Solicitation
Pneumatic Control Valves
355910mrh
Department of Energy, Fermilab - DOE Contractor. Industrial Valve Manufacturing.
Response deadline
March 29, 2024 at 5:00 PM EDT
Closed 971 days ago. Posted March 14, 2024. Scheduled to archive April 13, 2024.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2024
237 like it are open now in industrial valve manufacturing
- VALVE,SAFETY RELIEF
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 332911Ship to the buyerSPE7MC27Q0067Due tomorrowNov 25 - VALVE,GATE
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 332911Ship to the buyerSPE7MC27Q0055Due tomorrowNov 25 - VALVE,REGULATING,FLUID
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 332911Ship to the buyerSPE7M227U0061Due in 3 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 332911 (industrial valve manufacturing), means no more than 750 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 15 days from the day the solicitation was posted, March 14, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
REQUEST FOR PROPOSAL – 355910mrh Fermi Research Alliance, LLC (FRA) anticipates procurement of the following assemblies for Fermi National Accelerator Laboratory (Fermilab). Please provide your firm fixed price for the following:
Control valves are required for a liquid argon filtration skid. These are bellows sealed control valves that meet stringent design constraints such as the cryogenic temperatures required for flowing liquid argon (-273°C) that range up to Regeneration temperatures (250°C). The valves also meet the design considerations for the pressure / flow accounted for from a preexisting, already purchased submersible, cryogenic pump.
These valves would see both extreme high (250°C) and low temps (-273°C), but also are exceptional in leak-tightness. In the liquid argon detector systems, purity is the main focus; also, the flow control aspect is critical. Please reference attached RFP 355910rmh for complete details. Basis for Subcontract Award This is a Low Price Technically Acceptable (LPTA) source selection.
Award shall be made to the supplier who is deemed responsible by FRA, whose proposal is technically acceptable and offers the lowest evaluated price. FRA intends to award without discussions.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 14, 2024
Solicitation
Due March 29, 2024 at 5:00 PM EDT. SAM.gov, notice 0e9144552eaf40c9a5d49d0f5420564d
Points of contact
- Michael Hellauermhellaue@fnal.gov