{"canonical":"https://sealedbidder.com/opportunities/15b12125q00000008","key":"15B12125Q00000008","url":"https://sealedbidder.com/opportunities/15b12125q00000008","title":"FCC HAZELTON, FY25 SFF HOT WATER TANKS (PRODUCT ONLY)","solicitation_number":"15B12125Q00000008","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-02-03T19:00:00Z","first_posted":"2025-01-14","last_posted":"2025-02-10","department":"JUSTICE, DEPARTMENT OF","subagency":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office":"USP HAZELTON","naics":"238220","psc":"4520","set_aside":null,"place_state":"WV","place_scope":"nationwide","site":null,"place_state_source":null,"place_evidence":null,"place_county":"54077","place_county_name":"Preston County","place_city":"5410852","place_city_name":"Bruceton Mills","winner":"HOWLAND PUMP & SUPPLY CO INC","award_amount":"98080.00","publications":[{"notice_id":"0b0541371fda4111b9e01867cb3f9caa","title":"FCC HAZELTON, FY25 Water Heating System- PRODUCT ONLY","solicitation_number":"15B12125Q00000008","notice_type":"k","base_type":"k","posted":"2025-01-14","posted_at":"2025-01-14T17:34:35.284Z","due_at":"2025-02-03T19:00:00Z","due_date":"2025-02-03","cancelled":false,"archived":true,"archive_date":"2025-02-18","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0b0541371fda4111b9e01867cb3f9caa/view","enriched":true,"history":[{"index":3,"title":"FCC HAZELTON, FY25 Water Heating System- PRODUCT ONLY","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T17:34:35.284Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"0b0541371fda4111b9e01867cb3f9caa","solicitation_number":"15B12125Q00000008"}]},{"notice_id":"c0ada0584ad345fbad2c2ffe5e7e4fef","title":"FCC HAZELTON, FY25 SFF HOT WATER TANKS (PRODUCT ONLY)","solicitation_number":"15B12125Q00000008","notice_type":"a","base_type":"a","posted":"2025-02-10","posted_at":"2025-02-10T11:40:32.589Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-02-21","removed_at":null,"award_number":"15B12125P00000068","awardee_name":"HOWLAND PUMP & SUPPLY CO INC","amount":"98080.00","link_sam":"https://sam.gov/workspace/contract/opp/c0ada0584ad345fbad2c2ffe5e7e4fef/view","enriched":true,"history":[{"index":3,"title":"FCC HAZELTON, FY25 SFF HOT WATER TANKS (PRODUCT ONLY)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T11:40:32.589Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"c0ada0584ad345fbad2c2ffe5e7e4fef","solicitation_number":"15B12125Q00000008"}]}],"latest_notice_id":"c0ada0584ad345fbad2c2ffe5e7e4fef","first_type":"k","notices":[{"dates":{"posted":"2025-01-14","posted_at":"2025-01-14T17:34:35.284Z","created_at":"2025-01-14T17:26:46.604Z","modified_at":"2025-02-19T04:55:44.523Z","response_deadline":{"raw":"2025-02-03T14:00:00-05:00","utc":"2025-02-03T19:00:00Z","date":"2025-02-03","time":"14:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/0b0541371fda4111b9e01867cb3f9caa/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"FCC HAZELTON, FY25 Water Heating System- PRODUCT ONLY","agency":{"office":{"code":"15B121","name":"USP HAZELTON"},"subtier":{"code":"1540","name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS"},"department":{"code":"015","name":"JUSTICE, DEPARTMENT OF"},"office_address":{"zip":"26525","city":"BRUCETON MILLS","state":"WV","country":"USA"},"organization_id":"500025457","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-02-18","archive_type":"auto15"},"history":[{"index":3,"title":"FCC HAZELTON, FY25 Water Heating System- PRODUCT ONLY","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T17:34:35.284Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"0b0541371fda4111b9e01867cb3f9caa","solicitation_number":"15B12125Q00000008"}],"contacts":[{"name":"Andrea Burke","role":"primary","email":"ax2burke@bop.gov","phone":"3043795295"},{"name":"Kelly Brown","role":"secondary","email":"k1roberts@bop.gov","phone":"3043795156"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"0b0541371fda4111b9e01867cb3f9caa","lineage_id":"0b0541371fda4111b9e01867cb3f9caa","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-25T03:28:49.370171850Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"49e45c0fb340602e07b78d7ebfd8abfd8b7e1e875cc38c33c94da9fc8de40cdd","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-25T03:28:49.370171850Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>FCC Hazelton requires a quantity of 4 each indirect plate and frame water heater plus 4 each pumps to accompany the water heaters. &nbsp;<strong>Vendors are required to have active SAM.Gov registration and to provide their UEI. A signed SF1449 must be submitted to be considered received.