# Replace Roofs and Repair Facades Phase 1 at Northport VA Medical Center 79 Middleville RD, Northport, NY 11768

Canonical: https://sealedbidder.com/opportunities/36c24225b0015

- Solicitation number: 36C24225B0015
- Notice type: Solicitation (first published as presolicitation)
- Status: Awarded to Veterans Contracting Group, Inc.
- Department: Department of Veterans Affairs
- Contracting office: 242-Network Contract Office 02 (36C242)
- NAICS: 238160 Roofing Contractors
- Product or service code: Z1DA Maintenance Of Hospitals And Infirmaries
- Set-aside: Service-disabled veteran-owned small business set-aside
- Small business size standard: $19 million in average annual receipts (13 CFR 121.201, NAICS 238160)
- Location read from: the notice's place of performance
- County: Suffolk County (FIPS 36103). https://sealedbidder.com/counties/suffolk-county-ny-36103
- City: Northport. https://sealedbidder.com/cities/northport-ny-3653396
- First posted: February 13, 2025
- Last posted: April 28, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/fdff85e81c6b4920a72959fd8c7e403b/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: Service-disabled veteran-owned small business set-aside. Reserved for service-disabled veteran-owned small businesses. Small, under NAICS 238160 (roofing contractors), means no more than $19 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 32 days from the day the solicitation was posted, April 4, 2025, to the deadline. The deadline moved once: it was first April 24, 2025 and ended as May 6, 2025.
- Before the solicitation: The agency published a presolicitation on February 13, 2025, 50 days before the solicitation.
- How it ended: Awarded to Veterans Contracting Group, Inc. on July 31, 2025, 86 days after offers were due. The contracting office reported 3 offers (full and open competition after exclusion of sources).

## Description

Replace Roofs and Repair Facades Phase 1; Solicitation No. 36C24225B0015; Project No. 632-16-103 at Northport VA Medical Center, 79 Middleville Rd, Northport, NY 11768.
The purpose of this amendment is to provide responses to Request for Information (RFI) and Questions, RFIs and Questions responses are hereby included. Please see below for detailed information.
Request for Information/Question Responses
1. Based on the proposed phasing plan, it shows that we ll be required to proceed with the front of Buildings 61 & 62 for phase 1, and the back of Buildings 61 & 62 or phase 2.
Is there any way we would be able work on both the front & back of Buildings 61 & 62 concurrently?
Response:
As per contract documents, the Phase 1 is a streetside of the buildings 61&62 and the Phase 2 is a courtyard of the building 61&62. It was concerns of the extent of site disturbance, and if the GC could complete both sides concurrently which requires multiple dumpsters and staging on both sides of the building (due to the tunnels between buildings limiting the ease of access from one side of the building to the other).   The construction work will proceed in accordance with the terms outlined in the existing contract. The GC will provide construction phasing during project submittal phase for approval.
If we cannot work on the entirety of both buildings at once, would it be acceptable for phase 1 to completely finish Building 61, and then move to Building 62 for phase 2?
Response:
See response above.
2. Can you please provide the most recent asbestos / lead report?
Response:
See attached Environmental Report.
3. Can the Superintendent fulfill the Quality Control Manager (QCM) role?
Response:
The project superintendent will be held responsible for the equality of work. The QCM or CQC System manager should be on the site at all times during construction and is employed by the GC. It shall be provided alternate to serve in the event of the SDQC manager s absence. The requirements for alternate the same as for CQC Manager.
4. Is the QCM required to be onsite full-time, or can they make site visits as required for inspections?
Response:
See response above.
5. Can the Superintendent fulfill the Site Safety & Health Officer (SSHO) role?
Response:
The Competent person to fulfill the Site Safety & Health Officer (SSHO) role can have collateral duties as the superintendent.
6. What is the actual linear footage for the repointing?
Response:
Per the G002 General Notes  F  &  G  Contactor to verify all site dimensions and existing conditions prior to work occurring.  Contractors shall report any discrepancies to the govt prior to starting construction.  Commencement of the work by the contractor shall imply his acceptance of all existing conditions.
 contractor shall verify all conditions and dimensions at the job site prior to the star of construction
7. What is the actual linear footage for the rebricking?
Response:
Per the G002 General Notes  F  &  G
Contactor to verify all site dimensions and existing conditions prior to work occurring.  Contractors shall report any discrepancies to the govt prior to starting construction.  Commencement of the work by the contractor shall imply his acceptance of all existing conditions.
 contractor shall verify all conditions and dimensions at the job site prior to the star of construction
8. What is the actual linear footage for the lintels?
Response:
Per the G002 General Notes  F  &  G
Contactor to verify all site dimensions and existing conditions prior to work occurring.  Contractors shall report any discrepancies to the govt prior to starting construction.  Commencement of the work by the contractor shall imply his acceptance of all existing conditions.
 contractor shall verify all conditions and dimensions at the job site prior to the star of construction
Lintel quantities and approx. sizes are notes on the Hazardous Materials Lead sheets (HL100 thru HL107)
9. What is the actual linear footage of the windowsills?
Response:
Per the G002 General Notes  F  &  G
Contactor to verify all site dimensions and existing conditions prior to work occurring.  Contractors shall report any discrepancies to the govt prior to starting construction.  Commencement of the work by the contractor shall imply his acceptance of all existing conditions.
 contractor shall verify all conditions and dimensions at the job site prior to the star of construction
10. Does this scope require pipe scaffolding for safety, or will a lift be acceptable in some areas?
Response:
Per specification, the scaffolding shall be as approved by a professional engineer contracted by the GC.  Therefore, the GC s engineer would need to review and advise.  Please note Scaffolding requirements are further noted within spec section 01 35 26 as well as within G002 demo notes  U ,  V , &  AK
11. Please confirm if the replacement roof will require a 10, 20, or 30 year warranty.
Response:
All warranty requirements are as noted within the specifications.
Per spec section 07 31 13 ASPHALT SHINGLES section 1.7  warranty  notes a 30 year warranty as well as wind & algae warranty requirements.
Per spec section 07 53 23 EPDM Roofing section 1.10  warranty  notes a 30 year warranty.

