{"canonical":"https://sealedbidder.com/opportunities/36c24127q0058","key":"36C24127Q0058","url":"https://sealedbidder.com/opportunities/36c24127q0058","title":"J041--Building 2 Steam Station Replacement","solicitation_number":"36C24127Q0058","notice_type":"k","open":true,"removed":false,"removed_at":null,"response_deadline":"2026-12-03T15:00:00Z","first_posted":"2026-11-10","last_posted":"2026-11-10","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"238220","psc":"J041","set_aside":"SDVOSBC","place_state":"CT","place_scope":"site","site":null,"place_state_source":"sam_state_name","place_evidence":null,"place_county":"09170","place_county_name":"South Central Connecticut Planning Region","place_city":"0982800","place_city_name":"West Haven","winner":null,"award_amount":null,"publications":[{"notice_id":"af64aac30933462a938619a6596b072c","title":"J041--Building 2 Steam Station Replacement","solicitation_number":"36C24127Q0058","notice_type":"k","base_type":"k","posted":"2026-11-10","posted_at":"2026-11-10T14:27:07.465Z","due_at":"2026-12-03T15:00:00Z","due_date":"2026-12-03","cancelled":false,"archived":false,"archive_date":"2027-02-01","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/af64aac30933462a938619a6596b072c/view","enriched":true,"history":[{"index":1,"title":"J041--Building 2 Steam Station Replacement","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-10T14:27:07.465Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"af64aac30933462a938619a6596b072c","solicitation_number":"36C24127Q0058"}]}],"latest_notice_id":"af64aac30933462a938619a6596b072c","first_type":"k","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-11-10","posted_at":"2026-11-10T14:27:07.465Z","created_at":"2026-11-10T14:27:05.243Z","modified_at":"2026-11-10T14:27:07.465Z","response_deadline":{"raw":"2026-12-03T10:00:00-05:00","utc":"2026-12-03T15:00:00Z","date":"2026-12-03","time":"10:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/af64aac30933462a938619a6596b072c/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"J041--Building 2 Steam Station Replacement","agency":{"office":{"code":"36C241","name":"241-NETWORK CONTRACT OFFICE 01 (36C241)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"04330","city":"TOGUS","state":"ME","country":"USA"},"organization_id":"100176746","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-02-01","archive_type":"auto_custom"},"history":[{"index":1,"title":"J041--Building 2 Steam Station Replacement","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-11-10T14:27:07.465Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"af64aac30933462a938619a6596b072c","solicitation_number":"36C24127Q0058"}],"contacts":[{"name":"Tnauri Woodbridge","role":"primary","email":"tnauri.woodbridge@va.gov","phone":"203-932-5711 x2892","title":"Contracting Officer"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"af64aac30933462a938619a6596b072c","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"af64aac30933462a938619a6596b072c","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T11:26:32.656513053Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"0257206118ebe9482b80da2b24f1e441-27\"","fetched_at":"2026-11-11T04:50:18.941800608Z","row_sha256":"1ba5882e79a17a78da37b990ef05051604a2ed58f7db79f7934f373dc67d4923","last_modified":"2026-11-11T04:30:18Z"},"updated_at":"2026-11-11T11:26:32.656513053Z","first_seen_at":"2026-11-11T04:50:18.941800608Z"},"description":{"html":"Page 2 of 2\n\nCombined Synopsis Solicitation   West Haven VAMC  Steam Station Replacement\n (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.\n(ii) The solicitation number is 36C24127Q0058 and the solicitation is issued as a request for quotation (RFQ).\n(iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-05.\n(iv) This requirement is being issued as a SDVOSB set-aside.  The associated NAICS 238220 and small business size standard is $16.5 million.\n(v) The Government intends to award a firm-fixed price award for Steam Station Replacement  at West Haven VAMC.  Please see the attached Performance Work Statement for full requirement details.  Please complete the Price Schedule below and submit with the quote submission. \n(vi) The Contractor shall provide all resources necessary to provide Steam Station Replacement\nIAW the attached (PerformancevWork Statement).  Please see the attached PWS for full requirement details.\n(vii) The Place of Performance is West Haven VAMC as described per the (Performance Work Statement).\n(viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.204-7 System for Award Management (OCT 2018); 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016); 52.217-5 Evaluation of Options (JUL 1990); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008)\n(ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement. \nSite Visit: 950 Campbell Ave, West Haven CT 06516\nBidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing.Â  Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.Â Â Â  \nPlease post and include MCP 138-075 Lock-Out-Tag-Out Policy and Confined Space Entry Program. Bidders are required to comply with this policy and SOP.Â  \n\n \nSubmission of Quotes:  \n(1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered.\n(2) Offerors shall submit their quotes electronically via email to tnauri.woodbridge@va.gov.\n(3) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below.  All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer.\nEvaluation Process: \nAward shall be made to the best value, as determined to be the most beneficial to the Government.  Please read each section below carefully for the submittals and information required as part of the evaluation.  Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process.\nOfferor quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers.  Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15.  \nThe Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:Â \nPrice (Follow these instructions):\nOfferor shall complete Attachment 1 - Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces.Â  \nPast Performance:\nOfferor shall utilize Attachment 2   Past Performance Worksheet to provide at least one (1) but no more than (3) references of work, similar in scope and size with the requirement detailed in the (Performance Work Statement).  References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work.Â  The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources. \nTechnical: The offeror s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the (Performance Work Statement) in a timely efficient manner.Â \nContractor shall demonstrate their corporate experience and approach to meet all requirements stated in the (Performance Work Statement).\nContractor shall demonstrate that their technicians meet the qualification standards stated in the (Performance Work Statement).\nIf you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort.\nSAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling 1-866-606-8220. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer.\nVISTA: The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can request a Form 10091 at any time. \n(x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy.\n(xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items (OCT 2018), applies to this acquisition in addition to the following addenda s to the clause: 52.204-16 Commercial and Government Entity Code Maintenance (JUL 2016); 52.219-6 Notice of Total Small Business Set-Aside; 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013); 852.203-70 Commercial Advertising (MAY 2008); 852.232-72 Electronic Submission of Payment Requests (NOV 2018)    \nSubcontracting Commitments - Monitoring and Compliance \nThis solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the                                                                                                                                                                                                                                Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement  to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments.\n(xiii) All contract requirement(s) and/or terms and conditions are stated above.\n(xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement.\n(xv) RFQ responses are due December 3, 2026 by 10:00 AM EST. RFQ responses must be submitted via email to: tnauri.woodbridge@va.gov.  Hand deliveries shall not be accepted.\n(xvi) The POC of this solicitation is Tnauri.Woodbridge@va.gov) \n\n\n\n\n\n\n\n\n\n\n\n\n\n\nATTACHMENT 1\nPRICE SCHEDULE\nITEM NUMBER\nDESCRIPTION OF SERVICES\nQUANTITY\nUNIT\nUNIT PRICE\nAMOUNT\nBase\nREPLACE BUILDING 2 STEAM STATION\n1.00\nJB\n__________________\n__________________\n\n\n\n\n\n\n\n\n\n\nGRAND TOTAL\n__________________\n\n\n\n\n\n\nATTACHMENT 2\nPAST PERFORMANCE WORKSHEET\n1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization:\n2. Contracting Activity Address:\n3. Contract Number:\n4. Date of Contract Award:\n5. Beginning Date of Contract:\n6. Completion Date of Contract:\n7. Contract Value:\n8. Type of Contract:\n9a. Technical Point of Contact: \n9b. Contracting Point of Contact:\nName:\nName:\nTitle:\nTitle:\nAddress:\nAddress:\nTelephone:\nTelephone:\nEmail:\nEmail:\n10. Place of Performance:\n11. Description of Work (Use a continuation sheet if necessary):\n12. List any commendations or awards received: \n13. List of Major Subcontractors:\n\n\n\n\n\nATTACHMENT 3\nSTATEMENT OF WORK\nSTATEMENT OF WORK\nREPLACE BUILDING 2 STEAM STATION\n\nVA CONNECTICUT HEALTHCARE SYSTEM (VACHS) \nVA MEDICAL CENTER WEST HAVEN\n950 CAMPBELL AVENUE\nWEST HAVEN, CT 06516\n\nBACKGROUND\nVA Connecticut Healthcare System has identified existing steam pressure reducing stations that are currently non-functional and require complete replacement (like in kind) located in Building 2, Confined Space 15 within Mechanical Room G-139. \n\nJUSTIFICATION\nSteam station failure has been identified to be impacting inpatient and critical care areas during winter months.  Heating restoration to critical patient care areas is essential to compliance with health and safety standards, patient care, and prevention of domestic and fire suppression piping failures. \n\nPLACE OF PERFORMANCE\nThe place of performance for this contract is VA Connecticut Healthcare System, West Haven VA Medical Center located at 950 Campbell Avenue; West Haven, CT 06516.\n\nPERIOD OF PERFORMANCE\nThe Contract Time Period of Performance will be 180 days upon contract award and Notice to Proceed (NTP).\n\nQUALIFICATIONS\nTo be considered eligible for consideration, potential bidders shall have a field service representative located within 100 miles of the West Haven Campus of the VA Connecticut Healthcare System. \n\nBidders shall provide upon request, documentation of certification/training on the specific equipment under the terms of this contract.  \n\nBidders shall be qualified to perform work on steam distribution systems to include industrial boiler plant equipment and have completed prior steam distribution work and/or inspection projects for VA Connecticut Healthcare System.  \n\nService Provider shall have a minimum of three (3) years of related scope and work experience with commercial and industrial steam boiler and steam boiler component installation and repairs as well as all aspects of inspections, cleaning, calibration, and testing in compliance with and clear understanding of relevant codes and regulations.\n\nService Provider and/or assigned project staff members shall have industry standard certifications and qualifications to include but not limited to current OSHA 30 and OSHA 10 certification and equivalent qualifications associated with requirements herein.  \n\nService Provider shall submit documentation of technical training and certifications for personnel performing all work under the terms of this contract for review and acceptance prior to the start of work on site. \n\nBidders shall be evaluated on past performance, technical capability, and financial capability to perform the requirements of this work.\n\nA full boiler plant steam outage will be conducted prior to the start of this work.  Work is expected to be completed over the duration of two consecutive back to back boiler plant steam outages occurring Saturday 7:00 a.m. through Sunday 4:00 p.m. and will be coordinated between March 01, 2027 and May 31, 2027 and with a 30 day notice.  \n\nMandatory Pre Bid:\nBidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing.  Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.    \n\nDuring the pre-bid site visit, each bidder shall thoroughly inspect the work area and familiarize themselves with all existing conditions affecting the work.  At minimum, bidders shall verify:\n \nExisting steam pipe sizes. \nExisting 1/3 and 2/3 station pipe sizes. \nExisting regulator sizes. \nExisting valve sizes. \nExisting flange sizes, types, ratings, and configurations. \nExisting strainer sizes and configurations. \nExisting safety relief valve sizes and configurations. \nExisting pressure gauge arrangements. \nExisting condensate and drip piping. \nExisting support arrangements. \nExisting piping elevations. \nAvailable straight-pipe distances upstream and downstream of regulators. \nExisting cross tee configuration. \nAvailable physical space for the new steam station arrangement. \nAccess into and out of the pit/crawl space. \nConfined-space access conditions. \nRigging requirements. \nMaterial handling requirements. \nRemoval path for demolished materials. \nInstallation path for new materials and equipment. \nWorking clearances. \nExisting interference with piping, structure, ductwork, electrical, equipment, or other utilities. \nEquipment access requirements. \nExisting insulation. \nExisting asbestos-containing or suspect materials. \nFlanges containing square-head bolts. \nExisting pipe supports and structural attachment points. \nRequired temporary supports. \nRequired permanent supports. \nRequired access for future service and adjustment. \nPressure gauge visibility from outside the pit/crawl space. \nConditions affecting off-hours work. \nConditions affecting the scheduled steam shutdown. \n\nAll pipe sizing, valve sizing, equipment sizing, dimensions, elevations, quantities, access requirements, and existing conditions shall be field verified by the bidder prior to submitting their proposal.  \n\nDimensions, sizes, and quantities contained within this Scope of Work are intended to describe the general work and shall not relieve the bidder from field verification.\n\nThe bidder s submission of a proposal shall constitute acknowledgement that the bidder has inspected the existing conditions, understands the location and complexity of the work, and has included the work reasonably apparent or discoverable during the site visit within their bid price.  \n\nAll Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010. \n\nWork shall be conducted during WHEN hours.  A dedicated steam outage will be scheduled to perform this work to be included.  \n\nSCOPE OF WORK\nThe Service Provider shall furnish all labor, materials, equipment, tools, supervision, and incidentals to complete work for the services described in this document.\n\nThe intent of this Scope of Work is to provide a complete turnkey installation. The Service Provider shall furnish all labor, supervision, engineering/coordination, materials, equipment, tools, rigging, temporary protection, safety equipment, permits, testing, startup, commissioning, disposal, and incidental work required to compete the installation whether or not every individual fitting, component, support, connection, or accessory is specifically identified within this Scope of Work.  \n\nThe Service Provider shall submit a project schedule, work procedures, inspection procedures, testing procedures, all safety documentation, weld procedures, welder s certifications, etc. for review and approval by VA Contracting Officer Representative and Safety Office before work commences on site.  \n\nDescription of Services:\nService Provider shall schedule and coordinate all work with VA COR, Utilities Supervisor, and Boiler Plant Supervisor.  \n\nAll LOTO request and procedures shall be in compliance with the VA Connecticut Healthcare System Medical Center Policy 138-075.\n\nCoordinate Hot Work permit requests with VA Connecticut Healthcare System Safety Service.  \n\nCoordinate all placement and removal of Lock Out Tag Out devices for any energy sources with the VA COR/Maintenance & Operations.  \n\nAll Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010. \n\nCoordinate Hot Work Permit with VA Connecticut Healthcare System Occupational Health/Safety Service.  \n\nComplete Infection Control Risk Assessment (ICRA) and coordinate with COR and Medical Center Infection Prevention for approval.  \n\nFurnish and install required barrier(s) as required per the Infection Control Risk Assessment (ICRA). \n\nProtect all equipment in place during replacement activities.  \n\nIn accordance with VHA Operational Alert and Guidance, NO cast iron fittings and pipe components (valves, steam traps, etc.) shall be used.  