{"canonical":"https://sealedbidder.com/opportunities/191bwc25b0003","key":"191BWC25B0003","url":"https://sealedbidder.com/opportunities/191bwc25b0003","title":"Replacement of Hydraulic System for Penstock #5","solicitation_number":"191BWC25B0003","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-07-09T21:00:00Z","first_posted":"2025-03-19","last_posted":"2025-10-03","department":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","subagency":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","office":"INTERNAT. BOUNDARY AND WATER COMM.","naics":"237990","psc":"Y1KA","set_aside":null,"place_state":"TX","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"48465","place_county_name":"Val Verde County","place_city":"4819792","place_city_name":"Del Rio","winner":"TEXAS ELECTRICAL & TESTING SERVICES LLC","award_amount":"2589000.00","publications":[{"notice_id":"ee53858d5b844771b57683cda2d82a60","title":"Replacement of Hydraulic System for Penstock #5","solicitation_number":"191BWC25B0003","notice_type":"p","base_type":"p","posted":"2025-03-19","posted_at":"2025-03-19T21:39:47.232Z","due_at":"2025-04-05T21:00:00Z","due_date":"2025-04-05","cancelled":false,"archived":true,"archive_date":"2025-04-20","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ee53858d5b844771b57683cda2d82a60/view","enriched":true,"history":[{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}]},{"notice_id":"55b902cc0ea94147a759d16d619f85ec","title":"Replacement of Hydraulic System for Penstock #5","solicitation_number":"191BWC25B0003","notice_type":"o","base_type":"p","posted":"2025-05-12","posted_at":"2025-05-12T19:51:39.802Z","due_at":"2025-07-02T21:00:00Z","due_date":"2025-07-02","cancelled":false,"archived":true,"archive_date":"2025-07-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/55b902cc0ea94147a759d16d619f85ec/view","enriched":true,"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}]},{"notice_id":"f530c770949143c2bb8f35f7787849c6","title":"Replacement of Hydraulic System for Penstock #5","solicitation_number":"191BWC25B0003","notice_type":"o","base_type":"o","posted":"2025-05-14","posted_at":"2025-05-14T17:43:54.333Z","due_at":"2025-07-02T21:00:00Z","due_date":"2025-07-02","cancelled":false,"archived":true,"archive_date":"2025-07-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f530c770949143c2bb8f35f7787849c6/view","enriched":true,"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}]},{"notice_id":"d570b0b1f2504277848ccdfb568a026c","title":"Replacement of Hydraulic System for Penstock #5","solicitation_number":"191BWC25B0003","notice_type":"o","base_type":"o","posted":"2025-05-15","posted_at":"2025-05-15T16:54:23.321Z","due_at":"2025-07-02T21:00:00Z","due_date":"2025-07-02","cancelled":false,"archived":true,"archive_date":"2025-07-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d570b0b1f2504277848ccdfb568a026c/view","enriched":true,"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}]},{"notice_id":"b9c131d85f8e441e85fb38079395575e","title":"Replacement of Hydraulic System for Penstock #5","solicitation_number":"191BWC25B0003","notice_type":"o","base_type":"o","posted":"2025-06-10","posted_at":"2025-06-10T21:58:54.398Z","due_at":"2025-07-02T21:00:00Z","due_date":"2025-07-02","cancelled":false,"archived":true,"archive_date":"2025-07-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b9c131d85f8e441e85fb38079395575e/view","enriched":true,"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}]},{"notice_id":"e22b9ab12336448ca3a8b74f39264be2","title":"Replacement of Hydraulic System for Penstock #5","solicitation_number":"191BWC25B0003","notice_type":"o","base_type":"o","posted":"2025-06-25","posted_at":"2025-06-25T17:17:55.705Z","due_at":"2025-07-02T21:00:00Z","due_date":"2025-07-02","cancelled":false,"archived":true,"archive_date":"2025-07-17","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e22b9ab12336448ca3a8b74f39264be2/view","enriched":true,"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}]},{"notice_id":"557127e720e145789a9f45f90d38016d","title":"Replacement of Hydraulic System for Penstock #5","solicitation_number":"191BWC25B0003","notice_type":"o","base_type":"o","posted":"2025-07-02","posted_at":"2025-07-02T16:26:33.617Z","due_at":"2025-07-09T21:00:00Z","due_date":"2025-07-09","cancelled":false,"archived":true,"archive_date":"2025-07-24","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/557127e720e145789a9f45f90d38016d/view","enriched":true,"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}]},{"notice_id":"433b578b7dd94c17adc30be0adff087e","title":"Replacement of Hydraulic System for Penstock #5","solicitation_number":"191BWC25B0003","notice_type":"o","base_type":"o","posted":"2025-07-03","posted_at":"2025-07-03T16:12:00.043Z","due_at":"2025-07-09T21:00:00Z","due_date":"2025-07-09","cancelled":false,"archived":true,"archive_date":"2025-07-24","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/433b578b7dd94c17adc30be0adff087e/view","enriched":true,"history":[{"index":14,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-03T13:54:21.693Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"1b12b401ad6d4672b6604d77747cad73","solicitation_number":"191BWC25B0003","related_opportunity_id":"433b578b7dd94c17adc30be0adff087e"},{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}]},{"notice_id":"1b12b401ad6d4672b6604d77747cad73","title":"Replacement of Hydraulic System for Penstock #5","solicitation_number":"191BWC25B0003","notice_type":"a","base_type":"o","posted":"2025-10-03","posted_at":"2025-10-03T13:54:21.693Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-10-14","removed_at":null,"award_number":"191BWC25C0088","awardee_name":"TEXAS ELECTRICAL & TESTING SERVICES LLC","amount":"2589000.00","link_sam":"https://sam.gov/workspace/contract/opp/1b12b401ad6d4672b6604d77747cad73/view","enriched":true,"history":[{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-03T13:54:21.693Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"1b12b401ad6d4672b6604d77747cad73","solicitation_number":"191BWC25B0003","related_opportunity_id":"433b578b7dd94c17adc30be0adff087e"},{"index":2,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"}]}],"latest_notice_id":"1b12b401ad6d4672b6604d77747cad73","first_type":"p","notices":[{"dates":{"posted":"2025-03-19","posted_at":"2025-03-19T21:39:47.232Z","created_at":"2025-03-19T14:17:57.486Z","modified_at":"2025-04-21T03:55:49.677Z","response_deadline":{"raw":"2025-04-05T15:00:00-06:00","utc":"2025-04-05T21:00:00Z","date":"2025-04-05","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ee53858d5b844771b57683cda2d82a60/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Replacement of Hydraulic System for Penstock #5","agency":{"office":{"code":"199401","name":"INTERNAT. BOUNDARY AND WATER COMM."},"subtier":{"code":"19BM","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"department":{"code":"019","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"organization_id":"500025680","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-20","archive_type":"auto15"},"history":[{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}],"contacts":[{"name":"Adrian Knights","role":"primary","email":"adrian.knights@ibwc.gov"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"ee53858d5b844771b57683cda2d82a60","lineage_id":"ee53858d5b844771b57683cda2d82a60","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-20T02:43:24.105011648Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"84668657e16911d20d5ad8c2791121da2cd5bae6ad1d02764de756cc3bcb0520","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-20T02:43:24.105011648Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation (IFB) for the replacement of the hydraulic system for Penstock #5 in Amistad Dam.&nbsp; This penstock has not been functional in several years.&nbsp; The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.