{"canonical":"https://sealedbidder.com/opportunities/36c24125q0469","key":"36C24125Q0469","url":"https://sealedbidder.com/opportunities/36c24125q0469","title":"J045--Boiler Calibrations and Safety Device Testing Bedford VA Medical Center","solicitation_number":"36C24125Q0469","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-05-16T20:00:00Z","first_posted":"2025-05-09","last_posted":"2025-05-09","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"238220","psc":"J045","set_aside":"VSA","place_state":"MA","place_scope":"site","site":"Bedford VA Medical Center","place_state_source":"sam_street","place_evidence":"BEDFORD VA MEDICAL CENTER 200 SPRINGS RD BEDFORD, MA 01730","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"b3dbb8cfe4394368b3685ba65d88799d","title":"J045--Boiler Calibrations and Safety Device Testing Bedford VA Medical Center","solicitation_number":"36C24125Q0469","notice_type":"r","base_type":"r","posted":"2025-05-09","posted_at":"2025-05-09T20:29:55.844Z","due_at":"2025-05-16T20:00:00Z","due_date":"2025-05-16","cancelled":false,"archived":true,"archive_date":"2025-06-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b3dbb8cfe4394368b3685ba65d88799d/view","enriched":true,"history":[{"index":3,"title":"J045--Boiler Calibrations and Safety Device Testing Bedford VA Medical Center","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-09T20:29:55.844Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"b3dbb8cfe4394368b3685ba65d88799d","solicitation_number":"36C24125Q0469"}]}],"latest_notice_id":"b3dbb8cfe4394368b3685ba65d88799d","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-05-09","posted_at":"2025-05-09T20:29:55.844Z","created_at":"2025-05-09T20:29:31.058Z","modified_at":"2025-06-16T03:55:47.048Z","response_deadline":{"raw":"2025-05-16T16:00:00-04:00","utc":"2025-05-16T20:00:00Z","date":"2025-05-16","time":"16:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b3dbb8cfe4394368b3685ba65d88799d/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"J045--Boiler Calibrations and Safety Device Testing Bedford VA Medical Center","agency":{"office":{"code":"36C241","name":"241-NETWORK CONTRACT OFFICE 01 (36C241)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"04330","city":"TOGUS","state":"ME","country":"USA"},"organization_id":"100176746","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-06-15","archive_type":"auto_custom"},"history":[{"index":3,"title":"J045--Boiler Calibrations and Safety Device Testing Bedford VA Medical Center","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-09T20:29:55.844Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"b3dbb8cfe4394368b3685ba65d88799d","solicitation_number":"36C24125Q0469"}],"contacts":[{"name":"Carissa Sarazin","role":"primary","email":"carissa.sarazin@va.gov","phone":"401-273-7100","title":"Contract Specialist"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"b3dbb8cfe4394368b3685ba65d88799d","set_aside":{"code":"VSA","label":"Veteran-Owned Small Business Set-Aside (Department of Veterans Affairs)"},"lineage_id":"b3dbb8cfe4394368b3685ba65d88799d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T09:11:14.210995343Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"6f7f5ee53d4a1671a6b3a57a2e20394fa2ffa06c18dc5c482c2c00daecd902a4","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T09:11:14.210995343Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Page 2 of 2\n\nVA Bedford HCS\nSTATEMENT OF WORK\n\nBoiler Plant Burners, Controls, Instruments, and Data Management\nInspection, Safety Device Testing and Calibration\n\nGeneral Scope of Work\n1.  Semi-Annual Calibrations of Boiler Plant Controls and Instrumentation \n2.  Semi-Annual Combustion Testing of Boilers \n3.  Semi-annual Safety Device Testing\n4.  Semi-Annual Calibrations of Boiler Plant Controls and Instrumentation.\n\nA.  OVERVIEW\n1.  Contractor shall provide all labor, tools, testing equipment and supplies required for semi-annual calibrations of Boiler plant controls and instrumentation for three boilers located in Building #22, two boilers in Building #70, and other plant equipment. \n\n2.  Contractor shall ensure all work is in accordance with the procedures outlined in VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition, or the most current edition.\n\n3.  Contractor must have a laptop computer and required software to plug into and back-up all settings in the PCCIII controls and provide a back-up flash drive to Plant Supervisor. \n\n4.  Contractor will not be accessing any sensitive VA Information Systems, these are boiler controls only. Control devices will include but are not limited to the following: Preferred Instruments, CB Hawk, Foxboro, Yokogawa, Siemens, and Johnson Controls. \n\n5.  Contractor shall also supply to customer, calibration reports for each piece of equipment, indicating date, settings, pass/fail, technical data, and name of technician performing calibrations. \n\n6.  Contractor will provide a list of line items that require parts/replacement and the costs required to repair/replace those items. Additional work beyond the scope of this contract, requires approval from the Contracting Officer. See attached list of controls and instrumentation to be calibrated. \n\nB.  CALIBRATION\nThe following is a list of devices that will require calibration:\n\n1.  