# VISN 1 Critical Utility Management Plans

Canonical: https://sealedbidder.com/opportunities/36c24125q0342

- Solicitation number: 36C24125Q0342
- Notice type: Solicitation
- Status: Closed. Deadline was April 29, 2025 at 5:00 PM EDT
- Department: Department of Veterans Affairs
- Contracting office: 241-Network Contract Office 01 (36C241)
- NAICS: 541330 Engineering Services
- Product or service code: C219 Other Architect and Engineering Services
- Set-aside: Veteran-owned small business set-aside
- Small business size standard: $25.5 million in average annual receipts (13 CFR 121.201, NAICS 541330)
- Who can bid, by location: Location not published. The notice publishes no state, city or site; its documents may.
- First posted: April 2, 2025
- Last posted: April 22, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/9b7e4658d2b04573aa4833345e916caa/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: Veteran-owned small business set-aside. Reserved for veteran-owned small businesses under the VA Vets First program. Small, under NAICS 541330 (engineering services), means no more than $25.5 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 27 days from the day the solicitation was posted, April 2, 2025, to the deadline. The deadline moved once: it was first April 22, 2025 and ended as April 29, 2025.

## Description

Amendment Number 0001
Questions and Answers
Please provide any existingÂ historicalÂ inventory per building, per asset with age and condition. Document is attached.
Attachment A: Site Information provides Total Sq. Ft. for each Site. To better price the Statement of Work square footage and type of building are required. Please provide a list of buildings per Site, including square footage per building and type of building per Site (i.e. Medical office building, Wearhouse, Medical Facility, maintenance building, parking structure, etc.). Document is attached.
Plan Format section C requires  Inventory of major equipment associated with these utilities.  Is it correct to assume major equipment is defined as having a replacement value greater than $5,000? Major equipment refers to any distribution.
Critical inventory will be at the  system  level, not  component  or  part  level (i.e., AHU included, but fan excluded) Correct.
Critical inventory excludes piping, ductwork, and other distribution lines or component parts (i.e., valves, pipes, etc.) Correct.
Inventory excludes access to confined spaces, crawlspaces, and other limited access spaces. Correct.
Requirements for hardcopies have previously been removed to reduce paper. Will the Deliverables requirement for two (2) bound printed copies be removed, or please confirm  two (2) bound copies  are required per site, totaling 22 hardcopies. 2 hard copies required.
The Deliverables require a  CD  for each site. Please advise if  one (1) CDÂ copy  is required per site or if a downloadable copy is acceptable. CD is required.
The Plan Format requires site drawings for each utility showing routes and connection points to buildings is requested.Â  Does this indicate that we should be doing site locates and site surveys of the exterior utilities for the buildings as well? Plan is for basic distribution to show.
To what level of detail should the site drawing be developed to.Â  Should this only include interbuilding service connections overlayed on existing PDF campus maps or full CADD drawings? Plans will be CAD but existing GIS maps, where available, will be provided.
Please confirm, no drawings are required for systems interior to the buildings, correct? Correct.
Do drawings or reports need to be stamped by a professional engineer? No.
BACKGROUND refers to  items  while Plan Format section C requires an inventory of  major equipment.  It is understood that Plan Format Section C clarifies and supersedes the Background section, and all references to  item(s)  are in reference to  major equipment , correct? Correct.
BACKGROUND refers to a  (2022-23) Lock Out Tag Out (LOTO) inventory  for each site. To allow for accurate pricing, will the inventory be provided for review prior to bid? No.
Site drawings are referenced. It is understood this is limited to single-line diagrams overlaid on existing site maps, not signed drawings. Is this correct? Correct.
Critical equipment includes equipment that services  patient care areas  that remain operational during emergencies (natural disasters, etc.), such as emergency rooms, ICUs, and in-patient care. Critical equipment excludes equipment servicing non-critical facilities that close during emergencies, such as lobbies, out-patient clinics, cafeterias, kitchens, parking structures, etc. Is this correct? Correct.
Please provide all relevant information VHA Directives. Attached.
Management Plans limited to general, industry best practices per utility element and not specific to individual units by make and model, correct? Intent is for plans to include procedures for individual units.
Contingency plan is limited to a single contingency per utility element, not multiple failures, correct?  Contingency plans should be provided for each critical utility for each affected building.
Full inventory for each site limited to critical, major equipment servicing critical facilities, not all building equipment, correct? Correct.
Attachment A: Site Information provides general information for each of the 11 sites. This information is not enough to provide accurate, efficient pricing. Please provide a detailed list defining all buildings per site, including square footage, building use, number of floors, year of construction, and year of most recent major renovations. See attached.
Site Information - Please provide the following per site: 1) most up-to-date inventory, 2) site maps, 3) emergency plans, 4) preventive maintenance plans. Inventory will be provided upon award. Emergency plans and PM plans do not exist yet for sites.
Evaluation Factors, 3. Technical, subpart b. states  Contractor shall demonstrate that their technicians meet the qualification standards stated in the Performance Work Statement.  No qualification standards are provided in the RFQ. Is a minimum of an engineering degree with five years of experience be a minimum qualification standard? Yes, a minimum of an engineering degree with five years of experience is a minimum qualification.
Evaluation Factors, 3. Technical, subpart c. states  Contractor shall provide all current and relevant or license(s) to include manufacture training certificateÂ etc.   Licenses are not required. However, a minimum of an engineering degree with five years of experience is a minimum qualification.

