{"canonical":"https://sealedbidder.com/opportunities/36c24125q0342","key":"36C24125Q0342","url":"https://sealedbidder.com/opportunities/36c24125q0342","title":"C219--VISN 1 Critical Utility Management Plans","solicitation_number":"36C24125Q0342","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-04-29T21:00:00Z","first_posted":"2025-04-02","last_posted":"2025-04-22","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"541330","psc":"C219","set_aside":"VSA","place_state":null,"place_scope":"unknown","site":null,"place_state_source":null,"place_evidence":null,"place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"898abfcb395f48da9bfef2e3145c544b","title":"C219--VISN 1 Critical Utility Management Plans","solicitation_number":"36C24125Q0342","notice_type":"o","base_type":"p","posted":"2025-04-02","posted_at":"2025-04-02T21:54:48.747Z","due_at":"2025-04-22T21:00:00Z","due_date":"2025-04-22","cancelled":false,"archived":true,"archive_date":"2025-06-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/898abfcb395f48da9bfef2e3145c544b/view","enriched":true,"history":[{"index":6,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T19:05:14.696Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a91c963bca684c0fa796288e13027c06","solicitation_number":"36C24125Q0342"},{"index":4,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-22T17:11:07.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9b7e4658d2b04573aa4833345e916caa","solicitation_number":"36C24125Q0342","parent_opportunity_id":"898abfcb395f48da9bfef2e3145c544b"},{"index":2,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T21:54:48.747Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"898abfcb395f48da9bfef2e3145c544b","solicitation_number":"36C24125Q0342","related_opportunity_id":"a91c963bca684c0fa796288e13027c06"}]},{"notice_id":"a91c963bca684c0fa796288e13027c06","title":"C219--VISN 1 Critical Utility Management Plans","solicitation_number":"36C24125Q0342","notice_type":"p","base_type":"p","posted":"2025-04-02","posted_at":"2025-04-02T19:05:14.696Z","due_at":"2025-04-22T21:00:00Z","due_date":"2025-04-22","cancelled":false,"archived":true,"archive_date":"2025-06-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a91c963bca684c0fa796288e13027c06/view","enriched":true,"history":[{"index":4,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T19:05:14.696Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a91c963bca684c0fa796288e13027c06","solicitation_number":"36C24125Q0342"},{"index":2,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T21:54:48.747Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"898abfcb395f48da9bfef2e3145c544b","solicitation_number":"36C24125Q0342","related_opportunity_id":"a91c963bca684c0fa796288e13027c06"}]},{"notice_id":"9b7e4658d2b04573aa4833345e916caa","title":"C219--VISN 1 Critical Utility Management Plans","solicitation_number":"36C24125Q0342","notice_type":"o","base_type":"o","posted":"2025-04-22","posted_at":"2025-04-22T17:11:07.239Z","due_at":"2025-04-29T21:00:00Z","due_date":"2025-04-29","cancelled":false,"archived":true,"archive_date":"2025-05-29","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9b7e4658d2b04573aa4833345e916caa/view","enriched":true,"history":[{"index":3,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-22T17:11:07.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9b7e4658d2b04573aa4833345e916caa","solicitation_number":"36C24125Q0342","parent_opportunity_id":"898abfcb395f48da9bfef2e3145c544b"},{"index":1,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T21:54:48.747Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"898abfcb395f48da9bfef2e3145c544b","solicitation_number":"36C24125Q0342","related_opportunity_id":"a91c963bca684c0fa796288e13027c06"}]}],"latest_notice_id":"9b7e4658d2b04573aa4833345e916caa","first_type":"o","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-04-02","posted_at":"2025-04-02T21:54:48.747Z","created_at":"2025-04-02T21:54:06.642Z","modified_at":"2025-05-30T04:00:09.700Z","response_deadline":{"raw":"2025-04-22T17:00:00-04:00","utc":"2025-04-22T21:00:00Z","date":"2025-04-22","time":"17:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/898abfcb395f48da9bfef2e3145c544b/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"C219--VISN 1 Critical Utility Management Plans","agency":{"office":{"code":"36C241","name":"241-NETWORK CONTRACT OFFICE 01 (36C241)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"04330","city":"TOGUS","state":"ME","country":"USA"},"organization_id":"100176746","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-06-21","archive_type":"auto_custom"},"history":[{"index":6,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T19:05:14.696Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a91c963bca684c0fa796288e13027c06","solicitation_number":"36C24125Q0342"},{"index":4,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-22T17:11:07.