{"canonical":"https://sealedbidder.com/opportunities/36c24127q0080","key":"36C24127Q0080","url":"https://sealedbidder.com/opportunities/36c24127q0080","title":"J041--Chiller System Maintenance","solicitation_number":"36C24127Q0080","notice_type":"s","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-11-25T17:00:00Z","first_posted":"2026-11-19","last_posted":"2026-11-19","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"238220","psc":"J041","set_aside":null,"place_state":"MA","place_scope":"site","site":null,"place_state_source":"description","place_evidence":"MEDICAL CENTER, 1400 VFW PARKWAY, WEST ROXBURY, MA 02132","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"6b8fbf1ac7e748b7b14eb744211ac31a","title":"J041--Chiller System Maintenance","solicitation_number":"36C24127Q0080","notice_type":"s","base_type":"s","posted":"2026-11-19","posted_at":"2026-11-19T19:21:01.750Z","due_at":"2026-11-25T17:00:00Z","due_date":"2026-11-25","cancelled":false,"archived":false,"archive_date":"2027-01-24","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6b8fbf1ac7e748b7b14eb744211ac31a/view","enriched":true,"history":[{"index":1,"title":"J041--Chiller System Maintenance","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-19T19:21:01.750Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"6b8fbf1ac7e748b7b14eb744211ac31a","solicitation_number":"36C24127Q0080"}]}],"latest_notice_id":"6b8fbf1ac7e748b7b14eb744211ac31a","first_type":"s","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-11-19","posted_at":"2026-11-19T19:21:01.750Z","created_at":"2026-11-19T19:20:58.469Z","modified_at":"2026-11-19T19:21:01.750Z","response_deadline":{"raw":"2026-11-25T12:00:00-05:00","utc":"2026-11-25T17:00:00Z","date":"2026-11-25","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6b8fbf1ac7e748b7b14eb744211ac31a/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"J041--Chiller System Maintenance","agency":{"office":{"code":"36C241","name":"241-NETWORK CONTRACT OFFICE 01 (36C241)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"04330","city":"TOGUS","state":"ME","country":"USA"},"organization_id":"100176746","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-01-24","archive_type":"auto_custom"},"history":[{"index":1,"title":"J041--Chiller System Maintenance","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-19T19:21:01.750Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"6b8fbf1ac7e748b7b14eb744211ac31a","solicitation_number":"36C24127Q0080"}],"contacts":[{"name":"Issa Shawki","role":"primary","email":"issa.shawki@va.gov","phone":"774-826-3192","title":"Contracting Officer"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"6b8fbf1ac7e748b7b14eb744211ac31a","lineage_id":"6b8fbf1ac7e748b7b14eb744211ac31a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-20T08:21:15.678744853Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"c16e5e0dfa0d95d43d743e49e58247ca-28\"","fetched_at":"2026-11-20T05:29:17.372835729Z","row_sha256":"a356f27b7924b4cb910705d64b7b00514f0132889676a3b902883ad6a4235779","last_modified":"2026-11-20T04:30:19Z"},"updated_at":"2026-11-20T08:21:15.678744853Z","first_seen_at":"2026-11-20T05:29:17.372835729Z"},"description":{"html":"The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in Brockton, MA intends to enter into a sole source procurement, pursuant to the authority of FAR 6.302-1, with TRANE, for the following requirement:\n\nSTATEMENT OF WORK\n\nSCOPE OF WORK\n\nThe Contractor shall provide all supervision, personnel, material, parts, equipment, supplies, labor and transportation in performing basic preventive maintenance on the chiller systems, Ensemble controls and equipment as listed in Attachment A and located at the Department of Veterans Affairs Medical Center, 1400 VFW Parkway, West Roxbury, MA 02132 in accordance with all terms and conditions of this task order and accepted quotation.\n\nPeriod of Performance: This will be a firm-fixed price, base year plus four option years task order.\n\nDEFINITIONS/ACRONYMS\n\nContract Discrepancy Report (CDR) : A report that the Government shall complete and issue to the Contractor when service is unsatisfactory and not in compliance with the terms and conditions of the contract. The Contractor is required to complete and return this form to the COR whenever performance is unsatisfactory. The CDR requires the Contractor to explain, in writing, the cause of the unsatisfactory performance, how performance will be returned to acceptable standards, and how reoccurrence of the problem will be prevented in the future.\n\nContracting Officer (CO): The individual with the authority to enter into, administer, and/or terminate contracts. The CO is the exclusive Government official authorized to execute changes and deviations or variations in the contract.\n\nContracting Officer's Technical Representative (COTR) : A Government representative, designated in writing by the Contracting Officer, to be responsible for quality assurance, inspection, surveillance, documentation and acceptance of the Contractor's performance. A copy of the letter of designation will be provided to the Contractor.\n\nPreventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions.\nTo clean, lubricate, calibrate, and test the equipment and/or instrument to the operating condition defined in the manufacturer s specifications.\n\nRepair Cost Estimate:  The Contractors estimated cost (for parts, labor and freight) to repair a system according to manufactures' specifications and requirements. These repairs are covered under Emergency Service and repairs outside of routine maintenance.\n\nTime: When hours are given it shall mean clock hours exclusive of Saturdays, Sundays and Holidays unless otherwise specified (i.e., 1:00 P.M. Monday to 1:00 P.M. Tuesday equals 24 hours; 12:00 P.M. Friday to 12:00 P.M. Monday equals 24 hours). If days are indicated it shall mean calendar days including Saturdays, Sundays and Holidays.\n\nRework. The Contractor is required to correct and/or re-work any PM services due to unsatisfactory performance or nonperformance in accordance with the stated quality and level of effort in the PWS and final contract. Rework is performed at no additional cost to the Government.\nESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract.\n\nAcronyms. Commonly used acronyms are listed below \n\nFSE: Field Service Engineer\nAQL: Acceptable Quality Level\n\nIAW: In Accordance With\n\nQA: Quality Assurance\n\nQC: Quality Control\n\nWS: Performance Work Statement\n\nVA: VA Medical Center\n\nCO: Contracting Officer\n\nCOTR:Contracting Officer s Technical Representative FES: Facilities and Engineering Service\n\nPREVENTIVE MAINTENANCE REQUIREMENTS\n\nWithin 14 calendar days of Notice to Proceed, the vendor will submit to the COTR a written schedule of the planned PM visits for the coming year along with a written description of the work to be performed during each visit. \n\nThe following is the scope of services to be performed on Covered Equipment.  Items marked with an  X  are included in this contract.\n\nServices Included\nCooling Seasonal Service\nServices Included\nHeating Seasonal Service\nX\nSeasonal Start-up\n\nSeasonal Start-up\nX\nOperating Inspections Qty\n\nOperating Inspections Qty   \nX\nSystem Shutdown\n\nSystem Shutdown\nX\nAnnual Seasonal Maintenance\n\nAnnual Seasonal Maintenance\n\n\nServices Included\nLabor and Materials for Covered Equipment\nX\nScheduled Maintenance Labor\nX\nScheduled Maintenance Parts and Materials\nX\nRepair Labor: Repairs will be performed on covered equipment during Trane\nregular business hours   Select Agreement\n\nRepair Parts and Materials   Select Agreement\nX\nOvertime Repair Labor for Emergency Failures (outside Trane regular business\nX\nRefrigerant Monitor Inspection. Testing and Calibration once per year\n\nRefrigerant Replacement 0% of Charge per unit per year\nX\nRefrigerant Usage Reporting\n\nOther\n\n\nServices Included\nPredictive Testing and Analysis for Covered Equipment Chiller(s) Only\nX\nSpectrographic Oil Analysis   Trending oil analysis provides insight into potential\nX\nRefrigerant Analysis   Provides early warning of internal failure\nX\nKestrelView  Analysis   Requires Trane laptop and Trane software\nX\nOil Removal and Disposal by Trane in accordance with EPA Guidelines\nX\nOil Change\n\n\n\nServices Included\nAdditional Services\nX\nAir-cooled condenser coil cleaning once per year\nX\nClean Cooling Tower(s) once per year\nX\nCondenser Tube Cleaning & Evap Tube Cleaning once per year\n\n\nX\nStarter Maintenance  600 volt volt starter\nX\nEddy Current Test of tubes every 2 years\n\nOther\n  Chiller overhaul every 5 years was included in the current contract SOW\nEquipment Maintenance Procedures:\nTRANE CENTRIFUGAL CHILLERS\n(Low Pressure Units)\nCOMPREHENSIVE ANNUAL INSPECTION SERVICE   TRANE CTV-512\n\nReport in with the COTR and sign log with name, date and time.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nInspect for leaks and report leak check results to the customer. Provide reports at the end of each visit. \n\nRepair minor leaks as required (e.g. valve packing, flare nuts). Provide reports at the end of each visit.\n\nCalculate refrigerant loss rate and report to COR. Provide report at end of each visit.\n\nReplace the filter / drier on the motor cooling line, in accordance with mfg specifications.\n\nTest the security of mounting points; tighten all major points.\n\nControls and Safeties\n\nInspect control panel for cleanliness.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVerify the working condition of all indicator/alarm lights.\n\nVerify the operation of all timing devices.\n\nVerify the operation of the oil temperature thermostat. Calibrate and record setting and provide report to COR.\n\nVerify the operation of the low oil temperature safety device. Calibrate and record setting.\nTest the high discharge pressure safety device. Calibrate and record setting.\n\nTest the high suction temperature switch. Calibrate and record setting.\n\nTest the high discharge temperature safety device. Calibrate and record setting.\n\nTest the low suction pressure safety device. Calibrate and record setting.\n\nTest the low pressure override switch. Calibrate and record setting.\n\nTest the low leaving water temperature control device. Calibrate and record setting.\n\nLubrication System\n\nPull oil sample for spectroscopic analysis.\nChange oil\n\nTest oil for acid content and discoloration. Make recommendations to the COTR based on the results of the test.\nInspect oil pump motor terminals for tightness and signs of overheating and discoloration.\nMeasure and record oil pump motor voltage and amperage.\n\nVerify the operation of the oil heater. Measure amps and compare reading with the watt rating of the heater.\n\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect the wires and starter components for tightness and signs of overheating and discoloration.\nVerify the operation of the transition/system timer.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nVerify the operation of the electrical interlocks.\n\nCheck the dash pots oil for level, rust, and/or moisture.\n\nMeg the motor and record readings.\n\nCheck the motor terminals for cracks and/or leaks.\n\nMeasure voltage and record reading. Voltage should be nominal voltage Â±10%.\n\nSTARTUP / CHECKOUT PROCEDURE CTV-520\n\nVerify the operation of the oil heater and that the oil temperature is at least 110Â°F before starting the chiller.\nVerify full water systems, including the cooling tower, the condenser and the evaporator.\n\nVerify clean cooling tower and strainers.\n\nStart the condenser water pump, chilled water pump, and cooling tower fan(s).\n\n\nVerify flow rates through the condenser and the evaporator.\n\nTest all flow-proving devices on the chilled water and condenser water circuits.\n\nStart the chiller.\n\nVerify the starter operation.\n\nVerify the operation of all timing devices.\n\nCheck the load limit relay for set point, hunting, and unloading capability.\n\nCheck the mechanical limits on both vane arms. Verify smooth movement of vane arms.\n\nCheck the set point and sensitivity of the chilled water temperature control device. Verify the operation.\nVerify the operation of the condenser water temperature control device.\n\nVerify the motor cooling operation.\n\nShut down the chiller.\n\nCheck the oil and refrigerant levels, if levels are low provide leak rate calculation report to COR. (If the refrigerant charge needs correction, the refrigerant, and the labor to install it, are not included.)\nRe-start chiller and log the operating conditions after the system has stabilized.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CTV-530\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the purge unit.\n\nCheck the operation of the control circuit.\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data. Compare the data to the original design conditions.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nSEASONAL SHUT-DOWN PROCEDURE CTV-550\n\nCheck the general operation of the unit.\n\nShut down the chiller, pumps and auxiliary equipment.\n\nDrain the condenser and chilled water piping.\n\nTurn off equipment power as necessary.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nCONDENSER CLEANING\nWATER-COOLED CONDENSERS BRUSH TUBES\n(600 Tubes/Day) CDS-210\nPull easy end head, both ends\n\nBrush tubes.\n\nNOTE: The term  easy end head  refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit s having marine boxes.\n\nLUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130\n\nChange the oil and filter, using factory-recommended oil and filter every year.\n\nCOOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nSTRUCTURE\n\nDisassemble all screens and access panels for inspection.\n\nInspect the conditions of the slats.\n\nInspect the condition of the tower fill.\n\nInspect the condition of the support structure.\n\nInspect the condition of the basins (upper and lower), spray nozzles, and olson pan. Make necessary repairs  to basins  and replace nozzles if any issues.\n\n\nVerify clean basins and strainer(s).\n\nVerify the condition and operation of the basin fill valve system.\n\nFill basin\n\nMECHANICAL\n\nInspect gear box for leaks.\n\nInspect drive and coupling for condition and security\n\nInspect fan assembly for condition, security, and clearances (e.g. blade tip clearance).\n\nLubrication\n\nLubricate motor bearings.\n\nCheck gear box oil level.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactor(s) for free and smooth operation.\n\nMeg the motor and record reading.\n\nCheck disconnect terminal block for wear, tightness and signs of overheating and discoloration.\nCheck the condition and operation of the basin heater contactor(s).\n\nSTARTUP / CHECKOUT PROCEDURE CLT-220\n\nFill the basin and verify float level.\n\nVerify the operation of the basin heaters.\n\nVerify the operation, set point, and sensitivity of the basin heater temperature control device.\nStart the condenser water pumps.\n\nVerify the balance of the return water through the distribution boxes.\n\nVerify proper operation of the bypass valve(s), if applicable.\n\nOperate the fan(s) and verify smooth operation.\n\nLog operation after the system has stabilized.\n\nReview operating procedures with COTR.\n\n\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CLT-230\n\nCheck the general condition of the tower.\n\nVerify clean basins and strainers (upper and lower) and/or spray nozzles. Note, Building 20 strainer cleaning required for mid-season inspection.\n\nVerify proper water level in the basin.\n\nVerify proper operation of the water level control device.\n\nVerify smooth operation of the fan(s).\n\nVerify proper operation of the bypass valve(s).\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate uncorrected deficiencies detected.\n\n\nDIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110\n\nReport in with the COTR\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nCheck motor shaft and pump shaft for alignment.\n\nInspect the coupling for wear.\n\nVerify that the shaft guard is in place and tight.\n\nVerify water flow through the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nVerify smooth operation of the pump.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nLubrication\n\nLubricate the motor bearings as necessary.\n\nLubricate the pump bearings as necessary.\n\n\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nMeg the motor.\n\nVerify tight connections on the motor terminals.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nVerify proper volts and amps.\n\nPUMP RUN INSPECTION PMP-111\n\nVerify smooth operation of the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nVARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nClean the heat sinks.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVisually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture.\nVerify proper operation of the unit.\n\nVerify proper DC buss voltage.\n\n\nTRANE CENTRIFUGAL CHILLERS W-C\n(CVHE/F Style Units)\nCOMPREHENSIVE ANNUAL INSPECTION SERVICE ELECTRONIC CTV-210\n\nReport in with the Customer Representative.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with customer for operational problems and trends.\n\nGeneral Assembly\n\nCheck and record refrigerant level.\n\nInspect for leaks and report leak results (yearly).\n\nThe refrigerant should be correct before starting the leak check. To prevent unnecessary venting of refrigerant, EPA-recommended methods (e.g. hot water and/or electric blankets) must be used to pressurize the vessels.\nIn order to use EPA-recommended methods, certain conditions must be met:\n\nThe isolation valves on the chilled water and condenser water lines must shut off the circulation completely.\nThe temperature of the equipment room should be 70Â°F or higher.\n\nAccess connections to the condenser water and chilled water circuits must be provided (customer s responsibility).\nIf these conditions cannot be met, the refrigerant must be removed and the vessel pressurized, using dry nitrogen and a trace gas. This additional procedure is within the scope of this agreement.\nCalculate refrigerant loss and report to the COTR.\n\nRepair minor leaks as required (e.g., valve packing, flare nuts).\n\nVisually inspect condenser tubes for cleanliness.\n\nCheck internal vanes for free and smooth operation.\n\nCheck mechanical linkages for wear.\n\nPurge\nCheck purge unit controls for proper operation.\n\nCheck and clean purge drum as required.\n\nClean the condenser coil.\n\nClean strainers or replace filters as required.\n\nCheck the purge compressor assembly for leaks as required.\n\nCheck the purge unit for proper operation.\n\nControls and Safeties\nVerify all settings in the electronic control panel.\n\nInspect the control panel for cleanliness.\n\nInspect wiring and connections for tightness and signs for overheating and discoloration.\n\nVerify the operation of the vane control system:\n\nVerify the working condition of all indicator/alarm lights and LED/LCD displays.\n\nVerify the operation of the oil sump temperature control device.\n\nTest high condenser pressure safety device. Calibrate and record setting.\n\nTest low evaporator temperature safety device. Calibrate and record setting.\n\nTest low oil pressure safety device. Calibrate and record setting.\n\nTest high motor temperature safety device. Calibrate and record.\n\nTest operation of chilled water pump and condenser water pump starter auxiliary contacts.\n\n\nLubrication System\nPull oil sample for spectroscopic analysis.\n\nCheck oil for acid content and discoloration. Make recommendations to the customer based on the results of the test.\nMeasure and record the oil pump voltage and amperage.\n\nVerify the operation of the oil heater. Measure amps and compare readings with the watt rating of the heater.\nChange the oil and oil filter.\n\nVerify the oil level.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nCheck tightness of the motor terminal connections.\n\nMeg the motor and record reading.\n\nVerify the operation of the electrical interlocks.\n\nSTARTUP / CHECKOUT PROCEDURE CTV-220\n\n\nVerify the operation of the oil heater and that the oil temperature is at least 110Â°F before starting the chiller.\nVerify full water systems, including the cooling tower, condenser and evaporator.\n\nVerify clean cooling tower and strainers.\n\nStart the condenser water pump, chilled water pump, and cooling tower fan(s).\n\nTest all flow-proving devices on the chilled water and condenser water circuits\n\nVerify the flow rates through the condenser and the evaporator.\n\nStart the chiller.\n\nVerify the operation of all timing devices.\n\nVerify the operation of the current control device.\n\nCheck the set point and sensitivity of the chilled water temperature control device. Verify the operation.\nVerify the operation of the condenser water temperature control device.\n\nCheck the mechanical limits of both vane arms. Verify smooth movement of vane arms through the full range of operation.\nCheck the starter operation.\n\nVerify the motor cooling operation.\n\nCheck the purge operation.\n\nShut down the chiller.\n\nCheck the oil and refrigerant levels, provide leak rate calculation report if levels are low.\n\nRe-start the chiller and log the operating conditions after the system has stabilized.\n\nReview operating procedures with the operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any deficiencies detected.\n\n\nMID-SEASON RUNNING INSPECTION CTV-230\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the purge unit.\n\nCheck the operation of the control circuit.\n\n\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data. Compare the data to the original design conditions.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nSEASONAL SHUT-DOWN PROCEDURE CTV-250\n\nCheck the general operation of the unit.\n\nShut down the chiller, pumps, and auxiliary equipment.\n\nDrain the condenser and chilled water piping as required.\n\nTurn off equipment power as necessary.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nAir-Cooled Rotary Chillers ACR-1\nReview operation logs with COTR for any problems and trends.\n\nCheck and record refrigerant level, provide leak rate calculation report if levels are low.\n\nInspect for leaks, conduct leak check using EPA-recommended methods, and report leak results.\nCalculate refrigerant loss.\n\nRepair all minor leaks as required such as valve packing, flare nuts, etc.\n\nVisually inspect condenser coil for cleanliness.\n\nCheck the condenser fans for clearances and free operation.\n\nCheck tightness of condenser fan motor mounting brackets.\n\nCheck the set screws on the fan shafts.\n\nVerify the performance of the fan control inverter VFD.\n\nGrease fan bearings as required.\n\nAnnually, clean the condenser coil.\n\nVerify all settings in the electronic control panel.\n\n\n\nInspect the control panel for cleanliness.\n\nInspect controls and safety wiring and connections for tightness and signs of overheating and discoloration.\nVerify the working condition of all indicator/alarm lights and LED/LCD displays. Replace lights as required.\nTest the oil pressure safety device. Calibrate and record setting.\n\nTest high motor temperature safety device. Calibrate and record setting.\n\nTest operation of chilled water pump and condenser water pump starter auxiliary contacts.\nPull one oil sample per year for spectroscopic analysis.\n\nAnnually, check oil for acid content and discoloration. Change oil if out of normal parameters.\nVerify the operation of the oil heaters. Measure amps and compare readings with the wattage rating of the heaters.\nClean the starter cabinet and starter components.\n\nStart the unit if not already in operation.\n\nInspect motor and starter wiring and connections for tightness and signs of overheating and discoloration.\nCheck condition of contacts for wear and pitting.\n\nCheck contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nCheck tightness of the motor terminal connections.\n\nAnnually, meg the motor and record reading.\n\nVerify the operation of the electrical interlocks.\n\nMeasure and record voltages.\n\nProvide function test loss of normal operation and automatic emergency start up\n\nOnce per year, pull a refrigerant sample for spectrographic analysis for contaminants.\n\n\na. Additionally Performed During Mid-Season PM w/Equipment Running (Schedule during July)\n\n\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the control circuit.\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data and compare to the original design conditions for the equipment.\nReview operating procedures with COTR and VA staff.\n\nCENTRAL STATION AIR HANDLING UNITS COMPREHENSIVE ANNUAL INSPECTION AHU-110\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\n\n\nGeneral Assembly\n\nInspect the unit for cleanliness.\n\nInspect the fan wheel and shaft for wear and clearance.\n\nCheck the sheaves and pulleys for wear and alignment.\n\nCheck the belts for tension, wear, cracks, and glazing.\n\nVerify tight bolts, set screws, and locking collars.\n\nCheck dampers for wear, security and linkage adjustment.\n\nVerify clean condensate pan.\n\nVerify proper operation of the condensate drain.\n\nVerify clean air filters.\n\nVerify clean coils.\n\nVerify proper operation of the spray pump, if applicable.\n\nVerify smooth fan operation.\n\nLog operating conditions after system has stabilized.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\n\nLubrication\nLubricate the fan shaft bearings, if applicable.\n\nLubricate the motor bearings, if applicable.\n\nControls and Safeties\nTest the operation of the low temperature safety device, if applicable.\n\nTest the operation of the high static pressure safety device, if applicable.\n\nTest the operation of the low static pressure safety device, if applicable.\n\nCheck the thermal cutout on electric heaters, if applicable.