Plant Master PCIII\nOutside air temp\nPlant steam flow\nDistribution steam flow \nPlant demand\nSteam header press Hi/Lo and alarms\nOil pressure transmitter and alarms\nPropane pilot gas transmitter and alarms\nMain gas pressure transmitter and alarms\nControl air pressure transmitter and alarms\nLow main gas pressure alarm \nHigh main gas pressure alarm\nExplosive gas and carbon monoxide detection system\n\n\n2.  DA PCIII\nHigh oil header press alarm\nLow oil header press alarm\nDA steam PSI\nDA temp\nDA level \nHigh DA level alarm\nLow DA level alarm\nCond PCIII: Condensate tank level\nCondensate tank high level alarm\nCondensate tank low level alarm\nCondensate tank temp\nCondensate tank make-up valve\n\n3.  Hawk Controllers   Boilers, 1, 2, and 3\nPlant demand\nBoiler demand\nFiring rate\nSteam flow\nEconomizer flue temp-in\n\n4.  #1 and #2 Draft PCIII \nOxygen transmitter\nDamper %\nOutlet temp\nJackshaft position\nEfficiency\n\n5.  #1 and #2 Fuel Flow PCIII \nBoiler gas flow\nBoiler oil flow\nFlue gas temp monitorÂ calibration\nFlue gas temp High and Low temp alarms\n\n6.  #1, #2, and #3 Feedwater Pump Variable Frequency Drive Units\n\nNote; there is a new DA Tank installed as of October 2024. Testing will reflect the new parameters required on the new system. \n\nC.  SEMI-ANNUAL COMBUSTION TESTING OF BOILERS\n1.  Contractor will provide all labor and materials required to perform burner calibration on three (3) Cleaver Brooks CB700LE boilers. Each burner assembly will be inspected and adjusted to manufacturer s settings. Each boiler will be calibrated on gas and oil firing twice a year, approximately 6 months apart, as scheduled by the Maintenance and Operations Supervisor.   \n\n2.  Contractor will provide burner calibration printouts for each pin on the gas and oil cams 20 on CB Hawk for all three boilers. Settings will be as close and safe as possible for max input for gas and oil firing at high fire as per the inputs listed on the boiler plate. \n\n3. Contractor will calibrate the burners and not exceed the requirements of this facilities permit for emissions. Contractor will perform a smoke test on boilers. \n\n4. Contractor is responsible for providing all tools and specialized equipment required to perform the work. \n\nD.  SAFETY DEVICE TESTING\n1.  Contractor shall provide all labor, tools, and all testing equipment required to perform Semi-Annual Safety Device testing on three (3) Cleaver Brooks LE fire-tube boilers, and other plant equipment as identified in the VHA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition, or current edition. Testing shall be in accordance with the procedures outlined in VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition or the most current edition. Testing manual will be available upon request. \n\n2.  Contractor shall provide a detailed report including a picture of each device as installed on the system and all other information required by the VHA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition or current edition shall be scheduled with the Boiler Plant Supervisor.\n\n3.  Contractor will furnish all tools, parts, and specialized equipment to accomplish this.\n\n4.  Devices tested shall include, but not be limited to the list below as changes may be made to the VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition.\nHigh-steam pressure cut-out (recycle), High-steam pressure cut-out (non-recycle).  \nSteam safety valves (raise boiler pressure until valves lift and reset).\nCheck gas vent for leaks.\nHigh-gas fuel pressure cut-off. \nLow-gas fuel pressure cut-off. \nGas fuel safety shut off valves proof of closure. \nLeak test fuel oil safety shut off valves. \nCheck operation of Liquid Propane Gas pilot.  \nLow-pilot gas pressure cut-out. \nForced draft fan motor interlock.  \nForced draft fan damper wide open for purge. \nBoiler outlet damper wide open for purge.  \nPurge air flow interlock.  \nTiming for pre-purge. \nTiming for post-purge.  \nIgniter timing. \nLeak test gas fuel safety shut off valves. \nHigh-fuel oil temperature cut-off (heated fuel, N/A). \nLow-fuel oil temperature cut-off (heated fuel, N/A). \nLow-atomizing air pressure for fuel oil (HH) Low fire position interlock.  \nCombustion air interlocks.  \nMain flame out; i.e., time to close valves.  \nIgnition flame out; i.e., time to close valves. \nMinimum igniter flame test.  \nScanner not sensing ignition spark. \nLow-oxygen alarm and/or cut-out. \nPre-purge setting of flue gas recirculation damper.  \nInterlock of building outside air damper with burner control.\nHigh-fuel oil pressure cut-off.  \nLow fuel oil pressure cut-off.\nDA tank high- and low-level alarms.\nDA tank overflow device.\nDA tank high pressure alarm.\nDA tank safety valve.\nCondensate Receiver tank high- and low-level alarms.\nEconomizer safety valve.\n\nE.  BUILDING #70  BOILER MAINTENANCE, INSPECTION AND TUNE UP\n1. Contactor shall open the boilers water and firesides, for 2 HB Smith, 14 section, cast-iron, low-pressure boilers. \n2. Contractor shall prepare the boiler and its auxiliary devices for an internal inspection by a Contractor supplied ASME Board Certified Inspector.\n3. Contractor will perform all required safety device testing per the VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition.\n4. Upon completion of the inspection, if any repairs are required at that time, a written quote will be provided to the facility. No repairs will be made unless approved separately by the Contracting Officer.\n5. Once the boiler is inspected and/or repaired, the Contractor will put the boiler back together, fill with water, fire up the unit, and perform an operational and combustion test on oil and gas, making any adjustments needed for proper operation.\n6. Contractor will be responsible for any gaskets and seals that may be required to put boiler back together after inspection such as inspection port gaskets, low water cutout gaskets.\n7. Contractor is responsible to provide any specialized tools or equipment to perform the work.\n8. Contractor will provide a service report and all combustion printouts to the Contracting Officers Representative (COR) upon completion of work. \n9. Contractor will sign in/out at the Main Boiler Plant, Building #22, and will be escorted to the work site.\n10. No changes to this Statement of Work can be made without prior written approval of the Contacting Officer\n\nAttachments:\nVHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition\nVHA Directive 1810, Boiler and Boiler Plant Operations, January 4, 2023","text":"Page 2 of 2\n\nVA Bedford HCS\nSTATEMENT OF WORK\n\nBoiler Plant Burners, Controls, Instruments, and Data Management\nInspection, Safety Device Testing and Calibration\n\nGeneral Scope of Work\n1. Semi-Annual Calibrations of Boiler Plant Controls and Instrumentation\n2. Semi-Annual Combustion Testing of Boilers\n3. Semi-annual Safety Device Testing\n4. Semi-Annual Calibrations of Boiler Plant Controls and Instrumentation.\n\nA. OVERVIEW\n1. Contractor shall provide all labor, tools, testing equipment and supplies required for semi-annual calibrations of Boiler plant controls and instrumentation for three boilers located in Building #22, two boilers in Building #70, and other plant equipment.\n\n2. Contractor shall ensure all work is in accordance with the procedures outlined in VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition, or the most current edition.\n\n3. Contractor must have a laptop computer and required software to plug into and back-up all settings in the PCCIII controls and provide a back-up flash drive to Plant Supervisor.\n\n4. Contractor will not be accessing any sensitive VA Information Systems, these are boiler controls only. Control devices will include but are not limited to the following: Preferred Instruments, CB Hawk, Foxboro, Yokogawa, Siemens, and Johnson Controls.\n\n5. Contractor shall also supply to customer, calibration reports for each piece of equipment, indicating date, settings, pass/fail, technical data, and name of technician performing calibrations.\n\n6. Contractor will provide a list of line items that require parts/replacement and the costs required to repair/replace those items. Additional work beyond the scope of this contract, requires approval from the Contracting Officer. See attached list of controls and instrumentation to be calibrated.\n\nB. CALIBRATION\nThe following is a list of devices that will require calibration:\n\n1. Plant Master PCIII\nOutside air temp\nPlant steam flow\nDistribution steam flow\nPlant demand\nSteam header press Hi/Lo and alarms\nOil pressure transmitter and alarms\nPropane pilot gas transmitter and alarms\nMain gas pressure transmitter and alarms\nControl air pressure transmitter and alarms\nLow main gas pressure alarm\nHigh main gas pressure alarm\nExplosive gas and carbon monoxide detection system\n\n2. DA PCIII\nHigh oil header press alarm\nLow oil header press alarm\nDA steam PSI\nDA temp\nDA level\nHigh DA level alarm\nLow DA level alarm\nCond PCIII: Condensate tank level\nCondensate tank high level alarm\nCondensate tank low level alarm\nCondensate tank temp\nCondensate tank make-up valve\n\n3. Hawk Controllers Boilers, 1, 2, and 3\nPlant demand\nBoiler demand\nFiring rate\nSteam flow\nEconomizer flue temp-in\n\n4. #1 and #2 Draft PCIII\nOxygen transmitter\nDamper %\nOutlet temp\nJackshaft position\nEfficiency\n\n5. #1 and #2 Fuel Flow PCIII\nBoiler gas flow\nBoiler oil flow\nFlue gas temp monitorÂ calibration\nFlue gas temp High and Low temp alarms\n\n6. #1, #2, and #3 Feedwater Pump Variable Frequency Drive Units\n\nNote; there is a new DA Tank installed as of October 2024. Testing will reflect the new parameters required on the new system.\n\nC. SEMI-ANNUAL COMBUSTION TESTING OF BOILERS\n1. Contractor will provide all labor and materials required to perform burner calibration on three (3) Cleaver Brooks CB700LE boilers. Each burner assembly will be inspected and adjusted to manufacturer s settings. Each boiler will be calibrated on gas and oil firing twice a year, approximately 6 months apart, as scheduled by the Maintenance and Operations Supervisor.\n\n2. Contractor will provide burner calibration printouts for each pin on the gas and oil cams 20 on CB Hawk for all three boilers. Settings will be as close and safe as possible for max input for gas and oil firing at high fire as per the inputs listed on the boiler plate.\n\n3. Contractor will calibrate the burners and not exceed the requirements of this facilities permit for emissions. Contractor will perform a smoke test on boilers.\n\n4. Contractor is responsible for providing all tools and specialized equipment required to perform the work.