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9b7e4658d2b04573aa4833345e916caa","solicitation_number":"36C24125Q0342","parent_opportunity_id":"898abfcb395f48da9bfef2e3145c544b"},{"index":2,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T21:54:48.747Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"898abfcb395f48da9bfef2e3145c544b","solicitation_number":"36C24125Q0342","related_opportunity_id":"a91c963bca684c0fa796288e13027c06"}],"contacts":[{"name":"Rosangela Pereira","role":"primary","email":"rosangela.pereira@va.gov","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"898abfcb395f48da9bfef2e3145c544b","lineage_id":"898abfcb395f48da9bfef2e3145c544b","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-19T07:43:49.022804904Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"3f29020464587546c8b261728bc70012ff499871db19def090da3598e00cf17e","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-19T07:43:49.022804904Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"VISN 1 Critical Utility Management Plan","text":"VISN 1 Critical Utility Management Plan","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24125Q0342","product_service_code":"C219"},{"award":{"awardee":{}},"dates":{"posted":"2025-04-02","posted_at":"2025-04-02T19:05:14.696Z","created_at":"2025-04-02T19:05:12.507Z","modified_at":"2025-06-21T04:04:33.376Z","response_deadline":{"raw":"2025-04-22T17:00:00-04:00","utc":"2025-04-22T21:00:00Z","date":"2025-04-22","time":"17:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a91c963bca684c0fa796288e13027c06/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"C219--VISN 1 Critical Utility Management Plans","agency":{"office":{"code":"36C241","name":"241-NETWORK CONTRACT OFFICE 01 (36C241)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"04330","city":"TOGUS","state":"ME","country":"USA"},"organization_id":"100176746","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-06-21","archive_type":"auto_custom"},"history":[{"index":4,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T19:05:14.696Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"a91c963bca684c0fa796288e13027c06","solicitation_number":"36C24125Q0342"},{"index":2,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T21:54:48.747Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"898abfcb395f48da9bfef2e3145c544b","solicitation_number":"36C24125Q0342","related_opportunity_id":"a91c963bca684c0fa796288e13027c06"}],"contacts":[{"name":"Rosangela Pereira","role":"primary","email":"Rosangela.Pereira@va.gov","phone":"401-273-7100","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"a91c963bca684c0fa796288e13027c06","set_aside":{"code":"VSA","label":"Veteran-Owned Small Business Set-Aside (Department of Veterans Affairs)"},"lineage_id":"898abfcb395f48da9bfef2e3145c544b","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-19T07:57:44.449600316Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"70f645b053d5be45134c35560fe68d6c15a627a6757dc11b971f318f9f1cde80","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-19T07:57:44.449600316Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Page 2 of 2\nThe Department of Veteran Affairs intends to solicit for the following service:\n\nVISN 1 Critical Utility Management Plan\n\nThe Government intends to award a Firm-Fixed contract resulting from the solicitation to the responsive offeror whose offer conforms to the solicitation and will be most advantageous to the government in terms of price and other considered factors. The solicitation will be set aside for Veteran-Owned Small Businesses (VOSBs) that have the capability to fulfill this requirement.\n\nSolicitation 36C24125Q0342 will be available for download on April 2, 2025. The close date will be on April 22, 2025 at 5 PM EST time. Copies of the solicitation will not be available for mailing.  All prospective offerors must be registered in the System for Award Management (SAM) prior to award of the contract. Registration may be accomplished at www.sam.gov. Questions concerning this procurement may be directed to the Contract Specialist Rosangela Pereira at Rosangela.Pereira@va.gov.\n\nQuestions regarding this solicitation must be submitted by 3PM EST on April 18, 2025. Questions submitted after this deadline may not be answered.\n\nThe applicable NAICS code is 541330.","text":"Page 2 of 2\nThe Department of Veteran Affairs intends to solicit for the following service:\n\nVISN 1 Critical Utility Management Plan\n\nThe Government intends to award a Firm-Fixed contract resulting from the solicitation to the responsive offeror whose offer conforms to the solicitation and will be most advantageous to the government in terms of price and other considered factors. The solicitation will be set aside for Veteran-Owned Small Businesses (VOSBs) that have the capability to fulfill this requirement.\n\nSolicitation 36C24125Q0342 will be available for download on April 2, 2025. The close date will be on April 22, 2025 at 5 PM EST time. Copies of the solicitation will not be available for mailing. All prospective offerors must be registered in the System for Award Management (SAM) prior to award of the contract. Registration may be accomplished at www.sam.gov. Questions concerning this procurement may be directed to the Contract Specialist Rosangela Pereira at Rosangela.Pereira@va.gov.\n\nQuestions regarding this solicitation must be submitted by 3PM EST on April 18, 2025. Questions submitted after this deadline may not be answered.\n\nThe applicable NAICS code is 541330.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C24125Q0342","place_of_performance":{"street":"See SOW.","country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"C219"},{"award":{"awardee":{}},"dates":{"posted":"2025-04-22","posted_at":"2025-04-22T17:11:07.239Z","created_at":"2025-04-22T17:11:03.276Z","modified_at":"2025-05-30T04:00:09.700Z","response_deadline":{"raw":"2025-04-29T17:00:00-04:00","utc":"2025-04-29T21:00:00Z","date":"2025-04-29","time":"17:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9b7e4658d2b04573aa4833345e916caa/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"C219--VISN 1 Critical Utility Management Plans","agency":{"office":{"code":"36C241","name":"241-NETWORK CONTRACT OFFICE 01 (36C241)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"04330","city":"TOGUS","state":"ME","country":"USA"},"organization_id":"100176746","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-05-29","archive_type":"auto_custom"},"history":[{"index":3,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-22T17:11:07.