{"canonical":"https://sealedbidder.com/opportunities/30321pr260000003","key":"30321PR260000003","url":"https://sealedbidder.com/opportunities/30321pr260000003","title":"USCG STA Sand Key Repair Fuel Dispensers","solicitation_number":"30321PR260000003","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-03-20T19:00:00Z","first_posted":"2026-02-23","last_posted":"2026-03-09","department":"HOMELAND SECURITY, DEPARTMENT OF","subagency":"US COAST GUARD","office":"BASE MIAMI(00028)","naics":"237120","psc":"Z2NA","set_aside":"SBA","place_state":"FL","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"12103","place_county_name":"Pinellas County","place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"3569fd4c6cd74d6d96e2d1246846cc5a","title":"USCG STA Sand Key Repair Fuel Dispensers","solicitation_number":"30321PR260000003","notice_type":"k","base_type":"k","posted":"2026-02-23","posted_at":"2026-02-23T13:30:55.234Z","due_at":"2026-03-10T19:00:00Z","due_date":"2026-03-10","cancelled":false,"archived":true,"archive_date":"2026-03-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3569fd4c6cd74d6d96e2d1246846cc5a/view","enriched":true,"history":[{"index":3,"title":"USCG STA Sand Key Repair Fuel Dispensers","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-09T17:05:10.029Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d6fe81bb213f45daa6b09cceaa643cc1","solicitation_number":"30321PR260000003","parent_opportunity_id":"3569fd4c6cd74d6d96e2d1246846cc5a"},{"index":1,"title":"USCG STA Sand Key Repair Fuel Dispensers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T13:30:55.234Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"3569fd4c6cd74d6d96e2d1246846cc5a","solicitation_number":"30321PR260000003"}]},{"notice_id":"d6fe81bb213f45daa6b09cceaa643cc1","title":"USCG STA Sand Key Repair Fuel Dispensers","solicitation_number":"30321PR260000003","notice_type":"k","base_type":"k","posted":"2026-03-09","posted_at":"2026-03-09T17:05:10.029Z","due_at":"2026-03-20T19:00:00Z","due_date":"2026-03-20","cancelled":false,"archived":true,"archive_date":"2026-04-04","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d6fe81bb213f45daa6b09cceaa643cc1/view","enriched":true,"history":[{"index":3,"title":"USCG STA Sand Key Repair Fuel Dispensers","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-09T17:05:10.029Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d6fe81bb213f45daa6b09cceaa643cc1","solicitation_number":"30321PR260000003","parent_opportunity_id":"3569fd4c6cd74d6d96e2d1246846cc5a"},{"index":1,"title":"USCG STA Sand Key Repair Fuel Dispensers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T13:30:55.234Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"3569fd4c6cd74d6d96e2d1246846cc5a","solicitation_number":"30321PR260000003"}]}],"latest_notice_id":"d6fe81bb213f45daa6b09cceaa643cc1","first_type":"k","notices":[{"dates":{"posted":"2026-02-23","posted_at":"2026-02-23T13:30:55.234Z","created_at":"2026-02-23T13:10:03.586Z","modified_at":"2026-04-05T03:55:45.345Z","response_deadline":{"raw":"2026-03-10T15:00:00-04:00","utc":"2026-03-10T19:00:00Z","date":"2026-03-10","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3569fd4c6cd74d6d96e2d1246846cc5a/view"},"naics":{"codes":["237120"],"primary":"237120"},"title":"USCG STA Sand Key Repair Fuel Dispensers","agency":{"office":{"code":"70Z028","name":"BASE MIAMI(00028)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"33132","city":"MIAMI","state":"FL","country":"USA"},"organization_id":"100175096","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-25","archive_type":"auto15"},"history":[{"index":3,"title":"USCG STA Sand Key Repair Fuel Dispensers","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-09T17:05:10.029Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d6fe81bb213f45daa6b09cceaa643cc1","solicitation_number":"30321PR260000003","parent_opportunity_id":"3569fd4c6cd74d6d96e2d1246846cc5a"},{"index":1,"title":"USCG STA Sand Key Repair Fuel Dispensers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T13:30:55.234Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"3569fd4c6cd74d6d96e2d1246846cc5a","solicitation_number":"30321PR260000003"}],"contacts":[{"name":"BMC James Pinto","role":"primary","email":"James.E.Pinto@uscg.mil","phone":"(727) 596-8666 X 105"},{"name":"CPO Zachery Little","role":"secondary","email":"Zachery.T.Little@uscg.mil","phone":"(206) 820-4819"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"3569fd4c6cd74d6d96e2d1246846cc5a","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"3569fd4c6cd74d6d96e2d1246846cc5a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-12T08:43:32.114514146Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"37b8dd4ec0295866129700a157f6b0543d6838d68344200b5e7f324bc585e676","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-12T08:43:32.114514146Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>This combined synopsis/solicitation for construction services prepared in accordance with the<br />\nformat in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional&nbsp;<br />\ninformation included in this notice. This synopsis/solicitation is being advertised as Small&nbsp;<br />\nBusiness Set-Aside only. This announcement constitutes the only solicitation; no separate written&nbsp;<br />\nsolicitation will be issued.</p>\n\n<p><br />\nThe solicitation number is 30321PR260000003. Applicable North American Industry Classification&nbsp;</p>\n\n<p>Standard (NAICS) codes are:</p>\n\n<p>237120 - Oil and Gas Pipeline and Related Structures Construction</p>\n\n<p>This requirement is for a fixed price contract. The contract will be awarded using simplified&nbsp;<br />\nacquisition procedures in accordance with FAR part 13 and part 15<br />\nThe Government will award a contract resulting from this solicitation to the responsible offeror&nbsp;<br />\nwhose offer conforming to the solicitation will be most advantageous to the Government, Best Value.</p>\n\n<p>When submitting your proposals, request a price breakdown of the following:<br />\na. Cost of materials and equipment<br />\nb. Cost of labor</p>\n\n<p>Contract will be awarded to the vendor who can provide Best value which includes all labor,&nbsp;<br />\nmaterial, cost and equipment required within the SOW. Cost and Past Performance factors will also&nbsp;<br />\nbe considered when selecting the award.</p>\n\n<p>Anticipated award date: 10 business days after close of solicitation, OOA 20 March 2026</p>\n\n<p><br />\nQuotes are to be received no later than close of business (3 p.m.) on 10 March 2026 and are &nbsp;to be&nbsp;<br />\nsent via e-mail to angel.melendez@uscg.mil</p>\n\n<p><u><em><strong>Location of Work: </strong></em></u></p>\n\n<p><u><em><strong>1375 Gulf Blvd. Clearwater FL, 33767</strong></em></u></p>\n\n<p><u><em><strong>POC: </strong></em></u></p>\n\n<p><u><em><strong>Zachery Little Zachery.T.Little@uscg.mil<br />\n(206) 820-4819</strong></em></u></p>\n\n<p><u><em><strong>James Pinto James.E.Pinto@uscg.mil<br />\n(727) 596-8666 X 105</strong></em></u></p>\n\n<p><br />\nQuotations sent via the US Postal Service or hand delivered should be sent to:<br />\nCommanding Officer</p>\n\n<p>USCG Base Miami Beach (P&amp;C)</p>\n\n<p>Attn: Angel Melendez<br />\n12100 SW 152ⁿᵈ ST Miami, FL 33177.</p>\n\n<p>Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable)<br />\nwill be issued in SAM (www.sam.gov).</p>\n\n<p>Wage determinations: FL20240184 01/05/2024</p>\n\n<p>SCOPE OF WORK:</p>\n\n<p><br />\nCONTRACT SPECIFICATIONS STATION SAND KEY FUEL DISPENSERS<br />\nAT</p>\n\n<p>UNITED STATES COAST GUARD<br />\nStation Sand Key, Clearwater, FL</p>\n\n<p>PROJECT NUMBER 31562475<br />\nFebruary 2026</p>\n\n<p><br />\nSUMMARY OF WORK PART 1 GENERAL GENERAL DESCRIPTION<br />\nGeneral Work Requirements</p>\n\n<p>1. PROJECT OVERVIEW<br />\nThe Contractor shall provide all labor, supervision, materials, equipment, tools, testing, permits,&nbsp;<br />\nand incidentals necessary to perform a complete overhaul, rehabilitation, and modernization of the&nbsp;<br />\nfuel storage and dispensing system at USCG Station Sand Key.