</p>\n\n<p></p>\n\n<p>The Construction includes, but is not limited to site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.</p>\n\n<p></p>\n\n<p>The following site constraints apply:</p>\n\n<ul>\n\t<li>The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours.&nbsp; USIBWC facilities, including the dam, are closed during all Federal Holidays.</li>\n\t<li>There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing work must be coordinated with Amistad Field Office AOM through the COR.&nbsp; Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane certified operator to perform the relocation of the bulkhead. Several relocations may be required.&nbsp; The bulkhead is approximately 14.3 feet wide by 24.6 feet tall.&nbsp; The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).</li>\n\t<li>Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.</li>\n\t<li>Workers must pass through the port of entry to access the worksite.&nbsp; The port of entry is open from 10:00 a.m. to 6:00 p.m.&nbsp; DHS may change these hours without notice.&nbsp; If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager.&nbsp; Workers crossing through the port of entry need to have proper documentation for reentry to the United States.</li>\n</ul>\n\n<p></p>\n\n<p>Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.</p>\n\n<p></p>\n\n<p>The work is located in Val Verde County, Texas.&nbsp; A site visit date will be listed in the Solicitation.&nbsp; The work will be performed under NAICS Code 237990.&nbsp; The Contract will be firm-fixed price.</p>\n\n<p></p>\n\n<p>All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.&nbsp;</p>\n\n<ul>\n\t<li>Three sixty-five (365) calendar days are anticipated for construction.</li>\n\t<li>The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.</li>\n</ul>\n\n<p>The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. &nbsp;The time stated for completion shall include final cleanup of the premises.&nbsp;</p>\n\n<p></p>\n\n<p>The Solicitation will be issued pursuant to FAR Part 14.</p>\n\n<p></p>\n\n<p>The Solicitation is expected to be posted on or about April 4, 2025 (this is a target date which may slip or change).&nbsp; The Solicitation will be available for a minimum of thirty (30) calendar days.</p>\n\n<p></p>\n\n<p>This is a Presolicitation Notice. &nbsp;The Solicitation will include information on how to obtain the Scope of Work and attachments. &nbsp;All responsible sources may submit a bid to be considered by the Agency.</p>","text":"The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation (IFB) for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.\n\nThe Construction includes, but is not limited to site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.\n\nThe following site constraints apply:\n\n• The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays.\n\n• There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing work must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).\n\n• Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.\n\n• Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States.\n\nPer FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.\n\nThe work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price.\n\nAll work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.\n\n• Three sixty-five (365) calendar days are anticipated for construction.\n\n• The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.\n\nThe time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises.\n\nThe Solicitation will be issued pursuant to FAR Part 14.\n\nThe Solicitation is expected to be posted on or about April 4, 2025 (this is a target date which may slip or change). The Solicitation will be available for a minimum of thirty (30) calendar days.\n\nThis is a Presolicitation Notice. The Solicitation will include information on how to obtain the Scope of Work and attachments. All responsible sources may submit a bid to be considered by the Agency.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"191BWC25B0003","place_of_performance":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1KA"},{"dates":{"posted":"2025-05-12","posted_at":"2025-05-12T19:51:39.802Z","created_at":"2025-05-12T18:06:36.308Z","modified_at":"2025-07-25T03:55:47.767Z","response_deadline":{"raw":"2025-07-02T15:00:00-06:00","utc":"2025-07-02T21:00:00Z","date":"2025-07-02","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/55b902cc0ea94147a759d16d619f85ec/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Replacement of Hydraulic System for Penstock #5","agency":{"office":{"code":"199401","name":"INTERNAT. BOUNDARY AND WATER COMM."},"subtier":{"code":"19BM","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"department":{"code":"019","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"organization_id":"500025680","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-17","archive_type":"auto15"},"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}],"contacts":[{"name":"Adrian Knights","role":"primary","email":"adrian.knights@ibwc.gov","phone":"9158324794"},{"name":"Seone Michael Jones","role":"secondary","email":"seone.jones@ibwc.gov"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"55b902cc0ea94147a759d16d619f85ec","lineage_id":"55b902cc0ea94147a759d16d619f85ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T07:20:48.831999722Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"6e898851f6eb7c3adafd35d38edc2b97bfc983a94dbb65fdd0eb3f8c4b1ccb13","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T07:20:48.831999722Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam.&nbsp; This penstock has not been functional in several years.&nbsp; The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.</p>\n\n<p></p>\n\n<p>The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.</p>\n\n<p></p>\n\n<p>The following site constraints apply:</p>\n\n<p></p>\n\n<ul>\n\t<li>The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours.&nbsp; USIBWC facilities, including the dam, are closed during all Federal Holidays.</li>\n\t<li>There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR.&nbsp; Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required.&nbsp; The bulkhead is approximately 14.3 feet wide by 24.6 feet tall.&nbsp; The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).</li>\n\t<li>Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.</li>\n\t<li>Workers must pass through the port of entry to access the worksite.&nbsp; The port of entry is open from 10:00 a.m. to 6:00 p.m.&nbsp; DHS may change these hours without notice.&nbsp; If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager.&nbsp; Workers crossing through the port of entry need to have proper documentation for reentry to the United States.</li>\n</ul>\n\n<p></p>\n\n<p>Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.</p>\n\n<p></p>\n\n<p>The work is located in Val Verde County, Texas.&nbsp; A site visit date will be listed in the Solicitation.&nbsp; The work will be performed under NAICS Code 237990.&nbsp; The Contract will be firm-fixed price.</p>\n\n<p></p>\n\n<p>All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.&nbsp;</p>\n\n<ul>\n\t<li>Three sixty-five (365) calendar days are anticipated for construction.</li>\n\t<li>The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.</li>\n</ul>\n\n<p>The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. &nbsp;The time stated for completion shall include final cleanup of the premises.&nbsp;</p>\n\n<p></p>\n\n<p>This Solicitation will be issued pursuant to FAR Part 14.</p>\n\n<p></p>\n\n<p>All responsible sources must submit a bid to be considered by the Agency.&nbsp;</p>\n\n<p>Please see document named SBU Document Notice for information in receiving additional documentation.</p>","text":"The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.\n\nThe Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.