</strong>&nbsp;This requirement is for product ONLY. All quotes and bids are required to be submitted to Andrea Burke, Contract Specialist with FCC Hazelton at Ax2burke@bop.gov&nbsp; AND HAX-ProcurementProp-S@bop.gov. Quotes must be valid for at least 30 days after close of bids on February 3, 2025 at 2 PM EDT. Specific product requirements below and example spec sheets attached.</p>\n\n<p><u>Indirect Plate And Frame Water Heater: (4)</u></p>\n\n<p><strong>Dimensions cannot Exceed: 63&rdquo; Height Max; 22&rdquo; Width max; 61&rdquo; Base Length &ndash; MUST FIT THROUGH STANDARD 36&rdquo; door. Product should not exceed 1200 lbs &ndash; Lite Weight Preferred</strong></p>\n\n<p><strong>FEATURES:</strong></p>\n\n<p><strong>ASME DOUBLE WALL HEAT EXCHANGER&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</strong></p>\n\n<p>&bull; 316L Stainless Steel</p>\n\n<p>&bull; 150 psi Working Pressure</p>\n\n<p><strong>DIGITAL DISPLAY</strong></p>\n\n<p>&bull; DHW Set Point Range 90&deg;F to 180&deg;F</p>\n\n<p><strong>ADVANCED TEMPERATURE CONTROL</strong></p>\n\n<p><strong>MODULATING CONTROL VALVE</strong></p>\n\n<p><strong>SCALE REDUCING PUMP</strong></p>\n\n<p><strong>AUTOMATIC AIR VENT</strong></p>\n\n<p><strong>ASME TEMPERATURE &amp; PRESSURE RELIEF VALVE</strong></p>\n\n<p>&bull; 210&deg;F and 150 psi</p>\n\n<p><strong>ADJUSTABLE HIGH LIMIT</strong></p>\n\n<p><strong>WYE STRAINERS - DOMESTIC PIPING AND</strong></p>\n\n<p><strong>BOILER PIPING</strong></p>\n\n<p><strong>ISOLATION VALVES - DOMESTIC PIPING&nbsp;AND BOILER PIPING</strong></p>\n\n<p><strong>MODBUS COMMUNICATION</strong></p>\n\n<p><strong>WARRANTY</strong></p>\n\n<p>&bull; 5-Year limited warranty/1-Year limited parts</p>\n\n<p>&bull; Warranty for product only without services requirement</p>\n\n<p><strong>SUGGESTED SPECIFICATION</strong></p>\n\n<p>The Indirect Plate and Frame shall be constructed of a 316 stainless steel plate with EPDM gaskets. Maximum unit dimensions shall be: Length ___<u>61</u>_inches, Width ___<u>22</u>___inches and Height __<u>63</u>______ inches.</p>\n\n<p>The Indirect Plate and Frame shall be a double wall. The plate and frame shall be constructed in accordance with the ASME Boiler and Pressure Vessel Code requirements, stamped and registered with the National Board of Boiler and Pressure Vessel Inspectors&nbsp;</p>\n\n<p>The Indirect Plate and Frame shall have a 150 psi working pressure and be supplied with an ASME temperature and pressure relief valve. Standard equipment shall include Wye Strainers, Isolation Valves, Automatic Air Vent, Scale Reduction Pump, Adjustable High Limit and drain valve</p>\n\n<p>The temperature control shall provide + or &ndash; 4 degrees Fahrenheit accuracy with up to a 50% change in load. Setpoint range between 90 and 180 F. Modbus communication shall be standard equipment. The modulating valve shall have a 1000 to 1 turndown. The Indirect Plate and Frame shall be suitable for use with polypropylene glycol, up to 50% concentration. The de-rate associated with the glycol will vary per glycol manufacturer.</p>\n\n<p><strong><u>Pump: (4) Specifications must meet all below requirements for pump withsystem control and monitoring key</u></strong></p>\n\n<p><strong>Conditions of Service</strong></p>\n\n<p>Flow: 130 US GPM</p>\n\n<p>Head: 32 ft</p>\n\n<p>Efficiency: 68.6 %</p>\n\n<p>Liquid: Water</p>\n\n<p>Temperature: 60 &deg;C</p>\n\n<p>NPSH required: ft</p>\n\n<p><strong>Pump Data</strong></p>\n\n<p>Specific Gravity: 0.985</p>\n\n<p>Maximum operating pressure: 12 bar</p>\n\n<p>Liquid temperature range: -10 .. 