Combined synopsis and solicitation, first published as presolicitation
Design Build Construction for animal research facility to replace bldgs. 47 and 103, Sepulveda VA Medical Center
36C10F24R0075
Department of Veterans Affairs, Office of Construction & Facilities MGMT. Commercial and Institutional Building Construction.
Awarded
$32,709,104.00 obligated so far on USAspending
Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities
This one was awarded in 2025
188 like it are open now in commercial and institutional building construction
- USBC Weinberger Lower Floor Kitchenette Upgrade
Public Buildings Service, PBS Project Delivery Zones 5-7 - Pacific Northwest & Pacific Southwest Branch
PresolicitationSmall businessNAICS 236220San Diego, CAEQPMBE-27-0019Due tomorrowNov 26 - MACH1_AOI_Military Working Dog Facility_ Vandenberg Space Force_LOE 1 and LOE 2
Department of the Air Force, FA8903 772 Ess PK
PresolicitationNAICS 236220Lompoc, CAFA8903-27-OT005Due in 5 daysNov 30 - Project No. 640A0-27-104, Replace Roof at Building 347 - Menlo Park
Department of Veterans Affairs, 261-Network Contract Office 21
Combined synopsis and solicitationSDVOSBNAICS 236220Menlo Park, CA36C26127Q0082Due in 6 daysDec 1
All 188 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 300 days from the day the solicitation was posted, January 21, 2025, to the deadline. The deadline moved 9 times: it was first February 14, 2025 and ended as November 17, 2025.
- Before the solicitation
- The agency published a presolicitation on August 12, 2024, 162 days before the solicitation.
- How it ended
- Awarded to Richard Group LLC on June 25, 2026, 220 days after offers were due. The contracting office reported 3 offers (full and open competition).
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Attachments
Files and links listed on SAM.gov. Files we hold a copy of download from here; the rest open SAM's download, which needs no account. Links open the sites the agency named.
- 36C10F24R0075.docx24 KB, August 12, 2024
- 36C10F24R0075_2.docx16 KB, January 21, 2025
- Doing Business With VALink to va.gov, January 21, 2025
- Office of Construction & Facilities ManagementLink to cfm.va.gov, August 12, 2024
- 36C10F24R0075 PHASE I REQUEST FOR QUALIFICATION.pdf934 KB, January 21, 2025
- PPQ - 36C10F24R0075.docx106 KB, January 17, 2025
- VA CFMLink to cfm.va.gov, February 5, 2025
- PPQ - 36C10F24R0075.docx106 KB, January 21, 2025
- VA Construction and Facilities ManagementLink to va.gov, February 13, 2025
- 36C10F24R0075 A0001_1.docx29 KB, February 5, 2025
- 36C10F24R0075 A0002.docx36 KB, February 13, 2025
- 36C10F24R0075 PHASE I REQUEST FOR QUALIFICATION.pdf934 KB, January 17, 2025
- 36C10F24R0075 A0003_1.docx16 KB, February 19, 2025
- 36C10F24R0075 A0003.docx118 KB, February 19, 2025
- 36C10F24R0075 A0004.docx33 KB, February 24, 2025
- 36C10F24R0075 P0005_1.docx34 KB, April 17, 2025
- Wage Determination CA20250022.docx52 KB, April 17, 2025
- TemplateSubcontractingPlan.docx49 KB, April 17, 2025
- VAAR Class Dev - 822_852 Compliance with E.O. 13899.pdf257 KB, April 17, 2025
- 36C10F24R0075 A0006_1.docx16 KB, May 29, 2025
- 36C10F24R0075 A0006.pdf662 KB, May 29, 2025
- Building 7 -first floor.pdf146 KB, May 29, 2025
- Building 7 -basement.pdf124 KB, May 29, 2025
- Building 7 1994 Consolidated Research.pdf11.3 MB, May 29, 2025
- Building 7 - Canopy Structural Architectural.pdf12.0 MB, May 29, 2025
- Building 7 - 2000 Seismic Correction.pdf58.9 MB, May 29, 2025
- Building 47 Combined Files.pdf37.8 MB, May 29, 2025
- Building 103 Animal Research 1985.pdf6.8 MB, May 29, 2025
- Bldg 103 Drawings.pdf14.6 MB, May 29, 2025
- Combined Reports.pdf29.1 MB, May 29, 2025
- Building 7 Retrofits 1.pdf106.7 MB, May 30, 2025
- Building 7 Retrofits 2.pdf88.7 MB, May 30, 2025
- Building 7 Retrofits 3.pdf96.2 MB, May 30, 2025
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Richard Group LLC
- UEI
- QST7A5N63TL4
- CAGE
- 77PV6
- Vendor location
- Chicago, IL
- Contract
- 36C10F26C0003, definitive contract
- Obligated
- $32,709,104.00
- Actions
- 1 between June 25, 2026 and June 25, 2026
- Competition
- Full and Open Competition, 3 offers received
- Set-aside reported
- No Set Aside Used.