\n\nThe following site constraints apply:\n\n• The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays.\n\n• There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).\n\n• Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.\n\n• Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States.\n\nPer FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.\n\nThe work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price.\n\nAll work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.\n\n• Three sixty-five (365) calendar days are anticipated for construction.\n\n• The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.\n\nThe time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises.\n\nThis Solicitation will be issued pursuant to FAR Part 14.\n\nAll responsible sources must submit a bid to be considered by the Agency.\n\nPlease see document named SBU Document Notice for information in receiving additional documentation.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"191BWC25B0003","place_of_performance":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1KA"},{"dates":{"posted":"2025-05-14","posted_at":"2025-05-14T17:43:54.333Z","created_at":"2025-05-14T17:42:10.789Z","modified_at":"2025-07-25T03:55:47.767Z","response_deadline":{"raw":"2025-07-02T15:00:00-06:00","utc":"2025-07-02T21:00:00Z","date":"2025-07-02","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f530c770949143c2bb8f35f7787849c6/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Replacement of Hydraulic System for Penstock #5","agency":{"office":{"code":"199401","name":"INTERNAT. BOUNDARY AND WATER COMM."},"subtier":{"code":"19BM","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"department":{"code":"019","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"organization_id":"500025680","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-17","archive_type":"auto15"},"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}],"contacts":[{"name":"Adrian Knights","role":"primary","email":"adrian.knights@ibwc.gov","phone":"9158324794"},{"name":"Seone Michael Jones","role":"secondary","email":"seone.jones@ibwc.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"f530c770949143c2bb8f35f7787849c6","lineage_id":"55b902cc0ea94147a759d16d619f85ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T03:46:28.509557881Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"23965e3a32030500367107b7414a25db86d419bf9c9daf257e55fa33deb92060","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T03:46:28.509557881Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam.&nbsp; This penstock has not been functional in several years.&nbsp; The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.</p>\n\n<p></p>\n\n<p>The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.</p>\n\n<p></p>\n\n<p>The following site constraints apply:</p>\n\n<p></p>\n\n<ul>\n\t<li>The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours.&nbsp; USIBWC facilities, including the dam, are closed during all Federal Holidays.</li>\n\t<li>There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR.&nbsp; Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required.&nbsp; The bulkhead is approximately 14.3 feet wide by 24.6 feet tall.&nbsp; The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).</li>\n\t<li>Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.</li>\n\t<li>Workers must pass through the port of entry to access the worksite.&nbsp; The port of entry is open from 10:00 a.m. to 6:00 p.m.&nbsp; DHS may change these hours without notice.&nbsp; If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager.&nbsp; Workers crossing through the port of entry need to have proper documentation for reentry to the United States.</li>\n</ul>\n\n<p></p>\n\n<p>Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.</p>\n\n<p></p>\n\n<p>The work is located in Val Verde County, Texas.&nbsp; A site visit date will be listed in the Solicitation.&nbsp; The work will be performed under NAICS Code 237990.&nbsp; The Contract will be firm-fixed price.</p>\n\n<p></p>\n\n<p>All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.&nbsp;</p>\n\n<ul>\n\t<li>Three sixty-five (365) calendar days are anticipated for construction.</li>\n\t<li>The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.</li>\n</ul>\n\n<p>The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. &nbsp;The time stated for completion shall include final cleanup of the premises.&nbsp;</p>\n\n<p></p>\n\n<p>This Solicitation will be issued pursuant to FAR Part 14.</p>\n\n<p></p>\n\n<p>All responsible sources must submit a bid to be considered by the Agency.&nbsp;</p>\n\n<p>Please see document named SBU Document Notice for information in receiving additional documentation.</p>","text":"The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.\n\nThe Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.\n\nThe following site constraints apply:\n\n• The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays.\n\n• There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).\n\n• Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.\n\n• Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States.\n\nPer FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.\n\nThe work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price.\n\nAll work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.\n\n• Three sixty-five (365) calendar days are anticipated for construction.\n\n• The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.\n\nThe time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises.\n\nThis Solicitation will be issued pursuant to FAR Part 14.\n\nAll responsible sources must submit a bid to be considered by the Agency.\n\nPlease see document named SBU Document Notice for information in receiving additional documentation.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"191BWC25B0003","place_of_performance":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1KA"},{"dates":{"posted":"2025-05-15","posted_at":"2025-05-15T16:54:23.321Z","created_at":"2025-05-15T16:53:02.965Z","modified_at":"2025-07-25T03:55:47.767Z","response_deadline":{"raw":"2025-07-02T15:00:00-06:00","utc":"2025-07-02T21:00:00Z","date":"2025-07-02","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d570b0b1f2504277848ccdfb568a026c/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Replacement of Hydraulic System for Penstock #5","agency":{"office":{"code":"199401","name":"INTERNAT. BOUNDARY AND WATER COMM."},"subtier":{"code":"19BM","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"department":{"code":"019","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"organization_id":"500025680","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-17","archive_type":"auto15"},"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}],"contacts":[{"name":"Adrian Knights","role":"primary","email":"adrian.knights@ibwc.gov","phone":"9158324794"},{"name":"Seone Michael Jones","role":"secondary","email":"seone.jones@ibwc.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d570b0b1f2504277848ccdfb568a026c","lineage_id":"55b902cc0ea94147a759d16d619f85ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T02:49:19.320063851Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"b89f11e995d057308ea8496377d6ac4bfafc7bdabec85469620b96fb3501792e","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T02:49:19.320063851Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam.&nbsp; This penstock has not been functional in several years.&nbsp; The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.</p>\n\n<p></p>\n\n<p>The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.</p>\n\n<p></p>\n\n<p>The following site constraints apply:</p>\n\n<p></p>\n\n<ul>\n\t<li>The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours.&nbsp; USIBWC facilities, including the dam, are closed during all Federal Holidays.</li>\n\t<li>There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR.&nbsp; Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required.&nbsp; The bulkhead is approximately 14.3 feet wide by 24.6 feet tall.&nbsp; The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).</li>\n\t<li>Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.</li>\n\t<li>Workers must pass through the port of entry to access the worksite.&nbsp; The port of entry is open from 10:00 a.m. to 6:00 p.m.&nbsp; DHS may change these hours without notice.&nbsp; If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager.&nbsp; Workers crossing through the port of entry need to have proper documentation for reentry to the United States.</li>\n</ul>\n\n<p></p>\n\n<p>Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.</p>\n\n<p></p>\n\n<p>The work is located in Val Verde County, Texas.&nbsp; A site visit date will be listed in the Solicitation.&nbsp; The work will be performed under NAICS Code 237990.&nbsp; The Contract will be firm-fixed price.</p>\n\n<p></p>\n\n<p>All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.&nbsp;</p>\n\n<ul>\n\t<li>Three sixty-five (365) calendar days are anticipated for construction.</li>\n\t<li>The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.</li>\n</ul>\n\n<p>The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. &nbsp;The time stated for completion shall include final cleanup of the premises.&nbsp;</p>\n\n<p></p>\n\n<p>This Solicitation will be issued pursuant to FAR Part 14.</p>\n\n<p></p>\n\n<p>All responsible sources must submit a bid to be considered by the Agency.&nbsp;</p>\n\n<p>Please see document named SBU Document Notice for information in receiving additional documentation.</p>","text":"The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.\n\nThe Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.\n\nThe following site constraints apply:\n\n• The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays.\n\n• There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).\n\n• Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.\n\n• Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States.\n\nPer FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.\n\nThe work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price.\n\nAll work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.\n\n• Three sixty-five (365) calendar days are anticipated for construction.\n\n• The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.\n\nThe time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises.\n\nThis Solicitation will be issued pursuant to FAR Part 14.\n\nAll responsible sources must submit a bid to be considered by the Agency.\n\nPlease see document named SBU Document Notice for information in receiving additional documentation.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"191BWC25B0003","place_of_performance":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1KA"},{"dates":{"posted":"2025-06-10","posted_at":"2025-06-10T21:58:54.398Z","created_at":"2025-06-10T21:56:32.540Z","modified_at":"2025-07-25T03:55:47.767Z","response_deadline":{"raw":"2025-07-02T15:00:00-06:00","utc":"2025-07-02T21:00:00Z","date":"2025-07-02","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b9c131d85f8e441e85fb38079395575e/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Replacement of Hydraulic System for Penstock #5","agency":{"office":{"code":"199401","name":"INTERNAT. BOUNDARY AND WATER COMM."},"subtier":{"code":"19BM","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"department":{"code":"019","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"organization_id":"500025680","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-17","archive_type":"auto15"},"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}],"contacts":[{"name":"Adrian Knights","role":"primary","email":"adrian.knights@ibwc.gov","phone":"9158324794"},{"name":"Seone Michael Jones","role":"secondary","email":"seone.jones@ibwc.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"b9c131d85f8e441e85fb38079395575e","lineage_id":"55b902cc0ea94147a759d16d619f85ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T01:41:17.842600315Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"e912b5d4974cbb9f46901beda884e2a92501cf20b14c3c1420a07fd8b45504e8","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T01:41:17.842600315Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam.&nbsp; This penstock has not been functional in several years.&nbsp; The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.</p>\n\n<p></p>\n\n<p>The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.</p>\n\n<p></p>\n\n<p>The following site constraints apply:</p>\n\n<p></p>\n\n<ul>\n\t<li>The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours.&nbsp; USIBWC facilities, including the dam, are closed during all Federal Holidays.</li>\n\t<li>There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR.&nbsp; Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required.&nbsp; The bulkhead is approximately 14.3 feet wide by 24.6 feet tall.&nbsp; The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).</li>\n\t<li>Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.</li>\n\t<li>Workers must pass through the port of entry to access the worksite.&nbsp; The port of entry is open from 10:00 a.m. to 6:00 p.m.&nbsp; DHS may change these hours without notice.&nbsp; If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager.&nbsp; Workers crossing through the port of entry need to have proper documentation for reentry to the United States.</li>\n</ul>\n\n<p></p>\n\n<p>Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.</p>\n\n<p></p>\n\n<p>The work is located in Val Verde County, Texas.&nbsp; A site visit date will be listed in the Solicitation.&nbsp; The work will be performed under NAICS Code 237990.&nbsp; The Contract will be firm-fixed price.</p>\n\n<p></p>\n\n<p>All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.&nbsp;</p>\n\n<ul>\n\t<li>Three sixty-five (365) calendar days are anticipated for construction.</li>\n\t<li>The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.</li>\n</ul>\n\n<p>The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. &nbsp;The time stated for completion shall include final cleanup of the premises.&nbsp;</p>\n\n<p></p>\n\n<p>This Solicitation will be issued pursuant to FAR Part 14.</p>\n\n<p></p>\n\n<p>All responsible sources must submit a bid to be considered by the Agency.&nbsp;</p>\n\n<p>Please see document named SBU Document Notice for information in receiving additional documentation.</p>","text":"The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.\n\nThe Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.\n\nThe following site constraints apply:\n\n• The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays.\n\n• There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).\n\n• Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.\n\n• Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States.\n\nPer FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.\n\nThe work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price.\n\nAll work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.\n\n• Three sixty-five (365) calendar days are anticipated for construction.\n\n• The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.\n\nThe time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises.\n\nThis Solicitation will be issued pursuant to FAR Part 14.\n\nAll responsible sources must submit a bid to be considered by the Agency.\n\nPlease see document named SBU Document Notice for information in receiving additional documentation.