110 &deg;C</p>\n\n<p>Maximum ambient temperature: 40 &deg;C</p>\n\n<p>Flange standard: GF</p>\n\n<p>Pipe connection: GF65</p>\n\n<p>Product number: On request</p>\n\n<p><strong>Motor Data</strong></p>\n\n<p>P1 max: 29 .. 1385 W</p>\n\n<p>Mains frequency: 60 Hz</p>\n\n<p>Enclosure class: X4D</p>\n\n<p>Insulation class: F</p>\n\n<p>Four (4) - Set flanges (2 per set) for line item 0001 tanks<br />\nB&amp;G CAST IRON FLANGE PACK, 2&quot; or equivalent</p>\n\n<p></p>\n\n<p>ADDITIONAL INFORMATION: Domestic inlet temp Set point. DHW set point 90 to 180 degrees. GPH for all units together or for each if separated. GPH is for each unit. Each system will supply at minimum hot water to 64-cells, 10-showers, 2-mop closet and 1-staff restroom. Boiler water entering temp 160-180 degrees. Boiler water Leaving temp 120-140 degrees BTU I am looking for specifics on this. -These units are in use 24/7-365 if that helps.</p>\n\n<p>For singled cell showers, 10 to be used at a time with a maximum of up to 128.</p>","text":"FCC Hazelton requires a quantity of 4 each indirect plate and frame water heater plus 4 each pumps to accompany the water heaters. Vendors are required to have active SAM.Gov registration and to provide their UEI. A signed SF1449 must be submitted to be considered received. This requirement is for product ONLY. All quotes and bids are required to be submitted to Andrea Burke, Contract Specialist with FCC Hazelton at Ax2burke@bop.gov AND HAX-ProcurementProp-S@bop.gov. Quotes must be valid for at least 30 days after close of bids on February 3, 2025 at 2 PM EDT. Specific product requirements below and example spec sheets attached.\n\nIndirect Plate And Frame Water Heater: (4)\n\nDimensions cannot Exceed: 63” Height Max; 22” Width max; 61” Base Length – MUST FIT THROUGH STANDARD 36” door. Product should not exceed 1200 lbs – Lite Weight Preferred\n\nFEATURES:\n\nASME DOUBLE WALL HEAT EXCHANGER\n\n• 316L Stainless Steel\n\n• 150 psi Working Pressure\n\nDIGITAL DISPLAY\n\n• DHW Set Point Range 90°F to 180°F\n\nADVANCED TEMPERATURE CONTROL\n\nMODULATING CONTROL VALVE\n\nSCALE REDUCING PUMP\n\nAUTOMATIC AIR VENT\n\nASME TEMPERATURE & PRESSURE RELIEF VALVE\n\n• 210°F and 150 psi\n\nADJUSTABLE HIGH LIMIT\n\nWYE STRAINERS - DOMESTIC PIPING AND\n\nBOILER PIPING\n\nISOLATION VALVES - DOMESTIC PIPING AND BOILER PIPING\n\nMODBUS COMMUNICATION\n\nWARRANTY\n\n• 5-Year limited warranty/1-Year limited parts\n\n• Warranty for product only without services requirement\n\nSUGGESTED SPECIFICATION\n\nThe Indirect Plate and Frame shall be constructed of a 316 stainless steel plate with EPDM gaskets. Maximum unit dimensions shall be: Length ___61_inches, Width ___22___inches and Height __63______ inches.\n\nThe Indirect Plate and Frame shall be a double wall. The plate and frame shall be constructed in accordance with the ASME Boiler and Pressure Vessel Code requirements, stamped and registered with the National Board of Boiler and Pressure Vessel Inspectors\n\nThe Indirect Plate and Frame shall have a 150 psi working pressure and be supplied with an ASME temperature and pressure relief valve. Standard equipment shall include Wye Strainers, Isolation Valves, Automatic Air Vent, Scale Reduction Pump, Adjustable High Limit and drain valve\n\nThe temperature control shall provide + or – 4 degrees Fahrenheit accuracy with up to a 50% change in load. Setpoint range between 90 and 180 F. Modbus communication shall be standard equipment. The modulating valve shall have a 1000 to 1 turndown. The Indirect Plate and Frame shall be suitable for use with polypropylene glycol, up to 50% concentration. The de-rate associated with the glycol will vary per glycol manufacturer.