) and at time of submission of their qualifications in order to be considered for an award.  \nNOTE: Offerors are referred to VAAR 852.219-11(d)(1) Services. The Contractor will not pay more than 50% of the amount paid by the government to it to firms that are not SBA-listed SDVOSBs as set forth in 852.219-10. In order to assure compliance with this clause, all firms submitting a SF330 for this Sources Sought Notice are required to indicate what percentage of the cost of contract performance will be expended by the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other subcontracted or otherwise used small or large business entity(s). Any subcontracted or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e., SDVOSB, VOSB, 8(a), large, etc.).\n852.219-10   VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016) (DEVIATION)\nSCOPE OF SERVICE REQUIRED:\nA/E Design: Provide all necessary Architect-Engineer (A/E) services to design new roofing system for Building #1 at VA Medical Center at 423 East 23rd Street, New York, NY.  A/E shall provide feasibility study reports, basis of Design Reports, Schematics, Design Development, Contract Document and Construction Period Services as specified in Scope of work and Supplement B.  A/E shall provide three (3) options of roofing system designs with cost estimates. Please follow AE NRM submission guide PG-18-15. Replace the following existing roofs with new roofing systems or approved equal:\nReplacement of portions of the existing roof of Building #1 as follows:\n\nSouth Wing (South wing mechanical room -1,050 s.f. and South Wing Annex Roofs -1,900 s.f.), West Wing & North Wing -40,162 SF.\nMain Building Penthouse (4,168 s.f.)\nCentral Mechanical Room  (3,125 s.f).\nFloor repair and installation of waterproof coating on interior flooring on 19th floor (3,125 s.f.)\nFloor repair and installation of waterproof coating on interior flooring on 21st House Tank floor (4,168 s.f.)\nLibrary/Records Storage (2,750 s.f.)\nKitchen Roof (6,875 s.f.)\nDietetic /Freight Building Roof (1,363 s.f.)\nWarehouse Roof (3,850 s.f.)\nEast Wing Pharmacy (8225 s.f.)\nGenerator Building (2,000 s.f.)\nMetal Penthouse (2nd Floor North Wing) (800 s.f.)\nChapel/Penthouse (2400 s.f.)\nMorgue (1050 s.f.)\n2nd Floor Police Roof (2,200 s.f.)\nRoof from bridge connection between building 1 and 2 (By HR office). \nRoof on Gymnasium at 17W.\nRoof from Atrium bridge connection between building 1 and 6.\nReplacement of existing roof of Building #3 (Quarters Building) (4,034 s.f.)\nStaff and Nurse Quarters Building.\nStaff and Nurse Quarters Mechanical Room. \nStaff Entrance Area (13,925 s.f.)\nAdditional Requirements\n- Survey/seal all ductwork penetrations on roofs and provide waterproof insulation.\nRemove MRI trailer and remove day care planter.\nReplace roof at dunnage area on 19th floor north wing (500 S.F.) \nWaterproof all mechanical equipment rooms (MER) on 19th floor\nRepair or replace building 6 balcony area pavers / roof.\nProvide roof leak mitigation.\nNew roofing system designs shall include but not be limited to the following:\n\nRemoval and disposal of existing roofing system materials including gravel ballasts.\nExamine deck and make any necessary repairs to provide suitable substrate for roofing materials. Any repairs required will be a line-item price per square foot on bid forms.\nProvide protection for existing HVAC equipment, skylights, walls, windows, parapets, copings, roof decks, vents, electrical and conduits from damage.\nProvide protection for sidewalks and parking adjacent to roof work by building sidewalk shades.\nReplace all cracked/broken coping granites/stones, bricks, and masonry walls with new or approved equal.\nReplace all existing rusted/leaked vent pipes, strainer assemblies, drainpipes, limited sections of piping below, flashings and related components with new or approved equal.  Cutout and concrete replacement shall be included in the construction cost.   \nModify parapets as needed for new roofing system. \nReplace all existing and missing guard rails with New guard rails or approved equal.\nProvide and install new exterior OSHA compliant roof access ladders and guard rails as required.\nEvaluate and provide waterproof flooring for Mechanical Space on 7th Floor as needed.\nRoofs and drainpipes insulation materials may contain ACM (asbestos contaminate materials), the design shall incorporate the service of Certified Industrial Hygienist (CIH) to survey existing roofs and provide asbestos drawings and specifications and construction period services during asbestos abatement.  CIH shall also perform asbestos monitoring during construction.\nAdditional roof leaks as identified by the facility.\nScope of work also includes construction period services, such as submittal/shop drawing review and project meetings, site visits and preparation of as-built drawings.\nScope include a masterÂ phasing planÂ and the option Kemper liquidÂ type applied roof.\nA/E shall provide detailed construction estimates for one (1) Base Bid Cost and one (1) Alternate Bid Cost for the selected new roofing systems.\nProvide outside type hoist detail design drawing for transporting materials and equipment for Contractor. Contractor will not be allowed the use of existing elevators.\nContract documents requirements: \nAll contract A/E s employees shall take the Privacy and Information Security training and provide copies of training certificates to COR as required by VA policy.\nAE and the subconsultant shall use Autodesk Build Construction Management platform to manage the projects.\nAll contract A/E s employees shall provide the following documentation:\n\nBackground investigation Worksheet (Attachment No.2 under SOP Acquisition)\nVA Form 0711\nSecurity and Privacy Training certification\nOHSA certification\nTB tuberculin test certification\nDesign Development\n\nA.) CONSULT WITH VA TO IDENTIFY AND PRIORITIZE AREAS OF CONCERN,  BUDGETARY CONSTRAINTS, AND TIME CONSTRAINTS.\n REVIEW VA AS-BUILT DRAWINGS INDICATING ORIGINAL BUILDING  CONSTRUCTION, SPECIFICATIONS, AND PREVIOUS REPAIR CONTRACTS.\n\n VISUAL INSPECTION: WORK WILL INCLUDE A DETAILED VISUAL                                                               \n          INSPECTION OF RELEVANT PORTIONS OF THE PROJECT. THE INSPECTION \n          WILL PROVIDE INFORMATION REGARDING THE NATURE, EXTENT, AND  PROBABLE CAUSE OF ANY DEFICIENCIES IDENTIFIED.\n\nCOMPREHENSIVE REPORT: THE A/E SHALL ISSUE A REPORT RECOMMENDING REPAIR STRATEGIES, MATERIALS AND METHODS OF INSTALLATIONS, PRIORITIES, AND ALTERNATIVES.  THE REPORT SHALL INCLUDE:\nOBSERVATIONS AND FINDINGS FROM VISUAL,\n INSPECTIONS.\nPHOTOGRAPHIC DOCUMENTATION ON DIGITAL FORMAT.\nA SPREADSHEET ENUMERATING EACH RECOMMENDED ITEM \n     OF REPAIR, TOGETHER WITH AN INDICATION OF ITS PRIORITY, \n     AND AN ESTIMATE OF ASSOCIATED COST.\n\nE) REVIEW MEETINGS:  THE A/E SHALL MEET WITH VA PERSONNEL TO  REVIEW THE CONTENTS OF THE REPORT AND TO ESTABLISH A\n           CONSTRUCTION SCOPE OF WORK, WHICH IS ACCEPTABLE TO THE VA.\n\nContract Drawings\n\nA/E SHALL PREPARE DRAWINGS OF EACH PORTION OF THE PROJECT.  THESE DRAWINGS SHALL BE PRODUCED USING AUTOCAD AND WILL BE USED TO RECORD THE RESULTS OF THE VISUAL INSPECTION, AND AS  BACKGROUND  DRAWINGS FOR THE CONSTRUCTION DOCUMENTS.\n\nCONSTRUCTION DRAWINGS:  THE A/E SHALL PREPARE CONSTRUCTION DRAWINGS DELINEATING THE INTENDED SCOPE OF WORK TO BE PERFORMED AND CONSTRUCTION DETAILS TO BE USED ON THE PROJECT.\n\nCONSTRUCTION SPECIFICATIONS: THE A/E SHALL PREPARE WRITTEN SPECIFICATIONS TO BE USED IN CONJUNCTION WITH CONSTRUCTION DRAWINGS, SPECIFYING TECHNICAL AND ADMINISTRATIVE REQUIREMENTS OF THE PROJECT.\n\nDETAILED CONSTRUCTION COST ESTIMATE: THE A/E SHALL PREPARE A DETAILED CONSTRUCTION COST ESTIMATE IN TABULAR FORMAT LISTING ALL ITEMS OF WORK TO BE PERFORMED INCLUDING ESTIMATED QUANTITIES AND UNIT COSTS FOR LABOR AND MATERIALS TO PERFORM EACH ITEM AND EACH PORTION OF PROJECT.  THE A/E SHALL ALSO PREPARE THE SAME TABLE WITHOUT THE ESTIMATED UNIT COSTS AND TOTAL COST TO BE USED FOR BIDDING PURPOSES.  \n\nTHE A/E SHALL MEET WITH VA REPRESENTATIVES TO REVIEW THE CONTRACT DRAWINGS, SPECIFICATIONS, AND DETAILED COST ESTIMATE AT 65% AND 100% COMPLETION.  A/E SHALL MAKE ALL PROPER CORRECTIONS TO THE CONTRACT DOCUMENTS BASED UPON THE INTENTIONS OF THE VA DISCUSSED DURING THESE MEETINGS.  \n      \nConstruction Period Services\n\nTHE A/E SHALL REVIEW CONTRACTOR S SHOP DRAWINGS, SUBMITTALS, REQUESTS FOR INFORMATION (RFI), PAYMENT REQUISITIONS, AND CHANGE ORDER REQUESTS.  \n\nFurnish As-Built Drawings after Completion\nUPON COMPLETION OF WORK, THE A/E SHALL PREPARE AS-BUILT DRAWINGS DOCUMENTING THE AREAS OF COMPLETED WORK IN FORMAT ACCEPTABLE TO VA.\n\nSite Visits\nPERIODIC SITE VISITS: THE A/E SHALL MAKE UP TO THIRTY (30) SITE VISITS TO THE SITE TO MONITOR WORK, WITH REGARD TO ITS CONFORMANCE WITH THE CONTRACT DOCUMENTS.  A/E SHALL PREPARE COMPREHENSIVE REPORT FOR EACH SITE VISIT DETAILING ALL ITEMS DISCUSSED. \n\nReproduction\nBLUEPRINTS: THE A/E SHALL PROVIDE TEN (10) SETS OF CONSTRUCTION DOCUMENTS AND ONE (1) SET OF ORIGINAL REPRODUCIBLE VELLUMS. IN ADDITION, A/E SHALL PROVIDE DIGITAL VERSION OF ALL DOCUMENTATION IN FORMAT ACCEPTABLE TO VA CONTRACTING OFFICE.