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"191BWC25B0003","place_of_performance":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1KA"},{"dates":{"posted":"2025-06-25","posted_at":"2025-06-25T17:17:55.705Z","created_at":"2025-06-25T17:06:17.021Z","modified_at":"2025-07-25T03:55:47.767Z","response_deadline":{"raw":"2025-07-02T15:00:00-06:00","utc":"2025-07-02T21:00:00Z","date":"2025-07-02","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e22b9ab12336448ca3a8b74f39264be2/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Replacement of Hydraulic System for Penstock #5","agency":{"office":{"code":"199401","name":"INTERNAT. BOUNDARY AND WATER COMM."},"subtier":{"code":"19BM","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"department":{"code":"019","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"organization_id":"500025680","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-17","archive_type":"auto15"},"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}],"contacts":[{"name":"Adrian Knights","role":"primary","email":"adrian.knights@ibwc.gov","phone":"9158324794"},{"name":"Seone Michael Jones","role":"secondary","email":"seone.jones@ibwc.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e22b9ab12336448ca3a8b74f39264be2","lineage_id":"55b902cc0ea94147a759d16d619f85ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T01:36:49.686070885Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f7e208e9fa6526c2eb8b0399640bb2057ec2763637234411a57dea629597d675","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-12T01:36:49.686070885Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>NOTE: Answers to questions received incorporated into attached Technical Specifications&nbsp;191BWC25B0003_Penstock_5_Specs_20250624.</p>\n\n<p>The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam.&nbsp; This penstock has not been functional in several years.&nbsp; The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.</p>\n\n<p></p>\n\n<p>The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.</p>\n\n<p></p>\n\n<p>The following site constraints apply:</p>\n\n<p></p>\n\n<ul>\n\t<li>The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours.&nbsp; USIBWC facilities, including the dam, are closed during all Federal Holidays.</li>\n\t<li>There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR.&nbsp; Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required.&nbsp; The bulkhead is approximately 14.3 feet wide by 24.6 feet tall.&nbsp; The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).</li>\n\t<li>Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.</li>\n\t<li>Workers must pass through the port of entry to access the worksite.&nbsp; The port of entry is open from 10:00 a.m. to 6:00 p.m.&nbsp; DHS may change these hours without notice.&nbsp; If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager.&nbsp; Workers crossing through the port of entry need to have proper documentation for reentry to the United States.</li>\n</ul>\n\n<p></p>\n\n<p>Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.</p>\n\n<p></p>\n\n<p>The work is located in Val Verde County, Texas.&nbsp; A site visit date will be listed in the Solicitation.&nbsp; The work will be performed under NAICS Code 237990.&nbsp; The Contract will be firm-fixed price.</p>\n\n<p></p>\n\n<p>All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.&nbsp;</p>\n\n<ul>\n\t<li>Three sixty-five (365) calendar days are anticipated for construction.</li>\n\t<li>The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.</li>\n</ul>\n\n<p>The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. &nbsp;The time stated for completion shall include final cleanup of the premises.&nbsp;</p>\n\n<p></p>\n\n<p>This Solicitation will be issued pursuant to FAR Part 14.</p>\n\n<p></p>\n\n<p>All responsible sources must submit a bid to be considered by the Agency.&nbsp;</p>\n\n<p>Please see document named SBU Document Notice for information in receiving additional documentation.</p>","text":"NOTE: Answers to questions received incorporated into attached Technical Specifications 191BWC25B0003_Penstock_5_Specs_20250624.\n\nThe United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.\n\nThe Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.\n\nThe following site constraints apply:\n\n• The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays.\n\n• There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).\n\n• Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.\n\n• Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States.\n\nPer FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.\n\nThe work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price.\n\nAll work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.\n\n• Three sixty-five (365) calendar days are anticipated for construction.\n\n• The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.\n\nThe time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises.\n\nThis Solicitation will be issued pursuant to FAR Part 14.\n\nAll responsible sources must submit a bid to be considered by the Agency.\n\nPlease see document named SBU Document Notice for information in receiving additional documentation.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"191BWC25B0003","place_of_performance":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1KA"},{"dates":{"posted":"2025-07-02","posted_at":"2025-07-02T16:26:33.617Z","created_at":"2025-07-02T16:23:37.303Z","modified_at":"2025-07-25T03:55:47.767Z","response_deadline":{"raw":"2025-07-09T15:00:00-06:00","utc":"2025-07-09T21:00:00Z","date":"2025-07-09","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/557127e720e145789a9f45f90d38016d/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Replacement of Hydraulic System for Penstock #5","agency":{"office":{"code":"199401","name":"INTERNAT. BOUNDARY AND WATER COMM."},"subtier":{"code":"19BM","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"department":{"code":"019","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"organization_id":"500025680","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-24","archive_type":"auto15"},"history":[{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}],"contacts":[{"name":"Adrian Knights","role":"primary","email":"adrian.knights@ibwc.gov","phone":"9158324794"},{"name":"Seone Michael Jones","role":"secondary","email":"seone.jones@ibwc.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"557127e720e145789a9f45f90d38016d","lineage_id":"55b902cc0ea94147a759d16d619f85ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T04:22:39.514925336Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"128fbf23ba4346299d5c9fb764a908d9553b7f232e4cedae06b9b7e5abac9c25","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-11T04:22:39.514925336Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong>NOTE: Date offers due is extended to July 9, 2025, 3 PM MDT.</strong></p>\n\n<p>-----------------------------------------------------------</p>\n\n<p>NOTE: Answers to questions received incorporated into attached Technical Specifications&nbsp;191BWC25B0003_Penstock_5_Specs_20250624.</p>\n\n<p>The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam.&nbsp; This penstock has not been functional in several years.&nbsp; The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.</p>\n\n<p></p>\n\n<p>The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.</p>\n\n<p></p>\n\n<p>The following site constraints apply:</p>\n\n<p></p>\n\n<ul>\n\t<li>The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours.&nbsp; USIBWC facilities, including the dam, are closed during all Federal Holidays.</li>\n\t<li>There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR.&nbsp; Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required.&nbsp; The bulkhead is approximately 14.3 feet wide by 24.6 feet tall.&nbsp; The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).</li>\n\t<li>Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.</li>\n\t<li>Workers must pass through the port of entry to access the worksite.&nbsp; The port of entry is open from 10:00 a.m. to 6:00 p.m.&nbsp; DHS may change these hours without notice.