Award notice
Renovation of the Residence Hot/Cold Water/Sewer System for US Embassy TBILISI Residence
19GG8025P0682
Department of State, U.S. Embassy Tbilisi. Residential Building Construction.
Awarded
$48,700.00 on the award notice, September 26, 2025, contract 19GG8025P0682
Get the next one like this from Department of State by email, the day it is posted.Find my opportunities
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Award notice. Who won, when, and for how much. Glossary
- How it ended
- Awarded to Rapid Solutions Georgia LLC on September 26, 2025. The contracting office reported 3 offers (competed under simplified acquisition procedures).
Description
As published on SAM.gov.
The U.S Embassy Tbilisi would like to renovate the domestic hot/cold water/sewer systems at the Residence by replacing the existing old pipes. This renovation aims to enhance the functionality, safety, and energy efficiency of the residence.
Work is to be performed at Tbilisi, Georgia, 26 Nikoloz Beradze str. Dighomi 9, Tbilisi, Georgia. The contract type is firm-fixed price.
B. SCOPE OF WORK
The Contractor shall perform the work per details specified herein.
• The Embassy will host a pre-bid meetings and all interested parties must attend.
• The existing pipes will be renovated in accordance with technical requirements. The
contractor is responsible for providing renovation services according Design, Specification and
Explanatory Notes.
• Provide renovation sequences planning (staging plan) to meet the requirements indicated in
the Scope of Work and Design Project (should be done by contractor).
• Provide sufficient technical information (e.g. materials, shop drawings for temporary waiting
area and construction, etc.) for approval prior to renovation.
• Provide a complete set of as-built drawings of the project after completion.
Specific scope of works:
Project completion date estimate 30 calendar days.
Sanitary Facilities and Utility Areas (APPENDIX #2 with photo examples):
• Basement Level - 1 bathroom, laundry room, boiler room.
• Ground Floor: 2 bathrooms, kitchen with 2 connection points.
• Second Floor: 3 bathrooms and bar area.
• Third Floor: 1 bathroom.
1. Preparation Works:
• Development and approval of the working project.
• Arrangement of temporary water supply in the basement.
5
2. Dismantling Works:
• Removal of existing screed in bathrooms.
• Dismantling of old cold and hot water supply pipelines, as well as sewer
lines (in agreed areas).
• Disposal of construction waste and dismantled pipes.
3. Preparation of Routes for New Utilities:
• Wall chasing and floor cutting for pipe routing.
• Drilling of holes for pipe passage through slabs and walls.
• Creation of openings and embeds in the basement for main pipelines (core
drilling).
4. Installation of New Utilities:
• Installation of cold water, hot water, and hot water recirculation mains
(risers and floor distribution).
• Installation of sewer pipes on floors (excluding basement).
• Installation of regulating valves (if required).
• Installation of shut-off valves for independent isolation of each bathroom
and water supply branch (valves visible to users must be provided with decorative
covers).
• All sanitary fixture connection nodes must be fixed properly.
• Installation of pipe thermal insulation (in basement and shafts).
• Sealing of penetrations through walls and slabs.
5. Testing and Commissioning:
• Hydraulic pressure testing of cold and hot water supply systems.
• Testing of sewer system for tightness and correct slope.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 19GG8025P0682_Redacted.pdf1.0 MB, October 15, 2025
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Rapid Solutions Georgia LLC
- UEI
- NQS1GGBJC9P1
- CAGE
- SHNF3
- Vendor location
- Tbilisi
- Contract
- 19GG8025P0682, purchase order
- Obligated
- $48,652.48
- Actions
- 1 between September 26, 2025 and September 26, 2025
- Competition
- Competed Under SAP, 3 offers received
- Set-aside reported
- No Set Aside Used.
- Described as
- Fac:7482:xjaq0015:cmr:domestic Hot/Cold Water/Sewer Project
- Match
- award number 19GG8025P0682 equals the contract number; same awarding office 19GG80 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 15, 2025
Award notice
Awarded to Rapid Solutions Georgia LLC for $48,700. SAM.gov, notice 07a1ef70d25c4f37bfbf9ab2c428fcec
2 revisions on SAM
- October 15, 2025: publish, award notice
- October 15, 2025: publish, award notice
October 15, 2025
Award notice
Awarded to Rapid Solutions Georgia LLC for $48,700. SAM.gov, notice 3f925f11fb4c412f9f818d26a4a8d4e3
2 revisions on SAM
- October 15, 2025: publish, award notice
- October 15, 2025: publish, award notice