</p>\n\n<p>The objective is to restore the fuel system to full operational status in compliance with: Federal,&nbsp;<br />\nState of Florida, and Pinellas County regulations<br />\nEPA Underground Storage Tank (UST) requirements FDEP storage tank system regulations<br />\nNFPA 30 &amp; NFPA 30A</p>\n\n<p>UFC (Unified Facilities Criteria)</p>\n\n<p>USCG Civil Engineering Unit standards Shape<br />\n2. EXISTING SYSTEM DESCRIPTION<br />\nThe existing system generally consists of:</p>\n\n<p>Diesel fuel storage tank(s) (UST or AST &ndash; verify field conditions) Fuel transfer pump(s)<br />\nDispensing station(s)</p>\n\n<p>Fuel piping (underground and/or aboveground) Leak detection system<br />\nTank monitoring and alarm system</p>\n\n<p>Spill containment and overfill prevention Electrical controls and emergency shutoff<br />\nThe Contractor shall verify all existing conditions prior to mobilization. Shape<br />\n3. SCOPE OF SERVICES&nbsp;</p>\n\n<p><br />\n3.1 Pre-Construction Services</p>\n\n<p>Conduct site investigation and system condition assessment Perform tank tightness testing (if&nbsp;<br />\nrequired)<br />\nProvide as-built verification</p>\n\n<p>Develop phased construction plan to minimize operational disruption Prepare and submit shop&nbsp;<br />\ndrawings and submittals<br />\nObtain required permits and approvals Shape<br />\n3.2 Fuel Tank Work Contractor shall:<br />\nDecommission and remove existing fuel storage tank(s), OR Clean, inspect, and rehabilitate tank (if&nbsp;<br />\ntank is to remain)<br />\nIf replacing:<br />\nFurnish and install new double-wall UL-listed steel or fiberglass tank Provide corrosion protection&nbsp;<br />\nsystem (if UST)<br />\nInstall anchoring system (if required by water table conditions)</p>\n\n<p>Install new spill bucket and overfill protection Shape<br />\n3.3 Fuel Piping Replacement Remove existing underground piping<br />\nInstall new double-wall fiberglass or coated steel piping Provide secondary containment<br />\nInstall flex connectors at tank and dispenser Pressure test piping per code<br />\nProvide tracer wire (if non-metallic piping) Shape<br />\n3.4 Pump &amp; Dispenser Replacement Remove and replace fuel transfer pumps<br />\nInstall explosion-proof motors (Class I, Division 1 rated) Install new fuel dispensers with:<br />\nMetering system</p>\n\n<p>Hose reels (if required) Automatic shutoff nozzles<br />\nCalibrate meters to weights and measures standards Shape<br />\n3.5 Electrical &amp; Controls</p>\n\n<p>Replace or upgrade control panels Install new emergency shutoff switches<br />\nInstall new fuel management system (if required) Upgrade conduit and wiring to NEC compliance&nbsp;<br />\nInstall grounding and bonding system</p>\n\n<p>Integrate leak detection monitoring Shape<br />\n3.6 Environmental &amp; Compliance<br />\nProvide soil sampling if excavation required Properly dispose of contaminated materials Provide&nbsp;<br />\ncertified tank cleaning<br />\nMaintain spill prevention measures Provide SPCC compliance updates<br />\nSubmit closure documentation (if tank removal occurs) Shape<br />\n3.7 Concrete &amp; Site Restoration</p>\n\n<p>Demolish and replace damaged concrete pads Install new equipment pads<br />\nRestore pavement and striping Restore landscaping as required Shape<br />\n3.8 Testing &amp; Commissioning Contractor shall perform: Hydrostatic tank testing Piping pressure&nbsp;<br />\ntesting<br />\nLeak detection system testing Electrical system testing Dispenser calibration<br />\nFull operational functional testing Provide written test reports.<br />\nShape</p>\n\n<p>4. DELIVERABLES&nbsp;</p>\n\n<p><br />\nContractor shall provide:</p>\n\n<p>Shop drawings</p>\n\n<p>Product data submittals</p>\n\n<p>As-built drawings (hard copy &amp; digital) O&amp;M manuals<br />\nWarranty documentation (minimum 1-year workmanship, 10-year tank warranty typical) Training for&nbsp;<br />\nUSCG personnel<br />\nShape</p>\n\n<p>5. PHASING &amp; OPERATIONS&nbsp;</p>\n\n<p><br />\nMaintain station fueling capability throughout project OR Provide temporary fuel supply solution<br />\nCoordinate shutdowns with Commanding Officer Restrict work to approved hours<br />\nMaintain site security per USCG requirements Shape<br />\n6. SAFETY REQUIREMENTS&nbsp;</p>\n\n<p>Contractor shall:</p>\n\n<p>Submit Site-Specific Safety Plan</p>\n\n<p>Comply with OSHA 29 CFR 1910 &amp; 1926</p>\n\n<p>Provide confined space procedures (if tank entry required) Implement Hot Work Permits<br />\nMaintain fire watch during welding Follow USCG base access requirements Shape</p>\n\n<p>7. QUALITY CONTROL&nbsp;</p>\n\n<p><br />\nContractor shall implement a Quality Control Plan Provide qualified fuel system technicians<br />\nUse licensed storage tank contractor (State of Florida certified) Maintain daily quality control&nbsp;<br />\nreports<br />\nShape<br />\n8. WARRANTY&nbsp;</p>\n\n<p>Minimum 1-year labor warranty</p>\n\n<p>Manufacturer tank warranty (10&ndash;30 years depending on system) Pump and dispenser warranty per&nbsp;<br />\nmanufacturer<br />\nShape</p>\n\n<p>9. ESTIMATED PROJECT DURATION&nbsp;</p>\n\n<p><br />\nDesign &amp; Submittals: 30&ndash;60 days Procurement: 45&ndash;90 days<br />\nConstruction: 60&ndash;120 days</p>\n\n<p>Testing &amp; Commissioning: 1&ndash;2 weeks</p>\n\n<p>Total Estimated Duration: 4&ndash;8 months (depending on scope and environmental findings) Shape<br />\n10. OPTIONAL ADD ALTERNATES&nbsp;</p>\n\n<p><br />\nFuel polishing system Generator backup power Automated fuel tracking system Additional storage&nbsp;<br />\ncapacity Secondary containment canopy<br />\nCathodic protection monitoring system Shape</p>\n\n<p>END OF SCOPE OF WORK</p>\n\n<p><br />\nSite visit: It is highly recommended and encouraged that interested party&rsquo;s contact Mr. James Pinto&nbsp;<br />\nfor a site visit which will be held on Friday Febuary 27, 2026 at 09:00AM EST. For scheduling&nbsp;<br />\ncontact Mr. Pinto via email James.E.Pinto@uscg.mil Or via phone at (727) 596-8666 X 105.</p>\n\n<p><br />\nPerformance Period: Performance of work is expected to commence NLT 10 days after award is made.&nbsp;<br />\nExtension period must be approved by the Contracting Officer for any unforeseen delays.<br />\n**All Questions and Answers will not be accepted after 04 Mar 2026 at 10:00AM EST. APPLICABLE FAR&nbsp;<br />\nCLAUSES<br />\nFAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other<br />\nThan Commercial Items).</p>\n\n<p><br />\nATTACHED BY REFERENCE<br />\n52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS<br />\n52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984)<br />\n52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984)<br />\n52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995)<br />\nWork hours: Monday through Friday, 0730 &ndash; 1800 (7:30 am &ndash; 6 pm) No weekends or Holidays authorized.</p>\n\n<p>See attached applicable FAR Clauses by reference.</p>\n\n<p>Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far<br />\nThe following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this&nbsp;<br />\nsolicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006);&nbsp;<br />\nContracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR&nbsp;<br />\nclauses may be obtained electronically at http://www.dhs.gov.</p>\n\n<p>Vendors providing an offer must be registered in SAM (System for Award Management)<br />\nprior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors<br />\nSAM registration must be in an &ldquo;ACTIVE&rdquo; status prior to award.</p>\n\n<p><br />\n<br />\n&nbsp;</p>","text":"This combined synopsis/solicitation for construction services prepared in accordance with the\n\nformat in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional\n\ninformation included in this notice. This synopsis/solicitation is being advertised as Small\n\nBusiness Set-Aside only. This announcement constitutes the only solicitation; no separate written\n\nsolicitation will be issued.\n\nThe solicitation number is 30321PR260000003. Applicable North American Industry Classification\n\nStandard (NAICS) codes are:\n\n237120 - Oil and Gas Pipeline and Related Structures Construction\n\nThis requirement is for a fixed price contract. The contract will be awarded using simplified\n\nacquisition procedures in accordance with FAR part 13 and part 15\n\nThe Government will award a contract resulting from this solicitation to the responsible offeror\n\nwhose offer conforming to the solicitation will be most advantageous to the Government, Best Value.\n\nWhen submitting your proposals, request a price breakdown of the following:\n\na. Cost of materials and equipment\n\nb. Cost of labor\n\nContract will be awarded to the vendor who can provide Best value which includes all labor,\n\nmaterial, cost and equipment required within the SOW. Cost and Past Performance factors will also\n\nbe considered when selecting the award.\n\nAnticipated award date: 10 business days after close of solicitation, OOA 20 March 2026\n\nQuotes are to be received no later than close of business (3 p.m.) on 10 March 2026 and are to be\n\nsent via e-mail to angel.melendez@uscg.mil\n\nLocation of Work:\n\n1375 Gulf Blvd. Clearwater FL, 33767\n\nPOC:\n\nZachery Little Zachery.T.Little@uscg.mil\n\n(206) 820-4819\n\nJames Pinto James.E.Pinto@uscg.mil\n\n(727) 596-8666 X 105\n\nQuotations sent via the US Postal Service or hand delivered should be sent to:\n\nCommanding Officer\n\nUSCG Base Miami Beach (P&C)\n\nAttn: Angel Melendez\n\n12100 SW 152ⁿᵈ ST Miami, FL 33177.