\n\nCheck the step controller, if applicable.\n\nCheck and record supply air and control air pressure, if applicable.\n\nVerify the operation of the control system and dampers while the fan is operating.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect the wiring and connections for tightness and signs of overheating and discoloration. This includes wiring to the electric heat, if applicable.\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nMeg the motor and record readings.\n\nSCHEDULED RUNNING INSPECTION AHU-130\nCheck the general condition of the fan.\n\nVerify smooth fan operation.\n\nCheck and record supply and control air pressure, if applicable.\n\nFunction test loss of normal operation and emergency start up\n\nVerify the operation of the control system.\n\nLog the operating conditions after the system has stabilized.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate uncorrected deficiencies detected.\n\n\n\n\n\nVANE AXIAL FANS   TRANE COMPREHENSIVE ANNUAL INSPECTION   EXHAUST FANS\nFAN-130\n\nReport in with the COTR\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the COTR for operational problems and trends.\n\nGeneral Assembly\nInspect fan wheel for wear, security, and clearance.\n\nInspect sheaves and pulleys for wear and alignment.\n\nInspect belts for tension, wear, cracks, and glazing.\n\nVerify tight bolts, set screws, and locking collars.\n\nVerify smooth operation of the fan.\n\nLog operating conditions after the system has stabilized.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nLubrication\nLubricate the fan bearings.\n\nLubricate the motor bearings, if applicable.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect the wiring and connections for tightness and signs of overheating and discoloration.\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactor for free and smooth operation.\n\nMeg the motor and record the readings.\n\nCheck and record volts and amps of the motor.\n\nPURGE SYSTEMS PURIFIER PURGE PRG-130\nClean the condenser on the purge refrigeration unit.\n\nCheck purge unit controls for proper operation.\n\nCheck and clean purge drum.\n\nClean strainers or replace filters.\n\n\n\nCheck purge compressor assembly for leaks.\n\nCheck the purge unit for proper operation.\n\nLEAK CHECK (HIGH PRESSURE)\nWATER COOLED High Pressure Leak Check LCK-11O\n\nInspect for leaks and report results.\n\nRepair minor leaks as required (e.g. valve packing, flare nuts).\n\nCalculate refrigerant loss rate and report to the customer.\n\nCONDENSER CLEANING\nWATER-COOLED CONDENSERS BRUSH TUBES\n(600 Tubes/Day) CDS-210cds\n\nPull both heads.\n\nEddy Current test every 2 years.\n\nBrush tubes as necessary.\n\nNOTE: The term  easy end head  refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit s having marine boxes.\n\nLUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130\nChange the oil and filter, using factory-recommended oil and filter.\n\nREFRIGERANT MONITORS ANNUAL MAINTENANCE INSPECTION MSC-320\nReport in with the COTR.\n\nRecord and report abnormal conditions.\n\nCheck chassis mounting in enclosure.\n\nCheck operation of Clear Language Display.\n\nReplace sampling filter element /elements at sensing points.\n\nProvide Zero and Span calibration to accuracy within 1 PPM.\n\nVisually check photo-acoustic sensing device.\n\nCheck periodic re-zeroing.\n\nCOOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\nSTRUCTURE\n\nDisassemble all screens and access panels for inspection.\n\nInspect the conditions of the slats, if applicable.\n\nInspect the condition of the tower fill.\n\nInspect the condition of the support structure.\n\nInspect the condition of the basins (upper and lower) and/or spray nozzles.\n\nVerify clean basins and strainer(s).\n\nVerify the condition and operation of the basin fill valve system.\n\nMECHANICAL\n\nInspect gear box for leaks.\n\nInspect drive and coupling for condition and security\n\nInspect fan assembly for condition, security, and clearances (e.g. blade tip clearance).\n\nLubrication\nLubricate motor bearings.\n\nCheck gear box oil level.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactor(s) for free and smooth operation.\n\nMeg the motor and record reading.\n\nCheck disconnect terminal block for wear, tightness and signs of overheating and discoloration.\nCheck the condition and operation of the basin heater contactor(s).\n\nSTARTUP / CHECKOUT PROCEDURE CLT-220\nFill the basin and verify float level.\n\nVerify the operation of the basin heaters.\n\nVerify the operation, set point, and sensitivity of the basin heater temperature control device.\nStart the condenser water pumps.\n\nVerify the balance of the return water through the distribution boxes.\n\nVerify proper operation of the bypass valve(s), if applicable.\n\nOperate the fan(s) and verify smooth operation.\n\nLog operation after the system has stabilized.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nMID-SEASON RUNNING INSPECTION CLT-230\nCheck the general condition of the tower.\n\nVerify clean basins and strainers (upper and lower) and/or spray nozzles.\n\nVerify proper water level in the basin.\n\nVerify proper operation of the water level control device.\n\nVerify smooth operation of the fan(s).\n\nVerify proper operation of the bypass valve(s).\n\n\n\nDIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110\nReport in with the COTR\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\nCheck motor shaft and pump shaft for alignment.\n\nInspect the coupling for wear.\n\nVerify that the shaft guard is in place and tight.\n\nVerify water flow through the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nVerify smooth operation of the pump.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nLubrication\nLubricate the motor bearings as necessary.\n\nLubricate the pump bearings as necessary.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nMeg the motor and record results.\n\nVerify tight connections on the motor terminals.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nVerify proper volts and amps.\n\nPUMP RUN INSPECTION PMP-111\nVerify smooth operation of the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nVARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nClean the heat sink.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVisually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture.\n\nVerify proper operation of the unit.\n\nVerify proper DC buss voltage.\n\nEach inspection will be provided in accordance with the system/equipment manufacturers factory recommended procedures. Each inspection shall, at a minimum, include the following as specified for the equipment make, type, and time of seasonal operation. Any additional parts not identified in this document will not be covered by this contract. The vendor will obtain prior approval from the COTR prior to performing any additional repair work and the additional work will be billed separately.\n\nFor each PM inspection, the contractor will provide a detailed written report to the COTR that summarizes work performed, problems/deficiencies found, and measurements taken. This report will be submitted within 10 calendar days of the date of PM inspection.\n\nAll work will be performed between the hours of 7:30 a.m. and 4:00 p.m. on the prearranged dates.\n\nAll inspection work must be coordinated through the COTR who is:\n\nEMERGENCY SERVICE\nEmergency repair service is not covered by the contract. However, the contractor will provide a preferred customer response to emergency repair calls that includes labor and parts costs to be billed separately.\n\nCONTRACTOR PERSONNEL\n\nPersonnel Experience. All work shall be performed by competent mechanics, experienced and qualified to work on the specific makes and models of equipment listed in this contract. The Contractor shall submit to and for the approval of the Contracting Officer, certification and a list of credentials of the approved mechanics. Personnel shall have a minimum of three (3) years recent experience related to this work. The contractor must provide a list of three (3) reference contacts that have been provided service on similar or identical equipment. The contractor must provide authenticated factory training certificates or credentials (or acceptable substitute as approved by the COTR) for any personnel who are working on any VA equipment. The VA specifically reserves the right to reject any of the contractor s personnel and refuse them permission to work on VA equipment.\nConduct of Personnel. The Contractor shall ensure that his personnel present a professional appearance at all times and that their conduct shall not reflect discredit upon this facility or the Department of Veterans Affairs. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The removal from the job site of such a person shall not relieve the Contractor of the requirement to provide sufficient personnel to perform adequate and timely service. All employees shall be legal residents of the United States and be able to understand, speak, read and write the English language.\nIdentification of Employees. : The Contractor shall within 10 calendar days before beginning performance of work provide the Contracting Officer a list of all employees who will perform under this contract. The list shall include the full name, and work assignment of each employee. The Contractor shall notify the Contracting Officer in writing of any addition, deletion or change in work assignment within 10 days of such change. Each of the Contractor's employees shall conspicuously display on their person a badge provided by the VA West Roxbury Police Office.\n\nHOURS OF OPERATION\nNormal Duty Hours. The Contractor shall have employees available Monday through Friday, except legal public holidays at the times specified to perform routine work and inspections.\nFederal Holidays.  Federal Holidays observed by the VA are:\n\nNew Years Day; Martin Luther King Day; President s Day; Memorial Day; Independence Day; Labor Day; Columbus Day; Veterans Day; Thanksgiving Day; and Christmas.\n\nCONTRACTOR QUALITY CONTROL\n\nThe Contractor shall establish and maintain a Quality Control Program that ensures that all requirements of the contract are provided as specified.\n\nINSPECTION AND ACCEPTANCE\n\nFinal inspection and acceptance by the Government shall be made at the site of each system. However, final inspection and acceptance do not preclude the Government's right to inspect completed work prior to shipment from the Contractor's shop nor does it waive any rights of the Government.\nUnsatisfactory service will be reported in writing by the VA CO to the Contractor.\n\nTelephone Answering Service: The Contractor shall maintain, at his own expense, a dedicated (tie-line) toll-free telephone answering service for the exclusive use in the performance of this contract. This answering service shall be monitored during normal work hours as identified in the specifications.\n\nREMOVAL AND/OR DISPOSAL\nRemoving Government-Owned Material: All property removed remains the property of the\nU.S. Government and shall be returned by the Contractor to a place of storage as designated by the CO or COTR.\nSalvage: Items received by the Contractor that are non-repairable because of condition, or declared unfit for economical rehabilitation by the Contractor, shall be returned to the Government. All salvage remaining in the Contractor's shop shall remain Government property and may be used for repair of any Government-owned equipment when released by the CO. The Contractor shall be required to maintain an account record of inventory upon completion of the maintenance contract.\nInventories shall not be disposed of by the Contractor without inspection and written approval of the CO. Salvaged parts used in the repair of any government owned equipment shall be treated by the Contractor as Government furnished material and reflected as same on Contractor's invoices when submitted for payment. All salvage in the possession of the\n\n\n\nContractor, upon expiration of the contract, will be returned to the Government within thirty (30) days after such expiration.\n\nFIRE PREVENTION AND PROTECTION\n\nThe Contractor shall fully acquaint himself and his personnel with the location of fire equipment before work, take all prudent measures to minimize fire hazards that result from work, complies with all ordering agency fire and safety regulations.\n\nENERGY CONSERVATION\nThe Contractor is required to comply with all energy conservation regulations and instructions that are applicable to Government-owned facilities including but not limited to thermostat settings.\n\nCLEANING UP\nThe Contractor shall clean up after work, leaving each area where work is performed, neat and clean. All containers, trash and debris for which he is responsible shall be removed.\n\nHAZARDOUS CONDITIONS\nDuring the course of performing work under this contract, should the Contractor find serious or hazardous conditions existing with or in any of the equipment the Contractor shall secure the equipment and immediately notify the COTR.\n\nCLEANLINESS\nThe area immediately around the equipment provided for the Contractor s use shall be kept in a clean and orderly condition. Trash and waste material shall not be permitted to accumulate, but shall be removed by the Contractor s employees.\n\nSERVICE MANUALS\nThe VA shall not provide service manuals or service diagnostic software to the contractor. The contractor shall obtain, have on file, and make available to its FSEs all operational and technical documentation, (such as: operational and service manuals, schematics, and parts lists), which are necessary to meet the performance requirements of this contract. The location and listing of the service data manuals, by name, and/or the manuals themselves shall be provided to the CO upon request.\n\nINSURANCE\n\nWorker compensation and employer s liability. Contractor and any subcontractor covered under this contract are required to comply with applicable Federal and State Worker s Compensation and occupational disease statutes.\nGeneral Liability. Contractor and any subcontractor covered under this contract are required to have Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.\n\n\n\nProperty Damage Liability. Contractor and any subcontractor covered under this contract are to have Property Damage Liability insurance coverage of at least $500,000.\nContractor shall provide proof of liability insurance within five (5) days after contract award.\n\nSMOKING POLICY\nSmoking is prohibited inside all buildings except in designated areas.\n\nBILLING AND PAYMENT\nEach invoice shall contain the documentation required by this contract. The invoices shall be itemized to contain the equipment s identifier. When parts are furnished by the Government, they shall be itemized on Contractor's invoice at no-cost and indicated as Government-furnished parts.\nPayment. Payment will be made 30 days in arrears upon receipt of properly prepared invoice. Invoice must contain the contract number and the purchase order number.\n\nPRICING SUBMITTAL\n\nThe annual pricing of the contract should be itemized by the bidders to reflect a cost per unit PM per equipment item covered by contract.\n\nVENDOR REQUIREMENTS\n\nThe contractor must employ mechanics and technicians that are trained in the applicable codes, standards, and manufacturer requirements for maintenance and repair of the Trane and McQuay equipment covered by this contract.\nThe contractor must have at least 5 years  experience satisfactorily performing such maintenance on comparable units, equipment, or systems.\nThe contractor must have access to OEM (original equipment manufacturer)- manufactured parts and materials required for performance of this work.\nThe contractor must have sufficient supplies, tools, and equipment to perform all requirements of this contract.\n\n\nEQUIPMENT COVERED BY THIS CONTRACT\n\n\nBUILDING # 1\nVA ID#\nMANUFACTURER\nITEM NAME\nMODEL #\nSERIAL#\nSCHEDULE\nLOCATION\nÂ \nTrane (MICU) Back-Up\nAir-Cooled Chiller \nCGAM070F2Y03AXD2A1\nU22A00424\nACR-1\nWR-B1- 4B128\nÂ \nTrane (CCU)\nAir-Cooled Chiller \nCGAM070F2Y03AXD2A1\nU22A00422\nACR-1\nWR-B1- A4-01\nBUILDING # 2\nÂ \nTrane\nCentrifugal Chiller \nCVHF0910\nL03M08522\nCTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130\nWR-B2-AB- 13\nÂ \nTrane\nCentrifugal Chiller \nCVHF0910\nL03M08531\nCTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130\nWR-B2-AB- 13\nÂ \nMarley\nCooling Tower-1\nNC-8309 GZBS\nNC-241518-A2\nCLT-210, CLT-230, CLT-220\nWR-B2-A4-01\nÂ \nMarley\nCooling Tower-2\nNC-9309 GZBS\nNC-241518-A1\nCLT-210, CLT-230, CLT-220\nWR-B2-A4-01\nÂ \nTrane \n(OR- Back-Up) Air-Cooled Chiller \nRTAA0804YR01A301GBFC\nU06B06111\nACR-1\nWR-B2-A4-01\nÂ \nTrane \n(GI) Air-Cooled Chiller \nCGAFC304AK01A00000\nC06A00249\nACR-1\nWR-B2-A4-01\nÂ \nTrane \n(S5C) Air-Cooled Chiller \nRTAC1404\nU10F07753\nACR-1\nWR-B2-A4-01\nÂ \nTrane (Artic Chiller)\nChiller Modular -1\nPACVMV0400D4-MM-VS1\nA10001137\nRunning Inspection \nWR-B2-PH\nÂ \nTrane (Artic Chiller)\nChiller Modular -2\nPACVMV0400D4-MM-VS1\nA101011417\nRunning Inspection \nWR-B2-PH\nÂ \nTrane (Artic Tower)\nTower Modular-2\nTP00004075\nA101011517\nTower Cleaning & Running Inspection \nWR-B2-PH\nÂ \nTrane \nSPS Condenser\nRAUJ804A132BDF01D\nC10J04548\nACR-1\nWR-B2-POOL ROOF\nÂ \nTrane\nS5C AHU\nMCCB05ONBFOSDAA\nK08B22619\nAHU-110, AHU-130\nWR-B2-A4-01\nÂ \nTrane\n(OR-S5) AHU\nMCCB05OUA0AOUB\nK09D83236A\nAHU-110, AHU-130\nWR-B2-A4-01\nÂ \nTrane\nAHU-1A\nCSAA012UBL00\nK17C26642\nAHU-110, AHU-130\nWR-B2-ROOF\nÂ \nTrane\nAHU-1B\nCSAA0100\nK17C26621\nAHU-110, AHU-130\nWR-B2-ROOF\nÂ \nCarrier\n(S8-Elv Mch Rm) Air Cooled Chiller\n38ARZ008-601CA\n3806G50045\nACR-1\nWR-B2-ROOF\nÂ \nTrane\n(CTIR) Air Cooled Chiller \nTTA09044DAA02BS010001\n23193610YA\nACR-1\nWR-B2-ROOF\nÂ \nTrane \n(CTIR) Dry Cooler \nTR-SCS-120-SSA\n10331148\nACR-1\nWR-B2-ROOF\nÂ \nBarry Blower \nExhaust Fan \nEM2515T-G\n76-2902\nFAN-130\nWR-B2-PH\nÂ \nCook MFG\nExhaust Fan \n195CPS\nN/A\nFAN-130\nWR-B2-AB- 13\nÂ \nVaneaxial Fan\nExhaust Fan E-5\nN/A\nN/A\nFAN-130\nWR-B2-A4-01-PH\nÂ \nVaneaxial Fan\nExhaust Fan GE-1\nN/A\nN/A\nFAN-130\nWR-B2-A4-01-PH\nÂ \nBaldor Reliance\n2-SCHW-Pump-1\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-SCHW-Pump-1 Frame\nE-1510\nC331015-01A22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-SCHW-Pump-2\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-SCHW-Pump-2 Frame\nE-1510\nC331015-01G22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-SCHW-Pump-3\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-SCHW-Pump-3 Frame\nE-1510\nC331015-01C22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-SCHW-Pump-4\nEM3311T-G\n37J839L863G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-SCHW-Pump-4 Frame\nE-1510\nC331016-01B22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-SCHWP-1 VDF\n174Z4893\n988204Y252\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-SCHWP-2 VDF\n174Z4893\n525204Y182\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-SCHWP-3 VDF\n174Z4893\n525204Y182\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-SCHWP-4 VDF\n174Z4893\n771804Y222\nMSC-130\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-PCHW-Pump-1\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-PCHW-Pump-1 Frame\nVSC\nC331009-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-PCHW-Pump-2\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-PCHW-Pump-2 Frame\nVSC\nC331009-03C22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-PCHW-Pump-3\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-PCHW-Pump-3 Frame\nVSC\nC331009-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-PCHWP-1 VDF\n174Z4898\n986904Y252\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-PCHWP-2 VDF\n174Z4898\n986804Y252\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-PCHWP-3 VDF\n174Z4898\n986604Y252\nMSC-130\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-CW-Pump-1\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-CW-Pump-1 Frame\nVSC\nC331008-02D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-CW-Pump-2\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-CW-Pump-2 Frame\nVSC\nC331008-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-CW-Pump-3\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-CW-Pump-3 Frame\nVSC\nC331008-03D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-CWP-1 VDF\n174Z4902\n271004Y292\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-CWP-2 VDF\n174Z4902\n270804Y292\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-CWP-3 VDF\n174Z4902\n270904Y292\nMSC-130\nWR-B2-AB- 13\nÂ \nStrainer \nCW Strainer-1\n10\" ASTM A126 GR.B\nN/A\nClean Strainer \nWR-B2-AB- 13\nÂ \nStrainer \nCW Strainer-2\n10\" ASTM A126 GR.B\nN/A\nClean Strainer \nWR-B2-AB- 13\nÂ \nStrainer \nCW Strainer-3\n10\" ASTM A126 GR.B\nN/A\nClean Strainer \nWR-B2-AB- 13\nBUILDING # 3\nÂ \nTrane\nCentrifugal Chiller \nCVHE0450\nL09A05825\nCTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130\nWR-B3-3C101\nÂ \nTrane\nCentrifugal Chiller \nCVHE0450\nL09A05826\nCTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130\nWR-B3-3C101\nÂ \nTrane\n(B3-Cross Connect )Air-Cooled Chiller \nRTAC\nU22A00455\nACR-1\nWR-B3-ROOF\nÂ \nEvapco\nCooling Tower \nLST-10-183T\n879038\nCLT-210, CLT-220, CLT-230\nWR-B3- ROOF\nÂ \nEvapco\nCooling Tower \nLST-10-183T\n879039\nCLT-210, CLT-220, CLT-230\nWR-B3- ROOF\nÂ \nABB\nCooling Tower-1 VFD\nACH550-UH-045A-4\n2090602672\nMSC-130\nWR-B3-3C101\nÂ \nABB\nCooling Tower-2 VFD\nACH550-UH-045A-4\n2090602674\nMSC-130\nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCHW-Pump-1\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCHW-Pump-2\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCHW-Pump-3\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nABB\n3-PCHW-Pump-1 VFD\nACH550-UH-038A-4\n2090602676\nMSC-130\nWR-B3-3C101\nÂ \nABB\n3-PCHW-Pump-2 VFD\nACH550-UH-038A-4\n2090602673\nMSC-130\nWR-B3-3C101\nÂ \nABB\n3-PCHW-Pump-3 VFD\nACH550-UH-038A-4\n2090602675\nMSC-130\nWR-B3-3C101\nÂ \nStrainer \nBldg-3-CW Strainer-1\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer \nWR-B3-3C101\nÂ \nStrainer \nBldg-3-CW Strainer-2\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer \nWR-B3-3C101\nÂ \nStrainer \nBldg-3-CW Strainer-3\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer \nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCW-Pump-1\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCW-Pump-2\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCW-Pump-3\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nABB\n3-PCW-Pump-1 VFD\nACH550-UH-031A-4\n2090602687\nMSC-130\nWR-B3-3C101\nÂ \nABB\n3-PCW-Pump-2 VFD\nACH550-UH-031A-4\n2090602685\nMSC-130\nWR-B3-3C101\nÂ \nABB\n3-PCW-Pump-3 VFD\nACH550-UH-031A-4\n2090602688\nMSC-130\nWR-B3-3C101\nBUILDING # 20 & 21\nÂ \nTrane Arctic  \nChiller Mod 1\nTPWCCMV0300D4-MM\nA022047224\nRunning Inspection \nWR-B20\nÂ \nTrane Arctic  \nChiller Mod 2\nTPWCCMV0300D4-MM\nA022047124\nRunning Inspection \nWR-B20\nÂ \nTrane Arctic  \nChiller Mod 3\nTPWCCMV0300D4-MM\nA022047024\nRunning Inspection \nWR-B20\nÂ \nTrane \nCondenser Unit \nRAUJC604BA03AOD\nC10B00682\nACR-1\nWR-B21\nÂ \nTrane \nCondenser Unit \nRAUJC604BA03AOD\nC10B00681\nACR-1\nWR-B21\nÂ \nEvapco\nCooling Tower-1\nUSS14-86\n16-780293\nCLT-210, CLT-220, CLT-230\nWR-B21\nÂ \nEvapco\nCooling Tower-2\nUSS14-86\n16-780292\nCLT-210, CLT-220, CLT-230\nWR-B21\nÂ \nWEG\n21-CW-Pump-1 \n01018OT3E215T-S\n103116362\nPMP-110, PMP-111\nWR-B21\nÂ \nWEG\n21-CW-Pump-2\n0118OT3E215T-S\n103116359\nPMP-110, PMP-111\nWR-B21\nÂ \nWEG\n21-CHW-Pump-1 \n020180T3E256T-S\n1030953958\nPMP-110, PMP-111\nWR-B21\nÂ \nWEG\n21-CHW-Pump-2\n021080T3E256T-S\n1030953957\nPMP-110, PMP-111\nWR-B21\nÂ \nABB\n21-CW-Pump-1 VFD\nACH550-PCR-015A\n216900159\nMSC-130\nWR-B21\nÂ \nABB\n21-CW-Pump-2 VFD\nACH550-PCR-015A\n216900142\nMSC-130\nWR-B21\nÂ \nABB\n21-CHW-Pump-1 VFD\nACH550-PCR-031A\n216900168\nMSC-130\nWR-B21\nÂ \nABB\n21-CHW-Pump-2 VFD\nACH550-PCR-031A\n216900182\nMSC-130\nWR-B21\nÂ \nStrainer \nCW Strainer-1\nN/A\nN/A\nClean Strainer \nWR-B21\nÂ \nStrainer \nCW Strainer-2\nN/A\nN/A\nClean Strainer \nWR-B21\n\n\n\n\n\n\n\n\n\nThe NAICS code for this requirement is 238220.\n\nEngineering identifies Trane U.S. Inc. as the required single source for the complete manufacturer-supported Trane chiller maintenance program. The statement of work specifically calls for KestrelView analysis using a Trane laptop and software and for equipment-specific controls, protective-device, refrigerant, and mechanical service procedures that depend on Trane equipment documentation, specialized diagnostic resources, and qualified manufacturer support. These requirements go beyond generic HVAC maintenance and are central to assessing the condition and reliable operation of the installed Trane chillers.\n\nThe VA-owned Trane-controlled equipment and Trane Ensemble platform require Trane-specific software, programming capability, and replacement supplies and identified Trane as the contractor then able to deliver the specified integrated service. Those historical findings are being incorporated as the technical basis for continuity of the current installed-equipment requirement. Equipment lists have changed because of campus upgrades; this does not alter the need for the specified OEM diagnostic methods and chiller-specific maintenance capability.\n\nThe Government has intentionally retained Trane equipment as a principal element of its West Roxbury cooling infrastructure. Standardization and operational continuity are relevant to maintenance reliability, availability of consistent OEM service procedures, and safe seasonal transition of the chilled-water plants. Engineering requires the Trane-specific diagnostic portion to be integrated with the ongoing scheduled service program to ensure that findings, repairs recommendations, and unit availability are evaluated as one coordinated plant-maintenance effort.