\n\nCompletion Time:  360 Calendar days\n\nCOST RANGE: Estimated Construction Cost Range: $500,000.00 and $1,000,000.00\nTYPE OF CONTRACT CONTEMPLATED \nThe Department of Veterans Affairs is contemplating awarding a firm fixed price contract.\nThe following evaluation criteria will be used during the A/E selection process with assigned value: \nFirms submitting SF330 data for consideration must address each of the following factors in SF330.\nProfessional qualifications necessary for satisfactory performance of required services -20%.\nOfferors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines   Engineering (Civil, Structural, Mechanical, Electrical, Interior Design, Fire Protection) and Architecture \nSubmission requirements: Provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G.\nSpecialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials -20%. Offerors will be evaluated on specialized experience and technical competence in the performance of services similar to those anticipated under this contract with regard to:\nExperience with design services to renovate and redesign patient facilities and medical centers.\nExperience in providing post construction award services (shop drawing review, as-built drawing and Quality Assurance Plan (QAP) preparation and construction inspection services) :Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates\nSubmission requirements: Provide up to five (5) projects completed or substantially completed within the past five (5) years that best illustrate specialized experience of the proposed team including any subcontractors in the areas outlined above.\n(3) Capacity to accomplish the work in the required time-15%. This factor evaluates the ability of the firm, given their current projected workload and the availability of their key personnel, to accomplish the possible myriad of design projects in the required time. \nSubmission requirements: The general workload and staffing capacity of the design office will be evaluated.\nList current projects with a design fee of greater than $20,000 being designed in the firms  office. \nii.          Indicate the firms  present workload and the availability of the project team (including sub-consultants) for the specified contract performance period;\nDescribe experience in successfully delivering projects per performance schedule, providing timely construction support, and successfully completing multiple projects with similar delivery dates.\nThe firm shall provide a project schedule that demonstrates the understanding of the project scope, restrictions which must be considered in the schedule, understanding of events associated with coordinating design submittals and incorporating review comments, and the capability to schedule the complete design effort within the proposed contract duration.\n(4) Past performance- 15%. Offerors will be evaluated on past performance with Government agencies (emphasis on VA work) and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction.  \nRecent is defined as performance occurring within 5 years of the date of this Sources Sought, except that ongoing projects must have begun no less than one (1) year prior to the issuance of this Sources Sought.\nRelevancy is defined as performance of work on projects that are similar in scope to the types of projects anticipated under the resultant contracts.\nRespondents with no previous past performance shall state this when addressing the selection criteria. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation.\n\nSubmission Requirements: \ni. Submit a minimal of three (3) references; any of the following evaluations are acceptable:\n    a. Contractor Performance Assessment Report System (CPARS), \n    b. Past Performance Questionnaire (PPQ) evaluation for each project submitted     under  Criterion 2.\nii. If a completed CPARS evaluation is available, it shall be submitted with the completed SF330 package. If there is not a completed ACASS/CPARS evaluation, the PPQ included with this notice (Attachment #1) is provided for the Offeror or its team members to submit for each project included in criterion (2). If a PPQ is submitted, but an official ACASS/CPARS evaluation is found for that project in government databases, the official evaluation will take precedence. If an ACASS/CPARS evaluation is not available, ensure correct phone numbers and email addresses are provided for each contract customer/reference. If the A-E is unable to obtain a completed PPQ from a contract customer/reference for a project before the response date set forth in this notice, the A-E should complete and submit with their response the first page of the PPQ (Attachment #1), including contract and point of contact information for the respective projects.\niii. A-Es should follow-up with references to ensure timely submittal of questionnaires.  At the reference s request, questionnaires may be submitted directly to the Governments point of contact, Samantha Chavanga via email at Samantha.Chavanga@va.gov, prior to the response date. A-Es shall not incorporate by references into their response CPARS or PPQ evaluations previously submitted in response to other A-E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Submitted CPARS and PPQ evaluations will not be counted as part of any page limitation and shall be attached to the SF330, behind the SF330 Part II document.\n(5) Location -10% within a 300-mile radius to the design site (Manhattan, NY) and knowledge of the location (Manhattan VAMC, NY); provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms/teams will be evaluated on the locations of their office or offices that will be performing the work under this contract.\nSubmission requirements: \ni. The A/E Firm proximity to the NY Harbor Healthcare System, Manhattan VAMC, 423 East 23rd Street, New York, NY  10010.\nii. This distance is determined according to http://maps.google.com/\niii. This factor evaluates the distance the AE firm's design office or offices from the location of work.  Please provide the address (es) and distance of your closest office to the address listed \n(6) Record of significant claims against the firm because of improper or incomplete architectural and engineering services-10%. Offerors with substantiated claims against the firm as a result of improper architectural and engineering services provided in the last three (3) years. \nSubmission requirements: Records and any other documentation of substantiated claims highlighting improper or incomplete architectural engineering services against the firm within the last three (3) years.  The SF-330 shall contain a statement affirming that there are no records of significant claims because of improper or incomplete architectural and engineering services. \n(7) Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team- 10%.\nSubmission requirements: Offerors shall submit evidence of individuals experience and qualifications in their respective fields.  Additionally, documentation must be provided to show these individuals have worked together as a team on previous projects and their role.  (Completing Sections E, F, and G, on the SF-330 meets the documentation requirement). Furthermore, offerors shall describe the ability of the firm to manage, coordinate and work effectively with team members, both internal staff and consultants. Discuss the history of working relationships with team members, including joint venture partners where applicable.\nEvaluation Scoring\nEvaluation factors will be evaluated using the following adjectival ratings as follows:\nOutstanding: Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. \nGood: Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low. \nAcceptable: Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is moderate.  \nMarginal: Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high. \nUnacceptable: Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable. The firm s proposal demonstrates a misunderstanding of the requirement, and the approach fails to meet performance standards. The firm s proposal has major omissions and inadequate details to assure evaluators that the offeror has an understanding of requirement.\nThe ratings identified below were used in the evaluation of Past Performance (Criterion 4): Substantial Confidence: Based on the offeror s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. No doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract.\nSatisfactory Confidence: Based on the offeror s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. Little doubt exists based on the offeror s past performance that they could satisfy the requirements of the contract.\nUnknown Confidence (Neutral): No recent/relevant performance record is available, or the offeror s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.\nLimited Confidence: Based on the offeror s recent/relevant performance record, the Government has little expectation that the offeror will be able to successfully perform the required effort. Some doubt exists based on past performance that they could satisfy the terms and conditions of the contract.