\n\nPump: (4) Specifications must meet all below requirements for pump withsystem control and monitoring key\n\nConditions of Service\n\nFlow: 130 US GPM\n\nHead: 32 ft\n\nEfficiency: 68.6 %\n\nLiquid: Water\n\nTemperature: 60 °C\n\nNPSH required: ft\n\nPump Data\n\nSpecific Gravity: 0.985\n\nMaximum operating pressure: 12 bar\n\nLiquid temperature range: -10 .. 110 °C\n\nMaximum ambient temperature: 40 °C\n\nFlange standard: GF\n\nPipe connection: GF65\n\nProduct number: On request\n\nMotor Data\n\nP1 max: 29 .. 1385 W\n\nMains frequency: 60 Hz\n\nEnclosure class: X4D\n\nInsulation class: F\n\nFour (4) - Set flanges (2 per set) for line item 0001 tanks\n\nB&G CAST IRON FLANGE PACK, 2\" or equivalent\n\nADDITIONAL INFORMATION: Domestic inlet temp Set point. DHW set point 90 to 180 degrees. GPH for all units together or for each if separated. GPH is for each unit. Each system will supply at minimum hot water to 64-cells, 10-showers, 2-mop closet and 1-staff restroom. Boiler water entering temp 160-180 degrees. Boiler water Leaving temp 120-140 degrees BTU I am looking for specifics on this. -These units are in use 24/7-365 if that helps.\n\nFor singled cell showers, 10 to be used at a time with a maximum of up to 128.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"15B12125Q00000008","place_of_performance":{"zip":"26525","city":{"code":"10852","name":"Bruceton Mills"},"state":{"code":"WV","name":"West Virginia"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"4520"},{"award":{"date":"2025-02-06","amount":"98080.00","number":"15B12125P00000068","awardee":{"raw":"HOWLAND PUMP & SUPPLY CO INC Ogdensburg NY 13669 USA","uei":"M9BRDJBZ7AM4","cage":"1J3U9","name":"HOWLAND PUMP & SUPPLY CO INC","location":{"zip":"13669","city":{"code":"54485","name":"Ogdensburg"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2025-02-10","posted_at":"2025-02-10T11:40:32.589Z","award_date":"2025-02-06","created_at":"2025-02-04T15:18:14.622Z","modified_at":"2025-02-22T04:55:43.509Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/c0ada0584ad345fbad2c2ffe5e7e4fef/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"FCC HAZELTON, FY25 SFF HOT WATER TANKS (PRODUCT ONLY)","agency":{"office":{"code":"15B121","name":"USP HAZELTON"},"subtier":{"code":"1540","name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS"},"department":{"code":"015","name":"JUSTICE, DEPARTMENT OF"},"office_address":{"zip":"26525","city":"BRUCETON MILLS","state":"WV","country":"USA"},"organization_id":"500025457","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-02-21","archive_type":"auto15"},"history":[{"index":3,"title":"FCC HAZELTON, FY25 SFF HOT WATER TANKS (PRODUCT ONLY)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-02-10T11:40:32.589Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"c0ada0584ad345fbad2c2ffe5e7e4fef","solicitation_number":"15B12125Q00000008"}],"contacts":[{"name":"Andrea Burke","role":"primary","email":"ax2burke@bop.gov","phone":"3043795295"}],"base_type":{"code":"a","label":"Award Notice"},"notice_id":"c0ada0584ad345fbad2c2ffe5e7e4fef","lineage_id":"c0ada0584ad345fbad2c2ffe5e7e4fef","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-23T01:33:31.376453121Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"af7d93f41a422589bac9551d40728d445039c3e844b2407911591c2359bcca57","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-23T01:33:31.376453121Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"15B12125Q00000008","place_of_performance":{"zip":"26525","city":{"code":"10852","name":"Bruceton Mills"},"state":{"code":"WV","name":"West Virginia"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"4520"}],"due_at":"2025-02-03T19:00:00Z","due_date":"2025-02-03","closes_at":"2025-02-03T19:00:00Z","awardable":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1540","sub_name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office_key":"o-15B121","office_name":"USP HAZELTON","state":"WV","county":"54077","county_name":"Preston County","city":"5410852","city_name":"Bruceton Mills","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"M9BRDJBZ7AM4","amount":"98080.00","linked_awards":2,"cancelled":false,"archived":true,"updated_at":"2026-11-23T02:25:26.440577Z","principal_notice_id":"0b0541371fda4111b9e01867cb3f9caa","description":{"text":"FCC