12. Sign-in Sheet Request.
Response:

No Further Questions.

## Attachments

- [36C24225B0015.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/97cd58e962664f07969a139cafd6cd71/download)
- [36C24225B0015_1.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c5ab396a5d754b769591aba271224d84/download)
- [Department of Veterans Affairs](https://va.gov/) (link)
- [Attachment 1 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATION.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b6a67b0566fe4c91b839eeb366ca7915/download)
- [Attachment 2 52.225-2 Buy American Certificate.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/05dba460400e425aa52d566d0321db85/download)
- [Attachment 3 632-16-103 RoofFacadePhase1 Drawings.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5bf8e030945048ebb6d9f94e206bb39e/download)
- [Attachment 4 632-16-103 RoofFacadePhase1 SPECS.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ceece66b1c48433f8be53f682c3c7e10/download)
- [Attachment 5 Participation Goals for Minorities and Females.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/04730ff069854712bce0520e6ef101ee/download)
- [Attachment 6 - Wage Determination__Suffolk County__New York.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/acb5beb0d512463bbe85fe99abe71b4d/download)
- [36C24225B0015 0001.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c1d7d41e128047eabfff484668f93e62/download)
- [Environmental Report 21-1742 The Pettit Group - Buildings 61 62.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/00ff2ba31d3c4fda89cf9b618c5d2240/download)

## Award on USAspending

- Recipient: Veterans Contracting Group, Inc. (UEI F2B1FMNRVJH3)
- Contract: 36C24225C0056, definitive contract
- Obligated: $4,071,023.00
- Competition: Full and Open Competition After Exclusion of Sources, 3 offers received
- Link: solicitation number 36C24225B0015 equals the FPDS solicitation identifier; same awarding office 36C242 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_36C24225C0056_3600_-NONE-_-NONE-/


## Open now in the same industry

10 open in NAICS 238160.

- DSCR Building 70 Roof Replacement (SP470327Q0006), due November 25, 2026 at 11:59 PM EST. https://sealedbidder.com/opportunities/sp470327q0006
- FCI Bastrop - Remove and Replace Housing Unit Roofs (10) 27Z5BB3 (15B50127PR000024), due November 30, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/15b50127pr000024
- GAOA Mesa Falls VC Roof Repairs in Caribou-Targhee National Forest, Idaho (1240LT27Q0003), due December 1, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/1240lt27q0003

## Publications

- February 13, 2025: Presolicitation, due April 24, 2025 at 9:00 AM EDT. Notice 4fc43a01c424465995ed43a127ed17e8. https://sam.gov/workspace/contract/opp/4fc43a01c424465995ed43a127ed17e8/view
- April 4, 2025: Solicitation, due May 6, 2025 at 10:00 AM EDT. Notice 189a45def1c34f688147b42387f8fe47. https://sam.gov/workspace/contract/opp/189a45def1c34f688147b42387f8fe47/view
- April 28, 2025: Solicitation, due May 6, 2025 at 10:00 AM EDT. Notice fdff85e81c6b4920a72959fd8c7e403b. https://sam.gov/workspace/contract/opp/fdff85e81c6b4920a72959fd8c7e403b/view

## Points of contact

- Yingjie Yeung, Contract Specialist, Yingjie.Yeung@va.gov

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/36c24225b0015.