Reference VHA Directive 1810(1) as amended on September 11, 2018: 5.a(1) and 5.b(1). \n\nASTM A193 bolts shall be utilized and replace any ASTM A307 Bolts at locations of steam piping, flanges, gaskets, and other hardware where piping replacements are included within this scope of work. Reference Veterans Health Administration (VHA) Master Specifications for Hydronic Piping (Specification 23 22 13) and Steam and Condensate Heating Piping (Specification 23 22 13) where applicable. \n\nRepair of existing cast iron fittings or pipe components is permissible in specific instances but must be reported and coordinated with the CO and COR for approval before starting the work through submittal process with justification as necessary.  \n\nAll new steam and condensate line shall be Schedule 80.  All new steam and condensate lines that utilize valves to isolate or divert a medium shall be installed new as a double in series valve system. Where the option exists to utilize welded vs threaded.\n\nTag all existing and new valves and label new piping and components replaced as part of this scope of work. \n\nService provider shall perform all acceptance testing.  Facilities Management Service shall designate a staff member to witness acceptance testing of all components and completed work. \n\nService provider shall clean up work area and all debris. \n\nService provider shall provide a complete, fully operational, code-compliant replacement of the existing 1/3 and 2/3 steam pressure reducing stations located within the existing crawl space in Building 2 at the West Haven VA Medical Center.  \n\nExisting Conditions:\nThe existing steam pressure reducing stations are currently non-functional and require complete replacement. Known existing conditions include:\n\nExisting 2-inch steam pressure reducing station is non-functional. \nExisting 2-1/2-inch steam pressure reducing station is non-functional. \nBoth existing steam regulators are to be replaced. \nExisting steam stations are not presently installed in accordance with the required regulator  manufacturer's piping arrangement. \nExisting cross tee is leaking and shall be removed and replaced. \nExisting pressure gauge arrangement does not allow convenient observation from outside the pit/crawl space. \nExisting downstream safety relief valves shall be replaced. \nExisting flanged connections utilizing square-head bolts have been identified as containing or potentially containing asbestos-containing material. \nWork is located within a restricted-access pit/crawl-space environment. \nThese descriptions are not intended to represent every existing field condition. The bidder is responsible for identifying additional conditions that are visible, reasonably apparent, or reasonably discoverable during the mandatory pre-bid walk.\n\nSteam Pressure Reducing Station Replacement:\nService provider shall remove existing 1/3 and 2/3 steam pressure reducing stations as required to accommodate the new installation.  \nService provider shall furnish and install new pressure reducing stations serving the exiting steam system. \nRemove existing steam regulators.\nRemove associating piping necessary to properly rebuild the stations.\nRemove the leaking cross tee.\nRemove existing components that prevent compliance with manufacturer required piping arrangements. \nFurnish and install new steam regulators.\nFurnish and install new upstream and downstream piping.\nFurnish and install new fittings and tees.\nFurnish and install new flanges, gaskets, and flange bolting.\nFurnish and install unions or breakable connections where appropriate.\nFurnish and install strainers where required.\nFurnish and install isolation valves where required by the station configuration.\nFurnish and install condensate/drip provisions where required.\nFurnish and install required pipe supports.\nModify or replace of existing pipe supports as required.\nFurnish and install temporary support of existing piping during demolition and installation. \nReconnect all existing steam piping.\nFurnish and install all miscellaneous piping modifications necessary for the completed installation.\n\nSteam stations shall be installed in accordance with the selected steam regulator manufacturer s current installation requirements. The contractor shall verify and provide the manufacturer s required:\n\nUpstream straight-pipe distance. \nDownstream straight-pipe distance. \nValve arrangement. \nStrainer arrangement. \nPressure sensing arrangement. \nDrip-leg arrangement. \nCondensate removal provisions. \nGauge locations. \nBypass configuration, if required. \nRegulator orientation. \nService clearances. \nMaintenance clearances. \nSafety relief requirements. \n\nExisting conditions shall not be used as justification for installing the new regulators contrary to manufacturer requirements. Where existing piping must be reconfigured to meet manufacturer requirements, the required reconfiguration shall be included in the base bid. \n\nEquipment and Pipe Sizing:\nAll equipment and piping sizes shall be verified prior to bidding and again prior to procurement. The contractor shall verify: \n\nExisting pipe sizes. \nRequired regulator inlet size. \nRequired regulator outlet size. \nRequired regulator capacity. \nRequired steam pressure. \nRequired downstream pressure. \nRequired steam flow. \nSafety valve capacity. \nSafety valve set pressure. \nStrainer sizing. \nValve sizing. \nFlange pressure class. \nPipe schedule. \nApplicable steam pressure and temperature ratings. \n\nThe contractor shall provide steam regulators properly sized for the actual system operating conditions. The contractor shall not assume that the existing regulator size is automatically the correct replacement size. Where required, the successful bidder shall coordinate with the regulator manufacturer or authorized representative to confirm the proper regulator selection.\n\nManufacturer Requirements\nPrior to installation, the contractor shall provide manufacturer documentation demonstrating that the proposed steam regulators are suitable for the application.  The completed station shall comply with all manufacturer requirements. \n\nPressure Gauges\nProvide new pressure gauge arrangements servicing the steam pressure reducing stations. Pressure gauges shall be located and piped so that normal operating pressures can be clearly viewed from outside confined space number 15 without requiring personnel to enter the confined space for routine pressure observation.  \n\nSteam-rated gauge. \nGauge siphon. \nIsolation valve. \nPiping and fittings. \nSupports. \nIdentification. \nAppropriate protection from damage. \n\nGauge piping shall be securely supported and arranged so that it does not create an obstruction or interfere with access. Gauge locations shall be coordinated and approved prior to final installation.  \n\nSafety Relief Valves\nRemove and replace the existing downstream steam safety relief valves associated with the pressure reducing stations.  Provide new safety relief valves properly selected and sized for the actual system conditions.  \n\nThe contractor shall verify:\n\nRequired relieving capacity. \nInlet pressure. \nDownstream operating pressure. \nSafety valve set pressure. \nValve inlet size. \nValve outlet size. \nDischarge pipe size. \nRequired discharge arrangement. \n\nSafety valves and discharge piping shall comply with applicable codes, VA requirements, and manufacturer requirements.  Modify, replace, extend, support, or reconnect the existing safety valve discharge piping as necessary for a complete installation. The contractor shall include all piping modifications required between the new safety valves and the existing approved discharge termination.  \n\nCross Tee Replacement\nRemove the existing leaking cross tee.  Provide new steam-rated piping and fittings necessary to eliminate the existing leaking tee and provide a permanent repair. The bidder shall verify the existing tee size, orientation, connections, and piping arrangement during the mandatory pre-bid walkthrough.  All associated piping modifications required to complete this work shall be included.  \n\nPipe Supports\nProvide all new or modified supports required for the new piping arrangement. Supports shall be suitable for steam service and shall account for:\n\nPipe weight\nValve weight \nRegulator weight\nStrainer weight\nSafety valve weight\nThermal expansion\n\n\n\nOperating loads\nMaintenance loads \n\nExisting equipment shall not be improperly used as a pipe support.  Any temporary supports necessary during demolition and installation shall be included.\n\nInsulation\nRemove existing insulation as necessary to perform the work.  Provide new insulation at all disturbed or newly installed piping after successful testing and startup.  New insulation shall match the applicable VA specification requirements for steam service. All damaged insulation associated with the contractor s work shall be repaired or replaced. \n\nAsbestos Abatement\nExisting flanged connections utilizing square-head bolts have been identified as Potential Asbestos Containing Material (PACM).  Bidders shall make proper required abatement notification(s), obtain required permit(s) and licensed asbestos abatement professional and VPIH services for air quality monitoring to perform removal of flanges with PACM.  \n\nWrap existing flanges for removal and wet cut existing piping on each side of flange to dismantle in-tact flange.  Dispose of flanges as ACM. \n\nAbatement work shall meet State of Connecticut and local jurisdiction requirements for Asbestos Abatement.  \n\nRigging and Material Handling:\nThe contractor shall include all rigging and material handling required to remove existing equipment and install new equipment.  The bidder shall determine the appropriate means and methods during the pre-bid inspection. Restrictions associated with equipment access or material movement that are visible or reasonably discoverable during the pre-bid walk through shall be included in the bid. \n\nTesting:\nFollowing installation, test all newly installed or modified piping and equipment in accordance with applicable codes, VA specifications, and manufacturer requirements. Testing shall include as applicable:\nPressure testing\nLeak testing\nFlange inspection\nValve inspection\nRegulator inspection\nGauge verification\nSafety valve verification\n\nRepair any leaks or deficiencies associated with the new work at no additional cost to the government. \n\nStartup and Commissioning:\nFollowing completion of the installation:\n\nStart the steam system in coordination with the VA Maintenance & Operations Supervisor and Boiler Plant Supervisor.\nVerify proper regulator operation.\nAdjust regulators to the required operating pressures.\nSet the 1/3 station.\nSet the 2/3 station.\nVerify proper transition and operation between the two regulators where applicable.  \nVerify downstream pressures.\nVerify gauge readings.\nVerify valve operation.\nVerify safety valve installation.\nVerify proper condensate drainage.\nInspect all new piping and connections for leakage.\nMake final adjustments required for proper system operation. \n\nThe steam station shall not be considered complete until both stations are demonstrated to be operational and accepted by the VA COR and Contracting Officer.\n\nVA Specifications and Code Compliance:\nAll materials and workmanship shall comply with the applicable VA project specifications, including applicable VA Division 23 requirements, as identified by the project scope.  \n\nMaterials:\nAll materials shall be new unless specifically approved otherwise. Materials shall be properly rated for steam service, system pressure, system temperature and applicable pressure class.  Substitutions shall not be made without approval.  \nDemolition and Disposal\nRemove all demolished and discarded materials associated with this work from the project site. Dispose of materials legally at an approved facility and furnish a waste manifest as required by Local, Federal, and VA requirements and regulations.  The work area shall be broom-clean and free of construction debris following completion.\n\nProtection of Existing Conditions:\nThe contractor shall protect all existing facilities, equipment, piping, structure, and finishes adjacent to the work.  Any damage caused by the contractor shall be repaired at the contractor s expense.  The bidder shall include reasonable temporary protection required to perform the work.  \n\nBidder Responsibility for Complete Scope:\nThe bidder is responsible for providing a complete turnkey price based on:\nThis Scope of Work\nMandatory Site Inspection\nExisting Field Conditions\nApplicable VA Requirements\nApplicable Codes\nManufacturer installation requirements\nProper methods of constructing assemblies associated with the Scope of Work. \n\nThe bidder shall include all miscellaneous and incidental work reasonably required to provide a complete and operational installation.  The absence of an individual fitting, spool piece, support, gasket, bolt, valve, connection, accessory, rigging item, or similar incidental component from the written Scope of Work shall not constitute grounds for additional compensation when that item is reasonably necessary to complete the described work. \n\nBid Clarifications and Exceptions:\nAny ambiguity, discrepancy, conflict, unusual condition, or concern identified by a bidder shall be submitted in writing prior to bid submission to the VA Contracting Officer.  Any requested exclusions or exceptions shall be clearly identified in the bid. Failure to identify an exception shall indicate that the bidder has included the requirement within their base price.  \n\nThe successful bidder shall not rely upon assumptions that contradict conditions observable during the mandatory site walk or the requirements contained in this Scope of Work.  \n\nSUBMITTALS/DELIVERABLES\nService provider shall furnish all submittal item documentation with final dispositions and final documentation report with all tests, photos, and work completed within 10 business days following completion of work.  \n\nService provider shall furnish all material certifications for any replacement parts used.\n\nService provider shall furnish a waste manifest as required.\n\nSPECIAL INSTRUCTIONS\nAll service provider personnel, sub-service providers and representatives visiting VA sites will be required to sign in upon arrival at Building 15 and/or retain a temporary VA badge.  Each visiting individual be required to enter their name, their company s name, VA project title, reason for visit, and the times of arrival and departure.  Arrangements for after normal hour working site visits must be made in advance and during normal working hours. \n\nGeneral: The Contracting Officer reserves the right to terminate any services, without payment for services completed, if such services are not needed or are not being adequately completed.\n\nApproved Plans and Permits: Prior to the start of work, submit to VA copies of all required permits. \n\nSite Visits: Day to day project administration will be performed by the COR. Periodic reviews, tests, and other field observation by the Government are not to be interpreted as superintendence nor as resulting in any approval of the service provider s apparent progress toward meeting the Government s objectives; but are intended to discover any information that the Contracting Officer may be able to call to the service provider s attention to prevent costly misdirection of effort.\n\nThe service provider shall remain responsible for constructing, operating, and maintaining the site in full accordance if the requirements of this solicitation. \nThe service provider shall provide VA with a copy of all inspection reports for inspections conducted by local, regional, and state code authorities from the start of work through issuance of the certificate of completion.  \n\nThe service provider shall develop and provide to the VA the following:\nSafety Plan: The service provider shall produce work in accordance with the latest editions of all applicable DVA guidelines (e.g. Construction Standards, Master Specifications, Standard Details, Special Design Criteria to meet Hospital Joint Commission (JCAHO) requirements), NFPA, Federal and State codes pertinent to the project scope.\n\nAll applicable personnel on site are required to obtain an Occupational Safety and Health\nAdministration (OSHA) 10 hour construction certification, and the site competent person for the\nservice provider must obtain an OSHA 30 hour construction certification.\n\nPer VA Directive 1805, smoking vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees.\n\nNo photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time.  \n\nParking for Service provider and its employees shall be in designated areas only. Service provider to coordinate with COR.  \n\nThe Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer.  The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct.  Execute work in such a manner as to reduce impacts with work being done by others. \n\nBilling: Provide COR with a report or statement of work completed and include statements with request for payment.  Statement should include service completed and the date each service item was completed.  