Hazelton requires a quantity of 4 each indirect plate and frame water heater plus 4 each pumps to accompany the water heaters. Vendors are required to have active SAM.Gov registration and to provide their UEI. A signed SF1449 must be submitted to be considered received. This requirement is for product ONLY. All quotes and bids are required to be submitted to Andrea Burke, Contract Specialist with FCC Hazelton at Ax2burke@bop.gov AND HAX-ProcurementProp-S@bop.gov. Quotes must be valid for at least 30 days after close of bids on February 3, 2025 at 2 PM EDT. Specific product requirements below and example spec sheets attached.\n\nIndirect Plate And Frame Water Heater: (4)\n\nDimensions cannot Exceed: 63” Height Max; 22” Width max; 61” Base Length – MUST FIT THROUGH STANDARD 36” door. Product should not exceed 1200 lbs – Lite Weight Preferred\n\nFEATURES:\n\nASME DOUBLE WALL HEAT EXCHANGER\n\n• 316L Stainless Steel\n\n• 150 psi Working Pressure\n\nDIGITAL DISPLAY\n\n• DHW Set Point Range 90°F to 180°F\n\nADVANCED TEMPERATURE CONTROL\n\nMODULATING CONTROL VALVE\n\nSCALE REDUCING PUMP\n\nAUTOMATIC AIR VENT\n\nASME TEMPERATURE & PRESSURE RELIEF VALVE\n\n• 210°F and 150 psi\n\nADJUSTABLE HIGH LIMIT\n\nWYE STRAINERS - DOMESTIC PIPING AND\n\nBOILER PIPING\n\nISOLATION VALVES - DOMESTIC PIPING AND BOILER PIPING\n\nMODBUS COMMUNICATION\n\nWARRANTY\n\n• 5-Year limited warranty/1-Year limited parts\n\n• Warranty for product only without services requirement\n\nSUGGESTED SPECIFICATION\n\nThe Indirect Plate and Frame shall be constructed of a 316 stainless steel plate with EPDM gaskets. Maximum unit dimensions shall be: Length ___61_inches, Width ___22___inches and Height __63______ inches.\n\nThe Indirect Plate and Frame shall be a double wall. The plate and frame shall be constructed in accordance with the ASME Boiler and Pressure Vessel Code requirements, stamped and registered with the National Board of Boiler and Pressure Vessel Inspectors\n\nThe Indirect Plate and Frame shall have a 150 psi working pressure and be supplied with an ASME temperature and pressure relief valve. Standard equipment shall include Wye Strainers, Isolation Valves, Automatic Air Vent, Scale Reduction Pump, Adjustable High Limit and drain valve\n\nThe temperature control shall provide + or – 4 degrees Fahrenheit accuracy with up to a 50% change in load. Setpoint range between 90 and 180 F. Modbus communication shall be standard equipment. The modulating valve shall have a 1000 to 1 turndown. The Indirect Plate and Frame shall be suitable for use with polypropylene glycol, up to 50% concentration. The de-rate associated with the glycol will vary per glycol manufacturer.\n\nPump: (4) Specifications must meet all below requirements for pump withsystem control and monitoring key\n\nConditions of Service\n\nFlow: 130 US GPM\n\nHead: 32 ft\n\nEfficiency: 68.6 %\n\nLiquid: Water\n\nTemperature: 60 °C\n\nNPSH required: ft\n\nPump Data\n\nSpecific Gravity: 0.985\n\nMaximum operating pressure: 12 bar\n\nLiquid temperature range: -10 .. 110 °C\n\nMaximum ambient temperature: 40 °C\n\nFlange standard: GF\n\nPipe connection: GF65\n\nProduct number: On request\n\nMotor Data\n\nP1 max: 29 .. 1385 W\n\nMains frequency: 60 Hz\n\nEnclosure class: X4D\n\nInsulation class: F\n\nFour (4) - Set flanges (2 per set) for line item 0001 tanks\n\nB&G CAST IRON FLANGE PACK, 2\" or equivalent\n\nADDITIONAL INFORMATION: Domestic inlet temp Set point. DHW set point 90 to 180 degrees. GPH for all units together or for each if separated. GPH is for each unit. Each system will supply at minimum hot water to 64-cells, 10-showers, 2-mop closet and 1-staff restroom. Boiler water entering temp 160-180 degrees. Boiler water Leaving temp 120-140 degrees BTU I am looking for specifics on this. -These units are in use 24/7-365 if that helps.