\n\nTelephone requests of quotes, will not be accepted, a formal notice of changes (if applicable)\n\nwill be issued in SAM (www.sam.gov).\n\nWage determinations: FL20240184 01/05/2024\n\nSCOPE OF WORK:\n\nCONTRACT SPECIFICATIONS STATION SAND KEY FUEL DISPENSERS\n\nAT\n\nUNITED STATES COAST GUARD\n\nStation Sand Key, Clearwater, FL\n\nPROJECT NUMBER 31562475\n\nFebruary 2026\n\nSUMMARY OF WORK PART 1 GENERAL GENERAL DESCRIPTION\n\nGeneral Work Requirements\n\n1. PROJECT OVERVIEW\n\nThe Contractor shall provide all labor, supervision, materials, equipment, tools, testing, permits,\n\nand incidentals necessary to perform a complete overhaul, rehabilitation, and modernization of the\n\nfuel storage and dispensing system at USCG Station Sand Key.\n\nThe objective is to restore the fuel system to full operational status in compliance with: Federal,\n\nState of Florida, and Pinellas County regulations\n\nEPA Underground Storage Tank (UST) requirements FDEP storage tank system regulations\n\nNFPA 30 & NFPA 30A\n\nUFC (Unified Facilities Criteria)\n\nUSCG Civil Engineering Unit standards Shape\n\n2. EXISTING SYSTEM DESCRIPTION\n\nThe existing system generally consists of:\n\nDiesel fuel storage tank(s) (UST or AST – verify field conditions) Fuel transfer pump(s)\n\nDispensing station(s)\n\nFuel piping (underground and/or aboveground) Leak detection system\n\nTank monitoring and alarm system\n\nSpill containment and overfill prevention Electrical controls and emergency shutoff\n\nThe Contractor shall verify all existing conditions prior to mobilization. Shape\n\n3. SCOPE OF SERVICES\n\n3.1 Pre-Construction Services\n\nConduct site investigation and system condition assessment Perform tank tightness testing (if\n\nrequired)\n\nProvide as-built verification\n\nDevelop phased construction plan to minimize operational disruption Prepare and submit shop\n\ndrawings and submittals\n\nObtain required permits and approvals Shape\n\n3.2 Fuel Tank Work Contractor shall:\n\nDecommission and remove existing fuel storage tank(s), OR Clean, inspect, and rehabilitate tank (if\n\ntank is to remain)\n\nIf replacing:\n\nFurnish and install new double-wall UL-listed steel or fiberglass tank Provide corrosion protection\n\nsystem (if UST)\n\nInstall anchoring system (if required by water table conditions)\n\nInstall new spill bucket and overfill protection Shape\n\n3.3 Fuel Piping Replacement Remove existing underground piping\n\nInstall new double-wall fiberglass or coated steel piping Provide secondary containment\n\nInstall flex connectors at tank and dispenser Pressure test piping per code\n\nProvide tracer wire (if non-metallic piping) Shape\n\n3.4 Pump & Dispenser Replacement Remove and replace fuel transfer pumps\n\nInstall explosion-proof motors (Class I, Division 1 rated) Install new fuel dispensers with:\n\nMetering system\n\nHose reels (if required) Automatic shutoff nozzles\n\nCalibrate meters to weights and measures standards Shape\n\n3.5 Electrical & Controls\n\nReplace or upgrade control panels Install new emergency shutoff switches\n\nInstall new fuel management system (if required) Upgrade conduit and wiring to NEC compliance\n\nInstall grounding and bonding system\n\nIntegrate leak detection monitoring Shape\n\n3.6 Environmental & Compliance\n\nProvide soil sampling if excavation required Properly dispose of contaminated materials Provide\n\ncertified tank cleaning\n\nMaintain spill prevention measures Provide SPCC compliance updates\n\nSubmit closure documentation (if tank removal occurs) Shape\n\n3.7 Concrete & Site Restoration\n\nDemolish and replace damaged concrete pads Install new equipment pads\n\nRestore pavement and striping Restore landscaping as required Shape\n\n3.8 Testing & Commissioning Contractor shall perform: Hydrostatic tank testing Piping pressure\n\ntesting\n\nLeak detection system testing Electrical system testing Dispenser calibration\n\nFull operational functional testing Provide written test reports.\n\nShape\n\n4. DELIVERABLES\n\nContractor shall provide:\n\nShop drawings\n\nProduct data submittals\n\nAs-built drawings (hard copy & digital) O&M manuals\n\nWarranty documentation (minimum 1-year workmanship, 10-year tank warranty typical) Training for\n\nUSCG personnel\n\nShape\n\n5. PHASING & OPERATIONS\n\nMaintain station fueling capability throughout project OR Provide temporary fuel supply solution\n\nCoordinate shutdowns with Commanding Officer Restrict work to approved hours\n\nMaintain site security per USCG requirements Shape\n\n6. SAFETY REQUIREMENTS\n\nContractor shall:\n\nSubmit Site-Specific Safety Plan\n\nComply with OSHA 29 CFR 1910 & 1926\n\nProvide confined space procedures (if tank entry required) Implement Hot Work Permits\n\nMaintain fire watch during welding Follow USCG base access requirements Shape\n\n7. QUALITY CONTROL\n\nContractor shall implement a Quality Control Plan Provide qualified fuel system technicians\n\nUse licensed storage tank contractor (State of Florida certified) Maintain daily quality control\n\nreports\n\nShape\n\n8. WARRANTY\n\nMinimum 1-year labor warranty\n\nManufacturer tank warranty (10–30 years depending on system) Pump and dispenser warranty per\n\nmanufacturer\n\nShape\n\n9. ESTIMATED PROJECT DURATION\n\nDesign & Submittals: 30–60 days Procurement: 45–90 days\n\nConstruction: 60–120 days\n\nTesting & Commissioning: 1–2 weeks\n\nTotal Estimated Duration: 4–8 months (depending on scope and environmental findings) Shape\n\n10. OPTIONAL ADD ALTERNATES\n\nFuel polishing system Generator backup power Automated fuel tracking system Additional storage\n\ncapacity Secondary containment canopy\n\nCathodic protection monitoring system Shape\n\nEND OF SCOPE OF WORK\n\nSite visit: It is highly recommended and encouraged that interested party’s contact Mr. James Pinto\n\nfor a site visit which will be held on Friday Febuary 27, 2026 at 09:00AM EST. For scheduling\n\ncontact Mr. Pinto via email James.E.Pinto@uscg.mil Or via phone at (727) 596-8666 X 105.\n\nPerformance Period: Performance of work is expected to commence NLT 10 days after award is made.\n\nExtension period must be approved by the Contracting Officer for any unforeseen delays.\n\n**All Questions and Answers will not be accepted after 04 Mar 2026 at 10:00AM EST. APPLICABLE FAR\n\nCLAUSES\n\nFAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other\n\nThan Commercial Items).\n\nATTACHED BY REFERENCE\n\n52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS\n\n52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984)\n\n52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984)\n\n52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995)\n\nWork hours: Monday through Friday, 0730 – 1800 (7:30 am – 6 pm) No weekends or Holidays authorized.\n\nSee attached applicable FAR Clauses by reference.\n\nOfferors may obtain full text version of these clauses electronically at: www.arnet.gov/far\n\nThe following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this\n\nsolicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006);\n\nContracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR\n\nclauses may be obtained electronically at http://www.dhs.gov.\n\nVendors providing an offer must be registered in SAM (System for Award Management)\n\nprior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors\n\nSAM registration must be in an “ACTIVE” status prior to award.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"30321PR260000003","place_of_performance":{"zip":"33767","city":{"code":"12900","name":"Clearwater Beach"},"state":{"code":"FL","name":"Florida"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2NA"},{"dates":{"posted":"2026-03-09","posted_at":"2026-03-09T17:05:10.029Z","created_at":"2026-03-09T17:00:03.939Z","modified_at":"2026-04-05T03:55:45.345Z","response_deadline":{"raw":"2026-03-20T15:00:00-04:00","utc":"2026-03-20T19:00:00Z","date":"2026-03-20","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d6fe81bb213f45daa6b09cceaa643cc1/view"},"naics":{"codes":["237120"],"primary":"237120"},"title":"USCG STA Sand Key Repair Fuel Dispensers","agency":{"office":{"code":"70Z028","name":"BASE MIAMI(00028)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"33132","city":"MIAMI","state":"FL","country":"USA"},"organization_id":"100175096","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-04","archive_type":"auto15"},"history":[{"index":3,"title":"USCG STA Sand Key Repair Fuel Dispensers","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-09T17:05:10.029Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"d6fe81bb213f45daa6b09cceaa643cc1","solicitation_number":"30321PR260000003","parent_opportunity_id":"3569fd4c6cd74d6d96e2d1246846cc5a"},{"index":1,"title":"USCG STA Sand Key Repair Fuel Dispensers","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-23T13:30:55.234Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"3569fd4c6cd74d6d96e2d1246846cc5a","solicitation_number":"30321PR260000003"}],"contacts":[{"name":"BMC James Pinto","role":"primary","email":"James.E.Pinto@uscg.mil","phone":"(727) 596-8666 X 105"},{"name":"CPO Zachery Little","role":"secondary","email":"Zachery.T.Little@uscg.mil","phone":"(206) 820-4819"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"d6fe81bb213f45daa6b09cceaa643cc1","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"3569fd4c6cd74d6d96e2d1246846cc5a","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-11T11:25:24.408887417Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"a9b0f3fc2c32c9544cbff290dfdca65ec517e70dc1e326bc7ff898848bf85847","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-11T11:25:24.408887417Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>This combined synopsis/solicitation for construction services prepared in accordance with the<br />\nformat in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional&nbsp;<br />\ninformation included in this notice. This synopsis/solicitation is being advertised as Small&nbsp;<br />\nBusiness Set-Aside only. This announcement constitutes the only solicitation; no separate written&nbsp;<br />\nsolicitation will be issued.