{"canonical":"https://sealedbidder.com/opportunities/36c24225b0017","key":"36C24225B0017","url":"https://sealedbidder.com/opportunities/36c24225b0017","title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","solicitation_number":"36C24225B0017","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-03-27T15:45:00Z","first_posted":"2025-02-04","last_posted":"2025-03-25","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"238210","psc":"7E21","set_aside":"SDVOSBC","place_state":"NY","place_scope":"nationwide","site":"Brooklyn VA Medical Center","place_state_source":null,"place_evidence":"Product purchase (PSC 7E21)","place_county":"36061","place_county_name":"New York County","place_city":"3651000","place_city_name":"New York","winner":"TW PROFESSIONAL SOLUTIONS LLC","award_amount":null,"publications":[{"notice_id":"7bba52a2c8d442f3940aec8a3845b5e4","title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","solicitation_number":"36C24225B0017","notice_type":"p","base_type":"p","posted":"2025-02-04","posted_at":"2025-02-04T15:24:51.355Z","due_at":"2025-03-21T15:00:00Z","due_date":"2025-03-21","cancelled":false,"archived":true,"archive_date":"2025-06-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7bba52a2c8d442f3940aec8a3845b5e4/view","enriched":true,"history":[{"index":4,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-04T15:24:51.355Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4","solicitation_number":"36C24225B0017"},{"index":2,"title":"F108--Mold Analysis, Abatement, & Remediation Bldg. 14 BROOKLYN VAMC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-28T21:27:05.873Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"95cb2a6fe55c4643a3f5403743303043","solicitation_number":"36C24225B0017","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"}]},{"notice_id":"95cb2a6fe55c4643a3f5403743303043","title":"F108--Mold Analysis, Abatement, & Remediation Bldg. 14 BROOKLYN VAMC","solicitation_number":"36C24225B0017","notice_type":"o","base_type":"p","posted":"2025-02-28","posted_at":"2025-02-28T21:27:05.873Z","due_at":"2025-03-27T15:00:00Z","due_date":"2025-03-27","cancelled":false,"archived":true,"archive_date":"2025-07-04","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/95cb2a6fe55c4643a3f5403743303043/view","enriched":true,"history":[{"index":6,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-04T15:24:51.355Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4","solicitation_number":"36C24225B0017"},{"index":5,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-25T12:11:16.431Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"0cb41252671048b5a268a12a76531861","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043"},{"index":3,"title":"36C24225B0017 NextGen WiFi Upgrades Manhattan, St. Albans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-07T12:27:02.629Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"617a672dac134f7cb27ac5ba0b883539","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"},{"index":2,"title":"F108--Mold Analysis, Abatement, & Remediation Bldg. 14 BROOKLYN VAMC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-28T21:27:05.873Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"95cb2a6fe55c4643a3f5403743303043","solicitation_number":"36C24225B0017","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"}]},{"notice_id":"617a672dac134f7cb27ac5ba0b883539","title":"36C24225B0017 NextGen WiFi Upgrades Manhattan, St. Albans","solicitation_number":"36C24225B0017","notice_type":"o","base_type":"o","posted":"2025-03-07","posted_at":"2025-03-07T12:27:02.629Z","due_at":"2025-03-27T15:00:00Z","due_date":"2025-03-27","cancelled":false,"archived":true,"archive_date":"2025-07-04","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/617a672dac134f7cb27ac5ba0b883539/view","enriched":true,"history":[{"index":6,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-04T15:24:51.355Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4","solicitation_number":"36C24225B0017"},{"index":5,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-25T12:11:16.431Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"0cb41252671048b5a268a12a76531861","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043"},{"index":3,"title":"36C24225B0017 NextGen WiFi Upgrades Manhattan, St. Albans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-07T12:27:02.629Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"617a672dac134f7cb27ac5ba0b883539","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"},{"index":2,"title":"F108--Mold Analysis, Abatement, & Remediation Bldg. 14 BROOKLYN VAMC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-28T21:27:05.873Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"95cb2a6fe55c4643a3f5403743303043","solicitation_number":"36C24225B0017","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"}]},{"notice_id":"0cb41252671048b5a268a12a76531861","title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","solicitation_number":"36C24225B0017","notice_type":"o","base_type":"o","posted":"2025-03-25","posted_at":"2025-03-25T12:11:16.431Z","due_at":"2025-03-27T15:45:00Z","due_date":"2025-03-27","cancelled":false,"archived":true,"archive_date":"2025-04-26","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0cb41252671048b5a268a12a76531861/view","enriched":true,"history":[{"index":4,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-25T12:11:16.431Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"0cb41252671048b5a268a12a76531861","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043"},{"index":2,"title":"36C24225B0017 NextGen WiFi Upgrades Manhattan, St. Albans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-07T12:27:02.629Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"617a672dac134f7cb27ac5ba0b883539","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"},{"index":1,"title":"F108--Mold Analysis, Abatement, & Remediation Bldg. 14 BROOKLYN VAMC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-28T21:27:05.873Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"95cb2a6fe55c4643a3f5403743303043","solicitation_number":"36C24225B0017","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"}]}],"latest_notice_id":"0cb41252671048b5a268a12a76531861","first_type":"p","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-02-04","posted_at":"2025-02-04T15:24:51.355Z","created_at":"2025-02-04T15:24:49.144Z","modified_at":"2025-06-29T04:19:49.329Z","response_deadline":{"raw":"2025-03-21T11:00:00-04:00","utc":"2025-03-21T15:00:00Z","date":"2025-03-21","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7bba52a2c8d442f3940aec8a3845b5e4/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","agency":{"office":{"code":"36C242","name":"242-NETWORK CONTRACT OFFICE 02 (36C242)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"organization_id":"100186522","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-06-28","archive_type":"auto_custom"},"history":[{"index":4,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-04T15:24:51.355Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4","solicitation_number":"36C24225B0017"},{"index":2,"title":"F108--Mold Analysis, Abatement, & Remediation Bldg. 14 BROOKLYN VAMC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-28T21:27:05.873Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"95cb2a6fe55c4643a3f5403743303043","solicitation_number":"36C24225B0017","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"}],"contacts":[{"name":"Charlie Augustin","role":"primary","email":"Charlie.Auagustin@va.gov","phone":"718-526-1000 X2298","title":"Contracting Officer"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"7bba52a2c8d442f3940aec8a3845b5e4","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"95cb2a6fe55c4643a3f5403743303043","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-24T00:05:51.265831574Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"08ba375a310e8f309cd713f891e7cca30635f18195483b823a39b4c76ef7da92","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-24T00:05:51.265831574Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Presolicitation Notice\n\nPresolicitation Notice\n\nPage 5 of 5\nPresolicitation Notice\n*=Required Field\nPresolicitation Notice\n\nPage 1 of 5\n****THIS NOT A SOLICITATION****\nThis is a public synopsis of a forthcoming solicitation in accordance with FAR 36.213-2.  This is NOT a solicitation, and no solicitation documents are currently publicly available.\nSolicitation expected on or about February 19th, 2025. \nPre-Solicitation Notice for Solicitation 36C24225B0017; Project # 630-22-704  NEXT GEN Wi-Fi UPGRADES as required in scope of work, drawings and specifications, located at the VA New York Harbor Healthcare System, Manhattan Veterans Affairs Medical Center, 423 East 23rd Street, New York, NY 10010 and St. Albans VA Medical Center 179-00 Linden Blvd, Jamaica, NY 11425.\nThis project is 100% Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside under the authority of 38 U.S.C. 8127 As a result, competition for this requirement is restricted to SDVOSB firms. Firms must be verified by the SBA Veteran Small Business Certification (VetCert). \nThe Contractor shall furnish all labor, materials, tools, supervision, equipment, safety, necessary to perform the repair. At minimum, the following shall be performed: \n1. The Contractor shall take all necessary precautions and safety measure to protect all patients and end users from all repair related activities.  