&nbsp; If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager.&nbsp; Workers crossing through the port of entry need to have proper documentation for reentry to the United States.</li>\n</ul>\n\n<p></p>\n\n<p>Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.</p>\n\n<p></p>\n\n<p>The work is located in Val Verde County, Texas.&nbsp; A site visit date will be listed in the Solicitation.&nbsp; The work will be performed under NAICS Code 237990.&nbsp; The Contract will be firm-fixed price.</p>\n\n<p></p>\n\n<p>All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.&nbsp;</p>\n\n<ul>\n\t<li>Three sixty-five (365) calendar days are anticipated for construction.</li>\n\t<li>The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.</li>\n</ul>\n\n<p>The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. &nbsp;The time stated for completion shall include final cleanup of the premises.&nbsp;</p>\n\n<p></p>\n\n<p>This Solicitation will be issued pursuant to FAR Part 14.</p>\n\n<p></p>\n\n<p>All responsible sources must submit a bid to be considered by the Agency.&nbsp;</p>\n\n<p>Please see document named SBU Document Notice for information in receiving additional documentation.</p>","text":"NOTE: Date offers due is extended to July 9, 2025, 3 PM MDT.\n\n-----------------------------------------------------------\n\nNOTE: Answers to questions received incorporated into attached Technical Specifications 191BWC25B0003_Penstock_5_Specs_20250624.\n\nThe United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.\n\nThe Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.\n\nThe following site constraints apply:\n\n• The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays.\n\n• There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).\n\n• Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.\n\n• Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States.\n\nPer FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.\n\nThe work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price.\n\nAll work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.\n\n• Three sixty-five (365) calendar days are anticipated for construction.\n\n• The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.\n\nThe time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises.\n\nThis Solicitation will be issued pursuant to FAR Part 14.\n\nAll responsible sources must submit a bid to be considered by the Agency.\n\nPlease see document named SBU Document Notice for information in receiving additional documentation.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"191BWC25B0003","place_of_performance":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1KA"},{"dates":{"posted":"2025-07-03","posted_at":"2025-07-03T16:12:00.043Z","created_at":"2025-07-03T16:10:10.336Z","modified_at":"2025-07-25T03:55:47.767Z","response_deadline":{"raw":"2025-07-09T15:00:00-06:00","utc":"2025-07-09T21:00:00Z","date":"2025-07-09","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/433b578b7dd94c17adc30be0adff087e/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Replacement of Hydraulic System for Penstock #5","agency":{"office":{"code":"199401","name":"INTERNAT. BOUNDARY AND WATER COMM."},"subtier":{"code":"19BM","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"department":{"code":"019","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"organization_id":"500025680","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-24","archive_type":"auto15"},"history":[{"index":14,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-03T13:54:21.693Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"1b12b401ad6d4672b6604d77747cad73","solicitation_number":"191BWC25B0003","related_opportunity_id":"433b578b7dd94c17adc30be0adff087e"},{"index":11,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":9,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-02T16:26:33.617Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"557127e720e145789a9f45f90d38016d","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":8,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-25T17:17:55.705Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e22b9ab12336448ca3a8b74f39264be2","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":7,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-10T21:58:54.398Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b9c131d85f8e441e85fb38079395575e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":6,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-15T16:54:23.321Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d570b0b1f2504277848ccdfb568a026c","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T17:43:54.333Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f530c770949143c2bb8f35f7787849c6","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":4,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-12T19:51:39.802Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"55b902cc0ea94147a759d16d619f85ec","solicitation_number":"191BWC25B0003","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"},{"index":3,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-19T21:39:47.232Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"ee53858d5b844771b57683cda2d82a60","solicitation_number":"191BWC25B0003"}],"contacts":[{"name":"Adrian Knights","role":"primary","email":"adrian.knights@ibwc.gov","phone":"9158324794"},{"name":"Seone Michael Jones","role":"secondary","email":"seone.jones@ibwc.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"433b578b7dd94c17adc30be0adff087e","lineage_id":"55b902cc0ea94147a759d16d619f85ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T03:42:37.067179162Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"700eda7cbfa38875e53561766c753d476534442443251d5b7919d0d085d1cfaa","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-11T03:42:37.067179162Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong>NOTE: Date offers due is extended to July 9, 2025, 3 PM MDT.</strong></p>\n\n<p>-----------------------------------------------------------</p>\n\n<p>NOTE: Answers to questions received incorporated into attached Technical Specifications&nbsp;191BWC25B0003_Penstock_5_Specs_20250624.</p>\n\n<p>The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam.&nbsp; This penstock has not been functional in several years.&nbsp; The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.</p>\n\n<p></p>\n\n<p>The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.</p>\n\n<p></p>\n\n<p>The following site constraints apply:</p>\n\n<p></p>\n\n<ul>\n\t<li>The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours.&nbsp; USIBWC facilities, including the dam, are closed during all Federal Holidays.</li>\n\t<li>There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR.&nbsp; Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required.&nbsp; The bulkhead is approximately 14.3 feet wide by 24.6 feet tall.&nbsp; The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).</li>\n\t<li>Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.</li>\n\t<li>Workers must pass through the port of entry to access the worksite.&nbsp; The port of entry is open from 10:00 a.m. to 6:00 p.m.&nbsp; DHS may change these hours without notice.&nbsp; If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager.&nbsp; Workers crossing through the port of entry need to have proper documentation for reentry to the United States.</li>\n</ul>\n\n<p></p>\n\n<p>Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.</p>\n\n<p></p>\n\n<p>The work is located in Val Verde County, Texas.&nbsp; A site visit date will be listed in the Solicitation.&nbsp; The work will be performed under NAICS Code 237990.&nbsp; The Contract will be firm-fixed price.</p>\n\n<p></p>\n\n<p>All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.&nbsp;</p>\n\n<ul>\n\t<li>Three sixty-five (365) calendar days are anticipated for construction.