Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,734 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation, total small business set-aside

Replace outdated tower cabs **Updated 31 July**

149FWTowerCabs

Department of the Army, W7N2 Uspfo Activity Txang 149. Fabricated Structural Metal Manufacturing.

Response deadline

August 13, 2025 at 9:00 AM EDT

Closed 469 days ago. Posted July 31, 2025, first published July 18, 2025. Scheduled to archive August 28, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

6 like it are open now in fabricated structural metal manufacturing

  • KNOB

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationNAICS 332312Ship to the buyerSPE7LX27U0754
    Due in 3 daysNov 27
  • BOLT,MACHINE

    Defense Logistics Agency, DLA Aviation

    Combined synopsis and solicitationSDVOSBNAICS 332312Ship to the buyerSPE4A627U0321
    Closes in 9 daysDec 3
  • Guatemala - Tactical Dock

    Department of State, U.S.Embassy Guatemala City

    SolicitationNAICS 332312Outside the US19GT5027Q0004
    Closes in 9 daysDec 4

All 6 open in fabricated structural metal manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 332312 (fabricated structural metal manufacturing), means no more than 500 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 26 days from the day the solicitation was posted, July 18, 2025, to the deadline. The deadline moved 2 times: it was first August 1, 2025 and ended as August 13, 2025.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

25 JULY 2025 UPDATES

-Amended and extended quote submission date, added Q&A below.

-SEE NEW ATTACHMENT FOR DEMENSIONS AND PICTURES

Q&A current as of 23 July 2025:

Good morning,

Below are the Q&A responses I have from all contractors thus far to include yours:

Contractor 1:

If selected, do we have to remove, demolish the existing tower cabs and provide installation of the new cabs or we just need to deliver the tower cabs?

If possible, can you please share any drawings or example pictures of the building so we can put together an accurate proposal.

Response: Complete project is removal of old tower cab and install of new cab. See Attached

Contractor 2:

1.                      There is a reference to drawings, 5.12 Unit to have five quadplex outlets and four duplex outlets. Outlets

are wall mounted and circuited as shown on the electric plan,

sheet 4 of 7.

  1. From below, I assume that this is a 10'x12' cab.

Two 12' walls to have two rows of 18" wide x 20 12" tall checkers, two 10' walls to have two rows of 17 18" wide x 20 12" checker

  1. I am guessing that this is a bombing range tower(s).  Are there typical Air Force or USACE specs that accompany? 

Are they required to conform to any DOD UFCs

  1. Hard to tell but is the45 degree glass referenced on the upper corner with 15 degree glass on vertical wall?

  1. Are you looking for a price for the cabs only fob Tilden TX and you install?

Responses:

Question 1- Electrical requirement for the cab are  5 quadplex outlets  that are wall mounted and a total of 4 single gang junction boxes feed from 75amp 120/240vac panel  with ground bus and 8 circuits.  Reference to sheet 4 of 7 is in error no reference are available.

Question 2- Yes paint scheme two tone checkered pattern with said dimensions

Question  3 -  Need more time to verify requirements if any

Question 4-  no

Question 5- Price will include demolition(removal) of old cab, new cab, transportation to sire in Tilden TX, and install of new cab atop of tower.  

END OF Q&A

________________________________________________________________________________________________

100% SMALL BUSINESS SET ASIDE

Award is made due to price and other factors delivery/install, and customer review of specifications

1. PURPOSE.  Replace outdated tower cabs by removing older cabs and installing the newly fabricated cabs in their places.

2. SCOPE OF WORK.  Includes all fabrication, demolition, transportation, and installation activities required to complete the upgrade efficiently and safely with minimal disruption to ongoing tower operations. This work will ensure improved structural integrity, safety, and functionality of the towers, while meeting current operational and regulatory standards.

3. DELIVERY LOCATION AND DELIVERY DATE.  These cabs shall be delivered to the Texas Air National Guard 149 Fighter Wing/DET-1 (Yankee Range), located at 2200 FM 624 W, Tilden, Texas 78072 (28.23906 N, 98.71525 W) not later than October 30, 2025. 

4. QUANTITY REQUIRED: 2 Tower Cabs   

Q&A 

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 18, 2025

    Solicitation

    Replace outdated tower cabs

    Due August 1, 2025 at 12:00 PM EDT. SAM.gov, notice 126ef304f3a14f2783f5db0acf26ad34

    3 revisions on SAM
    • July 31, 2025: publish, solicitation
    • July 23, 2025: publish, solicitation
    • July 18, 2025: publish, solicitation
  2. July 23, 2025

    Solicitation

    Replace outdated tower cabs **Updated 23 July**

    Due August 6, 2025 at 12:00 PM EDT. SAM.gov, notice de1c13b98a2442ce9dcb86c1036ecc14

    3 revisions on SAM
    • July 31, 2025: publish, solicitation
    • July 23, 2025: publish, solicitation
    • July 18, 2025: publish, solicitation
  3. July 31, 2025

    Solicitation

    Due August 13, 2025 at 9:00 AM EDT. SAM.gov, notice 89423f00f61349e29b0cccd6c8d0e698

    3 revisions on SAM
    • July 31, 2025: publish, solicitation
    • July 23, 2025: publish, solicitation
    • July 18, 2025: publish, solicitation

Points of contact