Labor charges shall be billed hourly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report. \n\nSafety Codes / Certification / Licensing: \nEnvironmental abatement work, if necessary, is to be performed by Service provider under supervision and monitoring for the VA by a Certified Industrial Hygienist.\n\nThe Service provider shall comply with all codes as described above, as well as codes customarily applied in VA construction jobs such as NFPA fire code, OSHA, VA Design Guides, ASME, Manufacturer Requirements, etc. Labs used by the service provider shall be licensed as required by any applicable governing agencies, and their certifications and licenses shall be included in the reports.\n\nThe C&A requirements do not apply and a Security Accreditation Package is not required. \n\nNARA Records Management Requirements\n\nThe following standard items relate to records generated in executing this contract:\n\nCitations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31, and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.\n\nContractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.\n\nContractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government  IT  equipment and/or Government records.\n\nContractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. \n\nThe Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. \n\nThe Government Agency owns the rights to all data/records produced as part of this contract. \n\nThe Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. \n\nThe Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].\n\nNo disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules. \n\nThe Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.","text":"Page 2 of 2\n\nCombined Synopsis Solicitation West Haven VAMC Steam Station Replacement\n(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.\n(ii) The solicitation number is 36C24127Q0058 and the solicitation is issued as a request for quotation (RFQ).\n(iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-05.\n(iv) This requirement is being issued as a SDVOSB set-aside. The associated NAICS 238220 and small business size standard is $16.5 million.\n(v) The Government intends to award a firm-fixed price award for Steam Station Replacement at West Haven VAMC. Please see the attached Performance Work Statement for full requirement details. Please complete the Price Schedule below and submit with the quote submission.\n(vi) The Contractor shall provide all resources necessary to provide Steam Station Replacement\nIAW the attached (PerformancevWork Statement). Please see the attached PWS for full requirement details.\n(vii) The Place of Performance is West Haven VAMC as described per the (Performance Work Statement).\n(viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.204-7 System for Award Management (OCT 2018); 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016); 52.217-5 Evaluation of Options (JUL 1990); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008)\n(ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement.\nSite Visit: 950 Campbell Ave, West Haven CT 06516\nBidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing.Â Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.Â Â Â\nPlease post and include MCP 138-075 Lock-Out-Tag-Out Policy and Confined Space Entry Program. Bidders are required to comply with this policy and SOP.Â\n\nSubmission of Quotes:\n(1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered.\n(2) Offerors shall submit their quotes electronically via email to tnauri.woodbridge@va.gov.\n(3) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below. All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer.\nEvaluation Process:\nAward shall be made to the best value, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process.\nOfferor quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15.\nThe Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:Â\nPrice (Follow these instructions):\nOfferor shall complete Attachment 1 - Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces.Â\nPast Performance:\nOfferor shall utilize Attachment 2 Past Performance Worksheet to provide at least one (1) but no more than (3) references of work, similar in scope and size with the requirement detailed in the (Performance Work Statement). References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work.Â The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources.\nTechnical: The offeror s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the (Performance Work Statement) in a timely efficient manner.Â\nContractor shall demonstrate their corporate experience and approach to meet all requirements stated in the (Performance Work Statement).\nContractor shall demonstrate that their technicians meet the qualification standards stated in the (Performance Work Statement).\nIf you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort.\nSAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling 1-866-606-8220. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer.\nVISTA: The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can request a Form 10091 at any time.\n(x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy.\n(xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items (OCT 2018), applies to this acquisition in addition to the following addenda s to the clause: 52.204-16 Commercial and Government Entity Code Maintenance (JUL 2016); 52.219-6 Notice of Total Small Business Set-Aside; 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013); 852.203-70 Commercial Advertising (MAY 2008); 852.232-72 Electronic Submission of Payment Requests (NOV 2018)\nSubcontracting Commitments - Monitoring and Compliance\nThis solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments.\n(xiii) All contract requirement(s) and/or terms and conditions are stated above.\n(xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement.\n(xv) RFQ responses are due December 3, 2026 by 10:00 AM EST. RFQ responses must be submitted via email to: tnauri.woodbridge@va.gov. Hand deliveries shall not be accepted.\n(xvi) The POC of this solicitation is Tnauri.Woodbridge@va.gov)\n\nATTACHMENT 1\nPRICE SCHEDULE\nITEM NUMBER\nDESCRIPTION OF SERVICES\nQUANTITY\nUNIT\nUNIT PRICE\nAMOUNT\nBase\nREPLACE BUILDING 2 STEAM STATION\n1.00\nJB\n__________________\n__________________\n\nGRAND TOTAL\n__________________\n\nATTACHMENT 2\nPAST PERFORMANCE WORKSHEET\n1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization:\n2. Contracting Activity Address:\n3. Contract Number:\n4. Date of Contract Award:\n5. Beginning Date of Contract:\n6. Completion Date of Contract:\n7. Contract Value:\n8. Type of Contract:\n9a. Technical Point of Contact:\n9b. Contracting Point of Contact:\nName:\nName:\nTitle:\nTitle:\nAddress:\nAddress:\nTelephone:\nTelephone:\nEmail:\nEmail:\n10. Place of Performance:\n11. Description of Work (Use a continuation sheet if necessary):\n12. List any commendations or awards received:\n13. List of Major Subcontractors:\n\nATTACHMENT 3\nSTATEMENT OF WORK\nSTATEMENT OF WORK\nREPLACE BUILDING 2 STEAM STATION\n\nVA CONNECTICUT HEALTHCARE SYSTEM (VACHS)\nVA MEDICAL CENTER WEST HAVEN\n950 CAMPBELL AVENUE\nWEST HAVEN, CT 06516\n\nBACKGROUND\nVA Connecticut Healthcare System has identified existing steam pressure reducing stations that are currently non-functional and require complete replacement (like in kind) located in Building 2, Confined Space 15 within Mechanical Room G-139.\n\nJUSTIFICATION\nSteam station failure has been identified to be impacting inpatient and critical care areas during winter months. Heating restoration to critical patient care areas is essential to compliance with health and safety standards, patient care, and prevention of domestic and fire suppression piping failures.\n\nPLACE OF PERFORMANCE\nThe place of performance for this contract is VA Connecticut Healthcare System, West Haven VA Medical Center located at 950 Campbell Avenue; West Haven, CT 06516.\n\nPERIOD OF PERFORMANCE\nThe Contract Time Period of Performance will be 180 days upon contract award and Notice to Proceed (NTP).\n\nQUALIFICATIONS\nTo be considered eligible for consideration, potential bidders shall have a field service representative located within 100 miles of the West Haven Campus of the VA Connecticut Healthcare System.\n\nBidders shall provide upon request, documentation of certification/training on the specific equipment under the terms of this contract.\n\nBidders shall be qualified to perform work on steam distribution systems to include industrial boiler plant equipment and have completed prior steam distribution work and/or inspection projects for VA Connecticut Healthcare System.\n\nService Provider shall have a minimum of three (3) years of related scope and work experience with commercial and industrial steam boiler and steam boiler component installation and repairs as well as all aspects of inspections, cleaning, calibration, and testing in compliance with and clear understanding of relevant codes and regulations.\n\nService Provider and/or assigned project staff members shall have industry standard certifications and qualifications to include but not limited to current OSHA 30 and OSHA 10 certification and equivalent qualifications associated with requirements herein.\n\nService Provider shall submit documentation of technical training and certifications for personnel performing all work under the terms of this contract for review and acceptance prior to the start of work on site.\n\nBidders shall be evaluated on past performance, technical capability, and financial capability to perform the requirements of this work.\n\nA full boiler plant steam outage will be conducted prior to the start of this work. Work is expected to be completed over the duration of two consecutive back to back boiler plant steam outages occurring Saturday 7:00 a.m. through Sunday 4:00 p.m. and will be coordinated between March 01, 2027 and May 31, 2027 and with a 30 day notice.\n\nMandatory Pre Bid:\nBidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing. Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.\n\nDuring the pre-bid site visit, each bidder shall thoroughly inspect the work area and familiarize themselves with all existing conditions affecting the work. At minimum, bidders shall verify:\n\nExisting steam pipe sizes.\nExisting 1/3 and 2/3 station pipe sizes.\nExisting regulator sizes.\nExisting valve sizes.\nExisting flange sizes, types, ratings, and configurations.\nExisting strainer sizes and configurations.\nExisting safety relief valve sizes and configurations.\nExisting pressure gauge arrangements.\nExisting condensate and drip piping.\nExisting support arrangements.\nExisting piping elevations.\nAvailable straight-pipe distances upstream and downstream of regulators.\nExisting cross tee configuration.\nAvailable physical space for the new steam station arrangement.\nAccess into and out of the pit/crawl space.\nConfined-space access conditions.\nRigging requirements.\nMaterial handling requirements.\nRemoval path for demolished materials.\nInstallation path for new materials and equipment.\nWorking clearances.\nExisting interference with piping, structure, ductwork, electrical, equipment, or other utilities.\nEquipment access requirements.\nExisting insulation.\nExisting asbestos-containing or suspect materials.\nFlanges containing square-head bolts.\nExisting pipe supports and structural attachment points.\nRequired temporary supports.\nRequired permanent supports.\nRequired access for future service and adjustment.\nPressure gauge visibility from outside the pit/crawl space.\nConditions affecting off-hours work.\nConditions affecting the scheduled steam shutdown.\n\nAll pipe sizing, valve sizing, equipment sizing, dimensions, elevations, quantities, access requirements, and existing conditions shall be field verified by the bidder prior to submitting their proposal.\n\nDimensions, sizes, and quantities contained within this Scope of Work are intended to describe the general work and shall not relieve the bidder from field verification.\n\nThe bidder s submission of a proposal shall constitute acknowledgement that the bidder has inspected the existing conditions, understands the location and complexity of the work, and has included the work reasonably apparent or discoverable during the site visit within their bid price.\n\nAll Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010.\n\nWork shall be conducted during WHEN hours. A dedicated steam outage will be scheduled to perform this work to be included.\n\nSCOPE OF WORK\nThe Service Provider shall furnish all labor, materials, equipment, tools, supervision, and incidentals to complete work for the services described in this document.\n\nThe intent of this Scope of Work is to provide a complete turnkey installation. The Service Provider shall furnish all labor, supervision, engineering/coordination, materials, equipment, tools, rigging, temporary protection, safety equipment, permits, testing, startup, commissioning, disposal, and incidental work required to compete the installation whether or not every individual fitting, component, support, connection, or accessory is specifically identified within this Scope of Work.\n\nThe Service Provider shall submit a project schedule, work procedures, inspection procedures, testing procedures, all safety documentation, weld procedures, welder s certifications, etc. for review and approval by VA Contracting Officer Representative and Safety Office before work commences on site.\n\nDescription of Services:\nService Provider shall schedule and coordinate all work with VA COR, Utilities Supervisor, and Boiler Plant Supervisor.\n\nAll LOTO request and procedures shall be in compliance with the VA Connecticut Healthcare System Medical Center Policy 138-075.\n\nCoordinate Hot Work permit requests with VA Connecticut Healthcare System Safety Service.\n\nCoordinate all placement and removal of Lock Out Tag Out devices for any energy sources with the VA COR/Maintenance & Operations.\n\nAll Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010.\n\nCoordinate Hot Work Permit with VA Connecticut Healthcare System Occupational Health/Safety Service.\n\nComplete Infection Control Risk Assessment (ICRA) and coordinate with COR and Medical Center Infection Prevention for approval.\n\nFurnish and install required barrier(s) as required per the Infection Control Risk Assessment (ICRA).\n\nProtect all equipment in place during replacement activities.\n\nIn accordance with VHA Operational Alert and Guidance, NO cast iron fittings and pipe components (valves, steam traps, etc.) shall be used. Reference VHA Directive 1810(1) as amended on September 11, 2018: 5.a(1) and 5.b(1).\n\nASTM A193 bolts shall be utilized and replace any ASTM A307 Bolts at locations of steam piping, flanges, gaskets, and other hardware where piping replacements are included within this scope of work. Reference Veterans Health Administration (VHA) Master Specifications for Hydronic Piping (Specification 23 22 13) and Steam and Condensate Heating Piping (Specification 23 22 13) where applicable.\n\nRepair of existing cast iron fittings or pipe components is permissible in specific instances but must be reported and coordinated with the CO and COR for approval before starting the work through submittal process with justification as necessary.\n\nAll new steam and condensate line shall be Schedule 80. All new steam and condensate lines that utilize valves to isolate or divert a medium shall be installed new as a double in series valve system. Where the option exists to utilize welded vs threaded.\n\nTag all existing and new valves and label new piping and components replaced as part of this scope of work.\n\nService provider shall perform all acceptance testing. Facilities Management Service shall designate a staff member to witness acceptance testing of all components and completed work.\n\nService provider shall clean up work area and all debris.\n\nService provider shall provide a complete, fully operational, code-compliant replacement of the existing 1/3 and 2/3 steam pressure reducing stations located within the existing crawl space in Building 2 at the West Haven VA Medical Center.\n\nExisting Conditions:\nThe existing steam pressure reducing stations are currently non-functional and require complete replacement. Known existing conditions include:\n\nExisting 2-inch steam pressure reducing station is non-functional.\nExisting 2-1/2-inch steam pressure reducing station is non-functional.\nBoth existing steam regulators are to be replaced.\nExisting steam stations are not presently installed in accordance with the required regulator manufacturer's piping arrangement.\nExisting cross tee is leaking and shall be removed and replaced.\nExisting pressure gauge arrangement does not allow convenient observation from outside the pit/crawl space.\nExisting downstream safety relief valves shall be replaced.\nExisting flanged connections utilizing square-head bolts have been identified as containing or potentially containing asbestos-containing material.\nWork is located within a restricted-access pit/crawl-space environment.