\nNo Confidence: Based on the offeror s recent/relevant performance record, the Government has little expectations that the offeror will be able to successfully perform the required effort. Significant doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract.\nSELECTION INTERVIEW:\nInterviews shall be scheduled with firms slated as the most highly qualified. Firms slated for interviews may be asked to explain or expand on information contained in the SF-330 submittal through a formal interview or a discussion questionnaire as determined by the Contracting Officer. \nESTIMATED START AND COMPLETION DATES\nSP-13 DESIGN REVIEW AND COMPLETION SCHEDULE\nProject Title: Replace Roofs Bldg 1\nProject No.:  630-23-110\n\nThe A/E shall perform the work required within the limits of the following schedule.  A/E shall provide professional architects and engineers as directed by the Contracting Officer who are familiar with the work to attend the Design reviews on the following dates:\n\nPhase 1   Preliminary and Schematic Design/Feasibility Study/Elevator Inspection\nStart Preliminary, Basis of Design, Feasibility Study, Elevator Insp.\nIssuance of NTP\nSubmit Feasibility Study, Elevator Inspection Report for VA review\n21 Calendar days from NTP\nFeasibility Study, Elevator Inspection review with VA\n35 Calendar days from NTP\nSubmit Basis of Design, Master Plan of Operation for VA review\n56 Calendar days from NTP\nSubmit Basis of Design, Master Plan of Operation for VA review\n70 Calendar days from NTP\nSubmit 65% Preliminary and Schematic Design Phase for VA\n91 Calendar days from NTP\nReview 65% Preliminary and Schematic Design Phase with VA\n105 Calendar days from NTP\nSubmit 100% Preliminary and Schematic Design Phase for VA\n126 Calendar days from NTP\nReview 100% Preliminary and Schematic Design Phase with VA\n126 Calendar days from NTP\nPhase 2   Construction Document\nSubmit 35% Construction Documents for VA review\n156 Calendar days from NTP\nReview 35% Construction Documents with VA\n175 Calendar days from NTP\nSubmit 65% Construction Documents for VA review\n196 Calendar days from NTP\nReview 65% Construction Documents with VA\n210 Calendar days from NTP\nSubmit 95% Construction Documents for VA review\n231 Calendar days from NTP\nReview 95% Construction Documents with VA\n245 Calendar days from NTP\nSubmit 100% Construction Documents for VA review\n266 Calendar days from NTP\nReview 100% Construction Documents with VA\n280 Calendar days from NTP\nDeliver Final 100% Construction Documents for Bidding Purposes\n296 Calendar days from NTP\n\nDesign Completion Period        ... 296 Calendar Days \n\nNOTE: The Consultant is responsible for the development of a project estimate. The project estimate shall be all inclusive (construction, engineering, legal, administrative, etc). The Consultant shall advise the Contracting Officer in writing if at any time the cost of the project is perceived to exceed the established budget. The Consultant will notify the Contracting Officer at the time it is recognized, not after the fact.\n\nSUBMISSION REQUIREMENTS: The applicable NAICS code is 541330 and the small business size is $22.5 Million. This acquisition for design services will be a 100% set aside for service-disabled veteran owned small business concern (SDVOSB).  All SDVOSBs must be verified by the Office of Small and Disadvantaged Business Utilizations Center for Veterans Enterprise (CVE) through www.vetbiz.gov before award.\nSDVOSB firms desiring consideration must have a working office located within 300 miles of the Manhattan, New York City limits and be licensed in New York State. All interested SDVOSB A/E firms are invited to submit Standard Form 330, Architect Engineer Qualifications and for any consultants, on SF 330 Extra Sections E and F. Standard form 330 can be obtained at the following web site:  http://www.gsa.gov/portal/forms/download/21DBF5BF7E860FC185256E13005C6AA6.\nQualified Service-Disabled Veteran Owned Small Business (SDVOSB) firms  responses must be received no later than 11:00am, EST on Monday, 03/03/2025. Electronic submission of SF330 s is preferred.  The overall size of the file cannot exceed 7MB; if additional space is required, divide the file into segments with each file size less than 7MB.  No more than 2 files at 7MB each will be considered. \nEmail completed SF330 s to Samantha.Chavanga@va.gov Subject Line: Replace Roofs Bldg 1 , 36C24225R0040   SF330.\nNONCOMPLIANCE WITH THIS REQUIREMENT RISKS YOUR PACKAGES AS BEING NONRESPONSIVE\nNOTE: Any request for assistance with submission or other procedural matters shall be submitted via email only (Samantha.Chavanga@va.gov); telephone inquiries will not be honored.\nPAST PERFORMANCE QUESTIONNAIRE\nSolicitation Number: 36C24225R0040\nProject Title: AE Replace Roofs Bldg 1  \nProject #630-23-110 \n\nCONTRACT INFORMATION (Contractor to complete Blocks 1-4)\n1. Contractor Information\nFirm Name:  CAGE Code:\nAddress: DUNs Number:\nPhone Number:                                                                 Email Address:\nPoint of Contact:                                                               Contact Phone Number: \n2. Work Performed as:                   Prime Contractor        Sub Contractor      Joint Venture     Other \nPercent of project work performed:\nIf subcontractor, who was the prime (Name/Phone #):  \n3. Contract Information\nContract Number:                                                Delivery/Task Order Number (if applicable): \nContract Type:         Firm Fixed Price   Cost Reimbursement      Other (Please specify): \nContract Title:                                                       Contract Location:\nAward Date (mm/dd/yy):\nContract Completion Date (mm/dd/yy):  \nActual Completion Date (mm/dd/yy):\nExplain Differences:\nOriginal Contract Price (Award Amount):   \nFinal Contract Price (to include all modifications, if applicable):\nExplain Differences:\n4. Project Description:\nComplexity of Work   High        Med      Routine  \nHow is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)\nCLIENT INFORMATION (Client to complete Blocks 5-8)\n5. Client Information\nName:                                                Title:\nPhone Number:                                Email Address:\n6. Describe the client s role in the project:  \n\n\n7. Date Questionnaire was completed (mm/dd/yy):\n8. Client s Signature:\n\nSection D: Performance Information: Choose the letter on the scale that most accurately describes the contractor s performance or situation.  PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY UNSATISFACTORY OR MARGINAL RATINGS.\nE\nVG\nS\nM\nU\nN\nExceptional\n(Outstanding)\nVery Good\n(Above Average)\nSatisfactory\nMarginal\nUnsatisfactory\nNot Available\nPerformance meets contractual requirements and exceeds many to the Government s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective\n\nPerformance meets contractual requirements and exceeds some to the Government s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective\n\nPerformance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear, or were, satisfactory.\nPerformance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor s proposed actions appear only marginally effective, or were not fully implemented\n\nPerformance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor s corrective actions appear or were ineffective\n\nNo record of past performance or the record is inconclusive.\n1.  QUALITY:\n\na) Quality of technical data/report preparation efforts\nE       VG        S        M        U        N\na.1. Comments:\nb) Ability to meet quality standards specified for technical performance\nE       VG        S        M        U        N\n b.1. Comments:\nc) Timeliness/effectiveness of contract problem resolution without extensive customer guidance\nE       VG        S        M        U        N\nc.1. Comments:\nd) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)\nE       VG        S        M        U        N\nd.1. Comments:\n2. SCHEDULE/TIMELINESS OF PERFORMANCE:\n\na) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)\nE       VG        S        M        U        N\n2.a.1 Comments:\nb) Rate the contractor s use of available resources to accomplish tasks identified in the contract\nE       VG        S        M        U        N\n2.b.1. Comments:\n3.  CUSTOMER SATISFACTION:\n\na) To what extent were the end users satisfied with the project?\nE       VG        S        M        U        N\n3. a.1. Comments:\nb) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)\nE       VG        S        M        U        N\n3.b.1. Comments:\nc) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?\nE       VG        S        M        U        N\n3.c.1. Comments:\nd) Overall customer satisfaction\nE       VG        S        M        U        N\n3.d.1 Comments:\n4. MANAGEMENT/ PERSONNEL/LABOR\n\na) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?