\n\nD. SAFETY DEVICE TESTING\n1. Contractor shall provide all labor, tools, and all testing equipment required to perform Semi-Annual Safety Device testing on three (3) Cleaver Brooks LE fire-tube boilers, and other plant equipment as identified in the VHA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition, or current edition. Testing shall be in accordance with the procedures outlined in VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition or the most current edition. Testing manual will be available upon request.\n\n2. Contractor shall provide a detailed report including a picture of each device as installed on the system and all other information required by the VHA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition or current edition shall be scheduled with the Boiler Plant Supervisor.\n\n3. Contractor will furnish all tools, parts, and specialized equipment to accomplish this.\n\n4. Devices tested shall include, but not be limited to the list below as changes may be made to the VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition.\nHigh-steam pressure cut-out (recycle), High-steam pressure cut-out (non-recycle).\nSteam safety valves (raise boiler pressure until valves lift and reset).\nCheck gas vent for leaks.\nHigh-gas fuel pressure cut-off.\nLow-gas fuel pressure cut-off.\nGas fuel safety shut off valves proof of closure.\nLeak test fuel oil safety shut off valves.\nCheck operation of Liquid Propane Gas pilot.\nLow-pilot gas pressure cut-out.\nForced draft fan motor interlock.\nForced draft fan damper wide open for purge.\nBoiler outlet damper wide open for purge.\nPurge air flow interlock.\nTiming for pre-purge.\nTiming for post-purge.\nIgniter timing.\nLeak test gas fuel safety shut off valves.\nHigh-fuel oil temperature cut-off (heated fuel, N/A).\nLow-fuel oil temperature cut-off (heated fuel, N/A).\nLow-atomizing air pressure for fuel oil (HH) Low fire position interlock.\nCombustion air interlocks.\nMain flame out; i.e., time to close valves.\nIgnition flame out; i.e., time to close valves.\nMinimum igniter flame test.\nScanner not sensing ignition spark.\nLow-oxygen alarm and/or cut-out.\nPre-purge setting of flue gas recirculation damper.\nInterlock of building outside air damper with burner control.\nHigh-fuel oil pressure cut-off.\nLow fuel oil pressure cut-off.\nDA tank high- and low-level alarms.\nDA tank overflow device.\nDA tank high pressure alarm.\nDA tank safety valve.\nCondensate Receiver tank high- and low-level alarms.\nEconomizer safety valve.\n\nE. BUILDING #70 BOILER MAINTENANCE, INSPECTION AND TUNE UP\n1. Contactor shall open the boilers water and firesides, for 2 HB Smith, 14 section, cast-iron, low-pressure boilers.\n2. Contractor shall prepare the boiler and its auxiliary devices for an internal inspection by a Contractor supplied ASME Board Certified Inspector.\n3. Contractor will perform all required safety device testing per the VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition.\n4. Upon completion of the inspection, if any repairs are required at that time, a written quote will be provided to the facility. No repairs will be made unless approved separately by the Contracting Officer.\n5. Once the boiler is inspected and/or repaired, the Contractor will put the boiler back together, fill with water, fire up the unit, and perform an operational and combustion test on oil and gas, making any adjustments needed for proper operation.\n6. Contractor will be responsible for any gaskets and seals that may be required to put boiler back together after inspection such as inspection port gaskets, low water cutout gaskets.\n7. Contractor is responsible to provide any specialized tools or equipment to perform the work.\n8. Contractor will provide a service report and all combustion printouts to the Contracting Officers Representative (COR) upon completion of work.\n9. Contractor will sign in/out at the Main Boiler Plant, Building #22, and will be escorted to the work site.\n10. No changes to this Statement of Work can be made without prior written approval of the Contacting Officer\n\nAttachments:\nVHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition\nVHA Directive 1810, Boiler and Boiler Plant Operations, January 4, 2023","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C24125Q0469","place_of_performance":{"street":"Bedford VA Medical Center 200 Springs Rd","street2":"Bedford, MA 01730"},"product_service_code":"J045"}],"due_at":"2025-05-16T20:00:00Z","due_date":"2025-05-16","closes_at":"2025-05-16T20:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","state":"MA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":"sam_street","state_evidence":"BEDFORD VA MEDICAL CENTER 200 SPRINGS RD BEDFORD, MA 01730","site_key":"bedford-va-medical-center-ma","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-15T09:55:06.689350Z","principal_notice_id":"b3dbb8cfe4394368b3685ba65d88799d","description":{"text":"Page 2 of 2\n\nVA Bedford HCS\nSTATEMENT OF WORK\n\nBoiler Plant Burners, Controls, Instruments, and Data Management\nInspection, Safety Device Testing and Calibration\n\nGeneral Scope of Work\n1. Semi-Annual Calibrations of Boiler Plant Controls and Instrumentation\n2. Semi-Annual Combustion Testing of Boilers\n3. Semi-annual Safety Device Testing\n4. Semi-Annual Calibrations of Boiler Plant Controls and Instrumentation.