\nThese descriptions are not intended to represent every existing field condition. The bidder is responsible for identifying additional conditions that are visible, reasonably apparent, or reasonably discoverable during the mandatory pre-bid walk.\n\nSteam Pressure Reducing Station Replacement:\nService provider shall remove existing 1/3 and 2/3 steam pressure reducing stations as required to accommodate the new installation.\nService provider shall furnish and install new pressure reducing stations serving the exiting steam system.\nRemove existing steam regulators.\nRemove associating piping necessary to properly rebuild the stations.\nRemove the leaking cross tee.\nRemove existing components that prevent compliance with manufacturer required piping arrangements.\nFurnish and install new steam regulators.\nFurnish and install new upstream and downstream piping.\nFurnish and install new fittings and tees.\nFurnish and install new flanges, gaskets, and flange bolting.\nFurnish and install unions or breakable connections where appropriate.\nFurnish and install strainers where required.\nFurnish and install isolation valves where required by the station configuration.\nFurnish and install condensate/drip provisions where required.\nFurnish and install required pipe supports.\nModify or replace of existing pipe supports as required.\nFurnish and install temporary support of existing piping during demolition and installation.\nReconnect all existing steam piping.\nFurnish and install all miscellaneous piping modifications necessary for the completed installation.\n\nSteam stations shall be installed in accordance with the selected steam regulator manufacturer s current installation requirements. The contractor shall verify and provide the manufacturer s required:\n\nUpstream straight-pipe distance.\nDownstream straight-pipe distance.\nValve arrangement.\nStrainer arrangement.\nPressure sensing arrangement.\nDrip-leg arrangement.\nCondensate removal provisions.\nGauge locations.\nBypass configuration, if required.\nRegulator orientation.\nService clearances.\nMaintenance clearances.\nSafety relief requirements.\n\nExisting conditions shall not be used as justification for installing the new regulators contrary to manufacturer requirements. Where existing piping must be reconfigured to meet manufacturer requirements, the required reconfiguration shall be included in the base bid.\n\nEquipment and Pipe Sizing:\nAll equipment and piping sizes shall be verified prior to bidding and again prior to procurement. The contractor shall verify:\n\nExisting pipe sizes.\nRequired regulator inlet size.\nRequired regulator outlet size.\nRequired regulator capacity.\nRequired steam pressure.\nRequired downstream pressure.\nRequired steam flow.\nSafety valve capacity.\nSafety valve set pressure.\nStrainer sizing.\nValve sizing.\nFlange pressure class.\nPipe schedule.\nApplicable steam pressure and temperature ratings.\n\nThe contractor shall provide steam regulators properly sized for the actual system operating conditions. The contractor shall not assume that the existing regulator size is automatically the correct replacement size. Where required, the successful bidder shall coordinate with the regulator manufacturer or authorized representative to confirm the proper regulator selection.\n\nManufacturer Requirements\nPrior to installation, the contractor shall provide manufacturer documentation demonstrating that the proposed steam regulators are suitable for the application. The completed station shall comply with all manufacturer requirements.\n\nPressure Gauges\nProvide new pressure gauge arrangements servicing the steam pressure reducing stations. Pressure gauges shall be located and piped so that normal operating pressures can be clearly viewed from outside confined space number 15 without requiring personnel to enter the confined space for routine pressure observation.\n\nSteam-rated gauge.\nGauge siphon.\nIsolation valve.\nPiping and fittings.\nSupports.\nIdentification.\nAppropriate protection from damage.\n\nGauge piping shall be securely supported and arranged so that it does not create an obstruction or interfere with access. Gauge locations shall be coordinated and approved prior to final installation.\n\nSafety Relief Valves\nRemove and replace the existing downstream steam safety relief valves associated with the pressure reducing stations. Provide new safety relief valves properly selected and sized for the actual system conditions.\n\nThe contractor shall verify:\n\nRequired relieving capacity.\nInlet pressure.\nDownstream operating pressure.\nSafety valve set pressure.\nValve inlet size.\nValve outlet size.\nDischarge pipe size.\nRequired discharge arrangement.\n\nSafety valves and discharge piping shall comply with applicable codes, VA requirements, and manufacturer requirements. Modify, replace, extend, support, or reconnect the existing safety valve discharge piping as necessary for a complete installation. The contractor shall include all piping modifications required between the new safety valves and the existing approved discharge termination.\n\nCross Tee Replacement\nRemove the existing leaking cross tee. Provide new steam-rated piping and fittings necessary to eliminate the existing leaking tee and provide a permanent repair. The bidder shall verify the existing tee size, orientation, connections, and piping arrangement during the mandatory pre-bid walkthrough. All associated piping modifications required to complete this work shall be included.\n\nPipe Supports\nProvide all new or modified supports required for the new piping arrangement. Supports shall be suitable for steam service and shall account for:\n\nPipe weight\nValve weight\nRegulator weight\nStrainer weight\nSafety valve weight\nThermal expansion\n\nOperating loads\nMaintenance loads\n\nExisting equipment shall not be improperly used as a pipe support. Any temporary supports necessary during demolition and installation shall be included.\n\nInsulation\nRemove existing insulation as necessary to perform the work. Provide new insulation at all disturbed or newly installed piping after successful testing and startup. New insulation shall match the applicable VA specification requirements for steam service. All damaged insulation associated with the contractor s work shall be repaired or replaced.\n\nAsbestos Abatement\nExisting flanged connections utilizing square-head bolts have been identified as Potential Asbestos Containing Material (PACM). Bidders shall make proper required abatement notification(s), obtain required permit(s) and licensed asbestos abatement professional and VPIH services for air quality monitoring to perform removal of flanges with PACM.\n\nWrap existing flanges for removal and wet cut existing piping on each side of flange to dismantle in-tact flange. Dispose of flanges as ACM.\n\nAbatement work shall meet State of Connecticut and local jurisdiction requirements for Asbestos Abatement.\n\nRigging and Material Handling:\nThe contractor shall include all rigging and material handling required to remove existing equipment and install new equipment. The bidder shall determine the appropriate means and methods during the pre-bid inspection. Restrictions associated with equipment access or material movement that are visible or reasonably discoverable during the pre-bid walk through shall be included in the bid.\n\nTesting:\nFollowing installation, test all newly installed or modified piping and equipment in accordance with applicable codes, VA specifications, and manufacturer requirements. Testing shall include as applicable:\nPressure testing\nLeak testing\nFlange inspection\nValve inspection\nRegulator inspection\nGauge verification\nSafety valve verification\n\nRepair any leaks or deficiencies associated with the new work at no additional cost to the government.\n\nStartup and Commissioning:\nFollowing completion of the installation:\n\nStart the steam system in coordination with the VA Maintenance & Operations Supervisor and Boiler Plant Supervisor.\nVerify proper regulator operation.\nAdjust regulators to the required operating pressures.\nSet the 1/3 station.\nSet the 2/3 station.\nVerify proper transition and operation between the two regulators where applicable.\nVerify downstream pressures.\nVerify gauge readings.\nVerify valve operation.\nVerify safety valve installation.\nVerify proper condensate drainage.\nInspect all new piping and connections for leakage.\nMake final adjustments required for proper system operation.\n\nThe steam station shall not be considered complete until both stations are demonstrated to be operational and accepted by the VA COR and Contracting Officer.\n\nVA Specifications and Code Compliance:\nAll materials and workmanship shall comply with the applicable VA project specifications, including applicable VA Division 23 requirements, as identified by the project scope.\n\nMaterials:\nAll materials shall be new unless specifically approved otherwise. Materials shall be properly rated for steam service, system pressure, system temperature and applicable pressure class. Substitutions shall not be made without approval.\nDemolition and Disposal\nRemove all demolished and discarded materials associated with this work from the project site. Dispose of materials legally at an approved facility and furnish a waste manifest as required by Local, Federal, and VA requirements and regulations. The work area shall be broom-clean and free of construction debris following completion.\n\nProtection of Existing Conditions:\nThe contractor shall protect all existing facilities, equipment, piping, structure, and finishes adjacent to the work. Any damage caused by the contractor shall be repaired at the contractor s expense. The bidder shall include reasonable temporary protection required to perform the work.\n\nBidder Responsibility for Complete Scope:\nThe bidder is responsible for providing a complete turnkey price based on:\nThis Scope of Work\nMandatory Site Inspection\nExisting Field Conditions\nApplicable VA Requirements\nApplicable Codes\nManufacturer installation requirements\nProper methods of constructing assemblies associated with the Scope of Work.\n\nThe bidder shall include all miscellaneous and incidental work reasonably required to provide a complete and operational installation. The absence of an individual fitting, spool piece, support, gasket, bolt, valve, connection, accessory, rigging item, or similar incidental component from the written Scope of Work shall not constitute grounds for additional compensation when that item is reasonably necessary to complete the described work.\n\nBid Clarifications and Exceptions:\nAny ambiguity, discrepancy, conflict, unusual condition, or concern identified by a bidder shall be submitted in writing prior to bid submission to the VA Contracting Officer. Any requested exclusions or exceptions shall be clearly identified in the bid. Failure to identify an exception shall indicate that the bidder has included the requirement within their base price.\n\nThe successful bidder shall not rely upon assumptions that contradict conditions observable during the mandatory site walk or the requirements contained in this Scope of Work.\n\nSUBMITTALS/DELIVERABLES\nService provider shall furnish all submittal item documentation with final dispositions and final documentation report with all tests, photos, and work completed within 10 business days following completion of work.\n\nService provider shall furnish all material certifications for any replacement parts used.\n\nService provider shall furnish a waste manifest as required.\n\nSPECIAL INSTRUCTIONS\nAll service provider personnel, sub-service providers and representatives visiting VA sites will be required to sign in upon arrival at Building 15 and/or retain a temporary VA badge. Each visiting individual be required to enter their name, their company s name, VA project title, reason for visit, and the times of arrival and departure. Arrangements for after normal hour working site visits must be made in advance and during normal working hours.\n\nGeneral: The Contracting Officer reserves the right to terminate any services, without payment for services completed, if such services are not needed or are not being adequately completed.\n\nApproved Plans and Permits: Prior to the start of work, submit to VA copies of all required permits.\n\nSite Visits: Day to day project administration will be performed by the COR. Periodic reviews, tests, and other field observation by the Government are not to be interpreted as superintendence nor as resulting in any approval of the service provider s apparent progress toward meeting the Government s objectives; but are intended to discover any information that the Contracting Officer may be able to call to the service provider s attention to prevent costly misdirection of effort.\n\nThe service provider shall remain responsible for constructing, operating, and maintaining the site in full accordance if the requirements of this solicitation.\nThe service provider shall provide VA with a copy of all inspection reports for inspections conducted by local, regional, and state code authorities from the start of work through issuance of the certificate of completion.\n\nThe service provider shall develop and provide to the VA the following:\nSafety Plan: The service provider shall produce work in accordance with the latest editions of all applicable DVA guidelines (e.g. Construction Standards, Master Specifications, Standard Details, Special Design Criteria to meet Hospital Joint Commission (JCAHO) requirements), NFPA, Federal and State codes pertinent to the project scope.\n\nAll applicable personnel on site are required to obtain an Occupational Safety and Health\nAdministration (OSHA) 10 hour construction certification, and the site competent person for the\nservice provider must obtain an OSHA 30 hour construction certification.\n\nPer VA Directive 1805, smoking vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees.\n\nNo photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time.\n\nParking for Service provider and its employees shall be in designated areas only. Service provider to coordinate with COR.\n\nThe Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct. Execute work in such a manner as to reduce impacts with work being done by others.\n\nBilling: Provide COR with a report or statement of work completed and include statements with request for payment. Statement should include service completed and the date each service item was completed. Labor charges shall be billed hourly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report.\n\nSafety Codes / Certification / Licensing:\nEnvironmental abatement work, if necessary, is to be performed by Service provider under supervision and monitoring for the VA by a Certified Industrial Hygienist.\n\nThe Service provider shall comply with all codes as described above, as well as codes customarily applied in VA construction jobs such as NFPA fire code, OSHA, VA Design Guides, ASME, Manufacturer Requirements, etc. Labs used by the service provider shall be licensed as required by any applicable governing agencies, and their certifications and licenses shall be included in the reports.\n\nThe C&A requirements do not apply and a Security Accreditation Package is not required.\n\nNARA Records Management Requirements\n\nThe following standard items relate to records generated in executing this contract:\n\nCitations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31, and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.\n\nContractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.\n\nContractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.\n\nContractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.\n\nThe Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.\n\nThe Government Agency owns the rights to all data/records produced as part of this contract.\n\nThe Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.\n\nThe Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].\n\nNo disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.\n\nThe Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C24127Q0058","place_of_performance":{"zip":"06516","city":{"name":"West Haven"},"state":{"name":"CT"},"street":"West Haven VAMC","street2":"950 Campbell Ave"},"product_service_code":"J041"}],"due_at":"2026-12-03T15:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T15:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","state":"CT","county":"09170","county_name":"South Central Connecticut Planning Region","city":"0982800","city_name":"West Haven","country":null,"state_source":"sam_state_name","state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-11-11T12:27:32.430369Z","principal_notice_id":"af64aac30933462a938619a6596b072c","description":{"text":"Page 2 of 2\n\nCombined Synopsis Solicitation West Haven VAMC Steam Station Replacement\n(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.\n(ii) The solicitation number is 36C24127Q0058 and the solicitation is issued as a request for quotation (RFQ).\n(iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-05.\n(iv) This requirement is being issued as a SDVOSB set-aside. The associated NAICS 238220 and small business size standard is $16.5 million.