{"canonical":"https://sealedbidder.com/opportunities/36c10d25q0129","key":"36C10D25Q0129","url":"https://sealedbidder.com/opportunities/36c10d25q0129","title":"J042--Jackson Fire Suppression Maintenance","solicitation_number":"36C10D25Q0129","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-09-18T16:00:00Z","first_posted":"2025-07-07","last_posted":"2025-09-11","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"VETERANS BENEFITS ADMIN (36C10D)","naics":"541350","psc":"J042","set_aside":"SDVOSBC","place_state":"MS","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"28049","place_county_name":"Hinds County","place_city":"2836000","place_city_name":"Jackson","winner":"J3 ENTERPRISE LLC","award_amount":null,"publications":[{"notice_id":"b18d8ff122a24233bc6547f1d1c240fb","title":"J042--Jackson Fire Suppression Maintenance","solicitation_number":"36C10D25Q0129","notice_type":"p","base_type":"p","posted":"2025-07-07","posted_at":"2025-07-07T12:12:36.734Z","due_at":"2025-07-23T16:00:00Z","due_date":"2025-07-23","cancelled":false,"archived":true,"archive_date":"2025-08-02","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b18d8ff122a24233bc6547f1d1c240fb/view","enriched":true,"history":[{"index":6,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T14:02:03.456Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21a152040fc042fb92043180be5388bf","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"b18d8ff122a24233bc6547f1d1c240fb"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-07T12:12:36.734Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"b18d8ff122a24233bc6547f1d1c240fb","solicitation_number":"36C10D25Q0129"}]},{"notice_id":"21a152040fc042fb92043180be5388bf","title":"J042--Jackson Fire Suppression Maintenance","solicitation_number":"36C10D25Q0129","notice_type":"p","base_type":"p","posted":"2025-08-08","posted_at":"2025-08-08T14:02:03.456Z","due_at":"2025-07-23T16:00:00Z","due_date":"2025-07-23","cancelled":false,"archived":true,"archive_date":"2025-11-02","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/21a152040fc042fb92043180be5388bf/view","enriched":true,"history":[{"index":7,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T14:02:03.456Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21a152040fc042fb92043180be5388bf","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"b18d8ff122a24233bc6547f1d1c240fb"},{"index":5,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-07T12:12:36.734Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"b18d8ff122a24233bc6547f1d1c240fb","solicitation_number":"36C10D25Q0129"}]},{"notice_id":"d7453e6921d54fd49338d4cb8cd1bfab","title":"J042--Jackson Fire Suppression Maintenance","solicitation_number":"36C10D25Q0129","notice_type":"o","base_type":"p","posted":"2025-08-08","posted_at":"2025-08-08T18:31:39.322Z","due_at":"2025-09-05T16:00:00Z","due_date":"2025-09-05","cancelled":false,"archived":true,"archive_date":"2025-09-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d7453e6921d54fd49338d4cb8cd1bfab/view","enriched":true,"history":[{"index":9,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T14:02:03.456Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21a152040fc042fb92043180be5388bf","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"b18d8ff122a24233bc6547f1d1c240fb"},{"index":7,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-11T11:06:21.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"96c40101a22f447789f68a9c8628a2e1","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":5,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T13:59:34.365Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"916903ad522e4e02b82573133debd35c","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":4,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T11:43:48.992Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8ef24108f4dc49a98c00c196d78a1cf4","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T15:39:39.221Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79d03478dbff4d19ae1b8409f2051e43","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":2,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"}]},{"notice_id":"79d03478dbff4d19ae1b8409f2051e43","title":"J042--Jackson Fire Suppression Maintenance","solicitation_number":"36C10D25Q0129","notice_type":"o","base_type":"o","posted":"2025-08-29","posted_at":"2025-08-29T15:39:39.221Z","due_at":"2025-09-16T16:00:00Z","due_date":"2025-09-16","cancelled":false,"archived":true,"archive_date":"2025-10-16","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/79d03478dbff4d19ae1b8409f2051e43/view","enriched":true,"history":[{"index":6,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-11T11:06:21.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"96c40101a22f447789f68a9c8628a2e1","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":4,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T13:59:34.365Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"916903ad522e4e02b82573133debd35c","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T11:43:48.992Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8ef24108f4dc49a98c00c196d78a1cf4","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":2,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T15:39:39.221Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79d03478dbff4d19ae1b8409f2051e43","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":1,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"}]},{"notice_id":"8ef24108f4dc49a98c00c196d78a1cf4","title":"J042--Jackson Fire Suppression Maintenance","solicitation_number":"36C10D25Q0129","notice_type":"o","base_type":"o","posted":"2025-09-05","posted_at":"2025-09-05T11:43:48.992Z","due_at":"2025-09-16T16:00:00Z","due_date":"2025-09-16","cancelled":false,"archived":true,"archive_date":"2025-10-16","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8ef24108f4dc49a98c00c196d78a1cf4/view","enriched":true,"history":[{"index":6,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-11T11:06:21.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"96c40101a22f447789f68a9c8628a2e1","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":4,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T13:59:34.365Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"916903ad522e4e02b82573133debd35c","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T11:43:48.992Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8ef24108f4dc49a98c00c196d78a1cf4","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":2,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T15:39:39.221Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79d03478dbff4d19ae1b8409f2051e43","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":1,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"}]},{"notice_id":"916903ad522e4e02b82573133debd35c","title":"J042--Jackson Fire Suppression Maintenance","solicitation_number":"36C10D25Q0129","notice_type":"o","base_type":"o","posted":"2025-09-09","posted_at":"2025-09-09T13:59:34.365Z","due_at":"2025-09-16T16:00:00Z","due_date":"2025-09-16","cancelled":false,"archived":true,"archive_date":"2025-10-16","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/916903ad522e4e02b82573133debd35c/view","enriched":true,"history":[{"index":6,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-11T11:06:21.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"96c40101a22f447789f68a9c8628a2e1","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":4,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T13:59:34.365Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"916903ad522e4e02b82573133debd35c","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T11:43:48.992Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8ef24108f4dc49a98c00c196d78a1cf4","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":2,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T15:39:39.221Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79d03478dbff4d19ae1b8409f2051e43","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":1,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"}]},{"notice_id":"96c40101a22f447789f68a9c8628a2e1","title":"J042--Jackson Fire Suppression Maintenance","solicitation_number":"36C10D25Q0129","notice_type":"o","base_type":"o","posted":"2025-09-11","posted_at":"2025-09-11T11:06:21.603Z","due_at":"2025-09-18T16:00:00Z","due_date":"2025-09-18","cancelled":false,"archived":true,"archive_date":"2025-10-18","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/96c40101a22f447789f68a9c8628a2e1/view","enriched":true,"history":[{"index":6,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-11T11:06:21.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"96c40101a22f447789f68a9c8628a2e1","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":4,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T13:59:34.365Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"916903ad522e4e02b82573133debd35c","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T11:43:48.992Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8ef24108f4dc49a98c00c196d78a1cf4","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":2,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T15:39:39.221Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79d03478dbff4d19ae1b8409f2051e43","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":1,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"}]}],"latest_notice_id":"96c40101a22f447789f68a9c8628a2e1","first_type":"p","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-07-07","posted_at":"2025-07-07T12:12:36.734Z","created_at":"2025-07-07T12:12:34.471Z","modified_at":"2025-11-03T04:55:44.616Z","response_deadline":{"raw":"2025-07-23T12:00:00-04:00","utc":"2025-07-23T16:00:00Z","date":"2025-07-23","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b18d8ff122a24233bc6547f1d1c240fb/view"},"naics":{"codes":["541350"],"primary":"541350"},"title":"J042--Jackson Fire Suppression Maintenance","agency":{"office":{"code":"36C10D","name":"VETERANS BENEFITS ADMIN (36C10D)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"20006","city":"WASHINGTON","state":"DC","country":"USA"},"organization_id":"100167091","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-02","archive_type":"auto_custom"},"history":[{"index":6,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T14:02:03.456Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21a152040fc042fb92043180be5388bf","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"b18d8ff122a24233bc6547f1d1c240fb"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-07T12:12:36.734Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"b18d8ff122a24233bc6547f1d1c240fb","solicitation_number":"36C10D25Q0129"}],"contacts":[{"name":"Tiffany Garfield","role":"primary","email":"tiffany.garfield@va.gov","phone":"813-631-2818","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"b18d8ff122a24233bc6547f1d1c240fb","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"b18d8ff122a24233bc6547f1d1c240fb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T03:13:40.763059550Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"954513c2ba1c7a5f43bab107c9981331b82290af7cfa118ec24e30e40fbf569c","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-11T03:13:40.763059550Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"1\n\n\n\nPRE-SOLICITATION NOTICE\nFIRE AND SAFETY SYSTEM MAINTENANCE SOW\nGeneral:\n\nThe Contractor shall provide all supplies, travel, equipment, materials, parts, supervision, personnel/labor and technical supervision required to provide fire suppression system inspection and testing in accordance with the National Fire Protection Association (NFPA) codes, Joint Commission, The Department of Veterans Affairs, federal, state and local codes, and the manufacturer s recommended procedures for the Veterans Benefit Administration (VBA) Building at 1600 East Woodrow Wilson Ave, Jackson, MS 39216-5102. \n\nScope:\n\nThe Contractor shall provide services which include, but are not limited to: \n\nPerform scheduled and preventative maintenance including inspecting, testing, adjusting, repairing and parts replacement,\n\nTroubleshooting services to remedy failures and malfunctions,\n\nMajor equipment maintenance and overhaul, Maintenance reports, daily logs, and record keeping,\n\nMaintenance manual updating. The performance inspection, testing and repair of the fire alarm and notification systems, equipment and related components. The facility utilizes a Simplex FACP-4100U fire alarm system.\n\nProvide all labor to perform annual fire extinguisher inspection for up to 75 fire extinguishers of 5lb, 10lb, 20lb and two 131lb wheeled badger ABC extinguisher to include six and twelve-year maintenance testing and tagging.  Perform Hydrostatic testing and Maintenance on fire extinguishers as needed and replacement if needed in the VBA Building, Parking Garage, and Basement Storage Room. (Note: most ABC extinguishers were purchased in June 2013 therefore will be due hydrostatic testing at the same time).\n\nThe Contractor will be responsible to conduct a Five Year Internal and Obstruction inspection due on 18 wet sprinklers and gauges in accordance with NFPA 25, Chapter 13. In accordance with Section 13.2.7 (Gauges) shall be inspected to verify that gauges are operable and not physically damaged. Section 13.4.2.1 (Check Valves) Inspections shall be inspected internally every 5 years to verify that all of the valve s components operate correctly. Section 13.4.3.1.5 (Strainers, Filters, Restricted Orifices, and Diaphragms Chambers) shall be inspected internally every 5 years unless test indicate a greater frequency is necessary.  During this inspection any sprinkler gauges deemed out of date or requires replacing must be replace in accordance with NFPA 25, Section 13 \n\nThe Contractor shall be responsible to perform all services necessary to perform semi-annual inspection and certification of automatic kitchen hood suppression system and replace fusible links, located in the 2nd floor canteen during the months of October and April respectively (unless written changes are agreed upon in advance). The Contractor shall provide written notice two weeks in advance to the COTR to allow scheduling with all parties involved and prevent interfering with canteen serving schedule.  The Contractor is required to steam clean canteen vent hood twice during each contract year. Regular cleaning is necessary to keep the vent hood system functioning at its peak and to avoid costly breakdowns, cleaning is a must to stay in compliance with local health and fire codes. The cleaning shall include the entire hood system including exhaust fan(s), stack, grease filters, and backsplash. Polish the hood and clean up afterwards to follow NFPA Part 96 fire code regulations and applicable health codes. \n\nAntifreeze System: The freezing point of solutions in antifreeze will be tested annually by measuring the specific gravity with a hydrometer or refractometer and adjust the solutions if necessary.\n\nAlarm devises will be inspected quarterly to verify that they are free of physical damage.\n\nTest 8 backflow preventers once per contract year.\n\nMonthly maintenance will include inspect building fire sprinkler system to include operating the floor control valves for each floor of the building; opening and closing each standpipe valve; operating and test fire pump. Any associated labor and parts for maintenance or repairs shall be included in this contract.\n\nNo work is to be performed on the site on Saturdays, Sundays or legal holidays unless otherwise specified and the COTR is duly notified in writing no less than forty-eight hours in advance of the contemplated work and written approval for such is obtained.\n\nDevices include manual alarm devices, smoke and heat detectors, remote and graphic annunciators, main fire alarm panel and components to include; programming, voice alarm system, speakers and horns, and other audible and visual alarm devices. Additional components include wiring circuits and junctions, other alarm detection, control, ancillary, and emergency power operation devices.\n\nGeneral Requirements\n\nFire Alarm System Operability - The Contractor shall ensure that the fire alarm system is operable always except when being tested or repaired. When services require the system be turned off, the Contractor shall provide backup fire monitoring protection by providing sufficient personnel to perform the service and monitor the fire alarm system control panel until the system is brought back on line. All routine service visits shall be scheduled with the COR.\n\nRegardless of the reason for, or duration of a shutdown, the affected portion of the alarm system shall be tested to ensure that protection has been restored.\n\nThe Contractor is responsible for obtaining all necessary permits and licenses required for performing fire alarm tests and inspections, at the contractor's expense.\n\nHazardous Condition - If the Contractor encounters equipment that is in a condition that may endanger life or property, the Contractor shall immediately notify the COR. The Contractor shall also provide a written report which outlines the hazardous condition and recommended corrective action to the COR within 24 hours.\n\nThe Government reserves the right to monitor services in accordance with the contract as deemed necessary to ensure the system is operating as required.\n\nEach contract employee must sign in with the COR when arriving on VA Property, and will be escorted while in the building. The Contractor shall not be permitted on VA property without displaying proper ID. The Contractor shall deliver the service report and test reports to the Contracting Officer Representation (COR) located in the Support Services Division (SSD), Room 154, 1600 E. Woodrow Wilson Ave, Jackson, MS 39216.\n\nHours of Inspection- Inspections shall be performed during normal working hours, 6:00 AM - 6:00 PM, Monday- Friday, exclusive of federal holidays.  All alarm system service visits must be coordinated and scheduled with the COR 48 hours in advance.  All annual testing of the strobes and alarms are to be conducted between the hours of 6:00 PM   8:00 PM on a weekday. \n\nThe Contractor shall report the results of inspections and tests in accordance with NFPA-recommended format, or as directed by the COR.  Inspection reports will list each appliance and peripheral device; including audio, visuals, strobes, speakers and door holders that are connected to the fire alarm control panel, by device location and mapnet address, if such an address is available in the Fire Alarm Control Panel (FACP).\n\nFire Alarm Inventory Changes   The Contractor shall maintain an inventory of all active devices in the fire alarm system. COR shall inform the Contractor of any changes due to construction or other adjustments.\n\nNon-Contract Services - Those services not covered by this contract shall be negotiated between the Government and the Contractor and shall be procured through separate purchase agreements. The Contractor shall provide a scope of work, cost proposal and verification that technician(s) performing any non-contract work are properly certified.\nContractor Requirements\n\nThe Contractor agrees in accordance with NFPA 72, Section 14.2.3.6 (Service Personnel Qualifications and Experience). Service personnel shall be qualified and experienced in accordance with the requirements of 10.5.3 of the NFPA 72.\n\nThe Contractor may be asked to remove persons who pose a threat to health, safety, security or property.\n\nThe Contractor shall have enough qualified employees available to adequately and safely perform all work required under the terms of this contract.\n\nIn accordance with NFPA 72, Section 10.5.3 (Inspection, Testing, and Service Personnel) Service personnel shall have the knowledge and experience of the testing requirements contained in this Code, of the equipment being serviced or maintained, and of the servicing or maintenance methods.\n\nThe Contractor must demonstrate that its technicians are factory trained and certified for the specific type and brand of system being serviced, or who are certified by a nationally recognized certification organization acceptable to the authority having jurisdiction.\n\nAll Contractor and Subcontractor personnel performing work in this contract must possess any required state, county, locality or other licenses or permits. \nFire Alarm System Testing and Inspection Requirements\n\nThe Contractor shall perform an annual system and inspection, smoke detector cleaning, 24-HR, 7-day emergency coverage, and a complete written notification of any deficiencies and recommendations for repair covering all fire suppression, detection, and audio-visual devices present in the VBA Building, Parking Garage and basement Storage Room.  Service and inspect the ANSUL fire suppression system twice per each contract year in accordance with the testing methods and frequencies listed in the most recent edition of NFPA 72, National Fire Alarm Code.\n\nThe Contractor shall perform control equipment testing utilizing NFPA 72, Section 7.6 Inspection, Testing, and Maintenance Documentation (SIG-TMS):\n\nSection 7.6.6 (Record of Inspection and Testing). The record of all inspections, testing, and maintenance as required by section 14.6.2.4 shall be documented using either the record of inspection and testing forms, Figure 7.8.2(g) through Figure 7.8.2(l), or an alternative record that includes all the applicable information shown in Figure 7.8.2 (g) through Figure 7.8.2 (l). Verify correct receipt of alarm, supervisory and trouble signals (inputs).