Combined synopsis and solicitation
MSHA Altair Gas Monitors
1605C4-26-Q-00018
Office of the Assistant Secretary for Administration and Management, Dol - Cas Division 4 Procurement. Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables.
Response deadline
February 18, 2026 at 9:00 AM EST
Closed 281 days ago. Posted February 13, 2026. Scheduled to archive March 5, 2026.
Get the next one like this from Office of the Assistant Secretary for Administration and Management by email, the day it is posted.Find my opportunities
This one closed in 2026
30 like it are open now in instruments and related products manufacturing for measuring, displaying, and controlling industrial process variables
- RFI Process control system plumbing and programming
Department of the Army, W6QK ACC-APG Natick
Sources soughtNAICS 334513Natick, MARFIProcessControlSystemPlumbingAndProgrammingDue todayNov 26 - 19020-NEW/CHROMA MULTI-CHANNEL HIPOT TESTER
Department of the Navy, NSWC Crane
Combined synopsis and solicitationNAICS 334513Ship to Crane, INN0016427Q0029Due tomorrowNov 27 - T2 Test Chamber
Department of the Navy, Naval Air Warfare Center
Combined synopsis and solicitationSmall businessNAICS 334513Ship to the buyerN6893627Q0019Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 334513 (instruments and related products manufacturing for measuring, displaying, and controlling industrial process variables), means no more than 750 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 5 days from the day the solicitation was posted, February 13, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Working in a coal mine subjects personnel to a harsh environment where the average mine height is approximately 42 inches, there is no light, the surfaces are wet and slippery, and the average temperature is approximately 55 degrees. The environment may contain methane and other harmful gasses. Mine Safety and Health Administration (MSHA) must be prepared to monitor the working environment of the mines in order to determine if the concentration of harmful or noxious gasses is being effectively controlled by the measures utilized by the mine operator. The unit used to measure these gasses underground must be MSHA approved as intrinsically safe. Daily “bump testing” using a calibration station is required to ensure the unit is properly calibrated.
Moreover, space and weight concerns are of paramount importance to MSHA inspectors. MSHA inspectors frequently need to work in very tight spaces, many of which are less than 30 inches in height. MSHA inspectors need to carry a significant amount of equipment, often weighing as much as 45 pounds. As a result, smaller, lighter equipment lessens the load that inspectors need to carry. This is not just a question of comfort but of safety.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- A19 - 1605C4-26-Q-00018-Sol.pdf312 KB, February 13, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 13, 2026
Combined synopsis and solicitation
Due February 18, 2026 at 9:00 AM EST. SAM.gov, notice 3f9e63db99184f808193650e60cfa87c
2 revisions on SAM
- February 21, 2026: publish, combined synopsis and solicitation
- February 13, 2026: publish, combined synopsis and solicitation
Points of contact
- Alicia Jacksonjackson.alicia.m@dol.gov
- Michael V. Whiddonwhiddon.michael.v@dol.gov