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"9b7e4658d2b04573aa4833345e916caa","solicitation_number":"36C24125Q0342","parent_opportunity_id":"898abfcb395f48da9bfef2e3145c544b"},{"index":1,"title":"C219--VISN 1 Critical Utility Management Plans","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-04-02T21:54:48.747Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"898abfcb395f48da9bfef2e3145c544b","solicitation_number":"36C24125Q0342","related_opportunity_id":"a91c963bca684c0fa796288e13027c06"}],"contacts":[{"name":"Rosangela Pereira","role":"primary","email":"rosangela.pereira@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"9b7e4658d2b04573aa4833345e916caa","lineage_id":"898abfcb395f48da9bfef2e3145c544b","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-17T03:22:55.631252377Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7678548f3362cb7119d3240dee5454bed010b3e252f75a489a847a34f2746303","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-17T03:22:55.631252377Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Amendment Number 0001\nQuestions and Answers\nPlease provide any existingÂ historicalÂ inventory per building, per asset with age and condition. Document is attached.\nAttachment A: Site Information provides Total Sq. Ft. for each Site. To better price the Statement of Work square footage and type of building are required. Please provide a list of buildings per Site, including square footage per building and type of building per Site (i.e. Medical office building, Wearhouse, Medical Facility, maintenance building, parking structure, etc.). Document is attached.\nPlan Format section C requires  Inventory of major equipment associated with these utilities.  Is it correct to assume major equipment is defined as having a replacement value greater than $5,000? Major equipment refers to any distribution. \nCritical inventory will be at the  system  level, not  component  or  part  level (i.e., AHU included, but fan excluded) Correct.\nCritical inventory excludes piping, ductwork, and other distribution lines or component parts (i.e., valves, pipes, etc.) Correct.\nInventory excludes access to confined spaces, crawlspaces, and other limited access spaces. Correct.\nRequirements for hardcopies have previously been removed to reduce paper. Will the Deliverables requirement for two (2) bound printed copies be removed, or please confirm  two (2) bound copies  are required per site, totaling 22 hardcopies. 2 hard copies required.\nThe Deliverables require a  CD  for each site. Please advise if  one (1) CDÂ copy  is required per site or if a downloadable copy is acceptable. CD is required.\nThe Plan Format requires site drawings for each utility showing routes and connection points to buildings is requested.Â  Does this indicate that we should be doing site locates and site surveys of the exterior utilities for the buildings as well? Plan is for basic distribution to show. \nTo what level of detail should the site drawing be developed to.Â  Should this only include interbuilding service connections overlayed on existing PDF campus maps or full CADD drawings? Plans will be CAD but existing GIS maps, where available, will be provided.\nPlease confirm, no drawings are required for systems interior to the buildings, correct? Correct.\nDo drawings or reports need to be stamped by a professional engineer? No.\nBACKGROUND refers to  items  while Plan Format section C requires an inventory of  major equipment.  It is understood that Plan Format Section C clarifies and supersedes the Background section, and all references to  item(s)  are in reference to  major equipment , correct? Correct.\nBACKGROUND refers to a  (2022-23) Lock Out Tag Out (LOTO) inventory  for each site. To allow for accurate pricing, will the inventory be provided for review prior to bid? No.\nSite drawings are referenced. It is understood this is limited to single-line diagrams overlaid on existing site maps, not signed drawings. Is this correct? Correct.\nCritical equipment includes equipment that services  patient care areas  that remain operational during emergencies (natural disasters, etc.), such as emergency rooms, ICUs, and in-patient care. Critical equipment excludes equipment servicing non-critical facilities that close during emergencies, such as lobbies, out-patient clinics, cafeterias, kitchens, parking structures, etc. Is this correct? Correct.\nPlease provide all relevant information VHA Directives. Attached.\nManagement Plans limited to general, industry best practices per utility element and not specific to individual units by make and model, correct? Intent is for plans to include procedures for individual units.\nContingency plan is limited to a single contingency per utility element, not multiple failures, correct?  Contingency plans should be provided for each critical utility for each affected building.\nFull inventory for each site limited to critical, major equipment servicing critical facilities, not all building equipment, correct? Correct.\nAttachment A: Site Information provides general information for each of the 11 sites. This information is not enough to provide accurate, efficient pricing. Please provide a detailed list defining all buildings per site, including square footage, building use, number of floors, year of construction, and year of most recent major renovations. See attached.