The Contractor shall test and verify all repairs to ensure proper operation. \n2. The Contractor must have OSHA training, and specialized OSHA training. Lock-out/Tag-out is required prior to commencement of work. The Contracting Officer or his/her designee will notify the contractor of any noncompliance and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all and any part of the work and hold the Contractor in default. \n3. All work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, and OSHA regulations. In the performance of all work, the workers must be incompliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.). \n4. The Contractor shall follow all Infection Control measures and Interim Life Safety measures. All work performed will be in an operational healthcare facility. \n5. All work shall be done in compliance with all VA Policy and requirements. \n6. The Contractor shall provide daily log, certified payroll, and any required submittals. The Engineering Logbook shall be signed each day the Contractor perform work. The Contractor shall complete VA Privacy Training and VA Badge Requirement. \n7. Contractor shall account for any additional expenses for afterhours/weekend work. \n8. The Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. Contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost. \n9. It is the responsibility of the contractor to verify all quantities, field conditions and measurements prior to starting work. The contractor shall notify the CO/COR and VA Engineering Team of any differing site conditions prior to starting. \n10. The Contractor shall provide an English-Speaking working supervisor on-site at all times when work is being performed and for the duration of this project. Supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this. \n11. The Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc. \n12. The Contractor shall post visible required warning signs and barriers prior to beginning any work. \n13. The Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government. \n14. The Contractor shall be responsible for the proper and safe removal and disposal of all debris. \n15. The Contractor shall perform cleanup at any time when work area becomes cluttered and/or restricts traffic. At minimum, the Contractor shall clean work area at the end of each work shift. \n16. The Contractor must coordinate and schedule all work with the VA. \n17. The C&A requirements do not apply, and that a Security Accreditation Package is not required. \n18. The Contractor is responsible for completing the VA Privacy and Information Security Awareness training. \nEstimated construction cost range is $100,000- $250,000. The project is classified under NAICS: 238210, Electrical Contractors and Other Wiring Installation Contractors, size standard- $19 million. This requirement will be procured per Federal Acquisition Regulation (FAR) Part 14.101 -Sealed Bidding.\nPerformance Period: Project completion is 70 calendar days from issuance of Notice to Proceed.  \nProspective contractors must be registered and verified as a Service- Disabled Veteran Owned Small Business (SDVOSB). SDVOSB firms must be verified by the SBA Veteran Small Business Certification (VetCert): Veteran Small Business Certification (sba.gov)  and all offerors must be registered in the System for Award Management (SAM): https://www.sam.gov/SAM/ in accordance with 38 CFR Part 74 and VAAR 819.70 to be eligible for award. This project requires bonding. A bid bond is required, and the bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $3 million. All relevant solicitation documents, including specifications and drawings, may be accessed for download on the date of issue by conducting a search of Solicitation 36C24225B0017 on https://sam.gov/content/opportunities under Contract Opportunities. Any amendments to the solicitation will be posted solely to this website. It is the responsibility of the offeror to verify the number of amendments issued. All other details to include information on site visit will be included in the solicitation document and will be posted on https://www.sam.gov.   It is anticipated that the solicitation will be issued on/about February 19th ,2025.  The POC for this project is Charlie Augustin (Charlie.Augustin@va.gov).  No questions will be considered until the actual solicitation is released.\n\n This project will be 100% set-aside for SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES.","text":"Presolicitation Notice\n\nPresolicitation Notice\n\nPage 5 of 5\nPresolicitation Notice\n*=Required Field\nPresolicitation Notice\n\nPage 1 of 5\n****THIS NOT A SOLICITATION****\nThis is a public synopsis of a forthcoming solicitation in accordance with FAR 36.213-2. This is NOT a solicitation, and no solicitation documents are currently publicly available.\nSolicitation expected on or about February 19th, 2025.\nPre-Solicitation Notice for Solicitation 36C24225B0017; Project # 630-22-704 NEXT GEN Wi-Fi UPGRADES as required in scope of work, drawings and specifications, located at the VA New York Harbor Healthcare System, Manhattan Veterans Affairs Medical Center, 423 East 23rd Street, New York, NY 10010 and St. Albans VA Medical Center 179-00 Linden Blvd, Jamaica, NY 11425.\nThis project is 100% Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside under the authority of 38 U.S.C. 8127 As a result, competition for this requirement is restricted to SDVOSB firms. Firms must be verified by the SBA Veteran Small Business Certification (VetCert).\nThe Contractor shall furnish all labor, materials, tools, supervision, equipment, safety, necessary to perform the repair. At minimum, the following shall be performed:\n1. The Contractor shall take all necessary precautions and safety measure to protect all patients and end users from all repair related activities. The Contractor shall test and verify all repairs to ensure proper operation.\n2. The Contractor must have OSHA training, and specialized OSHA training. Lock-out/Tag-out is required prior to commencement of work. The Contracting Officer or his/her designee will notify the contractor of any noncompliance and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all and any part of the work and hold the Contractor in default.\n3. All work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, and OSHA regulations. In the performance of all work, the workers must be incompliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.).\n4. The Contractor shall follow all Infection Control measures and Interim Life Safety measures. All work performed will be in an operational healthcare facility.\n5. All work shall be done in compliance with all VA Policy and requirements.\n6. The Contractor shall provide daily log, certified payroll, and any required submittals. The Engineering Logbook shall be signed each day the Contractor perform work. The Contractor shall complete VA Privacy Training and VA Badge Requirement.\n7. Contractor shall account for any additional expenses for afterhours/weekend work.\n8. The Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. Contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost.\n9. It is the responsibility of the contractor to verify all quantities, field conditions and measurements prior to starting work. The contractor shall notify the CO/COR and VA Engineering Team of any differing site conditions prior to starting.\n10. The Contractor shall provide an English-Speaking working supervisor on-site at all times when work is being performed and for the duration of this project. Supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this.\n11. The Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc.\n12. The Contractor shall post visible required warning signs and barriers prior to beginning any work.\n13. The Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government.\n14. The Contractor shall be responsible for the proper and safe removal and disposal of all debris.\n15. The Contractor shall perform cleanup at any time when work area becomes cluttered and/or restricts traffic. At minimum, the Contractor shall clean work area at the end of each work shift.\n16. The Contractor must coordinate and schedule all work with the VA.\n17. The C&A requirements do not apply, and that a Security Accreditation Package is not required.\n18. The Contractor is responsible for completing the VA Privacy and Information Security Awareness training.\nEstimated construction cost range is $100,000- $250,000. The project is classified under NAICS: 238210, Electrical Contractors and Other Wiring Installation Contractors, size standard- $19 million. This requirement will be procured per Federal Acquisition Regulation (FAR) Part 14.101 -Sealed Bidding.\nPerformance Period: Project completion is 70 calendar days from issuance of Notice to Proceed.\nProspective contractors must be registered and verified as a Service- Disabled Veteran Owned Small Business (SDVOSB). SDVOSB firms must be verified by the SBA Veteran Small Business Certification (VetCert): Veteran Small Business Certification (sba.gov) and all offerors must be registered in the System for Award Management (SAM): https://www.sam.gov/SAM/ in accordance with 38 CFR Part 74 and VAAR 819.70 to be eligible for award. This project requires bonding. A bid bond is required, and the bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $3 million. All relevant solicitation documents, including specifications and drawings, may be accessed for download on the date of issue by conducting a search of Solicitation 36C24225B0017 on https://sam.gov/content/opportunities under Contract Opportunities. Any amendments to the solicitation will be posted solely to this website. It is the responsibility of the offeror to verify the number of amendments issued. All other details to include information on site visit will be included in the solicitation document and will be posted on https://www.sam.gov. It is anticipated that the solicitation will be issued on/about February 19th ,2025. The POC for this project is Charlie Augustin (Charlie.Augustin@va.gov). No questions will be considered until the actual solicitation is released.