\n(v) The Government intends to award a firm-fixed price award for Steam Station Replacement at West Haven VAMC. Please see the attached Performance Work Statement for full requirement details. Please complete the Price Schedule below and submit with the quote submission.\n(vi) The Contractor shall provide all resources necessary to provide Steam Station Replacement\nIAW the attached (PerformancevWork Statement). Please see the attached PWS for full requirement details.\n(vii) The Place of Performance is West Haven VAMC as described per the (Performance Work Statement).\n(viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.204-7 System for Award Management (OCT 2018); 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016); 52.217-5 Evaluation of Options (JUL 1990); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008)\n(ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement.\nSite Visit: 950 Campbell Ave, West Haven CT 06516\nBidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing.Â Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.Â Â Â\nPlease post and include MCP 138-075 Lock-Out-Tag-Out Policy and Confined Space Entry Program. Bidders are required to comply with this policy and SOP.Â\n\nSubmission of Quotes:\n(1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered.\n(2) Offerors shall submit their quotes electronically via email to tnauri.woodbridge@va.gov.\n(3) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below. All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer.\nEvaluation Process:\nAward shall be made to the best value, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process.\nOfferor quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15.\nThe Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:Â\nPrice (Follow these instructions):\nOfferor shall complete Attachment 1 - Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces.Â\nPast Performance:\nOfferor shall utilize Attachment 2 Past Performance Worksheet to provide at least one (1) but no more than (3) references of work, similar in scope and size with the requirement detailed in the (Performance Work Statement). References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work.Â The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources.\nTechnical: The offeror s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the (Performance Work Statement) in a timely efficient manner.Â\nContractor shall demonstrate their corporate experience and approach to meet all requirements stated in the (Performance Work Statement).\nContractor shall demonstrate that their technicians meet the qualification standards stated in the (Performance Work Statement).\nIf you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort.\nSAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling 1-866-606-8220. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer.\nVISTA: The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can request a Form 10091 at any time.\n(x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy.\n(xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items (OCT 2018), applies to this acquisition in addition to the following addenda s to the clause: 52.204-16 Commercial and Government Entity Code Maintenance (JUL 2016); 52.219-6 Notice of Total Small Business Set-Aside; 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013); 852.203-70 Commercial Advertising (MAY 2008); 852.232-72 Electronic Submission of Payment Requests (NOV 2018)\nSubcontracting Commitments - Monitoring and Compliance\nThis solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments.\n(xiii) All contract requirement(s) and/or terms and conditions are stated above.\n(xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement.\n(xv) RFQ responses are due December 3, 2026 by 10:00 AM EST. RFQ responses must be submitted via email to: tnauri.woodbridge@va.gov. Hand deliveries shall not be accepted.\n(xvi) The POC of this solicitation is Tnauri.Woodbridge@va.gov)\n\nATTACHMENT 1\nPRICE SCHEDULE\nITEM NUMBER\nDESCRIPTION OF SERVICES\nQUANTITY\nUNIT\nUNIT PRICE\nAMOUNT\nBase\nREPLACE BUILDING 2 STEAM STATION\n1.00\nJB\n__________________\n__________________\n\nGRAND TOTAL\n__________________\n\nATTACHMENT 2\nPAST PERFORMANCE WORKSHEET\n1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization:\n2. Contracting Activity Address:\n3. Contract Number:\n4. Date of Contract Award:\n5. Beginning Date of Contract:\n6. Completion Date of Contract:\n7. Contract Value:\n8. Type of Contract:\n9a. Technical Point of Contact:\n9b. Contracting Point of Contact:\nName:\nName:\nTitle:\nTitle:\nAddress:\nAddress:\nTelephone:\nTelephone:\nEmail:\nEmail:\n10. Place of Performance:\n11. Description of Work (Use a continuation sheet if necessary):\n12. List any commendations or awards received:\n13. List of Major Subcontractors:\n\nATTACHMENT 3\nSTATEMENT OF WORK\nSTATEMENT OF WORK\nREPLACE BUILDING 2 STEAM STATION\n\nVA CONNECTICUT HEALTHCARE SYSTEM (VACHS)\nVA MEDICAL CENTER WEST HAVEN\n950 CAMPBELL AVENUE\nWEST HAVEN, CT 06516\n\nBACKGROUND\nVA Connecticut Healthcare System has identified existing steam pressure reducing stations that are currently non-functional and require complete replacement (like in kind) located in Building 2, Confined Space 15 within Mechanical Room G-139.\n\nJUSTIFICATION\nSteam station failure has been identified to be impacting inpatient and critical care areas during winter months. Heating restoration to critical patient care areas is essential to compliance with health and safety standards, patient care, and prevention of domestic and fire suppression piping failures.\n\nPLACE OF PERFORMANCE\nThe place of performance for this contract is VA Connecticut Healthcare System, West Haven VA Medical Center located at 950 Campbell Avenue; West Haven, CT 06516.\n\nPERIOD OF PERFORMANCE\nThe Contract Time Period of Performance will be 180 days upon contract award and Notice to Proceed (NTP).\n\nQUALIFICATIONS\nTo be considered eligible for consideration, potential bidders shall have a field service representative located within 100 miles of the West Haven Campus of the VA Connecticut Healthcare System.\n\nBidders shall provide upon request, documentation of certification/training on the specific equipment under the terms of this contract.\n\nBidders shall be qualified to perform work on steam distribution systems to include industrial boiler plant equipment and have completed prior steam distribution work and/or inspection projects for VA Connecticut Healthcare System.\n\nService Provider shall have a minimum of three (3) years of related scope and work experience with commercial and industrial steam boiler and steam boiler component installation and repairs as well as all aspects of inspections, cleaning, calibration, and testing in compliance with and clear understanding of relevant codes and regulations.\n\nService Provider and/or assigned project staff members shall have industry standard certifications and qualifications to include but not limited to current OSHA 30 and OSHA 10 certification and equivalent qualifications associated with requirements herein.\n\nService Provider shall submit documentation of technical training and certifications for personnel performing all work under the terms of this contract for review and acceptance prior to the start of work on site.\n\nBidders shall be evaluated on past performance, technical capability, and financial capability to perform the requirements of this work.\n\nA full boiler plant steam outage will be conducted prior to the start of this work. Work is expected to be completed over the duration of two consecutive back to back boiler plant steam outages occurring Saturday 7:00 a.m. through Sunday 4:00 p.m. and will be coordinated between March 01, 2027 and May 31, 2027 and with a 30 day notice.\n\nMandatory Pre Bid:\nBidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing. Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.\n\nDuring the pre-bid site visit, each bidder shall thoroughly inspect the work area and familiarize themselves with all existing conditions affecting the work. At minimum, bidders shall verify:\n\nExisting steam pipe sizes.\nExisting 1/3 and 2/3 station pipe sizes.\nExisting regulator sizes.\nExisting valve sizes.\nExisting flange sizes, types, ratings, and configurations.\nExisting strainer sizes and configurations.\nExisting safety relief valve sizes and configurations.\nExisting pressure gauge arrangements.\nExisting condensate and drip piping.\nExisting support arrangements.\nExisting piping elevations.\nAvailable straight-pipe distances upstream and downstream of regulators.\nExisting cross tee configuration.\nAvailable physical space for the new steam station arrangement.\nAccess into and out of the pit/crawl space.\nConfined-space access conditions.\nRigging requirements.\nMaterial handling requirements.\nRemoval path for demolished materials.\nInstallation path for new materials and equipment.\nWorking clearances.\nExisting interference with piping, structure, ductwork, electrical, equipment, or other utilities.\nEquipment access requirements.\nExisting insulation.\nExisting asbestos-containing or suspect materials.\nFlanges containing square-head bolts.\nExisting pipe supports and structural attachment points.\nRequired temporary supports.\nRequired permanent supports.\nRequired access for future service and adjustment.\nPressure gauge visibility from outside the pit/crawl space.\nConditions affecting off-hours work.\nConditions affecting the scheduled steam shutdown.\n\nAll pipe sizing, valve sizing, equipment sizing, dimensions, elevations, quantities, access requirements, and existing conditions shall be field verified by the bidder prior to submitting their proposal.\n\nDimensions, sizes, and quantities contained within this Scope of Work are intended to describe the general work and shall not relieve the bidder from field verification.\n\nThe bidder s submission of a proposal shall constitute acknowledgement that the bidder has inspected the existing conditions, understands the location and complexity of the work, and has included the work reasonably apparent or discoverable during the site visit within their bid price.\n\nAll Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010.\n\nWork shall be conducted during WHEN hours. A dedicated steam outage will be scheduled to perform this work to be included.\n\nSCOPE OF WORK\nThe Service Provider shall furnish all labor, materials, equipment, tools, supervision, and incidentals to complete work for the services described in this document.\n\nThe intent of this Scope of Work is to provide a complete turnkey installation. The Service Provider shall furnish all labor, supervision, engineering/coordination, materials, equipment, tools, rigging, temporary protection, safety equipment, permits, testing, startup, commissioning, disposal, and incidental work required to compete the installation whether or not every individual fitting, component, support, connection, or accessory is specifically identified within this Scope of Work.\n\nThe Service Provider shall submit a project schedule, work procedures, inspection procedures, testing procedures, all safety documentation, weld procedures, welder s certifications, etc. for review and approval by VA Contracting Officer Representative and Safety Office before work commences on site.\n\nDescription of Services:\nService Provider shall schedule and coordinate all work with VA COR, Utilities Supervisor, and Boiler Plant Supervisor.\n\nAll LOTO request and procedures shall be in compliance with the VA Connecticut Healthcare System Medical Center Policy 138-075.\n\nCoordinate Hot Work permit requests with VA Connecticut Healthcare System Safety Service.\n\nCoordinate all placement and removal of Lock Out Tag Out devices for any energy sources with the VA COR/Maintenance & Operations.\n\nAll Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010.\n\nCoordinate Hot Work Permit with VA Connecticut Healthcare System Occupational Health/Safety Service.\n\nComplete Infection Control Risk Assessment (ICRA) and coordinate with COR and Medical Center Infection Prevention for approval.\n\nFurnish and install required barrier(s) as required per the Infection Control Risk Assessment (ICRA).\n\nProtect all equipment in place during replacement activities.\n\nIn accordance with VHA Operational Alert and Guidance, NO cast iron fittings and pipe components (valves, steam traps, etc.) shall be used. Reference VHA Directive 1810(1) as amended on September 11, 2018: 5.a(1) and 5.b(1).\n\nASTM A193 bolts shall be utilized and replace any ASTM A307 Bolts at locations of steam piping, flanges, gaskets, and other hardware where piping replacements are included within this scope of work. Reference Veterans Health Administration (VHA) Master Specifications for Hydronic Piping (Specification 23 22 13) and Steam and Condensate Heating Piping (Specification 23 22 13) where applicable.\n\nRepair of existing cast iron fittings or pipe components is permissible in specific instances but must be reported and coordinated with the CO and COR for approval before starting the work through submittal process with justification as necessary.\n\nAll new steam and condensate line shall be Schedule 80. All new steam and condensate lines that utilize valves to isolate or divert a medium shall be installed new as a double in series valve system. Where the option exists to utilize welded vs threaded.\n\nTag all existing and new valves and label new piping and components replaced as part of this scope of work.\n\nService provider shall perform all acceptance testing. Facilities Management Service shall designate a staff member to witness acceptance testing of all components and completed work.\n\nService provider shall clean up work area and all debris.\n\nService provider shall provide a complete, fully operational, code-compliant replacement of the existing 1/3 and 2/3 steam pressure reducing stations located within the existing crawl space in Building 2 at the West Haven VA Medical Center.\n\nExisting Conditions:\nThe existing steam pressure reducing stations are currently non-functional and require complete replacement. Known existing conditions include:\n\nExisting 2-inch steam pressure reducing station is non-functional.\nExisting 2-1/2-inch steam pressure reducing station is non-functional.\nBoth existing steam regulators are to be replaced.\nExisting steam stations are not presently installed in accordance with the required regulator manufacturer's piping arrangement.\nExisting cross tee is leaking and shall be removed and replaced.\nExisting pressure gauge arrangement does not allow convenient observation from outside the pit/crawl space.\nExisting downstream safety relief valves shall be replaced.\nExisting flanged connections utilizing square-head bolts have been identified as containing or potentially containing asbestos-containing material.\nWork is located within a restricted-access pit/crawl-space environment.\nThese descriptions are not intended to represent every existing field condition. The bidder is responsible for identifying additional conditions that are visible, reasonably apparent, or reasonably discoverable during the mandatory pre-bid walk.\n\nSteam Pressure Reducing Station Replacement:\nService provider shall remove existing 1/3 and 2/3 steam pressure reducing stations as required to accommodate the new installation.\nService provider shall furnish and install new pressure reducing stations serving the exiting steam system.\nRemove existing steam regulators.\nRemove associating piping necessary to properly rebuild the stations.\nRemove the leaking cross tee.\nRemove existing components that prevent compliance with manufacturer required piping arrangements.\nFurnish and install new steam regulators.\nFurnish and install new upstream and downstream piping.\nFurnish and install new fittings and tees.\nFurnish and install new flanges, gaskets, and flange bolting.\nFurnish and install unions or breakable connections where appropriate.\nFurnish and install strainers where required.\nFurnish and install isolation valves where required by the station configuration.\nFurnish and install condensate/drip provisions where required.\nFurnish and install required pipe supports.\nModify or replace of existing pipe supports as required.\nFurnish and install temporary support of existing piping during demolition and installation.\nReconnect all existing steam piping.\nFurnish and install all miscellaneous piping modifications necessary for the completed installation.\n\nSteam stations shall be installed in accordance with the selected steam regulator manufacturer s current installation requirements. The contractor shall verify and provide the manufacturer s required:\n\nUpstream straight-pipe distance.\nDownstream straight-pipe distance.\nValve arrangement.\nStrainer arrangement.\nPressure sensing arrangement.\nDrip-leg arrangement.\nCondensate removal provisions.\nGauge locations.\nBypass configuration, if required.\nRegulator orientation.\nService clearances.\nMaintenance clearances.\nSafety relief requirements.