\nSite Information - Please provide the following per site: 1) most up-to-date inventory, 2) site maps, 3) emergency plans, 4) preventive maintenance plans. Inventory will be provided upon award. Emergency plans and PM plans do not exist yet for sites. \nEvaluation Factors, 3. Technical, subpart b. states  Contractor shall demonstrate that their technicians meet the qualification standards stated in the Performance Work Statement.  No qualification standards are provided in the RFQ. Is a minimum of an engineering degree with five years of experience be a minimum qualification standard? Yes, a minimum of an engineering degree with five years of experience is a minimum qualification.\nEvaluation Factors, 3. Technical, subpart c. states  Contractor shall provide all current and relevant or license(s) to include manufacture training certificateÂ etc.   Licenses are not required. However, a minimum of an engineering degree with five years of experience is a minimum qualification.","text":"Amendment Number 0001\nQuestions and Answers\nPlease provide any existingÂ historicalÂ inventory per building, per asset with age and condition. Document is attached.\nAttachment A: Site Information provides Total Sq. Ft. for each Site. To better price the Statement of Work square footage and type of building are required. Please provide a list of buildings per Site, including square footage per building and type of building per Site (i.e. Medical office building, Wearhouse, Medical Facility, maintenance building, parking structure, etc.). Document is attached.\nPlan Format section C requires Inventory of major equipment associated with these utilities. Is it correct to assume major equipment is defined as having a replacement value greater than $5,000? Major equipment refers to any distribution.\nCritical inventory will be at the system level, not component or part level (i.e., AHU included, but fan excluded) Correct.\nCritical inventory excludes piping, ductwork, and other distribution lines or component parts (i.e., valves, pipes, etc.) Correct.\nInventory excludes access to confined spaces, crawlspaces, and other limited access spaces. Correct.\nRequirements for hardcopies have previously been removed to reduce paper. Will the Deliverables requirement for two (2) bound printed copies be removed, or please confirm two (2) bound copies are required per site, totaling 22 hardcopies. 2 hard copies required.\nThe Deliverables require a CD for each site. Please advise if one (1) CDÂ copy is required per site or if a downloadable copy is acceptable. CD is required.\nThe Plan Format requires site drawings for each utility showing routes and connection points to buildings is requested.Â Does this indicate that we should be doing site locates and site surveys of the exterior utilities for the buildings as well? Plan is for basic distribution to show.\nTo what level of detail should the site drawing be developed to.Â Should this only include interbuilding service connections overlayed on existing PDF campus maps or full CADD drawings? Plans will be CAD but existing GIS maps, where available, will be provided.\nPlease confirm, no drawings are required for systems interior to the buildings, correct? Correct.\nDo drawings or reports need to be stamped by a professional engineer? No.\nBACKGROUND refers to items while Plan Format section C requires an inventory of major equipment. It is understood that Plan Format Section C clarifies and supersedes the Background section, and all references to item(s) are in reference to major equipment , correct? Correct.\nBACKGROUND refers to a (2022-23) Lock Out Tag Out (LOTO) inventory for each site. To allow for accurate pricing, will the inventory be provided for review prior to bid? No.\nSite drawings are referenced. It is understood this is limited to single-line diagrams overlaid on existing site maps, not signed drawings. Is this correct? Correct.\nCritical equipment includes equipment that services patient care areas that remain operational during emergencies (natural disasters, etc.), such as emergency rooms, ICUs, and in-patient care. Critical equipment excludes equipment servicing non-critical facilities that close during emergencies, such as lobbies, out-patient clinics, cafeterias, kitchens, parking structures, etc. Is this correct? Correct.\nPlease provide all relevant information VHA Directives. Attached.\nManagement Plans limited to general, industry best practices per utility element and not specific to individual units by make and model, correct? Intent is for plans to include procedures for individual units.\nContingency plan is limited to a single contingency per utility element, not multiple failures, correct? Contingency plans should be provided for each critical utility for each affected building.\nFull inventory for each site limited to critical, major equipment servicing critical facilities, not all building equipment, correct? Correct.\nAttachment A: Site Information provides general information for each of the 11 sites. This information is not enough to provide accurate, efficient pricing. Please provide a detailed list defining all buildings per site, including square footage, building use, number of floors, year of construction, and year of most recent major renovations. See attached.\nSite Information - Please provide the following per site: 1) most up-to-date inventory, 2) site maps, 3) emergency plans, 4) preventive maintenance plans. Inventory will be provided upon award. Emergency plans and PM plans do not exist yet for sites.\nEvaluation Factors, 3. Technical, subpart b. states Contractor shall demonstrate that their technicians meet the qualification standards stated in the Performance Work Statement. No qualification standards are provided in the RFQ. Is a minimum of an engineering degree with five years of experience be a minimum qualification standard? Yes, a minimum of an engineering degree with five years of experience is a minimum qualification.