\n\nThis project will be 100% set-aside for SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C24225B0017","place_of_performance":{"zip":"10010","city":{"name":"NEW YORK"},"state":{"code":"NY","name":"New York"},"street":"DEPARTMENT OF VETERANS AFFAIRS NCO2","country":{"code":"USA","name":"UNITED STATES"},"street2":"VA NEW YORK HARBOR 423 E 23rs ST"},"product_service_code":"7E21"},{"award":{"awardee":{}},"dates":{"posted":"2025-02-28","posted_at":"2025-02-28T21:27:05.873Z","created_at":"2025-02-28T21:26:34.565Z","modified_at":"2025-04-26T04:00:32.244Z","response_deadline":{"raw":"2025-03-27T11:00:00-04:00","utc":"2025-03-27T15:00:00Z","date":"2025-03-27","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/95cb2a6fe55c4643a3f5403743303043/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"F108--Mold Analysis, Abatement, & Remediation Bldg. 14 BROOKLYN VAMC","agency":{"office":{"code":"36C242","name":"242-NETWORK CONTRACT OFFICE 02 (36C242)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"organization_id":"100186522","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-04","archive_type":"auto_custom"},"history":[{"index":6,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-04T15:24:51.355Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4","solicitation_number":"36C24225B0017"},{"index":5,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-25T12:11:16.431Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"0cb41252671048b5a268a12a76531861","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043"},{"index":3,"title":"36C24225B0017 NextGen WiFi Upgrades Manhattan, St. Albans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-07T12:27:02.629Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"617a672dac134f7cb27ac5ba0b883539","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"},{"index":2,"title":"F108--Mold Analysis, Abatement, & Remediation Bldg. 14 BROOKLYN VAMC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-28T21:27:05.873Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"95cb2a6fe55c4643a3f5403743303043","solicitation_number":"36C24225B0017","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"}],"contacts":[{"name":"Vladimir S Stoyanov","role":"primary","email":"vladimir.stoyanov@va.gov","title":"Contracting Officer"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"95cb2a6fe55c4643a3f5403743303043","lineage_id":"95cb2a6fe55c4643a3f5403743303043","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-21T10:38:30.564068031Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"22d952c9b954de014963ba86579464188245cd42a89222ecb114dc2ed7640b1a","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-21T10:38:30.564068031Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Page 2 of 2\n\nCONSTRUCTION SCOPE OF WORK\nEHRM NEXTGEN WIFI UPGRADES\n\n\n\nPROJECT NO:  630-22-704\nPROJECT NAME:  EHRM NextGen WiFi Upgrades   New York Harbor Healthcare System\n1. GENERAL INTENT:\n\nThe Contractor shall furnish all labor, tools, materials and equipment to support installation of new WiFi Access Points at the Margaret Cochran Corbin VA Medical center in Manhattan 423 East 23rd St. New York, NY and at the St Albans medical center located at  179-00 Linden Blvd Queens, NY. Please note that the scope of this work is limited and specifically as listed below.\n\n2.  STATEMENT OF WORK:  \n\nProvide and install conduit, raceways, horizontal and vertical penetrations, and fire stopping to support NextGen WiFi installation at the New York Harbor healthcare system as shown and described in the project drawings and specifications. A list of required access point locations requiring conduits and/or penetrations are provided as SOW Attachment 1.  SOW Attachment 2 and 2A include access point floor plans of the two medical centers.\n\nWork shall include:\n\n1. Installation of 180 WiFi Access Points (WAP s). WAP s will be provided by the VA, but the mounting brackets shall be provided by the Contractor.  (154 access points are located at Manhattan campus and 26 at St Albans campus.)\n\n2. Supply and Installation of 600 linear feet of EMT conduit, including junction boxes, pull cords, and fire stopping, throughout the Medical Centers. Existing conduit paths between floors/IT rooms will not have the capacity for more cable and new conduit paths will need to be created.  Most AP s will be wired to a telecommunication room on same floor however Manhattan Building 2 and 3, and St. Albans Buildings 89 and 85_86 are exceptions requiring vertical conduit pathways- see attached drawings for details.\n\nConduit sleeves are required from WAP room locations to corridors.  Once in corridor it is expected that cable will travel in existing cable trays.  Where cable tray is not present, J-Hooks shall be utilized if existing J-Hooks have not been previously installed or are at capacity.   Include pricing for supply and installation of (400) J Hooks.  Turnover any unused J-Hooks to VA at end of job.\n\nWhere the cables passes through a smoke zone as seen in drawings as a corridor door, provide and install a smoke rated sleeve e.g. EZ Path 44NEZ or equal where existing sleeves don t exist.  Also utilize the smoke rated sleeve for all penetrations into telecommunication rooms.  Assume Qty (94) to be required, turn over any unused sleeves to VA at end of job.\n\n3. Installation of approximately 36,000 linear feet of CAT 6A cable from APs to nearest IT rooms and terminating in a patch panel. WAP locations and IT room locations are shown on drawings.\n\n4. Infection Control Procedures.  \nWhen removing ceiling tiles in corridors and inpatient sleeping rooms,  all work must be done within mobile HEPA containment containers.  Contractor will be responsible for providing , renting if needed, and transporting such containers.   A  minimum of two HEPA carts will be required while pulling cable.  \n\nAll work will be performed during business hours, Monday thru Friday, 8 AM to 4:30 PM.\n\n3. PERIOD OF PERFORMANCE:\n\n3.1 Work timelines and completion progress shall be communicated to the COR for tracking purposes.Â \nÂ \n3.2 Work described in Section 2 shall be completed within 10 weeks of NTP\n\n4. REFERENCES:\n\n4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0Â  (Attachment 3).\n4.2      Infrastructure Standard for Telecommunication Spaces Vers 3.1     https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf  \n\n\n5. SPECIFICATIONS:\n\nDIVISION 01 - GENERAL REQUIREMENTS\n01 00 00 General Requirements\n01 32 16.15 Project Schedule\n01 33 23 Shop Drawings, Product Data, and Samples\n01 35 26 Safety Requirements\n01 74 19 Construction Waste Management\n\nDIVISION 07   THERMAL AND MOISTURE PROTECTION\n07 84 00 Firestopping\n\nDIVISION 27   COMMUNICATIONS\n27 05 11 Requirements for Communications Installations\n27 05 33 Raceways and Boxes for Communications Systems\n27 15 00 Communications Structured Cabling \n\n6. SUBMITTALS:\n\nThe contractor shall submit the following submittals for review:\nProduct data and sample of conduit or raceway , smoke rated sleeves and Cat 6A cable.\nAs-built drawings for all data locations and labels.  The Contractor shall provide the central drawing set to the Owner at the end of the project.  The marked-up drawing set will accurately depict the as-built status of the system. \n6. ATTACHMENTS:\n\n6.1 Attachment 1: List of Access Point locations and site prep requirements.\n6.2 Attachment 2 and 2A: NextGen WiFi Access Point location drawings\n6.3 Attachment 3: VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0\n6.4 Attachment 4: Sensitive Infrastructure Data Classification Memo\n6.5 Attachment 5: Seasonal Influenza with Vaccines\n6.6 Attachment 6: Specifications\n\nThe above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for this project. Contractor shall refer to drawings and specifications for comprehensive construction requirements. \n\nEnd of SOW","text":"Page 2 of 2\n\nCONSTRUCTION SCOPE OF WORK\nEHRM NEXTGEN WIFI UPGRADES\n\nPROJECT NO: 630-22-704\nPROJECT NAME: EHRM NextGen WiFi Upgrades New York Harbor Healthcare System\n1. GENERAL INTENT:\n\nThe Contractor shall furnish all labor, tools, materials and equipment to support installation of new WiFi Access Points at the Margaret Cochran Corbin VA Medical center in Manhattan 423 East 23rd St. New York, NY and at the St Albans medical center located at 179-00 Linden Blvd Queens, NY. Please note that the scope of this work is limited and specifically as listed below.\n\n2. STATEMENT OF WORK:\n\nProvide and install conduit, raceways, horizontal and vertical penetrations, and fire stopping to support NextGen WiFi installation at the New York Harbor healthcare system as shown and described in the project drawings and specifications. A list of required access point locations requiring conduits and/or penetrations are provided as SOW Attachment 1. SOW Attachment 2 and 2A include access point floor plans of the two medical centers.\n\nWork shall include:\n\n1. Installation of 180 WiFi Access Points (WAP s). WAP s will be provided by the VA, but the mounting brackets shall be provided by the Contractor. (154 access points are located at Manhattan campus and 26 at St Albans campus.)\n\n2. Supply and Installation of 600 linear feet of EMT conduit, including junction boxes, pull cords, and fire stopping, throughout the Medical Centers. Existing conduit paths between floors/IT rooms will not have the capacity for more cable and new conduit paths will need to be created. Most AP s will be wired to a telecommunication room on same floor however Manhattan Building 2 and 3, and St. Albans Buildings 89 and 85_86 are exceptions requiring vertical conduit pathways- see attached drawings for details.