\nE       VG        S        M        U        N\n4.a.1. Comments:\nb) Ability to hire, apply, and retain a qualified workforce to this effort \nE       VG        S        M        U        N\n4.b.1 Comments:\nc) Government Property Control\nE       VG        S        M        U        N\n4.c.1. Comments:\nd) Knowledge/expertise demonstrated by contractor personnel\nE       VG        S        M        U        N\n4.d.1. Comments:\ne) Utilization of Small Business concerns\nE       VG        S        M        U        N\n4.e.1. Comments:\nf) Ability to simultaneously manage multiple projects with multiple disciplines\nE       VG        S        M        U        N\n4.f.1. Comments:\ng) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes\nE       VG        S        M        U        N\n4.g.1. Comments:\nh) Effectiveness of overall management (including ability to effectively lead, manage and control the program)\nE       VG        S        M        U        N\n4.h.1. Comments:\n5. COST/FINANCIAL MANAGEMENT\n\na) Ability to meet the terms and conditions within the contractually agreed price(s)?\nE       VG        S        M        U        N\n5.a.1. Comments:\nb) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client\nE       VG        S        M        U        N\n5.b.1. Comments:\nc) If this is/was a Government cost type contract, please rate the Contractor s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)\nE       VG        S        M        U        N\n5.c.1. Comments:\nd) Is the Contractor s accounting system adequate for management and tracking of costs?  If no, please explain in Remarks section.\nYes                          No\n5.d.1. Comments:\ne) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations?  Indicate if show cause or cure notices were issued, or any default action in comment section below.  \nYes                          No\n5.e.1. Comments:\nf) Have there been any indications that the contractor has had any financial problems?  If yes, please explain below.\nYes                          No\n5.f.1 Comments:\n6. SAFETY/SECURITY\n\na) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)\nE       VG        S        M        U        N\n6.a.1 Comments:\nb) Contractor complied with all security requirements for the project and personnel security requirements.\nE       VG        S        M        U        N\n6.b.1. Comments:\n7. GENERAL\n\na) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).\nE       VG        S        M        U        N\n7.a.1. Comments:\nb) Compliance with contractual terms/provisions (explain if specific issues)\nE       VG        S        M        U        N\n7.b.1. Comments:\nc) Would you hire or work with this firm again? (If no, please explain below)\nYes                          No\n7.c.1. Comments:\nd) In summary, provide an overall rating for the work performed by this contractor. \nE       VG        S        M        U        N\n7.d.1. Comments:\nPlease provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary): __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ STRENGTHS:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________WEAKNESSES:___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________DEFICIENCIES:_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________                                   COMMENTS:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________\nPast Performance Information provided by: __________________________________________________\n     (Printed Name)\nSignature________________________________________Date:_________________\nOrganization:____________________________________Phone:_________________","text":"Sources Sought Notice\n\nSources Sought Notice\n\nPage 23 of 23\nSources Sought Notice\n*= Required Field\nSources Sought Notice\n\nPage 1 of 23\nDESCRIPTIONS\nTHIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT\nThe Department of Veterans Affairs is seeking a qualified Architect-Engineering (AE) firm to provide Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, Shop Drawing Review, and all other related information for Project No. 630-23-110, Replace Roofs Building #1 located at New York Harbor Healthcare System Margaret Cochran-Corbin Medical Center 423 East 23rd Street., New York, NY 10010.\nThis requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330 Engineering Services and small business size standard of $25.5 Million. Magnitude of Construction is between $500,000.00 and $1,000,000.00. Potential contractors must be registered in SAM (www.sam.gov) at time of submission of their qualifications to be considered for an award. The design will be completed in a manner such that the estimated construction cost is within the VA budget. It is not expected that any new space will be added to the existing building footprint. The anticipated award date of the proposed A-E Contract is on or before August 14, 2025. Prospective Contractors must be visible/verified/certified as SDVOSB in VetCert (https://veterans.certify.sba.gov) and registered in SAM (www.sam.gov) and at time of submission of their qualifications in order to be considered for an award.\nNOTE: Offerors are referred to VAAR 852.219-11(d)(1) Services. The Contractor will not pay more than 50% of the amount paid by the government to it to firms that are not SBA-listed SDVOSBs as set forth in 852.219-10. In order to assure compliance with this clause, all firms submitting a SF330 for this Sources Sought Notice are required to indicate what percentage of the cost of contract performance will be expended by the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other subcontracted or otherwise used small or large business entity(s). Any subcontracted or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e., SDVOSB, VOSB, 8(a), large, etc.).\n852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016) (DEVIATION)\nSCOPE OF SERVICE REQUIRED:\nA/E Design: Provide all necessary Architect-Engineer (A/E) services to design new roofing system for Building #1 at VA Medical Center at 423 East 23rd Street, New York, NY. A/E shall provide feasibility study reports, basis of Design Reports, Schematics, Design Development, Contract Document and Construction Period Services as specified in Scope of work and Supplement B. A/E shall provide three (3) options of roofing system designs with cost estimates. Please follow AE NRM submission guide PG-18-15. Replace the following existing roofs with new roofing systems or approved equal:\nReplacement of portions of the existing roof of Building #1 as follows:\n\nSouth Wing (South wing mechanical room -1,050 s.f. and South Wing Annex Roofs -1,900 s.f.), West Wing & North Wing -40,162 SF.\nMain Building Penthouse (4,168 s.f.)\nCentral Mechanical Room (3,125 s.f).\nFloor repair and installation of waterproof coating on interior flooring on 19th floor (3,125 s.f.)\nFloor repair and installation of waterproof coating on interior flooring on 21st House Tank floor (4,168 s.f.)\nLibrary/Records Storage (2,750 s.f.)\nKitchen Roof (6,875 s.f.)\nDietetic /Freight Building Roof (1,363 s.f.)\nWarehouse Roof (3,850 s.f.)\nEast Wing Pharmacy (8225 s.f.)\nGenerator Building (2,000 s.f.)\nMetal Penthouse (2nd Floor North Wing) (800 s.f.)\nChapel/Penthouse (2400 s.f.)\nMorgue (1050 s.f.)\n2nd Floor Police Roof (2,200 s.f.)\nRoof from bridge connection between building 1 and 2 (By HR office).\nRoof on Gymnasium at 17W.\nRoof from Atrium bridge connection between building 1 and 6.\nReplacement of existing roof of Building #3 (Quarters Building) (4,034 s.f.)\nStaff and Nurse Quarters Building.\nStaff and Nurse Quarters Mechanical Room.\nStaff Entrance Area (13,925 s.f.)\nAdditional Requirements\n- Survey/seal all ductwork penetrations on roofs and provide waterproof insulation.\nRemove MRI trailer and remove day care planter.\nReplace roof at dunnage area on 19th floor north wing (500 S.F.)\nWaterproof all mechanical equipment rooms (MER) on 19th floor\nRepair or replace building 6 balcony area pavers / roof.\nProvide roof leak mitigation.\nNew roofing system designs shall include but not be limited to the following:\n\nRemoval and disposal of existing roofing system materials including gravel ballasts.\nExamine deck and make any necessary repairs to provide suitable substrate for roofing materials. Any repairs required will be a line-item price per square foot on bid forms.\nProvide protection for existing HVAC equipment, skylights, walls, windows, parapets, copings, roof decks, vents, electrical and conduits from damage.\nProvide protection for sidewalks and parking adjacent to roof work by building sidewalk shades.\nReplace all cracked/broken coping granites/stones, bricks, and masonry walls with new or approved equal.\nReplace all existing rusted/leaked vent pipes, strainer assemblies, drainpipes, limited sections of piping below, flashings and related components with new or approved equal. Cutout and concrete replacement shall be included in the construction cost.\nModify parapets as needed for new roofing system.\nReplace all existing and missing guard rails with New guard rails or approved equal.\nProvide and install new exterior OSHA compliant roof access ladders and guard rails as required.\nEvaluate and provide waterproof flooring for Mechanical Space on 7th Floor as needed.\nRoofs and drainpipes insulation materials may contain ACM (asbestos contaminate materials), the design shall incorporate the service of Certified Industrial Hygienist (CIH) to survey existing roofs and provide asbestos drawings and specifications and construction period services during asbestos abatement. CIH shall also perform asbestos monitoring during construction.