</p>\n\n<p><br />\nThe solicitation number is 30321PR260000003. Applicable North American Industry Classification&nbsp;</p>\n\n<p>Standard (NAICS) codes are:</p>\n\n<p>237120 - Oil and Gas Pipeline and Related Structures Construction</p>\n\n<p>This requirement is for a fixed price contract. The contract will be awarded using simplified&nbsp;<br />\nacquisition procedures in accordance with FAR part 13 and part 15<br />\nThe Government will award a contract resulting from this solicitation to the responsible offeror&nbsp;<br />\nwhose offer conforming to the solicitation will be most advantageous to the Government, Best Value.</p>\n\n<p>When submitting your proposals, request a price breakdown of the following:<br />\na. Cost of materials and equipment<br />\nb. Cost of labor</p>\n\n<p>Contract will be awarded to the vendor who can provide Best value which includes all labor,&nbsp;<br />\nmaterial, cost and equipment required within the SOW. Cost and Past Performance factors will also&nbsp;<br />\nbe considered when selecting the award.</p>\n\n<p>Anticipated award date: 10 business days after close of solicitation, OOA 20 March 2026</p>\n\n<p><br />\nQuotes are to be received no later than close of business (3 p.m.) on 10 March 2026 and are &nbsp;to be&nbsp;<br />\nsent via e-mail to angel.melendez@uscg.mil</p>\n\n<p><u><em><strong>Location of Work: </strong></em></u></p>\n\n<p><u><em><strong>1375 Gulf Blvd. Clearwater FL, 33767</strong></em></u></p>\n\n<p><u><em><strong>POC: </strong></em></u></p>\n\n<p><u><em><strong>Zachery Little Zachery.T.Little@uscg.mil<br />\n(206) 820-4819</strong></em></u></p>\n\n<p><u><em><strong>James Pinto James.E.Pinto@uscg.mil<br />\n(727) 596-8666 X 105</strong></em></u></p>\n\n<p><br />\nQuotations sent via the US Postal Service or hand delivered should be sent to:<br />\nCommanding Officer</p>\n\n<p>USCG Base Miami Beach (P&amp;C)</p>\n\n<p>Attn: Angel Melendez<br />\n12100 SW 152ⁿᵈ ST Miami, FL 33177.</p>\n\n<p>Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable)<br />\nwill be issued in SAM (www.sam.gov).</p>\n\n<p>Wage determinations: FL20240184 01/05/2024</p>\n\n<p>SCOPE OF WORK:</p>\n\n<p><br />\nCONTRACT SPECIFICATIONS STATION SAND KEY FUEL DISPENSERS<br />\nAT</p>\n\n<p>UNITED STATES COAST GUARD<br />\nStation Sand Key, Clearwater, FL</p>\n\n<p>PROJECT NUMBER 31562475<br />\nFebruary 2026</p>\n\n<p><br />\nSUMMARY OF WORK PART 1 GENERAL GENERAL DESCRIPTION<br />\nGeneral Work Requirements</p>\n\n<p>1. PROJECT OVERVIEW<br />\nThe Contractor shall provide all labor, supervision, materials, equipment, tools, testing, permits,&nbsp;<br />\nand incidentals necessary to perform a complete overhaul, rehabilitation, and modernization of the&nbsp;<br />\nfuel storage and dispensing system at USCG Station Sand Key.</p>\n\n<p>The objective is to restore the fuel system to full operational status in compliance with: Federal,&nbsp;<br />\nState of Florida, and Pinellas County regulations<br />\nEPA Underground Storage Tank (UST) requirements FDEP storage tank system regulations<br />\nNFPA 30 &amp; NFPA 30A</p>\n\n<p>UFC (Unified Facilities Criteria)</p>\n\n<p>USCG Civil Engineering Unit standards Shape<br />\n2. EXISTING SYSTEM DESCRIPTION<br />\nThe existing system generally consists of:</p>\n\n<p>Diesel fuel storage tank(s) (UST or AST &ndash; verify field conditions) Fuel transfer pump(s)<br />\nDispensing station(s)</p>\n\n<p>Fuel piping (underground and/or aboveground) Leak detection system<br />\nTank monitoring and alarm system</p>\n\n<p>Spill containment and overfill prevention Electrical controls and emergency shutoff<br />\nThe Contractor shall verify all existing conditions prior to mobilization. Shape<br />\n3. SCOPE OF SERVICES&nbsp;</p>\n\n<p><br />\n3.1 Pre-Construction Services</p>\n\n<p>Conduct site investigation and system condition assessment Perform tank tightness testing (if&nbsp;<br />\nrequired)<br />\nProvide as-built verification</p>\n\n<p>Develop phased construction plan to minimize operational disruption Prepare and submit shop&nbsp;<br />\ndrawings and submittals<br />\nObtain required permits and approvals Shape<br />\n3.2 Fuel Tank Work Contractor shall:<br />\nDecommission and remove existing fuel storage tank(s), OR Clean, inspect, and rehabilitate tank (if&nbsp;<br />\ntank is to remain)<br />\nIf replacing:<br />\nFurnish and install new double-wall UL-listed steel or fiberglass tank Provide corrosion protection&nbsp;<br />\nsystem (if UST)<br />\nInstall anchoring system (if required by water table conditions)</p>\n\n<p>Install new spill bucket and overfill protection Shape<br />\n3.3 Fuel Piping Replacement Remove existing underground piping<br />\nInstall new double-wall fiberglass or coated steel piping Provide secondary containment<br />\nInstall flex connectors at tank and dispenser Pressure test piping per code<br />\nProvide tracer wire (if non-metallic piping) Shape<br />\n3.4 Pump &amp; Dispenser Replacement Remove and replace fuel transfer pumps<br />\nInstall explosion-proof motors (Class I, Division 1 rated) Install new fuel dispensers with:<br />\nMetering system</p>\n\n<p>Hose reels (if required) Automatic shutoff nozzles<br />\nCalibrate meters to weights and measures standards Shape<br />\n3.5 Electrical &amp; Controls</p>\n\n<p>Replace or upgrade control panels Install new emergency shutoff switches<br />\nInstall new fuel management system (if required) Upgrade conduit and wiring to NEC compliance&nbsp;<br />\nInstall grounding and bonding system</p>\n\n<p>Integrate leak detection monitoring Shape<br />\n3.6 Environmental &amp; Compliance<br />\nProvide soil sampling if excavation required Properly dispose of contaminated materials Provide&nbsp;<br />\ncertified tank cleaning<br />\nMaintain spill prevention measures Provide SPCC compliance updates<br />\nSubmit closure documentation (if tank removal occurs) Shape<br />\n3.7 Concrete &amp; Site Restoration</p>\n\n<p>Demolish and replace damaged concrete pads Install new equipment pads<br />\nRestore pavement and striping Restore landscaping as required Shape<br />\n3.8 Testing &amp; Commissioning Contractor shall perform: Hydrostatic tank testing Piping pressure&nbsp;<br />\ntesting<br />\nLeak detection system testing Electrical system testing Dispenser calibration<br />\nFull operational functional testing Provide written test reports.<br />\nShape</p>\n\n<p>4. DELIVERABLES&nbsp;</p>\n\n<p><br />\nContractor shall provide:</p>\n\n<p>Shop drawings</p>\n\n<p>Product data submittals</p>\n\n<p>As-built drawings (hard copy &amp; digital) O&amp;M manuals<br />\nWarranty documentation (minimum 1-year workmanship, 10-year tank warranty typical) Training for&nbsp;<br />\nUSCG personnel<br />\nShape</p>\n\n<p>5. PHASING &amp; OPERATIONS&nbsp;</p>\n\n<p><br />\nMaintain station fueling capability throughout project OR Provide temporary fuel supply solution<br />\nCoordinate shutdowns with Commanding Officer Restrict work to approved hours<br />\nMaintain site security per USCG requirements Shape<br />\n6. SAFETY REQUIREMENTS&nbsp;</p>\n\n<p>Contractor shall:</p>\n\n<p>Submit Site-Specific Safety Plan</p>\n\n<p>Comply with OSHA 29 CFR 1910 &amp; 1926</p>\n\n<p>Provide confined space procedures (if tank entry required) Implement Hot Work Permits<br />\nMaintain fire watch during welding Follow USCG base access requirements Shape</p>\n\n<p>7. QUALITY CONTROL&nbsp;</p>\n\n<p><br />\nContractor shall implement a Quality Control Plan Provide qualified fuel system technicians<br />\nUse licensed storage tank contractor (State of Florida certified) Maintain daily quality control&nbsp;<br />\nreports<br />\nShape<br />\n8. WARRANTY&nbsp;</p>\n\n<p>Minimum 1-year labor warranty</p>\n\n<p>Manufacturer tank warranty (10&ndash;30 years depending on system) Pump and dispenser warranty per&nbsp;<br />\nmanufacturer<br />\nShape</p>\n\n<p>9. ESTIMATED PROJECT DURATION&nbsp;</p>\n\n<p><br />\nDesign &amp; Submittals: 30&ndash;60 days Procurement: 45&ndash;90 days<br />\nConstruction: 60&ndash;120 days</p>\n\n<p>Testing &amp; Commissioning: 1&ndash;2 weeks</p>\n\n<p>Total Estimated Duration: 4&ndash;8 months (depending on scope and environmental findings) Shape<br />\n10. OPTIONAL ADD ALTERNATES&nbsp;</p>\n\n<p><br />\nFuel polishing system Generator backup power Automated fuel tracking system Additional storage&nbsp;<br />\ncapacity Secondary containment canopy<br />\nCathodic protection monitoring system Shape</p>\n\n<p>END OF SCOPE OF WORK</p>\n\n<p><br />\nSite visit: It is highly recommended and encouraged that interested party&rsquo;s contact Mr. James Pinto&nbsp;<br />\nfor a site visit which will be held on Friday Febuary 27, 2026 at 09:00AM EST. For scheduling&nbsp;<br />\ncontact Mr. Pinto via email James.E.Pinto@uscg.mil Or via phone at (727) 596-8666 X 105.