\n\nOperation of evacuation signals and auxiliary functions (outputs).\n\nCircuit supervision; including detection of open circuits, ground faults and power supply supervision for detection of loss of AC power and disconnection of secondary batteries. \n\nAuxiliary functions to be tested include, but are not limited to:\n\nVoice and strobe signals\n\nDoor release service\n\nDoor unlock service\n\nElevator recall\n\nHeat detector/shut trip for elevator mechanical rooms\n\nFan shut down on activation of associated duct detectors\n\nThe Contractor shall confirm that all auxiliary functions were tested and are functioning properly.\n\nThe Contractor shall prepare and submit a report of the inspection and test results to the COR within 14 days after inspection and testing has been completed, which shall include a list of all appliances and peripheral devices; including audio/visuals, strobes, speakers, and door holders that are connected to the fire alarm control panel, by device location and mapnet address.\n\nThe report must also contain the following:\n\nThe Contractor s Inspection and Testing Form that includes all the information required by NFPA 72, most recent edition.\n\nThe date of manufacture of fire alarm system and whether replacement parts are readily available.\n\nAny deficiencies noted, including inoperable or unsupervised devices or equipment, and devices that cannot be calibrated, tested or serviced in accordance with the manufacturer s recommendations.\n\nA cost proposal to correct any deficiencies, by device, separated into parts and labor costs. \n\nInspection and testing shall be performed in the following locations:\n\nVeterans Benefits Administration Building\n\nParking Garage\n\nBasement Storage Room\n\nIn accordance with NFPA 72, section 14.2.4.1; Before proceeding with any testing, all persons and facilities receiving alarm, supervisory, or trouble signal s and all building occupants shall be notified of the testing to prevent unnecessary response. The Contractor shall notify the VBA Safety Office, VBA Police, Alarm Monitoring Provider, and the local fire department. The COR shall ensure that all building occupants are notified. \n\nIn accordance with NFPA 72, section 14.2.4.2; At the conclusion of testing, those previously notified (and others, as necessary) shall be notified that testing has been concluded.\n\nThe Contractor may be required to perform some inspections or tests outside of normal working hours. Any work that would be considered disruptive to occupants (testing audible devices, elevator capture, fan shutdown, etc.) shall be performed after normal working hours between 6:00 PM   8:00 PM on weekdays. The Contractor and COR will coordinate after-hours building access.\n\nAny damage to the fire alarm or associated equipment (fans, elevators, generators, pumps) caused by normal testing shall be repaired by the Contractor at no additional cost to the Government. At its discretion, the Government may have representatives present to witness any or all such tests. All costs associated with this damage shall be borne by the Contractor.\n\nEquipment list: \nItem Number\nDescription\n\n\n1\nBackflows- 8; (2 domestic water, 2 irrigation water, 2 on chilled water makeup, 1 in basement on main supply, 1 on antifreeze loop)\n2\nKitchen Hoods- 1 hood with 3 links\n3\nFACP-4100U\n4\nBatteries-2\n5\nDucts-13\n6\nFlame Det-1\n7\nHeats-7\n8\nSmokes-70\n9\nPulls-35\n10\nWater Flows-15\n11\nZAMs-7\n12\nElevator Recall\n13\nAV-67\n14\nAnnunciator-1\n15\nVO-7\n16\nTampers-30\n17\nHorn-1\n18\nPower Supply-2\n19\nExtinguishers-up to 75\n20\n2 wet system with 16 total zones\n21\n1 fire pump\n22\n1 antifreeze loop\n\nRepairs and Repair Charges\n\nRepairs are defined as unscheduled work to repair or modify the fire alarm system, or to correct recurring system and/or equipment malfunction(s) or deficiencies identified during testing. All repairs must be authorized by the COR or a representative before any work begins.\n\nThe Contractor must be able to secure replacement parts for the system within 24 hours for the central processing unit (CPU), controller, monitoring and signaling cards, display boards, and other critical parts that may be required to restore the system to fully functional.\n  \nIf a replacement part is no longer available, the Contractor shall provide a replacement part model number and cost.\n\nWhen repairs are made that require replacement parts, The Regional Office shall issue a separate purchase order to cover the cost of these parts when funding is approved.\n\nWhen the Contractor identifies a repair need, they shall notify the COR before any repair work is started. If authorized, the Contractor shall complete the repair and submit a written report which contains the following:\n\nDetails the deficiency and suspected causes\nNature of the repair work provided\nList of any replacement parts used\nThe number of hours needed to complete the work\n\nOnce corrected, all deficiencies shall be tested according to the requirements in NFPA 72, most recent addition.\n \nThe Contractor shall provide a written record of all alarm system repairs upon request.\n\nSafety Requirements\nThe Contractor shall adhere to all OSHA, EPA, NFPA Life Safety Codes, and all other regulatory requirements.\n\nIn performance of this contract, the Contractor shall follow VBA safety policies and standards for safe work practices and take such safety precautions as the Safety Officer or designee may determine to be reasonably necessary to protect the lives and health of occupants of the building.  \n\nEmployee, visitor, and Contractor personnel safety best practices shall be adhered to always.  The Contractor is responsible for the safety and health of his/her employees. \n\nThe Contractor shall submit to the Contracting Officer, prior to the start of the contract, the Safety Data Sheets (SDS) for all potentially hazardous materials (lubricants, cleaners, working fluids, etc.) to be used in the facility during performance of the contract, and will not use in the facility, any materials which have not been cleared in advance with COR.  SDS for new chemicals shall be furnished concurrently with the arrival of the chemical on site.  The Contractor shall maintain a copy of all SDS at the chemical storage site in a location accessible to Regional Office personnel to assure compliance with all laws and requirements regarding the  Right to Know  law.\n\nThe Contractor is responsible for identifying, providing and maintaining all personal protective equipment (PPE) required to perform the duties outlined in the contract.  Additionally, the Contractor is responsible for identifying and adhering to all applicable safety program guidelines (lockout/tag out, confined space entry, universal precautions, etc.) required to perform the work.  Contractor is responsible for providing and documenting all required safety training and proper use of PPE to their employees. Training documentation shall be provided to the COR upon request.\n\nThe Contractor shall be notified of any non-compliance with the provisions of the contract.  The Contractor shall, after receipt of such notice, immediately correct the condition and notify the COR/contracting officer in writing that the condition has been corrected.  If, in the opinion of the Regional Office Safety Officer or designee, the compliance condition is life threatening, he/she shall instruct the Contractor to stop work until the condition has been corrected.  If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order halting all or any part of the work, and Contractor may be held in default. The Contractor shall bear all costs associated with a stoppage of work or time spent correcting any safety hazards.\n\nThe Contractor shall provide the following information within ten (10) working days after award of the contract:\n\nA detailed listing of safety programs and procedures that will be followed by the Contractor during the performance of the contract, and the work activities indicating when such procedures would be required.\n\nA detailed listing of the personal protective equipment (PPE) which Contractor personnel will utilize during the performance of the contract, and the work activities indicating when such equipment would be required.\n\nSafety Data Sheet (SDS) for any chemical(s) utilized by the Contractor in the performance of this contract.\n\nThe Contractor is responsible for the supervision of all its employees while on government property.  It is the Contractor s responsibility to assure compliance with the scope of work and the requirements of this contract.  Provisions provided in the scope of work are not intended to relieve the Contractor of this responsibility.\n\nIn the event of an accident or injury, the Contractor shall submit a written report to the COR within five work (5) days of the incident detailing the malfunction, accident or injury involved on site. The report shall state the cause of the injury or accident, and a list of completed or scheduled corrective actions to avoid further incidents.\n\nContractor Employee Conduct\n \nContractor shall ensure that their employees comply with the following at all times while on VBA property:\n\nContractors may not use government office equipment or computers, and should never search through desks, cabinets or files.\n\nGovernment telephones may be used for contract related work only.\n\nThe Contractor shall follow all applicable VA regulations and directives and will comply with any direction or instructions from government officials including the contracting officer (CO), COR, federal police officers, inspectors, etc.\n\nThe Contractor shall leave areas where it performs work neat, clean, and orderly.\nInvoices\nInvoices will be submitted no later than the 5th day of each month to the SSD mailbox (SSD.VBAJAC@va.gov), COR and Contracting Officer. A proper invoice is defined as one that identifies the contractor s name, phone number, contact information, invoice date, and itemized amount of billable work performed. Invoices shall include the following:\n\nContact Number\nCompany Name and Address\nInvoice Date\nInvoice Number (Note: Each invoice must have a different Invoice Number)\nContract Number\nObligation Number\nDescription of services provided as well as referencing the appropriate Contract Line Item Number (CLIN).  This way, the proper CLIN can be billed for the Invoice.\nDates of services\nTerms for any discount for prompt payment\n\nThe information page for the Financial Service Center of the Department of Veterans Affairs that includes information regarding electronic invoice submission can be referenced at:  http://www.fsc.va.gov/einvoice.asp\n\nNOTE: Invoices for payment may be rejected if all information required by FAR Clause 52.212-4(g) is not included.  Invoices without the required information will be returned.\n\nInvoices must be approved by the Contracting Officer s Representative prior to payment release.  Invoices without the required information will be returned.\n \nAll invoices must include the assigned purchase order number and be submitted within 10 days following the month of service.\n \nFailure to comply with all terms and conditions of this contract shall result in invoices/claims submitted for reimbursement during that period to be considered incomplete. Interest penalties imposed under the Prompt Payment Act shall not apply to incomplete invoices or invoices received after the established invoice due date. Contractor shall identify and assign personnel to be the liaison for billing purposes.\n\nThe Department of Veterans Affairs Financial Service Center (FSC) is the designated agency office for invoice receipt in accordance with the Prompt Payment Act (5 CFR Part 1315).  FSC or its designated representative may contact the vendor to provide specific instructions for electronic submission of invoices.  The vendor shall be responsible for any associated expenses.  FSC may utilize third-party contractors to facilitate invoice processing. \n\nContractor Remittance Address:  All payments by the Government to the Contractor shall be made by Electronic Funds Transfer (EFT).\nSpecial Contract Requirements\n\nSafety Requirements:  To protect the lives and health of occupants of the buildings, the Contractor in the performance of this Contract shall take such safety precautions as the CO, or his designate, may determine to be reasonably necessary. The CO, or his designate, shall notify the Contractor of any non-compliance with the foregoing provisions and the action to be taken.  The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed.  Such notice, when served on the Contractor or his representative shall be deemed sufficient for the purpose aforesaid.  If the Contractor fails or refuses to comply promptly, the CO may issue an order, stopping all or any part of the work, and hold the Contractor in default. Noncompliance may result in Contract termination.\n\nInterference with Normal Functions:  The Contractor s personnel are required to interrupt their work at any time so as not to interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility visitors, employees, equipment and emergency and/or service carts.  These interruptions should only be occasional.  Any interruptions considered to be excessive should be brought to the attention of the CO.\nSecurity Requirements\n\nAll Contractors and Contractor personnel shall be subject to the same Federal security and privacy laws, regulations, standards and VA policies as VA, including the Privacy Act, 5 U.S.C. Â§552a, and VA personnel, regarding information and information system security.\n\nEach employee working in the Regional Office Building will be required to view a Security Video (duration of 45 minutes) and sign a rules of behavior form.","text":"1\n\nPRE-SOLICITATION NOTICE\nFIRE AND SAFETY SYSTEM MAINTENANCE SOW\nGeneral:\n\nThe Contractor shall provide all supplies, travel, equipment, materials, parts, supervision, personnel/labor and technical supervision required to provide fire suppression system inspection and testing in accordance with the National Fire Protection Association (NFPA) codes, Joint Commission, The Department of Veterans Affairs, federal, state and local codes, and the manufacturer s recommended procedures for the Veterans Benefit Administration (VBA) Building at 1600 East Woodrow Wilson Ave, Jackson, MS 39216-5102.\n\nScope:\n\nThe Contractor shall provide services which include, but are not limited to:\n\nPerform scheduled and preventative maintenance including inspecting, testing, adjusting, repairing and parts replacement,\n\nTroubleshooting services to remedy failures and malfunctions,\n\nMajor equipment maintenance and overhaul, Maintenance reports, daily logs, and record keeping,\n\nMaintenance manual updating. The performance inspection, testing and repair of the fire alarm and notification systems, equipment and related components. The facility utilizes a Simplex FACP-4100U fire alarm system.\n\nProvide all labor to perform annual fire extinguisher inspection for up to 75 fire extinguishers of 5lb, 10lb, 20lb and two 131lb wheeled badger ABC extinguisher to include six and twelve-year maintenance testing and tagging. Perform Hydrostatic testing and Maintenance on fire extinguishers as needed and replacement if needed in the VBA Building, Parking Garage, and Basement Storage Room. (Note: most ABC extinguishers were purchased in June 2013 therefore will be due hydrostatic testing at the same time).\n\nThe Contractor will be responsible to conduct a Five Year Internal and Obstruction inspection due on 18 wet sprinklers and gauges in accordance with NFPA 25, Chapter 13. In accordance with Section 13.2.7 (Gauges) shall be inspected to verify that gauges are operable and not physically damaged. Section 13.4.2.1 (Check Valves) Inspections shall be inspected internally every 5 years to verify that all of the valve s components operate correctly. Section 13.4.3.1.5 (Strainers, Filters, Restricted Orifices, and Diaphragms Chambers) shall be inspected internally every 5 years unless test indicate a greater frequency is necessary. During this inspection any sprinkler gauges deemed out of date or requires replacing must be replace in accordance with NFPA 25, Section 13\n\nThe Contractor shall be responsible to perform all services necessary to perform semi-annual inspection and certification of automatic kitchen hood suppression system and replace fusible links, located in the 2nd floor canteen during the months of October and April respectively (unless written changes are agreed upon in advance). The Contractor shall provide written notice two weeks in advance to the COTR to allow scheduling with all parties involved and prevent interfering with canteen serving schedule. The Contractor is required to steam clean canteen vent hood twice during each contract year. Regular cleaning is necessary to keep the vent hood system functioning at its peak and to avoid costly breakdowns, cleaning is a must to stay in compliance with local health and fire codes. The cleaning shall include the entire hood system including exhaust fan(s), stack, grease filters, and backsplash. Polish the hood and clean up afterwards to follow NFPA Part 96 fire code regulations and applicable health codes.\n\nAntifreeze System: The freezing point of solutions in antifreeze will be tested annually by measuring the specific gravity with a hydrometer or refractometer and adjust the solutions if necessary.\n\nAlarm devises will be inspected quarterly to verify that they are free of physical damage.\n\nTest 8 backflow preventers once per contract year.\n\nMonthly maintenance will include inspect building fire sprinkler system to include operating the floor control valves for each floor of the building; opening and closing each standpipe valve; operating and test fire pump. Any associated labor and parts for maintenance or repairs shall be included in this contract.\n\nNo work is to be performed on the site on Saturdays, Sundays or legal holidays unless otherwise specified and the COTR is duly notified in writing no less than forty-eight hours in advance of the contemplated work and written approval for such is obtained.\n\nDevices include manual alarm devices, smoke and heat detectors, remote and graphic annunciators, main fire alarm panel and components to include; programming, voice alarm system, speakers and horns, and other audible and visual alarm devices. Additional components include wiring circuits and junctions, other alarm detection, control, ancillary, and emergency power operation devices.\n\nGeneral Requirements\n\nFire Alarm System Operability - The Contractor shall ensure that the fire alarm system is operable always except when being tested or repaired. When services require the system be turned off, the Contractor shall provide backup fire monitoring protection by providing sufficient personnel to perform the service and monitor the fire alarm system control panel until the system is brought back on line. All routine service visits shall be scheduled with the COR.\n\nRegardless of the reason for, or duration of a shutdown, the affected portion of the alarm system shall be tested to ensure that protection has been restored.\n\nThe Contractor is responsible for obtaining all necessary permits and licenses required for performing fire alarm tests and inspections, at the contractor's expense.\n\nHazardous Condition - If the Contractor encounters equipment that is in a condition that may endanger life or property, the Contractor shall immediately notify the COR. The Contractor shall also provide a written report which outlines the hazardous condition and recommended corrective action to the COR within 24 hours.\n\nThe Government reserves the right to monitor services in accordance with the contract as deemed necessary to ensure the system is operating as required.\n\nEach contract employee must sign in with the COR when arriving on VA Property, and will be escorted while in the building. The Contractor shall not be permitted on VA property without displaying proper ID. The Contractor shall deliver the service report and test reports to the Contracting Officer Representation (COR) located in the Support Services Division (SSD), Room 154, 1600 E. Woodrow Wilson Ave, Jackson, MS 39216.\n\nHours of Inspection- Inspections shall be performed during normal working hours, 6:00 AM - 6:00 PM, Monday- Friday, exclusive of federal holidays. All alarm system service visits must be coordinated and scheduled with the COR 48 hours in advance. All annual testing of the strobes and alarms are to be conducted between the hours of 6:00 PM 8:00 PM on a weekday.\n\nThe Contractor shall report the results of inspections and tests in accordance with NFPA-recommended format, or as directed by the COR. Inspection reports will list each appliance and peripheral device; including audio, visuals, strobes, speakers and door holders that are connected to the fire alarm control panel, by device location and mapnet address, if such an address is available in the Fire Alarm Control Panel (FACP).\n\nFire Alarm Inventory Changes The Contractor shall maintain an inventory of all active devices in the fire alarm system. COR shall inform the Contractor of any changes due to construction or other adjustments.