\n\nThe associated pumps, drives, cooling towers, and connected components are necessary for the cooling plant to function. The technical basis for a Trane-only order is the complete integrated service requirement with manufacturer-specific chiller diagnostics and supported service access.  Trane is the only provider identified in the supplied acquisition history as delivering the Trane-specific diagnostic and coordinated plant-maintenance requirement.\n\nThis notice of intent is not a solicitation nor is it a request for proposal.  However, interested parties that believe they can satisfy the requirement must clearly identify their capability to do so in writing by Monday, November 25, 2026 at 12 pm EST time.  Response should be sent to Issa Shawki at issa.shawki@va.gov.  Information submitted in response to this notice will be used solely to determine whether competitive procedures could be used for this acquisition.  A determination not to open this requirement to competition based upon responses to this notice is solely within the discretion of the Government.","text":"The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in Brockton, MA intends to enter into a sole source procurement, pursuant to the authority of FAR 6.302-1, with TRANE, for the following requirement:\n\nSTATEMENT OF WORK\n\nSCOPE OF WORK\n\nThe Contractor shall provide all supervision, personnel, material, parts, equipment, supplies, labor and transportation in performing basic preventive maintenance on the chiller systems, Ensemble controls and equipment as listed in Attachment A and located at the Department of Veterans Affairs Medical Center, 1400 VFW Parkway, West Roxbury, MA 02132 in accordance with all terms and conditions of this task order and accepted quotation.\n\nPeriod of Performance: This will be a firm-fixed price, base year plus four option years task order.\n\nDEFINITIONS/ACRONYMS\n\nContract Discrepancy Report (CDR) : A report that the Government shall complete and issue to the Contractor when service is unsatisfactory and not in compliance with the terms and conditions of the contract. The Contractor is required to complete and return this form to the COR whenever performance is unsatisfactory. The CDR requires the Contractor to explain, in writing, the cause of the unsatisfactory performance, how performance will be returned to acceptable standards, and how reoccurrence of the problem will be prevented in the future.\n\nContracting Officer (CO): The individual with the authority to enter into, administer, and/or terminate contracts. The CO is the exclusive Government official authorized to execute changes and deviations or variations in the contract.\n\nContracting Officer's Technical Representative (COTR) : A Government representative, designated in writing by the Contracting Officer, to be responsible for quality assurance, inspection, surveillance, documentation and acceptance of the Contractor's performance. A copy of the letter of designation will be provided to the Contractor.\n\nPreventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions.\nTo clean, lubricate, calibrate, and test the equipment and/or instrument to the operating condition defined in the manufacturer s specifications.\n\nRepair Cost Estimate: The Contractors estimated cost (for parts, labor and freight) to repair a system according to manufactures' specifications and requirements. These repairs are covered under Emergency Service and repairs outside of routine maintenance.\n\nTime: When hours are given it shall mean clock hours exclusive of Saturdays, Sundays and Holidays unless otherwise specified (i.e., 1:00 P.M. Monday to 1:00 P.M. Tuesday equals 24 hours; 12:00 P.M. Friday to 12:00 P.M. Monday equals 24 hours). If days are indicated it shall mean calendar days including Saturdays, Sundays and Holidays.\n\nRework. The Contractor is required to correct and/or re-work any PM services due to unsatisfactory performance or nonperformance in accordance with the stated quality and level of effort in the PWS and final contract. Rework is performed at no additional cost to the Government.\nESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract.\n\nAcronyms. Commonly used acronyms are listed below\n\nFSE: Field Service Engineer\nAQL: Acceptable Quality Level\n\nIAW: In Accordance With\n\nQA: Quality Assurance\n\nQC: Quality Control\n\nWS: Performance Work Statement\n\nVA: VA Medical Center\n\nCO: Contracting Officer\n\nCOTR:Contracting Officer s Technical Representative FES: Facilities and Engineering Service\n\nPREVENTIVE MAINTENANCE REQUIREMENTS\n\nWithin 14 calendar days of Notice to Proceed, the vendor will submit to the COTR a written schedule of the planned PM visits for the coming year along with a written description of the work to be performed during each visit.\n\nThe following is the scope of services to be performed on Covered Equipment. Items marked with an X are included in this contract.\n\nServices Included\nCooling Seasonal Service\nServices Included\nHeating Seasonal Service\nX\nSeasonal Start-up\n\nSeasonal Start-up\nX\nOperating Inspections Qty\n\nOperating Inspections Qty\nX\nSystem Shutdown\n\nSystem Shutdown\nX\nAnnual Seasonal Maintenance\n\nAnnual Seasonal Maintenance\n\nServices Included\nLabor and Materials for Covered Equipment\nX\nScheduled Maintenance Labor\nX\nScheduled Maintenance Parts and Materials\nX\nRepair Labor: Repairs will be performed on covered equipment during Trane\nregular business hours Select Agreement\n\nRepair Parts and Materials Select Agreement\nX\nOvertime Repair Labor for Emergency Failures (outside Trane regular business\nX\nRefrigerant Monitor Inspection. Testing and Calibration once per year\n\nRefrigerant Replacement 0% of Charge per unit per year\nX\nRefrigerant Usage Reporting\n\nOther\n\nServices Included\nPredictive Testing and Analysis for Covered Equipment Chiller(s) Only\nX\nSpectrographic Oil Analysis Trending oil analysis provides insight into potential\nX\nRefrigerant Analysis Provides early warning of internal failure\nX\nKestrelView Analysis Requires Trane laptop and Trane software\nX\nOil Removal and Disposal by Trane in accordance with EPA Guidelines\nX\nOil Change\n\nServices Included\nAdditional Services\nX\nAir-cooled condenser coil cleaning once per year\nX\nClean Cooling Tower(s) once per year\nX\nCondenser Tube Cleaning & Evap Tube Cleaning once per year\n\nX\nStarter Maintenance 600 volt volt starter\nX\nEddy Current Test of tubes every 2 years\n\nOther\nChiller overhaul every 5 years was included in the current contract SOW\nEquipment Maintenance Procedures:\nTRANE CENTRIFUGAL CHILLERS\n(Low Pressure Units)\nCOMPREHENSIVE ANNUAL INSPECTION SERVICE TRANE CTV-512\n\nReport in with the COTR and sign log with name, date and time.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nInspect for leaks and report leak check results to the customer. Provide reports at the end of each visit.\n\nRepair minor leaks as required (e.g. valve packing, flare nuts). Provide reports at the end of each visit.\n\nCalculate refrigerant loss rate and report to COR. Provide report at end of each visit.\n\nReplace the filter / drier on the motor cooling line, in accordance with mfg specifications.\n\nTest the security of mounting points; tighten all major points.\n\nControls and Safeties\n\nInspect control panel for cleanliness.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVerify the working condition of all indicator/alarm lights.\n\nVerify the operation of all timing devices.\n\nVerify the operation of the oil temperature thermostat. Calibrate and record setting and provide report to COR.\n\nVerify the operation of the low oil temperature safety device. Calibrate and record setting.\nTest the high discharge pressure safety device. Calibrate and record setting.\n\nTest the high suction temperature switch. Calibrate and record setting.\n\nTest the high discharge temperature safety device. Calibrate and record setting.\n\nTest the low suction pressure safety device. Calibrate and record setting.\n\nTest the low pressure override switch. Calibrate and record setting.\n\nTest the low leaving water temperature control device. Calibrate and record setting.\n\nLubrication System\n\nPull oil sample for spectroscopic analysis.\nChange oil\n\nTest oil for acid content and discoloration. Make recommendations to the COTR based on the results of the test.\nInspect oil pump motor terminals for tightness and signs of overheating and discoloration.\nMeasure and record oil pump motor voltage and amperage.\n\nVerify the operation of the oil heater. Measure amps and compare reading with the watt rating of the heater.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect the wires and starter components for tightness and signs of overheating and discoloration.\nVerify the operation of the transition/system timer.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nVerify the operation of the electrical interlocks.\n\nCheck the dash pots oil for level, rust, and/or moisture.\n\nMeg the motor and record readings.\n\nCheck the motor terminals for cracks and/or leaks.\n\nMeasure voltage and record reading. Voltage should be nominal voltage Â±10%.\n\nSTARTUP / CHECKOUT PROCEDURE CTV-520\n\nVerify the operation of the oil heater and that the oil temperature is at least 110Â°F before starting the chiller.\nVerify full water systems, including the cooling tower, the condenser and the evaporator.\n\nVerify clean cooling tower and strainers.\n\nStart the condenser water pump, chilled water pump, and cooling tower fan(s).\n\nVerify flow rates through the condenser and the evaporator.\n\nTest all flow-proving devices on the chilled water and condenser water circuits.\n\nStart the chiller.\n\nVerify the starter operation.\n\nVerify the operation of all timing devices.\n\nCheck the load limit relay for set point, hunting, and unloading capability.\n\nCheck the mechanical limits on both vane arms. Verify smooth movement of vane arms.\n\nCheck the set point and sensitivity of the chilled water temperature control device. Verify the operation.\nVerify the operation of the condenser water temperature control device.\n\nVerify the motor cooling operation.\n\nShut down the chiller.\n\nCheck the oil and refrigerant levels, if levels are low provide leak rate calculation report to COR. (If the refrigerant charge needs correction, the refrigerant, and the labor to install it, are not included.)\nRe-start chiller and log the operating conditions after the system has stabilized.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CTV-530\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the purge unit.\n\nCheck the operation of the control circuit.\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data. Compare the data to the original design conditions.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nSEASONAL SHUT-DOWN PROCEDURE CTV-550\n\nCheck the general operation of the unit.\n\nShut down the chiller, pumps and auxiliary equipment.\n\nDrain the condenser and chilled water piping.\n\nTurn off equipment power as necessary.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nCONDENSER CLEANING\nWATER-COOLED CONDENSERS BRUSH TUBES\n(600 Tubes/Day) CDS-210\nPull easy end head, both ends\n\nBrush tubes.\n\nNOTE: The term easy end head refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit s having marine boxes.\n\nLUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130\n\nChange the oil and filter, using factory-recommended oil and filter every year.\n\nCOOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nSTRUCTURE\n\nDisassemble all screens and access panels for inspection.\n\nInspect the conditions of the slats.\n\nInspect the condition of the tower fill.\n\nInspect the condition of the support structure.\n\nInspect the condition of the basins (upper and lower), spray nozzles, and olson pan. Make necessary repairs to basins and replace nozzles if any issues.\n\nVerify clean basins and strainer(s).\n\nVerify the condition and operation of the basin fill valve system.\n\nFill basin\n\nMECHANICAL\n\nInspect gear box for leaks.\n\nInspect drive and coupling for condition and security\n\nInspect fan assembly for condition, security, and clearances (e.g. blade tip clearance).\n\nLubrication\n\nLubricate motor bearings.\n\nCheck gear box oil level.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactor(s) for free and smooth operation.\n\nMeg the motor and record reading.\n\nCheck disconnect terminal block for wear, tightness and signs of overheating and discoloration.\nCheck the condition and operation of the basin heater contactor(s).\n\nSTARTUP / CHECKOUT PROCEDURE CLT-220\n\nFill the basin and verify float level.\n\nVerify the operation of the basin heaters.\n\nVerify the operation, set point, and sensitivity of the basin heater temperature control device.\nStart the condenser water pumps.\n\nVerify the balance of the return water through the distribution boxes.\n\nVerify proper operation of the bypass valve(s), if applicable.\n\nOperate the fan(s) and verify smooth operation.\n\nLog operation after the system has stabilized.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CLT-230\n\nCheck the general condition of the tower.\n\nVerify clean basins and strainers (upper and lower) and/or spray nozzles. Note, Building 20 strainer cleaning required for mid-season inspection.\n\nVerify proper water level in the basin.\n\nVerify proper operation of the water level control device.\n\nVerify smooth operation of the fan(s).\n\nVerify proper operation of the bypass valve(s).\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate uncorrected deficiencies detected.\n\nDIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110\n\nReport in with the COTR\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nCheck motor shaft and pump shaft for alignment.\n\nInspect the coupling for wear.\n\nVerify that the shaft guard is in place and tight.\n\nVerify water flow through the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nVerify smooth operation of the pump.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nLubrication\n\nLubricate the motor bearings as necessary.\n\nLubricate the pump bearings as necessary.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nMeg the motor.\n\nVerify tight connections on the motor terminals.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nVerify proper volts and amps.\n\nPUMP RUN INSPECTION PMP-111\n\nVerify smooth operation of the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nVARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nClean the heat sinks.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVisually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture.\nVerify proper operation of the unit.\n\nVerify proper DC buss voltage.\n\nTRANE CENTRIFUGAL CHILLERS W-C\n(CVHE/F Style Units)\nCOMPREHENSIVE ANNUAL INSPECTION SERVICE ELECTRONIC CTV-210\n\nReport in with the Customer Representative.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with customer for operational problems and trends.\n\nGeneral Assembly\n\nCheck and record refrigerant level.\n\nInspect for leaks and report leak results (yearly).\n\nThe refrigerant should be correct before starting the leak check. To prevent unnecessary venting of refrigerant, EPA-recommended methods (e.g. hot water and/or electric blankets) must be used to pressurize the vessels.\nIn order to use EPA-recommended methods, certain conditions must be met:\n\nThe isolation valves on the chilled water and condenser water lines must shut off the circulation completely.\nThe temperature of the equipment room should be 70Â°F or higher.\n\nAccess connections to the condenser water and chilled water circuits must be provided (customer s responsibility).\nIf these conditions cannot be met, the refrigerant must be removed and the vessel pressurized, using dry nitrogen and a trace gas. This additional procedure is within the scope of this agreement.\nCalculate refrigerant loss and report to the COTR.\n\nRepair minor leaks as required (e.g., valve packing, flare nuts).\n\nVisually inspect condenser tubes for cleanliness.\n\nCheck internal vanes for free and smooth operation.\n\nCheck mechanical linkages for wear.\n\nPurge\nCheck purge unit controls for proper operation.\n\nCheck and clean purge drum as required.\n\nClean the condenser coil.\n\nClean strainers or replace filters as required.\n\nCheck the purge compressor assembly for leaks as required.\n\nCheck the purge unit for proper operation.\n\nControls and Safeties\nVerify all settings in the electronic control panel.\n\nInspect the control panel for cleanliness.\n\nInspect wiring and connections for tightness and signs for overheating and discoloration.\n\nVerify the operation of the vane control system:\n\nVerify the working condition of all indicator/alarm lights and LED/LCD displays.\n\nVerify the operation of the oil sump temperature control device.\n\nTest high condenser pressure safety device. Calibrate and record setting.\n\nTest low evaporator temperature safety device. Calibrate and record setting.\n\nTest low oil pressure safety device. Calibrate and record setting.\n\nTest high motor temperature safety device. Calibrate and record.\n\nTest operation of chilled water pump and condenser water pump starter auxiliary contacts.\n\nLubrication System\nPull oil sample for spectroscopic analysis.\n\nCheck oil for acid content and discoloration. Make recommendations to the customer based on the results of the test.\nMeasure and record the oil pump voltage and amperage.\n\nVerify the operation of the oil heater. Measure amps and compare readings with the watt rating of the heater.\nChange the oil and oil filter.\n\nVerify the oil level.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nCheck tightness of the motor terminal connections.\n\nMeg the motor and record reading.\n\nVerify the operation of the electrical interlocks.\n\nSTARTUP / CHECKOUT PROCEDURE CTV-220\n\nVerify the operation of the oil heater and that the oil temperature is at least 110Â°F before starting the chiller.\nVerify full water systems, including the cooling tower, condenser and evaporator.\n\nVerify clean cooling tower and strainers.\n\nStart the condenser water pump, chilled water pump, and cooling tower fan(s).\n\nTest all flow-proving devices on the chilled water and condenser water circuits\n\nVerify the flow rates through the condenser and the evaporator.\n\nStart the chiller.\n\nVerify the operation of all timing devices.\n\nVerify the operation of the current control device.\n\nCheck the set point and sensitivity of the chilled water temperature control device. Verify the operation.\nVerify the operation of the condenser water temperature control device.\n\nCheck the mechanical limits of both vane arms. Verify smooth movement of vane arms through the full range of operation.\nCheck the starter operation.\n\nVerify the motor cooling operation.\n\nCheck the purge operation.\n\nShut down the chiller.\n\nCheck the oil and refrigerant levels, provide leak rate calculation report if levels are low.\n\nRe-start the chiller and log the operating conditions after the system has stabilized.\n\nReview operating procedures with the operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CTV-230\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the purge unit.\n\nCheck the operation of the control circuit.\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data. Compare the data to the original design conditions.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nSEASONAL SHUT-DOWN PROCEDURE CTV-250\n\nCheck the general operation of the unit.\n\nShut down the chiller, pumps, and auxiliary equipment.\n\nDrain the condenser and chilled water piping as required.\n\nTurn off equipment power as necessary.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nAir-Cooled Rotary Chillers ACR-1\nReview operation logs with COTR for any problems and trends.\n\nCheck and record refrigerant level, provide leak rate calculation report if levels are low.\n\nInspect for leaks, conduct leak check using EPA-recommended methods, and report leak results.\nCalculate refrigerant loss.\n\nRepair all minor leaks as required such as valve packing, flare nuts, etc.\n\nVisually inspect condenser coil for cleanliness.\n\nCheck the condenser fans for clearances and free operation.\n\nCheck tightness of condenser fan motor mounting brackets.\n\nCheck the set screws on the fan shafts.\n\nVerify the performance of the fan control inverter VFD.\n\nGrease fan bearings as required.\n\nAnnually, clean the condenser coil.\n\nVerify all settings in the electronic control panel.\n\nInspect the control panel for cleanliness.\n\nInspect controls and safety wiring and connections for tightness and signs of overheating and discoloration.\nVerify the working condition of all indicator/alarm lights and LED/LCD displays. Replace lights as required.\nTest the oil pressure safety device. Calibrate and record setting.\n\nTest high motor temperature safety device. Calibrate and record setting.\n\nTest operation of chilled water pump and condenser water pump starter auxiliary contacts.\nPull one oil sample per year for spectroscopic analysis.\n\nAnnually, check oil for acid content and discoloration. Change oil if out of normal parameters.\nVerify the operation of the oil heaters. Measure amps and compare readings with the wattage rating of the heaters.\nClean the starter cabinet and starter components.\n\nStart the unit if not already in operation.\n\nInspect motor and starter wiring and connections for tightness and signs of overheating and discoloration.\nCheck condition of contacts for wear and pitting.\n\nCheck contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nCheck tightness of the motor terminal connections.\n\nAnnually, meg the motor and record reading.\n\nVerify the operation of the electrical interlocks.\n\nMeasure and record voltages.\n\nProvide function test loss of normal operation and automatic emergency start up\n\nOnce per year, pull a refrigerant sample for spectrographic analysis for contaminants.\n\na. Additionally Performed During Mid-Season PM w/Equipment Running (Schedule during July)\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the control circuit.\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data and compare to the original design conditions for the equipment.\nReview operating procedures with COTR and VA staff.\n\nCENTRAL STATION AIR HANDLING UNITS COMPREHENSIVE ANNUAL INSPECTION AHU-110\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nInspect the unit for cleanliness.\n\nInspect the fan wheel and shaft for wear and clearance.\n\nCheck the sheaves and pulleys for wear and alignment.\n\nCheck the belts for tension, wear, cracks, and glazing.\n\nVerify tight bolts, set screws, and locking collars.\n\nCheck dampers for wear, security and linkage adjustment.\n\nVerify clean condensate pan.\n\nVerify proper operation of the condensate drain.\n\nVerify clean air filters.\n\nVerify clean coils.\n\nVerify proper operation of the spray pump, if applicable.\n\nVerify smooth fan operation.\n\nLog operating conditions after system has stabilized.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nLubrication\nLubricate the fan shaft bearings, if applicable.\n\nLubricate the motor bearings, if applicable.\n\nControls and Safeties\nTest the operation of the low temperature safety device, if applicable.\n\nTest the operation of the high static pressure safety device, if applicable.\n\nTest the operation of the low static pressure safety device, if applicable.\n\nCheck the thermal cutout on electric heaters, if applicable.\n\nCheck the step controller, if applicable.\n\nCheck and record supply air and control air pressure, if applicable.\n\nVerify the operation of the control system and dampers while the fan is operating.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect the wiring and connections for tightness and signs of overheating and discoloration. This includes wiring to the electric heat, if applicable.\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nMeg the motor and record readings.\n\nSCHEDULED RUNNING INSPECTION AHU-130\nCheck the general condition of the fan.\n\nVerify smooth fan operation.\n\nCheck and record supply and control air pressure, if applicable.\n\nFunction test loss of normal operation and emergency start up\n\nVerify the operation of the control system.\n\nLog the operating conditions after the system has stabilized.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate uncorrected deficiencies detected.\n\nVANE AXIAL FANS TRANE COMPREHENSIVE ANNUAL INSPECTION EXHAUST FANS\nFAN-130\n\nReport in with the COTR\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the COTR for operational problems and trends.\n\nGeneral Assembly\nInspect fan wheel for wear, security, and clearance.\n\nInspect sheaves and pulleys for wear and alignment.\n\nInspect belts for tension, wear, cracks, and glazing.\n\nVerify tight bolts, set screws, and locking collars.\n\nVerify smooth operation of the fan.\n\nLog operating conditions after the system has stabilized.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nLubrication\nLubricate the fan bearings.\n\nLubricate the motor bearings, if applicable.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect the wiring and connections for tightness and signs of overheating and discoloration.\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactor for free and smooth operation.\n\nMeg the motor and record the readings.\n\nCheck and record volts and amps of the motor.\n\nPURGE SYSTEMS PURIFIER PURGE PRG-130\nClean the condenser on the purge refrigeration unit.\n\nCheck purge unit controls for proper operation.\n\nCheck and clean purge drum.\n\nClean strainers or replace filters.\n\nCheck purge compressor assembly for leaks.\n\nCheck the purge unit for proper operation.