\n\nA. OVERVIEW\n1. Contractor shall provide all labor, tools, testing equipment and supplies required for semi-annual calibrations of Boiler plant controls and instrumentation for three boilers located in Building #22, two boilers in Building #70, and other plant equipment.\n\n2. Contractor shall ensure all work is in accordance with the procedures outlined in VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition, or the most current edition.\n\n3. Contractor must have a laptop computer and required software to plug into and back-up all settings in the PCCIII controls and provide a back-up flash drive to Plant Supervisor.\n\n4. Contractor will not be accessing any sensitive VA Information Systems, these are boiler controls only. Control devices will include but are not limited to the following: Preferred Instruments, CB Hawk, Foxboro, Yokogawa, Siemens, and Johnson Controls.\n\n5. Contractor shall also supply to customer, calibration reports for each piece of equipment, indicating date, settings, pass/fail, technical data, and name of technician performing calibrations.\n\n6. Contractor will provide a list of line items that require parts/replacement and the costs required to repair/replace those items. Additional work beyond the scope of this contract, requires approval from the Contracting Officer. See attached list of controls and instrumentation to be calibrated.\n\nB. CALIBRATION\nThe following is a list of devices that will require calibration:\n\n1. Plant Master PCIII\nOutside air temp\nPlant steam flow\nDistribution steam flow\nPlant demand\nSteam header press Hi/Lo and alarms\nOil pressure transmitter and alarms\nPropane pilot gas transmitter and alarms\nMain gas pressure transmitter and alarms\nControl air pressure transmitter and alarms\nLow main gas pressure alarm\nHigh main gas pressure alarm\nExplosive gas and carbon monoxide detection system\n\n2. DA PCIII\nHigh oil header press alarm\nLow oil header press alarm\nDA steam PSI\nDA temp\nDA level\nHigh DA level alarm\nLow DA level alarm\nCond PCIII: Condensate tank level\nCondensate tank high level alarm\nCondensate tank low level alarm\nCondensate tank temp\nCondensate tank make-up valve\n\n3. Hawk Controllers Boilers, 1, 2, and 3\nPlant demand\nBoiler demand\nFiring rate\nSteam flow\nEconomizer flue temp-in\n\n4. #1 and #2 Draft PCIII\nOxygen transmitter\nDamper %\nOutlet temp\nJackshaft position\nEfficiency\n\n5. #1 and #2 Fuel Flow PCIII\nBoiler gas flow\nBoiler oil flow\nFlue gas temp monitorÂ calibration\nFlue gas temp High and Low temp alarms\n\n6. #1, #2, and #3 Feedwater Pump Variable Frequency Drive Units\n\nNote; there is a new DA Tank installed as of October 2024. Testing will reflect the new parameters required on the new system.\n\nC. SEMI-ANNUAL COMBUSTION TESTING OF BOILERS\n1. Contractor will provide all labor and materials required to perform burner calibration on three (3) Cleaver Brooks CB700LE boilers. Each burner assembly will be inspected and adjusted to manufacturer s settings. Each boiler will be calibrated on gas and oil firing twice a year, approximately 6 months apart, as scheduled by the Maintenance and Operations Supervisor.\n\n2. Contractor will provide burner calibration printouts for each pin on the gas and oil cams 20 on CB Hawk for all three boilers. Settings will be as close and safe as possible for max input for gas and oil firing at high fire as per the inputs listed on the boiler plate.\n\n3. Contractor will calibrate the burners and not exceed the requirements of this facilities permit for emissions. Contractor will perform a smoke test on boilers.\n\n4. Contractor is responsible for providing all tools and specialized equipment required to perform the work.\n\nD. SAFETY DEVICE TESTING\n1. Contractor shall provide all labor, tools, and all testing equipment required to perform Semi-Annual Safety Device testing on three (3) Cleaver Brooks LE fire-tube boilers, and other plant equipment as identified in the VHA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition, or current edition. Testing shall be in accordance with the procedures outlined in VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition or the most current edition. Testing manual will be available upon request.\n\n2. Contractor shall provide a detailed report including a picture of each device as installed on the system and all other information required by the VHA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition or current edition shall be scheduled with the Boiler Plant Supervisor.\n\n3. Contractor will furnish all tools, parts, and specialized equipment to accomplish this.\n\n4. Devices tested shall include, but not be limited to the list below as changes may be made to the VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition.\nHigh-steam pressure cut-out (recycle), High-steam pressure cut-out (non-recycle).\nSteam safety valves (raise boiler pressure until valves lift and reset).\nCheck gas vent for leaks.\nHigh-gas fuel pressure cut-off.\nLow-gas fuel pressure cut-off.\nGas fuel safety shut off valves proof of closure.\nLeak test fuel oil safety shut off valves.\nCheck operation of Liquid Propane Gas pilot.\nLow-pilot gas pressure cut-out.\nForced draft fan motor interlock.