# Modernize Regenerative Thermal Oxidizer (RTO)

Canonical: https://sealedbidder.com/opportunities/2031za27b00001

- Solicitation number: 2031ZA27B00001
- Notice type: Sources sought
- Status: Closed. Deadline was November 25, 2026 at 4:00 PM EST
- Department: Department of the Treasury
- Agency: Bureau of Engraving and Printing
- Contracting office: Office of the Chief Procurement Officer (2031ZA)
- NAICS: 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Product or service code: Z2AZ Repair Or Alteration Of Other Administrative Facilities And Service Buildings
- Small business size standard: $19 million in average annual receipts (13 CFR 121.201, NAICS 238220)
- Place of performance: TX - Texas, Texas
- County: Tarrant County (FIPS 48439). https://sealedbidder.com/counties/tarrant-county-tx-48439
- First posted: November 18, 2026
- Last posted: November 18, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/622efd27a6cf48589063c08d3700b96b/view

## Reading this notice

- Kind of notice: Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates.
- What comes next: No solicitation has been published under this number yet. The sources sought of November 18, 2026 is the earliest notice of the purchase.

## Description

SEEKING SOURCES ONLY - The Bureau of Engraving and Printing (BEP) Western Currency Facility (WCF) is located at 9000 Blue Mound Road, Fort Worth, TX, 76131. Construction began on the WCF in 1987 and was completed in 1989. The Modernized Regenerative Thermal Oxidizer (RTO) is an air pollution control device that is required by the NSR

(New Source Review) Air Permit issued by the TCEQ (Texas Commission on Environmental Quality) to treat Volatile Organic Compounds (VOC) emissions from Plate Printing presses (14), Offset presses (4), and Rotary Screen presses (4). The existing RTO was commissioned in 2010 to control VOC emissions from Plate Printing. In 2021, the Offset presses were added to the RTO system. The existing conveyance system, which currently includes ducting from each press to the roof, nine (9) roof fans, and a 48" main duct on the roof, has been in place since the facility was built in the early 90s. The system has been cobbled together as presses were added in Plate Printing, which originally only housed four (4) presses, without consideration for the wholistic efficiency of the system. It is a requirement of the Clean Air Act, EPA regulations, and the WCF air permits, that an air pollution control device associated with a "facility" (equipment or area that is emitting air pollutants as defined by EPA) must be maintained in good condition and operated properly while the attached "facilities" operate.

This design/build project shall replace the RTO and the associated exhaust ventilation system: a new RTO with a modern control panel including safe PLCs and lower working voltage, a properly designed exhaust ventilation system that self-optimizes with feedback from modern performance-monitoring systems, properly sized roof fans, accessibility to clean ducting where needed, and increased voe capture efficiency to better exhaust printing areas while allowing the RTO to operate using less supplemental fuel. The new system shall also incorporate features to decrease the amount of ink and oils that get conveyed into the exhaust ventilation system causing air flow issues and damaging ducting, fans, and other system components. Natural gas usage of the new RTO shall be metered and integrated into the BEP Supervisory Control And Data Acquisition (SCADA) system.

In 2025, the existing RTO underwent several upgrades including the installation of a new, modern control panel to address obsolete components and increasingly difficult troubleshooting. This project shall set the Western Currency Facility (WCF) up for success in providing operational redundancy alongside the newly overhauled RTO that is currently operating at the facility. The entire voe exhaust ventilation system shall feed into one of two RTOs (existing or new) with the capability to divert process flow from one RTO to the other in the event one RTO shuts down for any reason. This redundancy shall enable production to continue operating while the root cause of the issue is addressed.

## Open now in the same industry

59 open in NAICS 238220.

- CON | Z1DA | REPLACE OR CHILLERS | 580-23-105 | SOLICITATION (36C25626R0130), due December 2, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/36c25626r0130
- CON | Z2DA | REPLACE CHILLER 1 B104 | 580-24-111 | SOLICITATION (36C25626R0131), due December 8, 2026 at 3:00 AM EST. https://sealedbidder.com/opportunities/36c25626r0131
- NTX VAMC Utility Tunnel Pump Room (36C25727Q0097), due December 16, 2026 at 11:00 AM EST. https://sealedbidder.com/opportunities/36c25727q0097

## Publications

- November 18, 2026: Sources sought, due November 25, 2026 at 4:00 PM EST. Notice 622efd27a6cf48589063c08d3700b96b. https://sam.gov/workspace/contract/opp/622efd27a6cf48589063c08d3700b96b/view

## Points of contact

- LaQulla Williams, Laqulla.Williams@bep.gov, 2024862465
- Brandy Idemudia, brandy.idemudia@bep.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/2031za27b00001.