\n\nLEAK CHECK (HIGH PRESSURE)\nWATER COOLED High Pressure Leak Check LCK-11O\n\nInspect for leaks and report results.\n\nRepair minor leaks as required (e.g. valve packing, flare nuts).\n\nCalculate refrigerant loss rate and report to the customer.\n\nCONDENSER CLEANING\nWATER-COOLED CONDENSERS BRUSH TUBES\n(600 Tubes/Day) CDS-210cds\n\nPull both heads.\n\nEddy Current test every 2 years.\n\nBrush tubes as necessary.\n\nNOTE: The term easy end head refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit s having marine boxes.\n\nLUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130\nChange the oil and filter, using factory-recommended oil and filter.\n\nREFRIGERANT MONITORS ANNUAL MAINTENANCE INSPECTION MSC-320\nReport in with the COTR.\n\nRecord and report abnormal conditions.\n\nCheck chassis mounting in enclosure.\n\nCheck operation of Clear Language Display.\n\nReplace sampling filter element /elements at sensing points.\n\nProvide Zero and Span calibration to accuracy within 1 PPM.\n\nVisually check photo-acoustic sensing device.\n\nCheck periodic re-zeroing.\n\nCOOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\nSTRUCTURE\n\nDisassemble all screens and access panels for inspection.\n\nInspect the conditions of the slats, if applicable.\n\nInspect the condition of the tower fill.\n\nInspect the condition of the support structure.\n\nInspect the condition of the basins (upper and lower) and/or spray nozzles.\n\nVerify clean basins and strainer(s).\n\nVerify the condition and operation of the basin fill valve system.\n\nMECHANICAL\n\nInspect gear box for leaks.\n\nInspect drive and coupling for condition and security\n\nInspect fan assembly for condition, security, and clearances (e.g. blade tip clearance).\n\nLubrication\nLubricate motor bearings.\n\nCheck gear box oil level.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactor(s) for free and smooth operation.\n\nMeg the motor and record reading.\n\nCheck disconnect terminal block for wear, tightness and signs of overheating and discoloration.\nCheck the condition and operation of the basin heater contactor(s).\n\nSTARTUP / CHECKOUT PROCEDURE CLT-220\nFill the basin and verify float level.\n\nVerify the operation of the basin heaters.\n\nVerify the operation, set point, and sensitivity of the basin heater temperature control device.\nStart the condenser water pumps.\n\nVerify the balance of the return water through the distribution boxes.\n\nVerify proper operation of the bypass valve(s), if applicable.\n\nOperate the fan(s) and verify smooth operation.\n\nLog operation after the system has stabilized.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CLT-230\nCheck the general condition of the tower.\n\nVerify clean basins and strainers (upper and lower) and/or spray nozzles.\n\nVerify proper water level in the basin.\n\nVerify proper operation of the water level control device.\n\nVerify smooth operation of the fan(s).\n\nVerify proper operation of the bypass valve(s).\n\nDIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110\nReport in with the COTR\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\nCheck motor shaft and pump shaft for alignment.\n\nInspect the coupling for wear.\n\nVerify that the shaft guard is in place and tight.\n\nVerify water flow through the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nVerify smooth operation of the pump.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nLubrication\nLubricate the motor bearings as necessary.\n\nLubricate the pump bearings as necessary.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nMeg the motor and record results.\n\nVerify tight connections on the motor terminals.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nVerify proper volts and amps.\n\nPUMP RUN INSPECTION PMP-111\nVerify smooth operation of the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nVARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nClean the heat sink.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVisually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture.\n\nVerify proper operation of the unit.\n\nVerify proper DC buss voltage.\n\nEach inspection will be provided in accordance with the system/equipment manufacturers factory recommended procedures. Each inspection shall, at a minimum, include the following as specified for the equipment make, type, and time of seasonal operation. Any additional parts not identified in this document will not be covered by this contract. The vendor will obtain prior approval from the COTR prior to performing any additional repair work and the additional work will be billed separately.\n\nFor each PM inspection, the contractor will provide a detailed written report to the COTR that summarizes work performed, problems/deficiencies found, and measurements taken. This report will be submitted within 10 calendar days of the date of PM inspection.\n\nAll work will be performed between the hours of 7:30 a.m. and 4:00 p.m. on the prearranged dates.\n\nAll inspection work must be coordinated through the COTR who is:\n\nEMERGENCY SERVICE\nEmergency repair service is not covered by the contract. However, the contractor will provide a preferred customer response to emergency repair calls that includes labor and parts costs to be billed separately.\n\nCONTRACTOR PERSONNEL\n\nPersonnel Experience. All work shall be performed by competent mechanics, experienced and qualified to work on the specific makes and models of equipment listed in this contract. The Contractor shall submit to and for the approval of the Contracting Officer, certification and a list of credentials of the approved mechanics. Personnel shall have a minimum of three (3) years recent experience related to this work. The contractor must provide a list of three (3) reference contacts that have been provided service on similar or identical equipment. The contractor must provide authenticated factory training certificates or credentials (or acceptable substitute as approved by the COTR) for any personnel who are working on any VA equipment. The VA specifically reserves the right to reject any of the contractor s personnel and refuse them permission to work on VA equipment.\nConduct of Personnel. The Contractor shall ensure that his personnel present a professional appearance at all times and that their conduct shall not reflect discredit upon this facility or the Department of Veterans Affairs. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The removal from the job site of such a person shall not relieve the Contractor of the requirement to provide sufficient personnel to perform adequate and timely service. All employees shall be legal residents of the United States and be able to understand, speak, read and write the English language.\nIdentification of Employees. : The Contractor shall within 10 calendar days before beginning performance of work provide the Contracting Officer a list of all employees who will perform under this contract. The list shall include the full name, and work assignment of each employee. The Contractor shall notify the Contracting Officer in writing of any addition, deletion or change in work assignment within 10 days of such change. Each of the Contractor's employees shall conspicuously display on their person a badge provided by the VA West Roxbury Police Office.\n\nHOURS OF OPERATION\nNormal Duty Hours. The Contractor shall have employees available Monday through Friday, except legal public holidays at the times specified to perform routine work and inspections.\nFederal Holidays. Federal Holidays observed by the VA are:\n\nNew Years Day; Martin Luther King Day; President s Day; Memorial Day; Independence Day; Labor Day; Columbus Day; Veterans Day; Thanksgiving Day; and Christmas.\n\nCONTRACTOR QUALITY CONTROL\n\nThe Contractor shall establish and maintain a Quality Control Program that ensures that all requirements of the contract are provided as specified.\n\nINSPECTION AND ACCEPTANCE\n\nFinal inspection and acceptance by the Government shall be made at the site of each system. However, final inspection and acceptance do not preclude the Government's right to inspect completed work prior to shipment from the Contractor's shop nor does it waive any rights of the Government.\nUnsatisfactory service will be reported in writing by the VA CO to the Contractor.\n\nTelephone Answering Service: The Contractor shall maintain, at his own expense, a dedicated (tie-line) toll-free telephone answering service for the exclusive use in the performance of this contract. This answering service shall be monitored during normal work hours as identified in the specifications.\n\nREMOVAL AND/OR DISPOSAL\nRemoving Government-Owned Material: All property removed remains the property of the\nU.S. Government and shall be returned by the Contractor to a place of storage as designated by the CO or COTR.\nSalvage: Items received by the Contractor that are non-repairable because of condition, or declared unfit for economical rehabilitation by the Contractor, shall be returned to the Government. All salvage remaining in the Contractor's shop shall remain Government property and may be used for repair of any Government-owned equipment when released by the CO. The Contractor shall be required to maintain an account record of inventory upon completion of the maintenance contract.\nInventories shall not be disposed of by the Contractor without inspection and written approval of the CO. Salvaged parts used in the repair of any government owned equipment shall be treated by the Contractor as Government furnished material and reflected as same on Contractor's invoices when submitted for payment. All salvage in the possession of the\n\nContractor, upon expiration of the contract, will be returned to the Government within thirty (30) days after such expiration.\n\nFIRE PREVENTION AND PROTECTION\n\nThe Contractor shall fully acquaint himself and his personnel with the location of fire equipment before work, take all prudent measures to minimize fire hazards that result from work, complies with all ordering agency fire and safety regulations.\n\nENERGY CONSERVATION\nThe Contractor is required to comply with all energy conservation regulations and instructions that are applicable to Government-owned facilities including but not limited to thermostat settings.\n\nCLEANING UP\nThe Contractor shall clean up after work, leaving each area where work is performed, neat and clean. All containers, trash and debris for which he is responsible shall be removed.\n\nHAZARDOUS CONDITIONS\nDuring the course of performing work under this contract, should the Contractor find serious or hazardous conditions existing with or in any of the equipment the Contractor shall secure the equipment and immediately notify the COTR.\n\nCLEANLINESS\nThe area immediately around the equipment provided for the Contractor s use shall be kept in a clean and orderly condition. Trash and waste material shall not be permitted to accumulate, but shall be removed by the Contractor s employees.\n\nSERVICE MANUALS\nThe VA shall not provide service manuals or service diagnostic software to the contractor. The contractor shall obtain, have on file, and make available to its FSEs all operational and technical documentation, (such as: operational and service manuals, schematics, and parts lists), which are necessary to meet the performance requirements of this contract. The location and listing of the service data manuals, by name, and/or the manuals themselves shall be provided to the CO upon request.\n\nINSURANCE\n\nWorker compensation and employer s liability. Contractor and any subcontractor covered under this contract are required to comply with applicable Federal and State Worker s Compensation and occupational disease statutes.\nGeneral Liability. Contractor and any subcontractor covered under this contract are required to have Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.\n\nProperty Damage Liability. Contractor and any subcontractor covered under this contract are to have Property Damage Liability insurance coverage of at least $500,000.\nContractor shall provide proof of liability insurance within five (5) days after contract award.\n\nSMOKING POLICY\nSmoking is prohibited inside all buildings except in designated areas.\n\nBILLING AND PAYMENT\nEach invoice shall contain the documentation required by this contract. The invoices shall be itemized to contain the equipment s identifier. When parts are furnished by the Government, they shall be itemized on Contractor's invoice at no-cost and indicated as Government-furnished parts.\nPayment. Payment will be made 30 days in arrears upon receipt of properly prepared invoice. Invoice must contain the contract number and the purchase order number.\n\nPRICING SUBMITTAL\n\nThe annual pricing of the contract should be itemized by the bidders to reflect a cost per unit PM per equipment item covered by contract.\n\nVENDOR REQUIREMENTS\n\nThe contractor must employ mechanics and technicians that are trained in the applicable codes, standards, and manufacturer requirements for maintenance and repair of the Trane and McQuay equipment covered by this contract.\nThe contractor must have at least 5 years experience satisfactorily performing such maintenance on comparable units, equipment, or systems.\nThe contractor must have access to OEM (original equipment manufacturer)- manufactured parts and materials required for performance of this work.\nThe contractor must have sufficient supplies, tools, and equipment to perform all requirements of this contract.\n\nEQUIPMENT COVERED BY THIS CONTRACT\n\nBUILDING # 1\nVA ID#\nMANUFACTURER\nITEM NAME\nMODEL #\nSERIAL#\nSCHEDULE\nLOCATION\nÂ\nTrane (MICU) Back-Up\nAir-Cooled Chiller\nCGAM070F2Y03AXD2A1\nU22A00424\nACR-1\nWR-B1- 4B128\nÂ\nTrane (CCU)\nAir-Cooled Chiller\nCGAM070F2Y03AXD2A1\nU22A00422\nACR-1\nWR-B1- A4-01\nBUILDING # 2\nÂ\nTrane\nCentrifugal Chiller\nCVHF0910\nL03M08522\nCTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130\nWR-B2-AB- 13\nÂ\nTrane\nCentrifugal Chiller\nCVHF0910\nL03M08531\nCTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130\nWR-B2-AB- 13\nÂ\nMarley\nCooling Tower-1\nNC-8309 GZBS\nNC-241518-A2\nCLT-210, CLT-230, CLT-220\nWR-B2-A4-01\nÂ\nMarley\nCooling Tower-2\nNC-9309 GZBS\nNC-241518-A1\nCLT-210, CLT-230, CLT-220\nWR-B2-A4-01\nÂ\nTrane\n(OR- Back-Up) Air-Cooled Chiller\nRTAA0804YR01A301GBFC\nU06B06111\nACR-1\nWR-B2-A4-01\nÂ\nTrane\n(GI) Air-Cooled Chiller\nCGAFC304AK01A00000\nC06A00249\nACR-1\nWR-B2-A4-01\nÂ\nTrane\n(S5C) Air-Cooled Chiller\nRTAC1404\nU10F07753\nACR-1\nWR-B2-A4-01\nÂ\nTrane (Artic Chiller)\nChiller Modular -1\nPACVMV0400D4-MM-VS1\nA10001137\nRunning Inspection\nWR-B2-PH\nÂ\nTrane (Artic Chiller)\nChiller Modular -2\nPACVMV0400D4-MM-VS1\nA101011417\nRunning Inspection\nWR-B2-PH\nÂ\nTrane (Artic Tower)\nTower Modular-2\nTP00004075\nA101011517\nTower Cleaning & Running Inspection\nWR-B2-PH\nÂ\nTrane\nSPS Condenser\nRAUJ804A132BDF01D\nC10J04548\nACR-1\nWR-B2-POOL ROOF\nÂ\nTrane\nS5C AHU\nMCCB05ONBFOSDAA\nK08B22619\nAHU-110, AHU-130\nWR-B2-A4-01\nÂ\nTrane\n(OR-S5) AHU\nMCCB05OUA0AOUB\nK09D83236A\nAHU-110, AHU-130\nWR-B2-A4-01\nÂ\nTrane\nAHU-1A\nCSAA012UBL00\nK17C26642\nAHU-110, AHU-130\nWR-B2-ROOF\nÂ\nTrane\nAHU-1B\nCSAA0100\nK17C26621\nAHU-110, AHU-130\nWR-B2-ROOF\nÂ\nCarrier\n(S8-Elv Mch Rm) Air Cooled Chiller\n38ARZ008-601CA\n3806G50045\nACR-1\nWR-B2-ROOF\nÂ\nTrane\n(CTIR) Air Cooled Chiller\nTTA09044DAA02BS010001\n23193610YA\nACR-1\nWR-B2-ROOF\nÂ\nTrane\n(CTIR) Dry Cooler\nTR-SCS-120-SSA\n10331148\nACR-1\nWR-B2-ROOF\nÂ\nBarry Blower\nExhaust Fan\nEM2515T-G\n76-2902\nFAN-130\nWR-B2-PH\nÂ\nCook MFG\nExhaust Fan\n195CPS\nN/A\nFAN-130\nWR-B2-AB- 13\nÂ\nVaneaxial Fan\nExhaust Fan E-5\nN/A\nN/A\nFAN-130\nWR-B2-A4-01-PH\nÂ\nVaneaxial Fan\nExhaust Fan GE-1\nN/A\nN/A\nFAN-130\nWR-B2-A4-01-PH\nÂ\nBaldor Reliance\n2-SCHW-Pump-1\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-SCHW-Pump-1 Frame\nE-1510\nC331015-01A22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-SCHW-Pump-2\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-SCHW-Pump-2 Frame\nE-1510\nC331015-01G22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-SCHW-Pump-3\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-SCHW-Pump-3 Frame\nE-1510\nC331015-01C22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-SCHW-Pump-4\nEM3311T-G\n37J839L863G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-SCHW-Pump-4 Frame\nE-1510\nC331016-01B22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-SCHWP-1 VDF\n174Z4893\n988204Y252\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-SCHWP-2 VDF\n174Z4893\n525204Y182\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-SCHWP-3 VDF\n174Z4893\n525204Y182\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-SCHWP-4 VDF\n174Z4893\n771804Y222\nMSC-130\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-PCHW-Pump-1\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-PCHW-Pump-1 Frame\nVSC\nC331009-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-PCHW-Pump-2\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-PCHW-Pump-2 Frame\nVSC\nC331009-03C22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-PCHW-Pump-3\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-PCHW-Pump-3 Frame\nVSC\nC331009-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-PCHWP-1 VDF\n174Z4898\n986904Y252\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-PCHWP-2 VDF\n174Z4898\n986804Y252\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-PCHWP-3 VDF\n174Z4898\n986604Y252\nMSC-130\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-CW-Pump-1\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-CW-Pump-1 Frame\nVSC\nC331008-02D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-CW-Pump-2\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-CW-Pump-2 Frame\nVSC\nC331008-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-CW-Pump-3\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-CW-Pump-3 Frame\nVSC\nC331008-03D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-CWP-1 VDF\n174Z4902\n271004Y292\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-CWP-2 VDF\n174Z4902\n270804Y292\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-CWP-3 VDF\n174Z4902\n270904Y292\nMSC-130\nWR-B2-AB- 13\nÂ\nStrainer\nCW Strainer-1\n10\" ASTM A126 GR.B\nN/A\nClean Strainer\nWR-B2-AB- 13\nÂ\nStrainer\nCW Strainer-2\n10\" ASTM A126 GR.B\nN/A\nClean Strainer\nWR-B2-AB- 13\nÂ\nStrainer\nCW Strainer-3\n10\" ASTM A126 GR.B\nN/A\nClean Strainer\nWR-B2-AB- 13\nBUILDING # 3\nÂ\nTrane\nCentrifugal Chiller\nCVHE0450\nL09A05825\nCTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130\nWR-B3-3C101\nÂ\nTrane\nCentrifugal Chiller\nCVHE0450\nL09A05826\nCTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130\nWR-B3-3C101\nÂ\nTrane\n(B3-Cross Connect )Air-Cooled Chiller\nRTAC\nU22A00455\nACR-1\nWR-B3-ROOF\nÂ\nEvapco\nCooling Tower\nLST-10-183T\n879038\nCLT-210, CLT-220, CLT-230\nWR-B3- ROOF\nÂ\nEvapco\nCooling Tower\nLST-10-183T\n879039\nCLT-210, CLT-220, CLT-230\nWR-B3- ROOF\nÂ\nABB\nCooling Tower-1 VFD\nACH550-UH-045A-4\n2090602672\nMSC-130\nWR-B3-3C101\nÂ\nABB\nCooling Tower-2 VFD\nACH550-UH-045A-4\n2090602674\nMSC-130\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCHW-Pump-1\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCHW-Pump-2\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCHW-Pump-3\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nABB\n3-PCHW-Pump-1 VFD\nACH550-UH-038A-4\n2090602676\nMSC-130\nWR-B3-3C101\nÂ\nABB\n3-PCHW-Pump-2 VFD\nACH550-UH-038A-4\n2090602673\nMSC-130\nWR-B3-3C101\nÂ\nABB\n3-PCHW-Pump-3 VFD\nACH550-UH-038A-4\n2090602675\nMSC-130\nWR-B3-3C101\nÂ\nStrainer\nBldg-3-CW Strainer-1\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer\nWR-B3-3C101\nÂ\nStrainer\nBldg-3-CW Strainer-2\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer\nWR-B3-3C101\nÂ\nStrainer\nBldg-3-CW Strainer-3\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCW-Pump-1\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCW-Pump-2\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCW-Pump-3\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nABB\n3-PCW-Pump-1 VFD\nACH550-UH-031A-4\n2090602687\nMSC-130\nWR-B3-3C101\nÂ\nABB\n3-PCW-Pump-2 VFD\nACH550-UH-031A-4\n2090602685\nMSC-130\nWR-B3-3C101\nÂ\nABB\n3-PCW-Pump-3 VFD\nACH550-UH-031A-4\n2090602688\nMSC-130\nWR-B3-3C101\nBUILDING # 20 & 21\nÂ\nTrane Arctic\nChiller Mod 1\nTPWCCMV0300D4-MM\nA022047224\nRunning Inspection\nWR-B20\nÂ\nTrane Arctic\nChiller Mod 2\nTPWCCMV0300D4-MM\nA022047124\nRunning Inspection\nWR-B20\nÂ\nTrane Arctic\nChiller Mod 3\nTPWCCMV0300D4-MM\nA022047024\nRunning Inspection\nWR-B20\nÂ\nTrane\nCondenser Unit\nRAUJC604BA03AOD\nC10B00682\nACR-1\nWR-B21\nÂ\nTrane\nCondenser Unit\nRAUJC604BA03AOD\nC10B00681\nACR-1\nWR-B21\nÂ\nEvapco\nCooling Tower-1\nUSS14-86\n16-780293\nCLT-210, CLT-220, CLT-230\nWR-B21\nÂ\nEvapco\nCooling Tower-2\nUSS14-86\n16-780292\nCLT-210, CLT-220, CLT-230\nWR-B21\nÂ\nWEG\n21-CW-Pump-1\n01018OT3E215T-S\n103116362\nPMP-110, PMP-111\nWR-B21\nÂ\nWEG\n21-CW-Pump-2\n0118OT3E215T-S\n103116359\nPMP-110, PMP-111\nWR-B21\nÂ\nWEG\n21-CHW-Pump-1\n020180T3E256T-S\n1030953958\nPMP-110, PMP-111\nWR-B21\nÂ\nWEG\n21-CHW-Pump-2\n021080T3E256T-S\n1030953957\nPMP-110, PMP-111\nWR-B21\nÂ\nABB\n21-CW-Pump-1 VFD\nACH550-PCR-015A\n216900159\nMSC-130\nWR-B21\nÂ\nABB\n21-CW-Pump-2 VFD\nACH550-PCR-015A\n216900142\nMSC-130\nWR-B21\nÂ\nABB\n21-CHW-Pump-1 VFD\nACH550-PCR-031A\n216900168\nMSC-130\nWR-B21\nÂ\nABB\n21-CHW-Pump-2 VFD\nACH550-PCR-031A\n216900182\nMSC-130\nWR-B21\nÂ\nStrainer\nCW Strainer-1\nN/A\nN/A\nClean Strainer\nWR-B21\nÂ\nStrainer\nCW Strainer-2\nN/A\nN/A\nClean Strainer\nWR-B21\n\nThe NAICS code for this requirement is 238220.\n\nEngineering identifies Trane U.S. Inc. as the required single source for the complete manufacturer-supported Trane chiller maintenance program. The statement of work specifically calls for KestrelView analysis using a Trane laptop and software and for equipment-specific controls, protective-device, refrigerant, and mechanical service procedures that depend on Trane equipment documentation, specialized diagnostic resources, and qualified manufacturer support. These requirements go beyond generic HVAC maintenance and are central to assessing the condition and reliable operation of the installed Trane chillers.\n\nThe VA-owned Trane-controlled equipment and Trane Ensemble platform require Trane-specific software, programming capability, and replacement supplies and identified Trane as the contractor then able to deliver the specified integrated service. Those historical findings are being incorporated as the technical basis for continuity of the current installed-equipment requirement. Equipment lists have changed because of campus upgrades; this does not alter the need for the specified OEM diagnostic methods and chiller-specific maintenance capability.\n\nThe Government has intentionally retained Trane equipment as a principal element of its West Roxbury cooling infrastructure. Standardization and operational continuity are relevant to maintenance reliability, availability of consistent OEM service procedures, and safe seasonal transition of the chilled-water plants. Engineering requires the Trane-specific diagnostic portion to be integrated with the ongoing scheduled service program to ensure that findings, repairs recommendations, and unit availability are evaluated as one coordinated plant-maintenance effort.\n\nThe associated pumps, drives, cooling towers, and connected components are necessary for the cooling plant to function. The technical basis for a Trane-only order is the complete integrated service requirement with manufacturer-specific chiller diagnostics and supported service access. Trane is the only provider identified in the supplied acquisition history as delivering the Trane-specific diagnostic and coordinated plant-maintenance requirement.\n\nThis notice of intent is not a solicitation nor is it a request for proposal. However, interested parties that believe they can satisfy the requirement must clearly identify their capability to do so in writing by Monday, November 25, 2026 at 12 pm EST time. Response should be sent to Issa Shawki at issa.shawki@va.gov. Information submitted in response to this notice will be used solely to determine whether competitive procedures could be used for this acquisition. A determination not to open this requirement to competition based upon responses to this notice is solely within the discretion of the Government.","origin":"detail"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"36C24127Q0080","product_service_code":"J041"}],"due_at":"2026-11-25T17:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T17:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","state":"MA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":"description","state_evidence":"MEDICAL CENTER, 1400 VFW PARKWAY, WEST ROXBURY, MA 02132","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-11-20T05:30:09.595354Z","principal_notice_id":"6b8fbf1ac7e748b7b14eb744211ac31a","description":{"text":"The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in Brockton, MA intends to enter into a sole source procurement, pursuant to the authority of FAR 6.302-1, with TRANE, for the following requirement:\n\nSTATEMENT OF WORK\n\nSCOPE OF WORK\n\nThe Contractor shall provide all supervision, personnel, material, parts, equipment, supplies, labor and transportation in performing basic preventive maintenance on the chiller systems, Ensemble controls and equipment as listed in Attachment A and located at the Department of Veterans Affairs Medical Center, 1400 VFW Parkway, West Roxbury, MA 02132 in accordance with all terms and conditions of this task order and accepted quotation.\n\nPeriod of Performance: This will be a firm-fixed price, base year plus four option years task order.