Combined synopsis and solicitation
Elevator Maintenance Contract
36C24124Q0533
Department of Veterans Affairs, 241-Network Contract Office 01. Other Building Equipment Contractors.
Response deadline
May 23, 2024 at 10:00 AM EDT
Closed 916 days ago. Posted May 21, 2024, first published May 10, 2024. Scheduled to archive July 22, 2024.
Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities
This one closed in 2024
18 like it are open now in other building equipment contractors
- Construction Services for replacing the wire ropes and designated associated sheave blocks, Franklin, New Hampshire.
Department of the Army, W2SD Endist New England
Sources soughtNAICS 238290Franklin, NHW912WJ27X1CX1Due todayNov 25 - Pneumatic Tube System Preventive Maintenance
Department of Veterans Affairs, 248-Network Contract Office 8
Sources soughtNAICS 238290San Juan, PR36C24827Q0155Due tomorrowNov 26 - JLM Roll Up Door Replacement
Department of Veterans Affairs, 256-Network Contract Office 16
Combined synopsis and solicitationSDVOSBNAICS 238290North Little Rock, AR36C25627Q0092Due in 5 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238290 (other building equipment contractors), means no more than $22 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 13 days from the day the solicitation was posted, May 10, 2024, to the deadline. The deadline moved once: it was first May 17, 2024 and ended as May 23, 2024.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B.
DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended. 12. ACCOUNTING AND APPROPRIATION DATA (REV. 11/2016) is required to sign this document and return
copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
(Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. 15C. DATE SIGNED B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER Contractor 16C. DATE SIGNED 14. DESCRIPTION OF AMENDMENT/MODIFICATION 16B. UNITED STATES OF AMERICA Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER 15B.
CONTRACTOR/OFFEROR STANDARD FORM 30 PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.) (If required) (SEE ITEM 11) (SEE ITEM 13) (X) CHECK ONE 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT (Signature of person authorized to sign) (Signature of Contracting Officer) 0001 36C241 NCO 1 VA Connecticut 950 Campbell Avenue West Haven CT 06516 36C241 NCO 1 VA Connecticut 950 Campbell Avenue West Haven CT 06516 To all Offerors/Bidders 36C24124Q0533 05-21-2024 X X X See CONTINUATION Page The purpose of this amendment is to include price schedule. CONTINUATION PAGE A.1 PRICE/COST SCHEDULE ITEM INFORMATION ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001 12.00 MO
The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at West Haven IAW the PWS. Services are inclusive of maintenance, repairs, after hours coverage, emergency calls and travel.
Contract Period:
Base POP Begin:
06-01-2024 POP End: 05-31-2025 0002 12.00 MO
The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at Newington IAW the PWS. Services are inclusive of maintenance, repairs, after hours covrage, emergency calls and travel.
Contract Period:
Base POP Begin:
06-01-2024 POP End: 05-31-2025 0003 50.00 HR
The Contractor shall provide all labor, materials and equipment to perform Contingency 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during REGULAR business hours.
Contract Period:
Base POP Begin:
06-01-2024 POP End: 05-31-2025 0004 50.00 HR
The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during NON-STANDARD business hours, weekends and holidays.
Contract Period:
Base POP Begin:
06-01-2024 POP End: 05-31-2025 0005 1.00 YR
The Contractor shall provide parts a needed for elevator repairs or installation. A supplier quote shall be furnished with the invoice. The Contractor shall provide a maxium of 20% markup for parts Contract Period:
Base POP Begin:
06-01-2024 POP End: 05-31-2025 1001 12.00 MO
The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at West Haven IAW the PWS. Services are inclusive of maintenance, repairs, after hours coverage, emergency calls and t ravel.
Contract Period:
Option 1 POP Begin:
06-01-2025 POP End: 05-31-2026 1002 12.00 MO
The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at Newington IAW the PWS. Services are inclusive of maintenance, repairs, after hours covrage, emergency calls and travel.
Contract Period:
Option 1 POP Begin:
06-01-2025 POP End: 05-31-2026 1003 50.00 HR
The Contractor shall provide all labor, materials and equipment to perform Contingency 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during REGULAR business hours.
Contract Period:
Option 1 POP Begin:
06-01-2025 POP End: 05-31-2026 1004 50.00 HR
The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during NON-STANDARD business hours, weekends and holidays.
Contract Period:
Option 1 POP Begin:
06-01-2025 POP End: 05-31-2026 1005 1.00 YR
The Contractor shall provide parts a needed for elevator repairs or installation. A supplier quote shall be furnished with the invoice. The Contractor shall provide a maximum of 20% markup for parts Contract Period:
Option 1 POP Begin:
06-01-2025 POP End: 05-31-2026 2001 12.00 MO
The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at West Haven IAW the PWS. Services are inclusive of maintenance, repairs, after hours coverage, emergency calls and travel.