\n\nExisting conditions shall not be used as justification for installing the new regulators contrary to manufacturer requirements. Where existing piping must be reconfigured to meet manufacturer requirements, the required reconfiguration shall be included in the base bid.\n\nEquipment and Pipe Sizing:\nAll equipment and piping sizes shall be verified prior to bidding and again prior to procurement. The contractor shall verify:\n\nExisting pipe sizes.\nRequired regulator inlet size.\nRequired regulator outlet size.\nRequired regulator capacity.\nRequired steam pressure.\nRequired downstream pressure.\nRequired steam flow.\nSafety valve capacity.\nSafety valve set pressure.\nStrainer sizing.\nValve sizing.\nFlange pressure class.\nPipe schedule.\nApplicable steam pressure and temperature ratings.\n\nThe contractor shall provide steam regulators properly sized for the actual system operating conditions. The contractor shall not assume that the existing regulator size is automatically the correct replacement size. Where required, the successful bidder shall coordinate with the regulator manufacturer or authorized representative to confirm the proper regulator selection.\n\nManufacturer Requirements\nPrior to installation, the contractor shall provide manufacturer documentation demonstrating that the proposed steam regulators are suitable for the application. The completed station shall comply with all manufacturer requirements.\n\nPressure Gauges\nProvide new pressure gauge arrangements servicing the steam pressure reducing stations. Pressure gauges shall be located and piped so that normal operating pressures can be clearly viewed from outside confined space number 15 without requiring personnel to enter the confined space for routine pressure observation.\n\nSteam-rated gauge.\nGauge siphon.\nIsolation valve.\nPiping and fittings.\nSupports.\nIdentification.\nAppropriate protection from damage.\n\nGauge piping shall be securely supported and arranged so that it does not create an obstruction or interfere with access. Gauge locations shall be coordinated and approved prior to final installation.\n\nSafety Relief Valves\nRemove and replace the existing downstream steam safety relief valves associated with the pressure reducing stations. Provide new safety relief valves properly selected and sized for the actual system conditions.\n\nThe contractor shall verify:\n\nRequired relieving capacity.\nInlet pressure.\nDownstream operating pressure.\nSafety valve set pressure.\nValve inlet size.\nValve outlet size.\nDischarge pipe size.\nRequired discharge arrangement.\n\nSafety valves and discharge piping shall comply with applicable codes, VA requirements, and manufacturer requirements. Modify, replace, extend, support, or reconnect the existing safety valve discharge piping as necessary for a complete installation. The contractor shall include all piping modifications required between the new safety valves and the existing approved discharge termination.\n\nCross Tee Replacement\nRemove the existing leaking cross tee. Provide new steam-rated piping and fittings necessary to eliminate the existing leaking tee and provide a permanent repair. The bidder shall verify the existing tee size, orientation, connections, and piping arrangement during the mandatory pre-bid walkthrough. All associated piping modifications required to complete this work shall be included.\n\nPipe Supports\nProvide all new or modified supports required for the new piping arrangement. Supports shall be suitable for steam service and shall account for:\n\nPipe weight\nValve weight\nRegulator weight\nStrainer weight\nSafety valve weight\nThermal expansion\n\nOperating loads\nMaintenance loads\n\nExisting equipment shall not be improperly used as a pipe support. Any temporary supports necessary during demolition and installation shall be included.\n\nInsulation\nRemove existing insulation as necessary to perform the work. Provide new insulation at all disturbed or newly installed piping after successful testing and startup. New insulation shall match the applicable VA specification requirements for steam service. All damaged insulation associated with the contractor s work shall be repaired or replaced.\n\nAsbestos Abatement\nExisting flanged connections utilizing square-head bolts have been identified as Potential Asbestos Containing Material (PACM). Bidders shall make proper required abatement notification(s), obtain required permit(s) and licensed asbestos abatement professional and VPIH services for air quality monitoring to perform removal of flanges with PACM.\n\nWrap existing flanges for removal and wet cut existing piping on each side of flange to dismantle in-tact flange. Dispose of flanges as ACM.\n\nAbatement work shall meet State of Connecticut and local jurisdiction requirements for Asbestos Abatement.\n\nRigging and Material Handling:\nThe contractor shall include all rigging and material handling required to remove existing equipment and install new equipment. The bidder shall determine the appropriate means and methods during the pre-bid inspection. Restrictions associated with equipment access or material movement that are visible or reasonably discoverable during the pre-bid walk through shall be included in the bid.\n\nTesting:\nFollowing installation, test all newly installed or modified piping and equipment in accordance with applicable codes, VA specifications, and manufacturer requirements. Testing shall include as applicable:\nPressure testing\nLeak testing\nFlange inspection\nValve inspection\nRegulator inspection\nGauge verification\nSafety valve verification\n\nRepair any leaks or deficiencies associated with the new work at no additional cost to the government.\n\nStartup and Commissioning:\nFollowing completion of the installation:\n\nStart the steam system in coordination with the VA Maintenance & Operations Supervisor and Boiler Plant Supervisor.\nVerify proper regulator operation.\nAdjust regulators to the required operating pressures.\nSet the 1/3 station.\nSet the 2/3 station.\nVerify proper transition and operation between the two regulators where applicable.\nVerify downstream pressures.\nVerify gauge readings.\nVerify valve operation.\nVerify safety valve installation.\nVerify proper condensate drainage.\nInspect all new piping and connections for leakage.\nMake final adjustments required for proper system operation.\n\nThe steam station shall not be considered complete until both stations are demonstrated to be operational and accepted by the VA COR and Contracting Officer.\n\nVA Specifications and Code Compliance:\nAll materials and workmanship shall comply with the applicable VA project specifications, including applicable VA Division 23 requirements, as identified by the project scope.\n\nMaterials:\nAll materials shall be new unless specifically approved otherwise. Materials shall be properly rated for steam service, system pressure, system temperature and applicable pressure class. Substitutions shall not be made without approval.\nDemolition and Disposal\nRemove all demolished and discarded materials associated with this work from the project site. Dispose of materials legally at an approved facility and furnish a waste manifest as required by Local, Federal, and VA requirements and regulations. The work area shall be broom-clean and free of construction debris following completion.\n\nProtection of Existing Conditions:\nThe contractor shall protect all existing facilities, equipment, piping, structure, and finishes adjacent to the work. Any damage caused by the contractor shall be repaired at the contractor s expense. The bidder shall include reasonable temporary protection required to perform the work.\n\nBidder Responsibility for Complete Scope:\nThe bidder is responsible for providing a complete turnkey price based on:\nThis Scope of Work\nMandatory Site Inspection\nExisting Field Conditions\nApplicable VA Requirements\nApplicable Codes\nManufacturer installation requirements\nProper methods of constructing assemblies associated with the Scope of Work.\n\nThe bidder shall include all miscellaneous and incidental work reasonably required to provide a complete and operational installation. The absence of an individual fitting, spool piece, support, gasket, bolt, valve, connection, accessory, rigging item, or similar incidental component from the written Scope of Work shall not constitute grounds for additional compensation when that item is reasonably necessary to complete the described work.\n\nBid Clarifications and Exceptions:\nAny ambiguity, discrepancy, conflict, unusual condition, or concern identified by a bidder shall be submitted in writing prior to bid submission to the VA Contracting Officer. Any requested exclusions or exceptions shall be clearly identified in the bid. Failure to identify an exception shall indicate that the bidder has included the requirement within their base price.\n\nThe successful bidder shall not rely upon assumptions that contradict conditions observable during the mandatory site walk or the requirements contained in this Scope of Work.\n\nSUBMITTALS/DELIVERABLES\nService provider shall furnish all submittal item documentation with final dispositions and final documentation report with all tests, photos, and work completed within 10 business days following completion of work.\n\nService provider shall furnish all material certifications for any replacement parts used.\n\nService provider shall furnish a waste manifest as required.\n\nSPECIAL INSTRUCTIONS\nAll service provider personnel, sub-service providers and representatives visiting VA sites will be required to sign in upon arrival at Building 15 and/or retain a temporary VA badge. Each visiting individual be required to enter their name, their company s name, VA project title, reason for visit, and the times of arrival and departure. Arrangements for after normal hour working site visits must be made in advance and during normal working hours.\n\nGeneral: The Contracting Officer reserves the right to terminate any services, without payment for services completed, if such services are not needed or are not being adequately completed.\n\nApproved Plans and Permits: Prior to the start of work, submit to VA copies of all required permits.\n\nSite Visits: Day to day project administration will be performed by the COR. Periodic reviews, tests, and other field observation by the Government are not to be interpreted as superintendence nor as resulting in any approval of the service provider s apparent progress toward meeting the Government s objectives; but are intended to discover any information that the Contracting Officer may be able to call to the service provider s attention to prevent costly misdirection of effort.\n\nThe service provider shall remain responsible for constructing, operating, and maintaining the site in full accordance if the requirements of this solicitation.\nThe service provider shall provide VA with a copy of all inspection reports for inspections conducted by local, regional, and state code authorities from the start of work through issuance of the certificate of completion.\n\nThe service provider shall develop and provide to the VA the following:\nSafety Plan: The service provider shall produce work in accordance with the latest editions of all applicable DVA guidelines (e.g. Construction Standards, Master Specifications, Standard Details, Special Design Criteria to meet Hospital Joint Commission (JCAHO) requirements), NFPA, Federal and State codes pertinent to the project scope.\n\nAll applicable personnel on site are required to obtain an Occupational Safety and Health\nAdministration (OSHA) 10 hour construction certification, and the site competent person for the\nservice provider must obtain an OSHA 30 hour construction certification.\n\nPer VA Directive 1805, smoking vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees.\n\nNo photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time.\n\nParking for Service provider and its employees shall be in designated areas only. Service provider to coordinate with COR.\n\nThe Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct. Execute work in such a manner as to reduce impacts with work being done by others.\n\nBilling: Provide COR with a report or statement of work completed and include statements with request for payment. Statement should include service completed and the date each service item was completed. Labor charges shall be billed hourly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report.\n\nSafety Codes / Certification / Licensing:\nEnvironmental abatement work, if necessary, is to be performed by Service provider under supervision and monitoring for the VA by a Certified Industrial Hygienist.\n\nThe Service provider shall comply with all codes as described above, as well as codes customarily applied in VA construction jobs such as NFPA fire code, OSHA, VA Design Guides, ASME, Manufacturer Requirements, etc. Labs used by the service provider shall be licensed as required by any applicable governing agencies, and their certifications and licenses shall be included in the reports.\n\nThe C&A requirements do not apply and a Security Accreditation Package is not required.\n\nNARA Records Management Requirements\n\nThe following standard items relate to records generated in executing this contract:\n\nCitations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31, and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.\n\nContractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.\n\nContractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.\n\nContractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.\n\nThe Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.\n\nThe Government Agency owns the rights to all data/records produced as part of this contract.\n\nThe Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.\n\nThe Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].\n\nNo disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.\n\nThe Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.","html":"Page 2 of 2\n\nCombined Synopsis Solicitation   West Haven VAMC  Steam Station Replacement\n (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.\n(ii) The solicitation number is 36C24127Q0058 and the solicitation is issued as a request for quotation (RFQ).\n(iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-05.\n(iv) This requirement is being issued as a SDVOSB set-aside.  The associated NAICS 238220 and small business size standard is $16.5 million.\n(v) The Government intends to award a firm-fixed price award for Steam Station Replacement  at West Haven VAMC.  Please see the attached Performance Work Statement for full requirement details.  Please complete the Price Schedule below and submit with the quote submission. \n(vi) The Contractor shall provide all resources necessary to provide Steam Station Replacement\nIAW the attached (PerformancevWork Statement).  Please see the attached PWS for full requirement details.\n(vii) The Place of Performance is West Haven VAMC as described per the (Performance Work Statement).\n(viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.204-7 System for Award Management (OCT 2018); 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016); 52.217-5 Evaluation of Options (JUL 1990); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008)\n(ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement. \nSite Visit: 950 Campbell Ave, West Haven CT 06516\nBidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing.Â  Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.Â Â Â  \nPlease post and include MCP 138-075 Lock-Out-Tag-Out Policy and Confined Space Entry Program. Bidders are required to comply with this policy and SOP.Â  \n\n \nSubmission of Quotes:  \n(1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered.\n(2) Offerors shall submit their quotes electronically via email to tnauri.woodbridge@va.gov.\n(3) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below.  All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer.\nEvaluation Process: \nAward shall be made to the best value, as determined to be the most beneficial to the Government.  Please read each section below carefully for the submittals and information required as part of the evaluation.  Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process.\nOfferor quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers.  Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15.  \nThe Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:Â \nPrice (Follow these instructions):\nOfferor shall complete Attachment 1 - Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces.Â  \nPast Performance:\nOfferor shall utilize Attachment 2   Past Performance Worksheet to provide at least one (1) but no more than (3) references of work, similar in scope and size with the requirement detailed in the (Performance Work Statement).  References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work.Â  The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources. \nTechnical: The offeror s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the (Performance Work Statement) in a timely efficient manner.Â \nContractor shall demonstrate their corporate experience and approach to meet all requirements stated in the (Performance Work Statement).