\n\nDEFINITIONS/ACRONYMS\n\nContract Discrepancy Report (CDR) : A report that the Government shall complete and issue to the Contractor when service is unsatisfactory and not in compliance with the terms and conditions of the contract. The Contractor is required to complete and return this form to the COR whenever performance is unsatisfactory. The CDR requires the Contractor to explain, in writing, the cause of the unsatisfactory performance, how performance will be returned to acceptable standards, and how reoccurrence of the problem will be prevented in the future.\n\nContracting Officer (CO): The individual with the authority to enter into, administer, and/or terminate contracts. The CO is the exclusive Government official authorized to execute changes and deviations or variations in the contract.\n\nContracting Officer's Technical Representative (COTR) : A Government representative, designated in writing by the Contracting Officer, to be responsible for quality assurance, inspection, surveillance, documentation and acceptance of the Contractor's performance. A copy of the letter of designation will be provided to the Contractor.\n\nPreventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions.\nTo clean, lubricate, calibrate, and test the equipment and/or instrument to the operating condition defined in the manufacturer s specifications.\n\nRepair Cost Estimate: The Contractors estimated cost (for parts, labor and freight) to repair a system according to manufactures' specifications and requirements. These repairs are covered under Emergency Service and repairs outside of routine maintenance.\n\nTime: When hours are given it shall mean clock hours exclusive of Saturdays, Sundays and Holidays unless otherwise specified (i.e., 1:00 P.M. Monday to 1:00 P.M. Tuesday equals 24 hours; 12:00 P.M. Friday to 12:00 P.M. Monday equals 24 hours). If days are indicated it shall mean calendar days including Saturdays, Sundays and Holidays.\n\nRework. The Contractor is required to correct and/or re-work any PM services due to unsatisfactory performance or nonperformance in accordance with the stated quality and level of effort in the PWS and final contract. Rework is performed at no additional cost to the Government.\nESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract.\n\nAcronyms. Commonly used acronyms are listed below\n\nFSE: Field Service Engineer\nAQL: Acceptable Quality Level\n\nIAW: In Accordance With\n\nQA: Quality Assurance\n\nQC: Quality Control\n\nWS: Performance Work Statement\n\nVA: VA Medical Center\n\nCO: Contracting Officer\n\nCOTR:Contracting Officer s Technical Representative FES: Facilities and Engineering Service\n\nPREVENTIVE MAINTENANCE REQUIREMENTS\n\nWithin 14 calendar days of Notice to Proceed, the vendor will submit to the COTR a written schedule of the planned PM visits for the coming year along with a written description of the work to be performed during each visit.\n\nThe following is the scope of services to be performed on Covered Equipment. Items marked with an X are included in this contract.\n\nServices Included\nCooling Seasonal Service\nServices Included\nHeating Seasonal Service\nX\nSeasonal Start-up\n\nSeasonal Start-up\nX\nOperating Inspections Qty\n\nOperating Inspections Qty\nX\nSystem Shutdown\n\nSystem Shutdown\nX\nAnnual Seasonal Maintenance\n\nAnnual Seasonal Maintenance\n\nServices Included\nLabor and Materials for Covered Equipment\nX\nScheduled Maintenance Labor\nX\nScheduled Maintenance Parts and Materials\nX\nRepair Labor: Repairs will be performed on covered equipment during Trane\nregular business hours Select Agreement\n\nRepair Parts and Materials Select Agreement\nX\nOvertime Repair Labor for Emergency Failures (outside Trane regular business\nX\nRefrigerant Monitor Inspection. Testing and Calibration once per year\n\nRefrigerant Replacement 0% of Charge per unit per year\nX\nRefrigerant Usage Reporting\n\nOther\n\nServices Included\nPredictive Testing and Analysis for Covered Equipment Chiller(s) Only\nX\nSpectrographic Oil Analysis Trending oil analysis provides insight into potential\nX\nRefrigerant Analysis Provides early warning of internal failure\nX\nKestrelView Analysis Requires Trane laptop and Trane software\nX\nOil Removal and Disposal by Trane in accordance with EPA Guidelines\nX\nOil Change\n\nServices Included\nAdditional Services\nX\nAir-cooled condenser coil cleaning once per year\nX\nClean Cooling Tower(s) once per year\nX\nCondenser Tube Cleaning & Evap Tube Cleaning once per year\n\nX\nStarter Maintenance 600 volt volt starter\nX\nEddy Current Test of tubes every 2 years\n\nOther\nChiller overhaul every 5 years was included in the current contract SOW\nEquipment Maintenance Procedures:\nTRANE CENTRIFUGAL CHILLERS\n(Low Pressure Units)\nCOMPREHENSIVE ANNUAL INSPECTION SERVICE TRANE CTV-512\n\nReport in with the COTR and sign log with name, date and time.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nInspect for leaks and report leak check results to the customer. Provide reports at the end of each visit.\n\nRepair minor leaks as required (e.g. valve packing, flare nuts). Provide reports at the end of each visit.\n\nCalculate refrigerant loss rate and report to COR. Provide report at end of each visit.\n\nReplace the filter / drier on the motor cooling line, in accordance with mfg specifications.\n\nTest the security of mounting points; tighten all major points.\n\nControls and Safeties\n\nInspect control panel for cleanliness.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVerify the working condition of all indicator/alarm lights.\n\nVerify the operation of all timing devices.\n\nVerify the operation of the oil temperature thermostat. Calibrate and record setting and provide report to COR.\n\nVerify the operation of the low oil temperature safety device. Calibrate and record setting.\nTest the high discharge pressure safety device. Calibrate and record setting.\n\nTest the high suction temperature switch. Calibrate and record setting.\n\nTest the high discharge temperature safety device. Calibrate and record setting.\n\nTest the low suction pressure safety device. Calibrate and record setting.\n\nTest the low pressure override switch. Calibrate and record setting.\n\nTest the low leaving water temperature control device. Calibrate and record setting.\n\nLubrication System\n\nPull oil sample for spectroscopic analysis.\nChange oil\n\nTest oil for acid content and discoloration. Make recommendations to the COTR based on the results of the test.\nInspect oil pump motor terminals for tightness and signs of overheating and discoloration.\nMeasure and record oil pump motor voltage and amperage.\n\nVerify the operation of the oil heater. Measure amps and compare reading with the watt rating of the heater.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect the wires and starter components for tightness and signs of overheating and discoloration.\nVerify the operation of the transition/system timer.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nVerify the operation of the electrical interlocks.\n\nCheck the dash pots oil for level, rust, and/or moisture.\n\nMeg the motor and record readings.\n\nCheck the motor terminals for cracks and/or leaks.\n\nMeasure voltage and record reading. Voltage should be nominal voltage Â±10%.\n\nSTARTUP / CHECKOUT PROCEDURE CTV-520\n\nVerify the operation of the oil heater and that the oil temperature is at least 110Â°F before starting the chiller.\nVerify full water systems, including the cooling tower, the condenser and the evaporator.\n\nVerify clean cooling tower and strainers.\n\nStart the condenser water pump, chilled water pump, and cooling tower fan(s).\n\nVerify flow rates through the condenser and the evaporator.\n\nTest all flow-proving devices on the chilled water and condenser water circuits.\n\nStart the chiller.\n\nVerify the starter operation.\n\nVerify the operation of all timing devices.\n\nCheck the load limit relay for set point, hunting, and unloading capability.\n\nCheck the mechanical limits on both vane arms. Verify smooth movement of vane arms.\n\nCheck the set point and sensitivity of the chilled water temperature control device. Verify the operation.\nVerify the operation of the condenser water temperature control device.\n\nVerify the motor cooling operation.\n\nShut down the chiller.\n\nCheck the oil and refrigerant levels, if levels are low provide leak rate calculation report to COR. (If the refrigerant charge needs correction, the refrigerant, and the labor to install it, are not included.)\nRe-start chiller and log the operating conditions after the system has stabilized.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CTV-530\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the purge unit.\n\nCheck the operation of the control circuit.\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data. Compare the data to the original design conditions.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nSEASONAL SHUT-DOWN PROCEDURE CTV-550\n\nCheck the general operation of the unit.\n\nShut down the chiller, pumps and auxiliary equipment.\n\nDrain the condenser and chilled water piping.\n\nTurn off equipment power as necessary.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nCONDENSER CLEANING\nWATER-COOLED CONDENSERS BRUSH TUBES\n(600 Tubes/Day) CDS-210\nPull easy end head, both ends\n\nBrush tubes.\n\nNOTE: The term easy end head refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit s having marine boxes.\n\nLUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130\n\nChange the oil and filter, using factory-recommended oil and filter every year.\n\nCOOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nSTRUCTURE\n\nDisassemble all screens and access panels for inspection.\n\nInspect the conditions of the slats.\n\nInspect the condition of the tower fill.\n\nInspect the condition of the support structure.\n\nInspect the condition of the basins (upper and lower), spray nozzles, and olson pan. Make necessary repairs to basins and replace nozzles if any issues.\n\nVerify clean basins and strainer(s).\n\nVerify the condition and operation of the basin fill valve system.\n\nFill basin\n\nMECHANICAL\n\nInspect gear box for leaks.\n\nInspect drive and coupling for condition and security\n\nInspect fan assembly for condition, security, and clearances (e.g. blade tip clearance).\n\nLubrication\n\nLubricate motor bearings.\n\nCheck gear box oil level.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactor(s) for free and smooth operation.\n\nMeg the motor and record reading.\n\nCheck disconnect terminal block for wear, tightness and signs of overheating and discoloration.\nCheck the condition and operation of the basin heater contactor(s).\n\nSTARTUP / CHECKOUT PROCEDURE CLT-220\n\nFill the basin and verify float level.\n\nVerify the operation of the basin heaters.\n\nVerify the operation, set point, and sensitivity of the basin heater temperature control device.\nStart the condenser water pumps.\n\nVerify the balance of the return water through the distribution boxes.\n\nVerify proper operation of the bypass valve(s), if applicable.\n\nOperate the fan(s) and verify smooth operation.\n\nLog operation after the system has stabilized.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CLT-230\n\nCheck the general condition of the tower.\n\nVerify clean basins and strainers (upper and lower) and/or spray nozzles. Note, Building 20 strainer cleaning required for mid-season inspection.\n\nVerify proper water level in the basin.\n\nVerify proper operation of the water level control device.\n\nVerify smooth operation of the fan(s).\n\nVerify proper operation of the bypass valve(s).\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate uncorrected deficiencies detected.\n\nDIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110\n\nReport in with the COTR\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nCheck motor shaft and pump shaft for alignment.\n\nInspect the coupling for wear.\n\nVerify that the shaft guard is in place and tight.\n\nVerify water flow through the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nVerify smooth operation of the pump.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nLubrication\n\nLubricate the motor bearings as necessary.\n\nLubricate the pump bearings as necessary.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nMeg the motor.\n\nVerify tight connections on the motor terminals.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nVerify proper volts and amps.\n\nPUMP RUN INSPECTION PMP-111\n\nVerify smooth operation of the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nVARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nClean the heat sinks.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVisually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture.\nVerify proper operation of the unit.\n\nVerify proper DC buss voltage.\n\nTRANE CENTRIFUGAL CHILLERS W-C\n(CVHE/F Style Units)\nCOMPREHENSIVE ANNUAL INSPECTION SERVICE ELECTRONIC CTV-210\n\nReport in with the Customer Representative.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with customer for operational problems and trends.\n\nGeneral Assembly\n\nCheck and record refrigerant level.\n\nInspect for leaks and report leak results (yearly).\n\nThe refrigerant should be correct before starting the leak check. To prevent unnecessary venting of refrigerant, EPA-recommended methods (e.g. hot water and/or electric blankets) must be used to pressurize the vessels.\nIn order to use EPA-recommended methods, certain conditions must be met:\n\nThe isolation valves on the chilled water and condenser water lines must shut off the circulation completely.\nThe temperature of the equipment room should be 70Â°F or higher.\n\nAccess connections to the condenser water and chilled water circuits must be provided (customer s responsibility).\nIf these conditions cannot be met, the refrigerant must be removed and the vessel pressurized, using dry nitrogen and a trace gas. This additional procedure is within the scope of this agreement.\nCalculate refrigerant loss and report to the COTR.\n\nRepair minor leaks as required (e.g., valve packing, flare nuts).\n\nVisually inspect condenser tubes for cleanliness.\n\nCheck internal vanes for free and smooth operation.\n\nCheck mechanical linkages for wear.\n\nPurge\nCheck purge unit controls for proper operation.\n\nCheck and clean purge drum as required.\n\nClean the condenser coil.\n\nClean strainers or replace filters as required.\n\nCheck the purge compressor assembly for leaks as required.\n\nCheck the purge unit for proper operation.\n\nControls and Safeties\nVerify all settings in the electronic control panel.\n\nInspect the control panel for cleanliness.\n\nInspect wiring and connections for tightness and signs for overheating and discoloration.\n\nVerify the operation of the vane control system:\n\nVerify the working condition of all indicator/alarm lights and LED/LCD displays.\n\nVerify the operation of the oil sump temperature control device.\n\nTest high condenser pressure safety device. Calibrate and record setting.\n\nTest low evaporator temperature safety device. Calibrate and record setting.\n\nTest low oil pressure safety device. Calibrate and record setting.\n\nTest high motor temperature safety device. Calibrate and record.\n\nTest operation of chilled water pump and condenser water pump starter auxiliary contacts.\n\nLubrication System\nPull oil sample for spectroscopic analysis.\n\nCheck oil for acid content and discoloration. Make recommendations to the customer based on the results of the test.\nMeasure and record the oil pump voltage and amperage.\n\nVerify the operation of the oil heater. Measure amps and compare readings with the watt rating of the heater.\nChange the oil and oil filter.\n\nVerify the oil level.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nCheck tightness of the motor terminal connections.\n\nMeg the motor and record reading.\n\nVerify the operation of the electrical interlocks.\n\nSTARTUP / CHECKOUT PROCEDURE CTV-220\n\nVerify the operation of the oil heater and that the oil temperature is at least 110Â°F before starting the chiller.\nVerify full water systems, including the cooling tower, condenser and evaporator.\n\nVerify clean cooling tower and strainers.\n\nStart the condenser water pump, chilled water pump, and cooling tower fan(s).\n\nTest all flow-proving devices on the chilled water and condenser water circuits\n\nVerify the flow rates through the condenser and the evaporator.\n\nStart the chiller.\n\nVerify the operation of all timing devices.\n\nVerify the operation of the current control device.\n\nCheck the set point and sensitivity of the chilled water temperature control device. Verify the operation.\nVerify the operation of the condenser water temperature control device.\n\nCheck the mechanical limits of both vane arms. Verify smooth movement of vane arms through the full range of operation.\nCheck the starter operation.\n\nVerify the motor cooling operation.\n\nCheck the purge operation.\n\nShut down the chiller.\n\nCheck the oil and refrigerant levels, provide leak rate calculation report if levels are low.\n\nRe-start the chiller and log the operating conditions after the system has stabilized.\n\nReview operating procedures with the operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CTV-230\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the purge unit.\n\nCheck the operation of the control circuit.\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data. Compare the data to the original design conditions.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nSEASONAL SHUT-DOWN PROCEDURE CTV-250\n\nCheck the general operation of the unit.\n\nShut down the chiller, pumps, and auxiliary equipment.\n\nDrain the condenser and chilled water piping as required.\n\nTurn off equipment power as necessary.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nAir-Cooled Rotary Chillers ACR-1\nReview operation logs with COTR for any problems and trends.\n\nCheck and record refrigerant level, provide leak rate calculation report if levels are low.\n\nInspect for leaks, conduct leak check using EPA-recommended methods, and report leak results.\nCalculate refrigerant loss.\n\nRepair all minor leaks as required such as valve packing, flare nuts, etc.\n\nVisually inspect condenser coil for cleanliness.\n\nCheck the condenser fans for clearances and free operation.\n\nCheck tightness of condenser fan motor mounting brackets.\n\nCheck the set screws on the fan shafts.\n\nVerify the performance of the fan control inverter VFD.\n\nGrease fan bearings as required.\n\nAnnually, clean the condenser coil.\n\nVerify all settings in the electronic control panel.\n\nInspect the control panel for cleanliness.\n\nInspect controls and safety wiring and connections for tightness and signs of overheating and discoloration.\nVerify the working condition of all indicator/alarm lights and LED/LCD displays. Replace lights as required.\nTest the oil pressure safety device. Calibrate and record setting.\n\nTest high motor temperature safety device. Calibrate and record setting.\n\nTest operation of chilled water pump and condenser water pump starter auxiliary contacts.\nPull one oil sample per year for spectroscopic analysis.\n\nAnnually, check oil for acid content and discoloration. Change oil if out of normal parameters.\nVerify the operation of the oil heaters. Measure amps and compare readings with the wattage rating of the heaters.\nClean the starter cabinet and starter components.\n\nStart the unit if not already in operation.\n\nInspect motor and starter wiring and connections for tightness and signs of overheating and discoloration.\nCheck condition of contacts for wear and pitting.\n\nCheck contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nCheck tightness of the motor terminal connections.\n\nAnnually, meg the motor and record reading.\n\nVerify the operation of the electrical interlocks.\n\nMeasure and record voltages.\n\nProvide function test loss of normal operation and automatic emergency start up\n\nOnce per year, pull a refrigerant sample for spectrographic analysis for contaminants.\n\na. Additionally Performed During Mid-Season PM w/Equipment Running (Schedule during July)\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the control circuit.\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data and compare to the original design conditions for the equipment.\nReview operating procedures with COTR and VA staff.\n\nCENTRAL STATION AIR HANDLING UNITS COMPREHENSIVE ANNUAL INSPECTION AHU-110\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nInspect the unit for cleanliness.\n\nInspect the fan wheel and shaft for wear and clearance.\n\nCheck the sheaves and pulleys for wear and alignment.\n\nCheck the belts for tension, wear, cracks, and glazing.\n\nVerify tight bolts, set screws, and locking collars.\n\nCheck dampers for wear, security and linkage adjustment.\n\nVerify clean condensate pan.\n\nVerify proper operation of the condensate drain.\n\nVerify clean air filters.\n\nVerify clean coils.\n\nVerify proper operation of the spray pump, if applicable.\n\nVerify smooth fan operation.\n\nLog operating conditions after system has stabilized.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nLubrication\nLubricate the fan shaft bearings, if applicable.\n\nLubricate the motor bearings, if applicable.\n\nControls and Safeties\nTest the operation of the low temperature safety device, if applicable.\n\nTest the operation of the high static pressure safety device, if applicable.\n\nTest the operation of the low static pressure safety device, if applicable.\n\nCheck the thermal cutout on electric heaters, if applicable.\n\nCheck the step controller, if applicable.\n\nCheck and record supply air and control air pressure, if applicable.\n\nVerify the operation of the control system and dampers while the fan is operating.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect the wiring and connections for tightness and signs of overheating and discoloration. This includes wiring to the electric heat, if applicable.\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nMeg the motor and record readings.\n\nSCHEDULED RUNNING INSPECTION AHU-130\nCheck the general condition of the fan.\n\nVerify smooth fan operation.\n\nCheck and record supply and control air pressure, if applicable.\n\nFunction test loss of normal operation and emergency start up\n\nVerify the operation of the control system.\n\nLog the operating conditions after the system has stabilized.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate uncorrected deficiencies detected.\n\nVANE AXIAL FANS TRANE COMPREHENSIVE ANNUAL INSPECTION EXHAUST FANS\nFAN-130\n\nReport in with the COTR\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the COTR for operational problems and trends.\n\nGeneral Assembly\nInspect fan wheel for wear, security, and clearance.\n\nInspect sheaves and pulleys for wear and alignment.\n\nInspect belts for tension, wear, cracks, and glazing.\n\nVerify tight bolts, set screws, and locking collars.\n\nVerify smooth operation of the fan.\n\nLog operating conditions after the system has stabilized.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nLubrication\nLubricate the fan bearings.\n\nLubricate the motor bearings, if applicable.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect the wiring and connections for tightness and signs of overheating and discoloration.\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactor for free and smooth operation.\n\nMeg the motor and record the readings.\n\nCheck and record volts and amps of the motor.\n\nPURGE SYSTEMS PURIFIER PURGE PRG-130\nClean the condenser on the purge refrigeration unit.\n\nCheck purge unit controls for proper operation.\n\nCheck and clean purge drum.\n\nClean strainers or replace filters.\n\nCheck purge compressor assembly for leaks.\n\nCheck the purge unit for proper operation.\n\nLEAK CHECK (HIGH PRESSURE)\nWATER COOLED High Pressure Leak Check LCK-11O\n\nInspect for leaks and report results.\n\nRepair minor leaks as required (e.g. valve packing, flare nuts).\n\nCalculate refrigerant loss rate and report to the customer.\n\nCONDENSER CLEANING\nWATER-COOLED CONDENSERS BRUSH TUBES\n(600 Tubes/Day) CDS-210cds\n\nPull both heads.\n\nEddy Current test every 2 years.\n\nBrush tubes as necessary.\n\nNOTE: The term easy end head refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit s having marine boxes.\n\nLUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130\nChange the oil and filter, using factory-recommended oil and filter.\n\nREFRIGERANT MONITORS ANNUAL MAINTENANCE INSPECTION MSC-320\nReport in with the COTR.\n\nRecord and report abnormal conditions.\n\nCheck chassis mounting in enclosure.\n\nCheck operation of Clear Language Display.\n\nReplace sampling filter element /elements at sensing points.\n\nProvide Zero and Span calibration to accuracy within 1 PPM.\n\nVisually check photo-acoustic sensing device.\n\nCheck periodic re-zeroing.\n\nCOOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\nSTRUCTURE\n\nDisassemble all screens and access panels for inspection.\n\nInspect the conditions of the slats, if applicable.\n\nInspect the condition of the tower fill.\n\nInspect the condition of the support structure.\n\nInspect the condition of the basins (upper and lower) and/or spray nozzles.\n\nVerify clean basins and strainer(s).\n\nVerify the condition and operation of the basin fill valve system.\n\nMECHANICAL\n\nInspect gear box for leaks.\n\nInspect drive and coupling for condition and security\n\nInspect fan assembly for condition, security, and clearances (e.g. blade tip clearance).\n\nLubrication\nLubricate motor bearings.\n\nCheck gear box oil level.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactor(s) for free and smooth operation.\n\nMeg the motor and record reading.\n\nCheck disconnect terminal block for wear, tightness and signs of overheating and discoloration.