\n\nNon-Contract Services - Those services not covered by this contract shall be negotiated between the Government and the Contractor and shall be procured through separate purchase agreements. The Contractor shall provide a scope of work, cost proposal and verification that technician(s) performing any non-contract work are properly certified.\nContractor Requirements\n\nThe Contractor agrees in accordance with NFPA 72, Section 14.2.3.6 (Service Personnel Qualifications and Experience). Service personnel shall be qualified and experienced in accordance with the requirements of 10.5.3 of the NFPA 72.\n\nThe Contractor may be asked to remove persons who pose a threat to health, safety, security or property.\n\nThe Contractor shall have enough qualified employees available to adequately and safely perform all work required under the terms of this contract.\n\nIn accordance with NFPA 72, Section 10.5.3 (Inspection, Testing, and Service Personnel) Service personnel shall have the knowledge and experience of the testing requirements contained in this Code, of the equipment being serviced or maintained, and of the servicing or maintenance methods.\n\nThe Contractor must demonstrate that its technicians are factory trained and certified for the specific type and brand of system being serviced, or who are certified by a nationally recognized certification organization acceptable to the authority having jurisdiction.\n\nAll Contractor and Subcontractor personnel performing work in this contract must possess any required state, county, locality or other licenses or permits.\nFire Alarm System Testing and Inspection Requirements\n\nThe Contractor shall perform an annual system and inspection, smoke detector cleaning, 24-HR, 7-day emergency coverage, and a complete written notification of any deficiencies and recommendations for repair covering all fire suppression, detection, and audio-visual devices present in the VBA Building, Parking Garage and basement Storage Room. Service and inspect the ANSUL fire suppression system twice per each contract year in accordance with the testing methods and frequencies listed in the most recent edition of NFPA 72, National Fire Alarm Code.\n\nThe Contractor shall perform control equipment testing utilizing NFPA 72, Section 7.6 Inspection, Testing, and Maintenance Documentation (SIG-TMS):\n\nSection 7.6.6 (Record of Inspection and Testing). The record of all inspections, testing, and maintenance as required by section 14.6.2.4 shall be documented using either the record of inspection and testing forms, Figure 7.8.2(g) through Figure 7.8.2(l), or an alternative record that includes all the applicable information shown in Figure 7.8.2 (g) through Figure 7.8.2 (l). Verify correct receipt of alarm, supervisory and trouble signals (inputs).\n\nOperation of evacuation signals and auxiliary functions (outputs).\n\nCircuit supervision; including detection of open circuits, ground faults and power supply supervision for detection of loss of AC power and disconnection of secondary batteries.\n\nAuxiliary functions to be tested include, but are not limited to:\n\nVoice and strobe signals\n\nDoor release service\n\nDoor unlock service\n\nElevator recall\n\nHeat detector/shut trip for elevator mechanical rooms\n\nFan shut down on activation of associated duct detectors\n\nThe Contractor shall confirm that all auxiliary functions were tested and are functioning properly.\n\nThe Contractor shall prepare and submit a report of the inspection and test results to the COR within 14 days after inspection and testing has been completed, which shall include a list of all appliances and peripheral devices; including audio/visuals, strobes, speakers, and door holders that are connected to the fire alarm control panel, by device location and mapnet address.\n\nThe report must also contain the following:\n\nThe Contractor s Inspection and Testing Form that includes all the information required by NFPA 72, most recent edition.\n\nThe date of manufacture of fire alarm system and whether replacement parts are readily available.\n\nAny deficiencies noted, including inoperable or unsupervised devices or equipment, and devices that cannot be calibrated, tested or serviced in accordance with the manufacturer s recommendations.\n\nA cost proposal to correct any deficiencies, by device, separated into parts and labor costs.\n\nInspection and testing shall be performed in the following locations:\n\nVeterans Benefits Administration Building\n\nParking Garage\n\nBasement Storage Room\n\nIn accordance with NFPA 72, section 14.2.4.1; Before proceeding with any testing, all persons and facilities receiving alarm, supervisory, or trouble signal s and all building occupants shall be notified of the testing to prevent unnecessary response. The Contractor shall notify the VBA Safety Office, VBA Police, Alarm Monitoring Provider, and the local fire department. The COR shall ensure that all building occupants are notified.\n\nIn accordance with NFPA 72, section 14.2.4.2; At the conclusion of testing, those previously notified (and others, as necessary) shall be notified that testing has been concluded.\n\nThe Contractor may be required to perform some inspections or tests outside of normal working hours. Any work that would be considered disruptive to occupants (testing audible devices, elevator capture, fan shutdown, etc.) shall be performed after normal working hours between 6:00 PM 8:00 PM on weekdays. The Contractor and COR will coordinate after-hours building access.\n\nAny damage to the fire alarm or associated equipment (fans, elevators, generators, pumps) caused by normal testing shall be repaired by the Contractor at no additional cost to the Government. At its discretion, the Government may have representatives present to witness any or all such tests. All costs associated with this damage shall be borne by the Contractor.\n\nEquipment list:\nItem Number\nDescription\n\n1\nBackflows- 8; (2 domestic water, 2 irrigation water, 2 on chilled water makeup, 1 in basement on main supply, 1 on antifreeze loop)\n2\nKitchen Hoods- 1 hood with 3 links\n3\nFACP-4100U\n4\nBatteries-2\n5\nDucts-13\n6\nFlame Det-1\n7\nHeats-7\n8\nSmokes-70\n9\nPulls-35\n10\nWater Flows-15\n11\nZAMs-7\n12\nElevator Recall\n13\nAV-67\n14\nAnnunciator-1\n15\nVO-7\n16\nTampers-30\n17\nHorn-1\n18\nPower Supply-2\n19\nExtinguishers-up to 75\n20\n2 wet system with 16 total zones\n21\n1 fire pump\n22\n1 antifreeze loop\n\nRepairs and Repair Charges\n\nRepairs are defined as unscheduled work to repair or modify the fire alarm system, or to correct recurring system and/or equipment malfunction(s) or deficiencies identified during testing. All repairs must be authorized by the COR or a representative before any work begins.\n\nThe Contractor must be able to secure replacement parts for the system within 24 hours for the central processing unit (CPU), controller, monitoring and signaling cards, display boards, and other critical parts that may be required to restore the system to fully functional.\n\nIf a replacement part is no longer available, the Contractor shall provide a replacement part model number and cost.\n\nWhen repairs are made that require replacement parts, The Regional Office shall issue a separate purchase order to cover the cost of these parts when funding is approved.\n\nWhen the Contractor identifies a repair need, they shall notify the COR before any repair work is started. If authorized, the Contractor shall complete the repair and submit a written report which contains the following:\n\nDetails the deficiency and suspected causes\nNature of the repair work provided\nList of any replacement parts used\nThe number of hours needed to complete the work\n\nOnce corrected, all deficiencies shall be tested according to the requirements in NFPA 72, most recent addition.\n\nThe Contractor shall provide a written record of all alarm system repairs upon request.\n\nSafety Requirements\nThe Contractor shall adhere to all OSHA, EPA, NFPA Life Safety Codes, and all other regulatory requirements.\n\nIn performance of this contract, the Contractor shall follow VBA safety policies and standards for safe work practices and take such safety precautions as the Safety Officer or designee may determine to be reasonably necessary to protect the lives and health of occupants of the building.\n\nEmployee, visitor, and Contractor personnel safety best practices shall be adhered to always. The Contractor is responsible for the safety and health of his/her employees.\n\nThe Contractor shall submit to the Contracting Officer, prior to the start of the contract, the Safety Data Sheets (SDS) for all potentially hazardous materials (lubricants, cleaners, working fluids, etc.) to be used in the facility during performance of the contract, and will not use in the facility, any materials which have not been cleared in advance with COR. SDS for new chemicals shall be furnished concurrently with the arrival of the chemical on site. The Contractor shall maintain a copy of all SDS at the chemical storage site in a location accessible to Regional Office personnel to assure compliance with all laws and requirements regarding the Right to Know law.\n\nThe Contractor is responsible for identifying, providing and maintaining all personal protective equipment (PPE) required to perform the duties outlined in the contract. Additionally, the Contractor is responsible for identifying and adhering to all applicable safety program guidelines (lockout/tag out, confined space entry, universal precautions, etc.) required to perform the work. Contractor is responsible for providing and documenting all required safety training and proper use of PPE to their employees. Training documentation shall be provided to the COR upon request.\n\nThe Contractor shall be notified of any non-compliance with the provisions of the contract. The Contractor shall, after receipt of such notice, immediately correct the condition and notify the COR/contracting officer in writing that the condition has been corrected. If, in the opinion of the Regional Office Safety Officer or designee, the compliance condition is life threatening, he/she shall instruct the Contractor to stop work until the condition has been corrected. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order halting all or any part of the work, and Contractor may be held in default. The Contractor shall bear all costs associated with a stoppage of work or time spent correcting any safety hazards.\n\nThe Contractor shall provide the following information within ten (10) working days after award of the contract:\n\nA detailed listing of safety programs and procedures that will be followed by the Contractor during the performance of the contract, and the work activities indicating when such procedures would be required.\n\nA detailed listing of the personal protective equipment (PPE) which Contractor personnel will utilize during the performance of the contract, and the work activities indicating when such equipment would be required.\n\nSafety Data Sheet (SDS) for any chemical(s) utilized by the Contractor in the performance of this contract.\n\nThe Contractor is responsible for the supervision of all its employees while on government property. It is the Contractor s responsibility to assure compliance with the scope of work and the requirements of this contract. Provisions provided in the scope of work are not intended to relieve the Contractor of this responsibility.\n\nIn the event of an accident or injury, the Contractor shall submit a written report to the COR within five work (5) days of the incident detailing the malfunction, accident or injury involved on site. The report shall state the cause of the injury or accident, and a list of completed or scheduled corrective actions to avoid further incidents.\n\nContractor Employee Conduct\n\nContractor shall ensure that their employees comply with the following at all times while on VBA property:\n\nContractors may not use government office equipment or computers, and should never search through desks, cabinets or files.\n\nGovernment telephones may be used for contract related work only.\n\nThe Contractor shall follow all applicable VA regulations and directives and will comply with any direction or instructions from government officials including the contracting officer (CO), COR, federal police officers, inspectors, etc.\n\nThe Contractor shall leave areas where it performs work neat, clean, and orderly.\nInvoices\nInvoices will be submitted no later than the 5th day of each month to the SSD mailbox (SSD.VBAJAC@va.gov), COR and Contracting Officer. A proper invoice is defined as one that identifies the contractor s name, phone number, contact information, invoice date, and itemized amount of billable work performed. Invoices shall include the following:\n\nContact Number\nCompany Name and Address\nInvoice Date\nInvoice Number (Note: Each invoice must have a different Invoice Number)\nContract Number\nObligation Number\nDescription of services provided as well as referencing the appropriate Contract Line Item Number (CLIN). This way, the proper CLIN can be billed for the Invoice.\nDates of services\nTerms for any discount for prompt payment\n\nThe information page for the Financial Service Center of the Department of Veterans Affairs that includes information regarding electronic invoice submission can be referenced at: http://www.fsc.va.gov/einvoice.asp\n\nNOTE: Invoices for payment may be rejected if all information required by FAR Clause 52.212-4(g) is not included. Invoices without the required information will be returned.\n\nInvoices must be approved by the Contracting Officer s Representative prior to payment release. Invoices without the required information will be returned.\n\nAll invoices must include the assigned purchase order number and be submitted within 10 days following the month of service.\n\nFailure to comply with all terms and conditions of this contract shall result in invoices/claims submitted for reimbursement during that period to be considered incomplete. Interest penalties imposed under the Prompt Payment Act shall not apply to incomplete invoices or invoices received after the established invoice due date. Contractor shall identify and assign personnel to be the liaison for billing purposes.\n\nThe Department of Veterans Affairs Financial Service Center (FSC) is the designated agency office for invoice receipt in accordance with the Prompt Payment Act (5 CFR Part 1315). FSC or its designated representative may contact the vendor to provide specific instructions for electronic submission of invoices. The vendor shall be responsible for any associated expenses. FSC may utilize third-party contractors to facilitate invoice processing.\n\nContractor Remittance Address: All payments by the Government to the Contractor shall be made by Electronic Funds Transfer (EFT).\nSpecial Contract Requirements\n\nSafety Requirements: To protect the lives and health of occupants of the buildings, the Contractor in the performance of this Contract shall take such safety precautions as the CO, or his designate, may determine to be reasonably necessary. The CO, or his designate, shall notify the Contractor of any non-compliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or his representative shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly, the CO may issue an order, stopping all or any part of the work, and hold the Contractor in default. Noncompliance may result in Contract termination.\n\nInterference with Normal Functions: The Contractor s personnel are required to interrupt their work at any time so as not to interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility visitors, employees, equipment and emergency and/or service carts. These interruptions should only be occasional. Any interruptions considered to be excessive should be brought to the attention of the CO.\nSecurity Requirements\n\nAll Contractors and Contractor personnel shall be subject to the same Federal security and privacy laws, regulations, standards and VA policies as VA, including the Privacy Act, 5 U.S.C. Â§552a, and VA personnel, regarding information and information system security.\n\nEach employee working in the Regional Office Building will be required to view a Security Video (duration of 45 minutes) and sign a rules of behavior form.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C10D25Q0129","place_of_performance":{"zip":"39216","city":{"code":"36000","name":"Jackson"},"state":{"code":"MS","name":"Mississippi"},"street":"Department of Veterans Affairs Veterans Benefits Administration","country":{"code":"USA","name":"UNITED STATES"},"street2":"Jackson Regional Office 1600 E Woodrow Wilson Avenue"},"product_service_code":"J042"},{"award":{"awardee":{}},"dates":{"posted":"2025-08-08","posted_at":"2025-08-08T14:02:03.456Z","created_at":"2025-08-08T14:02:03.456Z","modified_at":"2025-11-03T04:55:44.616Z","response_deadline":{"raw":"2025-07-23T12:00:00-04:00","utc":"2025-07-23T16:00:00Z","date":"2025-07-23","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/21a152040fc042fb92043180be5388bf/view"},"naics":{"codes":["541350"],"primary":"541350"},"title":"J042--Jackson Fire Suppression Maintenance","agency":{"office":{"code":"36C10D","name":"VETERANS BENEFITS ADMIN (36C10D)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"20006","city":"WASHINGTON","state":"DC","country":"USA"},"organization_id":"100167091","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-11-02","archive_type":"auto_custom"},"history":[{"index":7,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T14:02:03.456Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21a152040fc042fb92043180be5388bf","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"b18d8ff122a24233bc6547f1d1c240fb"},{"index":5,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-07T12:12:36.734Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"b18d8ff122a24233bc6547f1d1c240fb","solicitation_number":"36C10D25Q0129"}],"contacts":[{"name":"Tiffany Garfield","role":"primary","email":"tiffany.garfield@va.gov","phone":"813-631-2818","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"21a152040fc042fb92043180be5388bf","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"b18d8ff122a24233bc6547f1d1c240fb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-05T01:17:38.005658647Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"8c575bccc859f8f32d5167dfb47ce2fd30fea76d9f10986a8317de55b4573e53","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-05T01:17:38.005658647Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"1\n\n\n\nPRE-SOLICITATION NOTICE\nFIRE AND SAFETY SYSTEM MAINTENANCE SOW\nGeneral:\n\nThe Contractor shall provide all supplies, travel, equipment, materials, parts, supervision, personnel/labor and technical supervision required to provide fire suppression system inspection and testing in accordance with the National Fire Protection Association (NFPA) codes, Joint Commission, The Department of Veterans Affairs, federal, state and local codes, and the manufacturer s recommended procedures for the Veterans Benefit Administration (VBA) Building at 1600 East Woodrow Wilson Ave, Jackson, MS 39216-5102. \n\nScope:\n\nThe Contractor shall provide services which include, but are not limited to: \n\nPerform scheduled and preventative maintenance including inspecting, testing, adjusting, repairing and parts replacement,\n\nTroubleshooting services to remedy failures and malfunctions,\n\nMajor equipment maintenance and overhaul, Maintenance reports, daily logs, and record keeping,\n\nMaintenance manual updating. The performance inspection, testing and repair of the fire alarm and notification systems, equipment and related components. The facility utilizes a Simplex FACP-4100U fire alarm system.\n\nProvide all labor to perform annual fire extinguisher inspection for up to 75 fire extinguishers of 5lb, 10lb, 20lb and two 131lb wheeled badger ABC extinguisher to include six and twelve-year maintenance testing and tagging.  Perform Hydrostatic testing and Maintenance on fire extinguishers as needed and replacement if needed in the VBA Building, Parking Garage, and Basement Storage Room. (Note: most ABC extinguishers were purchased in June 2013 therefore will be due hydrostatic testing at the same time).\n\nThe Contractor will be responsible to conduct a Five Year Internal and Obstruction inspection due on 18 wet sprinklers and gauges in accordance with NFPA 25, Chapter 13. In accordance with Section 13.2.7 (Gauges) shall be inspected to verify that gauges are operable and not physically damaged. Section 13.4.2.1 (Check Valves) Inspections shall be inspected internally every 5 years to verify that all of the valve s components operate correctly. Section 13.4.3.1.5 (Strainers, Filters, Restricted Orifices, and Diaphragms Chambers) shall be inspected internally every 5 years unless test indicate a greater frequency is necessary.  During this inspection any sprinkler gauges deemed out of date or requires replacing must be replace in accordance with NFPA 25, Section 13 \n\nThe Contractor shall be responsible to perform all services necessary to perform semi-annual inspection and certification of automatic kitchen hood suppression system and replace fusible links, located in the 2nd floor canteen during the months of October and April respectively (unless written changes are agreed upon in advance). The Contractor shall provide written notice two weeks in advance to the COTR to allow scheduling with all parties involved and prevent interfering with canteen serving schedule.  