Special notice
Lease vs Purchase RFI for Temporary Chiller Plant Chillers
36C24124Q0809
Department of Veterans Affairs, 241-Network Contract Office 01. Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing.
Response deadline
August 30, 2024 at 4:00 PM EDT
Closed 817 days ago. Posted August 5, 2024. Scheduled to archive October 29, 2024.
Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities
This one closed in 2024
21 like it are open now in industrial and commercial fan and blower and air purification equipment manufacturing
- FAN,TUBEAXIAL
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 333413Ship to the buyerN0010426QSD50Due todayNov 25 - FILTER UNIT,AIR PUR
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 333413Ship to the buyerN0010426QYAK6Due in 2 daysNov 27 - FILTER ELEMENT,AIR CON
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 333413Ship to the buyerSPE7M227U0066Due in 3 daysNov 27
All 21 open in industrial and commercial fan and blower and air purification equipment manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
REQUEST FOR INFORMATION LEASE VERSUS PURCHASE OF CHILLERS FOR TEMPORARY CHILLER PLANT: The VA Connecticut Healthcare System, West Haven Campus, located at 950 Campbell Avenue, West Haven, CT, will soon have a requirement for a firm fixed price construction contract to construct a temporary chiller plant facility.
It is anticipated that this temporary chiller plant will be operational for a period of three to five years while the current chiller plant is demolished, and a new plant is constructed for permanent operation. This temporary chiller plant facility will require four (4) 500 ton air cooled chillers with integral pumps.
Federal Acquisition Regulation (FAR) Part 7.401, Acquisition Considerations, requires agencies to acquire equipment using the method of acquisition most advantageous to the Government based on a case-by-case analysis of comparative costs and other factors. To determine the most advantage method of obtaining the required chillers for this temporary facility, the following information is requested:
Lease Option: Four (4) 500 ton air cooled chillers with integral pumps. All other requirements provided by others: Short term rental or lease 3 years cost per month. Long term rental or lease 5 years cost per month. Freight Delivery for rental or lease. Freight Return for rental or lease. Labor required for delivery for rental or lease. Labor required for return for rental or lease. Maintenance requirement for rental or lease is it included or require a separate contract?
Does to VA perform preventative maintenance requirements? If so, add training costs. Payment requirements for rental or lease. Cancellation, extension and early return conditions and fees for 3 year rental or lease. Cancellation, extension and early return conditions and fees for 5 year rental or lease.
Lease with Option to Purchase: Four (4) 500 ton air cooled chillers with integral pumps. All other requirements provided by others: All costs associated with paragraph 1 above with a purchase price after 3 years. All costs associated with paragraph 1 above with a purchase price after 5 years.
Purchase: Four (4) 500 ton air cooled chillers with integral pumps. All other requirements provided by others: Net purchase price. Freight delivery for purchase. Available warranties length and details of what is covered. Maintenance requirements for warranties. Training and O&M Manuals Service contract availability for purchased equipment. Useful life expectancy for purchased equipment. Trade in or salvage value after 3 years. Trade in or salvage value after 5 years.
Potential obsolescence of the equipment if purchases due to imminent technological improvements. A response is requested by August 30, by 4:00 pm ET, so that the Government can analyze the responses and make a determination of lease versus purchase prior to the solicitation for the construction of the temporary chiller plant, which is anticipated in September 2024. Please provide the requested information via email to Contract Specialist Judith.Ruggiero@va,gov.
Subject line to read Lease versus Purchase Chiller Equipment . DISCLAIMER This request for information is issued solely for information and planning purposes only and does not constitute a solicitation. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this notice.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 5, 2024
Special notice
Due August 30, 2024 at 4:00 PM EDT. SAM.gov, notice dc05e49a9fb04fd6a51ffe80ec2d8120
Points of contact
- Jodi Ruggiero, Contract SpecialistJudith.Ruggiero@va.gov401-457-1412