Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,689 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Award notice, first published as presolicitation

Replace Roofing Staff Housing - FCI Safford

15B60924Q00000008

Federal Prison System / Bureau of Prisons, Fci Safford. Roofing Contractors.

Awarded

Aztech Contracting LLC

$95,904.00 obligated so far on USAspending

Get the next one like this from Federal Prison System / Bureau of Prisons by email, the day it is posted.Find my opportunities

This one was awarded in 2024

10 like it are open now in roofing contractors

All 10 open in roofing contractors

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Award notice. Who won, when, and for how much. Glossary
Time to respond
Bidders had 40 days from the day the solicitation was posted, June 26, 2024, to the deadline. The deadline moved 3 times: it was first June 22, 2024 and ended as August 5, 2024.
Before the solicitation
The agency published a presolicitation on June 7, 2024, 19 days before the solicitation.
How it ended
Awarded to Aztech Contracting LLC on August 6, 2024, 1 day after offers were due. The contracting office reported 2 offers (competed under simplified acquisition procedures).

Description

As published on SAM.gov with the combined synopsis and solicitation of July 31, 2024.

1. FLAT ROOF SECTION: The contractor shall be responsible for the removal and haul away of the existing flat rolled roofing, roof decking, fascia, shingle mold, drip edge, and rain gutters on the flat section located on the back of the staff housing complex. A new conventional framed sloped roof will need to be constructed to have a slope equal to or greater than 3:12 pitch to meet shingle manufactures specifications.

The existing rafters will not be removed but the new rafters attached to the existing with any alterations that may be required. The rafters will need to be long enough to make the new soffit 16 inches past the exterior wall. This new section of constructed roof will be required to have ½ plywood decking or OSB with plywood clips and required fasteners.

The contractor will be required to install new synthetic underlayment, sub fascia (traditional lumber), fascia (5/4” LP Smartside engineered wood trim), soffit (LP Smartside plywood panels), shingle mold (1x2 pine), metal drip edge (2”x2”), 30yr Owens Corning asphalt architectural shingles (sierra gray in color), roof jacks, flashings, and rain gutters.

2. PITCHED TRUSS SECTION: The Contractor shall be responsible for the removal and haul away of the existing asphalt shingles, felt(underlayment), shingle mold, metal drip edge, rain gutters, flashings, soffit, fascia, and roof jacks on the entire trussed staff housing complex. A row of sheeting will need to be removed to extend truss tails or install outriggers to make the new soffit overhang 16 inches past the exterior wall.

Once that has been removed the contractor will be required to install new synthetic underlayment, sub fascia (traditional lumber), fascia (5/4” LP Smartside engineered wood trim), soffit (LP Smartside plywood panels), shingle mold (1x2 pine), metal drip edge (2”x2”), 30yr Owens Corning asphalt architectural shingles (sierra gray in color), roof jacks, flashings, and rain gutters.

3. Housing will be occupied during construction. All construction activities must be conducted so that housing areas are protected from weather, and that staff living there are minimally impacted by construction.

4. The contractor shall be responsible for caulking, filling holes, priming, and painting all fascia, soffit, and drip edge on the staff housing complex.

5. Required sealant around all penetrations before roof is complete.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
U9BTPL48WN13
CAGE
882Z9
Vendor location
Thatcher, AZ
Contract
15B60924C00000086, definitive contract
Obligated
$95,904.00
Actions
3 between August 6, 2024 and November 18, 2024
Competition
Competed Under SAP, 2 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
Replace Roofing for Staff Housing at Fci Safford
Match
award number 15B60924C00000086 equals the contract number; same awarding office 15B609 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 7, 2024

    Presolicitation

    Due June 22, 2024 at 2:00 PM EDT. SAM.gov, notice 1513a3d4bc9f4df5944eee7897e41de8

  2. June 26, 2024

    Combined synopsis and solicitation, originally presolicitation

    Due July 26, 2024 at 4:00 PM EDT. SAM.gov, notice 6a324500f87d431898ba64dfa411a5bd

  3. June 28, 2024

    Combined synopsis and solicitation

    Due July 29, 2024 at 4:00 PM EDT. SAM.gov, notice 5c905b00d4574eccb87685d3c9964b25

  4. July 24, 2024

    Combined synopsis and solicitation

    Due August 5, 2024 at 4:00 PM EDT. SAM.gov, notice e75819ecbada4340bdab6b57ece4d929

  5. July 31, 2024

    Combined synopsis and solicitation

    Due August 5, 2024 at 4:00 PM EDT. SAM.gov, notice 6833c39db99147b29b897596756dbb4c

  6. August 22, 2024

    Award notice, originally combined synopsis and solicitation

    Awarded to AZTECH CONTRACTING LLC Thatcher for $95,904. SAM.gov, notice eb347e1879014595ab8b11144fa9cc30

Points of contact