The Contractor is required to steam clean canteen vent hood twice during each contract year. Regular cleaning is necessary to keep the vent hood system functioning at its peak and to avoid costly breakdowns, cleaning is a must to stay in compliance with local health and fire codes. The cleaning shall include the entire hood system including exhaust fan(s), stack, grease filters, and backsplash. Polish the hood and clean up afterwards to follow NFPA Part 96 fire code regulations and applicable health codes. \n\nAntifreeze System: The freezing point of solutions in antifreeze will be tested annually by measuring the specific gravity with a hydrometer or refractometer and adjust the solutions if necessary.\n\nAlarm devises will be inspected quarterly to verify that they are free of physical damage.\n\nTest 8 backflow preventers once per contract year.\n\nMonthly maintenance will include inspect building fire sprinkler system to include operating the floor control valves for each floor of the building; opening and closing each standpipe valve; operating and test fire pump. Any associated labor and parts for maintenance or repairs shall be included in this contract.\n\nNo work is to be performed on the site on Saturdays, Sundays or legal holidays unless otherwise specified and the COTR is duly notified in writing no less than forty-eight hours in advance of the contemplated work and written approval for such is obtained.\n\nDevices include manual alarm devices, smoke and heat detectors, remote and graphic annunciators, main fire alarm panel and components to include; programming, voice alarm system, speakers and horns, and other audible and visual alarm devices. Additional components include wiring circuits and junctions, other alarm detection, control, ancillary, and emergency power operation devices.\n\nGeneral Requirements\n\nFire Alarm System Operability - The Contractor shall ensure that the fire alarm system is operable always except when being tested or repaired. When services require the system be turned off, the Contractor shall provide backup fire monitoring protection by providing sufficient personnel to perform the service and monitor the fire alarm system control panel until the system is brought back on line. All routine service visits shall be scheduled with the COR.\n\nRegardless of the reason for, or duration of a shutdown, the affected portion of the alarm system shall be tested to ensure that protection has been restored.\n\nThe Contractor is responsible for obtaining all necessary permits and licenses required for performing fire alarm tests and inspections, at the contractor's expense.\n\nHazardous Condition - If the Contractor encounters equipment that is in a condition that may endanger life or property, the Contractor shall immediately notify the COR. The Contractor shall also provide a written report which outlines the hazardous condition and recommended corrective action to the COR within 24 hours.\n\nThe Government reserves the right to monitor services in accordance with the contract as deemed necessary to ensure the system is operating as required.\n\nEach contract employee must sign in with the COR when arriving on VA Property, and will be escorted while in the building. The Contractor shall not be permitted on VA property without displaying proper ID. The Contractor shall deliver the service report and test reports to the Contracting Officer Representation (COR) located in the Support Services Division (SSD), Room 154, 1600 E. Woodrow Wilson Ave, Jackson, MS 39216.\n\nHours of Inspection- Inspections shall be performed during normal working hours, 6:00 AM - 6:00 PM, Monday- Friday, exclusive of federal holidays.  All alarm system service visits must be coordinated and scheduled with the COR 48 hours in advance.  All annual testing of the strobes and alarms are to be conducted between the hours of 6:00 PM   8:00 PM on a weekday. \n\nThe Contractor shall report the results of inspections and tests in accordance with NFPA-recommended format, or as directed by the COR.  Inspection reports will list each appliance and peripheral device; including audio, visuals, strobes, speakers and door holders that are connected to the fire alarm control panel, by device location and mapnet address, if such an address is available in the Fire Alarm Control Panel (FACP).\n\nFire Alarm Inventory Changes   The Contractor shall maintain an inventory of all active devices in the fire alarm system. COR shall inform the Contractor of any changes due to construction or other adjustments.\n\nNon-Contract Services - Those services not covered by this contract shall be negotiated between the Government and the Contractor and shall be procured through separate purchase agreements. The Contractor shall provide a scope of work, cost proposal and verification that technician(s) performing any non-contract work are properly certified.\nContractor Requirements\n\nThe Contractor agrees in accordance with NFPA 72, Section 14.2.3.6 (Service Personnel Qualifications and Experience). Service personnel shall be qualified and experienced in accordance with the requirements of 10.5.3 of the NFPA 72.\n\nThe Contractor may be asked to remove persons who pose a threat to health, safety, security or property.\n\nThe Contractor shall have enough qualified employees available to adequately and safely perform all work required under the terms of this contract.\n\nIn accordance with NFPA 72, Section 10.5.3 (Inspection, Testing, and Service Personnel) Service personnel shall have the knowledge and experience of the testing requirements contained in this Code, of the equipment being serviced or maintained, and of the servicing or maintenance methods.\n\nThe Contractor must demonstrate that its technicians are factory trained and certified for the specific type and brand of system being serviced, or who are certified by a nationally recognized certification organization acceptable to the authority having jurisdiction.\n\nAll Contractor and Subcontractor personnel performing work in this contract must possess any required state, county, locality or other licenses or permits. \nFire Alarm System Testing and Inspection Requirements\n\nThe Contractor shall perform an annual system and inspection, smoke detector cleaning, 24-HR, 7-day emergency coverage, and a complete written notification of any deficiencies and recommendations for repair covering all fire suppression, detection, and audio-visual devices present in the VBA Building, Parking Garage and basement Storage Room.  Service and inspect the ANSUL fire suppression system twice per each contract year in accordance with the testing methods and frequencies listed in the most recent edition of NFPA 72, National Fire Alarm Code.\n\nThe Contractor shall perform control equipment testing utilizing NFPA 72, Section 7.6 Inspection, Testing, and Maintenance Documentation (SIG-TMS):\n\nSection 7.6.6 (Record of Inspection and Testing). The record of all inspections, testing, and maintenance as required by section 14.6.2.4 shall be documented using either the record of inspection and testing forms, Figure 7.8.2(g) through Figure 7.8.2(l), or an alternative record that includes all the applicable information shown in Figure 7.8.2 (g) through Figure 7.8.2 (l). Verify correct receipt of alarm, supervisory and trouble signals (inputs).\n\nOperation of evacuation signals and auxiliary functions (outputs).\n\nCircuit supervision; including detection of open circuits, ground faults and power supply supervision for detection of loss of AC power and disconnection of secondary batteries. \n\nAuxiliary functions to be tested include, but are not limited to:\n\nVoice and strobe signals\n\nDoor release service\n\nDoor unlock service\n\nElevator recall\n\nHeat detector/shut trip for elevator mechanical rooms\n\nFan shut down on activation of associated duct detectors\n\nThe Contractor shall confirm that all auxiliary functions were tested and are functioning properly.\n\nThe Contractor shall prepare and submit a report of the inspection and test results to the COR within 14 days after inspection and testing has been completed, which shall include a list of all appliances and peripheral devices; including audio/visuals, strobes, speakers, and door holders that are connected to the fire alarm control panel, by device location and mapnet address.\n\nThe report must also contain the following:\n\nThe Contractor s Inspection and Testing Form that includes all the information required by NFPA 72, most recent edition.\n\nThe date of manufacture of fire alarm system and whether replacement parts are readily available.\n\nAny deficiencies noted, including inoperable or unsupervised devices or equipment, and devices that cannot be calibrated, tested or serviced in accordance with the manufacturer s recommendations.\n\nA cost proposal to correct any deficiencies, by device, separated into parts and labor costs. \n\nInspection and testing shall be performed in the following locations:\n\nVeterans Benefits Administration Building\n\nParking Garage\n\nBasement Storage Room\n\nIn accordance with NFPA 72, section 14.2.4.1; Before proceeding with any testing, all persons and facilities receiving alarm, supervisory, or trouble signal s and all building occupants shall be notified of the testing to prevent unnecessary response. The Contractor shall notify the VBA Safety Office, VBA Police, Alarm Monitoring Provider, and the local fire department. The COR shall ensure that all building occupants are notified. \n\nIn accordance with NFPA 72, section 14.2.4.2; At the conclusion of testing, those previously notified (and others, as necessary) shall be notified that testing has been concluded.\n\nThe Contractor may be required to perform some inspections or tests outside of normal working hours. Any work that would be considered disruptive to occupants (testing audible devices, elevator capture, fan shutdown, etc.) shall be performed after normal working hours between 6:00 PM   8:00 PM on weekdays. The Contractor and COR will coordinate after-hours building access.\n\nAny damage to the fire alarm or associated equipment (fans, elevators, generators, pumps) caused by normal testing shall be repaired by the Contractor at no additional cost to the Government. At its discretion, the Government may have representatives present to witness any or all such tests. All costs associated with this damage shall be borne by the Contractor.\n\nEquipment list: \nItem Number\nDescription\n\n\n1\nBackflows- 8; (2 domestic water, 2 irrigation water, 2 on chilled water makeup, 1 in basement on main supply, 1 on antifreeze loop)\n2\nKitchen Hoods- 1 hood with 3 links\n3\nFACP-4100U\n4\nBatteries-2\n5\nDucts-13\n6\nFlame Det-1\n7\nHeats-7\n8\nSmokes-70\n9\nPulls-35\n10\nWater Flows-15\n11\nZAMs-7\n12\nElevator Recall\n13\nAV-67\n14\nAnnunciator-1\n15\nVO-7\n16\nTampers-30\n17\nHorn-1\n18\nPower Supply-2\n19\nExtinguishers-up to 75\n20\n2 wet system with 16 total zones\n21\n1 fire pump\n22\n1 antifreeze loop\n\nRepairs and Repair Charges\n\nRepairs are defined as unscheduled work to repair or modify the fire alarm system, or to correct recurring system and/or equipment malfunction(s) or deficiencies identified during testing. All repairs must be authorized by the COR or a representative before any work begins.\n\nThe Contractor must be able to secure replacement parts for the system within 24 hours for the central processing unit (CPU), controller, monitoring and signaling cards, display boards, and other critical parts that may be required to restore the system to fully functional.\n  \nIf a replacement part is no longer available, the Contractor shall provide a replacement part model number and cost.\n\nWhen repairs are made that require replacement parts, The Regional Office shall issue a separate purchase order to cover the cost of these parts when funding is approved.\n\nWhen the Contractor identifies a repair need, they shall notify the COR before any repair work is started. If authorized, the Contractor shall complete the repair and submit a written report which contains the following:\n\nDetails the deficiency and suspected causes\nNature of the repair work provided\nList of any replacement parts used\nThe number of hours needed to complete the work\n\nOnce corrected, all deficiencies shall be tested according to the requirements in NFPA 72, most recent addition.\n \nThe Contractor shall provide a written record of all alarm system repairs upon request.\n\nSafety Requirements\nThe Contractor shall adhere to all OSHA, EPA, NFPA Life Safety Codes, and all other regulatory requirements.\n\nIn performance of this contract, the Contractor shall follow VBA safety policies and standards for safe work practices and take such safety precautions as the Safety Officer or designee may determine to be reasonably necessary to protect the lives and health of occupants of the building.  \n\nEmployee, visitor, and Contractor personnel safety best practices shall be adhered to always.  The Contractor is responsible for the safety and health of his/her employees. \n\nThe Contractor shall submit to the Contracting Officer, prior to the start of the contract, the Safety Data Sheets (SDS) for all potentially hazardous materials (lubricants, cleaners, working fluids, etc.) to be used in the facility during performance of the contract, and will not use in the facility, any materials which have not been cleared in advance with COR.  SDS for new chemicals shall be furnished concurrently with the arrival of the chemical on site.  The Contractor shall maintain a copy of all SDS at the chemical storage site in a location accessible to Regional Office personnel to assure compliance with all laws and requirements regarding the  Right to Know  law.\n\nThe Contractor is responsible for identifying, providing and maintaining all personal protective equipment (PPE) required to perform the duties outlined in the contract.  Additionally, the Contractor is responsible for identifying and adhering to all applicable safety program guidelines (lockout/tag out, confined space entry, universal precautions, etc.) required to perform the work.  Contractor is responsible for providing and documenting all required safety training and proper use of PPE to their employees. Training documentation shall be provided to the COR upon request.\n\nThe Contractor shall be notified of any non-compliance with the provisions of the contract.  The Contractor shall, after receipt of such notice, immediately correct the condition and notify the COR/contracting officer in writing that the condition has been corrected.  If, in the opinion of the Regional Office Safety Officer or designee, the compliance condition is life threatening, he/she shall instruct the Contractor to stop work until the condition has been corrected.  If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order halting all or any part of the work, and Contractor may be held in default. The Contractor shall bear all costs associated with a stoppage of work or time spent correcting any safety hazards.\n\nThe Contractor shall provide the following information within ten (10) working days after award of the contract:\n\nA detailed listing of safety programs and procedures that will be followed by the Contractor during the performance of the contract, and the work activities indicating when such procedures would be required.\n\nA detailed listing of the personal protective equipment (PPE) which Contractor personnel will utilize during the performance of the contract, and the work activities indicating when such equipment would be required.\n\nSafety Data Sheet (SDS) for any chemical(s) utilized by the Contractor in the performance of this contract.\n\nThe Contractor is responsible for the supervision of all its employees while on government property.  It is the Contractor s responsibility to assure compliance with the scope of work and the requirements of this contract.  Provisions provided in the scope of work are not intended to relieve the Contractor of this responsibility.\n\nIn the event of an accident or injury, the Contractor shall submit a written report to the COR within five work (5) days of the incident detailing the malfunction, accident or injury involved on site. The report shall state the cause of the injury or accident, and a list of completed or scheduled corrective actions to avoid further incidents.\n\nContractor Employee Conduct\n \nContractor shall ensure that their employees comply with the following at all times while on VBA property:\n\nContractors may not use government office equipment or computers, and should never search through desks, cabinets or files.\n\nGovernment telephones may be used for contract related work only.\n\nThe Contractor shall follow all applicable VA regulations and directives and will comply with any direction or instructions from government officials including the contracting officer (CO), COR, federal police officers, inspectors, etc.\n\nThe Contractor shall leave areas where it performs work neat, clean, and orderly.\nInvoices\nInvoices will be submitted no later than the 5th day of each month to the SSD mailbox (SSD.VBAJAC@va.gov), COR and Contracting Officer. A proper invoice is defined as one that identifies the contractor s name, phone number, contact information, invoice date, and itemized amount of billable work performed. Invoices shall include the following:\n\nContact Number\nCompany Name and Address\nInvoice Date\nInvoice Number (Note: Each invoice must have a different Invoice Number)\nContract Number\nObligation Number\nDescription of services provided as well as referencing the appropriate Contract Line Item Number (CLIN).  This way, the proper CLIN can be billed for the Invoice.\nDates of services\nTerms for any discount for prompt payment\n\nThe information page for the Financial Service Center of the Department of Veterans Affairs that includes information regarding electronic invoice submission can be referenced at:  http://www.fsc.va.gov/einvoice.asp\n\nNOTE: Invoices for payment may be rejected if all information required by FAR Clause 52.212-4(g) is not included.  Invoices without the required information will be returned.\n\nInvoices must be approved by the Contracting Officer s Representative prior to payment release.  Invoices without the required information will be returned.\n \nAll invoices must include the assigned purchase order number and be submitted within 10 days following the month of service.\n \nFailure to comply with all terms and conditions of this contract shall result in invoices/claims submitted for reimbursement during that period to be considered incomplete. Interest penalties imposed under the Prompt Payment Act shall not apply to incomplete invoices or invoices received after the established invoice due date. Contractor shall identify and assign personnel to be the liaison for billing purposes.\n\nThe Department of Veterans Affairs Financial Service Center (FSC) is the designated agency office for invoice receipt in accordance with the Prompt Payment Act (5 CFR Part 1315).  FSC or its designated representative may contact the vendor to provide specific instructions for electronic submission of invoices.  The vendor shall be responsible for any associated expenses.  FSC may utilize third-party contractors to facilitate invoice processing. \n\nContractor Remittance Address:  All payments by the Government to the Contractor shall be made by Electronic Funds Transfer (EFT).\nSpecial Contract Requirements\n\nSafety Requirements:  To protect the lives and health of occupants of the buildings, the Contractor in the performance of this Contract shall take such safety precautions as the CO, or his designate, may determine to be reasonably necessary. The CO, or his designate, shall notify the Contractor of any non-compliance with the foregoing provisions and the action to be taken.  The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed.  Such notice, when served on the Contractor or his representative shall be deemed sufficient for the purpose aforesaid.  If the Contractor fails or refuses to comply promptly, the CO may issue an order, stopping all or any part of the work, and hold the Contractor in default. Noncompliance may result in Contract termination.\n\nInterference with Normal Functions:  The Contractor s personnel are required to interrupt their work at any time so as not to interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility visitors, employees, equipment and emergency and/or service carts.  These interruptions should only be occasional.  Any interruptions considered to be excessive should be brought to the attention of the CO.\nSecurity Requirements\n\nAll Contractors and Contractor personnel shall be subject to the same Federal security and privacy laws, regulations, standards and VA policies as VA, including the Privacy Act, 5 U.S.C. Â§552a, and VA personnel, regarding information and information system security.\n\nEach employee working in the Regional Office Building will be required to view a Security Video (duration of 45 minutes) and sign a rules of behavior form.","text":"1\n\nPRE-SOLICITATION NOTICE\nFIRE AND SAFETY SYSTEM MAINTENANCE SOW\nGeneral:\n\nThe Contractor shall provide all supplies, travel, equipment, materials, parts, supervision, personnel/labor and technical supervision required to provide fire suppression system inspection and testing in accordance with the National Fire Protection Association (NFPA) codes, Joint Commission, The Department of Veterans Affairs, federal, state and local codes, and the manufacturer s recommended procedures for the Veterans Benefit Administration (VBA) Building at 1600 East Woodrow Wilson Ave, Jackson, MS 39216-5102.