\nAdditional roof leaks as identified by the facility.\nScope of work also includes construction period services, such as submittal/shop drawing review and project meetings, site visits and preparation of as-built drawings.\nScope include a masterÂ phasing planÂ and the option Kemper liquidÂ type applied roof.\nA/E shall provide detailed construction estimates for one (1) Base Bid Cost and one (1) Alternate Bid Cost for the selected new roofing systems.\nProvide outside type hoist detail design drawing for transporting materials and equipment for Contractor. Contractor will not be allowed the use of existing elevators.\nContract documents requirements:\nAll contract A/E s employees shall take the Privacy and Information Security training and provide copies of training certificates to COR as required by VA policy.\nAE and the subconsultant shall use Autodesk Build Construction Management platform to manage the projects.\nAll contract A/E s employees shall provide the following documentation:\n\nBackground investigation Worksheet (Attachment No.2 under SOP Acquisition)\nVA Form 0711\nSecurity and Privacy Training certification\nOHSA certification\nTB tuberculin test certification\nDesign Development\n\nA.) CONSULT WITH VA TO IDENTIFY AND PRIORITIZE AREAS OF CONCERN, BUDGETARY CONSTRAINTS, AND TIME CONSTRAINTS.\nREVIEW VA AS-BUILT DRAWINGS INDICATING ORIGINAL BUILDING CONSTRUCTION, SPECIFICATIONS, AND PREVIOUS REPAIR CONTRACTS.\n\nVISUAL INSPECTION: WORK WILL INCLUDE A DETAILED VISUAL\nINSPECTION OF RELEVANT PORTIONS OF THE PROJECT. THE INSPECTION\nWILL PROVIDE INFORMATION REGARDING THE NATURE, EXTENT, AND PROBABLE CAUSE OF ANY DEFICIENCIES IDENTIFIED.\n\nCOMPREHENSIVE REPORT: THE A/E SHALL ISSUE A REPORT RECOMMENDING REPAIR STRATEGIES, MATERIALS AND METHODS OF INSTALLATIONS, PRIORITIES, AND ALTERNATIVES. THE REPORT SHALL INCLUDE:\nOBSERVATIONS AND FINDINGS FROM VISUAL,\nINSPECTIONS.\nPHOTOGRAPHIC DOCUMENTATION ON DIGITAL FORMAT.\nA SPREADSHEET ENUMERATING EACH RECOMMENDED ITEM\nOF REPAIR, TOGETHER WITH AN INDICATION OF ITS PRIORITY,\nAND AN ESTIMATE OF ASSOCIATED COST.\n\nE) REVIEW MEETINGS: THE A/E SHALL MEET WITH VA PERSONNEL TO REVIEW THE CONTENTS OF THE REPORT AND TO ESTABLISH A\nCONSTRUCTION SCOPE OF WORK, WHICH IS ACCEPTABLE TO THE VA.\n\nContract Drawings\n\nA/E SHALL PREPARE DRAWINGS OF EACH PORTION OF THE PROJECT. THESE DRAWINGS SHALL BE PRODUCED USING AUTOCAD AND WILL BE USED TO RECORD THE RESULTS OF THE VISUAL INSPECTION, AND AS BACKGROUND DRAWINGS FOR THE CONSTRUCTION DOCUMENTS.\n\nCONSTRUCTION DRAWINGS: THE A/E SHALL PREPARE CONSTRUCTION DRAWINGS DELINEATING THE INTENDED SCOPE OF WORK TO BE PERFORMED AND CONSTRUCTION DETAILS TO BE USED ON THE PROJECT.\n\nCONSTRUCTION SPECIFICATIONS: THE A/E SHALL PREPARE WRITTEN SPECIFICATIONS TO BE USED IN CONJUNCTION WITH CONSTRUCTION DRAWINGS, SPECIFYING TECHNICAL AND ADMINISTRATIVE REQUIREMENTS OF THE PROJECT.\n\nDETAILED CONSTRUCTION COST ESTIMATE: THE A/E SHALL PREPARE A DETAILED CONSTRUCTION COST ESTIMATE IN TABULAR FORMAT LISTING ALL ITEMS OF WORK TO BE PERFORMED INCLUDING ESTIMATED QUANTITIES AND UNIT COSTS FOR LABOR AND MATERIALS TO PERFORM EACH ITEM AND EACH PORTION OF PROJECT. THE A/E SHALL ALSO PREPARE THE SAME TABLE WITHOUT THE ESTIMATED UNIT COSTS AND TOTAL COST TO BE USED FOR BIDDING PURPOSES.\n\nTHE A/E SHALL MEET WITH VA REPRESENTATIVES TO REVIEW THE CONTRACT DRAWINGS, SPECIFICATIONS, AND DETAILED COST ESTIMATE AT 65% AND 100% COMPLETION. A/E SHALL MAKE ALL PROPER CORRECTIONS TO THE CONTRACT DOCUMENTS BASED UPON THE INTENTIONS OF THE VA DISCUSSED DURING THESE MEETINGS.\n\nConstruction Period Services\n\nTHE A/E SHALL REVIEW CONTRACTOR S SHOP DRAWINGS, SUBMITTALS, REQUESTS FOR INFORMATION (RFI), PAYMENT REQUISITIONS, AND CHANGE ORDER REQUESTS.\n\nFurnish As-Built Drawings after Completion\nUPON COMPLETION OF WORK, THE A/E SHALL PREPARE AS-BUILT DRAWINGS DOCUMENTING THE AREAS OF COMPLETED WORK IN FORMAT ACCEPTABLE TO VA.\n\nSite Visits\nPERIODIC SITE VISITS: THE A/E SHALL MAKE UP TO THIRTY (30) SITE VISITS TO THE SITE TO MONITOR WORK, WITH REGARD TO ITS CONFORMANCE WITH THE CONTRACT DOCUMENTS. A/E SHALL PREPARE COMPREHENSIVE REPORT FOR EACH SITE VISIT DETAILING ALL ITEMS DISCUSSED.\n\nReproduction\nBLUEPRINTS: THE A/E SHALL PROVIDE TEN (10) SETS OF CONSTRUCTION DOCUMENTS AND ONE (1) SET OF ORIGINAL REPRODUCIBLE VELLUMS. IN ADDITION, A/E SHALL PROVIDE DIGITAL VERSION OF ALL DOCUMENTATION IN FORMAT ACCEPTABLE TO VA CONTRACTING OFFICE.\n\nCompletion Time: 360 Calendar days\n\nCOST RANGE: Estimated Construction Cost Range: $500,000.00 and $1,000,000.00\nTYPE OF CONTRACT CONTEMPLATED\nThe Department of Veterans Affairs is contemplating awarding a firm fixed price contract.\nThe following evaluation criteria will be used during the A/E selection process with assigned value:\nFirms submitting SF330 data for consideration must address each of the following factors in SF330.\nProfessional qualifications necessary for satisfactory performance of required services -20%.\nOfferors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines Engineering (Civil, Structural, Mechanical, Electrical, Interior Design, Fire Protection) and Architecture\nSubmission requirements: Provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G.\nSpecialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials -20%. Offerors will be evaluated on specialized experience and technical competence in the performance of services similar to those anticipated under this contract with regard to:\nExperience with design services to renovate and redesign patient facilities and medical centers.\nExperience in providing post construction award services (shop drawing review, as-built drawing and Quality Assurance Plan (QAP) preparation and construction inspection services) :Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates\nSubmission requirements: Provide up to five (5) projects completed or substantially completed within the past five (5) years that best illustrate specialized experience of the proposed team including any subcontractors in the areas outlined above.\n(3) Capacity to accomplish the work in the required time-15%. This factor evaluates the ability of the firm, given their current projected workload and the availability of their key personnel, to accomplish the possible myriad of design projects in the required time.\nSubmission requirements: The general workload and staffing capacity of the design office will be evaluated.\nList current projects with a design fee of greater than $20,000 being designed in the firms office.\nii. Indicate the firms present workload and the availability of the project team (including sub-consultants) for the specified contract performance period;\nDescribe experience in successfully delivering projects per performance schedule, providing timely construction support, and successfully completing multiple projects with similar delivery dates.\nThe firm shall provide a project schedule that demonstrates the understanding of the project scope, restrictions which must be considered in the schedule, understanding of events associated with coordinating design submittals and incorporating review comments, and the capability to schedule the complete design effort within the proposed contract duration.\n(4) Past performance- 15%. Offerors will be evaluated on past performance with Government agencies (emphasis on VA work) and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction.\nRecent is defined as performance occurring within 5 years of the date of this Sources Sought, except that ongoing projects must have begun no less than one (1) year prior to the issuance of this Sources Sought.\nRelevancy is defined as performance of work on projects that are similar in scope to the types of projects anticipated under the resultant contracts.\nRespondents with no previous past performance shall state this when addressing the selection criteria. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation.\n\nSubmission Requirements:\ni. Submit a minimal of three (3) references; any of the following evaluations are acceptable:\na. Contractor Performance Assessment Report System (CPARS),\nb. Past Performance Questionnaire (PPQ) evaluation for each project submitted under Criterion 2.\nii. If a completed CPARS evaluation is available, it shall be submitted with the completed SF330 package. If there is not a completed ACASS/CPARS evaluation, the PPQ included with this notice (Attachment #1) is provided for the Offeror or its team members to submit for each project included in criterion (2). If a PPQ is submitted, but an official ACASS/CPARS evaluation is found for that project in government databases, the official evaluation will take precedence. If an ACASS/CPARS evaluation is not available, ensure correct phone numbers and email addresses are provided for each contract customer/reference. If the A-E is unable to obtain a completed PPQ from a contract customer/reference for a project before the response date set forth in this notice, the A-E should complete and submit with their response the first page of the PPQ (Attachment #1), including contract and point of contact information for the respective projects.