\nCheck the condition and operation of the basin heater contactor(s).\n\nSTARTUP / CHECKOUT PROCEDURE CLT-220\nFill the basin and verify float level.\n\nVerify the operation of the basin heaters.\n\nVerify the operation, set point, and sensitivity of the basin heater temperature control device.\nStart the condenser water pumps.\n\nVerify the balance of the return water through the distribution boxes.\n\nVerify proper operation of the bypass valve(s), if applicable.\n\nOperate the fan(s) and verify smooth operation.\n\nLog operation after the system has stabilized.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CLT-230\nCheck the general condition of the tower.\n\nVerify clean basins and strainers (upper and lower) and/or spray nozzles.\n\nVerify proper water level in the basin.\n\nVerify proper operation of the water level control device.\n\nVerify smooth operation of the fan(s).\n\nVerify proper operation of the bypass valve(s).\n\nDIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110\nReport in with the COTR\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\nCheck motor shaft and pump shaft for alignment.\n\nInspect the coupling for wear.\n\nVerify that the shaft guard is in place and tight.\n\nVerify water flow through the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nVerify smooth operation of the pump.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nLubrication\nLubricate the motor bearings as necessary.\n\nLubricate the pump bearings as necessary.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nMeg the motor and record results.\n\nVerify tight connections on the motor terminals.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nVerify proper volts and amps.\n\nPUMP RUN INSPECTION PMP-111\nVerify smooth operation of the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nVARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nClean the heat sink.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVisually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture.\n\nVerify proper operation of the unit.\n\nVerify proper DC buss voltage.\n\nEach inspection will be provided in accordance with the system/equipment manufacturers factory recommended procedures. Each inspection shall, at a minimum, include the following as specified for the equipment make, type, and time of seasonal operation. Any additional parts not identified in this document will not be covered by this contract. The vendor will obtain prior approval from the COTR prior to performing any additional repair work and the additional work will be billed separately.\n\nFor each PM inspection, the contractor will provide a detailed written report to the COTR that summarizes work performed, problems/deficiencies found, and measurements taken. This report will be submitted within 10 calendar days of the date of PM inspection.\n\nAll work will be performed between the hours of 7:30 a.m. and 4:00 p.m. on the prearranged dates.\n\nAll inspection work must be coordinated through the COTR who is:\n\nEMERGENCY SERVICE\nEmergency repair service is not covered by the contract. However, the contractor will provide a preferred customer response to emergency repair calls that includes labor and parts costs to be billed separately.\n\nCONTRACTOR PERSONNEL\n\nPersonnel Experience. All work shall be performed by competent mechanics, experienced and qualified to work on the specific makes and models of equipment listed in this contract. The Contractor shall submit to and for the approval of the Contracting Officer, certification and a list of credentials of the approved mechanics. Personnel shall have a minimum of three (3) years recent experience related to this work. The contractor must provide a list of three (3) reference contacts that have been provided service on similar or identical equipment. The contractor must provide authenticated factory training certificates or credentials (or acceptable substitute as approved by the COTR) for any personnel who are working on any VA equipment. The VA specifically reserves the right to reject any of the contractor s personnel and refuse them permission to work on VA equipment.\nConduct of Personnel. The Contractor shall ensure that his personnel present a professional appearance at all times and that their conduct shall not reflect discredit upon this facility or the Department of Veterans Affairs. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The removal from the job site of such a person shall not relieve the Contractor of the requirement to provide sufficient personnel to perform adequate and timely service. All employees shall be legal residents of the United States and be able to understand, speak, read and write the English language.\nIdentification of Employees. : The Contractor shall within 10 calendar days before beginning performance of work provide the Contracting Officer a list of all employees who will perform under this contract. The list shall include the full name, and work assignment of each employee. The Contractor shall notify the Contracting Officer in writing of any addition, deletion or change in work assignment within 10 days of such change. Each of the Contractor's employees shall conspicuously display on their person a badge provided by the VA West Roxbury Police Office.\n\nHOURS OF OPERATION\nNormal Duty Hours. The Contractor shall have employees available Monday through Friday, except legal public holidays at the times specified to perform routine work and inspections.\nFederal Holidays. Federal Holidays observed by the VA are:\n\nNew Years Day; Martin Luther King Day; President s Day; Memorial Day; Independence Day; Labor Day; Columbus Day; Veterans Day; Thanksgiving Day; and Christmas.\n\nCONTRACTOR QUALITY CONTROL\n\nThe Contractor shall establish and maintain a Quality Control Program that ensures that all requirements of the contract are provided as specified.\n\nINSPECTION AND ACCEPTANCE\n\nFinal inspection and acceptance by the Government shall be made at the site of each system. However, final inspection and acceptance do not preclude the Government's right to inspect completed work prior to shipment from the Contractor's shop nor does it waive any rights of the Government.\nUnsatisfactory service will be reported in writing by the VA CO to the Contractor.\n\nTelephone Answering Service: The Contractor shall maintain, at his own expense, a dedicated (tie-line) toll-free telephone answering service for the exclusive use in the performance of this contract. This answering service shall be monitored during normal work hours as identified in the specifications.\n\nREMOVAL AND/OR DISPOSAL\nRemoving Government-Owned Material: All property removed remains the property of the\nU.S. Government and shall be returned by the Contractor to a place of storage as designated by the CO or COTR.\nSalvage: Items received by the Contractor that are non-repairable because of condition, or declared unfit for economical rehabilitation by the Contractor, shall be returned to the Government. All salvage remaining in the Contractor's shop shall remain Government property and may be used for repair of any Government-owned equipment when released by the CO. The Contractor shall be required to maintain an account record of inventory upon completion of the maintenance contract.\nInventories shall not be disposed of by the Contractor without inspection and written approval of the CO. Salvaged parts used in the repair of any government owned equipment shall be treated by the Contractor as Government furnished material and reflected as same on Contractor's invoices when submitted for payment. All salvage in the possession of the\n\nContractor, upon expiration of the contract, will be returned to the Government within thirty (30) days after such expiration.\n\nFIRE PREVENTION AND PROTECTION\n\nThe Contractor shall fully acquaint himself and his personnel with the location of fire equipment before work, take all prudent measures to minimize fire hazards that result from work, complies with all ordering agency fire and safety regulations.\n\nENERGY CONSERVATION\nThe Contractor is required to comply with all energy conservation regulations and instructions that are applicable to Government-owned facilities including but not limited to thermostat settings.\n\nCLEANING UP\nThe Contractor shall clean up after work, leaving each area where work is performed, neat and clean. All containers, trash and debris for which he is responsible shall be removed.\n\nHAZARDOUS CONDITIONS\nDuring the course of performing work under this contract, should the Contractor find serious or hazardous conditions existing with or in any of the equipment the Contractor shall secure the equipment and immediately notify the COTR.\n\nCLEANLINESS\nThe area immediately around the equipment provided for the Contractor s use shall be kept in a clean and orderly condition. Trash and waste material shall not be permitted to accumulate, but shall be removed by the Contractor s employees.\n\nSERVICE MANUALS\nThe VA shall not provide service manuals or service diagnostic software to the contractor. The contractor shall obtain, have on file, and make available to its FSEs all operational and technical documentation, (such as: operational and service manuals, schematics, and parts lists), which are necessary to meet the performance requirements of this contract. The location and listing of the service data manuals, by name, and/or the manuals themselves shall be provided to the CO upon request.\n\nINSURANCE\n\nWorker compensation and employer s liability. Contractor and any subcontractor covered under this contract are required to comply with applicable Federal and State Worker s Compensation and occupational disease statutes.\nGeneral Liability. Contractor and any subcontractor covered under this contract are required to have Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.\n\nProperty Damage Liability. Contractor and any subcontractor covered under this contract are to have Property Damage Liability insurance coverage of at least $500,000.\nContractor shall provide proof of liability insurance within five (5) days after contract award.\n\nSMOKING POLICY\nSmoking is prohibited inside all buildings except in designated areas.\n\nBILLING AND PAYMENT\nEach invoice shall contain the documentation required by this contract. The invoices shall be itemized to contain the equipment s identifier. When parts are furnished by the Government, they shall be itemized on Contractor's invoice at no-cost and indicated as Government-furnished parts.\nPayment. Payment will be made 30 days in arrears upon receipt of properly prepared invoice. Invoice must contain the contract number and the purchase order number.\n\nPRICING SUBMITTAL\n\nThe annual pricing of the contract should be itemized by the bidders to reflect a cost per unit PM per equipment item covered by contract.\n\nVENDOR REQUIREMENTS\n\nThe contractor must employ mechanics and technicians that are trained in the applicable codes, standards, and manufacturer requirements for maintenance and repair of the Trane and McQuay equipment covered by this contract.\nThe contractor must have at least 5 years experience satisfactorily performing such maintenance on comparable units, equipment, or systems.\nThe contractor must have access to OEM (original equipment manufacturer)- manufactured parts and materials required for performance of this work.\nThe contractor must have sufficient supplies, tools, and equipment to perform all requirements of this contract.\n\nEQUIPMENT COVERED BY THIS CONTRACT\n\nBUILDING # 1\nVA ID#\nMANUFACTURER\nITEM NAME\nMODEL #\nSERIAL#\nSCHEDULE\nLOCATION\nÂ\nTrane (MICU) Back-Up\nAir-Cooled Chiller\nCGAM070F2Y03AXD2A1\nU22A00424\nACR-1\nWR-B1- 4B128\nÂ\nTrane (CCU)\nAir-Cooled Chiller\nCGAM070F2Y03AXD2A1\nU22A00422\nACR-1\nWR-B1- A4-01\nBUILDING # 2\nÂ\nTrane\nCentrifugal Chiller\nCVHF0910\nL03M08522\nCTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130\nWR-B2-AB- 13\nÂ\nTrane\nCentrifugal Chiller\nCVHF0910\nL03M08531\nCTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130\nWR-B2-AB- 13\nÂ\nMarley\nCooling Tower-1\nNC-8309 GZBS\nNC-241518-A2\nCLT-210, CLT-230, CLT-220\nWR-B2-A4-01\nÂ\nMarley\nCooling Tower-2\nNC-9309 GZBS\nNC-241518-A1\nCLT-210, CLT-230, CLT-220\nWR-B2-A4-01\nÂ\nTrane\n(OR- Back-Up) Air-Cooled Chiller\nRTAA0804YR01A301GBFC\nU06B06111\nACR-1\nWR-B2-A4-01\nÂ\nTrane\n(GI) Air-Cooled Chiller\nCGAFC304AK01A00000\nC06A00249\nACR-1\nWR-B2-A4-01\nÂ\nTrane\n(S5C) Air-Cooled Chiller\nRTAC1404\nU10F07753\nACR-1\nWR-B2-A4-01\nÂ\nTrane (Artic Chiller)\nChiller Modular -1\nPACVMV0400D4-MM-VS1\nA10001137\nRunning Inspection\nWR-B2-PH\nÂ\nTrane (Artic Chiller)\nChiller Modular -2\nPACVMV0400D4-MM-VS1\nA101011417\nRunning Inspection\nWR-B2-PH\nÂ\nTrane (Artic Tower)\nTower Modular-2\nTP00004075\nA101011517\nTower Cleaning & Running Inspection\nWR-B2-PH\nÂ\nTrane\nSPS Condenser\nRAUJ804A132BDF01D\nC10J04548\nACR-1\nWR-B2-POOL ROOF\nÂ\nTrane\nS5C AHU\nMCCB05ONBFOSDAA\nK08B22619\nAHU-110, AHU-130\nWR-B2-A4-01\nÂ\nTrane\n(OR-S5) AHU\nMCCB05OUA0AOUB\nK09D83236A\nAHU-110, AHU-130\nWR-B2-A4-01\nÂ\nTrane\nAHU-1A\nCSAA012UBL00\nK17C26642\nAHU-110, AHU-130\nWR-B2-ROOF\nÂ\nTrane\nAHU-1B\nCSAA0100\nK17C26621\nAHU-110, AHU-130\nWR-B2-ROOF\nÂ\nCarrier\n(S8-Elv Mch Rm) Air Cooled Chiller\n38ARZ008-601CA\n3806G50045\nACR-1\nWR-B2-ROOF\nÂ\nTrane\n(CTIR) Air Cooled Chiller\nTTA09044DAA02BS010001\n23193610YA\nACR-1\nWR-B2-ROOF\nÂ\nTrane\n(CTIR) Dry Cooler\nTR-SCS-120-SSA\n10331148\nACR-1\nWR-B2-ROOF\nÂ\nBarry Blower\nExhaust Fan\nEM2515T-G\n76-2902\nFAN-130\nWR-B2-PH\nÂ\nCook MFG\nExhaust Fan\n195CPS\nN/A\nFAN-130\nWR-B2-AB- 13\nÂ\nVaneaxial Fan\nExhaust Fan E-5\nN/A\nN/A\nFAN-130\nWR-B2-A4-01-PH\nÂ\nVaneaxial Fan\nExhaust Fan GE-1\nN/A\nN/A\nFAN-130\nWR-B2-A4-01-PH\nÂ\nBaldor Reliance\n2-SCHW-Pump-1\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-SCHW-Pump-1 Frame\nE-1510\nC331015-01A22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-SCHW-Pump-2\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-SCHW-Pump-2 Frame\nE-1510\nC331015-01G22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-SCHW-Pump-3\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-SCHW-Pump-3 Frame\nE-1510\nC331015-01C22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-SCHW-Pump-4\nEM3311T-G\n37J839L863G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-SCHW-Pump-4 Frame\nE-1510\nC331016-01B22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-SCHWP-1 VDF\n174Z4893\n988204Y252\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-SCHWP-2 VDF\n174Z4893\n525204Y182\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-SCHWP-3 VDF\n174Z4893\n525204Y182\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-SCHWP-4 VDF\n174Z4893\n771804Y222\nMSC-130\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-PCHW-Pump-1\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-PCHW-Pump-1 Frame\nVSC\nC331009-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-PCHW-Pump-2\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-PCHW-Pump-2 Frame\nVSC\nC331009-03C22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-PCHW-Pump-3\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-PCHW-Pump-3 Frame\nVSC\nC331009-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-PCHWP-1 VDF\n174Z4898\n986904Y252\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-PCHWP-2 VDF\n174Z4898\n986804Y252\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-PCHWP-3 VDF\n174Z4898\n986604Y252\nMSC-130\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-CW-Pump-1\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-CW-Pump-1 Frame\nVSC\nC331008-02D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-CW-Pump-2\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-CW-Pump-2 Frame\nVSC\nC331008-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBaldor Reliance\n2-CW-Pump-3\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nBell & Gossett\n2-CW-Pump-3 Frame\nVSC\nC331008-03D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-CWP-1 VDF\n174Z4902\n271004Y292\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-CWP-2 VDF\n174Z4902\n270804Y292\nMSC-130\nWR-B2-AB- 13\nÂ\nTrane TR200\n2-CWP-3 VDF\n174Z4902\n270904Y292\nMSC-130\nWR-B2-AB- 13\nÂ\nStrainer\nCW Strainer-1\n10\" ASTM A126 GR.B\nN/A\nClean Strainer\nWR-B2-AB- 13\nÂ\nStrainer\nCW Strainer-2\n10\" ASTM A126 GR.B\nN/A\nClean Strainer\nWR-B2-AB- 13\nÂ\nStrainer\nCW Strainer-3\n10\" ASTM A126 GR.B\nN/A\nClean Strainer\nWR-B2-AB- 13\nBUILDING # 3\nÂ\nTrane\nCentrifugal Chiller\nCVHE0450\nL09A05825\nCTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130\nWR-B3-3C101\nÂ\nTrane\nCentrifugal Chiller\nCVHE0450\nL09A05826\nCTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130\nWR-B3-3C101\nÂ\nTrane\n(B3-Cross Connect )Air-Cooled Chiller\nRTAC\nU22A00455\nACR-1\nWR-B3-ROOF\nÂ\nEvapco\nCooling Tower\nLST-10-183T\n879038\nCLT-210, CLT-220, CLT-230\nWR-B3- ROOF\nÂ\nEvapco\nCooling Tower\nLST-10-183T\n879039\nCLT-210, CLT-220, CLT-230\nWR-B3- ROOF\nÂ\nABB\nCooling Tower-1 VFD\nACH550-UH-045A-4\n2090602672\nMSC-130\nWR-B3-3C101\nÂ\nABB\nCooling Tower-2 VFD\nACH550-UH-045A-4\n2090602674\nMSC-130\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCHW-Pump-1\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCHW-Pump-2\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCHW-Pump-3\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nABB\n3-PCHW-Pump-1 VFD\nACH550-UH-038A-4\n2090602676\nMSC-130\nWR-B3-3C101\nÂ\nABB\n3-PCHW-Pump-2 VFD\nACH550-UH-038A-4\n2090602673\nMSC-130\nWR-B3-3C101\nÂ\nABB\n3-PCHW-Pump-3 VFD\nACH550-UH-038A-4\n2090602675\nMSC-130\nWR-B3-3C101\nÂ\nStrainer\nBldg-3-CW Strainer-1\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer\nWR-B3-3C101\nÂ\nStrainer\nBldg-3-CW Strainer-2\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer\nWR-B3-3C101\nÂ\nStrainer\nBldg-3-CW Strainer-3\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCW-Pump-1\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCW-Pump-2\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nBaldor Reliance\n3-PCW-Pump-3\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ\nABB\n3-PCW-Pump-1 VFD\nACH550-UH-031A-4\n2090602687\nMSC-130\nWR-B3-3C101\nÂ\nABB\n3-PCW-Pump-2 VFD\nACH550-UH-031A-4\n2090602685\nMSC-130\nWR-B3-3C101\nÂ\nABB\n3-PCW-Pump-3 VFD\nACH550-UH-031A-4\n2090602688\nMSC-130\nWR-B3-3C101\nBUILDING # 20 & 21\nÂ\nTrane Arctic\nChiller Mod 1\nTPWCCMV0300D4-MM\nA022047224\nRunning Inspection\nWR-B20\nÂ\nTrane Arctic\nChiller Mod 2\nTPWCCMV0300D4-MM\nA022047124\nRunning Inspection\nWR-B20\nÂ\nTrane Arctic\nChiller Mod 3\nTPWCCMV0300D4-MM\nA022047024\nRunning Inspection\nWR-B20\nÂ\nTrane\nCondenser Unit\nRAUJC604BA03AOD\nC10B00682\nACR-1\nWR-B21\nÂ\nTrane\nCondenser Unit\nRAUJC604BA03AOD\nC10B00681\nACR-1\nWR-B21\nÂ\nEvapco\nCooling Tower-1\nUSS14-86\n16-780293\nCLT-210, CLT-220, CLT-230\nWR-B21\nÂ\nEvapco\nCooling Tower-2\nUSS14-86\n16-780292\nCLT-210, CLT-220, CLT-230\nWR-B21\nÂ\nWEG\n21-CW-Pump-1\n01018OT3E215T-S\n103116362\nPMP-110, PMP-111\nWR-B21\nÂ\nWEG\n21-CW-Pump-2\n0118OT3E215T-S\n103116359\nPMP-110, PMP-111\nWR-B21\nÂ\nWEG\n21-CHW-Pump-1\n020180T3E256T-S\n1030953958\nPMP-110, PMP-111\nWR-B21\nÂ\nWEG\n21-CHW-Pump-2\n021080T3E256T-S\n1030953957\nPMP-110, PMP-111\nWR-B21\nÂ\nABB\n21-CW-Pump-1 VFD\nACH550-PCR-015A\n216900159\nMSC-130\nWR-B21\nÂ\nABB\n21-CW-Pump-2 VFD\nACH550-PCR-015A\n216900142\nMSC-130\nWR-B21\nÂ\nABB\n21-CHW-Pump-1 VFD\nACH550-PCR-031A\n216900168\nMSC-130\nWR-B21\nÂ\nABB\n21-CHW-Pump-2 VFD\nACH550-PCR-031A\n216900182\nMSC-130\nWR-B21\nÂ\nStrainer\nCW Strainer-1\nN/A\nN/A\nClean Strainer\nWR-B21\nÂ\nStrainer\nCW Strainer-2\nN/A\nN/A\nClean Strainer\nWR-B21\n\nThe NAICS code for this requirement is 238220.\n\nEngineering identifies Trane U.S. Inc. as the required single source for the complete manufacturer-supported Trane chiller maintenance program. The statement of work specifically calls for KestrelView analysis using a Trane laptop and software and for equipment-specific controls, protective-device, refrigerant, and mechanical service procedures that depend on Trane equipment documentation, specialized diagnostic resources, and qualified manufacturer support. These requirements go beyond generic HVAC maintenance and are central to assessing the condition and reliable operation of the installed Trane chillers.\n\nThe VA-owned Trane-controlled equipment and Trane Ensemble platform require Trane-specific software, programming capability, and replacement supplies and identified Trane as the contractor then able to deliver the specified integrated service. Those historical findings are being incorporated as the technical basis for continuity of the current installed-equipment requirement. Equipment lists have changed because of campus upgrades; this does not alter the need for the specified OEM diagnostic methods and chiller-specific maintenance capability.\n\nThe Government has intentionally retained Trane equipment as a principal element of its West Roxbury cooling infrastructure. Standardization and operational continuity are relevant to maintenance reliability, availability of consistent OEM service procedures, and safe seasonal transition of the chilled-water plants. Engineering requires the Trane-specific diagnostic portion to be integrated with the ongoing scheduled service program to ensure that findings, repairs recommendations, and unit availability are evaluated as one coordinated plant-maintenance effort.\n\nThe associated pumps, drives, cooling towers, and connected components are necessary for the cooling plant to function. The technical basis for a Trane-only order is the complete integrated service requirement with manufacturer-specific chiller diagnostics and supported service access. Trane is the only provider identified in the supplied acquisition history as delivering the Trane-specific diagnostic and coordinated plant-maintenance requirement.\n\nThis notice of intent is not a solicitation nor is it a request for proposal. However, interested parties that believe they can satisfy the requirement must clearly identify their capability to do so in writing by Monday, November 25, 2026 at 12 pm EST time. Response should be sent to Issa Shawki at issa.shawki@va.gov. Information submitted in response to this notice will be used solely to determine whether competitive procedures could be used for this acquisition. A determination not to open this requirement to competition based upon responses to this notice is solely within the discretion of the Government.","html":"The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in Brockton, MA intends to enter into a sole source procurement, pursuant to the authority of FAR 6.302-1, with TRANE, for the following requirement:\n\nSTATEMENT OF WORK\n\nSCOPE OF WORK\n\nThe Contractor shall provide all supervision, personnel, material, parts, equipment, supplies, labor and transportation in performing basic preventive maintenance on the chiller systems, Ensemble controls and equipment as listed in Attachment A and located at the Department of Veterans Affairs Medical Center, 1400 VFW Parkway, West Roxbury, MA 02132 in accordance with all terms and conditions of this task order and accepted quotation.\n\nPeriod of Performance: This will be a firm-fixed price, base year plus four option years task order.\n\nDEFINITIONS/ACRONYMS\n\nContract Discrepancy Report (CDR) : A report that the Government shall complete and issue to the Contractor when service is unsatisfactory and not in compliance with the terms and conditions of the contract. The Contractor is required to complete and return this form to the COR whenever performance is unsatisfactory. The CDR requires the Contractor to explain, in writing, the cause of the unsatisfactory performance, how performance will be returned to acceptable standards, and how reoccurrence of the problem will be prevented in the future.\n\nContracting Officer (CO): The individual with the authority to enter into, administer, and/or terminate contracts. The CO is the exclusive Government official authorized to execute changes and deviations or variations in the contract.\n\nContracting Officer's Technical Representative (COTR) : A Government representative, designated in writing by the Contracting Officer, to be responsible for quality assurance, inspection, surveillance, documentation and acceptance of the Contractor's performance. A copy of the letter of designation will be provided to the Contractor.\n\nPreventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions.\nTo clean, lubricate, calibrate, and test the equipment and/or instrument to the operating condition defined in the manufacturer s specifications.\n\nRepair Cost Estimate:  The Contractors estimated cost (for parts, labor and freight) to repair a system according to manufactures' specifications and requirements. These repairs are covered under Emergency Service and repairs outside of routine maintenance.\n\nTime: When hours are given it shall mean clock hours exclusive of Saturdays, Sundays and Holidays unless otherwise specified (i.e., 1:00 P.M. Monday to 1:00 P.M. Tuesday equals 24 hours; 12:00 P.M. Friday to 12:00 P.M. Monday equals 24 hours). If days are indicated it shall mean calendar days including Saturdays, Sundays and Holidays.\n\nRework. The Contractor is required to correct and/or re-work any PM services due to unsatisfactory performance or nonperformance in accordance with the stated quality and level of effort in the PWS and final contract. Rework is performed at no additional cost to the Government.\nESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract.\n\nAcronyms. Commonly used acronyms are listed below \n\nFSE: Field Service Engineer\nAQL: Acceptable Quality Level\n\nIAW: In Accordance With\n\nQA: Quality Assurance\n\nQC: Quality Control\n\nWS: Performance Work Statement\n\nVA: VA Medical Center\n\nCO: Contracting Officer\n\nCOTR:Contracting Officer s Technical Representative FES: Facilities and Engineering Service\n\nPREVENTIVE MAINTENANCE REQUIREMENTS\n\nWithin 14 calendar days of Notice to Proceed, the vendor will submit to the COTR a written schedule of the planned PM visits for the coming year along with a written description of the work to be performed during each visit. \n\nThe following is the scope of services to be performed on Covered Equipment.  Items marked with an  X  are included in this contract.\n\nServices Included\nCooling Seasonal Service\nServices Included\nHeating Seasonal Service\nX\nSeasonal Start-up\n\nSeasonal Start-up\nX\nOperating Inspections Qty\n\nOperating Inspections Qty   \nX\nSystem Shutdown\n\nSystem Shutdown\nX\nAnnual Seasonal Maintenance\n\nAnnual Seasonal Maintenance\n\n\nServices Included\nLabor and Materials for Covered Equipment\nX\nScheduled Maintenance Labor\nX\nScheduled Maintenance Parts and Materials\nX\nRepair Labor: Repairs will be performed on covered equipment during Trane\nregular business hours   Select Agreement\n\nRepair Parts and Materials   Select Agreement\nX\nOvertime Repair Labor for Emergency Failures (outside Trane regular business\nX\nRefrigerant Monitor Inspection. Testing and Calibration once per year\n\nRefrigerant Replacement 0% of Charge per unit per year\nX\nRefrigerant Usage Reporting\n\nOther\n\n\nServices Included\nPredictive Testing and Analysis for Covered Equipment Chiller(s) Only\nX\nSpectrographic Oil Analysis   Trending oil analysis provides insight into potential\nX\nRefrigerant Analysis   Provides early warning of internal failure\nX\nKestrelView  Analysis   Requires Trane laptop and Trane software\nX\nOil Removal and Disposal by Trane in accordance with EPA Guidelines\nX\nOil Change\n\n\n\nServices Included\nAdditional Services\nX\nAir-cooled condenser coil cleaning once per year\nX\nClean Cooling Tower(s) once per year\nX\nCondenser Tube Cleaning & Evap Tube Cleaning once per year\n\n\nX\nStarter Maintenance  600 volt volt starter\nX\nEddy Current Test of tubes every 2 years\n\nOther\n  Chiller overhaul every 5 years was included in the current contract SOW\nEquipment Maintenance Procedures:\nTRANE CENTRIFUGAL CHILLERS\n(Low Pressure Units)\nCOMPREHENSIVE ANNUAL INSPECTION SERVICE   TRANE CTV-512\n\nReport in with the COTR and sign log with name, date and time.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nInspect for leaks and report leak check results to the customer. Provide reports at the end of each visit. \n\nRepair minor leaks as required (e.g. valve packing, flare nuts). Provide reports at the end of each visit.\n\nCalculate refrigerant loss rate and report to COR. Provide report at end of each visit.\n\nReplace the filter / drier on the motor cooling line, in accordance with mfg specifications.\n\nTest the security of mounting points; tighten all major points.\n\nControls and Safeties\n\nInspect control panel for cleanliness.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVerify the working condition of all indicator/alarm lights.\n\nVerify the operation of all timing devices.\n\nVerify the operation of the oil temperature thermostat. Calibrate and record setting and provide report to COR.\n\nVerify the operation of the low oil temperature safety device. Calibrate and record setting.\nTest the high discharge pressure safety device. Calibrate and record setting.\n\nTest the high suction temperature switch. Calibrate and record setting.\n\nTest the high discharge temperature safety device. Calibrate and record setting.\n\nTest the low suction pressure safety device. Calibrate and record setting.\n\nTest the low pressure override switch. Calibrate and record setting.\n\nTest the low leaving water temperature control device. Calibrate and record setting.\n\nLubrication System\n\nPull oil sample for spectroscopic analysis.\nChange oil\n\nTest oil for acid content and discoloration. Make recommendations to the COTR based on the results of the test.\nInspect oil pump motor terminals for tightness and signs of overheating and discoloration.\nMeasure and record oil pump motor voltage and amperage.\n\nVerify the operation of the oil heater. Measure amps and compare reading with the watt rating of the heater.\n\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect the wires and starter components for tightness and signs of overheating and discoloration.\nVerify the operation of the transition/system timer.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nVerify the operation of the electrical interlocks.\n\nCheck the dash pots oil for level, rust, and/or moisture.\n\nMeg the motor and record readings.\n\nCheck the motor terminals for cracks and/or leaks.\n\nMeasure voltage and record reading. Voltage should be nominal voltage Â±10%.\n\nSTARTUP / CHECKOUT PROCEDURE CTV-520\n\nVerify the operation of the oil heater and that the oil temperature is at least 110Â°F before starting the chiller.\nVerify full water systems, including the cooling tower, the condenser and the evaporator.\n\nVerify clean cooling tower and strainers.\n\nStart the condenser water pump, chilled water pump, and cooling tower fan(s).\n\n\nVerify flow rates through the condenser and the evaporator.\n\nTest all flow-proving devices on the chilled water and condenser water circuits.\n\nStart the chiller.\n\nVerify the starter operation.\n\nVerify the operation of all timing devices.\n\nCheck the load limit relay for set point, hunting, and unloading capability.\n\nCheck the mechanical limits on both vane arms. Verify smooth movement of vane arms.\n\nCheck the set point and sensitivity of the chilled water temperature control device. Verify the operation.\nVerify the operation of the condenser water temperature control device.\n\nVerify the motor cooling operation.\n\nShut down the chiller.\n\nCheck the oil and refrigerant levels, if levels are low provide leak rate calculation report to COR. (If the refrigerant charge needs correction, the refrigerant, and the labor to install it, are not included.)\nRe-start chiller and log the operating conditions after the system has stabilized.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CTV-530\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the purge unit.\n\nCheck the operation of the control circuit.\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data. Compare the data to the original design conditions.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nSEASONAL SHUT-DOWN PROCEDURE CTV-550\n\nCheck the general operation of the unit.\n\nShut down the chiller, pumps and auxiliary equipment.\n\nDrain the condenser and chilled water piping.\n\nTurn off equipment power as necessary.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nCONDENSER CLEANING\nWATER-COOLED CONDENSERS BRUSH TUBES\n(600 Tubes/Day) CDS-210\nPull easy end head, both ends\n\nBrush tubes.\n\nNOTE: The term  easy end head  refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit s having marine boxes.\n\nLUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130\n\nChange the oil and filter, using factory-recommended oil and filter every year.\n\nCOOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nSTRUCTURE\n\nDisassemble all screens and access panels for inspection.\n\nInspect the conditions of the slats.\n\nInspect the condition of the tower fill.\n\nInspect the condition of the support structure.\n\nInspect the condition of the basins (upper and lower), spray nozzles, and olson pan. Make necessary repairs  to basins  and replace nozzles if any issues.\n\n\nVerify clean basins and strainer(s).\n\nVerify the condition and operation of the basin fill valve system.\n\nFill basin\n\nMECHANICAL\n\nInspect gear box for leaks.\n\nInspect drive and coupling for condition and security\n\nInspect fan assembly for condition, security, and clearances (e.g. blade tip clearance).\n\nLubrication\n\nLubricate motor bearings.\n\nCheck gear box oil level.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactor(s) for free and smooth operation.\n\nMeg the motor and record reading.\n\nCheck disconnect terminal block for wear, tightness and signs of overheating and discoloration.\nCheck the condition and operation of the basin heater contactor(s).\n\nSTARTUP / CHECKOUT PROCEDURE CLT-220\n\nFill the basin and verify float level.\n\nVerify the operation of the basin heaters.\n\nVerify the operation, set point, and sensitivity of the basin heater temperature control device.\nStart the condenser water pumps.\n\nVerify the balance of the return water through the distribution boxes.\n\nVerify proper operation of the bypass valve(s), if applicable.\n\nOperate the fan(s) and verify smooth operation.\n\nLog operation after the system has stabilized.\n\nReview operating procedures with COTR.\n\n\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nMID-SEASON RUNNING INSPECTION CLT-230\n\nCheck the general condition of the tower.\n\nVerify clean basins and strainers (upper and lower) and/or spray nozzles. Note, Building 20 strainer cleaning required for mid-season inspection.\n\nVerify proper water level in the basin.\n\nVerify proper operation of the water level control device.\n\nVerify smooth operation of the fan(s).\n\nVerify proper operation of the bypass valve(s).\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate uncorrected deficiencies detected.\n\n\nDIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110\n\nReport in with the COTR\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\n\nCheck motor shaft and pump shaft for alignment.\n\nInspect the coupling for wear.\n\nVerify that the shaft guard is in place and tight.\n\nVerify water flow through the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nVerify smooth operation of the pump.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nLubrication\n\nLubricate the motor bearings as necessary.\n\nLubricate the pump bearings as necessary.\n\n\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nMeg the motor.\n\nVerify tight connections on the motor terminals.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nVerify proper volts and amps.\n\nPUMP RUN INSPECTION PMP-111\n\nVerify smooth operation of the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nVARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nClean the heat sinks.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVisually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture.\nVerify proper operation of the unit.\n\nVerify proper DC buss voltage.\n\n\nTRANE CENTRIFUGAL CHILLERS W-C\n(CVHE/F Style Units)\nCOMPREHENSIVE ANNUAL INSPECTION SERVICE ELECTRONIC CTV-210\n\nReport in with the Customer Representative.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with customer for operational problems and trends.\n\nGeneral Assembly\n\nCheck and record refrigerant level.\n\nInspect for leaks and report leak results (yearly).\n\nThe refrigerant should be correct before starting the leak check. To prevent unnecessary venting of refrigerant, EPA-recommended methods (e.g. hot water and/or electric blankets) must be used to pressurize the vessels.\nIn order to use EPA-recommended methods, certain conditions must be met:\n\nThe isolation valves on the chilled water and condenser water lines must shut off the circulation completely.\nThe temperature of the equipment room should be 70Â°F or higher.\n\nAccess connections to the condenser water and chilled water circuits must be provided (customer s responsibility).\nIf these conditions cannot be met, the refrigerant must be removed and the vessel pressurized, using dry nitrogen and a trace gas. This additional procedure is within the scope of this agreement.\nCalculate refrigerant loss and report to the COTR.\n\nRepair minor leaks as required (e.g., valve packing, flare nuts).\n\nVisually inspect condenser tubes for cleanliness.\n\nCheck internal vanes for free and smooth operation.\n\nCheck mechanical linkages for wear.\n\nPurge\nCheck purge unit controls for proper operation.\n\nCheck and clean purge drum as required.\n\nClean the condenser coil.\n\nClean strainers or replace filters as required.\n\nCheck the purge compressor assembly for leaks as required.\n\nCheck the purge unit for proper operation.\n\nControls and Safeties\nVerify all settings in the electronic control panel.\n\nInspect the control panel for cleanliness.\n\nInspect wiring and connections for tightness and signs for overheating and discoloration.\n\nVerify the operation of the vane control system:\n\nVerify the working condition of all indicator/alarm lights and LED/LCD displays.\n\nVerify the operation of the oil sump temperature control device.\n\nTest high condenser pressure safety device. Calibrate and record setting.\n\nTest low evaporator temperature safety device. Calibrate and record setting.\n\nTest low oil pressure safety device. Calibrate and record setting.\n\nTest high motor temperature safety device. Calibrate and record.\n\nTest operation of chilled water pump and condenser water pump starter auxiliary contacts.\n\n\nLubrication System\nPull oil sample for spectroscopic analysis.\n\nCheck oil for acid content and discoloration. Make recommendations to the customer based on the results of the test.\nMeasure and record the oil pump voltage and amperage.\n\nVerify the operation of the oil heater. Measure amps and compare readings with the watt rating of the heater.\nChange the oil and oil filter.\n\nVerify the oil level.\n\nMotor and Starter\n\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nCheck tightness of the motor terminal connections.\n\nMeg the motor and record reading.\n\nVerify the operation of the electrical interlocks.\n\nSTARTUP / CHECKOUT PROCEDURE CTV-220\n\n\nVerify the operation of the oil heater and that the oil temperature is at least 110Â°F before starting the chiller.\nVerify full water systems, including the cooling tower, condenser and evaporator.\n\nVerify clean cooling tower and strainers.\n\nStart the condenser water pump, chilled water pump, and cooling tower fan(s).\n\nTest all flow-proving devices on the chilled water and condenser water circuits\n\nVerify the flow rates through the condenser and the evaporator.\n\nStart the chiller.\n\nVerify the operation of all timing devices.\n\nVerify the operation of the current control device.\n\nCheck the set point and sensitivity of the chilled water temperature control device. Verify the operation.\nVerify the operation of the condenser water temperature control device.\n\nCheck the mechanical limits of both vane arms. Verify smooth movement of vane arms through the full range of operation.\nCheck the starter operation.\n\nVerify the motor cooling operation.\n\nCheck the purge operation.\n\nShut down the chiller.\n\nCheck the oil and refrigerant levels, provide leak rate calculation report if levels are low.\n\nRe-start the chiller and log the operating conditions after the system has stabilized.\n\nReview operating procedures with the operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any deficiencies detected.\n\n\nMID-SEASON RUNNING INSPECTION CTV-230\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the purge unit.\n\nCheck the operation of the control circuit.\n\n\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data. Compare the data to the original design conditions.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nSEASONAL SHUT-DOWN PROCEDURE CTV-250\n\nCheck the general operation of the unit.\n\nShut down the chiller, pumps, and auxiliary equipment.\n\nDrain the condenser and chilled water piping as required.\n\nTurn off equipment power as necessary.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\nAir-Cooled Rotary Chillers ACR-1\nReview operation logs with COTR for any problems and trends.\n\nCheck and record refrigerant level, provide leak rate calculation report if levels are low.\n\nInspect for leaks, conduct leak check using EPA-recommended methods, and report leak results.\nCalculate refrigerant loss.\n\nRepair all minor leaks as required such as valve packing, flare nuts, etc.\n\nVisually inspect condenser coil for cleanliness.\n\nCheck the condenser fans for clearances and free operation.\n\nCheck tightness of condenser fan motor mounting brackets.\n\nCheck the set screws on the fan shafts.\n\nVerify the performance of the fan control inverter VFD.\n\nGrease fan bearings as required.\n\nAnnually, clean the condenser coil.\n\nVerify all settings in the electronic control panel.\n\n\n\nInspect the control panel for cleanliness.\n\nInspect controls and safety wiring and connections for tightness and signs of overheating and discoloration.\nVerify the working condition of all indicator/alarm lights and LED/LCD displays. Replace lights as required.\nTest the oil pressure safety device. Calibrate and record setting.\n\nTest high motor temperature safety device. Calibrate and record setting.\n\nTest operation of chilled water pump and condenser water pump starter auxiliary contacts.\nPull one oil sample per year for spectroscopic analysis.\n\nAnnually, check oil for acid content and discoloration. Change oil if out of normal parameters.\nVerify the operation of the oil heaters. Measure amps and compare readings with the wattage rating of the heaters.\nClean the starter cabinet and starter components.\n\nStart the unit if not already in operation.\n\nInspect motor and starter wiring and connections for tightness and signs of overheating and discoloration.\nCheck condition of contacts for wear and pitting.\n\nCheck contactors for free and smooth operation.\n\nCheck the mechanical linkages for wear, security, and clearances.\n\nCheck tightness of the motor terminal connections.\n\nAnnually, meg the motor and record reading.\n\nVerify the operation of the electrical interlocks.\n\nMeasure and record voltages.\n\nProvide function test loss of normal operation and automatic emergency start up\n\nOnce per year, pull a refrigerant sample for spectrographic analysis for contaminants.\n\n\na. Additionally Performed During Mid-Season PM w/Equipment Running (Schedule during July)\n\n\n\nCheck the general operation of the unit.\n\nLog the operating temperatures, pressures, voltages, and amperages.\n\nCheck the operation of the control circuit.\n\nCheck the operation of the lubrication system.\n\nCheck the operation of the motor and starter.\n\nAnalyze the recorded data and compare to the original design conditions for the equipment.\nReview operating procedures with COTR and VA staff.\n\nCENTRAL STATION AIR HANDLING UNITS COMPREHENSIVE ANNUAL INSPECTION AHU-110\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\n\n\nGeneral Assembly\n\nInspect the unit for cleanliness.\n\nInspect the fan wheel and shaft for wear and clearance.\n\nCheck the sheaves and pulleys for wear and alignment.\n\nCheck the belts for tension, wear, cracks, and glazing.\n\nVerify tight bolts, set screws, and locking collars.\n\nCheck dampers for wear, security and linkage adjustment.\n\nVerify clean condensate pan.\n\nVerify proper operation of the condensate drain.\n\nVerify clean air filters.\n\nVerify clean coils.\n\nVerify proper operation of the spray pump, if applicable.\n\nVerify smooth fan operation.\n\nLog operating conditions after system has stabilized.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\n\nLubrication\nLubricate the fan shaft bearings, if applicable.\n\nLubricate the motor bearings, if applicable.\n\nControls and Safeties\nTest the operation of the low temperature safety device, if applicable.\n\nTest the operation of the high static pressure safety device, if applicable.\n\nTest the operation of the low static pressure safety device, if applicable.\n\nCheck the thermal cutout on electric heaters, if applicable.\n\nCheck the step controller, if applicable.\n\nCheck and record supply air and control air pressure, if applicable.\n\nVerify the operation of the control system and dampers while the fan is operating.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect the wiring and connections for tightness and signs of overheating and discoloration. This includes wiring to the electric heat, if applicable.\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nMeg the motor and record readings.\n\nSCHEDULED RUNNING INSPECTION AHU-130\nCheck the general condition of the fan.\n\nVerify smooth fan operation.\n\nCheck and record supply and control air pressure, if applicable.\n\nFunction test loss of normal operation and emergency start up\n\nVerify the operation of the control system.\n\nLog the operating conditions after the system has stabilized.\n\nReview operating procedures with operating personnel.\n\nProvide a written report of completed work, operating log, and indicate uncorrected deficiencies detected.\n\n\n\n\n\nVANE AXIAL FANS   TRANE COMPREHENSIVE ANNUAL INSPECTION   EXHAUST FANS\nFAN-130\n\nReport in with the COTR\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the COTR for operational problems and trends.\n\nGeneral Assembly\nInspect fan wheel for wear, security, and clearance.\n\nInspect sheaves and pulleys for wear and alignment.\n\nInspect belts for tension, wear, cracks, and glazing.\n\nVerify tight bolts, set screws, and locking collars.\n\nVerify smooth operation of the fan.\n\nLog operating conditions after the system has stabilized.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nLubrication\nLubricate the fan bearings.\n\nLubricate the motor bearings, if applicable.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect the wiring and connections for tightness and signs of overheating and discoloration.\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactor for free and smooth operation.\n\nMeg the motor and record the readings.\n\nCheck and record volts and amps of the motor.\n\nPURGE SYSTEMS PURIFIER PURGE PRG-130\nClean the condenser on the purge refrigeration unit.\n\nCheck purge unit controls for proper operation.\n\nCheck and clean purge drum.\n\nClean strainers or replace filters.\n\n\n\nCheck purge compressor assembly for leaks.\n\nCheck the purge unit for proper operation.\n\nLEAK CHECK (HIGH PRESSURE)\nWATER COOLED High Pressure Leak Check LCK-11O\n\nInspect for leaks and report results.\n\nRepair minor leaks as required (e.g. valve packing, flare nuts).\n\nCalculate refrigerant loss rate and report to the customer.\n\nCONDENSER CLEANING\nWATER-COOLED CONDENSERS BRUSH TUBES\n(600 Tubes/Day) CDS-210cds\n\nPull both heads.\n\nEddy Current test every 2 years.\n\nBrush tubes as necessary.\n\nNOTE: The term  easy end head  refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit s having marine boxes.\n\nLUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130\nChange the oil and filter, using factory-recommended oil and filter.\n\nREFRIGERANT MONITORS ANNUAL MAINTENANCE INSPECTION MSC-320\nReport in with the COTR.\n\nRecord and report abnormal conditions.\n\nCheck chassis mounting in enclosure.\n\nCheck operation of Clear Language Display.\n\nReplace sampling filter element /elements at sensing points.\n\nProvide Zero and Span calibration to accuracy within 1 PPM.\n\nVisually check photo-acoustic sensing device.\n\nCheck periodic re-zeroing.\n\nCOOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210\n\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\nSTRUCTURE\n\nDisassemble all screens and access panels for inspection.\n\nInspect the conditions of the slats, if applicable.\n\nInspect the condition of the tower fill.\n\nInspect the condition of the support structure.\n\nInspect the condition of the basins (upper and lower) and/or spray nozzles.\n\nVerify clean basins and strainer(s).\n\nVerify the condition and operation of the basin fill valve system.\n\nMECHANICAL\n\nInspect gear box for leaks.\n\nInspect drive and coupling for condition and security\n\nInspect fan assembly for condition, security, and clearances (e.g. blade tip clearance).\n\nLubrication\nLubricate motor bearings.\n\nCheck gear box oil level.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nCheck condition of the contacts for wear and pitting.\n\nCheck contactor(s) for free and smooth operation.\n\nMeg the motor and record reading.\n\nCheck disconnect terminal block for wear, tightness and signs of overheating and discoloration.\nCheck the condition and operation of the basin heater contactor(s).\n\nSTARTUP / CHECKOUT PROCEDURE CLT-220\nFill the basin and verify float level.\n\nVerify the operation of the basin heaters.\n\nVerify the operation, set point, and sensitivity of the basin heater temperature control device.\nStart the condenser water pumps.\n\nVerify the balance of the return water through the distribution boxes.\n\nVerify proper operation of the bypass valve(s), if applicable.\n\nOperate the fan(s) and verify smooth operation.\n\nLog operation after the system has stabilized.\n\nReview operating procedures with COTR.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nMID-SEASON RUNNING INSPECTION CLT-230\nCheck the general condition of the tower.\n\nVerify clean basins and strainers (upper and lower) and/or spray nozzles.\n\nVerify proper water level in the basin.\n\nVerify proper operation of the water level control device.\n\nVerify smooth operation of the fan(s).\n\nVerify proper operation of the bypass valve(s).\n\n\n\nDIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110\nReport in with the COTR\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nGeneral Assembly\nCheck motor shaft and pump shaft for alignment.\n\nInspect the coupling for wear.\n\nVerify that the shaft guard is in place and tight.\n\nVerify water flow through the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nVerify smooth operation of the pump.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nLubrication\nLubricate the motor bearings as necessary.\n\nLubricate the pump bearings as necessary.\n\nMotor and Starter\nClean the starter and cabinet.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nMeg the motor and record results.\n\nVerify tight connections on the motor terminals.\n\nCheck the condition of the contacts for wear and pitting.