\n\nScope:\n\nThe Contractor shall provide services which include, but are not limited to:\n\nPerform scheduled and preventative maintenance including inspecting, testing, adjusting, repairing and parts replacement,\n\nTroubleshooting services to remedy failures and malfunctions,\n\nMajor equipment maintenance and overhaul, Maintenance reports, daily logs, and record keeping,\n\nMaintenance manual updating. The performance inspection, testing and repair of the fire alarm and notification systems, equipment and related components. The facility utilizes a Simplex FACP-4100U fire alarm system.\n\nProvide all labor to perform annual fire extinguisher inspection for up to 75 fire extinguishers of 5lb, 10lb, 20lb and two 131lb wheeled badger ABC extinguisher to include six and twelve-year maintenance testing and tagging. Perform Hydrostatic testing and Maintenance on fire extinguishers as needed and replacement if needed in the VBA Building, Parking Garage, and Basement Storage Room. (Note: most ABC extinguishers were purchased in June 2013 therefore will be due hydrostatic testing at the same time).\n\nThe Contractor will be responsible to conduct a Five Year Internal and Obstruction inspection due on 18 wet sprinklers and gauges in accordance with NFPA 25, Chapter 13. In accordance with Section 13.2.7 (Gauges) shall be inspected to verify that gauges are operable and not physically damaged. Section 13.4.2.1 (Check Valves) Inspections shall be inspected internally every 5 years to verify that all of the valve s components operate correctly. Section 13.4.3.1.5 (Strainers, Filters, Restricted Orifices, and Diaphragms Chambers) shall be inspected internally every 5 years unless test indicate a greater frequency is necessary. During this inspection any sprinkler gauges deemed out of date or requires replacing must be replace in accordance with NFPA 25, Section 13\n\nThe Contractor shall be responsible to perform all services necessary to perform semi-annual inspection and certification of automatic kitchen hood suppression system and replace fusible links, located in the 2nd floor canteen during the months of October and April respectively (unless written changes are agreed upon in advance). The Contractor shall provide written notice two weeks in advance to the COTR to allow scheduling with all parties involved and prevent interfering with canteen serving schedule. The Contractor is required to steam clean canteen vent hood twice during each contract year. Regular cleaning is necessary to keep the vent hood system functioning at its peak and to avoid costly breakdowns, cleaning is a must to stay in compliance with local health and fire codes. The cleaning shall include the entire hood system including exhaust fan(s), stack, grease filters, and backsplash. Polish the hood and clean up afterwards to follow NFPA Part 96 fire code regulations and applicable health codes.\n\nAntifreeze System: The freezing point of solutions in antifreeze will be tested annually by measuring the specific gravity with a hydrometer or refractometer and adjust the solutions if necessary.\n\nAlarm devises will be inspected quarterly to verify that they are free of physical damage.\n\nTest 8 backflow preventers once per contract year.\n\nMonthly maintenance will include inspect building fire sprinkler system to include operating the floor control valves for each floor of the building; opening and closing each standpipe valve; operating and test fire pump. Any associated labor and parts for maintenance or repairs shall be included in this contract.\n\nNo work is to be performed on the site on Saturdays, Sundays or legal holidays unless otherwise specified and the COTR is duly notified in writing no less than forty-eight hours in advance of the contemplated work and written approval for such is obtained.\n\nDevices include manual alarm devices, smoke and heat detectors, remote and graphic annunciators, main fire alarm panel and components to include; programming, voice alarm system, speakers and horns, and other audible and visual alarm devices. Additional components include wiring circuits and junctions, other alarm detection, control, ancillary, and emergency power operation devices.\n\nGeneral Requirements\n\nFire Alarm System Operability - The Contractor shall ensure that the fire alarm system is operable always except when being tested or repaired. When services require the system be turned off, the Contractor shall provide backup fire monitoring protection by providing sufficient personnel to perform the service and monitor the fire alarm system control panel until the system is brought back on line. All routine service visits shall be scheduled with the COR.\n\nRegardless of the reason for, or duration of a shutdown, the affected portion of the alarm system shall be tested to ensure that protection has been restored.\n\nThe Contractor is responsible for obtaining all necessary permits and licenses required for performing fire alarm tests and inspections, at the contractor's expense.\n\nHazardous Condition - If the Contractor encounters equipment that is in a condition that may endanger life or property, the Contractor shall immediately notify the COR. The Contractor shall also provide a written report which outlines the hazardous condition and recommended corrective action to the COR within 24 hours.\n\nThe Government reserves the right to monitor services in accordance with the contract as deemed necessary to ensure the system is operating as required.\n\nEach contract employee must sign in with the COR when arriving on VA Property, and will be escorted while in the building. The Contractor shall not be permitted on VA property without displaying proper ID. The Contractor shall deliver the service report and test reports to the Contracting Officer Representation (COR) located in the Support Services Division (SSD), Room 154, 1600 E. Woodrow Wilson Ave, Jackson, MS 39216.\n\nHours of Inspection- Inspections shall be performed during normal working hours, 6:00 AM - 6:00 PM, Monday- Friday, exclusive of federal holidays. All alarm system service visits must be coordinated and scheduled with the COR 48 hours in advance. All annual testing of the strobes and alarms are to be conducted between the hours of 6:00 PM 8:00 PM on a weekday.\n\nThe Contractor shall report the results of inspections and tests in accordance with NFPA-recommended format, or as directed by the COR. Inspection reports will list each appliance and peripheral device; including audio, visuals, strobes, speakers and door holders that are connected to the fire alarm control panel, by device location and mapnet address, if such an address is available in the Fire Alarm Control Panel (FACP).\n\nFire Alarm Inventory Changes The Contractor shall maintain an inventory of all active devices in the fire alarm system. COR shall inform the Contractor of any changes due to construction or other adjustments.\n\nNon-Contract Services - Those services not covered by this contract shall be negotiated between the Government and the Contractor and shall be procured through separate purchase agreements. The Contractor shall provide a scope of work, cost proposal and verification that technician(s) performing any non-contract work are properly certified.\nContractor Requirements\n\nThe Contractor agrees in accordance with NFPA 72, Section 14.2.3.6 (Service Personnel Qualifications and Experience). Service personnel shall be qualified and experienced in accordance with the requirements of 10.5.3 of the NFPA 72.\n\nThe Contractor may be asked to remove persons who pose a threat to health, safety, security or property.\n\nThe Contractor shall have enough qualified employees available to adequately and safely perform all work required under the terms of this contract.\n\nIn accordance with NFPA 72, Section 10.5.3 (Inspection, Testing, and Service Personnel) Service personnel shall have the knowledge and experience of the testing requirements contained in this Code, of the equipment being serviced or maintained, and of the servicing or maintenance methods.\n\nThe Contractor must demonstrate that its technicians are factory trained and certified for the specific type and brand of system being serviced, or who are certified by a nationally recognized certification organization acceptable to the authority having jurisdiction.\n\nAll Contractor and Subcontractor personnel performing work in this contract must possess any required state, county, locality or other licenses or permits.\nFire Alarm System Testing and Inspection Requirements\n\nThe Contractor shall perform an annual system and inspection, smoke detector cleaning, 24-HR, 7-day emergency coverage, and a complete written notification of any deficiencies and recommendations for repair covering all fire suppression, detection, and audio-visual devices present in the VBA Building, Parking Garage and basement Storage Room. Service and inspect the ANSUL fire suppression system twice per each contract year in accordance with the testing methods and frequencies listed in the most recent edition of NFPA 72, National Fire Alarm Code.\n\nThe Contractor shall perform control equipment testing utilizing NFPA 72, Section 7.6 Inspection, Testing, and Maintenance Documentation (SIG-TMS):\n\nSection 7.6.6 (Record of Inspection and Testing). The record of all inspections, testing, and maintenance as required by section 14.6.2.4 shall be documented using either the record of inspection and testing forms, Figure 7.8.2(g) through Figure 7.8.2(l), or an alternative record that includes all the applicable information shown in Figure 7.8.2 (g) through Figure 7.8.2 (l). Verify correct receipt of alarm, supervisory and trouble signals (inputs).\n\nOperation of evacuation signals and auxiliary functions (outputs).\n\nCircuit supervision; including detection of open circuits, ground faults and power supply supervision for detection of loss of AC power and disconnection of secondary batteries.\n\nAuxiliary functions to be tested include, but are not limited to:\n\nVoice and strobe signals\n\nDoor release service\n\nDoor unlock service\n\nElevator recall\n\nHeat detector/shut trip for elevator mechanical rooms\n\nFan shut down on activation of associated duct detectors\n\nThe Contractor shall confirm that all auxiliary functions were tested and are functioning properly.\n\nThe Contractor shall prepare and submit a report of the inspection and test results to the COR within 14 days after inspection and testing has been completed, which shall include a list of all appliances and peripheral devices; including audio/visuals, strobes, speakers, and door holders that are connected to the fire alarm control panel, by device location and mapnet address.\n\nThe report must also contain the following:\n\nThe Contractor s Inspection and Testing Form that includes all the information required by NFPA 72, most recent edition.\n\nThe date of manufacture of fire alarm system and whether replacement parts are readily available.\n\nAny deficiencies noted, including inoperable or unsupervised devices or equipment, and devices that cannot be calibrated, tested or serviced in accordance with the manufacturer s recommendations.\n\nA cost proposal to correct any deficiencies, by device, separated into parts and labor costs.\n\nInspection and testing shall be performed in the following locations:\n\nVeterans Benefits Administration Building\n\nParking Garage\n\nBasement Storage Room\n\nIn accordance with NFPA 72, section 14.2.4.1; Before proceeding with any testing, all persons and facilities receiving alarm, supervisory, or trouble signal s and all building occupants shall be notified of the testing to prevent unnecessary response. The Contractor shall notify the VBA Safety Office, VBA Police, Alarm Monitoring Provider, and the local fire department. The COR shall ensure that all building occupants are notified.\n\nIn accordance with NFPA 72, section 14.2.4.2; At the conclusion of testing, those previously notified (and others, as necessary) shall be notified that testing has been concluded.\n\nThe Contractor may be required to perform some inspections or tests outside of normal working hours. Any work that would be considered disruptive to occupants (testing audible devices, elevator capture, fan shutdown, etc.) shall be performed after normal working hours between 6:00 PM 8:00 PM on weekdays. The Contractor and COR will coordinate after-hours building access.\n\nAny damage to the fire alarm or associated equipment (fans, elevators, generators, pumps) caused by normal testing shall be repaired by the Contractor at no additional cost to the Government. At its discretion, the Government may have representatives present to witness any or all such tests. All costs associated with this damage shall be borne by the Contractor.\n\nEquipment list:\nItem Number\nDescription\n\n1\nBackflows- 8; (2 domestic water, 2 irrigation water, 2 on chilled water makeup, 1 in basement on main supply, 1 on antifreeze loop)\n2\nKitchen Hoods- 1 hood with 3 links\n3\nFACP-4100U\n4\nBatteries-2\n5\nDucts-13\n6\nFlame Det-1\n7\nHeats-7\n8\nSmokes-70\n9\nPulls-35\n10\nWater Flows-15\n11\nZAMs-7\n12\nElevator Recall\n13\nAV-67\n14\nAnnunciator-1\n15\nVO-7\n16\nTampers-30\n17\nHorn-1\n18\nPower Supply-2\n19\nExtinguishers-up to 75\n20\n2 wet system with 16 total zones\n21\n1 fire pump\n22\n1 antifreeze loop\n\nRepairs and Repair Charges\n\nRepairs are defined as unscheduled work to repair or modify the fire alarm system, or to correct recurring system and/or equipment malfunction(s) or deficiencies identified during testing. All repairs must be authorized by the COR or a representative before any work begins.\n\nThe Contractor must be able to secure replacement parts for the system within 24 hours for the central processing unit (CPU), controller, monitoring and signaling cards, display boards, and other critical parts that may be required to restore the system to fully functional.\n\nIf a replacement part is no longer available, the Contractor shall provide a replacement part model number and cost.\n\nWhen repairs are made that require replacement parts, The Regional Office shall issue a separate purchase order to cover the cost of these parts when funding is approved.\n\nWhen the Contractor identifies a repair need, they shall notify the COR before any repair work is started. If authorized, the Contractor shall complete the repair and submit a written report which contains the following:\n\nDetails the deficiency and suspected causes\nNature of the repair work provided\nList of any replacement parts used\nThe number of hours needed to complete the work\n\nOnce corrected, all deficiencies shall be tested according to the requirements in NFPA 72, most recent addition.\n\nThe Contractor shall provide a written record of all alarm system repairs upon request.\n\nSafety Requirements\nThe Contractor shall adhere to all OSHA, EPA, NFPA Life Safety Codes, and all other regulatory requirements.\n\nIn performance of this contract, the Contractor shall follow VBA safety policies and standards for safe work practices and take such safety precautions as the Safety Officer or designee may determine to be reasonably necessary to protect the lives and health of occupants of the building.\n\nEmployee, visitor, and Contractor personnel safety best practices shall be adhered to always. The Contractor is responsible for the safety and health of his/her employees.\n\nThe Contractor shall submit to the Contracting Officer, prior to the start of the contract, the Safety Data Sheets (SDS) for all potentially hazardous materials (lubricants, cleaners, working fluids, etc.) to be used in the facility during performance of the contract, and will not use in the facility, any materials which have not been cleared in advance with COR. SDS for new chemicals shall be furnished concurrently with the arrival of the chemical on site. The Contractor shall maintain a copy of all SDS at the chemical storage site in a location accessible to Regional Office personnel to assure compliance with all laws and requirements regarding the Right to Know law.\n\nThe Contractor is responsible for identifying, providing and maintaining all personal protective equipment (PPE) required to perform the duties outlined in the contract. Additionally, the Contractor is responsible for identifying and adhering to all applicable safety program guidelines (lockout/tag out, confined space entry, universal precautions, etc.) required to perform the work. Contractor is responsible for providing and documenting all required safety training and proper use of PPE to their employees. Training documentation shall be provided to the COR upon request.\n\nThe Contractor shall be notified of any non-compliance with the provisions of the contract. The Contractor shall, after receipt of such notice, immediately correct the condition and notify the COR/contracting officer in writing that the condition has been corrected. If, in the opinion of the Regional Office Safety Officer or designee, the compliance condition is life threatening, he/she shall instruct the Contractor to stop work until the condition has been corrected. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order halting all or any part of the work, and Contractor may be held in default. The Contractor shall bear all costs associated with a stoppage of work or time spent correcting any safety hazards.\n\nThe Contractor shall provide the following information within ten (10) working days after award of the contract:\n\nA detailed listing of safety programs and procedures that will be followed by the Contractor during the performance of the contract, and the work activities indicating when such procedures would be required.\n\nA detailed listing of the personal protective equipment (PPE) which Contractor personnel will utilize during the performance of the contract, and the work activities indicating when such equipment would be required.\n\nSafety Data Sheet (SDS) for any chemical(s) utilized by the Contractor in the performance of this contract.\n\nThe Contractor is responsible for the supervision of all its employees while on government property. It is the Contractor s responsibility to assure compliance with the scope of work and the requirements of this contract. Provisions provided in the scope of work are not intended to relieve the Contractor of this responsibility.\n\nIn the event of an accident or injury, the Contractor shall submit a written report to the COR within five work (5) days of the incident detailing the malfunction, accident or injury involved on site. The report shall state the cause of the injury or accident, and a list of completed or scheduled corrective actions to avoid further incidents.\n\nContractor Employee Conduct\n\nContractor shall ensure that their employees comply with the following at all times while on VBA property:\n\nContractors may not use government office equipment or computers, and should never search through desks, cabinets or files.\n\nGovernment telephones may be used for contract related work only.\n\nThe Contractor shall follow all applicable VA regulations and directives and will comply with any direction or instructions from government officials including the contracting officer (CO), COR, federal police officers, inspectors, etc.\n\nThe Contractor shall leave areas where it performs work neat, clean, and orderly.\nInvoices\nInvoices will be submitted no later than the 5th day of each month to the SSD mailbox (SSD.VBAJAC@va.gov), COR and Contracting Officer. A proper invoice is defined as one that identifies the contractor s name, phone number, contact information, invoice date, and itemized amount of billable work performed. Invoices shall include the following:\n\nContact Number\nCompany Name and Address\nInvoice Date\nInvoice Number (Note: Each invoice must have a different Invoice Number)\nContract Number\nObligation Number\nDescription of services provided as well as referencing the appropriate Contract Line Item Number (CLIN). This way, the proper CLIN can be billed for the Invoice.\nDates of services\nTerms for any discount for prompt payment\n\nThe information page for the Financial Service Center of the Department of Veterans Affairs that includes information regarding electronic invoice submission can be referenced at: http://www.fsc.va.gov/einvoice.asp\n\nNOTE: Invoices for payment may be rejected if all information required by FAR Clause 52.212-4(g) is not included. Invoices without the required information will be returned.\n\nInvoices must be approved by the Contracting Officer s Representative prior to payment release. Invoices without the required information will be returned.\n\nAll invoices must include the assigned purchase order number and be submitted within 10 days following the month of service.\n\nFailure to comply with all terms and conditions of this contract shall result in invoices/claims submitted for reimbursement during that period to be considered incomplete. Interest penalties imposed under the Prompt Payment Act shall not apply to incomplete invoices or invoices received after the established invoice due date. Contractor shall identify and assign personnel to be the liaison for billing purposes.