\niii. A-Es should follow-up with references to ensure timely submittal of questionnaires. At the reference s request, questionnaires may be submitted directly to the Governments point of contact, Samantha Chavanga via email at Samantha.Chavanga@va.gov, prior to the response date. A-Es shall not incorporate by references into their response CPARS or PPQ evaluations previously submitted in response to other A-E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Submitted CPARS and PPQ evaluations will not be counted as part of any page limitation and shall be attached to the SF330, behind the SF330 Part II document.\n(5) Location -10% within a 300-mile radius to the design site (Manhattan, NY) and knowledge of the location (Manhattan VAMC, NY); provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms/teams will be evaluated on the locations of their office or offices that will be performing the work under this contract.\nSubmission requirements:\ni. The A/E Firm proximity to the NY Harbor Healthcare System, Manhattan VAMC, 423 East 23rd Street, New York, NY 10010.\nii. This distance is determined according to http://maps.google.com/\niii. This factor evaluates the distance the AE firm's design office or offices from the location of work. Please provide the address (es) and distance of your closest office to the address listed\n(6) Record of significant claims against the firm because of improper or incomplete architectural and engineering services-10%. Offerors with substantiated claims against the firm as a result of improper architectural and engineering services provided in the last three (3) years.\nSubmission requirements: Records and any other documentation of substantiated claims highlighting improper or incomplete architectural engineering services against the firm within the last three (3) years. The SF-330 shall contain a statement affirming that there are no records of significant claims because of improper or incomplete architectural and engineering services.\n(7) Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team- 10%.\nSubmission requirements: Offerors shall submit evidence of individuals experience and qualifications in their respective fields. Additionally, documentation must be provided to show these individuals have worked together as a team on previous projects and their role. (Completing Sections E, F, and G, on the SF-330 meets the documentation requirement). Furthermore, offerors shall describe the ability of the firm to manage, coordinate and work effectively with team members, both internal staff and consultants. Discuss the history of working relationships with team members, including joint venture partners where applicable.\nEvaluation Scoring\nEvaluation factors will be evaluated using the following adjectival ratings as follows:\nOutstanding: Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.\nGood: Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.\nAcceptable: Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is moderate.\nMarginal: Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.\nUnacceptable: Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable. The firm s proposal demonstrates a misunderstanding of the requirement, and the approach fails to meet performance standards. The firm s proposal has major omissions and inadequate details to assure evaluators that the offeror has an understanding of requirement.\nThe ratings identified below were used in the evaluation of Past Performance (Criterion 4): Substantial Confidence: Based on the offeror s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. No doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract.\nSatisfactory Confidence: Based on the offeror s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. Little doubt exists based on the offeror s past performance that they could satisfy the requirements of the contract.\nUnknown Confidence (Neutral): No recent/relevant performance record is available, or the offeror s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.\nLimited Confidence: Based on the offeror s recent/relevant performance record, the Government has little expectation that the offeror will be able to successfully perform the required effort. Some doubt exists based on past performance that they could satisfy the terms and conditions of the contract.\nNo Confidence: Based on the offeror s recent/relevant performance record, the Government has little expectations that the offeror will be able to successfully perform the required effort. Significant doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract.\nSELECTION INTERVIEW:\nInterviews shall be scheduled with firms slated as the most highly qualified. Firms slated for interviews may be asked to explain or expand on information contained in the SF-330 submittal through a formal interview or a discussion questionnaire as determined by the Contracting Officer.\nESTIMATED START AND COMPLETION DATES\nSP-13 DESIGN REVIEW AND COMPLETION SCHEDULE\nProject Title: Replace Roofs Bldg 1\nProject No.: 630-23-110\n\nThe A/E shall perform the work required within the limits of the following schedule. A/E shall provide professional architects and engineers as directed by the Contracting Officer who are familiar with the work to attend the Design reviews on the following dates:\n\nPhase 1 Preliminary and Schematic Design/Feasibility Study/Elevator Inspection\nStart Preliminary, Basis of Design, Feasibility Study, Elevator Insp.\nIssuance of NTP\nSubmit Feasibility Study, Elevator Inspection Report for VA review\n21 Calendar days from NTP\nFeasibility Study, Elevator Inspection review with VA\n35 Calendar days from NTP\nSubmit Basis of Design, Master Plan of Operation for VA review\n56 Calendar days from NTP\nSubmit Basis of Design, Master Plan of Operation for VA review\n70 Calendar days from NTP\nSubmit 65% Preliminary and Schematic Design Phase for VA\n91 Calendar days from NTP\nReview 65% Preliminary and Schematic Design Phase with VA\n105 Calendar days from NTP\nSubmit 100% Preliminary and Schematic Design Phase for VA\n126 Calendar days from NTP\nReview 100% Preliminary and Schematic Design Phase with VA\n126 Calendar days from NTP\nPhase 2 Construction Document\nSubmit 35% Construction Documents for VA review\n156 Calendar days from NTP\nReview 35% Construction Documents with VA\n175 Calendar days from NTP\nSubmit 65% Construction Documents for VA review\n196 Calendar days from NTP\nReview 65% Construction Documents with VA\n210 Calendar days from NTP\nSubmit 95% Construction Documents for VA review\n231 Calendar days from NTP\nReview 95% Construction Documents with VA\n245 Calendar days from NTP\nSubmit 100% Construction Documents for VA review\n266 Calendar days from NTP\nReview 100% Construction Documents with VA\n280 Calendar days from NTP\nDeliver Final 100% Construction Documents for Bidding Purposes\n296 Calendar days from NTP\n\nDesign Completion Period ... 296 Calendar Days\n\nNOTE: The Consultant is responsible for the development of a project estimate. The project estimate shall be all inclusive (construction, engineering, legal, administrative, etc). The Consultant shall advise the Contracting Officer in writing if at any time the cost of the project is perceived to exceed the established budget. The Consultant will notify the Contracting Officer at the time it is recognized, not after the fact.\n\nSUBMISSION REQUIREMENTS: The applicable NAICS code is 541330 and the small business size is $22.5 Million. This acquisition for design services will be a 100% set aside for service-disabled veteran owned small business concern (SDVOSB). All SDVOSBs must be verified by the Office of Small and Disadvantaged Business Utilizations Center for Veterans Enterprise (CVE) through www.vetbiz.gov before award.\nSDVOSB firms desiring consideration must have a working office located within 300 miles of the Manhattan, New York City limits and be licensed in New York State. All interested SDVOSB A/E firms are invited to submit Standard Form 330, Architect Engineer Qualifications and for any consultants, on SF 330 Extra Sections E and F. Standard form 330 can be obtained at the following web site: http://www.gsa.gov/portal/forms/download/21DBF5BF7E860FC185256E13005C6AA6.\nQualified Service-Disabled Veteran Owned Small Business (SDVOSB) firms responses must be received no later than 11:00am, EST on Monday, 03/03/2025. Electronic submission of SF330 s is preferred. The overall size of the file cannot exceed 7MB; if additional space is required, divide the file into segments with each file size less than 7MB. No more than 2 files at 7MB each will be considered.\nEmail completed SF330 s to Samantha.Chavanga@va.gov Subject Line: Replace Roofs Bldg 1 , 36C24225R0040 SF330.\nNONCOMPLIANCE WITH THIS REQUIREMENT RISKS YOUR PACKAGES AS BEING NONRESPONSIVE\nNOTE: Any request for assistance with submission or other procedural matters shall be submitted via email only (Samantha.Chavanga@va.gov); telephone inquiries will not be honored.