\nForced draft fan damper wide open for purge.\nBoiler outlet damper wide open for purge.\nPurge air flow interlock.\nTiming for pre-purge.\nTiming for post-purge.\nIgniter timing.\nLeak test gas fuel safety shut off valves.\nHigh-fuel oil temperature cut-off (heated fuel, N/A).\nLow-fuel oil temperature cut-off (heated fuel, N/A).\nLow-atomizing air pressure for fuel oil (HH) Low fire position interlock.\nCombustion air interlocks.\nMain flame out; i.e., time to close valves.\nIgnition flame out; i.e., time to close valves.\nMinimum igniter flame test.\nScanner not sensing ignition spark.\nLow-oxygen alarm and/or cut-out.\nPre-purge setting of flue gas recirculation damper.\nInterlock of building outside air damper with burner control.\nHigh-fuel oil pressure cut-off.\nLow fuel oil pressure cut-off.\nDA tank high- and low-level alarms.\nDA tank overflow device.\nDA tank high pressure alarm.\nDA tank safety valve.\nCondensate Receiver tank high- and low-level alarms.\nEconomizer safety valve.\n\nE. BUILDING #70 BOILER MAINTENANCE, INSPECTION AND TUNE UP\n1. Contactor shall open the boilers water and firesides, for 2 HB Smith, 14 section, cast-iron, low-pressure boilers.\n2. Contractor shall prepare the boiler and its auxiliary devices for an internal inspection by a Contractor supplied ASME Board Certified Inspector.\n3. Contractor will perform all required safety device testing per the VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition.\n4. Upon completion of the inspection, if any repairs are required at that time, a written quote will be provided to the facility. No repairs will be made unless approved separately by the Contracting Officer.\n5. Once the boiler is inspected and/or repaired, the Contractor will put the boiler back together, fill with water, fire up the unit, and perform an operational and combustion test on oil and gas, making any adjustments needed for proper operation.\n6. Contractor will be responsible for any gaskets and seals that may be required to put boiler back together after inspection such as inspection port gaskets, low water cutout gaskets.\n7. Contractor is responsible to provide any specialized tools or equipment to perform the work.\n8. Contractor will provide a service report and all combustion printouts to the Contracting Officers Representative (COR) upon completion of work.\n9. Contractor will sign in/out at the Main Boiler Plant, Building #22, and will be escorted to the work site.\n10. No changes to this Statement of Work can be made without prior written approval of the Contacting Officer\n\nAttachments:\nVHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition\nVHA Directive 1810, Boiler and Boiler Plant Operations, January 4, 2023","html":"Page 2 of 2\n\nVA Bedford HCS\nSTATEMENT OF WORK\n\nBoiler Plant Burners, Controls, Instruments, and Data Management\nInspection, Safety Device Testing and Calibration\n\nGeneral Scope of Work\n1.  Semi-Annual Calibrations of Boiler Plant Controls and Instrumentation \n2.  Semi-Annual Combustion Testing of Boilers \n3.  Semi-annual Safety Device Testing\n4.  Semi-Annual Calibrations of Boiler Plant Controls and Instrumentation.\n\nA.  OVERVIEW\n1.  Contractor shall provide all labor, tools, testing equipment and supplies required for semi-annual calibrations of Boiler plant controls and instrumentation for three boilers located in Building #22, two boilers in Building #70, and other plant equipment. \n\n2.  Contractor shall ensure all work is in accordance with the procedures outlined in VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition, or the most current edition.\n\n3.  Contractor must have a laptop computer and required software to plug into and back-up all settings in the PCCIII controls and provide a back-up flash drive to Plant Supervisor. \n\n4.  Contractor will not be accessing any sensitive VA Information Systems, these are boiler controls only. Control devices will include but are not limited to the following: Preferred Instruments, CB Hawk, Foxboro, Yokogawa, Siemens, and Johnson Controls. \n\n5.  Contractor shall also supply to customer, calibration reports for each piece of equipment, indicating date, settings, pass/fail, technical data, and name of technician performing calibrations. \n\n6.  Contractor will provide a list of line items that require parts/replacement and the costs required to repair/replace those items. Additional work beyond the scope of this contract, requires approval from the Contracting Officer. See attached list of controls and instrumentation to be calibrated. \n\nB.  CALIBRATION\nThe following is a list of devices that will require calibration:\n\n1.  Plant Master PCIII\nOutside air temp\nPlant steam flow\nDistribution steam flow \nPlant demand\nSteam header press Hi/Lo and alarms\nOil pressure transmitter and alarms\nPropane pilot gas transmitter and alarms\nMain gas pressure transmitter and alarms\nControl air pressure transmitter and alarms\nLow main gas pressure alarm \nHigh main gas pressure alarm\nExplosive gas and carbon monoxide detection system\n\n\n2.  DA PCIII\nHigh oil header press alarm\nLow oil header press alarm\nDA steam PSI\nDA temp\nDA level \nHigh DA level alarm\nLow DA level alarm\nCond PCIII: Condensate tank level\nCondensate tank high level alarm\nCondensate tank low level alarm\nCondensate tank temp\nCondensate tank make-up valve\n\n3.  