\n\nThe Department of Veterans Affairs Financial Service Center (FSC) is the designated agency office for invoice receipt in accordance with the Prompt Payment Act (5 CFR Part 1315). FSC or its designated representative may contact the vendor to provide specific instructions for electronic submission of invoices. The vendor shall be responsible for any associated expenses. FSC may utilize third-party contractors to facilitate invoice processing.\n\nContractor Remittance Address: All payments by the Government to the Contractor shall be made by Electronic Funds Transfer (EFT).\nSpecial Contract Requirements\n\nSafety Requirements: To protect the lives and health of occupants of the buildings, the Contractor in the performance of this Contract shall take such safety precautions as the CO, or his designate, may determine to be reasonably necessary. The CO, or his designate, shall notify the Contractor of any non-compliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or his representative shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly, the CO may issue an order, stopping all or any part of the work, and hold the Contractor in default. Noncompliance may result in Contract termination.\n\nInterference with Normal Functions: The Contractor s personnel are required to interrupt their work at any time so as not to interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility visitors, employees, equipment and emergency and/or service carts. These interruptions should only be occasional. Any interruptions considered to be excessive should be brought to the attention of the CO.\nSecurity Requirements\n\nAll Contractors and Contractor personnel shall be subject to the same Federal security and privacy laws, regulations, standards and VA policies as VA, including the Privacy Act, 5 U.S.C. Â§552a, and VA personnel, regarding information and information system security.\n\nEach employee working in the Regional Office Building will be required to view a Security Video (duration of 45 minutes) and sign a rules of behavior form.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C10D25Q0129","place_of_performance":{"zip":"39216","city":{"code":"36000","name":"Jackson"},"state":{"code":"MS","name":"Mississippi"},"street":"Department of Veterans Affairs Veterans Benefits Administration","country":{"code":"USA","name":"UNITED STATES"},"street2":"Jackson Regional Office 1600 E Woodrow Wilson Avenue"},"product_service_code":"J042"},{"award":{"awardee":{}},"dates":{"posted":"2025-08-08","posted_at":"2025-08-08T18:31:39.322Z","created_at":"2025-08-08T18:31:30.385Z","modified_at":"2025-10-19T03:55:45.315Z","response_deadline":{"raw":"2025-09-05T12:00:00-04:00","utc":"2025-09-05T16:00:00Z","date":"2025-09-05","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d7453e6921d54fd49338d4cb8cd1bfab/view"},"naics":{"codes":["541350"],"primary":"541350"},"title":"J042--Jackson Fire Suppression Maintenance","agency":{"office":{"code":"36C10D","name":"VETERANS BENEFITS ADMIN (36C10D)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"20006","city":"WASHINGTON","state":"DC","country":"USA"},"organization_id":"100167091","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-15","archive_type":"auto_custom"},"history":[{"index":9,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T14:02:03.456Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21a152040fc042fb92043180be5388bf","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"b18d8ff122a24233bc6547f1d1c240fb"},{"index":7,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-11T11:06:21.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"96c40101a22f447789f68a9c8628a2e1","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":5,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T13:59:34.365Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"916903ad522e4e02b82573133debd35c","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":4,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T11:43:48.992Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8ef24108f4dc49a98c00c196d78a1cf4","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T15:39:39.221Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79d03478dbff4d19ae1b8409f2051e43","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":2,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"}],"contacts":[{"name":"Tiffany L Garfield","role":"primary","email":"tiffany.garfield@va.gov","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"d7453e6921d54fd49338d4cb8cd1bfab","lineage_id":"b18d8ff122a24233bc6547f1d1c240fb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-05T02:01:15.185563246Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"321bbd03770e3a04ac82a10c3d739dbdfd2447eafc46a61ef80640aaf5fb4225","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-05T02:01:15.185563246Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Please see attached solicitation.","text":"Please see attached solicitation.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C10D25Q0129","product_service_code":"J042"},{"award":{"awardee":{}},"dates":{"posted":"2025-08-29","posted_at":"2025-08-29T15:39:39.221Z","created_at":"2025-08-29T15:39:36.642Z","modified_at":"2025-10-19T03:55:45.315Z","response_deadline":{"raw":"2025-09-16T12:00:00-04:00","utc":"2025-09-16T16:00:00Z","date":"2025-09-16","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/79d03478dbff4d19ae1b8409f2051e43/view"},"naics":{"codes":["541350"],"primary":"541350"},"title":"J042--Jackson Fire Suppression Maintenance","agency":{"office":{"code":"36C10D","name":"VETERANS BENEFITS ADMIN (36C10D)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"20006","city":"WASHINGTON","state":"DC","country":"USA"},"organization_id":"100167091","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-16","archive_type":"auto_custom"},"history":[{"index":6,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-11T11:06:21.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"96c40101a22f447789f68a9c8628a2e1","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":4,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T13:59:34.365Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"916903ad522e4e02b82573133debd35c","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T11:43:48.992Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8ef24108f4dc49a98c00c196d78a1cf4","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":2,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T15:39:39.221Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79d03478dbff4d19ae1b8409f2051e43","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":1,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"}],"contacts":[{"name":"Tiffany L Garfield","role":"primary","email":"tiffany.garfield@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"79d03478dbff4d19ae1b8409f2051e43","lineage_id":"d7453e6921d54fd49338d4cb8cd1bfab","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-02T00:27:07.681240568Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"e867fab5b4601484629c691c67d41894ecffaaed3ab7b8262069da0655667c13","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-02T00:27:07.681240568Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Preparation and Submission Instructions\n\n\nQuote Requirements - The following items shall be included in your submission:\n\n\nCover Page with Solicitation Number, Project Title, points of contact, address, phone numbers, etc., and SAM Unique Entity ID Number (Contractors shall be registered in SAM - Home | SAM.gov) \n\nResponse to Evaluation Factors:\n\nFactor 1   Technical Qualifications\n     Factor 2   Relevant and Recent Past Performance\n     \n\nSigned offer (SF 1449) and Signed Acknowledgement of all Amendments (SF30) (if any are executed)\n\nPricing Schedule completed \n\nCopy of current SDVOSB certification from VetCert (Small Business Administration -   Veteran Small Business Certification (sba.gov)) \n\nEnsure the appropriate NAICS code (541350) is listed in the company s SAM Representations and Certifications \n\n\nSite Visit:\n\nA Second Site Visit is scheduled for September 4, 2025 at 9:00am CST.  All contractors will meet at the front of the building s double glass door to enter the regional office at 1600 E. Woodrow Wilson Avenue, Jackson, MS 39216.  \n\nThe contractors can park in the parking garage (the arm will be up).Â Â  We will meet at the entrance door to the Regional Office exiting the parking garage. When you park in the parking garage proceed to the ground floor.Â  The parking garage is connected to the building.Â  Wait at the double glass door to enter the regional office.Â  \n\n\nRequest for Information (RFI):\n\nAll RFIs are due no later than September 9, 2025 no later than 12:00pm EST.  All RFIs shall be submitted to the Contracting Officer via email at tiffany.garfield@va.gov","text":"Preparation and Submission Instructions\n\nQuote Requirements - The following items shall be included in your submission:\n\nCover Page with Solicitation Number, Project Title, points of contact, address, phone numbers, etc., and SAM Unique Entity ID Number (Contractors shall be registered in SAM - Home | SAM.gov)\n\nResponse to Evaluation Factors:\n\nFactor 1 Technical Qualifications\nFactor 2 Relevant and Recent Past Performance\n\nSigned offer (SF 1449) and Signed Acknowledgement of all Amendments (SF30) (if any are executed)\n\nPricing Schedule completed\n\nCopy of current SDVOSB certification from VetCert (Small Business Administration - Veteran Small Business Certification (sba.gov))\n\nEnsure the appropriate NAICS code (541350) is listed in the company s SAM Representations and Certifications\n\nSite Visit:\n\nA Second Site Visit is scheduled for September 4, 2025 at 9:00am CST. All contractors will meet at the front of the building s double glass door to enter the regional office at 1600 E. Woodrow Wilson Avenue, Jackson, MS 39216.\n\nThe contractors can park in the parking garage (the arm will be up).Â Â We will meet at the entrance door to the Regional Office exiting the parking garage. When you park in the parking garage proceed to the ground floor.Â The parking garage is connected to the building.Â Wait at the double glass door to enter the regional office.Â\n\nRequest for Information (RFI):\n\nAll RFIs are due no later than September 9, 2025 no later than 12:00pm EST. All RFIs shall be submitted to the Contracting Officer via email at tiffany.garfield@va.gov","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C10D25Q0129","product_service_code":"J042"},{"award":{"awardee":{}},"dates":{"posted":"2025-09-05","posted_at":"2025-09-05T11:43:48.992Z","created_at":"2025-09-05T11:41:45.112Z","modified_at":"2025-10-19T03:55:45.315Z","response_deadline":{"raw":"2025-09-16T12:00:00-04:00","utc":"2025-09-16T16:00:00Z","date":"2025-09-16","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8ef24108f4dc49a98c00c196d78a1cf4/view"},"naics":{"codes":["541350"],"primary":"541350"},"title":"J042--Jackson Fire Suppression Maintenance","agency":{"office":{"code":"36C10D","name":"VETERANS BENEFITS ADMIN (36C10D)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"20006","city":"WASHINGTON","state":"DC","country":"USA"},"organization_id":"100167091","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-16","archive_type":"auto_custom"},"history":[{"index":6,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-11T11:06:21.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"96c40101a22f447789f68a9c8628a2e1","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":4,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T13:59:34.365Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"916903ad522e4e02b82573133debd35c","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T11:43:48.992Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8ef24108f4dc49a98c00c196d78a1cf4","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":2,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T15:39:39.221Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79d03478dbff4d19ae1b8409f2051e43","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":1,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"}],"contacts":[{"name":"Tiffany L Garfield","role":"primary","email":"tiffany.garfield@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8ef24108f4dc49a98c00c196d78a1cf4","lineage_id":"d7453e6921d54fd49338d4cb8cd1bfab","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-01T00:51:41.881303861Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"6d4543e2c75519fe197df4e594690d6da787e6ff4935d47711e6d91f7c1f1c1f","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-01T00:51:41.881303861Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Solicitation 36C10D25Q0129\nFire Suppression Maintenance at VBA Jackson Regional Office\nQuestions and Answers\nSet #2\nSeptember 4, 2025\n\n\nOn the two malfunctioning backflow preventers, can you please provide the type, size, make, and data from the data placard or the last inspection report/deficiency notation? See attached photos for specifics\n\nMake: watts Model: 909 4  RP Serial No: 200465\nMake: Wilkins Mode: 375 RP 4  Serial No: L09323\n\nCan you please provide the make, model, and size of the other backflow preventers requiring inspection and testing? See attached photos for specifics   \nMake: watts Model: 909 4  RP Serial No: 200465\nMake: Wilkin Model: 375A 3  RP Serial No: X00891\nMake: Wilkins Mode: 375 RP 4  Serial No: L09323\n\nCan you provide additional information for the fire pump? What is the make and model, size (rated flow and pressure), and diesel or electric?  See attached photos of the fire pump data plate\nCentrifugal Fire Pump: Split Case\nMake: 4  1844F Serial#: 14-2429323\n\nThe equipment list shows fire extinguishers. What are the types and sizes of fire extinguishers requiring inspection?  \nModel 10MB-6H Dry Chemical 10lBS\nModel: AA108339  22lbs\n\nWhat type of monitoring communicator is used, POTs (plain old telephone service) or cellular? Dual Path Dire Alarm Cell/IP communicator. See the photo attached of the communicator.\n\n\nHow many elevators are there in total, and how many floors does each elevator serve?  There are 3 elevators.  There are 3 floors.\n\n\nHow many standpipes are there? There are 2 standpipes.\n\n\nCan you please provide the make/model and location of the flame detector? Please refer to the list provided for the flame detectors.  The location is listed on the custom label list  that is covered under the fire suppression fire alarm.","text":"Solicitation 36C10D25Q0129\nFire Suppression Maintenance at VBA Jackson Regional Office\nQuestions and Answers\nSet #2\nSeptember 4, 2025\n\nOn the two malfunctioning backflow preventers, can you please provide the type, size, make, and data from the data placard or the last inspection report/deficiency notation? See attached photos for specifics\n\nMake: watts Model: 909 4 RP Serial No: 200465\nMake: Wilkins Mode: 375 RP 4 Serial No: L09323\n\nCan you please provide the make, model, and size of the other backflow preventers requiring inspection and testing? See attached photos for specifics\nMake: watts Model: 909 4 RP Serial No: 200465\nMake: Wilkin Model: 375A 3 RP Serial No: X00891\nMake: Wilkins Mode: 375 RP 4 Serial No: L09323\n\nCan you provide additional information for the fire pump? What is the make and model, size (rated flow and pressure), and diesel or electric? See attached photos of the fire pump data plate\nCentrifugal Fire Pump: Split Case\nMake: 4 1844F Serial#: 14-2429323\n\nThe equipment list shows fire extinguishers. What are the types and sizes of fire extinguishers requiring inspection?\nModel 10MB-6H Dry Chemical 10lBS\nModel: AA108339 22lbs\n\nWhat type of monitoring communicator is used, POTs (plain old telephone service) or cellular? Dual Path Dire Alarm Cell/IP communicator. See the photo attached of the communicator.\n\nHow many elevators are there in total, and how many floors does each elevator serve? There are 3 elevators. There are 3 floors.\n\nHow many standpipes are there? There are 2 standpipes.\n\nCan you please provide the make/model and location of the flame detector? Please refer to the list provided for the flame detectors. The location is listed on the custom label list that is covered under the fire suppression fire alarm.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C10D25Q0129","product_service_code":"J042"},{"award":{"awardee":{}},"dates":{"posted":"2025-09-09","posted_at":"2025-09-09T13:59:34.365Z","created_at":"2025-09-09T13:59:31.814Z","modified_at":"2025-10-19T03:55:45.315Z","response_deadline":{"raw":"2025-09-16T12:00:00-04:00","utc":"2025-09-16T16:00:00Z","date":"2025-09-16","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/916903ad522e4e02b82573133debd35c/view"},"naics":{"codes":["541350"],"primary":"541350"},"title":"J042--Jackson Fire Suppression Maintenance","agency":{"office":{"code":"36C10D","name":"VETERANS BENEFITS ADMIN (36C10D)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"20006","city":"WASHINGTON","state":"DC","country":"USA"},"organization_id":"100167091","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-16","archive_type":"auto_custom"},"history":[{"index":6,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-11T11:06:21.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"96c40101a22f447789f68a9c8628a2e1","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":4,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T13:59:34.365Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"916903ad522e4e02b82573133debd35c","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T11:43:48.992Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8ef24108f4dc49a98c00c196d78a1cf4","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":2,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T15:39:39.221Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79d03478dbff4d19ae1b8409f2051e43","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":1,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"}],"contacts":[{"name":"Tiffany L Garfield","role":"primary","email":"tiffany.garfield@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"916903ad522e4e02b82573133debd35c","lineage_id":"d7453e6921d54fd49338d4cb8cd1bfab","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-31T02:54:29.846860880Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"6c5d7924b69aed34ac0a784285259eabd6f36f3206a7a717155b18efb7d159fc","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-31T02:54:29.846860880Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Solicitation 36C10D25Q0129 Amendment 0003 to Revise Contract Line Item Numbers (CLINs)","text":"Solicitation 36C10D25Q0129 Amendment 0003 to Revise Contract Line Item Numbers (CLINs)","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C10D25Q0129","product_service_code":"J042"},{"award":{"awardee":{}},"dates":{"posted":"2025-09-11","posted_at":"2025-09-11T11:06:21.603Z","created_at":"2025-09-11T11:06:19.071Z","modified_at":"2025-10-19T03:55:45.315Z","response_deadline":{"raw":"2025-09-18T12:00:00-04:00","utc":"2025-09-18T16:00:00Z","date":"2025-09-18","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/96c40101a22f447789f68a9c8628a2e1/view"},"naics":{"codes":["541350"],"primary":"541350"},"title":"J042--Jackson Fire Suppression Maintenance","agency":{"office":{"code":"36C10D","name":"VETERANS BENEFITS ADMIN (36C10D)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"20006","city":"WASHINGTON","state":"DC","country":"USA"},"organization_id":"100167091","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-18","archive_type":"auto_custom"},"history":[{"index":6,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-11T11:06:21.603Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"96c40101a22f447789f68a9c8628a2e1","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":4,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-09T13:59:34.365Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"916903ad522e4e02b82573133debd35c","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":3,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-05T11:43:48.992Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"8ef24108f4dc49a98c00c196d78a1cf4","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":2,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T15:39:39.221Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79d03478dbff4d19ae1b8409f2051e43","solicitation_number":"36C10D25Q0129","parent_opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab"},{"index":1,"title":"J042--Jackson Fire Suppression Maintenance","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-08T18:31:39.322Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"d7453e6921d54fd49338d4cb8cd1bfab","solicitation_number":"36C10D25Q0129","related_opportunity_id":"21a152040fc042fb92043180be5388bf"}],"contacts":[{"name":"Tiffany L Garfield","role":"primary","email":"tiffany.garfield@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"96c40101a22f447789f68a9c8628a2e1","lineage_id":"d7453e6921d54fd49338d4cb8cd1bfab","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-31T00:29:35.508651192Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"17b58f80b22b0742875a637f097de923a70e3a7ca930781fba704f564cf016bf","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-31T00:29:35.508651192Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Solicitation 36C10D25Q0129\nFire Suppression Maintenance at VBA Jackson Regional Office\nQuestions and Answers\nSet #3\nCan you please specify each element of performance from the Joint Commission standard EC.02.03.05 is required to be performed and documented under this contract? Referring to NFPA 25 and 72 does not provide the clarification needed.