\nPAST PERFORMANCE QUESTIONNAIRE\nSolicitation Number: 36C24225R0040\nProject Title: AE Replace Roofs Bldg 1\nProject #630-23-110\n\nCONTRACT INFORMATION (Contractor to complete Blocks 1-4)\n1. Contractor Information\nFirm Name: CAGE Code:\nAddress: DUNs Number:\nPhone Number: Email Address:\nPoint of Contact: Contact Phone Number:\n2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other\nPercent of project work performed:\nIf subcontractor, who was the prime (Name/Phone #):\n3. Contract Information\nContract Number: Delivery/Task Order Number (if applicable):\nContract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):\nContract Title: Contract Location:\nAward Date (mm/dd/yy):\nContract Completion Date (mm/dd/yy):\nActual Completion Date (mm/dd/yy):\nExplain Differences:\nOriginal Contract Price (Award Amount):\nFinal Contract Price (to include all modifications, if applicable):\nExplain Differences:\n4. Project Description:\nComplexity of Work High Med Routine\nHow is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)\nCLIENT INFORMATION (Client to complete Blocks 5-8)\n5. Client Information\nName: Title:\nPhone Number: Email Address:\n6. Describe the client s role in the project:\n\n7. Date Questionnaire was completed (mm/dd/yy):\n8. Client s Signature:\n\nSection D: Performance Information: Choose the letter on the scale that most accurately describes the contractor s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY UNSATISFACTORY OR MARGINAL RATINGS.\nE\nVG\nS\nM\nU\nN\nExceptional\n(Outstanding)\nVery Good\n(Above Average)\nSatisfactory\nMarginal\nUnsatisfactory\nNot Available\nPerformance meets contractual requirements and exceeds many to the Government s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective\n\nPerformance meets contractual requirements and exceeds some to the Government s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective\n\nPerformance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear, or were, satisfactory.\nPerformance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor s proposed actions appear only marginally effective, or were not fully implemented\n\nPerformance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor s corrective actions appear or were ineffective\n\nNo record of past performance or the record is inconclusive.\n1. QUALITY:\n\na) Quality of technical data/report preparation efforts\nE VG S M U N\na.1. Comments:\nb) Ability to meet quality standards specified for technical performance\nE VG S M U N\nb.1. Comments:\nc) Timeliness/effectiveness of contract problem resolution without extensive customer guidance\nE VG S M U N\nc.1. Comments:\nd) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)\nE VG S M U N\nd.1. Comments:\n2. SCHEDULE/TIMELINESS OF PERFORMANCE:\n\na) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)\nE VG S M U N\n2.a.1 Comments:\nb) Rate the contractor s use of available resources to accomplish tasks identified in the contract\nE VG S M U N\n2.b.1. Comments:\n3. CUSTOMER SATISFACTION:\n\na) To what extent were the end users satisfied with the project?\nE VG S M U N\n3. a.1. Comments:\nb) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)\nE VG S M U N\n3.b.1. Comments:\nc) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?\nE VG S M U N\n3.c.1. Comments:\nd) Overall customer satisfaction\nE VG S M U N\n3.d.1 Comments:\n4. MANAGEMENT/ PERSONNEL/LABOR\n\na) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?\nE VG S M U N\n4.a.1. Comments:\nb) Ability to hire, apply, and retain a qualified workforce to this effort\nE VG S M U N\n4.b.1 Comments:\nc) Government Property Control\nE VG S M U N\n4.c.1. Comments:\nd) Knowledge/expertise demonstrated by contractor personnel\nE VG S M U N\n4.d.1. Comments:\ne) Utilization of Small Business concerns\nE VG S M U N\n4.e.1. Comments:\nf) Ability to simultaneously manage multiple projects with multiple disciplines\nE VG S M U N\n4.f.1. Comments:\ng) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes\nE VG S M U N\n4.g.1. Comments:\nh) Effectiveness of overall management (including ability to effectively lead, manage and control the program)\nE VG S M U N\n4.h.1. Comments:\n5. COST/FINANCIAL MANAGEMENT\n\na) Ability to meet the terms and conditions within the contractually agreed price(s)?\nE VG S M U N\n5.a.1. Comments:\nb) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client\nE VG S M U N\n5.b.1. Comments:\nc) If this is/was a Government cost type contract, please rate the Contractor s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)\nE VG S M U N\n5.c.1. Comments:\nd) Is the Contractor s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.\nYes No\n5.d.1. Comments:\ne) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.\nYes No\n5.e.1. Comments:\nf) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.\nYes No\n5.f.1 Comments:\n6. SAFETY/SECURITY\n\na) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)\nE VG S M U N\n6.a.1 Comments:\nb) Contractor complied with all security requirements for the project and personnel security requirements.\nE VG S M U N\n6.b.1. Comments:\n7. GENERAL\n\na) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).\nE VG S M U N\n7.a.1. Comments:\nb) Compliance with contractual terms/provisions (explain if specific issues)\nE VG S M U N\n7.b.1. Comments:\nc) Would you hire or work with this firm again? (If no, please explain below)\nYes No\n7.c.1. Comments:\nd) In summary, provide an overall rating for the work performed by this contractor.\nE VG S M U N\n7.d.1. Comments:\nPlease provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary): __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ STRENGTHS:____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________WEAKNESSES:___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________DEFICIENCIES:_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ COMMENTS:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________\nPast Performance Information provided by: __________________________________________________\n(Printed Name)\nSignature________________________________________Date:_________________\nOrganization:____________________________________Phone:_________________","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24225R0040","place_of_performance":{"zip":"10010","city":{"name":"New York"},"state":{"code":"NY","name":"New York"},"street":"Department of Veterans Affairs New York Harbor Healthcare System","country":{"code":"USA","name":"UNITED STATES"},"street2":"Margaret Cochran Corbin VA Campus 423 East 23rd Street"},"product_service_code":"C1DA"},{"award":{"awardee":{}},"dates":{"posted":"2025-03-03","posted_at":"2025-03-03T15:49:56.425Z","created_at":"2025-03-03T15:49:54.208Z","modified_at":"2025-05-09T04:04:30.403Z","response_deadline":{"raw":"2025-03-10T11:00:00-04:00","utc":"2025-03-10T15:00:00Z","date":"2025-03-10","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5285a1ceef644e8391fcc43dcf2865e7/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","agency":{"office":{"code":"36C242","name":"242-NETWORK CONTRACT OFFICE 02 (36C242)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"organization_id":"100186522","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-09","archive_type":"auto_custom"},"history":[{"index":3,"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-03T15:49:56.425Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"5285a1ceef644e8391fcc43dcf2865e7","solicitation_number":"36C24225R0040","parent_opportunity_id":"d418af84a21c465fb548357bd957cb91"},{"index":1,"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-31T18:33:47.161Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"d418af84a21c465fb548357bd957cb91","solicitation_number":"36C24225R0040"}],"contacts":[{"name":"Samantha Chavanga","role":"primary","email":"Samantha.Chavanga@va.gov","phone":"917-868-2471","title":"Contract Specialist"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"5285a1ceef644e8391fcc43dcf2865e7","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"d418af84a21c465fb548357bd957cb91","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-21T08:56:53.594711671Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"28462f51ddf6a27066fe6bbaf07854a859a92d17638e43f9c59f44962242023a","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-21T08:56:53.594711671Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Description: Solicitation 36C24225R0040 Amendment 1\n\nThe SF330s due date is extended to Monday, March 10, 2025, at 10:00AM EST.","text":"Description: Solicitation 36C24225R0040 Amendment 1\n\nThe SF330s due date is extended to Monday, March 10, 2025, at 10:00AM EST.