</p>\n\n<p><br />\nPerformance Period: Performance of work is expected to commence NLT 10 days after award is made.&nbsp;<br />\nExtension period must be approved by the Contracting Officer for any unforeseen delays.<br />\n**All Questions and Answers will not be accepted after 04 Mar 2026 at 10:00AM EST. APPLICABLE FAR&nbsp;<br />\nCLAUSES<br />\nFAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other<br />\nThan Commercial Items).</p>\n\n<p><br />\nATTACHED BY REFERENCE<br />\n52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS<br />\n52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984)<br />\n52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984)<br />\n52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995)<br />\nWork hours: Monday through Friday, 0730 &ndash; 1800 (7:30 am &ndash; 6 pm) No weekends or Holidays authorized.</p>\n\n<p>See attached applicable FAR Clauses by reference.</p>\n\n<p>Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far<br />\nThe following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this&nbsp;<br />\nsolicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006);&nbsp;<br />\nContracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR&nbsp;<br />\nclauses may be obtained electronically at http://www.dhs.gov.</p>\n\n<p>Vendors providing an offer must be registered in SAM (System for Award Management)<br />\nprior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors<br />\nSAM registration must be in an &ldquo;ACTIVE&rdquo; status prior to award.</p>\n\n<p><br />\n<br />\n&nbsp;</p>","text":"This combined synopsis/solicitation for construction services prepared in accordance with the\n\nformat in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional\n\ninformation included in this notice. This synopsis/solicitation is being advertised as Small\n\nBusiness Set-Aside only. This announcement constitutes the only solicitation; no separate written\n\nsolicitation will be issued.\n\nThe solicitation number is 30321PR260000003. Applicable North American Industry Classification\n\nStandard (NAICS) codes are:\n\n237120 - Oil and Gas Pipeline and Related Structures Construction\n\nThis requirement is for a fixed price contract. The contract will be awarded using simplified\n\nacquisition procedures in accordance with FAR part 13 and part 15\n\nThe Government will award a contract resulting from this solicitation to the responsible offeror\n\nwhose offer conforming to the solicitation will be most advantageous to the Government, Best Value.\n\nWhen submitting your proposals, request a price breakdown of the following:\n\na. Cost of materials and equipment\n\nb. Cost of labor\n\nContract will be awarded to the vendor who can provide Best value which includes all labor,\n\nmaterial, cost and equipment required within the SOW. Cost and Past Performance factors will also\n\nbe considered when selecting the award.\n\nAnticipated award date: 10 business days after close of solicitation, OOA 20 March 2026\n\nQuotes are to be received no later than close of business (3 p.m.) on 10 March 2026 and are to be\n\nsent via e-mail to angel.melendez@uscg.mil\n\nLocation of Work:\n\n1375 Gulf Blvd. Clearwater FL, 33767\n\nPOC:\n\nZachery Little Zachery.T.Little@uscg.mil\n\n(206) 820-4819\n\nJames Pinto James.E.Pinto@uscg.mil\n\n(727) 596-8666 X 105\n\nQuotations sent via the US Postal Service or hand delivered should be sent to:\n\nCommanding Officer\n\nUSCG Base Miami Beach (P&C)\n\nAttn: Angel Melendez\n\n12100 SW 152ⁿᵈ ST Miami, FL 33177.\n\nTelephone requests of quotes, will not be accepted, a formal notice of changes (if applicable)\n\nwill be issued in SAM (www.sam.gov).\n\nWage determinations: FL20240184 01/05/2024\n\nSCOPE OF WORK:\n\nCONTRACT SPECIFICATIONS STATION SAND KEY FUEL DISPENSERS\n\nAT\n\nUNITED STATES COAST GUARD\n\nStation Sand Key, Clearwater, FL\n\nPROJECT NUMBER 31562475\n\nFebruary 2026\n\nSUMMARY OF WORK PART 1 GENERAL GENERAL DESCRIPTION\n\nGeneral Work Requirements\n\n1. PROJECT OVERVIEW\n\nThe Contractor shall provide all labor, supervision, materials, equipment, tools, testing, permits,\n\nand incidentals necessary to perform a complete overhaul, rehabilitation, and modernization of the\n\nfuel storage and dispensing system at USCG Station Sand Key.\n\nThe objective is to restore the fuel system to full operational status in compliance with: Federal,\n\nState of Florida, and Pinellas County regulations\n\nEPA Underground Storage Tank (UST) requirements FDEP storage tank system regulations\n\nNFPA 30 & NFPA 30A\n\nUFC (Unified Facilities Criteria)\n\nUSCG Civil Engineering Unit standards Shape\n\n2. EXISTING SYSTEM DESCRIPTION\n\nThe existing system generally consists of:\n\nDiesel fuel storage tank(s) (UST or AST – verify field conditions) Fuel transfer pump(s)\n\nDispensing station(s)\n\nFuel piping (underground and/or aboveground) Leak detection system\n\nTank monitoring and alarm system\n\nSpill containment and overfill prevention Electrical controls and emergency shutoff\n\nThe Contractor shall verify all existing conditions prior to mobilization. Shape\n\n3. SCOPE OF SERVICES\n\n3.1 Pre-Construction Services\n\nConduct site investigation and system condition assessment Perform tank tightness testing (if\n\nrequired)\n\nProvide as-built verification\n\nDevelop phased construction plan to minimize operational disruption Prepare and submit shop\n\ndrawings and submittals\n\nObtain required permits and approvals Shape\n\n3.2 Fuel Tank Work Contractor shall:\n\nDecommission and remove existing fuel storage tank(s), OR Clean, inspect, and rehabilitate tank (if\n\ntank is to remain)\n\nIf replacing:\n\nFurnish and install new double-wall UL-listed steel or fiberglass tank Provide corrosion protection\n\nsystem (if UST)\n\nInstall anchoring system (if required by water table conditions)\n\nInstall new spill bucket and overfill protection Shape\n\n3.3 Fuel Piping Replacement Remove existing underground piping\n\nInstall new double-wall fiberglass or coated steel piping Provide secondary containment\n\nInstall flex connectors at tank and dispenser Pressure test piping per code\n\nProvide tracer wire (if non-metallic piping) Shape\n\n3.4 Pump & Dispenser Replacement Remove and replace fuel transfer pumps\n\nInstall explosion-proof motors (Class I, Division 1 rated) Install new fuel dispensers with:\n\nMetering system\n\nHose reels (if required) Automatic shutoff nozzles\n\nCalibrate meters to weights and measures standards Shape\n\n3.5 Electrical & Controls\n\nReplace or upgrade control panels Install new emergency shutoff switches\n\nInstall new fuel management system (if required) Upgrade conduit and wiring to NEC compliance\n\nInstall grounding and bonding system\n\nIntegrate leak detection monitoring Shape\n\n3.6 Environmental & Compliance\n\nProvide soil sampling if excavation required Properly dispose of contaminated materials Provide\n\ncertified tank cleaning\n\nMaintain spill prevention measures Provide SPCC compliance updates\n\nSubmit closure documentation (if tank removal occurs) Shape\n\n3.7 Concrete & Site Restoration\n\nDemolish and replace damaged concrete pads Install new equipment pads\n\nRestore pavement and striping Restore landscaping as required Shape\n\n3.8 Testing & Commissioning Contractor shall perform: Hydrostatic tank testing Piping pressure\n\ntesting\n\nLeak detection system testing Electrical system testing Dispenser calibration\n\nFull operational functional testing Provide written test reports.