Contract Period:
Option 2 POP Begin:
06-01-2026 POP End: 05-31-2027 2002 12.00 MO
The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at Newington IAW the PWS. Services are inclusive of maintenance, repairs, after hours covrage, emergency calls and travel.
Contract Period:
Option 2 POP Begin:
06-01-2026 POP End: 05-31-2027 2003 50.00 HR
The Contractor shall provide all labor, materials and equipment to perform Contingency 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during REGULAR business hours.
Contract Period:
Option 2 POP Begin:
06-01-2026 POP End: 05-31-2027 2004 50.00 HR
The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during NON-STANDARD business hours, weekends and holidays.
Contract Period:
Option 2 POP Begin:
06-01-2026 POP End: 05-31-2027 2005 1.00 YR
The Contractor shall provide parts a needed for elevator repairs or installation. A supplier quote shall be furnished with the invoice. The Contractor shall provide a maxium of 20% markup for parts Contract Period:
Option 2 POP Begin:
06-01-2026 POP End: 05-31-2027 3001 12.00 MO
The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at West Haven IAW the PWS. Services are inclusive of maintenance, repairs, after hours coverage, emergency calls and t ravel.
Contract Period:
Option 3 POP Begin:
06-01-2027 POP End: 05-31-2028 3002 12.00 MO
The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at Newington IAW the PWS. Services are inclusive of maintenance, repairs, after hours covrage, emergency calls and travel.
Contract Period:
Option 3 POP Begin:
06-01-2027 POP End: 05-31-2028 3003 50.00 HR
The Contractor shall provide all labor, materials and equipment to perform Contingency 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during REGULAR business hours.
Contract Period:
Option 3 POP Begin:
06-01-2027 POP End: 05-31-2028 3004 50.00 HR
The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during NON-STANDARD business hours, weekends and holidays.
Contract Period:
Option 3 POP Begin:
06-01-2027 POP End: 05-31-2028 3005 1.00 YR
The Contractor shall provide parts a needed for elevator repairs or installation. A supplier quote shall be furnished with the invoice. The Contractor shall provide a maxium of 20% markup for parts Contract Period:
Option 3 POP Begin:
06-01-2027 POP End: 05-31-2028 4001 12.00 MO
The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at West Haven IAW the PWS. Services are inclusive of maintenance, repairs, after hours coverage, emergency calls and t ravel.
Contract Period:
Option 4 POP Begin:
06-01-2028 POP End: 05-31-2029 4002 12.00 MO
The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at Newington IAW the PWS. Services are inclusive of maintenance, repairs, after hours coverage, emergency calls and travel.
Contract Period:
Option 4 POP Begin:
06-01-2028 POP End: 05-31-2029 4003 50.00 HR
The Contractor shall provide all labor, materials and equipment to perform Contingency 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during REGULAR business hours.
Contract Period:
Option 4 POP Begin:
06-01-2028 POP End: 05-31-2029 4004 50.00 HR
The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during NON-STANDARD business hours, weekends and holidays.
Contract Period:
Option 4 POP Begin:
06-01-2028 POP End: 05-31-2029 4005 1.00 YR
The Contractor shall provide parts a needed for elevator repairs or installation. A supplier quote shall be furnished with the invoice. The Contractor shall provide a maximum of 20% markup for parts Contract Period:
Option 4 POP Begin:
06-01-2028 POP End: 05-31-2029 GRAND TOTAL
Elevator Maintenance and Repair in support of Connecticut HCS.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 10, 2024
Combined synopsis and solicitation
Elevator Maintenance Contract Base Plus Four
Due May 17, 2024 at 12:00 PM EDT. SAM.gov, notice 46836ac0bbec4a4482042f6e03eacd20
May 17, 2024
Combined synopsis and solicitation
Elevator Maintenance Contract ****Due Date Extended to 5/23/2024**** Amendment to answer questions submitted
Due May 23, 2024 at 10:00 AM EDT. SAM.gov, notice abd0ecb70d7f45daabe41dff9f7ee9e4
May 21, 2024
Combined synopsis and solicitation
Due May 23, 2024 at 10:00 AM EDT. SAM.gov, notice 5a2809dd5f2a47238d3bf52a31be7dc2
Points of contact
- Tnauri Woodbridge, Contract Specialisttnauri.woodbridge@va.gov203-932-5711 x2892