Hawk Controllers   Boilers, 1, 2, and 3\nPlant demand\nBoiler demand\nFiring rate\nSteam flow\nEconomizer flue temp-in\n\n4.  #1 and #2 Draft PCIII \nOxygen transmitter\nDamper %\nOutlet temp\nJackshaft position\nEfficiency\n\n5.  #1 and #2 Fuel Flow PCIII \nBoiler gas flow\nBoiler oil flow\nFlue gas temp monitorÂ calibration\nFlue gas temp High and Low temp alarms\n\n6.  #1, #2, and #3 Feedwater Pump Variable Frequency Drive Units\n\nNote; there is a new DA Tank installed as of October 2024. Testing will reflect the new parameters required on the new system. \n\nC.  SEMI-ANNUAL COMBUSTION TESTING OF BOILERS\n1.  Contractor will provide all labor and materials required to perform burner calibration on three (3) Cleaver Brooks CB700LE boilers. Each burner assembly will be inspected and adjusted to manufacturer s settings. Each boiler will be calibrated on gas and oil firing twice a year, approximately 6 months apart, as scheduled by the Maintenance and Operations Supervisor.   \n\n2.  Contractor will provide burner calibration printouts for each pin on the gas and oil cams 20 on CB Hawk for all three boilers. Settings will be as close and safe as possible for max input for gas and oil firing at high fire as per the inputs listed on the boiler plate. \n\n3. Contractor will calibrate the burners and not exceed the requirements of this facilities permit for emissions. Contractor will perform a smoke test on boilers. \n\n4. Contractor is responsible for providing all tools and specialized equipment required to perform the work. \n\nD.  SAFETY DEVICE TESTING\n1.  Contractor shall provide all labor, tools, and all testing equipment required to perform Semi-Annual Safety Device testing on three (3) Cleaver Brooks LE fire-tube boilers, and other plant equipment as identified in the VHA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition, or current edition. Testing shall be in accordance with the procedures outlined in VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition or the most current edition. Testing manual will be available upon request. \n\n2.  Contractor shall provide a detailed report including a picture of each device as installed on the system and all other information required by the VHA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition or current edition shall be scheduled with the Boiler Plant Supervisor.\n\n3.  Contractor will furnish all tools, parts, and specialized equipment to accomplish this.\n\n4.  Devices tested shall include, but not be limited to the list below as changes may be made to the VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition.\nHigh-steam pressure cut-out (recycle), High-steam pressure cut-out (non-recycle).  \nSteam safety valves (raise boiler pressure until valves lift and reset).\nCheck gas vent for leaks.\nHigh-gas fuel pressure cut-off. \nLow-gas fuel pressure cut-off. \nGas fuel safety shut off valves proof of closure. \nLeak test fuel oil safety shut off valves. \nCheck operation of Liquid Propane Gas pilot.  \nLow-pilot gas pressure cut-out. \nForced draft fan motor interlock.  \nForced draft fan damper wide open for purge. \nBoiler outlet damper wide open for purge.  \nPurge air flow interlock.  \nTiming for pre-purge. \nTiming for post-purge.  \nIgniter timing. \nLeak test gas fuel safety shut off valves. \nHigh-fuel oil temperature cut-off (heated fuel, N/A). \nLow-fuel oil temperature cut-off (heated fuel, N/A). \nLow-atomizing air pressure for fuel oil (HH) Low fire position interlock.  \nCombustion air interlocks.  \nMain flame out; i.e., time to close valves.  \nIgnition flame out; i.e., time to close valves. \nMinimum igniter flame test.  \nScanner not sensing ignition spark. \nLow-oxygen alarm and/or cut-out. \nPre-purge setting of flue gas recirculation damper.  \nInterlock of building outside air damper with burner control.\nHigh-fuel oil pressure cut-off.  \nLow fuel oil pressure cut-off.\nDA tank high- and low-level alarms.\nDA tank overflow device.\nDA tank high pressure alarm.\nDA tank safety valve.\nCondensate Receiver tank high- and low-level alarms.\nEconomizer safety valve.\n\nE.  BUILDING #70  BOILER MAINTENANCE, INSPECTION AND TUNE UP\n1. Contactor shall open the boilers water and firesides, for 2 HB Smith, 14 section, cast-iron, low-pressure boilers. \n2. Contractor shall prepare the boiler and its auxiliary devices for an internal inspection by a Contractor supplied ASME Board Certified Inspector.\n3. Contractor will perform all required safety device testing per the VHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition.\n4. Upon completion of the inspection, if any repairs are required at that time, a written quote will be provided to the facility. No repairs will be made unless approved separately by the Contracting Officer.\n5. Once the boiler is inspected and/or repaired, the Contractor will put the boiler back together, fill with water, fire up the unit, and perform an operational and combustion test on oil and gas, making any adjustments needed for proper operation.\n6. Contractor will be responsible for any gaskets and seals that may be required to put boiler back together after inspection such as inspection port gaskets, low water cutout gaskets.\n7. Contractor is responsible to provide any specialized tools or equipment to perform the work.