\n\nShape\n\n4. DELIVERABLES\n\nContractor shall provide:\n\nShop drawings\n\nProduct data submittals\n\nAs-built drawings (hard copy & digital) O&M manuals\n\nWarranty documentation (minimum 1-year workmanship, 10-year tank warranty typical) Training for\n\nUSCG personnel\n\nShape\n\n5. PHASING & OPERATIONS\n\nMaintain station fueling capability throughout project OR Provide temporary fuel supply solution\n\nCoordinate shutdowns with Commanding Officer Restrict work to approved hours\n\nMaintain site security per USCG requirements Shape\n\n6. SAFETY REQUIREMENTS\n\nContractor shall:\n\nSubmit Site-Specific Safety Plan\n\nComply with OSHA 29 CFR 1910 & 1926\n\nProvide confined space procedures (if tank entry required) Implement Hot Work Permits\n\nMaintain fire watch during welding Follow USCG base access requirements Shape\n\n7. QUALITY CONTROL\n\nContractor shall implement a Quality Control Plan Provide qualified fuel system technicians\n\nUse licensed storage tank contractor (State of Florida certified) Maintain daily quality control\n\nreports\n\nShape\n\n8. WARRANTY\n\nMinimum 1-year labor warranty\n\nManufacturer tank warranty (10–30 years depending on system) Pump and dispenser warranty per\n\nmanufacturer\n\nShape\n\n9. ESTIMATED PROJECT DURATION\n\nDesign & Submittals: 30–60 days Procurement: 45–90 days\n\nConstruction: 60–120 days\n\nTesting & Commissioning: 1–2 weeks\n\nTotal Estimated Duration: 4–8 months (depending on scope and environmental findings) Shape\n\n10. OPTIONAL ADD ALTERNATES\n\nFuel polishing system Generator backup power Automated fuel tracking system Additional storage\n\ncapacity Secondary containment canopy\n\nCathodic protection monitoring system Shape\n\nEND OF SCOPE OF WORK\n\nSite visit: It is highly recommended and encouraged that interested party’s contact Mr. James Pinto\n\nfor a site visit which will be held on Friday Febuary 27, 2026 at 09:00AM EST. For scheduling\n\ncontact Mr. Pinto via email James.E.Pinto@uscg.mil Or via phone at (727) 596-8666 X 105.\n\nPerformance Period: Performance of work is expected to commence NLT 10 days after award is made.\n\nExtension period must be approved by the Contracting Officer for any unforeseen delays.\n\n**All Questions and Answers will not be accepted after 04 Mar 2026 at 10:00AM EST. APPLICABLE FAR\n\nCLAUSES\n\nFAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other\n\nThan Commercial Items).\n\nATTACHED BY REFERENCE\n\n52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS\n\n52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984)\n\n52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984)\n\n52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995)\n\nWork hours: Monday through Friday, 0730 – 1800 (7:30 am – 6 pm) No weekends or Holidays authorized.\n\nSee attached applicable FAR Clauses by reference.\n\nOfferors may obtain full text version of these clauses electronically at: www.arnet.gov/far\n\nThe following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this\n\nsolicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006);\n\nContracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR\n\nclauses may be obtained electronically at http://www.dhs.gov.\n\nVendors providing an offer must be registered in SAM (System for Award Management)\n\nprior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors\n\nSAM registration must be in an “ACTIVE” status prior to award.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"30321PR260000003","place_of_performance":{"zip":"33767","city":{"code":"12900","name":"Clearwater Beach"},"state":{"code":"FL","name":"Florida"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2NA"}],"due_at":"2026-03-20T19:00:00Z","due_date":"2026-03-20","closes_at":"2026-03-20T19:00:00Z","awardable":true,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z028","office_name":"BASE MIAMI(00028)","state":"FL","county":"12103","county_name":"Pinellas County","city":null,"city_name":null,"country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-11T11:27:07.726584Z","principal_notice_id":"d6fe81bb213f45daa6b09cceaa643cc1","description":{"text":"This combined synopsis/solicitation for construction services prepared in accordance with the\n\nformat in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional\n\ninformation included in this notice. This synopsis/solicitation is being advertised as Small\n\nBusiness Set-Aside only. This announcement constitutes the only solicitation; no separate written\n\nsolicitation will be issued.\n\nThe solicitation number is 30321PR260000003. Applicable North American Industry Classification\n\nStandard (NAICS) codes are:\n\n237120 - Oil and Gas Pipeline and Related Structures Construction\n\nThis requirement is for a fixed price contract. The contract will be awarded using simplified\n\nacquisition procedures in accordance with FAR part 13 and part 15\n\nThe Government will award a contract resulting from this solicitation to the responsible offeror\n\nwhose offer conforming to the solicitation will be most advantageous to the Government, Best Value.\n\nWhen submitting your proposals, request a price breakdown of the following:\n\na. Cost of materials and equipment\n\nb. Cost of labor\n\nContract will be awarded to the vendor who can provide Best value which includes all labor,\n\nmaterial, cost and equipment required within the SOW. Cost and Past Performance factors will also\n\nbe considered when selecting the award.\n\nAnticipated award date: 10 business days after close of solicitation, OOA 20 March 2026\n\nQuotes are to be received no later than close of business (3 p.m.) on 10 March 2026 and are to be\n\nsent via e-mail to angel.melendez@uscg.mil\n\nLocation of Work:\n\n1375 Gulf Blvd. Clearwater FL, 33767\n\nPOC:\n\nZachery Little Zachery.T.Little@uscg.mil\n\n(206) 820-4819\n\nJames Pinto James.E.Pinto@uscg.mil\n\n(727) 596-8666 X 105\n\nQuotations sent via the US Postal Service or hand delivered should be sent to:\n\nCommanding Officer\n\nUSCG Base Miami Beach (P&C)\n\nAttn: Angel Melendez\n\n12100 SW 152ⁿᵈ ST Miami, FL 33177.\n\nTelephone requests of quotes, will not be accepted, a formal notice of changes (if applicable)\n\nwill be issued in SAM (www.sam.gov).\n\nWage determinations: FL20240184 01/05/2024\n\nSCOPE OF WORK:\n\nCONTRACT SPECIFICATIONS STATION SAND KEY FUEL DISPENSERS\n\nAT\n\nUNITED STATES COAST GUARD\n\nStation Sand Key, Clearwater, FL\n\nPROJECT NUMBER 31562475\n\nFebruary 2026\n\nSUMMARY OF WORK PART 1 GENERAL GENERAL DESCRIPTION\n\nGeneral Work Requirements\n\n1. PROJECT OVERVIEW\n\nThe Contractor shall provide all labor, supervision, materials, equipment, tools, testing, permits,\n\nand incidentals necessary to perform a complete overhaul, rehabilitation, and modernization of the\n\nfuel storage and dispensing system at USCG Station Sand Key.\n\nThe objective is to restore the fuel system to full operational status in compliance with: Federal,\n\nState of Florida, and Pinellas County regulations\n\nEPA Underground Storage Tank (UST) requirements FDEP storage tank system regulations\n\nNFPA 30 & NFPA 30A\n\nUFC (Unified Facilities Criteria)\n\nUSCG Civil Engineering Unit standards Shape\n\n2. EXISTING SYSTEM DESCRIPTION\n\nThe existing system generally consists of:\n\nDiesel fuel storage tank(s) (UST or AST – verify field conditions) Fuel transfer pump(s)\n\nDispensing station(s)\n\nFuel piping (underground and/or aboveground) Leak detection system\n\nTank monitoring and alarm system\n\nSpill containment and overfill prevention Electrical controls and emergency shutoff\n\nThe Contractor shall verify all existing conditions prior to mobilization. Shape\n\n3. SCOPE OF SERVICES\n\n3.1 Pre-Construction Services\n\nConduct site investigation and system condition assessment Perform tank tightness testing (if\n\nrequired)\n\nProvide as-built verification\n\nDevelop phased construction plan to minimize operational disruption Prepare and submit shop\n\ndrawings and submittals\n\nObtain required permits and approvals Shape\n\n3.2 Fuel Tank Work Contractor shall:\n\nDecommission and remove existing fuel storage tank(s), OR Clean, inspect, and rehabilitate tank (if\n\ntank is to remain)\n\nIf replacing:\n\nFurnish and install new double-wall UL-listed steel or fiberglass tank Provide corrosion protection\n\nsystem (if UST)\n\nInstall anchoring system (if required by water table conditions)\n\nInstall new spill bucket and overfill protection Shape\n\n3.3 Fuel Piping Replacement Remove existing underground piping\n\nInstall new double-wall fiberglass or coated steel piping Provide secondary containment\n\nInstall flex connectors at tank and dispenser Pressure test piping per code\n\nProvide tracer wire (if non-metallic piping) Shape\n\n3.4 Pump & Dispenser Replacement Remove and replace fuel transfer pumps\n\nInstall explosion-proof motors (Class I, Division 1 rated) Install new fuel dispensers with:\n\nMetering system\n\nHose reels (if required) Automatic shutoff nozzles\n\nCalibrate meters to weights and measures standards Shape\n\n3.5 Electrical & Controls\n\nReplace or upgrade control panels Install new emergency shutoff switches\n\nInstall new fuel management system (if required) Upgrade conduit and wiring to NEC compliance\n\nInstall grounding and bonding system\n\nIntegrate leak detection monitoring Shape\n\n3.6 Environmental & Compliance\n\nProvide soil sampling if excavation required Properly dispose of contaminated materials Provide\n\ncertified tank cleaning\n\nMaintain spill prevention measures Provide SPCC compliance updates\n\nSubmit closure documentation (if tank removal occurs) Shape\n\n3.7 Concrete & Site Restoration\n\nDemolish and replace damaged concrete pads Install new equipment pads\n\nRestore pavement and striping Restore landscaping as required Shape\n\n3.8 Testing & Commissioning Contractor shall perform: Hydrostatic tank testing Piping pressure\n\ntesting\n\nLeak detection system testing Electrical system testing Dispenser calibration\n\nFull operational functional testing Provide written test reports.