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24225R0040","place_of_performance":{"zip":"10010","city":{"name":"New York"},"state":{"code":"NY","name":"New York"},"street":"Manhattan VA Medical Center Margaret Cochran-Corbin Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"423 East 23rd Street"},"product_service_code":"C1DA"},{"award":{"date":"2025-09-19","amount":"903566.73","number":"36C24225C0105","awardee":{"raw":"WEST POINT ENGINEERS LLC LOUISVILLE 40218 KGZ","uei":"DEJEN69ZLAX5","cage":"742E0","name":"WEST POINT ENGINEERS LLC","location":{"zip":"40218","city":{"name":"LOUISVILLE"},"state":{"name":"KY"},"country":{"code":"KGZ","name":"KYRGYZSTAN"}}}},"dates":{"posted":"2025-09-29","posted_at":"2025-09-29T15:16:22.209Z","award_date":"2025-09-19","created_at":"2025-09-29T15:16:19.939Z","modified_at":"2026-01-07T05:00:06.964Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/d52ea37167234112a05de9cb64d8e2a1/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","agency":{"office":{"code":"36C242","name":"242-NETWORK CONTRACT OFFICE 02 (36C242)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"organization_id":"100186522","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-06","archive_type":"auto_custom"},"history":[{"index":3,"title":"C1DA--NRM-AE PROJ#630-23-110 Replace Roofs Bldg 1","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-29T15:16:22.209Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"d52ea37167234112a05de9cb64d8e2a1","solicitation_number":"36C24225R0040"}],"contacts":[{"name":"Samantha Chavanga","role":"primary","email":"Samantha.Chavanga@va.gov","phone":"934-221-8574","title":"Contract Specialist"}],"base_type":{"code":"a","label":"Award Notice"},"notice_id":"d52ea37167234112a05de9cb64d8e2a1","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"d52ea37167234112a05de9cb64d8e2a1","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-28T00:06:37.629173039Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"76249c072a58a931b11f1635819ba6e70dbdb5ff3adec9ae96068d3584fcac8b","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-28T00:06:37.629173039Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"36C24225R0040","product_service_code":"C1DA"}],"due_at":"2025-03-10T15:00:00Z","due_date":"2025-03-10","closes_at":"2025-03-10T15:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","state":"NY","county":"36061","county_name":"New York County","city":"3651000","city_name":"New York","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"DEJEN69ZLAX5","amount":"903566.73","linked_awards":3,"cancelled":false,"archived":true,"updated_at":"2026-10-28T00:38:37.126996Z","principal_notice_id":"5285a1ceef644e8391fcc43dcf2865e7","description":{"text":"Description: Solicitation 36C24225R0040 Amendment 1\n\nThe SF330s due date is extended to Monday, March 10, 2025, at 10:00AM EST.","html":"Description: Solicitation 36C24225R0040 Amendment 1\n\nThe SF330s due date is extended to Monday, March 10, 2025, at 10:00AM EST.","origin":"detail"},"contacts":[{"name":"Samantha Chavanga","role":"primary","email":"Samantha.Chavanga@va.gov","phone":"934-221-8574","title":"Contract Specialist"}],"place_of_performance":{"zip":"10010","city":{"name":"New York"},"state":{"code":"NY","name":"New York"},"street":"Manhattan VA Medical Center Margaret Cochran-Corbin Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"423 East 23rd Street"},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"naics_codes":["541330"],"award":{"awardee":{}},"attachments":[{"resource_id":"e4a7961f7b02410eaabb0218045e4d62","name":"36C24225C0105_1.docx","kind":"file","mime_type":".docx","size_bytes":13690,"posted_at":"2025-09-29T15:16:22.209Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e4a7961f7b02410eaabb0218045e4d62/download","mirrored":false},{"resource_id":"9b7b8937fe544dd88a89474a401d4bd4","name":"36C24225R0040.docx","kind":"file","mime_type":".docx","size_bytes":45077,"posted_at":"2025-01-31T18:33:47.161Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9b7b8937fe544dd88a89474a401d4bd4/download","mirrored":false},{"resource_id":"033ab35f8e5441c688f69bcad755ef3e","name":"Department of Veterans Affairs","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-01-31T18:33:47.161Z","export_controlled":false,"sha256":null,"url":"http://www.va.gov","mirrored":false},{"resource_id":"a841cf8a45bd459e8335976fe39feca5","name":"36C24225R0040 0001_1.docx","kind":"file","mime_type":".docx","size_bytes":14104,"posted_at":"2025-03-03T15:49:56.425Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a841cf8a45bd459e8335976fe39feca5/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C24225C0105_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C24225C0105_3600_-NONE-_-NONE-/","piid":"36C24225C0105","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"DEJEN69ZLAX5","recipient_name":"WEST POINT ENGINEERS LLC","recipient_uei":"DEJEN69ZLAX5","recipient_cage":"742E0","recipient_city":"LOUISVILLE","recipient_state":"KY","sub_name":"Department of Veterans Affairs","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","office_key":"o-36C242","first_action_date":"2025-09-19","last_action_date":"2026-07-09","actions":3,"obligated":"903566.73","current_total_value":"903566.73","potential_total_value":"903566.73","naics":"541330","psc":"C1DA","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":11,"description":"REPLACE ROOF BUILDING # 1 AT MANHATTAN","method":"piid","confidence":"high","evidence":["award number 36C24225C0105 equals the contract number","same awarding office 36C242"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C24226R0115","latest_notice_id":"90161704ac554dd8b698d6922b32b544","title":"X1DB--Valley Stream CBOC - New Replacing Lease (VA-28-00000026)","solicitation_number":"36C24226R0115","notice_type":"r","first_type":"r","first_posted":"2026-11-06","last_posted":"2026-11-06","notices":1,"due_at":"2026-11-27T09:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T09:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"531120","psc":"X1DB","set_aside":null,"state":"NY","county":"36059","county_name":"Nassau County","city":"3676705","city_name":"Valley Stream","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-07T04:54:53.607561Z"},{"key":"36C24227R0010","latest_notice_id":"c95dcd81879b4a90b11678c8a80b3462","title":"F108--620-26-206 Asbestos Abatement","solicitation_number":"36C24227R0010","notice_type":"o","first_type":"p","first_posted":"2026-10-23","last_posted":"2026-11-19","notices":8,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"562910","psc":"F108","set_aside":"SDVOSBC","state":"NY","county":"36119","county_name":"Westchester County","city":"3648208","city_name":"Montrose","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24227Q0135","latest_notice_id":"878a17ea716349ce875349b4308f3e10","title":"Y1DA--STATION-CONST TBD OIG RENOVATION","solicitation_number":"36C24227Q0135","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":2,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"236220","psc":"Y1DA","set_aside":"SDVOSBC","state":"NY","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"description","state_evidence":"ANTEEN OPERATIONS. LOCATION: MARGARET COCHRAN CORBIN VA CAMPUS 423 EAST, 23RD STREET NEW YORK, NY 10010","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C24227Q0122","latest_notice_id":"ab2010ecef12446face409c44090d58a","title":"8910--East Orange Milk and Dairy","solicitation_number":"36C24227Q0122","notice_type":"o","first_type":"p","first_posted":"2026-11-09","last_posted":"2026-11-24","notices":2,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"311511","psc":"8910","set_aside":"SBA","state":"NJ","county":"34013","county_name":"Essex County","city":"3419390","city_name":"East Orange","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 8910)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C24227Q0091","latest_notice_id":"5d73616203d447e888c36d0c3fdea423","title":"R425--FY 27 Service (Base+4) | NYH Energy Control Procedures/LOTO Services | 630","solicitation_number":"36C24227Q0091","notice_type":"k","first_type":"k","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"541330","psc":"R425","set_aside":"SDVOSBC","state":"NY","county":"36061","county_name":"New York County","city":"3651000","city_name":"New York","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"}],"similar_open":[{"key":"36C24227Q0091","latest_notice_id":"5d73616203d447e888c36d0c3fdea423","title":"R425--FY 27 Service (Base+4) | NYH Energy Control Procedures/LOTO Services | 630","solicitation_number":"36C24227Q0091","notice_type":"k","first_type":"k","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"541330","psc":"R425","set_aside":"SDVOSBC","state":"NY","county":"36061","county_name":"New York County","city":"3651000","city_name":"New York","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"RFP476957","latest_notice_id":"884620f0b21d4e6887235b2a474d261b","title":"A-E Services for Electron Injector Complex","solicitation_number":"RFP_476957","notice_type":"o","first_type":"o","first_posted":"2026-10-23","last_posted":"2026-11-20","notices":4,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899033","office_name":"BROOKHAVEN NATL LAB -DOE CONTRACTOR","naics":"541330","psc":"C1HC","set_aside":null,"state":"NY","county":"36103","county_name":"Suffolk County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"RFQ481463","latest_notice_id":"6c474305bc924f1d8590c863af5d4ddf","title":"A-E Cost Estimation Services","solicitation_number":"RFQ_481463","notice_type":"o","first_type":"o","first_posted":"2026-10-30","last_posted":"2026-11-01","notices":2,"due_at":"2026-12-04T22:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-089","dept_name":"ENERGY, DEPARTMENT OF","sub_key":"s-8900","sub_name":"ENERGY, DEPARTMENT OF","office_key":"o-899033","office_name":"BROOKHAVEN NATL LAB -DOE CONTRACTOR","naics":"541330","psc":"R425","set_aside":null,"state":"NY","county":"36103","county_name":"Suffolk County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-02T05:17:02.075389Z"}],"similar_open_total":98,"indexable":false}