Solicitation
Magnets for NNSA Beamline
367162swk
Department of Energy, Fermilab - DOE Contractor. Machine Shops.
Response deadline
June 12, 2025 at 6:00 PM EDT
Closed 531 days ago. Posted May 9, 2025, first published April 24, 2025. Scheduled to archive June 27, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
34 like it are open now in machine shops
- Request for Information - Vacuum Vessels
Department of Energy, Fermilab - DOE Contractor
PresolicitationNAICS 332710Batavia, ILRFIVacuumVesselsCloses in 12 daysDec 7 - CHASSIS,ELECTRICAL-, IN REPAIR/MODIFICATION OF
Department of the Navy, NAVSUP Weapon Systems Support
PresolicitationNAICS 332710Ship to the buyerN0038326RAA43Due todayNov 25 - Wicket Gate Locks for Little Goose & Lower Granite Dams
Department of the Army, US Army Engineer District Walla Wal
Sources soughtNAICS 332710Ship to Clarkston, WAW912EF27RSS05Due todayNov 25
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 332710 (machine shops), means no more than 500 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 49 days from the day the solicitation was posted, April 24, 2025, to the deadline. The deadline moved 2 times: it was first May 12, 2025 and ended as June 12, 2025.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Please see attached for Fermilab RFP# 368489swk and its associated documentation. Please ensure that you review the RFP document fully, as it outlines the evaluation criteria that will be used to score any submitted proposals, as well as how to submit a complete proposal package.
Important information related to this RFP:
- Proposal due date: May 12, 2025 by 5pm Central
- Technical questions due by May 6, 2025 by 5pm Central
- Proposals will be scored as per the evaluation criteria included on the RFP document, Appendix A
Please see below for technical questions and answers related to this RFP:
- Regarding the solenoids, is the specified "length" intended to be
- The solenoids’ length is the length of the coil.
- Regarding the dipole, do you have any specification of field quality required?
- Field uniformity <=1%
- Regarding the dipole, do you want zero degree edge angles (i.e. a pure sector magnet)?
- Yes
- Regarding the collector solenoid, this is very high field and a short length relative to its aperture. If the specified length is the magnetic length (see question above) then it may not be possible to meet this specification. In any case, it will need to be a very high-power high-current-density coil. Do you have any flexibility on this solenoid, for example to make the length longer at a lower field?
- Yes, the defocusing solenoid can be made longer up to 200 mm. If 200 mm still not feasible, we can discuss further
- Regarding the steering magnets, we have the same question about "length" as question 1 above. In this case it seems like this is the magnetic length, given the field and steering angles provided — but please confirm either way.
- The length of the steering magnet is the maximum length of the assembled magnet
- Regarding all magnets, do they require any support structures or adjustment features or is that out of scope?
- The support structure will be designed at Fermilab. Vendor will provide mounting interface.
- Would you be able to provide any dimensional constraints for these magnets?
- Available longitudinal space for the solenoids and dipole is +50 mm on each side. There is no much of constrains in the transverse direction
- It looks like there is not much concern on the electrical or cooling properties, because the power supplies still need to be purchased. However, if you had some maximum current / voltage / flow values in mind that you could provide this would help me stay within your expectations.
This will depend on the design choice by Vendor
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- RFP 367162swk.pdf234 KB, April 24, 2025
- SARC_Subcontractor Annual RepsCerts Rev 4.pdf362 KB, April 24, 2025
- 367162swk Procurement Specification - NNSA Beamline Magnets Rev 2.pdf424 KB, April 24, 2025
- PUR-466_Proposal Certifications.pdf574 KB, April 24, 2025
- RFP 367162swk Amendment 01.pdf108 KB, April 30, 2025
- RFP 367162swk Amendment 02.pdf103 KB, May 9, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 24, 2025
Solicitation
Due May 12, 2025 at 6:00 PM EDT. SAM.gov, notice aea71c30a16240bab77271f8ce976869
4 revisions on SAM
- May 9, 2025: publish, solicitation
- May 5, 2025: publish, solicitation
- April 30, 2025: publish, solicitation
- April 24, 2025: publish, solicitation
April 30, 2025
Solicitation
Due May 12, 2025 at 6:00 PM EDT. SAM.gov, notice 1290c6e7e9a148d5bbc65239fe6cfad6
4 revisions on SAM
- May 9, 2025: publish, solicitation
- May 5, 2025: publish, solicitation
- April 30, 2025: publish, solicitation
- April 24, 2025: publish, solicitation
May 5, 2025
Solicitation
Due May 19, 2025 at 6:00 PM EDT. SAM.gov, notice c7765ced4ee04572bceaeaae4e9ae049
4 revisions on SAM
- May 9, 2025: publish, solicitation
- May 5, 2025: publish, solicitation
- April 30, 2025: publish, solicitation
- April 24, 2025: publish, solicitation
May 9, 2025
Solicitation
Due June 12, 2025 at 6:00 PM EDT. SAM.gov, notice 66906e0b6bfa4072ae29bd9f405c9b86
4 revisions on SAM
- May 9, 2025: publish, solicitation
- May 5, 2025: publish, solicitation
- April 30, 2025: publish, solicitation
- April 24, 2025: publish, solicitation
Points of contact
- Spencer Keskeskeske@fnal.gov