\nEvaluation Factors, 3. Technical, subpart c. states Contractor shall provide all current and relevant or license(s) to include manufacture training certificateÂ etc. Licenses are not required. However, a minimum of an engineering degree with five years of experience is a minimum qualification.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24125Q0342","product_service_code":"C219"}],"due_at":"2025-04-29T21:00:00Z","due_date":"2025-04-29","closes_at":"2025-04-29T21:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-17T03:44:36.618934Z","principal_notice_id":"9b7e4658d2b04573aa4833345e916caa","description":{"text":"Amendment Number 0001\nQuestions and Answers\nPlease provide any existingÂ historicalÂ inventory per building, per asset with age and condition. Document is attached.\nAttachment A: Site Information provides Total Sq. Ft. for each Site. To better price the Statement of Work square footage and type of building are required. Please provide a list of buildings per Site, including square footage per building and type of building per Site (i.e. Medical office building, Wearhouse, Medical Facility, maintenance building, parking structure, etc.). Document is attached.\nPlan Format section C requires Inventory of major equipment associated with these utilities. Is it correct to assume major equipment is defined as having a replacement value greater than $5,000? Major equipment refers to any distribution.\nCritical inventory will be at the system level, not component or part level (i.e., AHU included, but fan excluded) Correct.\nCritical inventory excludes piping, ductwork, and other distribution lines or component parts (i.e., valves, pipes, etc.) Correct.\nInventory excludes access to confined spaces, crawlspaces, and other limited access spaces. Correct.\nRequirements for hardcopies have previously been removed to reduce paper. Will the Deliverables requirement for two (2) bound printed copies be removed, or please confirm two (2) bound copies are required per site, totaling 22 hardcopies. 2 hard copies required.\nThe Deliverables require a CD for each site. Please advise if one (1) CDÂ copy is required per site or if a downloadable copy is acceptable. CD is required.\nThe Plan Format requires site drawings for each utility showing routes and connection points to buildings is requested.Â Does this indicate that we should be doing site locates and site surveys of the exterior utilities for the buildings as well? Plan is for basic distribution to show.\nTo what level of detail should the site drawing be developed to.Â Should this only include interbuilding service connections overlayed on existing PDF campus maps or full CADD drawings? Plans will be CAD but existing GIS maps, where available, will be provided.\nPlease confirm, no drawings are required for systems interior to the buildings, correct? Correct.\nDo drawings or reports need to be stamped by a professional engineer? No.\nBACKGROUND refers to items while Plan Format section C requires an inventory of major equipment. It is understood that Plan Format Section C clarifies and supersedes the Background section, and all references to item(s) are in reference to major equipment , correct? Correct.\nBACKGROUND refers to a (2022-23) Lock Out Tag Out (LOTO) inventory for each site. To allow for accurate pricing, will the inventory be provided for review prior to bid? No.\nSite drawings are referenced. It is understood this is limited to single-line diagrams overlaid on existing site maps, not signed drawings. Is this correct? Correct.\nCritical equipment includes equipment that services patient care areas that remain operational during emergencies (natural disasters, etc.), such as emergency rooms, ICUs, and in-patient care. Critical equipment excludes equipment servicing non-critical facilities that close during emergencies, such as lobbies, out-patient clinics, cafeterias, kitchens, parking structures, etc. Is this correct? Correct.\nPlease provide all relevant information VHA Directives. Attached.\nManagement Plans limited to general, industry best practices per utility element and not specific to individual units by make and model, correct? Intent is for plans to include procedures for individual units.\nContingency plan is limited to a single contingency per utility element, not multiple failures, correct? Contingency plans should be provided for each critical utility for each affected building.\nFull inventory for each site limited to critical, major equipment servicing critical facilities, not all building equipment, correct? Correct.\nAttachment A: Site Information provides general information for each of the 11 sites. This information is not enough to provide accurate, efficient pricing. Please provide a detailed list defining all buildings per site, including square footage, building use, number of floors, year of construction, and year of most recent major renovations. See attached.\nSite Information - Please provide the following per site: 1) most up-to-date inventory, 2) site maps, 3) emergency plans, 4) preventive maintenance plans. Inventory will be provided upon award. Emergency plans and PM plans do not exist yet for sites.\nEvaluation Factors, 3. Technical, subpart b. states Contractor shall demonstrate that their technicians meet the qualification standards stated in the Performance Work Statement. No qualification standards are provided in the RFQ. Is a minimum of an engineering degree with five years of experience be a minimum qualification standard? Yes, a minimum of an engineering degree with five years of experience is a minimum qualification.