Solicitation
FCI Jesup Water Mian Tie-in 23Z3AH7
15BBNF26Q00000012
Federal Prison System / Bureau of Prisons, Fao. Water and Sewer Line and Related Structures Construction.
Response deadline
January 13, 2026 at 3:00 PM EST
Closed 316 days ago. Posted December 12, 2025. Scheduled to archive January 28, 2026.
Get the next one like this from Federal Prison System / Bureau of Prisons by email, the day it is posted.Find my opportunities
This one closed in 2026
25 like it are open now in water and sewer line and related structures construction
- HAVO 326181 Rehabilitate Rainshed&Water Treatment
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237110Hawaii140P2026R0091Due in 3 daysNov 28 - New Meadows Range Barn
Forest Service, Payette National Forest
Combined synopsis and solicitationSmall businessNAICS 237110Idaho1240LT27Q0027Due in 4 daysNov 29 - Kelly Pierson OSS
Indian Health Service, Div of Engineering SVCS - Seattle
Combined synopsis and solicitationSmall businessNAICS 237110Shelton, WA75H70127Q00001Due in 5 daysNov 30
All 25 open in water and sewer line and related structures construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237110 (water and sewer line and related structures construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 32 days from the day the solicitation was posted, December 12, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Federal Bureau of Prisons (FBOP), FCI Jesup, is a federal correctional facility located at 2600 Highway 301 South, Jesup, GA 31599. The FBOP intends to award to a responsible entity for the provision of all labor, materials, and equipment necessary for tapping into the existing 12" Ductile Iron Water Main, reducing it to 6" pipe, to supply water to the new water softener system. Work includes excavating around an existing check valve vault to expose the 12-inch ductile iron water main, installing 12-inch valve onto the upstream side of the check valve, installing tie-ins for a 6-inch supply and a return on the 12-inch water main underground, penetrating through the metal building wall, and install a 6-inch line to the existing water softener system. See SOW and drawings for further details. All work must comply with local, state, and federal regulations. Full and Open Competition, no set-aside. Evaluation factors; Lowest Price Technically Acceptable (LPTA) and past performance. A Pre-Bid site visit will take place at FCI Jesup on Tuesday, January 6, 2026, at 9:00 am EST.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- RFQ 15BBNF26Q00000012 23Z3AH7 FCI JESUP 23Z3AH7.pdf656 KB, December 12, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
December 12, 2025
Solicitation
Due January 13, 2026 at 3:00 PM EST. SAM.gov, notice e28903a67d014594aa295ccd2f10215f
1 revision on SAM
- December 12, 2025: publish, solicitation
Points of contact
- Steven Dennisonsdennison@bop.gov7197845744