\nPlease refer to the updated SOW.\nWhich CLIN should the cost for fire alarm monitoring services be applied to?\nIt is included in the contract.   Please refer to the SOW.\nWhich CLIN should the cost of the internal 5-year obstruction inspection be applied to? Please note, this is to occur in only 1 of the 5 years of the contract.\nRefer to the SOW.\nCan you please provide a complete inventory of fire extinguishers requiring inspection? This list should be broken down by type and size to determine appropriate inspection costs. Gathering an inventory of the fire extinguishers is not something that can be done during a site visit as that would require building drawings and access to every room to verify fire extinguishers. A previous inspection report will also provide us with the quantities and each type.\nI have requested the list.\nPrevious responses to the RFI s included a fire alarm inspection report. Can you please provide the previous annual fire sprinkler, standpipes, fire pump, backflow preventers, kitchen suppression, and fire extinguisher inspection reports? These reports will help clear up uncertainty within the scope of work and as required by the joint commission they should be available.\nI have requested the list.\nPrevious question 13.8, response stated see number 7 above. These 2 items are not same. CLIN 0011 is to replace 14 pull stations which the host of the site visit was under the impression this work was already completed. Please confirm if this work is completed or needed to remain in this scope of work.\nRemain in the scope but changed from replaced to repair 14 pull station.\nThe scope of work for fire alarm and detection/monitoring services Paragraph a.vi states the monitoring service needs to be at a minimum NICET certified. This does not exist, NICET certifies individual technicians in fire protection related disciplines. Companies and facilities are not provided with NICET certifications for anything. Can you please remove or revise this requirement to ensure offerors will not be deemed unacceptable because of this? Remove the language for the NICET requirement.Â  The contractor will provide the minimum NFPA 72 requirement. SOW has been updated. \n(Does this mean that the monitoring service should be UL listed).\n No\nRelating to the RFI above, please confirm the intention for the NICET requirement is for technicians performing the inspection, testing, and maintenance to be NICET certified. Typically, NICET Level II technicians perform the inspection, testing, and maintenance work, and are overseen by NICET III or IV technicians. We would recommend qualification requirements such as this consistent amongst most fire protection and life safety solicitations we see through the VA. The Technician can be NICET certified but require per NFPA 72 requirements. \n(This needs more clarification. In the past, the technicians were required to have NICET II license to perform inspections on site. This answer makes that sound optional, but I'm not sure that is what the customer meant. NFPA 72 has nothing to do with the license requirement. We need to confirm that all inspectors performing the inspections need to have NICET II certifications. We also need to confirm if that goes for all systems, (Fire alarm, sprinkler, extinguisher, suppression etc.), or if it only applies to fire and sprinkler).\nPlease look at the revise statement of work.\nWhen were each of the required 5-year inspection services last performed? We need to know this for allocating resources for each contract year.Â  The last five-year inspection was completed September 4, 2024. \n(I have paperwork showing a 5-year internal/obstruction inspection was just completed on the sprinkler system in August this year. Is this in reference to another 5-year inspection? And which system is this 5-year referring to if it's not sprinkler?)\nPlease look at the revise statement of work.  5 year annual inspection is 5 years from September 4, 2024\nThe following questions are regarding the Price/Cost Schedule.\nItem 0001: Is this two 100% inspections each year or two 50% inspections each year?Â  Please read the information by PleaseÂ refer to NFPA 25 standards. \n(This seems to be very vague and leaves it up for interpretation by each vendor. The item refers to fire alarm, so it would be NFPA 72, not NFPA 25. I would say 100% annual once a year, (including smoke detector cleaning), and a simple panel battery inspection/test & visual of the rest of the system for the semi-annual requirement. Please confirm).\nPlease look at the revise statement of work.\nItem 0002: Exactly what is to be included in monthly inspections? Just notification devices (A/Vs)? 100% or 1/12?Â  Please refer to NFPA 25 standards \n(This seems to also be referring to NFPA 72, since it's fire alarm. The monthly inspections are visual only for control equipment & system status checks according to NFPA 72. Please confirm).\nPlease look at the revise statement of work.\nItem 0003: Exactly what is to be included in monthly inspections? 100% or 1/12? Please refer to NFPA 25 standards. \n(Also for fire alarm, NFPA 72. This item also notes a monthly inspections. Item 0002 & 0003 seem to be the same thing    Please confirm).\n  Please look at the revise statement of work.\nItem 0006: Is this 100% each month or 1/12 each month? Please refer to NFPA 25 standards. \n(Monthly is running the fire pump for 10 minutes each week, and visually checking valves & gauges on all sprinkler and standpipe systems once a month  ..Please confirm).\nPlease look at the revise statement of work.\nItem 0007: The specifications mention backflow to be inspected monthly, but this item specifies once per year. Can you please clarify?Â  Please read the information from SOW and the CLIN again.Â  Fire suppression (a)(x) shows a monthly inspection.Â  CLNN 0007states that the backflow preventor will be TESTED annually. \n(If the SOW calls for monthly backflow inspections, which CLIN should we put the price for that? 0006 mentions sprinkler, standpipe, and fire pump, but not backflow.. Please confirm).\nI don t see a line item to provide pricing for monitoring services or for 5-year Internal Obstruction inspections listed in the specifications. There is no line item for that.Â Â  That is part of the contract when the contract is awarded.Â  \n(If there is no line for that, and this is part of the contract when it is awarded, does this mean we provide that price separately at the time these items are needed, or should the price be included in one of the CLIN. If we should include the price in a CLIN, which CLIN should we include it under?)\n  Please reference the Updated SOW.\nItem 0011: Site visit guide was under the assumption that this item may have already been completed. Please clarify. See number 7 above. \n(The SOW for 0011 is for replacing 14 pull stations. Was that completed? Number 7 only notes the backflow.)\n Please reference the Updated SOW. \nDo the devices already have unique identifiers or is this a new feature added to the scope this year? If they already have them, are they barcodes? And will the listing be provided to the winning bidder? Yes (The device names are listed on the points list provided. If they are already named and in the panel programming, I'm not sure what this CLIN is for. What is item 0009 exactly requesting?)\nPlease reference the Updated SOW. \nIn the section referencing the suppression (Ansul) system, it specifies that the contractor shall  provide inspection & maintenance . including installation, maintenance, and testing of the system. Please define what is to be included with the terms  installation  and  maintenance . Please refer to NFPA 72. \n(Assuming this is NFPA 96, since it's referencing kitchen hood. We need to confirm if we are responsible for installing a brand new kitchen hood system, or any 'adds moves changes', in our quoted price, or if those larger items would be quoted outside of this initial price.)\nPlease review NFPA standard that applies to what you are doing relating to kitchen hood.  Please refer to the SOW (repairs and Repair Charges) of once a problem is identified.\n\nIn the section referencing monthly preventative maintenance of the fire sprinkler system, what is considered  preventative maintenance ?Â  Preventative maintenance is a proactive approach to ensuring that equipment and facilities run smoothly, avoiding the high costs and disruptions of unplanned breakdowns.Â  This will be related to the sprinkler system. \n(I've always understood preventative maintenance to be inspections and testing, since that is the way to prevent issues in advance when possible. This would not normally include labor or materials to actually make the repairs   Please confirm.\nPlease refer back to the SOW (repairs and Repair Charges) of once a problem is identified.\n\nCan you please provide the make/model and location of the flame detector? Another site visit is required for that. \n(During walkthrough, all agreed there is not a flame detector, and it should be removed from the RFQ in the device list  .Please confirm.)\n Yes, agreed No flame detector listed.","text":"Solicitation 36C10D25Q0129\nFire Suppression Maintenance at VBA Jackson Regional Office\nQuestions and Answers\nSet #3\nCan you please specify each element of performance from the Joint Commission standard EC.02.03.05 is required to be performed and documented under this contract? Referring to NFPA 25 and 72 does not provide the clarification needed.\nPlease refer to the updated SOW.\nWhich CLIN should the cost for fire alarm monitoring services be applied to?\nIt is included in the contract. Please refer to the SOW.\nWhich CLIN should the cost of the internal 5-year obstruction inspection be applied to? Please note, this is to occur in only 1 of the 5 years of the contract.\nRefer to the SOW.\nCan you please provide a complete inventory of fire extinguishers requiring inspection? This list should be broken down by type and size to determine appropriate inspection costs. Gathering an inventory of the fire extinguishers is not something that can be done during a site visit as that would require building drawings and access to every room to verify fire extinguishers. A previous inspection report will also provide us with the quantities and each type.\nI have requested the list.\nPrevious responses to the RFI s included a fire alarm inspection report. Can you please provide the previous annual fire sprinkler, standpipes, fire pump, backflow preventers, kitchen suppression, and fire extinguisher inspection reports? These reports will help clear up uncertainty within the scope of work and as required by the joint commission they should be available.\nI have requested the list.\nPrevious question 13.8, response stated see number 7 above. These 2 items are not same. CLIN 0011 is to replace 14 pull stations which the host of the site visit was under the impression this work was already completed. Please confirm if this work is completed or needed to remain in this scope of work.\nRemain in the scope but changed from replaced to repair 14 pull station.\nThe scope of work for fire alarm and detection/monitoring services Paragraph a.vi states the monitoring service needs to be at a minimum NICET certified. This does not exist, NICET certifies individual technicians in fire protection related disciplines. Companies and facilities are not provided with NICET certifications for anything. Can you please remove or revise this requirement to ensure offerors will not be deemed unacceptable because of this? Remove the language for the NICET requirement.Â The contractor will provide the minimum NFPA 72 requirement. SOW has been updated.\n(Does this mean that the monitoring service should be UL listed).\nNo\nRelating to the RFI above, please confirm the intention for the NICET requirement is for technicians performing the inspection, testing, and maintenance to be NICET certified. Typically, NICET Level II technicians perform the inspection, testing, and maintenance work, and are overseen by NICET III or IV technicians. We would recommend qualification requirements such as this consistent amongst most fire protection and life safety solicitations we see through the VA. The Technician can be NICET certified but require per NFPA 72 requirements.\n(This needs more clarification. In the past, the technicians were required to have NICET II license to perform inspections on site. This answer makes that sound optional, but I'm not sure that is what the customer meant. NFPA 72 has nothing to do with the license requirement. We need to confirm that all inspectors performing the inspections need to have NICET II certifications. We also need to confirm if that goes for all systems, (Fire alarm, sprinkler, extinguisher, suppression etc.), or if it only applies to fire and sprinkler).\nPlease look at the revise statement of work.\nWhen were each of the required 5-year inspection services last performed? We need to know this for allocating resources for each contract year.Â The last five-year inspection was completed September 4, 2024.\n(I have paperwork showing a 5-year internal/obstruction inspection was just completed on the sprinkler system in August this year. Is this in reference to another 5-year inspection? And which system is this 5-year referring to if it's not sprinkler?)\nPlease look at the revise statement of work. 5 year annual inspection is 5 years from September 4, 2024\nThe following questions are regarding the Price/Cost Schedule.\nItem 0001: Is this two 100% inspections each year or two 50% inspections each year?Â Please read the information by PleaseÂ refer to NFPA 25 standards.\n(This seems to be very vague and leaves it up for interpretation by each vendor. The item refers to fire alarm, so it would be NFPA 72, not NFPA 25. I would say 100% annual once a year, (including smoke detector cleaning), and a simple panel battery inspection/test & visual of the rest of the system for the semi-annual requirement. Please confirm).\nPlease look at the revise statement of work.\nItem 0002: Exactly what is to be included in monthly inspections? Just notification devices (A/Vs)? 100% or 1/12?Â Please refer to NFPA 25 standards\n(This seems to also be referring to NFPA 72, since it's fire alarm. The monthly inspections are visual only for control equipment & system status checks according to NFPA 72. Please confirm).\nPlease look at the revise statement of work.\nItem 0003: Exactly what is to be included in monthly inspections? 100% or 1/12? Please refer to NFPA 25 standards.\n(Also for fire alarm, NFPA 72. This item also notes a monthly inspections. Item 0002 & 0003 seem to be the same thing Please confirm).\nPlease look at the revise statement of work.\nItem 0006: Is this 100% each month or 1/12 each month? Please refer to NFPA 25 standards.\n(Monthly is running the fire pump for 10 minutes each week, and visually checking valves & gauges on all sprinkler and standpipe systems once a month ..Please confirm).\nPlease look at the revise statement of work.\nItem 0007: The specifications mention backflow to be inspected monthly, but this item specifies once per year. Can you please clarify?Â Please read the information from SOW and the CLIN again.Â Fire suppression (a)(x) shows a monthly inspection.Â CLNN 0007states that the backflow preventor will be TESTED annually.\n(If the SOW calls for monthly backflow inspections, which CLIN should we put the price for that? 0006 mentions sprinkler, standpipe, and fire pump, but not backflow.. Please confirm).\nI don t see a line item to provide pricing for monitoring services or for 5-year Internal Obstruction inspections listed in the specifications. There is no line item for that.Â Â That is part of the contract when the contract is awarded.Â\n(If there is no line for that, and this is part of the contract when it is awarded, does this mean we provide that price separately at the time these items are needed, or should the price be included in one of the CLIN. If we should include the price in a CLIN, which CLIN should we include it under?)\nPlease reference the Updated SOW.\nItem 0011: Site visit guide was under the assumption that this item may have already been completed. Please clarify. See number 7 above.\n(The SOW for 0011 is for replacing 14 pull stations. Was that completed? Number 7 only notes the backflow.)\nPlease reference the Updated SOW.\nDo the devices already have unique identifiers or is this a new feature added to the scope this year? If they already have them, are they barcodes? And will the listing be provided to the winning bidder? Yes (The device names are listed on the points list provided. If they are already named and in the panel programming, I'm not sure what this CLIN is for. What is item 0009 exactly requesting?)\nPlease reference the Updated SOW.\nIn the section referencing the suppression (Ansul) system, it specifies that the contractor shall provide inspection & maintenance . including installation, maintenance, and testing of the system. Please define what is to be included with the terms installation and maintenance . Please refer to NFPA 72.\n(Assuming this is NFPA 96, since it's referencing kitchen hood. We need to confirm if we are responsible for installing a brand new kitchen hood system, or any 'adds moves changes', in our quoted price, or if those larger items would be quoted outside of this initial price.)\nPlease review NFPA standard that applies to what you are doing relating to kitchen hood. Please refer to the SOW (repairs and Repair Charges) of once a problem is identified.\n\nIn the section referencing monthly preventative maintenance of the fire sprinkler system, what is considered preventative maintenance ?Â Preventative maintenance is a proactive approach to ensuring that equipment and facilities run smoothly, avoiding the high costs and disruptions of unplanned breakdowns.Â This will be related to the sprinkler system.\n(I've always understood preventative maintenance to be inspections and testing, since that is the way to prevent issues in advance when possible. This would not normally include labor or materials to actually make the repairs Please confirm.\nPlease refer back to the SOW (repairs and Repair Charges) of once a problem is identified.\n\nCan you please provide the make/model and location of the flame detector? Another site visit is required for that.\n(During walkthrough, all agreed there is not a flame detector, and it should be removed from the RFQ in the device list .Please confirm.)\nYes, agreed No flame detector listed.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C10D25Q0129","product_service_code":"J042"}],"due_at":"2025-09-18T16:00:00Z","due_date":"2025-09-18","closes_at":"2025-09-18T16:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C10D","office_name":"VETERANS BENEFITS ADMIN (36C10D)","state":"MS","county":"28049","county_name":"Hinds County","city":"2836000","city_name":"Jackson","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"KSH2WH9FUGC4","amount":null,"linked_awards":7,"cancelled":false,"archived":true,"updated_at":"2026-10-31T01:06:46.070659Z","principal_notice_id":"96c40101a22f447789f68a9c8628a2e1","description":{"text":"Solicitation 36C10D25Q0129\nFire Suppression Maintenance at VBA Jackson Regional Office\nQuestions and Answers\nSet #3\nCan you please specify each element of performance from the Joint Commission standard EC.02.03.05 is required to be performed and documented under this contract? Referring to NFPA 25 and 72 does not provide the clarification needed.\nPlease refer to the updated SOW.\nWhich CLIN should the cost for fire alarm monitoring services be applied to?\nIt is included in the contract. Please refer to the SOW.\nWhich CLIN should the cost of the internal 5-year obstruction inspection be applied to? Please note, this is to occur in only 1 of the 5 years of the contract.\nRefer to the SOW.\nCan you please provide a complete inventory of fire extinguishers requiring inspection? This list should be broken down by type and size to determine appropriate inspection costs. Gathering an inventory of the fire extinguishers is not something that can be done during a site visit as that would require building drawings and access to every room to verify fire extinguishers. A previous inspection report will also provide us with the quantities and each type.\nI have requested the list.\nPrevious responses to the RFI s included a fire alarm inspection report. Can you please provide the previous annual fire sprinkler, standpipes, fire pump, backflow preventers, kitchen suppression, and fire extinguisher inspection reports? These reports will help clear up uncertainty within the scope of work and as required by the joint commission they should be available.\nI have requested the list.\nPrevious question 13.8, response stated see number 7 above. These 2 items are not same. CLIN 0011 is to replace 14 pull stations which the host of the site visit was under the impression this work was already completed. Please confirm if this work is completed or needed to remain in this scope of work.