\n\nShape\n\n4. DELIVERABLES\n\nContractor shall provide:\n\nShop drawings\n\nProduct data submittals\n\nAs-built drawings (hard copy & digital) O&M manuals\n\nWarranty documentation (minimum 1-year workmanship, 10-year tank warranty typical) Training for\n\nUSCG personnel\n\nShape\n\n5. PHASING & OPERATIONS\n\nMaintain station fueling capability throughout project OR Provide temporary fuel supply solution\n\nCoordinate shutdowns with Commanding Officer Restrict work to approved hours\n\nMaintain site security per USCG requirements Shape\n\n6. SAFETY REQUIREMENTS\n\nContractor shall:\n\nSubmit Site-Specific Safety Plan\n\nComply with OSHA 29 CFR 1910 & 1926\n\nProvide confined space procedures (if tank entry required) Implement Hot Work Permits\n\nMaintain fire watch during welding Follow USCG base access requirements Shape\n\n7. QUALITY CONTROL\n\nContractor shall implement a Quality Control Plan Provide qualified fuel system technicians\n\nUse licensed storage tank contractor (State of Florida certified) Maintain daily quality control\n\nreports\n\nShape\n\n8. WARRANTY\n\nMinimum 1-year labor warranty\n\nManufacturer tank warranty (10–30 years depending on system) Pump and dispenser warranty per\n\nmanufacturer\n\nShape\n\n9. ESTIMATED PROJECT DURATION\n\nDesign & Submittals: 30–60 days Procurement: 45–90 days\n\nConstruction: 60–120 days\n\nTesting & Commissioning: 1–2 weeks\n\nTotal Estimated Duration: 4–8 months (depending on scope and environmental findings) Shape\n\n10. OPTIONAL ADD ALTERNATES\n\nFuel polishing system Generator backup power Automated fuel tracking system Additional storage\n\ncapacity Secondary containment canopy\n\nCathodic protection monitoring system Shape\n\nEND OF SCOPE OF WORK\n\nSite visit: It is highly recommended and encouraged that interested party’s contact Mr. James Pinto\n\nfor a site visit which will be held on Friday Febuary 27, 2026 at 09:00AM EST. For scheduling\n\ncontact Mr. Pinto via email James.E.Pinto@uscg.mil Or via phone at (727) 596-8666 X 105.\n\nPerformance Period: Performance of work is expected to commence NLT 10 days after award is made.\n\nExtension period must be approved by the Contracting Officer for any unforeseen delays.\n\n**All Questions and Answers will not be accepted after 04 Mar 2026 at 10:00AM EST. APPLICABLE FAR\n\nCLAUSES\n\nFAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other\n\nThan Commercial Items).\n\nATTACHED BY REFERENCE\n\n52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS\n\n52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984)\n\n52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984)\n\n52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995)\n\nWork hours: Monday through Friday, 0730 – 1800 (7:30 am – 6 pm) No weekends or Holidays authorized.\n\nSee attached applicable FAR Clauses by reference.\n\nOfferors may obtain full text version of these clauses electronically at: www.arnet.gov/far\n\nThe following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this\n\nsolicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006);\n\nContracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR\n\nclauses may be obtained electronically at http://www.dhs.gov.\n\nVendors providing an offer must be registered in SAM (System for Award Management)\n\nprior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors\n\nSAM registration must be in an “ACTIVE” status prior to award.","html":"<p>This combined synopsis/solicitation for construction services prepared in accordance with the<br />\nformat in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional&nbsp;<br />\ninformation included in this notice. This synopsis/solicitation is being advertised as Small&nbsp;<br />\nBusiness Set-Aside only. This announcement constitutes the only solicitation; no separate written&nbsp;<br />\nsolicitation will be issued.</p>\n\n<p><br />\nThe solicitation number is 30321PR260000003. Applicable North American Industry Classification&nbsp;</p>\n\n<p>Standard (NAICS) codes are:</p>\n\n<p>237120 - Oil and Gas Pipeline and Related Structures Construction</p>\n\n<p>This requirement is for a fixed price contract. The contract will be awarded using simplified&nbsp;<br />\nacquisition procedures in accordance with FAR part 13 and part 15<br />\nThe Government will award a contract resulting from this solicitation to the responsible offeror&nbsp;<br />\nwhose offer conforming to the solicitation will be most advantageous to the Government, Best Value.</p>\n\n<p>When submitting your proposals, request a price breakdown of the following:<br />\na. Cost of materials and equipment<br />\nb. Cost of labor</p>\n\n<p>Contract will be awarded to the vendor who can provide Best value which includes all labor,&nbsp;<br />\nmaterial, cost and equipment required within the SOW. Cost and Past Performance factors will also&nbsp;<br />\nbe considered when selecting the award.</p>\n\n<p>Anticipated award date: 10 business days after close of solicitation, OOA 20 March 2026</p>\n\n<p><br />\nQuotes are to be received no later than close of business (3 p.m.) on 10 March 2026 and are &nbsp;to be&nbsp;<br />\nsent via e-mail to angel.melendez@uscg.mil</p>\n\n<p><u><em><strong>Location of Work: </strong></em></u></p>\n\n<p><u><em><strong>1375 Gulf Blvd. Clearwater FL, 33767</strong></em></u></p>\n\n<p><u><em><strong>POC: </strong></em></u></p>\n\n<p><u><em><strong>Zachery Little Zachery.T.Little@uscg.mil<br />\n(206) 820-4819</strong></em></u></p>\n\n<p><u><em><strong>James Pinto James.E.Pinto@uscg.mil<br />\n(727) 596-8666 X 105</strong></em></u></p>\n\n<p><br />\nQuotations sent via the US Postal Service or hand delivered should be sent to:<br />\nCommanding Officer</p>\n\n<p>USCG Base Miami Beach (P&amp;C)</p>\n\n<p>Attn: Angel Melendez<br />\n12100 SW 152ⁿᵈ ST Miami, FL 33177.</p>\n\n<p>Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable)<br />\nwill be issued in SAM (www.sam.gov).</p>\n\n<p>Wage determinations: FL20240184 01/05/2024</p>\n\n<p>SCOPE OF WORK:</p>\n\n<p><br />\nCONTRACT SPECIFICATIONS STATION SAND KEY FUEL DISPENSERS<br />\nAT</p>\n\n<p>UNITED STATES COAST GUARD<br />\nStation Sand Key, Clearwater, FL</p>\n\n<p>PROJECT NUMBER 31562475<br />\nFebruary 2026</p>\n\n<p><br />\nSUMMARY OF WORK PART 1 GENERAL GENERAL DESCRIPTION<br />\nGeneral Work Requirements</p>\n\n<p>1. PROJECT OVERVIEW<br />\nThe Contractor shall provide all labor, supervision, materials, equipment, tools, testing, permits,&nbsp;<br />\nand incidentals necessary to perform a complete overhaul, rehabilitation, and modernization of the&nbsp;<br />\nfuel storage and dispensing system at USCG Station Sand Key.