\n\nFor singled cell showers, 10 to be used at a time with a maximum of up to 128.","html":"<p>FCC Hazelton requires a quantity of 4 each indirect plate and frame water heater plus 4 each pumps to accompany the water heaters. &nbsp;<strong>Vendors are required to have active SAM.Gov registration and to provide their UEI. A signed SF1449 must be submitted to be considered received.</strong>&nbsp;This requirement is for product ONLY. All quotes and bids are required to be submitted to Andrea Burke, Contract Specialist with FCC Hazelton at Ax2burke@bop.gov&nbsp; AND HAX-ProcurementProp-S@bop.gov. Quotes must be valid for at least 30 days after close of bids on February 3, 2025 at 2 PM EDT. Specific product requirements below and example spec sheets attached.</p>\n\n<p><u>Indirect Plate And Frame Water Heater: (4)</u></p>\n\n<p><strong>Dimensions cannot Exceed: 63&rdquo; Height Max; 22&rdquo; Width max; 61&rdquo; Base Length &ndash; MUST FIT THROUGH STANDARD 36&rdquo; door. Product should not exceed 1200 lbs &ndash; Lite Weight Preferred</strong></p>\n\n<p><strong>FEATURES:</strong></p>\n\n<p><strong>ASME DOUBLE WALL HEAT EXCHANGER&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</strong></p>\n\n<p>&bull; 316L Stainless Steel</p>\n\n<p>&bull; 150 psi Working Pressure</p>\n\n<p><strong>DIGITAL DISPLAY</strong></p>\n\n<p>&bull; DHW Set Point Range 90&deg;F to 180&deg;F</p>\n\n<p><strong>ADVANCED TEMPERATURE CONTROL</strong></p>\n\n<p><strong>MODULATING CONTROL VALVE</strong></p>\n\n<p><strong>SCALE REDUCING PUMP</strong></p>\n\n<p><strong>AUTOMATIC AIR VENT</strong></p>\n\n<p><strong>ASME TEMPERATURE &amp; PRESSURE RELIEF VALVE</strong></p>\n\n<p>&bull; 210&deg;F and 150 psi</p>\n\n<p><strong>ADJUSTABLE HIGH LIMIT</strong></p>\n\n<p><strong>WYE STRAINERS - DOMESTIC PIPING AND</strong></p>\n\n<p><strong>BOILER PIPING</strong></p>\n\n<p><strong>ISOLATION VALVES - DOMESTIC PIPING&nbsp;AND BOILER PIPING</strong></p>\n\n<p><strong>MODBUS COMMUNICATION</strong></p>\n\n<p><strong>WARRANTY</strong></p>\n\n<p>&bull; 5-Year limited warranty/1-Year limited parts</p>\n\n<p>&bull; Warranty for product only without services requirement</p>\n\n<p><strong>SUGGESTED SPECIFICATION</strong></p>\n\n<p>The Indirect Plate and Frame shall be constructed of a 316 stainless steel plate with EPDM gaskets. Maximum unit dimensions shall be: Length ___<u>61</u>_inches, Width ___<u>22</u>___inches and Height __<u>63</u>______ inches.</p>\n\n<p>The Indirect Plate and Frame shall be a double wall. The plate and frame shall be constructed in accordance with the ASME Boiler and Pressure Vessel Code requirements, stamped and registered with the National Board of Boiler and Pressure Vessel Inspectors&nbsp;</p>\n\n<p>The Indirect Plate and Frame shall have a 150 psi working pressure and be supplied with an ASME temperature and pressure relief valve. Standard equipment shall include Wye Strainers, Isolation Valves, Automatic Air Vent, Scale Reduction Pump, Adjustable High Limit and drain valve</p>\n\n<p>The temperature control shall provide + or &ndash; 4 degrees Fahrenheit accuracy with up to a 50% change in load. Setpoint range between 90 and 180 F. Modbus communication shall be standard equipment. The modulating valve shall have a 1000 to 1 turndown. The Indirect Plate and Frame shall be suitable for use with polypropylene glycol, up to 50% concentration. The de-rate associated with the glycol will vary per glycol manufacturer.</p>\n\n<p><strong><u>Pump: (4) Specifications must meet all below requirements for pump withsystem control and monitoring key</u></strong></p>\n\n<p><strong>Conditions of Service</strong></p>\n\n<p>Flow: 130 US GPM</p>\n\n<p>Head: 32 ft</p>\n\n<p>Efficiency: 68.6 %</p>\n\n<p>Liquid: Water</p>\n\n<p>Temperature: 60 &deg;C</p>\n\n<p>NPSH required: ft</p>\n\n<p><strong>Pump Data</strong></p>\n\n<p>Specific Gravity: 0.985</p>\n\n<p>Maximum operating pressure: 12 bar</p>\n\n<p>Liquid temperature range: -10 .. 110 &deg;C</p>\n\n<p>Maximum ambient temperature: 40 &deg;C</p>\n\n<p>Flange standard: GF</p>\n\n<p>Pipe connection: GF65</p>\n\n<p>Product number: On request</p>\n\n<p><strong>Motor Data</strong></p>\n\n<p>P1 max: 29 .. 