\nEvaluation Factors, 3. Technical, subpart c. states Contractor shall provide all current and relevant or license(s) to include manufacture training certificateÂ etc. Licenses are not required. However, a minimum of an engineering degree with five years of experience is a minimum qualification.","html":"Amendment Number 0001\nQuestions and Answers\nPlease provide any existingÂ historicalÂ inventory per building, per asset with age and condition. Document is attached.\nAttachment A: Site Information provides Total Sq. Ft. for each Site. To better price the Statement of Work square footage and type of building are required. Please provide a list of buildings per Site, including square footage per building and type of building per Site (i.e. Medical office building, Wearhouse, Medical Facility, maintenance building, parking structure, etc.). Document is attached.\nPlan Format section C requires  Inventory of major equipment associated with these utilities.  Is it correct to assume major equipment is defined as having a replacement value greater than $5,000? Major equipment refers to any distribution. \nCritical inventory will be at the  system  level, not  component  or  part  level (i.e., AHU included, but fan excluded) Correct.\nCritical inventory excludes piping, ductwork, and other distribution lines or component parts (i.e., valves, pipes, etc.) Correct.\nInventory excludes access to confined spaces, crawlspaces, and other limited access spaces. Correct.\nRequirements for hardcopies have previously been removed to reduce paper. Will the Deliverables requirement for two (2) bound printed copies be removed, or please confirm  two (2) bound copies  are required per site, totaling 22 hardcopies. 2 hard copies required.\nThe Deliverables require a  CD  for each site. Please advise if  one (1) CDÂ copy  is required per site or if a downloadable copy is acceptable. CD is required.\nThe Plan Format requires site drawings for each utility showing routes and connection points to buildings is requested.Â  Does this indicate that we should be doing site locates and site surveys of the exterior utilities for the buildings as well? Plan is for basic distribution to show. \nTo what level of detail should the site drawing be developed to.Â  Should this only include interbuilding service connections overlayed on existing PDF campus maps or full CADD drawings? Plans will be CAD but existing GIS maps, where available, will be provided.\nPlease confirm, no drawings are required for systems interior to the buildings, correct? Correct.\nDo drawings or reports need to be stamped by a professional engineer? No.\nBACKGROUND refers to  items  while Plan Format section C requires an inventory of  major equipment.  It is understood that Plan Format Section C clarifies and supersedes the Background section, and all references to  item(s)  are in reference to  major equipment , correct? Correct.\nBACKGROUND refers to a  (2022-23) Lock Out Tag Out (LOTO) inventory  for each site. To allow for accurate pricing, will the inventory be provided for review prior to bid? No.\nSite drawings are referenced. It is understood this is limited to single-line diagrams overlaid on existing site maps, not signed drawings. Is this correct? Correct.\nCritical equipment includes equipment that services  patient care areas  that remain operational during emergencies (natural disasters, etc.), such as emergency rooms, ICUs, and in-patient care. Critical equipment excludes equipment servicing non-critical facilities that close during emergencies, such as lobbies, out-patient clinics, cafeterias, kitchens, parking structures, etc. Is this correct? Correct.\nPlease provide all relevant information VHA Directives. Attached.\nManagement Plans limited to general, industry best practices per utility element and not specific to individual units by make and model, correct? Intent is for plans to include procedures for individual units.\nContingency plan is limited to a single contingency per utility element, not multiple failures, correct?  Contingency plans should be provided for each critical utility for each affected building.\nFull inventory for each site limited to critical, major equipment servicing critical facilities, not all building equipment, correct? Correct.\nAttachment A: Site Information provides general information for each of the 11 sites. This information is not enough to provide accurate, efficient pricing. Please provide a detailed list defining all buildings per site, including square footage, building use, number of floors, year of construction, and year of most recent major renovations. See attached.\nSite Information - Please provide the following per site: 1) most up-to-date inventory, 2) site maps, 3) emergency plans, 4) preventive maintenance plans. Inventory will be provided upon award. Emergency plans and PM plans do not exist yet for sites. \nEvaluation Factors, 3. Technical, subpart b. states  Contractor shall demonstrate that their technicians meet the qualification standards stated in the Performance Work Statement.  No qualification standards are provided in the RFQ. Is a minimum of an engineering degree with five years of experience be a minimum qualification standard? Yes, a minimum of an engineering degree with five years of experience is a minimum qualification.\nEvaluation Factors, 3. Technical, subpart c. states  Contractor shall provide all current and relevant or license(s) to include manufacture training certificateÂ etc.   