</p>\n\n<p>The objective is to restore the fuel system to full operational status in compliance with: Federal,&nbsp;<br />\nState of Florida, and Pinellas County regulations<br />\nEPA Underground Storage Tank (UST) requirements FDEP storage tank system regulations<br />\nNFPA 30 &amp; NFPA 30A</p>\n\n<p>UFC (Unified Facilities Criteria)</p>\n\n<p>USCG Civil Engineering Unit standards Shape<br />\n2. EXISTING SYSTEM DESCRIPTION<br />\nThe existing system generally consists of:</p>\n\n<p>Diesel fuel storage tank(s) (UST or AST &ndash; verify field conditions) Fuel transfer pump(s)<br />\nDispensing station(s)</p>\n\n<p>Fuel piping (underground and/or aboveground) Leak detection system<br />\nTank monitoring and alarm system</p>\n\n<p>Spill containment and overfill prevention Electrical controls and emergency shutoff<br />\nThe Contractor shall verify all existing conditions prior to mobilization. Shape<br />\n3. SCOPE OF SERVICES&nbsp;</p>\n\n<p><br />\n3.1 Pre-Construction Services</p>\n\n<p>Conduct site investigation and system condition assessment Perform tank tightness testing (if&nbsp;<br />\nrequired)<br />\nProvide as-built verification</p>\n\n<p>Develop phased construction plan to minimize operational disruption Prepare and submit shop&nbsp;<br />\ndrawings and submittals<br />\nObtain required permits and approvals Shape<br />\n3.2 Fuel Tank Work Contractor shall:<br />\nDecommission and remove existing fuel storage tank(s), OR Clean, inspect, and rehabilitate tank (if&nbsp;<br />\ntank is to remain)<br />\nIf replacing:<br />\nFurnish and install new double-wall UL-listed steel or fiberglass tank Provide corrosion protection&nbsp;<br />\nsystem (if UST)<br />\nInstall anchoring system (if required by water table conditions)</p>\n\n<p>Install new spill bucket and overfill protection Shape<br />\n3.3 Fuel Piping Replacement Remove existing underground piping<br />\nInstall new double-wall fiberglass or coated steel piping Provide secondary containment<br />\nInstall flex connectors at tank and dispenser Pressure test piping per code<br />\nProvide tracer wire (if non-metallic piping) Shape<br />\n3.4 Pump &amp; Dispenser Replacement Remove and replace fuel transfer pumps<br />\nInstall explosion-proof motors (Class I, Division 1 rated) Install new fuel dispensers with:<br />\nMetering system</p>\n\n<p>Hose reels (if required) Automatic shutoff nozzles<br />\nCalibrate meters to weights and measures standards Shape<br />\n3.5 Electrical &amp; Controls</p>\n\n<p>Replace or upgrade control panels Install new emergency shutoff switches<br />\nInstall new fuel management system (if required) Upgrade conduit and wiring to NEC compliance&nbsp;<br />\nInstall grounding and bonding system</p>\n\n<p>Integrate leak detection monitoring Shape<br />\n3.6 Environmental &amp; Compliance<br />\nProvide soil sampling if excavation required Properly dispose of contaminated materials Provide&nbsp;<br />\ncertified tank cleaning<br />\nMaintain spill prevention measures Provide SPCC compliance updates<br />\nSubmit closure documentation (if tank removal occurs) Shape<br />\n3.7 Concrete &amp; Site Restoration</p>\n\n<p>Demolish and replace damaged concrete pads Install new equipment pads<br />\nRestore pavement and striping Restore landscaping as required Shape<br />\n3.8 Testing &amp; Commissioning Contractor shall perform: Hydrostatic tank testing Piping pressure&nbsp;<br />\ntesting<br />\nLeak detection system testing Electrical system testing Dispenser calibration<br />\nFull operational functional testing Provide written test reports.<br />\nShape</p>\n\n<p>4. DELIVERABLES&nbsp;</p>\n\n<p><br />\nContractor shall provide:</p>\n\n<p>Shop drawings</p>\n\n<p>Product data submittals</p>\n\n<p>As-built drawings (hard copy &amp; digital) O&amp;M manuals<br />\nWarranty documentation (minimum 1-year workmanship, 10-year tank warranty typical) Training for&nbsp;<br />\nUSCG personnel<br />\nShape</p>\n\n<p>5. PHASING &amp; OPERATIONS&nbsp;</p>\n\n<p><br />\nMaintain station fueling capability throughout project OR Provide temporary fuel supply solution<br />\nCoordinate shutdowns with Commanding Officer Restrict work to approved hours<br />\nMaintain site security per USCG requirements Shape<br />\n6. SAFETY REQUIREMENTS&nbsp;</p>\n\n<p>Contractor shall:</p>\n\n<p>Submit Site-Specific Safety Plan</p>\n\n<p>Comply with OSHA 29 CFR 1910 &amp; 1926</p>\n\n<p>Provide confined space procedures (if tank entry required) Implement Hot Work Permits<br />\nMaintain fire watch during welding Follow USCG base access requirements Shape</p>\n\n<p>7. QUALITY CONTROL&nbsp;</p>\n\n<p><br />\nContractor shall implement a Quality Control Plan Provide qualified fuel system technicians<br />\nUse licensed storage tank contractor (State of Florida certified) Maintain daily quality control&nbsp;<br />\nreports<br />\nShape<br />\n8. WARRANTY&nbsp;</p>\n\n<p>Minimum 1-year labor warranty</p>\n\n<p>Manufacturer tank warranty (10&ndash;30 years depending on system) Pump and dispenser warranty per&nbsp;<br />\nmanufacturer<br />\nShape</p>\n\n<p>9. ESTIMATED PROJECT DURATION&nbsp;</p>\n\n<p><br />\nDesign &amp; Submittals: 30&ndash;60 days Procurement: 45&ndash;90 days<br />\nConstruction: 60&ndash;120 days</p>\n\n<p>Testing &amp; Commissioning: 1&ndash;2 weeks</p>\n\n<p>Total Estimated Duration: 4&ndash;8 months (depending on scope and environmental findings) Shape<br />\n10. OPTIONAL ADD ALTERNATES&nbsp;</p>\n\n<p><br />\nFuel polishing system Generator backup power Automated fuel tracking system Additional storage&nbsp;<br />\ncapacity Secondary containment canopy<br />\nCathodic protection monitoring system Shape</p>\n\n<p>END OF SCOPE OF WORK</p>\n\n<p><br />\nSite visit: It is highly recommended and encouraged that interested party&rsquo;s contact Mr. James Pinto&nbsp;<br />\nfor a site visit which will be held on Friday Febuary 27, 2026 at 09:00AM EST. For scheduling&nbsp;<br />\ncontact Mr. Pinto via email James.E.Pinto@uscg.mil Or via phone at (727) 596-8666 X 105.</p>\n\n<p><br />\nPerformance Period: Performance of work is expected to commence NLT 10 days after award is made.&nbsp;<br />\nExtension period must be approved by the Contracting Officer for any unforeseen delays.<br />\n**All Questions and Answers will not be accepted after 04 Mar 2026 at 10:00AM EST. APPLICABLE FAR&nbsp;<br />\nCLAUSES<br />\nFAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other<br />\nThan Commercial Items).</p>\n\n<p><br />\nATTACHED BY REFERENCE<br />\n52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS<br />\n52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984)<br />\n52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984)<br />\n52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995)<br />\nWork hours: Monday through Friday, 0730 &ndash; 1800 (7:30 am &ndash; 6 pm) No weekends or Holidays authorized.</p>\n\n<p>See attached applicable FAR Clauses by reference.</p>\n\n<p>Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far<br />\nThe following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this&nbsp;<br />\nsolicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006);&nbsp;<br />\nContracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR&nbsp;<br />\nclauses may be obtained electronically at http://www.dhs.gov.</p>\n\n<p>Vendors providing an offer must be registered in SAM (System for Award Management)<br />\nprior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors<br />\nSAM registration must be in an &ldquo;ACTIVE&rdquo; status prior to award.</p>\n\n<p><br />\n<br />\n&nbsp;</p>","origin":"detail"},"contacts":[{"name":"BMC James Pinto","role":"primary","email":"James.E.Pinto@uscg.mil","phone":"(727) 596-8666 X 105"},{"name":"CPO Zachery Little","role":"secondary","email":"Zachery.T.Little@uscg.mil","phone":"(206) 820-4819"}],"place_of_performance":{"zip":"33767","city":{"code":"12900","name":"Clearwater Beach"},"state":{"code":"FL","name":"Florida"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"33132","city":"MIAMI","state":"FL","country":"USA"},"naics_codes":["237120"],"award":null,"attachments":[{"resource_id":"069d194930f04b21bff27a8bc21f71f3","name":"SOW STA SAnd Key Fuel Dispensers.pdf","kind":"file","mime_type":".pdf","size_bytes":315502,"posted_at":"2026-02-23T13:30:55.234Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/069d194930f04b21bff27a8bc21f71f3/download","mirrored":false}],"awards":[],"related":[],"similar_open":[{"key":"PANNWD26P028176","latest_notice_id":"616764bb1a97432d8ac63a5c61cee2b3","title":"Mather Fueling System Repairs","solicitation_number":"PANNWD26P028176","notice_type":"o","first_type":"o","first_posted":"2026-10-22","last_posted":"2026-11-23","notices":6,"due_at":"2026-12-04T20:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9128F","office_name":"W071 ENDIST OMAHA","naics":"237120","psc":"Y1GC","set_aside":"SBA","state":"CA","county":"06067","county_name":"Sacramento County","city":"0646226","city_name":"Mather","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"W9128F27RA053PN","latest_notice_id":"15591f13cee9414a874f30579573c570","title":"Savannah ANG Repairs Pre-Solicitation Notice","solicitation_number":"W9128F27RA053PN","notice_type":"p","first_type":"p","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-04T20:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9128F","office_name":"W071 ENDIST OMAHA","naics":"237120","psc":"Y1NA","set_aside":"SBA","state":"GA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"SAVANNAH, GA","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"W9128F27RA054","latest_notice_id":"d83960f9dc674f0b9a03bdb7907af48e","title":"WH Ford RTC Fueling System Repairs","solicitation_number":"W9128F27RA054","notice_type":"o","first_type":"o","first_posted":"2026-10-20","last_posted":"2026-11-16","notices":3,"due_at":"2026-12-21T20:00:00Z","due_date":"2026-12-21","closes_at":"2026-12-21T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9128F","office_name":"W071 ENDIST OMAHA","naics":"237120","psc":"Y1GC","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"}],"similar_open_total":5,"indexable":false}