Solicitation
Multimegawatt Electrolyzer Stack Heat Exchangers
2025025474
Department of Energy, Alliance for Energy Innovation, LLC - DOE Contractor. Power Boiler and Heat Exchanger Manufacturing.
Response deadline
September 25, 2025 at 7:00 PM EDT
Closed 426 days ago. Posted September 10, 2025, first published August 25, 2025. Scheduled to archive September 26, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
3 like it are open now in power boiler and heat exchanger manufacturing
- USNS LEROY GRUMMAN Clayton Boiler Coils
Department of the Navy, MSCHQ Norfolk
SolicitationNAICS 332410Ship to the buyerN3220527Q7044Closes in 8 daysDec 3 - GASKET AND RING ASSEMB
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationNAICS 332410Ship to the buyerSPE8E827T0761Closes in 13 daysDec 7 - COOLER ASSEMBLY
Department of the Navy, NAVSUP Weapon Systems Support Mech
PresolicitationNAICS 332410Ship to the buyerN0010425RBW83Closes in 24 daysDec 19
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 332410 (power boiler and heat exchanger manufacturing), means no more than 750 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 31 days from the day the solicitation was posted, August 25, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Amendment No. 1 answers to questions posted 9/10/25. See attachment.
This purchase is to acquire quantity 5 heat exchangers (HX) to allow cooling of the electrolyzer stacks being tested as part of the Multimegawatt (MMW) Electrolyzer project. The process fluid on one side of the heat exchanger will be 50/50 propylene glycol/water “cold side” and the other will be DI water “hot side”. The DI water side will need to be cleaned and passivated for Type 1 DI water.
Attachments/Links: Attachment 1 – Technical Specifications; Attachment 1A – DI HX
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 1A - DI HX Equipment Description.pdf125 KB, August 25, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 25, 2025
Solicitation
Due September 25, 2025 at 7:00 PM EDT. SAM.gov, notice eec3ef31e15344b5980ea1191a2d2df8
2 revisions on SAM
- September 10, 2025: publish, solicitation
- August 25, 2025: publish, solicitation
September 10, 2025
Solicitation
Due September 25, 2025 at 7:00 PM EDT. SAM.gov, notice 80f0ef276ec5486a93f20281dc7d860f
2 revisions on SAM
- September 10, 2025: publish, solicitation
- August 25, 2025: publish, solicitation
Points of contact
- Nicole EdunNicole.Edun@nrel.gov