</li>\n\t<li>The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.</li>\n</ul>\n\n<p>The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. &nbsp;The time stated for completion shall include final cleanup of the premises.&nbsp;</p>\n\n<p></p>\n\n<p>This Solicitation will be issued pursuant to FAR Part 14.</p>\n\n<p></p>\n\n<p>All responsible sources must submit a bid to be considered by the Agency.&nbsp;</p>\n\n<p>Please see document named SBU Document Notice for information in receiving additional documentation.</p>","text":"NOTE: Date offers due is extended to July 9, 2025, 3 PM MDT.\n\n-----------------------------------------------------------\n\nNOTE: Answers to questions received incorporated into attached Technical Specifications 191BWC25B0003_Penstock_5_Specs_20250624.\n\nThe United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.\n\nThe Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.\n\nThe following site constraints apply:\n\n• The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays.\n\n• There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).\n\n• Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.\n\n• Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States.\n\nPer FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.\n\nThe work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price.\n\nAll work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.\n\n• Three sixty-five (365) calendar days are anticipated for construction.\n\n• The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.\n\nThe time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises.\n\nThis Solicitation will be issued pursuant to FAR Part 14.\n\nAll responsible sources must submit a bid to be considered by the Agency.\n\nPlease see document named SBU Document Notice for information in receiving additional documentation.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"191BWC25B0003","place_of_performance":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1KA"},{"award":{"date":"2025-09-29","amount":"2589000.00","number":"191BWC25C0088","awardee":{"raw":"TEXAS ELECTRICAL & TESTING SERVICES LLC Del Rio TX 78840 USA","uei":"EJUMYCUW6RE5","cage":"7W8N4","name":"TEXAS ELECTRICAL & TESTING SERVICES LLC","location":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2025-10-03","posted_at":"2025-10-03T13:54:21.693Z","award_date":"2025-09-29","created_at":"2025-10-03T13:49:56.025Z","modified_at":"2025-10-15T03:55:44.919Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/1b12b401ad6d4672b6604d77747cad73/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Replacement of Hydraulic System for Penstock #5","agency":{"office":{"code":"199401","name":"INTERNAT. BOUNDARY AND WATER COMM."},"subtier":{"code":"19BM","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"department":{"code":"019","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"organization_id":"500025680","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-14","archive_type":"auto15"},"history":[{"index":5,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-03T13:54:21.693Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"1b12b401ad6d4672b6604d77747cad73","solicitation_number":"191BWC25B0003","related_opportunity_id":"433b578b7dd94c17adc30be0adff087e"},{"index":2,"title":"Replacement of Hydraulic System for Penstock #5","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T16:12:00.043Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"433b578b7dd94c17adc30be0adff087e","solicitation_number":"191BWC25B0003","parent_opportunity_id":"55b902cc0ea94147a759d16d619f85ec","related_opportunity_id":"ee53858d5b844771b57683cda2d82a60"}],"contacts":[{"name":"Adrian Knights","role":"primary","email":"adrian.knights@ibwc.gov","phone":"9158324794"},{"name":"Seone Michael Jones","role":"secondary","email":"seone.jones@ibwc.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"1b12b401ad6d4672b6604d77747cad73","lineage_id":"55b902cc0ea94147a759d16d619f85ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-27T01:43:28.617851849Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"77b84e71ae2059c5d98ccbcce428e932f45ab4637277814deecb1db27ed57f56","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-27T01:43:28.617851849Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>Award was made to&nbsp;TEXAS ELECTRICAL &amp; TESTING SERVICES LLC on 9/29/2025 for $2,589,000.00.</p>","text":"Award was made to TEXAS ELECTRICAL & TESTING SERVICES LLC on 9/29/2025 for $2,589,000.00.","origin":"detail"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"191BWC25B0003","place_of_performance":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1KA"}],"due_at":"2025-07-09T21:00:00Z","due_date":"2025-07-09","closes_at":"2025-07-09T21:00:00Z","awardable":false,"dept_key":"d-019","dept_name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","sub_key":"s-19BM","sub_name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","office_key":"o-199401","office_name":"INTERNAT. BOUNDARY AND WATER COMM.","state":"TX","county":"48465","county_name":"Val Verde County","city":"4819792","city_name":"Del Rio","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"EJUMYCUW6RE5","amount":"2589000.00","linked_awards":9,"cancelled":false,"archived":true,"updated_at":"2026-10-27T02:15:10.239981Z","principal_notice_id":"1b12b401ad6d4672b6604d77747cad73","description":{"text":"Award was made to TEXAS ELECTRICAL & TESTING SERVICES LLC on 9/29/2025 for $2,589,000.00.","html":"<p>Award was made to&nbsp;TEXAS ELECTRICAL &amp; TESTING SERVICES LLC on 9/29/2025 for $2,589,000.00.</p>","origin":"detail"},"contacts":[{"name":"Adrian Knights","role":"primary","email":"adrian.knights@ibwc.gov","phone":"9158324794"},{"name":"Seone Michael Jones","role":"secondary","email":"seone.jones@ibwc.gov"}],"place_of_performance":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"naics_codes":["237990"],"award":{"date":"2025-09-29","amount":"2589000.00","number":"191BWC25C0088","awardee":{"raw":"TEXAS ELECTRICAL & TESTING SERVICES LLC Del Rio TX 78840 USA","uei":"EJUMYCUW6RE5","cage":"7W8N4","name":"TEXAS ELECTRICAL & TESTING SERVICES LLC","location":{"zip":"78840","city":{"code":"19792","name":"Del Rio"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}}}},"attachments":[{"resource_id":"c173137e1d194181ba9d565b9da7227e","name":"Presolicitation Notice - Replacement of Hydraulic System Penstock 5.docx","kind":"file","mime_type":".docx","size_bytes":35370,"posted_at":"2025-03-19T21:39:47.232Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c173137e1d194181ba9d565b9da7227e/download","mirrored":false},{"resource_id":"b7e1e7066df44343807628633e3411ac","name":"SBU_Document_Notice.pdf","kind":"file","mime_type":".pdf","size_bytes":84516,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b7e1e7066df44343807628633e3411ac/download","mirrored":false},{"resource_id":"b79ed32cfaa14331bf96dcf3e2aa7eef","name":"IBWC_Form_245C_Performance_of_Work_Contractor.pdf","kind":"file","mime_type":".pdf","size_bytes":113399,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b79ed32cfaa14331bf96dcf3e2aa7eef/download","mirrored":false},{"resource_id":"222914c0a4de44419e41145cb364b45f","name":"IBWC_Form_245B_Backup_Information.pdf","kind":"file","mime_type":".pdf","size_bytes":61309,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/222914c0a4de44419e41145cb364b45f/download","mirrored":false},{"resource_id":"3978530116d94ea7a1545f54fc561b32","name":"IBWC_Form_358A_Nondisclosure_Agreement_Release_SBU.pdf","kind":"file","mime_type":".pdf","size_bytes":88989,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3978530116d94ea7a1545f54fc561b32/download","mirrored":false},{"resource_id":"55e2d85fa8384c9babf79c334ee22c2a","name":"Wage_Determination_TX20250090.pdf","kind":"file","mime_type":".pdf","size_bytes":55164,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/55e2d85fa8384c9babf79c334