\n\nCheck the contactors for free and smooth operation.\n\nVerify proper volts and amps.\n\nPUMP RUN INSPECTION PMP-111\nVerify smooth operation of the pump.\n\nCheck for leaks on the mechanical pump seals.\n\nVerify proper drip rate on the pump seal packing.\n\nProvide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.\n\n\nVARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130\nReport in with the COTR.\n\nRecord and report abnormal conditions, measurements taken, etc.\n\nReview customer logs with the customer for operational problems and trends.\n\nClean the heat sink.\n\nInspect wiring and connections for tightness and signs of overheating and discoloration.\n\nVisually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture.\n\nVerify proper operation of the unit.\n\nVerify proper DC buss voltage.\n\nEach inspection will be provided in accordance with the system/equipment manufacturers factory recommended procedures. Each inspection shall, at a minimum, include the following as specified for the equipment make, type, and time of seasonal operation. Any additional parts not identified in this document will not be covered by this contract. The vendor will obtain prior approval from the COTR prior to performing any additional repair work and the additional work will be billed separately.\n\nFor each PM inspection, the contractor will provide a detailed written report to the COTR that summarizes work performed, problems/deficiencies found, and measurements taken. This report will be submitted within 10 calendar days of the date of PM inspection.\n\nAll work will be performed between the hours of 7:30 a.m. and 4:00 p.m. on the prearranged dates.\n\nAll inspection work must be coordinated through the COTR who is:\n\nEMERGENCY SERVICE\nEmergency repair service is not covered by the contract. However, the contractor will provide a preferred customer response to emergency repair calls that includes labor and parts costs to be billed separately.\n\nCONTRACTOR PERSONNEL\n\nPersonnel Experience. All work shall be performed by competent mechanics, experienced and qualified to work on the specific makes and models of equipment listed in this contract. The Contractor shall submit to and for the approval of the Contracting Officer, certification and a list of credentials of the approved mechanics. Personnel shall have a minimum of three (3) years recent experience related to this work. The contractor must provide a list of three (3) reference contacts that have been provided service on similar or identical equipment. The contractor must provide authenticated factory training certificates or credentials (or acceptable substitute as approved by the COTR) for any personnel who are working on any VA equipment. The VA specifically reserves the right to reject any of the contractor s personnel and refuse them permission to work on VA equipment.\nConduct of Personnel. The Contractor shall ensure that his personnel present a professional appearance at all times and that their conduct shall not reflect discredit upon this facility or the Department of Veterans Affairs. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The removal from the job site of such a person shall not relieve the Contractor of the requirement to provide sufficient personnel to perform adequate and timely service. All employees shall be legal residents of the United States and be able to understand, speak, read and write the English language.\nIdentification of Employees. : The Contractor shall within 10 calendar days before beginning performance of work provide the Contracting Officer a list of all employees who will perform under this contract. The list shall include the full name, and work assignment of each employee. The Contractor shall notify the Contracting Officer in writing of any addition, deletion or change in work assignment within 10 days of such change. Each of the Contractor's employees shall conspicuously display on their person a badge provided by the VA West Roxbury Police Office.\n\nHOURS OF OPERATION\nNormal Duty Hours. The Contractor shall have employees available Monday through Friday, except legal public holidays at the times specified to perform routine work and inspections.\nFederal Holidays.  Federal Holidays observed by the VA are:\n\nNew Years Day; Martin Luther King Day; President s Day; Memorial Day; Independence Day; Labor Day; Columbus Day; Veterans Day; Thanksgiving Day; and Christmas.\n\nCONTRACTOR QUALITY CONTROL\n\nThe Contractor shall establish and maintain a Quality Control Program that ensures that all requirements of the contract are provided as specified.\n\nINSPECTION AND ACCEPTANCE\n\nFinal inspection and acceptance by the Government shall be made at the site of each system. However, final inspection and acceptance do not preclude the Government's right to inspect completed work prior to shipment from the Contractor's shop nor does it waive any rights of the Government.\nUnsatisfactory service will be reported in writing by the VA CO to the Contractor.\n\nTelephone Answering Service: The Contractor shall maintain, at his own expense, a dedicated (tie-line) toll-free telephone answering service for the exclusive use in the performance of this contract. This answering service shall be monitored during normal work hours as identified in the specifications.\n\nREMOVAL AND/OR DISPOSAL\nRemoving Government-Owned Material: All property removed remains the property of the\nU.S. Government and shall be returned by the Contractor to a place of storage as designated by the CO or COTR.\nSalvage: Items received by the Contractor that are non-repairable because of condition, or declared unfit for economical rehabilitation by the Contractor, shall be returned to the Government. All salvage remaining in the Contractor's shop shall remain Government property and may be used for repair of any Government-owned equipment when released by the CO. The Contractor shall be required to maintain an account record of inventory upon completion of the maintenance contract.\nInventories shall not be disposed of by the Contractor without inspection and written approval of the CO. Salvaged parts used in the repair of any government owned equipment shall be treated by the Contractor as Government furnished material and reflected as same on Contractor's invoices when submitted for payment. All salvage in the possession of the\n\n\n\nContractor, upon expiration of the contract, will be returned to the Government within thirty (30) days after such expiration.\n\nFIRE PREVENTION AND PROTECTION\n\nThe Contractor shall fully acquaint himself and his personnel with the location of fire equipment before work, take all prudent measures to minimize fire hazards that result from work, complies with all ordering agency fire and safety regulations.\n\nENERGY CONSERVATION\nThe Contractor is required to comply with all energy conservation regulations and instructions that are applicable to Government-owned facilities including but not limited to thermostat settings.\n\nCLEANING UP\nThe Contractor shall clean up after work, leaving each area where work is performed, neat and clean. All containers, trash and debris for which he is responsible shall be removed.\n\nHAZARDOUS CONDITIONS\nDuring the course of performing work under this contract, should the Contractor find serious or hazardous conditions existing with or in any of the equipment the Contractor shall secure the equipment and immediately notify the COTR.\n\nCLEANLINESS\nThe area immediately around the equipment provided for the Contractor s use shall be kept in a clean and orderly condition. Trash and waste material shall not be permitted to accumulate, but shall be removed by the Contractor s employees.\n\nSERVICE MANUALS\nThe VA shall not provide service manuals or service diagnostic software to the contractor. The contractor shall obtain, have on file, and make available to its FSEs all operational and technical documentation, (such as: operational and service manuals, schematics, and parts lists), which are necessary to meet the performance requirements of this contract. The location and listing of the service data manuals, by name, and/or the manuals themselves shall be provided to the CO upon request.\n\nINSURANCE\n\nWorker compensation and employer s liability. Contractor and any subcontractor covered under this contract are required to comply with applicable Federal and State Worker s Compensation and occupational disease statutes.\nGeneral Liability. Contractor and any subcontractor covered under this contract are required to have Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.\n\n\n\nProperty Damage Liability. Contractor and any subcontractor covered under this contract are to have Property Damage Liability insurance coverage of at least $500,000.\nContractor shall provide proof of liability insurance within five (5) days after contract award.\n\nSMOKING POLICY\nSmoking is prohibited inside all buildings except in designated areas.\n\nBILLING AND PAYMENT\nEach invoice shall contain the documentation required by this contract. The invoices shall be itemized to contain the equipment s identifier. When parts are furnished by the Government, they shall be itemized on Contractor's invoice at no-cost and indicated as Government-furnished parts.\nPayment. Payment will be made 30 days in arrears upon receipt of properly prepared invoice. Invoice must contain the contract number and the purchase order number.\n\nPRICING SUBMITTAL\n\nThe annual pricing of the contract should be itemized by the bidders to reflect a cost per unit PM per equipment item covered by contract.\n\nVENDOR REQUIREMENTS\n\nThe contractor must employ mechanics and technicians that are trained in the applicable codes, standards, and manufacturer requirements for maintenance and repair of the Trane and McQuay equipment covered by this contract.\nThe contractor must have at least 5 years  experience satisfactorily performing such maintenance on comparable units, equipment, or systems.\nThe contractor must have access to OEM (original equipment manufacturer)- manufactured parts and materials required for performance of this work.\nThe contractor must have sufficient supplies, tools, and equipment to perform all requirements of this contract.\n\n\nEQUIPMENT COVERED BY THIS CONTRACT\n\n\nBUILDING # 1\nVA ID#\nMANUFACTURER\nITEM NAME\nMODEL #\nSERIAL#\nSCHEDULE\nLOCATION\nÂ \nTrane (MICU) Back-Up\nAir-Cooled Chiller \nCGAM070F2Y03AXD2A1\nU22A00424\nACR-1\nWR-B1- 4B128\nÂ \nTrane (CCU)\nAir-Cooled Chiller \nCGAM070F2Y03AXD2A1\nU22A00422\nACR-1\nWR-B1- A4-01\nBUILDING # 2\nÂ \nTrane\nCentrifugal Chiller \nCVHF0910\nL03M08522\nCTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130\nWR-B2-AB- 13\nÂ \nTrane\nCentrifugal Chiller \nCVHF0910\nL03M08531\nCTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130\nWR-B2-AB- 13\nÂ \nMarley\nCooling Tower-1\nNC-8309 GZBS\nNC-241518-A2\nCLT-210, CLT-230, CLT-220\nWR-B2-A4-01\nÂ \nMarley\nCooling Tower-2\nNC-9309 GZBS\nNC-241518-A1\nCLT-210, CLT-230, CLT-220\nWR-B2-A4-01\nÂ \nTrane \n(OR- Back-Up) Air-Cooled Chiller \nRTAA0804YR01A301GBFC\nU06B06111\nACR-1\nWR-B2-A4-01\nÂ \nTrane \n(GI) Air-Cooled Chiller \nCGAFC304AK01A00000\nC06A00249\nACR-1\nWR-B2-A4-01\nÂ \nTrane \n(S5C) Air-Cooled Chiller \nRTAC1404\nU10F07753\nACR-1\nWR-B2-A4-01\nÂ \nTrane (Artic Chiller)\nChiller Modular -1\nPACVMV0400D4-MM-VS1\nA10001137\nRunning Inspection \nWR-B2-PH\nÂ \nTrane (Artic Chiller)\nChiller Modular -2\nPACVMV0400D4-MM-VS1\nA101011417\nRunning Inspection \nWR-B2-PH\nÂ \nTrane (Artic Tower)\nTower Modular-2\nTP00004075\nA101011517\nTower Cleaning & Running Inspection \nWR-B2-PH\nÂ \nTrane \nSPS Condenser\nRAUJ804A132BDF01D\nC10J04548\nACR-1\nWR-B2-POOL ROOF\nÂ \nTrane\nS5C AHU\nMCCB05ONBFOSDAA\nK08B22619\nAHU-110, AHU-130\nWR-B2-A4-01\nÂ \nTrane\n(OR-S5) AHU\nMCCB05OUA0AOUB\nK09D83236A\nAHU-110, AHU-130\nWR-B2-A4-01\nÂ \nTrane\nAHU-1A\nCSAA012UBL00\nK17C26642\nAHU-110, AHU-130\nWR-B2-ROOF\nÂ \nTrane\nAHU-1B\nCSAA0100\nK17C26621\nAHU-110, AHU-130\nWR-B2-ROOF\nÂ \nCarrier\n(S8-Elv Mch Rm) Air Cooled Chiller\n38ARZ008-601CA\n3806G50045\nACR-1\nWR-B2-ROOF\nÂ \nTrane\n(CTIR) Air Cooled Chiller \nTTA09044DAA02BS010001\n23193610YA\nACR-1\nWR-B2-ROOF\nÂ \nTrane \n(CTIR) Dry Cooler \nTR-SCS-120-SSA\n10331148\nACR-1\nWR-B2-ROOF\nÂ \nBarry Blower \nExhaust Fan \nEM2515T-G\n76-2902\nFAN-130\nWR-B2-PH\nÂ \nCook MFG\nExhaust Fan \n195CPS\nN/A\nFAN-130\nWR-B2-AB- 13\nÂ \nVaneaxial Fan\nExhaust Fan E-5\nN/A\nN/A\nFAN-130\nWR-B2-A4-01-PH\nÂ \nVaneaxial Fan\nExhaust Fan GE-1\nN/A\nN/A\nFAN-130\nWR-B2-A4-01-PH\nÂ \nBaldor Reliance\n2-SCHW-Pump-1\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-SCHW-Pump-1 Frame\nE-1510\nC331015-01A22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-SCHW-Pump-2\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-SCHW-Pump-2 Frame\nE-1510\nC331015-01G22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-SCHW-Pump-3\nEM3313T-G\n37J839L868G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-SCHW-Pump-3 Frame\nE-1510\nC331015-01C22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-SCHW-Pump-4\nEM3311T-G\n37J839L863G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-SCHW-Pump-4 Frame\nE-1510\nC331016-01B22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-SCHWP-1 VDF\n174Z4893\n988204Y252\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-SCHWP-2 VDF\n174Z4893\n525204Y182\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-SCHWP-3 VDF\n174Z4893\n525204Y182\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-SCHWP-4 VDF\n174Z4893\n771804Y222\nMSC-130\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-PCHW-Pump-1\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-PCHW-Pump-1 Frame\nVSC\nC331009-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-PCHW-Pump-2\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-PCHW-Pump-2 Frame\nVSC\nC331009-03C22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-PCHW-Pump-3\nEM2539T-G\n40E245X166G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-PCHW-Pump-3 Frame\nVSC\nC331009-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-PCHWP-1 VDF\n174Z4898\n986904Y252\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-PCHWP-2 VDF\n174Z4898\n986804Y252\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-PCHWP-3 VDF\n174Z4898\n986604Y252\nMSC-130\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-CW-Pump-1\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-CW-Pump-1 Frame\nVSC\nC331008-02D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-CW-Pump-2\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-CW-Pump-2 Frame\nVSC\nC331008-01D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBaldor Reliance\n2-CW-Pump-3\nEM2555T-4G\n44E227W390G1\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nBell & Gossett\n2-CW-Pump-3 Frame\nVSC\nC331008-03D22\nPMP-110, PMP-111\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-CWP-1 VDF\n174Z4902\n271004Y292\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-CWP-2 VDF\n174Z4902\n270804Y292\nMSC-130\nWR-B2-AB- 13\nÂ \nTrane TR200\n2-CWP-3 VDF\n174Z4902\n270904Y292\nMSC-130\nWR-B2-AB- 13\nÂ \nStrainer \nCW Strainer-1\n10\" ASTM A126 GR.B\nN/A\nClean Strainer \nWR-B2-AB- 13\nÂ \nStrainer \nCW Strainer-2\n10\" ASTM A126 GR.B\nN/A\nClean Strainer \nWR-B2-AB- 13\nÂ \nStrainer \nCW Strainer-3\n10\" ASTM A126 GR.B\nN/A\nClean Strainer \nWR-B2-AB- 13\nBUILDING # 3\nÂ \nTrane\nCentrifugal Chiller \nCVHE0450\nL09A05825\nCTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130\nWR-B3-3C101\nÂ \nTrane\nCentrifugal Chiller \nCVHE0450\nL09A05826\nCTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130\nWR-B3-3C101\nÂ \nTrane\n(B3-Cross Connect )Air-Cooled Chiller \nRTAC\nU22A00455\nACR-1\nWR-B3-ROOF\nÂ \nEvapco\nCooling Tower \nLST-10-183T\n879038\nCLT-210, CLT-220, CLT-230\nWR-B3- ROOF\nÂ \nEvapco\nCooling Tower \nLST-10-183T\n879039\nCLT-210, CLT-220, CLT-230\nWR-B3- ROOF\nÂ \nABB\nCooling Tower-1 VFD\nACH550-UH-045A-4\n2090602672\nMSC-130\nWR-B3-3C101\nÂ \nABB\nCooling Tower-2 VFD\nACH550-UH-045A-4\n2090602674\nMSC-130\nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCHW-Pump-1\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCHW-Pump-2\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCHW-Pump-3\nEM2531T\n40G048W943\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nABB\n3-PCHW-Pump-1 VFD\nACH550-UH-038A-4\n2090602676\nMSC-130\nWR-B3-3C101\nÂ \nABB\n3-PCHW-Pump-2 VFD\nACH550-UH-038A-4\n2090602673\nMSC-130\nWR-B3-3C101\nÂ \nABB\n3-PCHW-Pump-3 VFD\nACH550-UH-038A-4\n2090602675\nMSC-130\nWR-B3-3C101\nÂ \nStrainer \nBldg-3-CW Strainer-1\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer \nWR-B3-3C101\nÂ \nStrainer \nBldg-3-CW Strainer-2\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer \nWR-B3-3C101\nÂ \nStrainer \nBldg-3-CW Strainer-3\n10\" Keckley Style A 125lbs\nN/A\nClean Strainer \nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCW-Pump-1\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCW-Pump-2\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nBaldor Reliance\n3-PCW-Pump-3\nEM2528T\n40G048X120\nPMP-110, PMP-111\nWR-B3-3C101\nÂ \nABB\n3-PCW-Pump-1 VFD\nACH550-UH-031A-4\n2090602687\nMSC-130\nWR-B3-3C101\nÂ \nABB\n3-PCW-Pump-2 VFD\nACH550-UH-031A-4\n2090602685\nMSC-130\nWR-B3-3C101\nÂ \nABB\n3-PCW-Pump-3 VFD\nACH550-UH-031A-4\n2090602688\nMSC-130\nWR-B3-3C101\nBUILDING # 20 & 21\nÂ \nTrane Arctic  \nChiller Mod 1\nTPWCCMV0300D4-MM\nA022047224\nRunning Inspection \nWR-B20\nÂ \nTrane Arctic  \nChiller Mod 2\nTPWCCMV0300D4-MM\nA022047124\nRunning Inspection \nWR-B20\nÂ \nTrane Arctic  \nChiller Mod 3\nTPWCCMV0300D4-MM\nA022047024\nRunning Inspection \nWR-B20\nÂ \nTrane \nCondenser Unit \nRAUJC604BA03AOD\nC10B00682\nACR-1\nWR-B21\nÂ \nTrane \nCondenser Unit \nRAUJC604BA03AOD\nC10B00681\nACR-1\nWR-B21\nÂ \nEvapco\nCooling Tower-1\nUSS14-86\n16-780293\nCLT-210, CLT-220, CLT-230\nWR-B21\nÂ \nEvapco\nCooling Tower-2\nUSS14-86\n16-780292\nCLT-210, CLT-220, CLT-230\nWR-B21\nÂ \nWEG\n21-CW-Pump-1 \n01018OT3E215T-S\n103116362\nPMP-110, PMP-111\nWR-B21\nÂ \nWEG\n21-CW-Pump-2\n0118OT3E215T-S\n103116359\nPMP-110, PMP-111\nWR-B21\nÂ \nWEG\n21-CHW-Pump-1 \n020180T3E256T-S\n1030953958\nPMP-110, PMP-111\nWR-B21\nÂ \nWEG\n21-CHW-Pump-2\n021080T3E256T-S\n1030953957\nPMP-110, PMP-111\nWR-B21\nÂ \nABB\n21-CW-Pump-1 VFD\nACH550-PCR-015A\n216900159\nMSC-130\nWR-B21\nÂ \nABB\n21-CW-Pump-2 VFD\nACH550-PCR-015A\n216900142\nMSC-130\nWR-B21\nÂ \nABB\n21-CHW-Pump-1 VFD\nACH550-PCR-031A\n216900168\nMSC-130\nWR-B21\nÂ \nABB\n21-CHW-Pump-2 VFD\nACH550-PCR-031A\n216900182\nMSC-130\nWR-B21\nÂ \nStrainer \nCW Strainer-1\nN/A\nN/A\nClean Strainer \nWR-B21\nÂ \nStrainer \nCW Strainer-2\nN/A\nN/A\nClean Strainer \nWR-B21\n\n\n\n\n\n\n\n\n\nThe NAICS code for this requirement is 238220.\n\nEngineering identifies Trane U.S. Inc. as the required single source for the complete manufacturer-supported Trane chiller maintenance program. The statement of work specifically calls for KestrelView analysis using a Trane laptop and software and for equipment-specific controls, protective-device, refrigerant, and mechanical service procedures that depend on Trane equipment documentation, specialized diagnostic resources, and qualified manufacturer support. These requirements go beyond generic HVAC maintenance and are central to assessing the condition and reliable operation of the installed Trane chillers.\n\nThe VA-owned Trane-controlled equipment and Trane Ensemble platform require Trane-specific software, programming capability, and replacement supplies and identified Trane as the contractor then able to deliver the specified integrated service. Those historical findings are being incorporated as the technical basis for continuity of the current installed-equipment requirement. Equipment lists have changed because of campus upgrades; this does not alter the need for the specified OEM diagnostic methods and chiller-specific maintenance capability.\n\nThe Government has intentionally retained Trane equipment as a principal element of its West Roxbury cooling infrastructure. Standardization and operational continuity are relevant to maintenance reliability, availability of consistent OEM service procedures, and safe seasonal transition of the chilled-water plants. Engineering requires the Trane-specific diagnostic portion to be integrated with the ongoing scheduled service program to ensure that findings, repairs recommendations, and unit availability are evaluated as one coordinated plant-maintenance effort.\n\nThe associated pumps, drives, cooling towers, and connected components are necessary for the cooling plant to function. The technical basis for a Trane-only order is the complete integrated service requirement with manufacturer-specific chiller diagnostics and supported service access.  Trane is the only provider identified in the supplied acquisition history as delivering the Trane-specific diagnostic and coordinated plant-maintenance requirement.\n\nThis notice of intent is not a solicitation nor is it a request for proposal.  However, interested parties that believe they can satisfy the requirement must clearly identify their capability to do so in writing by Monday, November 25, 2026 at 12 pm EST time.  Response should be sent to Issa Shawki at issa.shawki@va.gov.  Information submitted in response to this notice will be used solely to determine whether competitive procedures could be used for this acquisition.  A determination not to open this requirement to competition based upon responses to this notice is solely within the discretion of the Government.","origin":"detail"},"contacts":[{"name":"Issa Shawki","role":"primary","email":"issa.shawki@va.gov","phone":"774-826-3192","title":"Contracting Officer"}],"place_of_performance":null,"office_address":{"zip":"04330","city":"TOGUS","state":"ME","country":"USA"},"naics_codes":["238220"],"award":{"awardee":{}},"attachments":[{"resource_id":"f9e4629e68b84a318c48e4807ade8665","name":"36C24127Q0080.docx","kind":"file","mime_type":".docx","size_bytes":109450,"posted_at":"2026-11-19T19:21:01.750Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f9e4629e68b84a318c48e4807ade8665/download","mirrored":false}],"awards":[],"related":[{"key":"36C24127Q0084","latest_notice_id":"939b8f3021be4a75ae5972b0c7ffb9ae","title":"X1EA--CWM VA Police Use of shooting range.","solicitation_number":"36C24127Q0084","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-27T15:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"611699","psc":"X1EA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C24127Q0017","latest_notice_id":"d60676ea33af4051b90a1953ab55743e","title":"S201--36C24127Q0017 Windows Washing Service Amendment 0002","solicitation_number":"36C24127Q0017","notice_type":"k","first_type":"k","first_posted":"2026-10-26","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"561720","psc":"S201","set_aside":"SDVOSBC","state":"MA","county":"25017","county_name":"Middlesex County","city":"2501704615","city_name":"Bedford","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C24127Q0044","latest_notice_id":"a2f2fe28c1ec4687b2a2955cf947935e","title":"9140--Togus Fuel Oil and Diesel Delivery","solicitation_number":"36C24127Q0044","notice_type":"k","first_type":"k","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"324110","psc":"9140","set_aside":"SBA","state":"ME","county":"23011","county_name":"Kennebec County","city":"2302100","city_name":"Augusta","country":"USA","place_scope":"nationwide","state_source":"sam_zip","state_evidence":"04330","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C24127Q0076","latest_notice_id":"bb30bc78067840a082b5d9e12eceddd2","title":"Q601--Sources sought Boston Medical Coding Period of Period 01/01/2027-04/01/2027","solicitation_number":"36C24127Q0076","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"541219","psc":"Q601","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24127Q0030","latest_notice_id":"10c3d2d3d0c543179707f8cc9448f701","title":"J061--Eaton Powerware System Replacement","solicitation_number":"36C24127Q0030","notice_type":"k","first_type":"k","first_posted":"2026-11-04","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"811310","psc":"J061","set_aside":"SDVOSBC","state":"NH","county":"33011","county_name":"Hillsborough County","city":"3345140","city_name":"Manchester","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"140PP027B0004","latest_notice_id":"53398cb59b8f4b0687efd4e3fa6241dc","title":"Z--13976 PUHO FIRE PROTECTION AT DORM","solicitation_number":"140PP027B0004","notice_type":"r","first_type":"s","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":2,"due_at":"2026-11-26T03:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T03:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140PP0","office_name":"NATIONAL PARK SERVICE CONTRACTING ACTIVITY","naics":"238220","psc":"Z2AA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"140FF027Q0080","latest_notice_id":"c706d18cc5e846508a63090d29caa934","title":"AK-AK MARITIME NWR-LEAK REPAIR","solicitation_number":"140FF027Q0080","notice_type":"o","first_type":"o","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-26T17:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140FF0","office_name":"FWS CONTRACTING ACTIVITY","naics":"238220","psc":"J045","set_aside":"SBA","state":"AK","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"title","state_evidence":"AK-A","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"36C26227Q0149","latest_notice_id":"99fd06e3089e4005bf945b21581e7d70","title":"J065--BRINE MAINTENANCE SVC - Base +4 OY ($0.00) [605] | POP: 01/01/2027 - 12/31/2031","solicitation_number":"36C26227Q0149","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"238220","psc":"J065","set_aside":"SDVOSBC","state":"CA","county":"06071","county_name":"San Bernardino County","city":"0642370","city_name":"Loma Linda","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T07:05:05.540398Z"}],"similar_open_total":57,"indexable":true}