\n8. Contractor will provide a service report and all combustion printouts to the Contracting Officers Representative (COR) upon completion of work. \n9. Contractor will sign in/out at the Main Boiler Plant, Building #22, and will be escorted to the work site.\n10. No changes to this Statement of Work can be made without prior written approval of the Contacting Officer\n\nAttachments:\nVHA Boiler and Associated Plant Safety Device Testing Manual Eighth Edition\nVHA Directive 1810, Boiler and Boiler Plant Operations, January 4, 2023","origin":"detail"},"contacts":[{"name":"Carissa Sarazin","role":"primary","email":"carissa.sarazin@va.gov","phone":"401-273-7100","title":"Contract Specialist"}],"place_of_performance":{"street":"Bedford VA Medical Center 200 Springs Rd","street2":"Bedford, MA 01730"},"office_address":{"zip":"04330","city":"TOGUS","state":"ME","country":"USA"},"naics_codes":["238220"],"award":{"awardee":{}},"attachments":[{"resource_id":"698bf6474c3549e4a64b315bec326fcf","name":"36C24125Q0469.docx","kind":"file","mime_type":".docx","size_bytes":20837,"posted_at":"2025-05-09T20:29:55.844Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/698bf6474c3549e4a64b315bec326fcf/download","mirrored":false}],"awards":[],"related":[{"key":"36C24127Q0084","latest_notice_id":"939b8f3021be4a75ae5972b0c7ffb9ae","title":"X1EA--CWM VA Police Use of shooting range.","solicitation_number":"36C24127Q0084","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-27T15:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"611699","psc":"X1EA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C24127Q0017","latest_notice_id":"d60676ea33af4051b90a1953ab55743e","title":"S201--36C24127Q0017 Windows Washing Service Amendment 0002","solicitation_number":"36C24127Q0017","notice_type":"k","first_type":"k","first_posted":"2026-10-26","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"561720","psc":"S201","set_aside":"SDVOSBC","state":"MA","county":"25017","county_name":"Middlesex County","city":"2501704615","city_name":"Bedford","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C24127Q0044","latest_notice_id":"a2f2fe28c1ec4687b2a2955cf947935e","title":"9140--Togus Fuel Oil and Diesel Delivery","solicitation_number":"36C24127Q0044","notice_type":"k","first_type":"k","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"324110","psc":"9140","set_aside":"SBA","state":"ME","county":"23011","county_name":"Kennebec County","city":"2302100","city_name":"Augusta","country":"USA","place_scope":"nationwide","state_source":"sam_zip","state_evidence":"04330","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C24127Q0076","latest_notice_id":"bb30bc78067840a082b5d9e12eceddd2","title":"Q601--Sources sought Boston Medical Coding Period of Period 01/01/2027-04/01/2027","solicitation_number":"36C24127Q0076","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"541219","psc":"Q601","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24127Q0030","latest_notice_id":"10c3d2d3d0c543179707f8cc9448f701","title":"J061--Eaton Powerware System Replacement","solicitation_number":"36C24127Q0030","notice_type":"k","first_type":"k","first_posted":"2026-11-04","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"811310","psc":"J061","set_aside":"SDVOSBC","state":"NH","county":"33011","county_name":"Hillsborough County","city":"3345140","city_name":"Manchester","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"W911PT27QA020","latest_notice_id":"084d5efc5ec44a9885a37b90e6705ffa","title":"REMOVE AND REPAIR TWO HIGH VELOCITY AIR HANDLING UNITS","solicitation_number":"W911PT27QA020","notice_type":"k","first_type":"k","first_posted":"2026-11-05","last_posted":"2026-11-05","notices":1,"due_at":"2026-11-25T18:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911PT","office_name":"W6QK ACC WVA","naics":"238220","psc":"Z2NB","set_aside":"SBA","state":"NY","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"description","state_evidence":"IGH VELOCITY AIR HANDLING UNITSPROJECT LOCATION: WATERVLIET ARSENAL","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"},{"key":"2031ZA27B00001","latest_notice_id":"622efd27a6cf48589063c08d3700b96b","title":"Modernize Regenerative Thermal Oxidizer (RTO)","solicitation_number":"2031ZA27B00001","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-25T21:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-020","dept_name":"TREASURY, DEPARTMENT OF THE","sub_key":"s-2041","sub_name":"BUREAU OF ENGRAVING AND PRINTING","office_key":"o-2031ZA","office_name":"OFFICE OF THE CHIEF PROCUREMENT OFFICER","naics":"238220","psc":"Z2AZ","set_aside":null,"state":"TX","county":"48439","county_name":"Tarrant County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"140PP027B0004","latest_notice_id":"53398cb59b8f4b0687efd4e3fa6241dc","title":"Z--13976 PUHO FIRE PROTECTION AT DORM","solicitation_number":"140PP027B0004","notice_type":"r","first_type":"s","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":2,"due_at":"2026-11-26T03:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-26T03:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140PP0","office_name":"NATIONAL PARK SERVICE CONTRACTING ACTIVITY","naics":"238220","psc":"Z2AA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open_total":59,"indexable":false}