Licenses are not required. However, a minimum of an engineering degree with five years of experience is a minimum qualification.","origin":"detail"},"contacts":[{"name":"Rosangela Pereira","role":"primary","email":"rosangela.pereira@va.gov","title":"Contract Specialist"}],"place_of_performance":null,"office_address":{"zip":"04330","city":"TOGUS","state":"ME","country":"USA"},"naics_codes":["541330"],"award":{"awardee":{}},"attachments":[{"resource_id":"5131844cb76541d19544723520a5d993","name":"36C24125Q0342.docx","kind":"file","mime_type":".docx","size_bytes":15693,"posted_at":"2025-04-02T19:05:14.696Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5131844cb76541d19544723520a5d993/download","mirrored":false},{"resource_id":"77375d15a5d44177ada7119edf316c3e","name":"36C24125Q0342_1.docx","kind":"file","mime_type":".docx","size_bytes":91943,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/77375d15a5d44177ada7119edf316c3e/download","mirrored":false},{"resource_id":"be09b4ac89cc448c91c89262376f3cf5","name":"LOS certification.pdf","kind":"file","mime_type":".pdf","size_bytes":187703,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/be09b4ac89cc448c91c89262376f3cf5/download","mirrored":false},{"resource_id":"309e47f5483f4cedbb81bb123300ecd2","name":"Past Performance Worksheet.xlsx","kind":"file","mime_type":".xlsx","size_bytes":17080,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/309e47f5483f4cedbb81bb123300ecd2/download","mirrored":false},{"resource_id":"e8a911d37c714cf4a5da2807fd27aaa8","name":"WD 2015-4019 Manchester Rev29.pdf","kind":"file","mime_type":".pdf","size_bytes":5048824,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e8a911d37c714cf4a5da2807fd27aaa8/download","mirrored":false},{"resource_id":"97fe2fc6a92945e9b5a742c87ac159c0","name":"WD 2015-4047 Boston Bedford Rev29.pdf","kind":"file","mime_type":".pdf","size_bytes":5156516,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/97fe2fc6a92945e9b5a742c87ac159c0/download","mirrored":false},{"resource_id":"52cda0e6f33e42219221284526f33aa4","name":"WD 2015-4053 Brockton Rev30.pdf","kind":"file","mime_type":".pdf","size_bytes":5032211,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/52cda0e6f33e42219221284526f33aa4/download","mirrored":false},{"resource_id":"6792da99c411402aaa671e453cdd0433","name":"WD 2015-4083 Providence Rev29.pdf","kind":"file","mime_type":".pdf","size_bytes":74994,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6792da99c411402aaa671e453cdd0433/download","mirrored":false},{"resource_id":"25a4b4706a8240429536d880c546f7f6","name":"WD 2015-4095 NorthHampton Rev30.pdf","kind":"file","mime_type":".pdf","size_bytes":5107146,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/25a4b4706a8240429536d880c546f7f6/download","mirrored":false},{"resource_id":"9bcd6d30dc06405dad65a179189bf7f5","name":"WD 2015-4009 Togus Rev29.pdf","kind":"file","mime_type":".pdf","size_bytes":5567677,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9bcd6d30dc06405dad65a179189bf7f5/download","mirrored":false},{"resource_id":"973c7939664c40f395948c6c7261599a","name":"WD 2015-4119 Newington Rev30.pdf","kind":"file","mime_type":".pdf","size_bytes":5079086,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/973c7939664c40f395948c6c7261599a/download","mirrored":false},{"resource_id":"7e7605a6a49243bdb4d3cf3a073e2775","name":"WD 2015-4127 WHaven Rev30.pdf","kind":"file","mime_type":".pdf","size_bytes":5054395,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7e7605a6a49243bdb4d3cf3a073e2775/download","mirrored":false},{"resource_id":"f498a1fe0e714fb5a7492a338ca899e0","name":"WD 2015-4139 WhiteRiver Rev29.pdf","kind":"file","mime_type":".pdf","size_bytes":5227722,"posted_at":"2025-04-02T21:54:48.747Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f498a1fe0e714fb5a7492a338ca899e0/download","mirrored":false},{"resource_id":"ac4ebcdded2b48c9b551dc7952b9a9c7","name":"36C24125Q0342 0001.docx","kind":"file","mime_type":".docx","size_bytes":21607,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ac4ebcdded2b48c9b551dc7952b9a9c7/download","mirrored":false},{"resource_id":"2de580cc7a1e4b49926ef055e35a4719","name":"Buildings Full Detailed Report Rl. Dt. 04_08_2023 4_17_2025 12_16_33 PM.xls","kind":"file","mime_type":".xls","size_bytes":612379,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2de580cc7a1e4b49926ef055e35a4719/download","mirrored":false},{"resource_id":"0a37ee63d0d84e0ab70aa34c3c5ca51f","name":"1811_D_2023-04-10.pdf","kind":"file","mime_type":".pdf","size_bytes":141519,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0a37ee63d0d84e0ab70aa34c3c5ca51f/download","mirrored":false},{"resource_id":"1cecb3c9377947fbaf07d229d38adddf","name":"Bedford Strategic Site Plan.xls","kind":"file","mime_type":".xls","size_bytes":588288,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1cecb3c9377947fbaf07d229d38adddf/download","mirrored":false},{"resource_id":"942b3d48aad045ac969fad9255f7d7a4","name":"Boston-Jamaica Plain Strategic Site Plan.xls","kind":"file","mime_type":".xls","size_bytes":431616,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/942b3d48aad045ac969fad9255f7d7a4/download","mirrored":false},{"resource_id":"c663f52e385b42a9bc48cd2a08ef2bc2","name":"Brockton Strategic Site Plan.xls","kind":"file","mime_type":".xls","size_bytes":425984,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c663f52e385b42a9bc48cd2a08ef2bc2/download","mirrored":false},{"resource_id":"9d40dd82188b44488a250cf39ab21390","name":"Manchester Strategic Site Plan.xls","kind":"file","mime_type":".xls","size_bytes":235520,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9d40dd82188b44488a250cf39ab21390/download","mirrored":false},{"resource_id":"52da533ddc7c459a937e9ddc0eb19f21","name":"Newington