\n\nConduit sleeves are required from WAP room locations to corridors. Once in corridor it is expected that cable will travel in existing cable trays. Where cable tray is not present, J-Hooks shall be utilized if existing J-Hooks have not been previously installed or are at capacity. Include pricing for supply and installation of (400) J Hooks. Turnover any unused J-Hooks to VA at end of job.\n\nWhere the cables passes through a smoke zone as seen in drawings as a corridor door, provide and install a smoke rated sleeve e.g. EZ Path 44NEZ or equal where existing sleeves don t exist. Also utilize the smoke rated sleeve for all penetrations into telecommunication rooms. Assume Qty (94) to be required, turn over any unused sleeves to VA at end of job.\n\n3. Installation of approximately 36,000 linear feet of CAT 6A cable from APs to nearest IT rooms and terminating in a patch panel. WAP locations and IT room locations are shown on drawings.\n\n4. Infection Control Procedures.\nWhen removing ceiling tiles in corridors and inpatient sleeping rooms, all work must be done within mobile HEPA containment containers. Contractor will be responsible for providing , renting if needed, and transporting such containers. A minimum of two HEPA carts will be required while pulling cable.\n\nAll work will be performed during business hours, Monday thru Friday, 8 AM to 4:30 PM.\n\n3. PERIOD OF PERFORMANCE:\n\n3.1 Work timelines and completion progress shall be communicated to the COR for tracking purposes.Â\nÂ\n3.2 Work described in Section 2 shall be completed within 10 weeks of NTP\n\n4. REFERENCES:\n\n4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0Â (Attachment 3).\n4.2 Infrastructure Standard for Telecommunication Spaces Vers 3.1 https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf\n\n5. SPECIFICATIONS:\n\nDIVISION 01 - GENERAL REQUIREMENTS\n01 00 00 General Requirements\n01 32 16.15 Project Schedule\n01 33 23 Shop Drawings, Product Data, and Samples\n01 35 26 Safety Requirements\n01 74 19 Construction Waste Management\n\nDIVISION 07 THERMAL AND MOISTURE PROTECTION\n07 84 00 Firestopping\n\nDIVISION 27 COMMUNICATIONS\n27 05 11 Requirements for Communications Installations\n27 05 33 Raceways and Boxes for Communications Systems\n27 15 00 Communications Structured Cabling\n\n6. SUBMITTALS:\n\nThe contractor shall submit the following submittals for review:\nProduct data and sample of conduit or raceway , smoke rated sleeves and Cat 6A cable.\nAs-built drawings for all data locations and labels. The Contractor shall provide the central drawing set to the Owner at the end of the project. The marked-up drawing set will accurately depict the as-built status of the system.\n6. ATTACHMENTS:\n\n6.1 Attachment 1: List of Access Point locations and site prep requirements.\n6.2 Attachment 2 and 2A: NextGen WiFi Access Point location drawings\n6.3 Attachment 3: VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0\n6.4 Attachment 4: Sensitive Infrastructure Data Classification Memo\n6.5 Attachment 5: Seasonal Influenza with Vaccines\n6.6 Attachment 6: Specifications\n\nThe above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for this project. Contractor shall refer to drawings and specifications for comprehensive construction requirements.\n\nEnd of SOW","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24225B0017","product_service_code":"F108"},{"award":{"awardee":{}},"dates":{"posted":"2025-03-07","posted_at":"2025-03-07T12:27:02.629Z","created_at":"2025-03-07T12:24:57.981Z","modified_at":"2025-04-26T04:00:32.244Z","response_deadline":{"raw":"2025-03-27T11:00:00-04:00","utc":"2025-03-27T15:00:00Z","date":"2025-03-27","time":"11:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/617a672dac134f7cb27ac5ba0b883539/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"36C24225B0017 NextGen WiFi Upgrades Manhattan, St. Albans","agency":{"office":{"code":"36C242","name":"242-NETWORK CONTRACT OFFICE 02 (36C242)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"organization_id":"100186522","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-04","archive_type":"auto_custom"},"history":[{"index":6,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-04T15:24:51.355Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4","solicitation_number":"36C24225B0017"},{"index":5,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-25T12:11:16.431Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"0cb41252671048b5a268a12a76531861","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043"},{"index":3,"title":"36C24225B0017 NextGen WiFi Upgrades Manhattan, St. Albans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-07T12:27:02.629Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"617a672dac134f7cb27ac5ba0b883539","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"},{"index":2,"title":"F108--Mold Analysis, Abatement, & Remediation Bldg. 14 BROOKLYN VAMC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-28T21:27:05.873Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"95cb2a6fe55c4643a3f5403743303043","solicitation_number":"36C24225B0017","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"}],"contacts":[{"name":"Vladimir S Stoyanov","role":"primary","email":"vladimir.stoyanov@va.gov","title":"Contracting Officer"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"617a672dac134f7cb27ac5ba0b883539","lineage_id":"95cb2a6fe55c4643a3f5403743303043","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-21T01:43:31.663117027Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"4a0dea61c785a4f5fcddeaa041f415dc99e5db0418803f54a501a0cf07597df5","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-21T01:43:31.663117027Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Page 2 of 2\n\nCONSTRUCTION SCOPE OF WORK\nEHRM NEXTGEN WIFI UPGRADES\n\n\n\nPROJECT NO:  630-22-704\nPROJECT NAME:  EHRM NextGen WiFi Upgrades   New York Harbor Healthcare System\n1. GENERAL INTENT:\n\nThe Contractor shall furnish all labor, tools, materials and equipment to support installation of new WiFi Access Points at the Margaret Cochran Corbin VA Medical center in Manhattan 423 East 23rd St. New York, NY and at the St Albans medical center located at  179-00 Linden Blvd Queens, NY. Please note that the scope of this work is limited and specifically as listed below.\n\n2.  STATEMENT OF WORK:  \n\nProvide and install conduit, raceways, horizontal and vertical penetrations, and fire stopping to support NextGen WiFi installation at the New York Harbor healthcare system as shown and described in the project drawings and specifications. A list of required access point locations requiring conduits and/or penetrations are provided as SOW Attachment 1.  SOW Attachment 2 and 2A include access point floor plans of the two medical centers.\n\nWork shall include:\n\n1. Installation of 180 WiFi Access Points (WAP s). WAP s will be provided by the VA, but the mounting brackets shall be provided by the Contractor.  (154 access points are located at Manhattan campus and 26 at St Albans campus.)\n\n2. Supply and Installation of 600 linear feet of EMT conduit, including junction boxes, pull cords, and fire stopping, throughout the Medical Centers. Existing conduit paths between floors/IT rooms will not have the capacity for more cable and new conduit paths will need to be created.  Most AP s will be wired to a telecommunication room on same floor however Manhattan Building 2 and 3, and St. Albans Buildings 89 and 85_86 are exceptions requiring vertical conduit pathways- see attached drawings for details.\n\nConduit sleeves are required from WAP room locations to corridors.  Once in corridor it is expected that cable will travel in existing cable trays.  Where cable tray is not present, J-Hooks shall be utilized if existing J-Hooks have not been previously installed or are at capacity.   Include pricing for supply and installation of (400) J Hooks.  Turnover any unused J-Hooks to VA at end of job.\n\nWhere the cables passes through a smoke zone as seen in drawings as a corridor door, provide and install a smoke rated sleeve e.g. EZ Path 44NEZ or equal where existing sleeves don t exist.  Also utilize the smoke rated sleeve for all penetrations into telecommunication rooms.  Assume Qty (94) to be required, turn over any unused sleeves to VA at end of job.\n\n3. Installation of approximately 36,000 linear feet of CAT 6A cable from APs to nearest IT rooms and terminating in a patch panel. WAP locations and IT room locations are shown on drawings.\n\n4. Infection Control Procedures.  \nWhen removing ceiling tiles in corridors and inpatient sleeping rooms,  all work must be done within mobile HEPA containment containers.  Contractor will be responsible for providing , renting if needed, and transporting such containers.   A  minimum of two HEPA carts will be required while pulling cable.  \n\nAll work will be performed during business hours, Monday thru Friday, 8 AM to 4:30 PM.\n\n3. PERIOD OF PERFORMANCE:\n\n3.1 Work timelines and completion progress shall be communicated to the COR for tracking purposes.Â \nÂ \n3.2 Work described in Section 2 shall be completed within 10 weeks of NTP\n\n4. REFERENCES:\n\n4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0Â  (Attachment 3).\n4.2      Infrastructure Standard for Telecommunication Spaces Vers 3.1     https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf  \n\n\n5. SPECIFICATIONS:\n\nDIVISION 01 - GENERAL REQUIREMENTS\n01 00 00 General Requirements\n01 32 16.15 Project Schedule\n01 33 23 Shop Drawings, Product Data, and Samples\n01 35 26 Safety Requirements\n01 74 19 Construction Waste Management\n\nDIVISION 07   THERMAL AND MOISTURE PROTECTION\n07 84 00 Firestopping\n\nDIVISION 27   COMMUNICATIONS\n27 05 11 Requirements for Communications Installations\n27 05 33 Raceways and Boxes for Communications Systems\n27 15 00 Communications Structured Cabling \n\n6. SUBMITTALS:\n\nThe contractor shall submit the following submittals for review:\nProduct data and sample of conduit or raceway , smoke rated sleeves and Cat 6A cable.