- Described as
- Design-Build Project for the Design and Construction of a New Animal Research Building, 7 Annex to Replace Buildings 47 and 103 at the VA Sepulveda Ambulatory Care Center, Los Angeles, Ca.
- Match
- solicitation number 36C10F24R0075 equals the FPDS solicitation identifier; same awarding office 36C10F (high confidence)
- Record
- USAspending award page
- Recipient
- Korte Construction Company
- UEI
- X3BYPXNZN8N1
- CAGE
- 1D6R7
- Vendor location
- Saint Louis, MO
- Contract
- 36C10F26P0006, purchase order
- Obligated
- $10,000.00
- Actions
- 1 between July 16, 2026 and July 16, 2026
- Competition
- Full and Open Competition, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- Stipend Payment for Nonselected Offeror Under 91343-2036
- Match
- solicitation number 36C10F24R0075 equals the FPDS solicitation identifier; same awarding office 36C10F (high confidence)
- Record
- USAspending award page
- Recipient
- S. J. Amoroso Construction Co., LLC
- UEI
- KU19CNLCK2K7
- CAGE
- 4FBW4
- Vendor location
- Redwood City, CA
- Contract
- 36C10F26P0007, purchase order
- Obligated
- $10,000.00
- Actions
- 1 between July 16, 2026 and July 16, 2026
- Competition
- Full and Open Competition, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- Payment of Stipend for Solicitation Participation for Sepulveda Ar Design-Build
- Match
- solicitation number 36C10F24R0075 equals the FPDS solicitation identifier; same awarding office 36C10F (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 12, 2024
Presolicitation
DESIGN BUILD CONSTRUCTION FOR ANIMAL RESEARCH FACILITY TO REPLACE BLDGS. 47 AND 103, SEPULVEDA VA MEDICAL CENTER PROJECT NUMBER 691-903
SAM.gov, notice baa634c59d6a48fc83b0eae062b45c5f
January 17, 2025
Presolicitation
DESIGN BUILD CONSTRUCTION FOR ANIMAL RESEARCH FACILITY TO REPLACE BLDGS. 47 AND 103, SEPULVEDA VA MEDICAL CENTER PROJECT NUMBER 691-903
Due February 14, 2025 at 7:10 PM EST. SAM.gov, notice 47ad0e3f6d9343c0b94882ccbb9c7cb9
7 revisions on SAM
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- August 12, 2024: publish, presolicitation
January 17, 2025
Presolicitation
DESIGN BUILD CONSTRUCTION FOR ANIMAL RESEARCH FACILITY TO REPLACE BLDGS. 47 AND 103, SEPULVEDA VA MEDICAL CENTER PROJECT NUMBER 691-903
Due February 14, 2025 at 7:10 PM EST. SAM.gov, notice 633b1054cba14213b37af15cee3347e0
7 revisions on SAM
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- August 12, 2024: publish, presolicitation
January 17, 2025
Presolicitation
DESIGN BUILD CONSTRUCTION FOR ANIMAL RESEARCH FACILITY TO REPLACE BLDGS. 47 AND 103, SEPULVEDA VA MEDICAL CENTER PROJECT NUMBER 691-903
Due February 14, 2025 at 7:10 PM EST. SAM.gov, notice 8cc680b4a2564f10a470b04775989980
7 revisions on SAM
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- August 12, 2024: publish, presolicitation
January 17, 2025
Presolicitation
DESIGN BUILD CONSTRUCTION FOR ANIMAL RESEARCH FACILITY TO REPLACE BLDGS. 47 AND 103, SEPULVEDA VA MEDICAL CENTER PROJECT NUMBER 691-903
Due February 14, 2025. SAM.gov, notice af6f16c73f664390ac9faea95432bba9
7 revisions on SAM
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- August 12, 2024: publish, presolicitation
January 17, 2025
Presolicitation
DESIGN BUILD CONSTRUCTION FOR ANIMAL RESEARCH FACILITY TO REPLACE BLDGS. 47 AND 103, SEPULVEDA VA MEDICAL CENTER PROJECT NUMBER 691-903
Due February 14, 2025 at 7:10 PM EST. SAM.gov, notice 2b5b23e27e4f44daa909d11924ec1fb0
8 revisions on SAM