1385 W</p>\n\n<p>Mains frequency: 60 Hz</p>\n\n<p>Enclosure class: X4D</p>\n\n<p>Insulation class: F</p>\n\n<p>Four (4) - Set flanges (2 per set) for line item 0001 tanks<br />\nB&amp;G CAST IRON FLANGE PACK, 2&quot; or equivalent</p>\n\n<p></p>\n\n<p>ADDITIONAL INFORMATION: Domestic inlet temp Set point. DHW set point 90 to 180 degrees. GPH for all units together or for each if separated. GPH is for each unit. Each system will supply at minimum hot water to 64-cells, 10-showers, 2-mop closet and 1-staff restroom. Boiler water entering temp 160-180 degrees. Boiler water Leaving temp 120-140 degrees BTU I am looking for specifics on this. -These units are in use 24/7-365 if that helps.</p>\n\n<p>For singled cell showers, 10 to be used at a time with a maximum of up to 128.</p>","origin":"detail"},"contacts":[{"name":"Andrea Burke","role":"primary","email":"ax2burke@bop.gov","phone":"3043795295"}],"place_of_performance":{"zip":"26525","city":{"code":"10852","name":"Bruceton Mills"},"state":{"code":"WV","name":"West Virginia"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"26525","city":"BRUCETON MILLS","state":"WV","country":"USA"},"naics_codes":["238220"],"award":null,"attachments":[{"resource_id":"2846a0035b3d4581aa5888abe4dd28b3","name":"15B12125Q00000008 RFQ.pdf","kind":"file","mime_type":".pdf","size_bytes":394746,"posted_at":"2025-01-14T17:34:35.284Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2846a0035b3d4581aa5888abe4dd28b3/download","mirrored":false},{"resource_id":"cec9c1803f084e45bbbc1f3ca856a222","name":"HW Tank Specs.pdf","kind":"file","mime_type":".pdf","size_bytes":559567,"posted_at":"2025-01-14T17:34:35.284Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cec9c1803f084e45bbbc1f3ca856a222/download","mirrored":false},{"resource_id":"1d9d63f3ee9a45af91419d0ba618f38c","name":"Pump Specs.pdf","kind":"file","mime_type":".pdf","size_bytes":621543,"posted_at":"2025-01-14T17:34:35.284Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1d9d63f3ee9a45af91419d0ba618f38c/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_15B12125P00000068_1540_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_15B12125P00000068_1540_-NONE-_-NONE-/","piid":"15B12125P00000068","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"M9BRDJBZ7AM4","recipient_name":"HOWLAND PUMP & SUPPLY CO INC","recipient_uei":"M9BRDJBZ7AM4","recipient_cage":"1J3U9","recipient_city":"OGDENSBURG","recipient_state":"NY","sub_name":"Federal Prison System / Bureau of Prisons","office_name":"USP HAZELTON","office_key":"o-15B121","first_action_date":"2025-02-10","last_action_date":"2025-02-10","actions":1,"obligated":"98080.00","current_total_value":"98080.00","potential_total_value":"98080.00","naics":"238220","psc":"4520","extent_competed":"COMPETED UNDER SAP","set_aside":"NO SET ASIDE USED.","offers_received":5,"description":"FY25 PZ 25Z1AC3 REPLACE SFF UNIT HW HEATERS","method":"piid","confidence":"high","evidence":["award number 15B12125P00000068 equals the contract number","same awarding office 15B121"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"15B12127Q00000007","latest_notice_id":"02a886f3907f4980a3a5fba5180ce7aa","title":"FCC HAZELTON FY27 Q2 SUBSISTENCE","solicitation_number":"15B12127Q00000007","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-12-01T17:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1540","sub_name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office_key":"o-15B121","office_name":"USP HAZELTON","naics":"311999","psc":"8945","set_aside":"SBA","state":"WV","county":"54077","county_name":"Preston County","city":"5410852","city_name":"Bruceton Mills","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"15B12127Q00000002","latest_notice_id":"6cba41853d2b48d3a7456fd2aa40e9ff","title":"FCC HAZELTON FY27 Q2 DAIRY","solicitation_number":"15B12127Q00000002","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-12-01T17:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1540","sub_name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office_key":"o-15B121","office_name":"USP