\nAs-built drawings for all data locations and labels.  The Contractor shall provide the central drawing set to the Owner at the end of the project.  The marked-up drawing set will accurately depict the as-built status of the system. \n6. ATTACHMENTS:\n\n6.1 Attachment 1: List of Access Point locations and site prep requirements.\n6.2 Attachment 2 and 2A: NextGen WiFi Access Point location drawings\n6.3 Attachment 3: VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0\n6.4 Attachment 4: Sensitive Infrastructure Data Classification Memo\n6.5 Attachment 5: Seasonal Influenza with Vaccines\n6.6 Attachment 6: Specifications\n\nThe above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for this project. Contractor shall refer to drawings and specifications for comprehensive construction requirements. \n\nEnd of SOW","text":"Page 2 of 2\n\nCONSTRUCTION SCOPE OF WORK\nEHRM NEXTGEN WIFI UPGRADES\n\nPROJECT NO: 630-22-704\nPROJECT NAME: EHRM NextGen WiFi Upgrades New York Harbor Healthcare System\n1. GENERAL INTENT:\n\nThe Contractor shall furnish all labor, tools, materials and equipment to support installation of new WiFi Access Points at the Margaret Cochran Corbin VA Medical center in Manhattan 423 East 23rd St. New York, NY and at the St Albans medical center located at 179-00 Linden Blvd Queens, NY. Please note that the scope of this work is limited and specifically as listed below.\n\n2. STATEMENT OF WORK:\n\nProvide and install conduit, raceways, horizontal and vertical penetrations, and fire stopping to support NextGen WiFi installation at the New York Harbor healthcare system as shown and described in the project drawings and specifications. A list of required access point locations requiring conduits and/or penetrations are provided as SOW Attachment 1. SOW Attachment 2 and 2A include access point floor plans of the two medical centers.\n\nWork shall include:\n\n1. Installation of 180 WiFi Access Points (WAP s). WAP s will be provided by the VA, but the mounting brackets shall be provided by the Contractor. (154 access points are located at Manhattan campus and 26 at St Albans campus.)\n\n2. Supply and Installation of 600 linear feet of EMT conduit, including junction boxes, pull cords, and fire stopping, throughout the Medical Centers. Existing conduit paths between floors/IT rooms will not have the capacity for more cable and new conduit paths will need to be created. Most AP s will be wired to a telecommunication room on same floor however Manhattan Building 2 and 3, and St. Albans Buildings 89 and 85_86 are exceptions requiring vertical conduit pathways- see attached drawings for details.\n\nConduit sleeves are required from WAP room locations to corridors. Once in corridor it is expected that cable will travel in existing cable trays. Where cable tray is not present, J-Hooks shall be utilized if existing J-Hooks have not been previously installed or are at capacity. Include pricing for supply and installation of (400) J Hooks. Turnover any unused J-Hooks to VA at end of job.\n\nWhere the cables passes through a smoke zone as seen in drawings as a corridor door, provide and install a smoke rated sleeve e.g. EZ Path 44NEZ or equal where existing sleeves don t exist. Also utilize the smoke rated sleeve for all penetrations into telecommunication rooms. Assume Qty (94) to be required, turn over any unused sleeves to VA at end of job.\n\n3. Installation of approximately 36,000 linear feet of CAT 6A cable from APs to nearest IT rooms and terminating in a patch panel. WAP locations and IT room locations are shown on drawings.\n\n4. Infection Control Procedures.\nWhen removing ceiling tiles in corridors and inpatient sleeping rooms, all work must be done within mobile HEPA containment containers. Contractor will be responsible for providing , renting if needed, and transporting such containers. A minimum of two HEPA carts will be required while pulling cable.\n\nAll work will be performed during business hours, Monday thru Friday, 8 AM to 4:30 PM.\n\n3. PERIOD OF PERFORMANCE:\n\n3.1 Work timelines and completion progress shall be communicated to the COR for tracking purposes.Â\nÂ\n3.2 Work described in Section 2 shall be completed within 10 weeks of NTP\n\n4. REFERENCES:\n\n4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0Â (Attachment 3).\n4.2 Infrastructure Standard for Telecommunication Spaces Vers 3.1 https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf\n\n5. SPECIFICATIONS:\n\nDIVISION 01 - GENERAL REQUIREMENTS\n01 00 00 General Requirements\n01 32 16.15 Project Schedule\n01 33 23 Shop Drawings, Product Data, and Samples\n01 35 26 Safety Requirements\n01 74 19 Construction Waste Management\n\nDIVISION 07 THERMAL AND MOISTURE PROTECTION\n07 84 00 Firestopping\n\nDIVISION 27 COMMUNICATIONS\n27 05 11 Requirements for Communications Installations\n27 05 33 Raceways and Boxes for Communications Systems\n27 15 00 Communications Structured Cabling\n\n6. SUBMITTALS:\n\nThe contractor shall submit the following submittals for review:\nProduct data and sample of conduit or raceway , smoke rated sleeves and Cat 6A cable.\nAs-built drawings for all data locations and labels. The Contractor shall provide the central drawing set to the Owner at the end of the project. The marked-up drawing set will accurately depict the as-built status of the system.\n6. ATTACHMENTS:\n\n6.1 Attachment 1: List of Access Point locations and site prep requirements.\n6.2 Attachment 2 and 2A: NextGen WiFi Access Point location drawings\n6.3 Attachment 3: VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0\n6.4 Attachment 4: Sensitive Infrastructure Data Classification Memo\n6.5 Attachment 5: Seasonal Influenza with Vaccines\n6.6 Attachment 6: Specifications\n\nThe above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for this project. Contractor shall refer to drawings and specifications for comprehensive construction requirements.\n\nEnd of SOW","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24225B0017","product_service_code":"F108"},{"award":{"awardee":{}},"dates":{"posted":"2025-03-25","posted_at":"2025-03-25T12:11:16.431Z","created_at":"2025-03-25T12:11:13.683Z","modified_at":"2025-04-26T04:00:32.244Z","response_deadline":{"raw":"2025-03-27T11:45:00-04:00","utc":"2025-03-27T15:45:00Z","date":"2025-03-27","time":"11:45:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/0cb41252671048b5a268a12a76531861/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","agency":{"office":{"code":"36C242","name":"242-NETWORK CONTRACT OFFICE 02 (36C242)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"organization_id":"100186522","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-26","archive_type":"auto_custom"},"history":[{"index":4,"title":"7E21--NextGen Wi-Fi Upgrades Manhattan and St. Albans VAMC","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-25T12:11:16.431Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"0cb41252671048b5a268a12a76531861","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043"},{"index":2,"title":"36C24225B0017 NextGen WiFi Upgrades Manhattan, St. Albans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-07T12:27:02.629Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"617a672dac134f7cb27ac5ba0b883539","solicitation_number":"36C24225B0017","parent_opportunity_id":"95cb2a6fe55c4643a3f5403743303043","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"},{"index":1,"title":"F108--Mold Analysis, Abatement, & Remediation Bldg. 14 BROOKLYN VAMC","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-28T21:27:05.873Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"95cb2a6fe55c4643a3f5403743303043","solicitation_number":"36C24225B0017","related_opportunity_id":"7bba52a2c8d442f3940aec8a3845b5e4"}],"contacts":[{"name":"Jean M Paul","role":"primary","email":"Jean.Paul@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"0cb41252671048b5a268a12a76531861","lineage_id":"95cb2a6fe55c4643a3f5403743303043","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-19T21:08:03.070711018Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"9daf6d7aa9719e7014a0939b7dbf5a5703a55895a8f7dffaf0516a4c98b46e3f","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-19T21:08:03.070711018Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"VA New York Harbor HCS 12/17/24\n423 East 23rd St. \nNew York, NY 10010\nPage 2 of 8\nCONSTRUCTION SCOPE OF WORK\nEHRM NEXTGEN WIFI UPGRADES\n\n\n\nPROJECT NO:  630-22-704\nPROJECT NAME:  EHRM NextGen WiFi Upgrades   New York Harbor Healthcare System\n1. GENERAL INTENT:\n\nThe Contractor shall furnish all labor, tools, materials and equipment to support installation of new WiFi Access Points at the Margaret Cochran Corbin VA Medical center in Manhattan 423 East 23rd St. New York, NY and at the St Albans medical center located at  179-00 Linden Blvd Queens, NY. Please note that the scope of this work is limited and specifically as listed below.\n\n2.  STATEMENT OF WORK:  \n\nProvide and install conduit, raceways, horizontal and vertical penetrations, and fire stopping to support NextGen WiFi installation at the New York Harbor healthcare system as shown and described in the project drawings and specifications. A list of required access point locations requiring conduits and/or penetrations are provided as SOW Attachment 1.  SOW Attachment 2 and 2A include access point floor plans of the two medical centers.\n\nWork shall include:\n\n1. Installation of 180 WiFi Access Points (WAP s). WAP s will be provided by the VA, but the mounting brackets shall be provided by the Contractor.  (154 access points are located at Manhattan campus and 26 at St Albans campus.)