- January 17, 2025: publish, presolicitation
- January 21, 2025: publish, combined synopsis and solicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- August 12, 2024: publish, presolicitation
January 17, 2025
Presolicitation
DESIGN BUILD CONSTRUCTION FOR ANIMAL RESEARCH FACILITY TO REPLACE BLDGS. 47 AND 103, SEPULVEDA VA MEDICAL CENTER PROJECT NUMBER 691-903
Due February 14, 2025 at 7:10 PM EST. SAM.gov, notice df7fa5ea485243fd83a7ad03c09568f5
7 revisions on SAM
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- January 17, 2025: publish, presolicitation
- August 12, 2024: publish, presolicitation
January 21, 2025
Combined synopsis and solicitation, originally presolicitation
Due February 14, 2025 at 7:00 PM EST. SAM.gov, notice 3e3b1bc274014131a0dfb59a55d53778
19 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- January 17, 2025: publish, presolicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
January 22, 2025
Combined synopsis and solicitation
Due February 14, 2025 at 7:00 PM EST. SAM.gov, notice 0f8d7b45da3d4cd5882c5734a4b454de
19 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- January 17, 2025: publish, presolicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
January 22, 2025
Combined synopsis and solicitation
Due February 14, 2025 at 7:00 PM EST. SAM.gov, notice c3984690fe08439797e6a6531ee4e115
19 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- January 17, 2025: publish, presolicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
February 5, 2025
Combined synopsis and solicitation
Design Build Construction for animal research facility to replace bldgs. 47 and 103, RFI Listing
Due February 17, 2025 at 7:00 PM EST. SAM.gov, notice 4a68ad04455e4731b6d44c8a2cf491ed
18 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
February 5, 2025
Combined synopsis and solicitation
Design Build Construction for animal research facility to replace bldgs. 47 and 103, RFI Listing
Due February 17, 2025 at 7:00 PM EST. SAM.gov, notice 63bafca85b4b4495bf91e6130c2529b4
19 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- January 17, 2025: publish, presolicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
February 5, 2025
Combined synopsis and solicitation
Due February 17, 2025 at 7:00 PM EST. SAM.gov, notice 8fa4580384b54efbaeaab9dfc4677ca7
19 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- January 17, 2025: publish, presolicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
February 13, 2025
Combined synopsis and solicitation
Replace Seismically Deficient Animal Research Buildings 47 and 103, Sepulveda Animal Research RFQ Due Date Extension
Due February 24, 2025 at 7:00 PM EST. SAM.gov, notice f33e2b8cd03845398e9d68ce5d7b908b
18 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
February 19, 2025
Combined synopsis and solicitation
Amendments to remove PLA language from solicitations per Class Deviation
Due February 24, 2025 at 7:00 PM EST. SAM.gov, notice 9c428ea72ec04c53a552c4865b5f2294
18 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
February 24, 2025
Combined synopsis and solicitation
Incorporation of PLA back to the solicitation due to Class Deviation Rescindment
Due March 3, 2025 at 7:00 PM EST. SAM.gov, notice ef39cadb4e8a45dcb9cbfabee208035f
18 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
April 17, 2025
Combined synopsis and solicitation
Phase II - Design Build Construction for animal research facility to replace bldgs. 47 and 103, Sepulveda VA Medical Center
