# Indefinite Delivery Indefinite Quantity IDIQ Multiple Award Task Order Contracts MATOC for Construction Services in the States of Alabama and Georgia

Canonical: https://sealedbidder.com/opportunities/1923r0001

- Solicitation number: 1923R0001
- Notice type: Presolicitation
- Status: Closed. Deadline was February 13, 2025 at 3:00 AM EST
- Department: General Services Administration
- Agency: Public Buildings Service
- Contracting office: PBS R4 (Amd) Acquisition MGMT Division (47PE00)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Z2AA Repair Or Alteration Of Office Buildings
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236220)
- Place of performance: Atlanta, Georgia
- County: Fulton County (FIPS 13121). https://sealedbidder.com/counties/fulton-county-ga-13121
- City: Atlanta. https://sealedbidder.com/cities/atlanta-ga-1304000
- First posted: December 16, 2024
- Last posted: December 16, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/f9cf181efc2149a2a827975fa57c3e48/view

## Reading this notice

- Kind of notice: Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates.
- What comes next: No solicitation was published under this number after the presolicitation of December 16, 2024. An agency sometimes issues the solicitation under a new number.

## Description

The procurement will include a wide range of construction projects over the period of performance utilizing the DB or DBB task order contract approach. Primarily, task orders will consist of repair/alteration and tenant finish projects for GSA and other government agencies in occupied federally owned or leased buildings. A typical task order could contain some or all of the following:

modifications to architectural components and related electrical systems associated with, but not limited to ceilings, walls, floors (including access floor systems), roofing systems, millwork and wall covering. Work may also include modifications and replacement of mechanical systems to include, but not limited to:

air handling units, chillers, boilers, ductwork systems and accessories, piping systems (including pumps), HVAC system controls, fire protection sprinkler systems and accessories, and plumbing equipment/accessories. In addition, scope may include work on electrical systems including, but not limited to lighting systems, primary and secondary power distribution systems, and transformers.

Special competencies will be required for any work involving membrane roofing, asbestos abatement, PCB removal and/or elevator work. Interested parties must be capable of providing the services associated with the aforementioned competencies. The Contractor’s principal tasks may include, but are not limited to:

renovation and conversion of the building in accordance with the specifications, administration of the construction contract and all subcontractors, field verification and site investigations, required testing, reviewing designs, preparing cost estimates, reviewing cost estimates, providing schedules, reporting on progress, resolving problems, conducting value engineering or alternate means and methods recommendations, performing constructability reviews, submittals, coordination of all documents and requirements, promptly reporting to the contracting Officer any ambiguities or discrepancies found in the project requirements or documents, coordination of all activities, coordination of all meetings, construction administration and execution of quality control plan, commissioning, performing administrative collection of sustainable design and construction-related materials and processes, construction waste recycling receipts, compliance with applicable building codes and regulations, critical path method (CPM) scheduling, maintenance of construction records including daily logs and monthly reports, monitoring of construction costs, managing turnover of completed projects to designated facility management staff, and other required supplemental services as requested by GSA.

The contractor shall have a full understanding of the project, its contract documents, and the principles of Federal construction and contract administration, and other services as defined in the Contract Documents.

The DB requirements of the project can include, but are not limited to, review, and evaluation of the concept, design development and construction document submission for constructability, value engineering or alternate means and methods recommendations, identification of any problems or errors in the design documentation, consultation during construction document production, preliminary project schedule development, primary cost estimates during design development and construction documents, and development of subcontractor and supplier interest.

Task orders may require Pre-Construction Phase Services and shall include, but are not limited to, review, and evaluation of the concept, design development and construction document submission for constructability, value engineering or alternate means and methods, recommendations, identification of any problems or errors in the design documentation, consultation during construction document production, preliminary project schedule development, primary cost estimates during design development and construction documents, and development of subcontractor and supplier interest.

## Open now in the same industry

194 open in NAICS 236220.

- Building 262 Renovation, FLETC Glynco, Georgia (70LGLY27RSSB00001), due December 2, 2026 at 11:00 AM EST. https://sealedbidder.com/opportunities/70lgly27rssb00001
- FY27 NRM - EHRM Base 509-22-701 - EHRM Infrastructure Upgrades - Downtown Division - Construction (VA-27-00011175) (36C77627Q0075), due December 3, 2026 at 12:00 PM EST. https://sealedbidder.com/opportunities/36c77627q0075
- Robins RAPID Construction OTA Umbrella Notice (RAPIDFY27), due December 1, 2027 at 5:00 PM EST. https://sealedbidder.com/opportunities/rapidfy27

## Publications

- December 16, 2024: Presolicitation, due February 13, 2025 at 3:00 AM EST. Notice f9cf181efc2149a2a827975fa57c3e48. https://sam.gov/workspace/contract/opp/f9cf181efc2149a2a827975fa57c3e48/view

## Points of contact

- Michelle D Mayfield, michelled.mayfield@gsa.gov, (404) 561-3631
- Elizabeth Moten, elizabeth.moten@gsa.gov, (813) 215-8501

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/1923r0001.