\n\n2. Supply and Installation of 600 linear feet of EMT conduit, including junction boxes, pull cords, and fire stopping, throughout the Medical Centers. Existing conduit paths between floors/IT rooms will not have the capacity for more cable and new conduit paths will need to be created.  Most AP s will be wired to a telecommunication room on same floor however Manhattan Building 2 and 3, and St. Albans Buildings 89 and 85_86 are exceptions requiring vertical conduit pathways- see attached drawings for details.\n\nConduit sleeves are required from WAP room locations to corridors.  Once in corridor it is expected that cable will travel in existing cable trays.  Where cable tray is not present, J-Hooks shall be utilized if existing J-Hooks have not been previously installed or are at capacity.   Include pricing for supply and installation of (400) J Hooks.  Turnover any unused J-Hooks to VA at end of job.\n\nWhere the cables passes through a smoke zone as seen in drawings as a corridor door, provide and install a smoke rated sleeve e.g. EZ Path 44NEZ or equal where existing sleeves don t exist.  Also utilize the smoke rated sleeve for all penetrations into telecommunication rooms.  Assume Qty (94) to be required, turn over any unused sleeves to VA at end of job.\n\n3. Installation of approximately 36,000 linear feet of CAT 6A cable from APs to nearest IT rooms and terminating in a patch panel. WAP locations and IT room locations are shown on drawings.\n\n4. Infection Control Procedures.  \nWhen removing ceiling tiles in corridors and inpatient sleeping rooms,  all work must be done within mobile HEPA containment containers.  Contractor will be responsible for providing , renting if needed, and transporting such containers.   A  minimum of two HEPA carts will be required while pulling cable.  \n\nAll work will be performed during business hours, Monday thru Friday, 8 AM to 4:30 PM.\n\n3. PERIOD OF PERFORMANCE:\n\n3.1 Work timelines and completion progress shall be communicated to the COR for tracking purposes.Â \nÂ \n3.2 Work described in Section 2 shall be completed within 10 weeks of NTP\n\n4. REFERENCES:\n\n4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0Â  (Attachment 3).\n4.2      Infrastructure Standard for Telecommunication Spaces Vers 3.1     https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf  \n\n\n5. SPECIFICATIONS:\n\nDIVISION 01 - GENERAL REQUIREMENTS\n01 00 00 General Requirements\n01 32 16.15 Project Schedule\n01 33 23 Shop Drawings, Product Data, and Samples\n01 35 26 Safety Requirements\n01 74 19 Construction Waste Management\n\nDIVISION 07   THERMAL AND MOISTURE PROTECTION\n07 84 00 Firestopping\n\nDIVISION 27   COMMUNICATIONS\n27 05 11 Requirements for Communications Installations\n27 05 33 Raceways and Boxes for Communications Systems\n27 15 00 Communications Structured Cabling \n\n6. SUBMITTALS:\n\nThe contractor shall submit the following submittals for review:\nProduct data and sample of conduit or raceway , smoke rated sleeves and Cat 6A cable.\nAs-built drawings for all data locations and labels.  The Contractor shall provide the central drawing set to the Owner at the end of the project.  The marked-up drawing set will accurately depict the as-built status of the system. \n6. ATTACHMENTS:\n\n6.1 Attachment 1: List of Access Point locations and site prep requirements.\n6.2 Attachment 2 and 2A: NextGen WiFi Access Point location drawings\n6.3 Attachment 3: VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0\n6.4 Attachment 4: Sensitive Infrastructure Data Classification Memo\n6.5 Attachment 5: Seasonal Influenza with Vaccines\n6.6 Attachment 6: Specifications\n\nThe above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for this project. Contractor shall refer to drawings and specifications for comprehensive construction requirements. \n\nEnd of SOW","text":"VA New York Harbor HCS 12/17/24\n423 East 23rd St.\nNew York, NY 10010\nPage 2 of 8\nCONSTRUCTION SCOPE OF WORK\nEHRM NEXTGEN WIFI UPGRADES\n\nPROJECT NO: 630-22-704\nPROJECT NAME: EHRM NextGen WiFi Upgrades New York Harbor Healthcare System\n1. GENERAL INTENT:\n\nThe Contractor shall furnish all labor, tools, materials and equipment to support installation of new WiFi Access Points at the Margaret Cochran Corbin VA Medical center in Manhattan 423 East 23rd St. New York, NY and at the St Albans medical center located at 179-00 Linden Blvd Queens, NY. Please note that the scope of this work is limited and specifically as listed below.\n\n2. STATEMENT OF WORK:\n\nProvide and install conduit, raceways, horizontal and vertical penetrations, and fire stopping to support NextGen WiFi installation at the New York Harbor healthcare system as shown and described in the project drawings and specifications. A list of required access point locations requiring conduits and/or penetrations are provided as SOW Attachment 1. SOW Attachment 2 and 2A include access point floor plans of the two medical centers.\n\nWork shall include:\n\n1. Installation of 180 WiFi Access Points (WAP s). WAP s will be provided by the VA, but the mounting brackets shall be provided by the Contractor. (154 access points are located at Manhattan campus and 26 at St Albans campus.)\n\n2. Supply and Installation of 600 linear feet of EMT conduit, including junction boxes, pull cords, and fire stopping, throughout the Medical Centers. Existing conduit paths between floors/IT rooms will not have the capacity for more cable and new conduit paths will need to be created. Most AP s will be wired to a telecommunication room on same floor however Manhattan Building 2 and 3, and St. Albans Buildings 89 and 85_86 are exceptions requiring vertical conduit pathways- see attached drawings for details.\n\nConduit sleeves are required from WAP room locations to corridors. Once in corridor it is expected that cable will travel in existing cable trays. Where cable tray is not present, J-Hooks shall be utilized if existing J-Hooks have not been previously installed or are at capacity. Include pricing for supply and installation of (400) J Hooks. Turnover any unused J-Hooks to VA at end of job.\n\nWhere the cables passes through a smoke zone as seen in drawings as a corridor door, provide and install a smoke rated sleeve e.g. EZ Path 44NEZ or equal where existing sleeves don t exist. Also utilize the smoke rated sleeve for all penetrations into telecommunication rooms. Assume Qty (94) to be required, turn over any unused sleeves to VA at end of job.\n\n3. Installation of approximately 36,000 linear feet of CAT 6A cable from APs to nearest IT rooms and terminating in a patch panel. WAP locations and IT room locations are shown on drawings.\n\n4. Infection Control Procedures.\nWhen removing ceiling tiles in corridors and inpatient sleeping rooms, all work must be done within mobile HEPA containment containers. Contractor will be responsible for providing , renting if needed, and transporting such containers. A minimum of two HEPA carts will be required while pulling cable.\n\nAll work will be performed during business hours, Monday thru Friday, 8 AM to 4:30 PM.\n\n3. PERIOD OF PERFORMANCE:\n\n3.1 Work timelines and completion progress shall be communicated to the COR for tracking purposes.Â\nÂ\n3.2 Work described in Section 2 shall be completed within 10 weeks of NTP\n\n4. REFERENCES:\n\n4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0Â (Attachment 3).\n4.2 Infrastructure Standard for Telecommunication Spaces Vers 3.1 https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf\n\n5. SPECIFICATIONS:\n\nDIVISION 01 - GENERAL REQUIREMENTS\n01 00 00 General Requirements\n01 32 16.15 Project Schedule\n01 33 23 Shop Drawings, Product Data, and Samples\n01 35 26 Safety Requirements\n01 74 19 Construction Waste Management\n\nDIVISION 07 THERMAL AND MOISTURE PROTECTION\n07 84 00 Firestopping\n\nDIVISION 27 COMMUNICATIONS\n27 05 11 Requirements for Communications Installations\n27 05 33 Raceways and Boxes for Communications Systems\n27 15 00 Communications Structured Cabling\n\n6. SUBMITTALS:\n\nThe contractor shall submit the following submittals for review:\nProduct data and sample of conduit or raceway , smoke rated sleeves and Cat 6A cable.\nAs-built drawings for all data locations and labels. The Contractor shall provide the central drawing set to the Owner at the end of the project. The marked-up drawing set will accurately depict the as-built status of the system.\n6. ATTACHMENTS:\n\n6.1 Attachment 1: List of Access Point locations and site prep requirements.\n6.2 Attachment 2 and 2A: NextGen WiFi Access Point location drawings\n6.3 Attachment 3: VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0\n6.4 Attachment 4: Sensitive Infrastructure Data Classification Memo\n6.5 Attachment 5: Seasonal Influenza with Vaccines\n6.6 Attachment 6: Specifications\n\nThe above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for this project. Contractor shall refer to drawings and specifications for comprehensive construction requirements.\n\nEnd of SOW","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24225B0017","product_service_code":"7E21"}],"due_at":"2025-03-27T15:45:00Z","due_date":"2025-03-27","closes_at":"2025-03-27T15:45:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","state":"NY","county":"36061","county_name":"New York County","city":"3651000","city_name":"New York","country":"USA","state_source":null,"state_evidence":"Product purchase (PSC 7E21)","site_key":"brooklyn-va-medical-center-ny","winner_key":"LM9XGNLXA1L1","amount":null,"linked_awards":4,"cancelled":false,"archived":true,"updated_at":"2026-11-19T21:44:27.760751Z","principal_notice_id":"0cb41252671048b5a268a12a76531861","description":{"text":"VA New York Harbor HCS 12/17/24\n423 East 23rd St.