Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,509 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Presolicitation

NMAH: 2027 Install Emergency Generator

33330227RF0010025

Smithsonian Institution, Smithsonian Institution. Commercial and Institutional Building Construction.

Offers due

February 10, 2027 at 3:00 PM EST

77 days from now. Posted November 12, 2026.

Get an email when this is amended, when the deadline moves and when it is awarded.Watch it

Similar, open now

All 184 open in commercial and institutional building construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Nothing is submitted yet. The solicitation normally follows under the same number. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
What comes next
No solicitation has been published under this number yet. The presolicitation of November 12, 2026 is the earliest notice of the purchase.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The Smithsonian Institution (“Smithsonian”) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560.

Note: This is a revised RFP. Do not use previous posted documents from SOL# 33330226RF0010007. 

The applicable North American Industry Classification Codes (“NAICS”) are: 236220 - Commercial and Institutional Building Construction size standard is $45.0 million.

238210 – Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million.

Construction Budget: Over $10M.

Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum’s lower level, which has exceeded its operational lifespan. This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance.

Specifically, work under this project includes but is not limited to:

a.         Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS’s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level. 

b.         Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout.

c.         Existing conditions documentation early in the construction phase for implementation into BIM models.

d.         Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study. 

e.         A short circuit study of the proposed project prior to equipment submittals.

f.          Protection of existing finishes in the areas of work.

g.         Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up.

h.         Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building. Removal of existing conduit, panelboards, and pull-boxes throughout the building. 

i.          Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation.

j.          Two switchover events: One from existing to temporary emergency power supplies and one for temporary to new emergency power supplies.

k.         Reinforcement of existing structure to support the new generators.

l.          Removal of the existing diesel generator in the lower level.

m.        Testing for lead and asbestos on existing piping at new points of connection.

n.         Mechanical work in the lower level to provide new fuel oil pumps.

o.         Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort.

p.         Work within and adjacent to sensitive 5th floor spaces including the Library and the Director’s Suite.

q.         All work is within an operational Museum with both staff and the public present.

r.          Ceiling removals and installation on the 4th and 5th floors.

s.         Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane.

t.          Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction.

u.         Integration and coordination of new mechanical and generator control systems into existing Siemens BAS.

v.         Initial testing, commissioning and black start of new electrical emergency generator systems.

The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff. 

Construction Schedule:  Total period of performance allowed for construction is 680 calendar days from the Notice to Proceed.

This is not the requst for Proposals.  The full solicitation, request for proposals and supporting documents will be released on or about beginning of December 2026; however, there is no guarantee or implication of a guarantee this this project will be solicited. Electronic copies will be uploaded to SAM.gov site.  This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response.

THIS IS NOT A REQUEST FOR PROPOSAL.  DO NOT SUBMIT ANY DOCUMENTS.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 12, 2026

    Presolicitation

    Due February 10, 2027 at 3:00 PM EST. SAM.gov, notice 6543257e0c4e49059daf554deecf5134

    1 revision on SAM
    • November 12, 2026: publish, presolicitation

Points of contact