Strategic Site Plan.xls","kind":"file","mime_type":".xls","size_bytes":217600,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/52da533ddc7c459a937e9ddc0eb19f21/download","mirrored":false},{"resource_id":"4b8c976b69e14521ae8dac28842fa667","name":"Northampton Strategic Site Plan.xls","kind":"file","mime_type":".xls","size_bytes":313856,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4b8c976b69e14521ae8dac28842fa667/download","mirrored":false},{"resource_id":"7ddff70c73ad4f2498fb0d558421c5a2","name":"Providence Strategic Site Plan.xls","kind":"file","mime_type":".xls","size_bytes":234496,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7ddff70c73ad4f2498fb0d558421c5a2/download","mirrored":false},{"resource_id":"ff8d294d19014c12865b5a9af1e75e90","name":"Togus Strategic Site Plan.xls","kind":"file","mime_type":".xls","size_bytes":396800,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ff8d294d19014c12865b5a9af1e75e90/download","mirrored":false},{"resource_id":"a9ca99187a044b8fadafd7d0659d9281","name":"West Haven Strategic Site Plan.xls","kind":"file","mime_type":".xls","size_bytes":185344,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a9ca99187a044b8fadafd7d0659d9281/download","mirrored":false},{"resource_id":"f400e25714ea47edbe0d5e9e0f0c8ced","name":"West Roxbury Strategic Site Plan.xls","kind":"file","mime_type":".xls","size_bytes":186368,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f400e25714ea47edbe0d5e9e0f0c8ced/download","mirrored":false},{"resource_id":"444778b3e5a845a6b2a6ba03d2401bf9","name":"White River Junction Strategic Site Plan.xls","kind":"file","mime_type":".xls","size_bytes":307712,"posted_at":"2025-04-22T17:11:07.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/444778b3e5a845a6b2a6ba03d2401bf9/download","mirrored":false}],"awards":[],"related":[{"key":"36C24127Q0084","latest_notice_id":"939b8f3021be4a75ae5972b0c7ffb9ae","title":"X1EA--CWM VA Police Use of shooting range.","solicitation_number":"36C24127Q0084","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-27T15:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"611699","psc":"X1EA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C24127Q0017","latest_notice_id":"d60676ea33af4051b90a1953ab55743e","title":"S201--36C24127Q0017 Windows Washing Service Amendment 0002","solicitation_number":"36C24127Q0017","notice_type":"k","first_type":"k","first_posted":"2026-10-26","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"561720","psc":"S201","set_aside":"SDVOSBC","state":"MA","county":"25017","county_name":"Middlesex County","city":"2501704615","city_name":"Bedford","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C24127Q0044","latest_notice_id":"a2f2fe28c1ec4687b2a2955cf947935e","title":"9140--Togus Fuel Oil and Diesel Delivery","solicitation_number":"36C24127Q0044","notice_type":"k","first_type":"k","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"324110","psc":"9140","set_aside":"SBA","state":"ME","county":"23011","county_name":"Kennebec County","city":"2302100","city_name":"Augusta","country":"USA","place_scope":"nationwide","state_source":"sam_zip","state_evidence":"04330","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C24127Q0076","latest_notice_id":"bb30bc78067840a082b5d9e12eceddd2","title":"Q601--Sources sought Boston Medical Coding Period of Period 01/01/2027-04/01/2027","solicitation_number":"36C24127Q0076","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"541219","psc":"Q601","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C24127Q0030","latest_notice_id":"10c3d2d3d0c543179707f8cc9448f701","title":"J061--Eaton Powerware System Replacement","solicitation_number":"36C24127Q0030","notice_type":"k","first_type":"k","first_posted":"2026-11-04","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C241","office_name":"241-NETWORK CONTRACT OFFICE 01 (36C241)","naics":"811310","psc":"J061","set_aside":"SDVOSBC","state":"NH","county":"33011","county_name":"Hillsborough County","city":"3345140","city_name":"Manchester","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"SEAPORTNMRILFMSLABSPPTREV1","latest_notice_id":"4423bab4da4a4647be47503ffb97e48f","title":"SEAPORT_NMRIL_FMS_LAB_SPPT_1","solicitation_number":"SEAPORT_NMRIL_FMS_LAB_SPPT_REV1","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":1,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N66001","office_name":"NIWC PACIFIC","naics":"541330","psc":"R425","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"140RR027Q0030","latest_notice_id":"b3d89b92cabe48c8abc7fafb296b6bcf","title":"C--TSC A-E IDIQ MATOC and Construction Management Services","solicitation_number":"140RR027Q0030","notice_type":"p","first_type":"p","first_posted":"2026-11-06","last_posted":"2026-11-06","notices":1,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140RR0","office_name":"RECLAMATION CONTRACTING ACTIVITY","naics":"541330","psc":"C211","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"UGHOUT THE CONTINENTAL UNITED STATES (CONUS","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-07T04:54:53.607561Z"},{"key":"N0025326R0001","latest_notice_id":"6cc7d76cdf5942628833bcf57e005584","title":"Keyport Infrastructure Security Support Services (KISSS)","solicitation_number":"N0025326R0001","notice_type":"p","first_type":"p","first_posted":"2026-03-30","last_posted":"2026-11-10","notices":4,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00253","office_name":"NAVAL UNDERSEA WARFARE CENTER","naics":"541330","psc":"R499","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"}],"similar_open_total":100,"indexable":false}