\nNew York, NY 10010\nPage 2 of 8\nCONSTRUCTION SCOPE OF WORK\nEHRM NEXTGEN WIFI UPGRADES\n\nPROJECT NO: 630-22-704\nPROJECT NAME: EHRM NextGen WiFi Upgrades New York Harbor Healthcare System\n1. GENERAL INTENT:\n\nThe Contractor shall furnish all labor, tools, materials and equipment to support installation of new WiFi Access Points at the Margaret Cochran Corbin VA Medical center in Manhattan 423 East 23rd St. New York, NY and at the St Albans medical center located at 179-00 Linden Blvd Queens, NY. Please note that the scope of this work is limited and specifically as listed below.\n\n2. STATEMENT OF WORK:\n\nProvide and install conduit, raceways, horizontal and vertical penetrations, and fire stopping to support NextGen WiFi installation at the New York Harbor healthcare system as shown and described in the project drawings and specifications. A list of required access point locations requiring conduits and/or penetrations are provided as SOW Attachment 1. SOW Attachment 2 and 2A include access point floor plans of the two medical centers.\n\nWork shall include:\n\n1. Installation of 180 WiFi Access Points (WAP s). WAP s will be provided by the VA, but the mounting brackets shall be provided by the Contractor. (154 access points are located at Manhattan campus and 26 at St Albans campus.)\n\n2. Supply and Installation of 600 linear feet of EMT conduit, including junction boxes, pull cords, and fire stopping, throughout the Medical Centers. Existing conduit paths between floors/IT rooms will not have the capacity for more cable and new conduit paths will need to be created. Most AP s will be wired to a telecommunication room on same floor however Manhattan Building 2 and 3, and St. Albans Buildings 89 and 85_86 are exceptions requiring vertical conduit pathways- see attached drawings for details.\n\nConduit sleeves are required from WAP room locations to corridors. Once in corridor it is expected that cable will travel in existing cable trays. Where cable tray is not present, J-Hooks shall be utilized if existing J-Hooks have not been previously installed or are at capacity. Include pricing for supply and installation of (400) J Hooks. Turnover any unused J-Hooks to VA at end of job.\n\nWhere the cables passes through a smoke zone as seen in drawings as a corridor door, provide and install a smoke rated sleeve e.g. EZ Path 44NEZ or equal where existing sleeves don t exist. Also utilize the smoke rated sleeve for all penetrations into telecommunication rooms. Assume Qty (94) to be required, turn over any unused sleeves to VA at end of job.\n\n3. Installation of approximately 36,000 linear feet of CAT 6A cable from APs to nearest IT rooms and terminating in a patch panel. WAP locations and IT room locations are shown on drawings.\n\n4. Infection Control Procedures.\nWhen removing ceiling tiles in corridors and inpatient sleeping rooms, all work must be done within mobile HEPA containment containers. Contractor will be responsible for providing , renting if needed, and transporting such containers. A minimum of two HEPA carts will be required while pulling cable.\n\nAll work will be performed during business hours, Monday thru Friday, 8 AM to 4:30 PM.\n\n3. PERIOD OF PERFORMANCE:\n\n3.1 Work timelines and completion progress shall be communicated to the COR for tracking purposes.Â\nÂ\n3.2 Work described in Section 2 shall be completed within 10 weeks of NTP\n\n4. REFERENCES:\n\n4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0Â (Attachment 3).\n4.2 Infrastructure Standard for Telecommunication Spaces Vers 3.1 https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf\n\n5. SPECIFICATIONS:\n\nDIVISION 01 - GENERAL REQUIREMENTS\n01 00 00 General Requirements\n01 32 16.15 Project Schedule\n01 33 23 Shop Drawings, Product Data, and Samples\n01 35 26 Safety Requirements\n01 74 19 Construction Waste Management\n\nDIVISION 07 THERMAL AND MOISTURE PROTECTION\n07 84 00 Firestopping\n\nDIVISION 27 COMMUNICATIONS\n27 05 11 Requirements for Communications Installations\n27 05 33 Raceways and Boxes for Communications Systems\n27 15 00 Communications Structured Cabling\n\n6. SUBMITTALS:\n\nThe contractor shall submit the following submittals for review:\nProduct data and sample of conduit or raceway , smoke rated sleeves and Cat 6A cable.\nAs-built drawings for all data locations and labels. The Contractor shall provide the central drawing set to the Owner at the end of the project. The marked-up drawing set will accurately depict the as-built status of the system.\n6. ATTACHMENTS:\n\n6.1 Attachment 1: List of Access Point locations and site prep requirements.\n6.2 Attachment 2 and 2A: NextGen WiFi Access Point location drawings\n6.3 Attachment 3: VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0\n6.4 Attachment 4: Sensitive Infrastructure Data Classification Memo\n6.5 Attachment 5: Seasonal Influenza with Vaccines\n6.6 Attachment 6: Specifications\n\nThe above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for this project. Contractor shall refer to drawings and specifications for comprehensive construction requirements.\n\nEnd of SOW","html":"VA New York Harbor HCS 12/17/24\n423 East 23rd St. \nNew York, NY 10010\nPage 2 of 8\nCONSTRUCTION SCOPE OF WORK\nEHRM NEXTGEN WIFI UPGRADES\n\n\n\nPROJECT NO:  630-22-704\nPROJECT NAME:  EHRM NextGen WiFi Upgrades   New York Harbor Healthcare System\n1. GENERAL INTENT:\n\nThe Contractor shall furnish all labor, tools, materials and equipment to support installation of new WiFi Access Points at the Margaret Cochran Corbin VA Medical center in Manhattan 423 East 23rd St. New York, NY and at the St Albans medical center located at  179-00 Linden Blvd Queens, NY. Please note that the scope of this work is limited and specifically as listed below.\n\n2.  STATEMENT OF WORK:  \n\nProvide and install conduit, raceways, horizontal and vertical penetrations, and fire stopping to support NextGen WiFi installation at the New York Harbor healthcare system as shown and described in the project drawings and specifications. A list of required access point locations requiring conduits and/or penetrations are provided as SOW Attachment 1.  SOW Attachment 2 and 2A include access point floor plans of the two medical centers.\n\nWork shall include:\n\n1. Installation of 180 WiFi Access Points (WAP s). WAP s will be provided by the VA, but the mounting brackets shall be provided by the Contractor.  (154 access points are located at Manhattan campus and 26 at St Albans campus.)\n\n2. Supply and Installation of 600 linear feet of EMT conduit, including junction boxes, pull cords, and fire stopping, throughout the Medical Centers. Existing conduit paths between floors/IT rooms will not have the capacity for more cable and new conduit paths will need to be created.  Most AP s will be wired to a telecommunication room on same floor however Manhattan Building 2 and 3, and St. Albans Buildings 89 and 85_86 are exceptions requiring vertical conduit pathways- see attached drawings for details.\n\nConduit sleeves are required from WAP room locations to corridors.  Once in corridor it is expected that cable will travel in existing cable trays.  Where cable tray is not present, J-Hooks shall be utilized if existing J-Hooks have not been previously installed or are at capacity.   Include pricing for supply and installation of (400) J Hooks.  Turnover any unused J-Hooks to VA at end of job.\n\nWhere the cables passes through a smoke zone as seen in drawings as a corridor door, provide and install a smoke rated sleeve e.g. EZ Path 44NEZ or equal where existing sleeves don t exist.  Also utilize the smoke rated sleeve for all penetrations into telecommunication rooms.  Assume Qty (94) to be required, turn over any unused sleeves to VA at end of job.\n\n3. Installation of approximately 36,000 linear feet of CAT 6A cable from APs to nearest IT rooms and terminating in a patch panel. WAP locations and IT room locations are shown on drawings.\n\n4. Infection Control Procedures.  \nWhen removing ceiling tiles in corridors and inpatient sleeping rooms,  all work must be done within mobile HEPA containment containers.  Contractor will be responsible for providing , renting if needed, and transporting such containers.   A  minimum of two HEPA carts will be required while pulling cable.  \n\nAll work will be performed during business hours, Monday thru Friday, 8 AM to 4:30 PM.\n\n3. PERIOD OF PERFORMANCE:\n\n3.1 Work timelines and completion progress shall be communicated to the COR for tracking purposes.Â \nÂ \n3.2 Work described in Section 2 shall be completed within 10 weeks of NTP\n\n4. REFERENCES:\n\n4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0Â  (Attachment 3).\n4.2      Infrastructure Standard for Telecommunication Spaces Vers 3.1     https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf  \n\n\n5. SPECIFICATIONS:\n\nDIVISION 01 - GENERAL REQUIREMENTS\n01 00 00 General Requirements\n01 32 16.15 Project Schedule\n01 33 23 Shop Drawings, Product Data, and Samples\n01 35 26 Safety Requirements\n01 74 19 Construction Waste Management\n\nDIVISION 07   THERMAL AND MOISTURE PROTECTION\n07 84 00 Firestopping\n\nDIVISION 27   COMMUNICATIONS\n27 05 11 Requirements for Communications Installations\n27 05 33 Raceways and Boxes for Communications Systems\n27 15 00 Communications Structured Cabling \n\n6. SUBMITTALS:\n\nThe contractor shall submit the following submittals for review:\nProduct data and sample of conduit or raceway , smoke rated sleeves and Cat 6A cable.\nAs-built drawings for all data locations and labels.  The Contractor shall provide the central drawing set to the Owner at the end of the project.  The marked-up drawing set will accurately depict the as-built status of the system. \n6. ATTACHMENTS:\n\n6.1 Attachment 1: List of Access Point locations and site prep requirements.