Due June 2, 2025 at 7:00 PM EDT. SAM.gov, notice 12aed750330e425ba792b160ff848ccd
18 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
May 29, 2025
Combined synopsis and solicitation
Phase II - Design Build Construction for animal research facility to replace bldgs. 47 and 103, Sepulveda VA Medical Center
Due June 2, 2025 at 7:00 PM EDT. SAM.gov, notice 5dd00950d49341f9a06c9409a34c1125
19 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- January 17, 2025: publish, presolicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
May 29, 2025
Combined synopsis and solicitation
Design Build Construction for Animal Research Facility, Sepulveda VA Medical Center-RFI Responses and Due date Extension to June 16, 2025
Due June 16, 2025 at 3:00 PM EDT. SAM.gov, notice 9316b448a90f4c47a9b8879175f23f24
18 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
May 30, 2025
Combined synopsis and solicitation
Design Build Construction for Animal Research Facility, Sepulveda VA Medical Center-RFI Responses and Due date Extension to June 16, 2025
Due June 16, 2025 at 3:00 PM EDT. SAM.gov, notice 6c9737d0e5af4cfca2869eb60278e2e2
19 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- January 17, 2025: publish, presolicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
October 31, 2025
Combined synopsis and solicitation
Due November 7, 2025 at 7:00 PM EST. SAM.gov, notice 29c48079d30c42b3af38be4afdc1876e
19 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- January 17, 2025: publish, presolicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
October 31, 2025
Combined synopsis and solicitation
Design Build Construction for Animal Research Facility, Sepulveda VA Medical Center-RFI Responses and Due date Extension to June 16, 2025
Due June 16, 2025 at 3:00 PM EDT. SAM.gov, notice 84a45d6db6f44128a4ca9332482cae06
19 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- January 17, 2025: publish, presolicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
October 31, 2025
Combined synopsis and solicitation
Due November 7, 2025 at 7:00 PM EST. SAM.gov, notice e8ddd59649a54674a42598a221cf237e
18 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
November 6, 2025
Combined synopsis and solicitation
Due November 17, 2025 at 7:00 PM EST. SAM.gov, notice 0c65a3fb81bf4a4b8198d0f873e400c0
19 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- January 17, 2025: publish, presolicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
November 6, 2025
Combined synopsis and solicitation
Due November 17, 2025 at 7:00 PM EST. SAM.gov, notice fe4232b031894332a2d8aa4d6231931e
18 revisions on SAM
- November 6, 2025: publish, combined synopsis and solicitation
- November 6, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- October 31, 2025: publish, combined synopsis and solicitation
- May 30, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- May 29, 2025: publish, combined synopsis and solicitation
- April 17, 2025: publish, combined synopsis and solicitation
- February 24, 2025: publish, combined synopsis and solicitation
- February 19, 2025: publish, combined synopsis and solicitation
- February 13, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- February 5, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 22, 2025: publish, combined synopsis and solicitation
- January 21, 2025: publish, combined synopsis and solicitation
Points of contact
- Ferdinand Gawaran, Contracting Specialistferdinand.gawaran@va.gov707-227-8342