\nContractor shall demonstrate that their technicians meet the qualification standards stated in the (Performance Work Statement).\nIf you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort.\nSAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling 1-866-606-8220. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer.\nVISTA: The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can request a Form 10091 at any time. \n(x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy.\n(xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items (OCT 2018), applies to this acquisition in addition to the following addenda s to the clause: 52.204-16 Commercial and Government Entity Code Maintenance (JUL 2016); 52.219-6 Notice of Total Small Business Set-Aside; 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013); 852.203-70 Commercial Advertising (MAY 2008); 852.232-72 Electronic Submission of Payment Requests (NOV 2018)    \nSubcontracting Commitments - Monitoring and Compliance \nThis solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the                                                                                                                                                                                                                                Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement  to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments.\n(xiii) All contract requirement(s) and/or terms and conditions are stated above.\n(xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement.\n(xv) RFQ responses are due December 3, 2026 by 10:00 AM EST. RFQ responses must be submitted via email to: tnauri.woodbridge@va.gov.  Hand deliveries shall not be accepted.\n(xvi) The POC of this solicitation is Tnauri.Woodbridge@va.gov) \n\n\n\n\n\n\n\n\n\n\n\n\n\n\nATTACHMENT 1\nPRICE SCHEDULE\nITEM NUMBER\nDESCRIPTION OF SERVICES\nQUANTITY\nUNIT\nUNIT PRICE\nAMOUNT\nBase\nREPLACE BUILDING 2 STEAM STATION\n1.00\nJB\n__________________\n__________________\n\n\n\n\n\n\n\n\n\n\nGRAND TOTAL\n__________________\n\n\n\n\n\n\nATTACHMENT 2\nPAST PERFORMANCE WORKSHEET\n1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization:\n2. Contracting Activity Address:\n3. Contract Number:\n4. Date of Contract Award:\n5. Beginning Date of Contract:\n6. Completion Date of Contract:\n7. Contract Value:\n8. Type of Contract:\n9a. Technical Point of Contact: \n9b. Contracting Point of Contact:\nName:\nName:\nTitle:\nTitle:\nAddress:\nAddress:\nTelephone:\nTelephone:\nEmail:\nEmail:\n10. Place of Performance:\n11. Description of Work (Use a continuation sheet if necessary):\n12. List any commendations or awards received: \n13. List of Major Subcontractors:\n\n\n\n\n\nATTACHMENT 3\nSTATEMENT OF WORK\nSTATEMENT OF WORK\nREPLACE BUILDING 2 STEAM STATION\n\nVA CONNECTICUT HEALTHCARE SYSTEM (VACHS) \nVA MEDICAL CENTER WEST HAVEN\n950 CAMPBELL AVENUE\nWEST HAVEN, CT 06516\n\nBACKGROUND\nVA Connecticut Healthcare System has identified existing steam pressure reducing stations that are currently non-functional and require complete replacement (like in kind) located in Building 2, Confined Space 15 within Mechanical Room G-139. \n\nJUSTIFICATION\nSteam station failure has been identified to be impacting inpatient and critical care areas during winter months.  Heating restoration to critical patient care areas is essential to compliance with health and safety standards, patient care, and prevention of domestic and fire suppression piping failures. \n\nPLACE OF PERFORMANCE\nThe place of performance for this contract is VA Connecticut Healthcare System, West Haven VA Medical Center located at 950 Campbell Avenue; West Haven, CT 06516.\n\nPERIOD OF PERFORMANCE\nThe Contract Time Period of Performance will be 180 days upon contract award and Notice to Proceed (NTP).\n\nQUALIFICATIONS\nTo be considered eligible for consideration, potential bidders shall have a field service representative located within 100 miles of the West Haven Campus of the VA Connecticut Healthcare System. \n\nBidders shall provide upon request, documentation of certification/training on the specific equipment under the terms of this contract.  \n\nBidders shall be qualified to perform work on steam distribution systems to include industrial boiler plant equipment and have completed prior steam distribution work and/or inspection projects for VA Connecticut Healthcare System.  \n\nService Provider shall have a minimum of three (3) years of related scope and work experience with commercial and industrial steam boiler and steam boiler component installation and repairs as well as all aspects of inspections, cleaning, calibration, and testing in compliance with and clear understanding of relevant codes and regulations.\n\nService Provider and/or assigned project staff members shall have industry standard certifications and qualifications to include but not limited to current OSHA 30 and OSHA 10 certification and equivalent qualifications associated with requirements herein.  \n\nService Provider shall submit documentation of technical training and certifications for personnel performing all work under the terms of this contract for review and acceptance prior to the start of work on site. \n\nBidders shall be evaluated on past performance, technical capability, and financial capability to perform the requirements of this work.\n\nA full boiler plant steam outage will be conducted prior to the start of this work.  Work is expected to be completed over the duration of two consecutive back to back boiler plant steam outages occurring Saturday 7:00 a.m. through Sunday 4:00 p.m. and will be coordinated between March 01, 2027 and May 31, 2027 and with a 30 day notice.  \n\nMandatory Pre Bid:\nBidders shall perform a pre-bid walkthrough at 8:30 a.m. on November 14, 2026 and plan to meet in the Building 16 Boiler Plant at the VA Medical Center West Haven and report for a safety briefing.  Bidders shall be responsible to comply with the VA Connecticut Healthcare System Medical Center Policy 138-075 for Lock-Out-Tag-Out and VA Connecticut Healthcare System Confined Space Entry Program SOP SO-010.    \n\nDuring the pre-bid site visit, each bidder shall thoroughly inspect the work area and familiarize themselves with all existing conditions affecting the work.  At minimum, bidders shall verify:\n \nExisting steam pipe sizes. \nExisting 1/3 and 2/3 station pipe sizes. \nExisting regulator sizes. \nExisting valve sizes. \nExisting flange sizes, types, ratings, and configurations. \nExisting strainer sizes and configurations. \nExisting safety relief valve sizes and configurations. \nExisting pressure gauge arrangements. \nExisting condensate and drip piping. \nExisting support arrangements. \nExisting piping elevations. \nAvailable straight-pipe distances upstream and downstream of regulators. \nExisting cross tee configuration. \nAvailable physical space for the new steam station arrangement. \nAccess into and out of the pit/crawl space. \nConfined-space access conditions. \nRigging requirements. \nMaterial handling requirements. \nRemoval path for demolished materials. \nInstallation path for new materials and equipment. \nWorking clearances. \nExisting interference with piping, structure, ductwork, electrical, equipment, or other utilities. \nEquipment access requirements. \nExisting insulation. \nExisting asbestos-containing or suspect materials. \nFlanges containing square-head bolts. \nExisting pipe supports and structural attachment points. \nRequired temporary supports. \nRequired permanent supports. \nRequired access for future service and adjustment. \nPressure gauge visibility from outside the pit/crawl space. \nConditions affecting off-hours work. \nConditions affecting the scheduled steam shutdown. \n\nAll pipe sizing, valve sizing, equipment sizing, dimensions, elevations, quantities, access requirements, and existing conditions shall be field verified by the bidder prior to submitting their proposal.  \n\nDimensions, sizes, and quantities contained within this Scope of Work are intended to describe the general work and shall not relieve the bidder from field verification.\n\nThe bidder s submission of a proposal shall constitute acknowledgement that the bidder has inspected the existing conditions, understands the location and complexity of the work, and has included the work reasonably apparent or discoverable during the site visit within their bid price.  \n\nAll Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010. \n\nWork shall be conducted during WHEN hours.  A dedicated steam outage will be scheduled to perform this work to be included.  \n\nSCOPE OF WORK\nThe Service Provider shall furnish all labor, materials, equipment, tools, supervision, and incidentals to complete work for the services described in this document.\n\nThe intent of this Scope of Work is to provide a complete turnkey installation. The Service Provider shall furnish all labor, supervision, engineering/coordination, materials, equipment, tools, rigging, temporary protection, safety equipment, permits, testing, startup, commissioning, disposal, and incidental work required to compete the installation whether or not every individual fitting, component, support, connection, or accessory is specifically identified within this Scope of Work.  \n\nThe Service Provider shall submit a project schedule, work procedures, inspection procedures, testing procedures, all safety documentation, weld procedures, welder s certifications, etc. for review and approval by VA Contracting Officer Representative and Safety Office before work commences on site.  \n\nDescription of Services:\nService Provider shall schedule and coordinate all work with VA COR, Utilities Supervisor, and Boiler Plant Supervisor.  \n\nAll LOTO request and procedures shall be in compliance with the VA Connecticut Healthcare System Medical Center Policy 138-075.\n\nCoordinate Hot Work permit requests with VA Connecticut Healthcare System Safety Service.  \n\nCoordinate all placement and removal of Lock Out Tag Out devices for any energy sources with the VA COR/Maintenance & Operations.  \n\nAll Confined Space Entries shall be in compliance with the VA Connecticut Healthcare System Standard Operating Procedure Confined Space SOP-SO-010. \n\nCoordinate Hot Work Permit with VA Connecticut Healthcare System Occupational Health/Safety Service.  \n\nComplete Infection Control Risk Assessment (ICRA) and coordinate with COR and Medical Center Infection Prevention for approval.  \n\nFurnish and install required barrier(s) as required per the Infection Control Risk Assessment (ICRA). \n\nProtect all equipment in place during replacement activities.  \n\nIn accordance with VHA Operational Alert and Guidance, NO cast iron fittings and pipe components (valves, steam traps, etc.) shall be used.  Reference VHA Directive 1810(1) as amended on September 11, 2018: 5.a(1) and 5.b(1). \n\nASTM A193 bolts shall be utilized and replace any ASTM A307 Bolts at locations of steam piping, flanges, gaskets, and other hardware where piping replacements are included within this scope of work. Reference Veterans Health Administration (VHA) Master Specifications for Hydronic Piping (Specification 23 22 13) and Steam and Condensate Heating Piping (Specification 23 22 13) where applicable. \n\nRepair of existing cast iron fittings or pipe components is permissible in specific instances but must be reported and coordinated with the CO and COR for approval before starting the work through submittal process with justification as necessary.  \n\nAll new steam and condensate line shall be Schedule 80.  All new steam and condensate lines that utilize valves to isolate or divert a medium shall be installed new as a double in series valve system. Where the option exists to utilize welded vs threaded.\n\nTag all existing and new valves and label new piping and components replaced as part of this scope of work. \n\nService provider shall perform all acceptance testing.  Facilities Management Service shall designate a staff member to witness acceptance testing of all components and completed work. \n\nService provider shall clean up work area and all debris. \n\nService provider shall provide a complete, fully operational, code-compliant replacement of the existing 1/3 and 2/3 steam pressure reducing stations located within the existing crawl space in Building 2 at the West Haven VA Medical Center.  \n\nExisting Conditions:\nThe existing steam pressure reducing stations are currently non-functional and require complete replacement. Known existing conditions include:\n\nExisting 2-inch steam pressure reducing station is non-functional. \nExisting 2-1/2-inch steam pressure reducing station is non-functional. \nBoth existing steam regulators are to be replaced. \nExisting steam stations are not presently installed in accordance with the required regulator  manufacturer's piping arrangement. \nExisting cross tee is leaking and shall be removed and replaced. \nExisting pressure gauge arrangement does not allow convenient observation from outside the pit/crawl space. \nExisting downstream safety relief valves shall be replaced. \nExisting flanged connections utilizing square-head bolts have been identified as containing or potentially containing asbestos-containing material. \nWork is located within a restricted-access pit/crawl-space environment. \nThese descriptions are not intended to represent every existing field condition. The bidder is responsible for identifying additional conditions that are visible, reasonably apparent, or reasonably discoverable during the mandatory pre-bid walk.\n\nSteam Pressure Reducing Station Replacement:\nService provider shall remove existing 1/3 and 2/3 steam pressure reducing stations as required to accommodate the new installation.  \nService provider shall furnish and install new pressure reducing stations serving the exiting steam system. \nRemove existing steam regulators.\nRemove associating piping necessary to properly rebuild the stations.\nRemove the leaking cross tee.\nRemove existing components that prevent compliance with manufacturer required piping arrangements. \nFurnish and install new steam regulators.\nFurnish and install new upstream and downstream piping.\nFurnish and install new fittings and tees.\nFurnish and install new flanges, gaskets, and flange bolting.\nFurnish and install unions or breakable connections where appropriate.\nFurnish and install strainers where required.\nFurnish and install isolation valves where required by the station configuration.\nFurnish and install condensate/drip provisions where required.\nFurnish and install required pipe supports.\nModify or replace of existing pipe supports as required.\nFurnish and install temporary support of existing piping during demolition and installation. \nReconnect all existing steam piping.\nFurnish and install all miscellaneous piping modifications necessary for the completed installation.\n\nSteam stations shall be installed in accordance with the selected steam regulator manufacturer s current installation requirements. The contractor shall verify and provide the manufacturer s required:\n\nUpstream straight-pipe distance. \nDownstream straight-pipe distance. \nValve arrangement. \nStrainer arrangement. \nPressure sensing arrangement. \nDrip-leg arrangement. \nCondensate removal provisions. \nGauge locations. \nBypass configuration, if required. \nRegulator orientation. \nService clearances. \nMaintenance clearances. \nSafety relief requirements. \n\nExisting conditions shall not be used as justification for installing the new regulators contrary to manufacturer requirements. Where existing piping must be reconfigured to meet manufacturer requirements, the required reconfiguration shall be included in the base bid. \n\nEquipment and Pipe Sizing:\nAll equipment and piping sizes shall be verified prior to bidding and again prior to procurement. The contractor shall verify: \n\nExisting pipe sizes. \nRequired regulator inlet size. \nRequired regulator outlet size. \nRequired regulator capacity. \nRequired steam pressure. \nRequired downstream pressure. \nRequired steam flow. \nSafety valve capacity. \nSafety valve set pressure. \nStrainer sizing. \nValve sizing. \nFlange pressure class. \nPipe schedule. \nApplicable steam pressure and temperature ratings. \n\nThe contractor shall provide steam regulators properly sized for the actual system operating conditions. The contractor shall not assume that the existing regulator size is automatically the correct replacement size. Where required, the successful bidder shall coordinate with the regulator manufacturer or authorized representative to confirm the proper regulator selection.\n\nManufacturer Requirements\nPrior to installation, the contractor shall provide manufacturer documentation demonstrating that the proposed steam regulators are suitable for the application.  The completed station shall comply with all manufacturer requirements. \n\nPressure Gauges\nProvide new pressure gauge arrangements servicing the steam pressure reducing stations. Pressure gauges shall be located and piped so that normal operating pressures can be clearly viewed from outside confined space number 15 without requiring personnel to enter the confined space for routine pressure observation.  \n\nSteam-rated gauge. \nGauge siphon. \nIsolation valve. \nPiping and fittings. \nSupports. \nIdentification. \nAppropriate protection from damage. \n\nGauge piping shall be securely supported and arranged so that it does not create an obstruction or interfere with access. Gauge locations shall be coordinated and approved prior to final installation.  \n\nSafety Relief Valves\nRemove and replace the existing downstream steam safety relief valves associated with the pressure reducing stations.  Provide new safety relief valves properly selected and sized for the actual system conditions.  \n\nThe contractor shall verify:\n\nRequired relieving capacity. \nInlet pressure. \nDownstream operating pressure. \nSafety valve set pressure. \nValve inlet size. \nValve outlet size. \nDischarge pipe size. \nRequired discharge arrangement. \n\nSafety valves and discharge piping shall comply with applicable codes, VA requirements, and manufacturer requirements.  Modify, replace, extend, support, or reconnect the existing safety valve discharge piping as necessary for a complete installation. The contractor shall include all piping modifications required between the new safety valves and the existing approved discharge termination.  \n\nCross Tee Replacement\nRemove the existing leaking cross tee.  Provide new steam-rated piping and fittings necessary to eliminate the existing leaking tee and provide a permanent repair. The bidder shall verify the existing tee size, orientation, connections, and piping arrangement during the mandatory pre-bid walkthrough.  All associated piping modifications required to complete this work shall be included.  \n\nPipe Supports\nProvide all new or modified supports required for the new piping arrangement. Supports shall be suitable for steam service and shall account for:\n\nPipe weight\nValve weight \nRegulator weight\nStrainer weight\nSafety valve weight\nThermal expansion\n\n\n\nOperating loads\nMaintenance loads \n\nExisting equipment shall not be improperly used as a pipe support.  Any temporary supports necessary during demolition and installation shall be included.\n\nInsulation\nRemove existing insulation as necessary to perform the work.  Provide new insulation at all disturbed or newly installed piping after successful testing and startup.  New insulation shall match the applicable VA specification requirements for steam service. All damaged insulation associated with the contractor s work shall be repaired or replaced. \n\nAsbestos Abatement\nExisting flanged connections utilizing square-head bolts have been identified as Potential Asbestos Containing Material (PACM).  Bidders shall make proper required abatement notification(s), obtain required permit(s) and licensed asbestos abatement professional and VPIH services for air quality monitoring to perform removal of flanges with PACM.  \n\nWrap existing flanges for removal and wet cut existing piping on each side of flange to dismantle in-tact flange.  Dispose of flanges as ACM. \n\nAbatement work shall meet State of Connecticut and local jurisdiction requirements for Asbestos Abatement.  \n\nRigging and Material Handling:\nThe contractor shall include all rigging and material handling required to remove existing equipment and install new equipment.  The bidder shall determine the appropriate means and methods during the pre-bid inspection. Restrictions associated with equipment access or material movement that are visible or reasonably discoverable during the pre-bid walk through shall be included in the bid. \n\nTesting:\nFollowing installation, test all newly installed or modified piping and equipment in accordance with applicable codes, VA specifications, and manufacturer requirements. Testing shall include as applicable:\nPressure testing\nLeak testing\nFlange inspection\nValve inspection\nRegulator inspection\nGauge verification\nSafety valve verification\n\nRepair any leaks or deficiencies associated with the new work at no additional cost to the government. \n\nStartup and Commissioning:\nFollowing completion of the installation:\n\nStart the steam system in coordination with the VA Maintenance & Operations Supervisor and Boiler Plant Supervisor.\nVerify proper regulator operation.\nAdjust regulators to the required operating pressures.\nSet the 1/3 station.\nSet the 2/3 station.\nVerify proper transition and operation between the two regulators where applicable.  \nVerify downstream pressures.\nVerify gauge readings.\nVerify valve operation.\nVerify safety valve installation.\nVerify proper condensate drainage.\nInspect all new piping and connections for leakage.\nMake final adjustments required for proper system operation. \n\nThe steam station shall not be considered complete until both stations are demonstrated to be operational and accepted by the VA COR and Contracting Officer.\n\nVA Specifications and Code Compliance:\nAll materials and workmanship shall comply with the applicable VA project specifications, including applicable VA Division 23 requirements, as identified by the project scope.  \n\nMaterials:\nAll materials shall be new unless specifically approved otherwise. Materials shall be properly rated for steam service, system pressure, system temperature and applicable pressure class.  Substitutions shall not be made without approval.  \nDemolition and Disposal\nRemove all demolished and discarded materials associated with this work from the project site. Dispose of materials legally at an approved facility and furnish a waste manifest as required by Local, Federal, and VA requirements and regulations.  The work area shall be broom-clean and free of construction debris following completion.\n\nProtection of Existing Conditions:\nThe contractor shall protect all existing facilities, equipment, piping, structure, and finishes adjacent to the work.  Any damage caused by the contractor shall be repaired at the contractor s expense.  The bidder shall include reasonable temporary protection required to perform the work.  \n\nBidder Responsibility for Complete Scope:\nThe bidder is responsible for providing a complete turnkey price based on:\nThis Scope of Work\nMandatory Site Inspection\nExisting Field Conditions\nApplicable VA Requirements\nApplicable Codes\nManufacturer installation requirements\nProper methods of constructing assemblies associated with the Scope of Work. \n\nThe bidder shall include all miscellaneous and incidental work reasonably required to provide a complete and operational installation.  The absence of an individual fitting, spool piece, support, gasket, bolt, valve, connection, accessory, rigging item, or similar incidental component from the written Scope of Work shall not constitute grounds for additional compensation when that item is reasonably necessary to complete the described work. \n\nBid Clarifications and Exceptions:\nAny ambiguity, discrepancy, conflict, unusual condition, or concern identified by a bidder shall be submitted in writing prior to bid submission to the VA Contracting Officer.  Any requested exclusions or exceptions shall be clearly identified in the bid. Failure to identify an exception shall indicate that the bidder has included the requirement within their base price.  \n\nThe successful bidder shall not rely upon assumptions that contradict conditions observable during the mandatory site walk or the requirements contained in this Scope of Work.  \n\nSUBMITTALS/DELIVERABLES\nService provider shall furnish all submittal item documentation with final dispositions and final documentation report with all tests, photos, and work completed within 10 business days following completion of work.  \n\nService provider shall furnish all material certifications for any replacement parts used.\n\nService provider shall furnish a waste manifest as required.\n\nSPECIAL INSTRUCTIONS\nAll service provider personnel, sub-service providers and representatives visiting VA sites will be required to sign in upon arrival at Building 15 and/or retain a temporary VA badge.  Each visiting individual be required to enter their name, their company s name, VA project title, reason for visit, and the times of arrival and departure.  Arrangements for after normal hour working site visits must be made in advance and during normal working hours. \n\nGeneral: The Contracting Officer reserves the right to terminate any services, without payment for services completed, if such services are not needed or are not being adequately completed.\n\nApproved Plans and Permits: Prior to the start of work, submit to VA copies of all required permits. \n\nSite Visits: Day to day project administration will be performed by the COR. Periodic reviews, tests, and other field observation by the Government are not to be interpreted as superintendence nor as resulting in any approval of the service provider s apparent progress toward meeting the Government s objectives; but are intended to discover any information that the Contracting Officer may be able to call to the service provider s attention to prevent costly misdirection of effort.\n\nThe service provider shall remain responsible for constructing, operating, and maintaining the site in full accordance if the requirements of this solicitation. \nThe service provider shall provide VA with a copy of all inspection reports for inspections conducted by local, regional, and state code authorities from the start of work through issuance of the certificate of completion.  \n\nThe service provider shall develop and provide to the VA the following:\nSafety Plan: The service provider shall produce work in accordance with the latest editions of all applicable DVA guidelines (e.g. Construction Standards, Master Specifications, Standard Details, Special Design Criteria to meet Hospital Joint Commission (JCAHO) requirements), NFPA, Federal and State codes pertinent to the project scope.\n\nAll applicable personnel on site are required to obtain an Occupational Safety and Health\nAdministration (OSHA) 10 hour construction certification, and the site competent person for the\nservice provider must obtain an OSHA 30 hour construction certification.\n\nPer VA Directive 1805, smoking vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees.\n\nNo photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time.  \n\nParking for Service provider and its employees shall be in designated areas only. Service provider to coordinate with COR.  \n\nThe Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer.  The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct.  Execute work in such a manner as to reduce impacts with work being done by others. \n\nBilling: Provide COR with a report or statement of work completed and include statements with request for payment.  Statement should include service completed and the date each service item was completed.  Labor charges shall be billed hourly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report. \n\nSafety Codes / Certification / Licensing: \nEnvironmental abatement work, if necessary, is to be performed by Service provider under supervision and monitoring for the VA by a Certified Industrial Hygienist.\n\nThe Service provider shall comply with all codes as described above, as well as codes customarily applied in VA construction jobs such as NFPA fire code, OSHA, VA Design Guides, ASME, Manufacturer Requirements, etc. Labs used by the service provider shall be licensed as required by any applicable governing agencies, and their certifications and licenses shall be included in the reports.\n\nThe C&A requirements do not apply and a Security Accreditation Package is not required. \n\nNARA Records Management Requirements\n\nThe following standard items relate to records generated in executing this contract:\n\nCitations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31, and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.\n\nContractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.\n\nContractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government  IT  equipment and/or Government records.\n\nContractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. \n\nThe Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. \n\nThe Government Agency owns the rights to all data/records produced as part of this contract. \n\nThe Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. \n\nThe Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].\n\nNo disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules. \n\nThe Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.","origin":"detail"},"contacts":[{"name":"Tnauri Woodbridge","role":"primary","email":"tnauri.woodbridge@va.gov","phone":"203-932-5711 x2892","title":"Contracting Officer"}],"place_of_performance":{"zip":"06516","city":{"name":"West Haven"},"state":{"name":"CT"},"street":"West Haven VAMC","street2":"950 Campbell Ave"},"office_address":{"zip":"04330","city":"TOGUS","state":"ME","country":"USA"},"naics_codes":["238220"],"award":{"awardee":{}},"attachments":[{"resource_id":"feb536cabcfc4a6e940f89efcc094bb4","name":"36C24127Q0058.docx","kind":"file","mime_type":".docx","size_bytes":40703,"posted_at":"2026-11-10T14:27:07.465Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/feb536cabcfc4a6e940f89efcc094bb4/download","mirrored":false}],"awards":[],"related":[{"key":"36C24127Q0084","latest_notice_id":"939b8f3021be4a75ae5972b0c7ffb9ae","title":"X1EA--CWM VA Police Use of shooting range.","solicitation_number":"36C24127Q0084","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-27T15:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"611699","psc":"X1EA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C24127Q0017","latest_notice_id":"d60676ea33af4051b90a1953ab55743e","title":"S201--36C24127Q0017 Windows Washing Service Amendment 0002","solicitation_number":"36C24127Q0017","notice_type":"k","first_type":"k","first_posted":"2026-10-26","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"561720","psc":"S201","set_aside":"SDVOSBC","state":"MA","county":"25017","county_name":"Middlesex County","city":"2501704615","city_name":"Bedford","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C24127Q0044","latest_notice_id":"a2f2fe28c1ec4687b2a2955cf947935e","title":"9140--Togus Fuel Oil and Diesel Delivery","solicitation_number":"36C24127Q0044","notice_type":"k","first_type":"k","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"324110","psc":"9140","set_aside":"SBA","state":"ME","county":"23011","county_name":"Kennebec County","city":"2302100","city_name":"Augusta","country":"USA","place_scope":"nationwide","state_source":"sam_zip","state_evidence":"04330","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C24127Q0076","latest_notice_id":"bb30bc78067840a082b5d9e12eceddd2","title":"Q601--Sources sought Boston Medical Coding Period of Period 01/01/2027-04/01/2027","solicitation_number":"36C24127Q0076","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"541219","psc":"Q601","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24127Q0030","latest_notice_id":"10c3d2d3d0c543179707f8cc9448f701","title":"J061--Eaton Powerware System Replacement","solicitation_number":"36C24127Q0030","notice_type":"k","first_type":"k","first_posted":"2026-11-04","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"811310","psc":"J061","set_aside":"SDVOSBC","state":"NH","county":"33011","county_name":"Hillsborough County","city":"3345140","city_name":"Manchester","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"36C24127Q0054","latest_notice_id":"b89e7d9df42245668a708071ff95a9d4","title":"J041--Condensate Pump Replacement","solicitation_number":"36C24127Q0054","notice_type":"k","first_type":"k","first_posted":"2026-11-09","last_posted":"2026-11-09","notices":1,"due_at":"2026-12-03T15:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"238220","psc":"J041","set_aside":"SDVOSBC","state":"CT","county":"09170","county_name":"South Central Connecticut Planning Region","city":"0982800","city_name":"West Haven","country":null,"place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"removed_at":null,"updated_at":"2026-11-11T01:11:15.014913Z"},{"key":"140PP027B0004","latest_notice_id":"53398cb59b8f4b0687efd4e3fa6241dc","title":"Z--13976 PUHO FIRE PROTECTION AT DORM","solicitation_number":"140PP027B0004","notice_type":"r","first_type":"s","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":2,"due_at":"2026-11-26T03:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T03:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140PP0","office_name":"NATIONAL PARK SERVICE CONTRACTING ACTIVITY","naics":"238220","psc":"Z2AA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"140FF027Q0080","latest_notice_id":"c706d18cc5e846508a63090d29caa934","title":"AK-AK MARITIME NWR-LEAK REPAIR","solicitation_number":"140FF027Q0080","notice_type":"o","first_type":"o","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-26T17:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140FF0","office_name":"FWS CONTRACTING ACTIVITY","naics":"238220","psc":"J045","set_aside":"SBA","state":"AK","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"title","state_evidence":"AK-A","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"}],"similar_open_total":56,"indexable":true}