\n6.2 Attachment 2 and 2A: NextGen WiFi Access Point location drawings\n6.3 Attachment 3: VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0\n6.4 Attachment 4: Sensitive Infrastructure Data Classification Memo\n6.5 Attachment 5: Seasonal Influenza with Vaccines\n6.6 Attachment 6: Specifications\n\nThe above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for this project. Contractor shall refer to drawings and specifications for comprehensive construction requirements. \n\nEnd of SOW","origin":"detail"},"contacts":[{"name":"Jean M Paul","role":"primary","email":"Jean.Paul@va.gov","title":"Contract Specialist"}],"place_of_performance":null,"office_address":{"zip":"12208","city":"ALBANY","state":"NY","country":"USA"},"naics_codes":["238210"],"award":{"awardee":{}},"attachments":[{"resource_id":"7086f79978d147ef8ef8cb29843505b1","name":"36C24225B0017.docx","kind":"file","mime_type":".docx","size_bytes":21099,"posted_at":"2025-02-04T15:24:51.355Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7086f79978d147ef8ef8cb29843505b1/download","mirrored":false},{"resource_id":"8d93c41e03d34fd1afeac2683479b7ef","name":"36C24225B0017_1.docx","kind":"file","mime_type":".docx","size_bytes":103972,"posted_at":"2025-02-28T21:27:05.873Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8d93c41e03d34fd1afeac2683479b7ef/download","mirrored":false},{"resource_id":"eba7438709d24679a7c48da047864d97","name":"WAGE-RATES.docx","kind":"file","mime_type":".docx","size_bytes":39387,"posted_at":"2025-02-28T21:27:05.873Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/eba7438709d24679a7c48da047864d97/download","mirrored":false},{"resource_id":"6021c9c7885544a5b2208d6ac797e89b","name":"S02 SPECS .pdf","kind":"file","mime_type":".pdf","size_bytes":5134519,"posted_at":"2025-02-28T21:27:05.873Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6021c9c7885544a5b2208d6ac797e89b/download","mirrored":false},{"resource_id":"8901f5823ade4674b11008553f3edf26","name":"S02 DRAWINGS .pdf","kind":"file","mime_type":".pdf","size_bytes":1643494,"posted_at":"2025-02-28T21:27:05.873Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8901f5823ade4674b11008553f3edf26/download","mirrored":false},{"resource_id":"9ab2cc9eec544207b5b314a49222b6b8","name":"C10 VA ID PACKAGE UPDATED 12-19-2023.pdf","kind":"file","mime_type":".pdf","size_bytes":869326,"posted_at":"2025-02-28T21:27:05.873Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9ab2cc9eec544207b5b314a49222b6b8/download","mirrored":false},{"resource_id":"10883925af8f4c45ad08dc47379cd6ea","name":"C22 ALL POSTERS.pdf","kind":"file","mime_type":".pdf","size_bytes":2407357,"posted_at":"2025-02-28T21:27:05.873Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/10883925af8f4c45ad08dc47379cd6ea/download","mirrored":false},{"resource_id":"41620535089b4359ba054571cbb8b1b6","name":"ADDITIONAL INSERTS.doc","kind":"file","mime_type":".doc","size_bytes":28160,"posted_at":"2025-02-28T21:27:05.873Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/41620535089b4359ba054571cbb8b1b6/download","mirrored":false},{"resource_id":"5084ce7ce2ad42d9a8ceadd0f070ab7e","name":"Attachment 4 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATION (1).pdf","kind":"file","mime_type":".pdf","size_bytes":125619,"posted_at":"2025-02-28T21:27:05.873Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5084ce7ce2ad42d9a8ceadd0f070ab7e/download","mirrored":false},{"resource_id":"29b08f85bdee4b4d8bfb6611ddf849f4","name":"Attachment 5 FAR 52.225-2 BUY AMERICAN CERTIFICATE.pdf","kind":"file","mime_type":".pdf","size_bytes":136329,"posted_at":"2025-02-28T21:27:05.873Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/29b08f85bdee4b4d8bfb6611ddf849f4/download","mirrored":false},{"resource_id":"9aba45f0f77b4f77852740642a6b1ae8","name":"36C24225B0017 0001.docx","kind":"file","mime_type":".docx","size_bytes":122468,"posted_at":"2025-03-25T12:11:16.431Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9aba45f0f77b4f77852740642a6b1ae8/download","mirrored":false},{"resource_id":"59eefb6f802145a28eb561636e9c7ac6","name":"SAMPLE BID SHEET WiFi UPGRADE.docx","kind":"file","mime_type":".docx","size_bytes":14006,"posted_at":"2025-03-25T12:11:16.431Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/59eefb6f802145a28eb561636e9c7ac6/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C24225C0044_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C24225C0044_3600_-NONE-_-NONE-/","piid":"36C24225C0044","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"LM9XGNLXA1L1","recipient_name":"TW PROFESSIONAL SOLUTIONS LLC","recipient_uei":"LM9XGNLXA1L1","recipient_cage":"8P7D5","recipient_city":"LITHIA SPRINGS","recipient_state":"GA","sub_name":"Department of Veterans Affairs","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","office_key":"o-36C242","first_action_date":"2025-05-12","last_action_date":"2025-08-15","actions":2,"obligated":"198791.00","current_total_value":"198791.00","potential_total_value":"198791.00","naics":"238210","psc":"7E21","extent_competed":"COMPETED UNDER SAP","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":3,"description":"NEXT GEN WIFI UPGRADE","method":"solicitation","confidence":"high","evidence":["solicitation number 36C24225B0017 equals the FPDS solicitation identifier","same awarding office 36C242"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C24226R0115","latest_notice_id":"90161704ac554dd8b698d6922b32b544","title":"X1DB--Valley Stream CBOC - New Replacing Lease (VA-28-00000026)","solicitation_number":"36C24226R0115","notice_type":"r","first_type":"r","first_posted":"2026-11-06","last_posted":"2026-11-06","notices":1,"due_at":"2026-11-27T09:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T09:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"531120","psc":"X1DB","set_aside":null,"state":"NY","county":"36059","county_name":"Nassau County","city":"3676705","city_name":"Valley Stream","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-07T04:54:53.607561Z"},{"key":"36C24227R0010","latest_notice_id":"c95dcd81879b4a90b11678c8a80b3462","title":"F108--620-26-206 Asbestos Abatement","solicitation_number":"36C24227R0010","notice_type":"o","first_type":"p","first_posted":"2026-10-23","last_posted":"2026-11-19","notices":8,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"562910","psc":"F108","set_aside":"SDVOSBC","state":"NY","county":"36119","county_name":"Westchester County","city":"3648208","city_name":"Montrose","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C24227Q0135","latest_notice_id":"878a17ea716349ce875349b4308f3e10","title":"Y1DA--STATION-CONST TBD OIG RENOVATION","solicitation_number":"36C24227Q0135","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":2,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"236220","psc":"Y1DA","set_aside":"SDVOSBC","state":"NY","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"description","state_evidence":"ANTEEN OPERATIONS. LOCATION: MARGARET COCHRAN CORBIN VA CAMPUS 423 EAST, 23RD STREET NEW YORK, NY 10010","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C24227Q0122","latest_notice_id":"ab2010ecef12446face409c44090d58a","title":"8910--East Orange Milk and Dairy","solicitation_number":"36C24227Q0122","notice_type":"o","first_type":"p","first_posted":"2026-11-09","last_posted":"2026-11-24","notices":2,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"311511","psc":"8910","set_aside":"SBA","state":"NJ","county":"34013","county_name":"Essex County","city":"3419390","city_name":"East Orange","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 8910)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C24227Q0091","latest_notice_id":"5d73616203d447e888c36d0c3fdea423","title":"R425--FY 27 Service (Base+4) | NYH Energy Control Procedures/LOTO Services | 630","solicitation_number":"36C24227Q0091","notice_type":"k","first_type":"k","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"541330","psc":"R425","set_aside":"SDVOSBC","state":"NY","county":"36061","county_name":"New York County","city":"3651000","city_name":"New York","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"}],"similar_open":[{"key":"36C24627Q0114","latest_notice_id":"9464cbfda7004348805568dfa367e88c","title":"5975--INSTALLATION OF PROXIMITY SENSORS FOR AUTOMATIC DOORS","solicitation_number":"36C24627Q0114","notice_type":"o","first_type":"r","first_posted":"2026-11-04","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-25T15:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C246","office_name":"246-NETWORK CONTRACTING OFFICE 6 (36C246)","naics":"238210","psc":"5975","set_aside":null,"state":"NC","county":"37051","county_name":"Cumberland County","city":"3722920","city_name":"Fayetteville","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":"Product purchase (PSC 5975)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"1232SA27Q0021","latest_notice_id":"8c35373e3e5c4e3bb88b3fb51c3ea2c1","title":"Electrical Installation of 5-Station Cubicle and One Single Hotel Desk Arrangement","solicitation_number":"1232SA27Q0021","notice_type":"k","first_type":"k","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12H2","sub_name":"AGRICULTURAL RESEARCH SERVICE","office_key":"o-1232SA","office_name":"USDA ARS AFM APD","naics":"238210","psc":"N059","set_aside":"SBA","state":"WI","county":"55025","county_name":"Dane County","city":"5548000","city_name":"Madison","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"1240LU26Q0132","latest_notice_id":"7772e7cbaf1a46409b142ded751c8ec8","title":"USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements","solicitation_number":"1240LU26Q0132","notice_type":"k","first_type":"k","first_posted":"2026-09-24","last_posted":"2026-11-05","notices":4,"due_at":"2026-11-26T00:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-1240LU","office_name":"USDA-FS, CSA INTERMOUNTAIN 9","naics":"238210","psc":"N061","set_aside":"SBA","state":"MT","county":"30031","county_name":"Gallatin County","city":"3079525","city_name":"West Yellowstone","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"}],"similar_open_total":42,"indexable":false}