\nRemain in the scope but changed from replaced to repair 14 pull station.\nThe scope of work for fire alarm and detection/monitoring services Paragraph a.vi states the monitoring service needs to be at a minimum NICET certified. This does not exist, NICET certifies individual technicians in fire protection related disciplines. Companies and facilities are not provided with NICET certifications for anything. Can you please remove or revise this requirement to ensure offerors will not be deemed unacceptable because of this? Remove the language for the NICET requirement.Â The contractor will provide the minimum NFPA 72 requirement. SOW has been updated.\n(Does this mean that the monitoring service should be UL listed).\nNo\nRelating to the RFI above, please confirm the intention for the NICET requirement is for technicians performing the inspection, testing, and maintenance to be NICET certified. Typically, NICET Level II technicians perform the inspection, testing, and maintenance work, and are overseen by NICET III or IV technicians. We would recommend qualification requirements such as this consistent amongst most fire protection and life safety solicitations we see through the VA. The Technician can be NICET certified but require per NFPA 72 requirements.\n(This needs more clarification. In the past, the technicians were required to have NICET II license to perform inspections on site. This answer makes that sound optional, but I'm not sure that is what the customer meant. NFPA 72 has nothing to do with the license requirement. We need to confirm that all inspectors performing the inspections need to have NICET II certifications. We also need to confirm if that goes for all systems, (Fire alarm, sprinkler, extinguisher, suppression etc.), or if it only applies to fire and sprinkler).\nPlease look at the revise statement of work.\nWhen were each of the required 5-year inspection services last performed? We need to know this for allocating resources for each contract year.Â The last five-year inspection was completed September 4, 2024.\n(I have paperwork showing a 5-year internal/obstruction inspection was just completed on the sprinkler system in August this year. Is this in reference to another 5-year inspection? And which system is this 5-year referring to if it's not sprinkler?)\nPlease look at the revise statement of work. 5 year annual inspection is 5 years from September 4, 2024\nThe following questions are regarding the Price/Cost Schedule.\nItem 0001: Is this two 100% inspections each year or two 50% inspections each year?Â Please read the information by PleaseÂ refer to NFPA 25 standards.\n(This seems to be very vague and leaves it up for interpretation by each vendor. The item refers to fire alarm, so it would be NFPA 72, not NFPA 25. I would say 100% annual once a year, (including smoke detector cleaning), and a simple panel battery inspection/test & visual of the rest of the system for the semi-annual requirement. Please confirm).\nPlease look at the revise statement of work.\nItem 0002: Exactly what is to be included in monthly inspections? Just notification devices (A/Vs)? 100% or 1/12?Â Please refer to NFPA 25 standards\n(This seems to also be referring to NFPA 72, since it's fire alarm. The monthly inspections are visual only for control equipment & system status checks according to NFPA 72. Please confirm).\nPlease look at the revise statement of work.\nItem 0003: Exactly what is to be included in monthly inspections? 100% or 1/12? Please refer to NFPA 25 standards.\n(Also for fire alarm, NFPA 72. This item also notes a monthly inspections. Item 0002 & 0003 seem to be the same thing Please confirm).\nPlease look at the revise statement of work.\nItem 0006: Is this 100% each month or 1/12 each month? Please refer to NFPA 25 standards.\n(Monthly is running the fire pump for 10 minutes each week, and visually checking valves & gauges on all sprinkler and standpipe systems once a month ..Please confirm).\nPlease look at the revise statement of work.\nItem 0007: The specifications mention backflow to be inspected monthly, but this item specifies once per year. Can you please clarify?Â Please read the information from SOW and the CLIN again.Â Fire suppression (a)(x) shows a monthly inspection.Â CLNN 0007states that the backflow preventor will be TESTED annually.\n(If the SOW calls for monthly backflow inspections, which CLIN should we put the price for that? 0006 mentions sprinkler, standpipe, and fire pump, but not backflow.. Please confirm).\nI don t see a line item to provide pricing for monitoring services or for 5-year Internal Obstruction inspections listed in the specifications. There is no line item for that.Â Â That is part of the contract when the contract is awarded.Â\n(If there is no line for that, and this is part of the contract when it is awarded, does this mean we provide that price separately at the time these items are needed, or should the price be included in one of the CLIN. If we should include the price in a CLIN, which CLIN should we include it under?)\nPlease reference the Updated SOW.\nItem 0011: Site visit guide was under the assumption that this item may have already been completed. Please clarify. See number 7 above.\n(The SOW for 0011 is for replacing 14 pull stations. Was that completed? Number 7 only notes the backflow.)\nPlease reference the Updated SOW.\nDo the devices already have unique identifiers or is this a new feature added to the scope this year? If they already have them, are they barcodes? And will the listing be provided to the winning bidder? Yes (The device names are listed on the points list provided. If they are already named and in the panel programming, I'm not sure what this CLIN is for. What is item 0009 exactly requesting?)\nPlease reference the Updated SOW.\nIn the section referencing the suppression (Ansul) system, it specifies that the contractor shall provide inspection & maintenance . including installation, maintenance, and testing of the system. Please define what is to be included with the terms installation and maintenance . Please refer to NFPA 72.\n(Assuming this is NFPA 96, since it's referencing kitchen hood. We need to confirm if we are responsible for installing a brand new kitchen hood system, or any 'adds moves changes', in our quoted price, or if those larger items would be quoted outside of this initial price.)\nPlease review NFPA standard that applies to what you are doing relating to kitchen hood. Please refer to the SOW (repairs and Repair Charges) of once a problem is identified.\n\nIn the section referencing monthly preventative maintenance of the fire sprinkler system, what is considered preventative maintenance ?Â Preventative maintenance is a proactive approach to ensuring that equipment and facilities run smoothly, avoiding the high costs and disruptions of unplanned breakdowns.Â This will be related to the sprinkler system.\n(I've always understood preventative maintenance to be inspections and testing, since that is the way to prevent issues in advance when possible. This would not normally include labor or materials to actually make the repairs Please confirm.\nPlease refer back to the SOW (repairs and Repair Charges) of once a problem is identified.\n\nCan you please provide the make/model and location of the flame detector? Another site visit is required for that.\n(During walkthrough, all agreed there is not a flame detector, and it should be removed from the RFQ in the device list .Please confirm.)\nYes, agreed No flame detector listed.","html":"Solicitation 36C10D25Q0129\nFire Suppression Maintenance at VBA Jackson Regional Office\nQuestions and Answers\nSet #3\nCan you please specify each element of performance from the Joint Commission standard EC.02.03.05 is required to be performed and documented under this contract? Referring to NFPA 25 and 72 does not provide the clarification needed.\nPlease refer to the updated SOW.\nWhich CLIN should the cost for fire alarm monitoring services be applied to?\nIt is included in the contract.   Please refer to the SOW.\nWhich CLIN should the cost of the internal 5-year obstruction inspection be applied to? Please note, this is to occur in only 1 of the 5 years of the contract.\nRefer to the SOW.\nCan you please provide a complete inventory of fire extinguishers requiring inspection? This list should be broken down by type and size to determine appropriate inspection costs. Gathering an inventory of the fire extinguishers is not something that can be done during a site visit as that would require building drawings and access to every room to verify fire extinguishers. A previous inspection report will also provide us with the quantities and each type.\nI have requested the list.\nPrevious responses to the RFI s included a fire alarm inspection report. Can you please provide the previous annual fire sprinkler, standpipes, fire pump, backflow preventers, kitchen suppression, and fire extinguisher inspection reports? These reports will help clear up uncertainty within the scope of work and as required by the joint commission they should be available.\nI have requested the list.\nPrevious question 13.8, response stated see number 7 above. These 2 items are not same. CLIN 0011 is to replace 14 pull stations which the host of the site visit was under the impression this work was already completed. Please confirm if this work is completed or needed to remain in this scope of work.\nRemain in the scope but changed from replaced to repair 14 pull station.\nThe scope of work for fire alarm and detection/monitoring services Paragraph a.vi states the monitoring service needs to be at a minimum NICET certified. This does not exist, NICET certifies individual technicians in fire protection related disciplines. Companies and facilities are not provided with NICET certifications for anything. Can you please remove or revise this requirement to ensure offerors will not be deemed unacceptable because of this? Remove the language for the NICET requirement.Â  The contractor will provide the minimum NFPA 72 requirement. SOW has been updated. \n(Does this mean that the monitoring service should be UL listed).\n No\nRelating to the RFI above, please confirm the intention for the NICET requirement is for technicians performing the inspection, testing, and maintenance to be NICET certified. Typically, NICET Level II technicians perform the inspection, testing, and maintenance work, and are overseen by NICET III or IV technicians. We would recommend qualification requirements such as this consistent amongst most fire protection and life safety solicitations we see through the VA. The Technician can be NICET certified but require per NFPA 72 requirements. \n(This needs more clarification. In the past, the technicians were required to have NICET II license to perform inspections on site. This answer makes that sound optional, but I'm not sure that is what the customer meant. NFPA 72 has nothing to do with the license requirement. We need to confirm that all inspectors performing the inspections need to have NICET II certifications. We also need to confirm if that goes for all systems, (Fire alarm, sprinkler, extinguisher, suppression etc.), or if it only applies to fire and sprinkler).\nPlease look at the revise statement of work.\nWhen were each of the required 5-year inspection services last performed? We need to know this for allocating resources for each contract year.Â  The last five-year inspection was completed September 4, 2024. \n(I have paperwork showing a 5-year internal/obstruction inspection was just completed on the sprinkler system in August this year. Is this in reference to another 5-year inspection? And which system is this 5-year referring to if it's not sprinkler?)\nPlease look at the revise statement of work.  5 year annual inspection is 5 years from September 4, 2024\nThe following questions are regarding the Price/Cost Schedule.\nItem 0001: Is this two 100% inspections each year or two 50% inspections each year?Â  Please read the information by PleaseÂ refer to NFPA 25 standards. \n(This seems to be very vague and leaves it up for interpretation by each vendor. The item refers to fire alarm, so it would be NFPA 72, not NFPA 25. I would say 100% annual once a year, (including smoke detector cleaning), and a simple panel battery inspection/test & visual of the rest of the system for the semi-annual requirement. Please confirm).\nPlease look at the revise statement of work.\nItem 0002: Exactly what is to be included in monthly inspections? Just notification devices (A/Vs)? 100% or 1/12?Â  Please refer to NFPA 25 standards \n(This seems to also be referring to NFPA 72, since it's fire alarm. The monthly inspections are visual only for control equipment & system status checks according to NFPA 72. Please confirm).\nPlease look at the revise statement of work.\nItem 0003: Exactly what is to be included in monthly inspections? 100% or 1/12? Please refer to NFPA 25 standards. \n(Also for fire alarm, NFPA 72. This item also notes a monthly inspections. Item 0002 & 0003 seem to be the same thing    Please confirm).\n  Please look at the revise statement of work.\nItem 0006: Is this 100% each month or 1/12 each month? Please refer to NFPA 25 standards. \n(Monthly is running the fire pump for 10 minutes each week, and visually checking valves & gauges on all sprinkler and standpipe systems once a month  ..Please confirm).\nPlease look at the revise statement of work.\nItem 0007: The specifications mention backflow to be inspected monthly, but this item specifies once per year. Can you please clarify?Â  Please read the information from SOW and the CLIN again.Â  Fire suppression (a)(x) shows a monthly inspection.Â  CLNN 0007states that the backflow preventor will be TESTED annually. \n(If the SOW calls for monthly backflow inspections, which CLIN should we put the price for that? 0006 mentions sprinkler, standpipe, and fire pump, but not backflow.. Please confirm).\nI don t see a line item to provide pricing for monitoring services or for 5-year Internal Obstruction inspections listed in the specifications. There is no line item for that.Â Â  That is part of the contract when the contract is awarded.Â  \n(If there is no line for that, and this is part of the contract when it is awarded, does this mean we provide that price separately at the time these items are needed, or should the price be included in one of the CLIN. If we should include the price in a CLIN, which CLIN should we include it under?)\n  Please reference the Updated SOW.\nItem 0011: Site visit guide was under the assumption that this item may have already been completed. Please clarify. See number 7 above. \n(The SOW for 0011 is for replacing 14 pull stations. Was that completed? Number 7 only notes the backflow.)\n Please reference the Updated SOW. \nDo the devices already have unique identifiers or is this a new feature added to the scope this year? If they already have them, are they barcodes? And will the listing be provided to the winning bidder? Yes (The device names are listed on the points list provided. If they are already named and in the panel programming, I'm not sure what this CLIN is for. What is item 0009 exactly requesting?)\nPlease reference the Updated SOW. \nIn the section referencing the suppression (Ansul) system, it specifies that the contractor shall  provide inspection & maintenance . including installation, maintenance, and testing of the system. Please define what is to be included with the terms  installation  and  maintenance . Please refer to NFPA 72. \n(Assuming this is NFPA 96, since it's referencing kitchen hood. We need to confirm if we are responsible for installing a brand new kitchen hood system, or any 'adds moves changes', in our quoted price, or if those larger items would be quoted outside of this initial price.)\nPlease review NFPA standard that applies to what you are doing relating to kitchen hood.  Please refer to the SOW (repairs and Repair Charges) of once a problem is identified.\n\nIn the section referencing monthly preventative maintenance of the fire sprinkler system, what is considered  preventative maintenance ?Â  Preventative maintenance is a proactive approach to ensuring that equipment and facilities run smoothly, avoiding the high costs and disruptions of unplanned breakdowns.Â  This will be related to the sprinkler system. \n(I've always understood preventative maintenance to be inspections and testing, since that is the way to prevent issues in advance when possible. This would not normally include labor or materials to actually make the repairs   Please confirm.\nPlease refer back to the SOW (repairs and Repair Charges) of once a problem is identified.\n\nCan you please provide the make/model and location of the flame detector? Another site visit is required for that. \n(During walkthrough, all agreed there is not a flame detector, and it should be removed from the RFQ in the device list  .Please confirm.)\n Yes, agreed No flame detector listed.","origin":"detail"},"contacts":[{"name":"Tiffany L Garfield","role":"primary","email":"tiffany.garfield@va.gov","title":"Contract Specialist"}],"place_of_performance":null,"office_address":{"zip":"20006","city":"WASHINGTON","state":"DC","country":"USA"},"naics_codes":["541350"],"award":{"awardee":{}},"attachments":[{"resource_id":"f4bef7bf01fb49af80c160db7906199d","name":"36C10D25Q0129.docx","kind":"file","mime_type":".docx","size_bytes":112026,"posted_at":"2025-08-08T18:31:39.322Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f4bef7bf01fb49af80c160db7906199d/download","mirrored":false},{"resource_id":"b7d47ae8f1004601ac98b09e87824afd","name":"36C10D25Q0129_1.docx","kind":"file","mime_type":".docx","size_bytes":41408,"posted_at":"2025-07-07T12:12:36.734Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b7d47ae8f1004601ac98b09e87824afd/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C10D25P0126_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C10D25P0126_3600_-NONE-_-NONE-/","piid":"36C10D25P0126","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"KSH2WH9FUGC4","recipient_name":"J3 ENTERPRISE LLC","recipient_uei":"KSH2WH9FUGC4","recipient_cage":"90WN6","recipient_city":"GLENDALE","recipient_state":"CA","sub_name":"Department of Veterans Affairs","office_name":"VETERANS BENEFITS ADMIN (36C10D)","office_key":"o-36C10D","first_action_date":"2025-09-29","last_action_date":"2026-08-28","actions":3,"obligated":"88944.44","current_total_value":"88944.44","potential_total_value":"271742.29","naics":"541350","psc":"J042","extent_competed":"COMPETED UNDER SAP","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":6,"description":"JACKSON RO FIRE SUPPRESSION MAINTENANCE CONTRACT","method":"solicitation","confidence":"high","evidence":["solicitation number 36C10D25Q0129 equals the FPDS solicitation identifier","same awarding office 36C10D"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C10D27Q0012","latest_notice_id":"7a7b7e2bb60e44af8c98105516a4cda9","title":"3750--VR&E Landscaping Equipment for Self-Employment; Base; Award","solicitation_number":"36C10D27Q0012","notice_type":"o","first_type":"p","first_posted":"2026-11-06","last_posted":"2026-11-16","notices":3,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C10D","office_name":"VETERANS BENEFITS ADMIN (36C10D)","naics":"333112","psc":"3750","set_aside":"SBA","state":"DC","county":"11001","county_name":"District of Columbia","city":"1150000","city_name":"Washington","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 3750)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"}],"similar_open":[{"key":"36C25526Q0617","latest_notice_id":"3506983a2af048deaf442eae0f8b8a04","title":"H112--Annual/Sem-i annual fire smoke inspections and auto door services l EKH","solicitation_number":"36C25526Q0617","notice_type":"o","first_type":"r","first_posted":"2026-08-19","last_posted":"2026-11-18","notices":11,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C255","office_name":"255-NETWORK CONTRACT OFFICE 15 (36C255)","naics":"541350","psc":"H112","set_aside":"SBA","state":"KS","county":"20103","county_name":"Leavenworth County","city":"2039000","city_name":"Leavenworth","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"15DDHQ27R00000001","latest_notice_id":"bf980e13286649b7a1ed1898b4d44b95","title":"Aviation Operations Center (AOC)- Building Engineer Report (BER)","solicitation_number":"15DDHQ27R00000001","notice_type":"k","first_type":"k","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1524","sub_name":"DRUG ENFORCEMENT ADMINISTRATION","office_key":"o-15DDFA","office_name":"OFFICE ACQUISITION MANAGEMENT","naics":"541350","psc":"H156","set_aside":"SBA","state":"TX","county":null,"county_name":null,"city":"4827000","city_name":"Fort Worth","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"36C25727Q00310002","latest_notice_id":"c463c6aa97b7496d99268a3c961117de","title":"NTX Elevator Inspection - Amendment","solicitation_number":"36C25727Q0031-0002","notice_type":"k","first_type":"k","first_posted":"2026-11-04","last_posted":"2026-11-04","notices":1,"due_at":"2026-11-30T21:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C257","office_name":"257-NETWORK CONTRACT OFFICE 17 (36C257)","naics":"541350","psc":"J036","set_aside":"SDVOSBC","state":"TX","county":"48113","county_name":"Dallas County","city":"4819000","city_name":"Dallas","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-05T04:36:35.392694Z"}],"similar_open_total":9,"indexable":false}