HAZELTON","naics":"112120","psc":"8910","set_aside":null,"state":"WV","county":"54077","county_name":"Preston County","city":"5410852","city_name":"Bruceton Mills","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"15B12127Q00000003","latest_notice_id":"a7cd4a08c662414287f818d8286be2cb","title":"FCC HAZELTON FY27 Q2 EGGS","solicitation_number":"15B12127Q00000003","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-12-01T17:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1540","sub_name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office_key":"o-15B121","office_name":"USP HAZELTON","naics":"311999","psc":"8910","set_aside":"SBA","state":"WV","county":"54077","county_name":"Preston County","city":"5410852","city_name":"Bruceton Mills","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"15B12127Q00000001","latest_notice_id":"08d37a70d21d461c9a982ed3bb6e17dc","title":"FCC HAZELTON FY27 Q2 BREAD","solicitation_number":"15B12127Q00000001","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-12-01T17:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1540","sub_name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office_key":"o-15B121","office_name":"USP HAZELTON","naics":"311812","psc":"8920","set_aside":null,"state":"WV","county":"54077","county_name":"Preston County","city":"5410852","city_name":"Bruceton Mills","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"15B12127Q00000006","latest_notice_id":"00418f3b9e9440fd88c96063c8e4bd24","title":"FCC HAZELTON FY27 Q2 MEATS","solicitation_number":"15B12127Q00000006","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-12-01T17:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1540","sub_name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office_key":"o-15B121","office_name":"USP HAZELTON","naics":"311999","psc":"8905","set_aside":"SBA","state":"WV","county":"54077","county_name":"Preston County","city":"5410852","city_name":"Bruceton Mills","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open":[{"key":"36C26227Q0149","latest_notice_id":"99fd06e3089e4005bf945b21581e7d70","title":"J065--BRINE MAINTENANCE SVC - Base +4 OY ($0.00) [605] | POP: 01/01/2027 - 12/31/2031","solicitation_number":"36C26227Q0149","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"238220","psc":"J065","set_aside":"SDVOSBC","state":"CA","county":"06071","county_name":"San Bernardino County","city":"0642370","city_name":"Loma Linda","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T07:05:05.540398Z"},{"key":"IHS1532768","latest_notice_id":"a173f2538e054794af04e5aa126d48b4","title":"SOURCES SOUGHT NOTICE: Preventive Maintenance Services for Medical Gas and Vacuum Systems","solicitation_number":"IHS1532768","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-27T19:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-075","dept_name":"HEALTH AND HUMAN SERVICES, DEPARTMENT OF","sub_key":"s-7527","sub_name":"INDIAN HEALTH SERVICE","office_key":"o-75H710","office_name":"NAVAJO AREA INDIAN HEALTH SVC","naics":"238220","psc":"J045","set_aside":null,"state":"AZ","county":"04005","county_name":"Coconino County","city":"0474470","city_name":"Tonalea","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"30332Q270000002","latest_notice_id":"edb8b91a6c8d46b29652376b51dd3d21","title":"Remediation of storm damage to station multi-Purpose Bldg","solicitation_number":"30332Q270000002","notice_type":"k","first_type":"k","first_posted":"2026-11-18","last_posted":"2026-11-20","notices":3,"due_at":"2026-11-28T18:00:00Z","due_date":"2026-11-28","closes_at":"2026-11-28T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70ZL28","office_name":"BASE NEW ORLEANS","naics":"238220","psc":"Z2AZ","set_aside":"SBA","state":"AL","county":"01097","county_name":"Mobile County","city":"0119744","city_name":"Dauphin Island","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":59,"indexable":false}