## Attachments

- [36C24125Q0342.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5131844cb76541d19544723520a5d993/download)
- [36C24125Q0342_1.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/77375d15a5d44177ada7119edf316c3e/download)
- [LOS certification.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/be09b4ac89cc448c91c89262376f3cf5/download)
- [Past Performance Worksheet.xlsx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/309e47f5483f4cedbb81bb123300ecd2/download)
- [WD 2015-4019 Manchester Rev29.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e8a911d37c714cf4a5da2807fd27aaa8/download)
- [WD 2015-4047 Boston Bedford Rev29.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/97fe2fc6a92945e9b5a742c87ac159c0/download)
- [WD 2015-4053 Brockton Rev30.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/52cda0e6f33e42219221284526f33aa4/download)
- [WD 2015-4083 Providence Rev29.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6792da99c411402aaa671e453cdd0433/download)
- [WD 2015-4095 NorthHampton Rev30.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/25a4b4706a8240429536d880c546f7f6/download)
- [WD 2015-4009 Togus Rev29.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9bcd6d30dc06405dad65a179189bf7f5/download)
- [WD 2015-4119 Newington Rev30.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/973c7939664c40f395948c6c7261599a/download)
- [WD 2015-4127 WHaven Rev30.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7e7605a6a49243bdb4d3cf3a073e2775/download)
- [WD 2015-4139 WhiteRiver Rev29.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f498a1fe0e714fb5a7492a338ca899e0/download)
- [36C24125Q0342 0001.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ac4ebcdded2b48c9b551dc7952b9a9c7/download)
- [Buildings Full Detailed Report Rl. Dt. 04_08_2023 4_17_2025 12_16_33 PM.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2de580cc7a1e4b49926ef055e35a4719/download)
- [1811_D_2023-04-10.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0a37ee63d0d84e0ab70aa34c3c5ca51f/download)
- [Bedford Strategic Site Plan.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1cecb3c9377947fbaf07d229d38adddf/download)
- [Boston-Jamaica Plain Strategic Site Plan.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/942b3d48aad045ac969fad9255f7d7a4/download)
- [Brockton Strategic Site Plan.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c663f52e385b42a9bc48cd2a08ef2bc2/download)
- [Manchester Strategic Site Plan.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9d40dd82188b44488a250cf39ab21390/download)
- [Newington Strategic Site Plan.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/52da533ddc7c459a937e9ddc0eb19f21/download)
- [Northampton Strategic Site Plan.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4b8c976b69e14521ae8dac28842fa667/download)
- [Providence Strategic Site Plan.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7ddff70c73ad4f2498fb0d558421c5a2/download)
- [Togus Strategic Site Plan.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ff8d294d19014c12865b5a9af1e75e90/download)
- [West Haven Strategic Site Plan.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a9ca99187a044b8fadafd7d0659d9281/download)
- [West Roxbury Strategic Site Plan.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f400e25714ea47edbe0d5e9e0f0c8ced/download)
- [White River Junction Strategic Site Plan.xls](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/444778b3e5a845a6b2a6ba03d2401bf9/download)

## Open now in the same industry

98 open in NAICS 541330.

- SEAPORT_NMRIL_FMS_LAB_SPPT_1 (SEAPORT_NMRIL_FMS_LAB_SPPT_REV1), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/seaportnmrilfmslabspptrev1
- TSC A-E IDIQ MATOC and Construction Management Services (140RR027Q0030), due November 30, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/140rr027q0030
- Keyport Infrastructure Security Support Services (KISSS) (N0025326R0001), due November 30, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/n0025326r0001

## Publications

- April 2, 2025: Solicitation, due April 22, 2025 at 5:00 PM EDT. Notice 898abfcb395f48da9bfef2e3145c544b. https://sam.gov/workspace/contract/opp/898abfcb395f48da9bfef2e3145c544b/view
- April 2, 2025: Presolicitation, due April 22, 2025 at 5:00 PM EDT. Notice a91c963bca684c0fa796288e13027c06. https://sam.gov/workspace/contract/opp/a91c963bca684c0fa796288e13027c06/view
- April 22, 2025: Solicitation, due April 29, 2025 at 5:00 PM EDT. Notice 9b7e4658d2b04573aa4833345e916caa. https://sam.gov/workspace/contract/opp/9b7e4658d2b04573aa4833345e916caa/view

## Points of contact

- Rosangela Pereira, Contract Specialist, rosangela.pereira@va.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/36c24125q0342.