ee22c2a/download","mirrored":false},{"resource_id":"e8a2a6714d9f46af8a40d96094ae4476","name":"IBWC_Form_245_Minimum_Qualifications_for_Award.pdf","kind":"file","mime_type":".pdf","size_bytes":167021,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e8a2a6714d9f46af8a40d96094ae4476/download","mirrored":false},{"resource_id":"7ecf55f0103340fbb8d88c60e09ed7b8","name":"IBWC_Form_358_Nondisclosure_Agreement_SBU.pdf","kind":"file","mime_type":".pdf","size_bytes":204391,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7ecf55f0103340fbb8d88c60e09ed7b8/download","mirrored":false},{"resource_id":"3eceabea4bb34907a11c8cee14d52053","name":"IBWC_Form_245A_Minimum_Quals_for_Award-Joint_Venture.pdf","kind":"file","mime_type":".pdf","size_bytes":205661,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3eceabea4bb34907a11c8cee14d52053/download","mirrored":false},{"resource_id":"2406b160a0424729bc82411424ffaffb","name":"00_31_26_01_1-4-A_Amistad_Dam_Asbestos_and_Lead-Based_Paint_Survey_20041217.pdf","kind":"file","mime_type":".pdf","size_bytes":7095086,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2406b160a0424729bc82411424ffaffb/download","mirrored":false},{"resource_id":"6f20daa71b79433da04d7c44c0f8d5dd","name":"00_31_26_01_1-4-B_Amistad_Asbestos_and_Lead-Paint_Survey_20140319.pdf","kind":"file","mime_type":".pdf","size_bytes":12787519,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6f20daa71b79433da04d7c44c0f8d5dd/download","mirrored":false},{"resource_id":"811010a973a8411197ecb2ac2fffe4ad","name":"191BWC25B0003_Amistad_Penstock_5_SOW_20250407.pdf","kind":"file","mime_type":".pdf","size_bytes":2951137,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/811010a973a8411197ecb2ac2fffe4ad/download","mirrored":false},{"resource_id":"7c9e3a4183d541d2aac29939a93ca610","name":"191BWC25B0003.pdf","kind":"file","mime_type":".pdf","size_bytes":456188,"posted_at":"2025-05-12T19:51:39.802Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7c9e3a4183d541d2aac29939a93ca610/download","mirrored":false},{"resource_id":"ee323d27a3f64463bbd04c2d415c74be","name":"IBWC Form 116 Statement of Equipment.pdf","kind":"file","mime_type":".pdf","size_bytes":225563,"posted_at":"2025-05-14T17:43:54.333Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ee323d27a3f64463bbd04c2d415c74be/download","mirrored":false},{"resource_id":"1ac8de797fc44c7db06721db1038063a","name":"IBWC Form 117 Statement of Attendance at Pre-Bid conference and Site Visit.pdf","kind":"file","mime_type":".pdf","size_bytes":219518,"posted_at":"2025-05-14T17:43:54.333Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1ac8de797fc44c7db06721db1038063a/download","mirrored":false},{"resource_id":"aa69f2b018cf41b6aa549c4cfeef74a6","name":"IBWC Form 110 Certification of Authority for Signing Bids - Contracts.pdf","kind":"file","mime_type":".pdf","size_bytes":234774,"posted_at":"2025-05-14T17:43:54.333Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/aa69f2b018cf41b6aa549c4cfeef74a6/download","mirrored":false},{"resource_id":"3c43284557984996ac53ac071c6c3fad","name":"191BWC25B0003.pdf","kind":"file","mime_type":".pdf","size_bytes":488461,"posted_at":"2025-05-15T16:54:23.321Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3c43284557984996ac53ac071c6c3fad/download","mirrored":false},{"resource_id":"94c54f3658b44b148572df346c446055","name":"191BWC25B0003 0001.pdf","kind":"file","mime_type":".pdf","size_bytes":674790,"posted_at":"2025-06-10T21:58:54.398Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/94c54f3658b44b148572df346c446055/download","mirrored":false},{"resource_id":"b9a4c49385b34e26900a516230e8606d","name":"191BWC25B0003_Penstock_5_Specs_20250624.pdf","kind":"file","mime_type":".pdf","size_bytes":3133881,"posted_at":"2025-06-25T17:17:55.705Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b9a4c49385b34e26900a516230e8606d/download","mirrored":false},{"resource_id":"82bc9116a584499c80fe19733ed15b64","name":"191BWC25B0003 0002.pdf","kind":"file","mime_type":".pdf","size_bytes":438237,"posted_at":"2025-06-25T17:17:55.705Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/82bc9116a584499c80fe19733ed15b64/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_191BWC25C0088_19BM_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_191BWC25C0088_19BM_-NONE-_-NONE-/","piid":"191BWC25C0088","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"EJUMYCUW6RE5","recipient_name":"TEXAS ELECTRICAL & TESTING SERVICES LLC","recipient_uei":"EJUMYCUW6RE5","recipient_cage":"7W8N4","recipient_city":"UVALDE","recipient_state":"TX","sub_name":"International Boundary and Water Commission: U.S.-Mexico","office_name":"INTL BOUNDARY WATER COMM US MEX","office_key":"o-191BWC","first_action_date":"2025-09-29","last_action_date":"2026-11-16","actions":3,"obligated":"2589000.00","current_total_value":"2589000.00","potential_total_value":"2589000.00","naics":"237990","psc":"C1PZ","extent_competed":"FULL AND OPEN COMPETITION","set_aside":"NO SET ASIDE USED.","offers_received":1,"description":"AMISTAD RESERVOIR AND DAM REPLACEMENT OF PENSTOCK #5","method":"solicitation","confidence":"high","evidence":["solicitation number 191BWC25B0003 equals the FPDS solicitation identifier","same sub-agency 19BM"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"191BWC26R0009","latest_notice_id":"81a87121377844a0af705b7a60af1e31","title":"Operations and Maintenance (O&M) Services for the SBIWTP","solicitation_number":"191BWC26R0009","notice_type":"o","first_type":"o","first_posted":"2026-09-25","last_posted":"2026-11-18","notices":4,"due_at":"2027-01-06T21:00:00Z","due_date":"2027-01-06","closes_at":"2027-01-06T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-019","dept_name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","sub_key":"s-19BM","sub_name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","office_key":"o-199401","office_name":"INTERNAT. BOUNDARY AND WATER COMM.","naics":"221320","psc":"M1ND","set_aside":null,"state":"CA","county":"06073","county_name":"San Diego County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"}],"similar_open":[{"key":"W912HY27RA001","latest_notice_id":"2145e5cdeca0404db67d1f6c12adf421","title":"Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou","solicitation_number":"W912HY27RA001","notice_type":"o","first_type":"p","first_posted":"2026-09-24","last_posted":"2026-11-20","notices":7,"due_at":"2026-12-01T20:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","naics":"237990","psc":"Y1KF","set_aside":null,"state":"TX","county":null,"county_name":null,"city":"4835000","city_name":"Houston","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"W912HY26S1AX4","latest_notice_id":"2d6854a966894dcfa100ac6821550aa9","title":"FY26 Harlingen Placement Area (PA)13 and 10 Improvements","solicitation_number":"W912HY-26-S-1AX4","notice_type":"r","first_type":"r","first_posted":"2025-12-03","last_posted":"2025-12-03","notices":1,"due_at":"2026-12-17T16:00:00Z","due_date":"2026-12-17","closes_at":"2026-12-17T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","naics":"237990","psc":"Z1KF","set_aside":null,"state":"TX","county":"48061","county_name":"Cameron County","city":"4832372","city_name":"Harlingen","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"},{"key":"FA890327OT001","latest_notice_id":"75e5efdecd5e4638857b6e7828ade272","title":"MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure","solicitation_number":"FA8903-27-OT-001","notice_type":"p","first_type":"p","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2027-01-15T16:00:00Z","due_date":"2027-01-15","closes_at":"2027-01-15T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA8903","office_name":"FA8903 772 ESS PK","naics":"237990","psc":"Y1BD","set_aside":null,"state":"TX","county":"48029","county_name":"Bexar County","city":"4865000","city_name":"San Antonio","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open_total":144,"indexable":false}